As Per Actual Measurement of Tower A To e
As Per Actual Measurement of Tower A To e
Service FINISHING WORKS PACKAGE FOR GODREJ ARIA SEC-79,Gurgaon Period : Up to Jan. 2021
Bill To
Employer Wonder City Buildcon Pvt. Ltd.
Address 3rd floor, UM House, Plot No.35, Sector-44, Gurgaon-122002, Haryana, India
Employer GST No 06AABCW4346B1ZO
Employer PAN No AABCW4346B
State Code 06
State Haryana
B ADD Taxation
B1 Add Service Tax @ 9.8% on "A" 852,698 852,698
B2 Add SBC @ 0.35% On ''A'' 30,454 30,454
B3 Add KKC @ 0.35% On ''A'' 30,454 30,454
B4 Labour cess @ 1% on "A1" 2,209,729 11,429 2,221,159
B5 CGST @ 9% 19,104,473 102,864 19,207,338
B6 SGST @ 9% 19,104,473 102,864 19,207,338
B7 Adjustment of CGST @9% already paid with adhoc Bills 1,795,253 - 1,795,253
B8 Adjustment of SGST @9% already paid with adhoc Bills 1,795,253 - 1,795,253
B7 Adjustment of CGST @9% already paid with adhoc Bills (TDS with GST) 770,585 - 770,585
B8 Adjustment of CGST @9% already paid with adhoc Bills (TDS with GST) 770,585 - 770,585
B9 Adjustment of CGST @9% already paid with Secured Advance 3,495,528 - 3,495,528
B10 Adjustment of SGST @9% already paid with Secured Advance 3,495,528 - 3,495,528
Sub total - B (Gross Amount) [B1+B2+B3+B4+B5+B6-B7-B8-B9-B10] 29,209,549 217,158 29,426,707
C Amount after addition of Taxes [A+B] 250,182,478 1,360,096 251,542,574
D Recoveries
D1 Retention Money @5% on ''A'' 11,048,646 57,147 11,105,793
D2 Mobilization advance (Mobilization advance shall be
recovered on pro-Rata basis from RA Bills Commencing 12,356,295 - 12,356,295
from 3rd RA Bill.)
D3 TDS @ 2% on "A+B4-(B7+B8+D2+D6+D7)" 2,625,452 - 2,625,452
D4 TDS @ 1.5% on "A+B4-(B7+B8+D2+D6+D7) (Rev. slab as on 14-05-2020) 159,962 17,316 177,277
D5 WCT @ 5% on ''A'' 435,050 435,050
D6 Labour cess 1% on "A" 2,209,729 11,429 2,221,159
D7 Recovery of Adhoc Payment 19,947,251 19,947,251 upto 7th Adhoc
-
D8 Recovery of Adhoc Payment (TDS with GST) 8,562,056 - 8,562,056
D9 Recovery of Secured Advance 38,839,205 - 38,839,205 12th RA SA
D10 Hold For Quality 1,500,000 - 1,500,000
D11 HOLD Against snaging handover for 20 PLP Flats. (in 16th RA) 1,200,000 - 1,200,000
D12 Debit Amount Against DG Elecricity supply by GPL (22nd RA) 44,500 - 44,500
Sub total D 98,928,146 85,892 99,014,037
E Release Hold Amount (D9) 500,000 500,000 1,000,000
Release Hold Amount (D10) 1,200,000 - 1,200,000
F Amount Payable (C-D+E) 152,954,333 1,774,204 154,728,537
Net Payable Rupees Eighteen Lakhs Thirty Eight thousand Three Hundred and Seven Only/-
All on account payments made till date ,TDS etc as applicable shall be checked & verified by Account/Finance Deptt.prior to release
The AMOUNT CERTIFIED is payable to M/s- Jayant K. Furnishers Issuance, payment & acceptance of payment are without prejudice to any rights of the
Recommended by Employer or Contractor under this Contract. Approved by
JITENDRA
SHAHBAZ AHMAD AAMIR AZIZ GIRISH SINGH FINANCE
KUMAR
TAX INVOICE
Project : Godrej Aria Date 19-Feb-20
Project Address [Place of Sector-79, Naurangpur Village, Gurgaon,Haryana-122001
Service] RA Bill No. 24th RA
Service FINISHING WORKS PACKAGE FOR GODREJ ARIA SEC-79,Gurgaon Period Up to Jan. 2021
Bill To
Employer Wonder City Buildcon Pvt. Ltd.
