100% found this document useful (1 vote)
1K views1 page

Att - 2 Maintenance Check List Cobas E411 - 20022013

This document provides a maintenance checklist for a cobas e411 unit. It lists various parts that should be checked, cleaned, replaced, or adjusted on a regular schedule. Key components include the liquid flow path, various tubings and seals, filters, probes, tanks, valves, electronics, mechanics, and the measuring cell. The checklist indicates if maintenance is needed monthly, every 6 months, yearly, or only when replacing certain parts like the measuring cell.

Uploaded by

Mohand Elbakry
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
1K views1 page

Att - 2 Maintenance Check List Cobas E411 - 20022013

This document provides a maintenance checklist for a cobas e411 unit. It lists various parts that should be checked, cleaned, replaced, or adjusted on a regular schedule. Key components include the liquid flow path, various tubings and seals, filters, probes, tanks, valves, electronics, mechanics, and the measuring cell. The checklist indicates if maintenance is needed monthly, every 6 months, yearly, or only when replacing certain parts like the measuring cell.

Uploaded by

Mohand Elbakry
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Maintenance cobas e411 

SN:………………………………………….. Customer:…………………………………………

Date:………………………………………… FSR:……………………………………………….

Unit C R A T Remarks Done


Cover, Housing X
Chassis X
Liquid flow path
Tube BW for measuring cell X only in case of MC exchange
Tube BW for sipper X only in case of MC exchange
Tube B for sipper syringe X only in case of MC exchange
Pinch valve tubings X every 2 months or after
measuring 25,000 test/channel
whichever comes first
Seal piece P for S/R syringe X 2nd PM
Seal piece S for sipper syringe X 2nd PM
Tube 510 X 2nd PM
Tube 465 X 2nd PM
Nozzle seal pipetter X 2nd PM
Nozzle seal sipper X only in case of Tube B for sipper
exchange
Packings for syringes X 2nd PM
O-Ring SV1, SV2, SV5, SV6, SV7 X every 12 month
Filter MD 6 X
S/R probe X
Sipper probe X
DI water and waste tank X
Valve Body X every 12 month
Sipper Wash station X every 12 month
Waste Tubing Nr.3 Branch Block.. X
Service LFC X
Electronics
S/R - LLD X X
Sipper - LLD X X
Pressure sensor X X
Temperature unit
Detection Unit X 28°C
Incubator X 37°C
Reagent disk X 20°C
System Reagent X 28°C
Mechanics
Gripper finger X
Spring for Gripper finger X every 12 month
Light barriers X
Reagent disk, Barcodereader window X
Incubator X
Module (Fans, PCB's, Power X
Mixer paddle X
Mixer belt X
Mixer speed X X 2050rpm in air/ 2000rpm in liquid

Mechanism check X
Measuring Unit
Measuring cell X
Calibration Data Reset X Delete Lot calibrations
System Volume Check X only in case of MC exchange
PMT-HV Adjustment X only in case of MC exchange
Assay Performance Check X
Blank Cell Calibration X only in case of MC exchange
Miscellaneous X Check for latest modifications
X Backup data

C: Check/ Clean R: Replace A: Adjust T: To do

You might also like