Address 3rd floor, UM House, Plot No.35, Sector-44, Gurgaon-122002, Haryana, India
Employer GST No 06AABCW4346B1ZO
Employer PAN No AABCW4346B
State Code 06
State Haryana
B ADD Taxation
B1 Add Service Tax @ 9.8% on "A" 852,698 852,698
B2 Add SBC @ 0.35% On ''A'' 30,454 30,454
B3 Add KKC @ 0.35% On ''A'' 30,454 30,454
B4 Labour cess @ 1% on "A1" 2,209,729 11,429 2,221,159
B5 CGST @ 9% 19,104,473 102,864 19,207,338
B6 SGST @ 9% 19,104,473 102,864 19,207,338
B7 Adjustment of CGST @9% already paid with adhoc Bills 1,795,253 - 1,795,253
B8 Adjustment of SGST @9% already paid with adhoc Bills 1,795,253 - 1,795,253
B7 Adjustment of CGST @9% already paid with adhoc Bills (TDS with GST) 770,585 - 770,585
B8 Adjustment of CGST @9% already paid with adhoc Bills (TDS with GST) 770,585 - 770,585
B9 Adjustment of CGST @9% already paid with Secured Advance 3,495,528 - 3,495,528
B10 Adjustment of SGST @9% already paid with Secured Advance 3,495,528 - 3,495,528
Sub total - B (Gross Amount) [B1+B2+B3+B4+B5+B6-B7-B8-B9-B10] 29,209,549 217,158 29,426,707
C Amount after addition of Taxes [A+B] 250,182,478 1,360,096 251,542,574
D Recoveries
D1 Retention Money @5% on ''A'' 11,048,646 57,147 11,105,793
D2 Mobilization advance (Mobilization
advance shall be recovered on pro-Rata 12,356,295 - 12,356,295
basis from RA Bills Commencing from
D3 TDS @ Bill.)
3rd RA 2% on "A+B4-(B7+B8+D2+D6+D7)" 2,625,452 - 2,625,452
D4 TDS @ 1.5% on "A+B4-(B7+B8+D2+D6+D7) (Rev. slab as on 14-05-2020) 159,962 17,316 177,277
D5 WCT @ 5% on ''A'' 435,050 435,050
D6 Labour cess 1% on "A" 2,209,729 11,429 2,221,159
D7 Recovery of Adhoc Payment 19,947,251 19,947,251 upto 7th Adhoc
-
D8 Recovery of Adhoc Payment (TDS with GST) 8,562,056 - 8,562,056
D9 Recovery of Secured Advance 38,839,205 - 38,839,205 12th RA SA
D10 Hold For Quality 1,500,000 - 1,500,000
D11 HOLD Against snaging handover for 20 PLP Flats. 1,200,000 - 1,200,000
D12 Debit Amount Against DG Elecricity supply by GPL (22nd RA) 44,500 - 44,500
Sub total D 98,928,146 85,892 99,014,037
E Release Hold Amount (D9) 500,000 500,000 1,000,000
Release Hold Amount (D10) 1,200,000 - 1,200,000
F Amount Payable (C-D+E) 152,954,333 1,774,204 154,728,537
Net Payable Rupees Eighteen Lakhs Thirty Eight thousand Three Hundred and Seven Only/-
Debit Note
Sr.No Description Unit Rate Previous Paid Qty Actual Quantity Exceed Paid Qty Amount Remarks
2.6.2 Counter Stone Fixing- Toilets
Providing and laying machine cut pre-polished stone slab
in required size of approved quality in counters fixed over
19mm thick Marine ply supported with MS angle
frame with anchor fasteners including providing and
applying two or more coats of approved synthetic
enamel paint over a coat of primer including surface
2.6.2 preparation and including front fascia, verticals,
With
pointing18 towith
20mm thickwhite
tinted Prepolished
cement, Granite stone and
polishing, curing
joint to be filledall
etc. complete with
as white cement slurry
per drawings and asmixed with
per detailed
specifications,
pigment to match and
thejoints
shade neatly
of stonefinished withofwhite
(Basic rate
cement paste
prepolished (onemixed with matching
side) Granite pigmentinclusive
@ Rs. 118/Sqft to match
theallshade
of dutiesof stone making
excluding openings/
taxes F.O.R. site) holes for wash
a. basin, mixers, soap dispenser, ledge/ sorrounding of Sqm 5,983 162.59 55.800 -106.786 -638895.05
bath tub, back splash, facia, ledges of shower area
etc. as required including edge chamfering,
moulding, mirror polishing of moulding and cut
edges, and filling silicon at junctions with sanitary
Total Qty Consumed as per Base Procured Escalation/De-
fixtures and corners with wall whereever required
etc. complete as per drawing. Rate to include cost of Exceed Amount Amount escalation
Rate Rate amount Payable
Debit
necessary forMSEscalation
framework. PlanFor area
Extra paid
shall be in
Granite with all lead and lift and as directed by
measured,
Project Consultant/Engineer in charge. -For Toilet
106.786 1270.152 135633.842624639 1506.96 160921.5081987 (25,287.67)
S. No. Percntage % Rate Per Flat Rate Per Flat No. of Snaging Flat Amount of Snaging Flat
as per %
Prev. This Bill Total Prev. This Bill Total
On Snag 40% 89,488 35,795 280 16.00 296.0 10,022,670 572,724 10,595,394
On De-Snag 40% 89,488 35,795 195 22.00 217.0 6,980,074 787,495 7,767,569
On Hand Over 20% 89,488 17,898 115 75.31 190.0 2,052,631 1,347,918 3,400,549
This Bill Amount 19,055,375 2,708,137 21,763,512
Total Snagged and De-snagged and Handing Over of Flat List Up to 31 Jan. - 2021
Jayant K. Furnishers Site at Godrej aria Project
1 03.12.2018 10
2 04.12.2018 11
3 05.12.2018 9
4 06.12.2018 7
5 07.12.2018 20
6 08.12.2018 35
7 09.12.2018 34
8 10.12.2018 20
9 11.12.2018 17
10 12.12.2018 16
11 13.12.2018 9
12 14.12.2018 8
13 15.12.2018 13
14 16.12.2018 7
15 17.12.2018 10
16 18.12.2018 9
17 19.12.2018 10
18 20.12.2018 5
19 21.12.2018 7
20 22.12.2018 4
21 23.12.2018 0
22 02.01.2019 50.5
23 03.01.2019 44.5
24 04.01.2019 59
25 05.01.2019 52.5
26 08.01.2019 3
27 18.01.2019 1
28 19.01.2019 18
29 20.01.2019 1
30 25.01.2019 9
31 27.01.2019 21 (15 trolly + 1x6 hiwa =21)
32 28.01.2019 14
33 02.02.2019 102 (6 trolly + 16x6 hiwa =102)
34 03.02.2019 26
35 04.02.2019 13
36 05.02.2019 5
37 06.02.2019 1
38 18.02.2019 1
39 19.02.2019 4
TOTAL 686.5
Rate 2500
Amount 1716250
Paid Amount @ 60% 1029750
Recovery Status : Full Recovery in 13th RA Bill Month of April -May 2019
Project : Godrej Aria sector 79 Gurgaon Date 19-Feb-20
Vendor Jayant K. Furnishers, RA Bill No. 24th RA
Service FINISHING WORKS FOR GODREJ ARIA SEC-79, Gurgaon Period Up to Jan. 2021
LOI No. GPL/GGN/LOA/GODREJ ARIA/JAYANT
- (66,263) -
1.6.2 Anti Skid Ceramic- for Balcony- 300x300 mm 2,055.02 (172,646.4) 2,055.02
1.6.2 Anti Skid Ceramic- for Kitchen Floor 300x300 mm 632.60 (58,978.3) 632.60
1.6.2 Anti Skid Ceramic- for Toilet floor 300x300 mm 796.74 (67,613.0) 796.74
External Paint - Weather Proof Synthetic Texture Pai 2,571.70 165,432.11 2,420.38
1.6.1 600mm x 600mm Grid ceiling, ceiling tiles 773.82 (87,457.14) 753.98
Tower bolt
1.3.2
200 X 10 mm 254.80 (29,556.80) 247.00
a
250 X 10 mm 56.84 (8,241.80) 55.10
b
Partly fixed, 2 track Sliding, of types SD2 - SD10 338.65 (76,534.90) 338.65
b
1.1.3 Windows
Partly fixed with partly side hung openable shutter
of types W11, W14, W14' 19.04 37,984.80 20.00
a
Partly fixed with partly side hung openable shutter
and with provision for exhaust fan of types - - -
W12,W13
b
Partly fixed with 2 track sliding of types W1, W4,
W5, W7, W9, W9' ,W10 222.45 129,465.90 222.28
c
Partly fixed with 2 track sliding and with provision
for exhaust fan of types W5', W8 - - -
d
Partly Fixed with partly louvered of types W2, W3,
W6 - - -
e
Partly Fixed partly top hung openable with
provision for exhaust fan of types V, V1 127.11 167,403.87 127.36
f
Total (1,125,603.6)
Prev.
This Bill
Escalation - Cummulative amoun
Tower B Tower C Tower D Tower E
- - - - - - -
- - - - - -
- - - - - -
- - - - - - -
- - - - - - -
- (11,231) - -
2,447 (141,069) - - - - -
1,269 (86,789) - - - - -
657 (48,614) - - - - -
476 (40,410) - - - - -
305 (41,879) - - - - -
230 (47,051) - - - - -
- - - - - - -
- - - - - -
- - - - - -
1,716 (11,208) - - - - -
1,558 (1,822) - - - - -
6,743 (131,073) - - - - -
483 (54,582) - - - - -
129 (40,837) - - - - -
412 48,287 - - - - -
63 (27,279) - - - - -
145 (51,620) - - - - -
125 (78,500) - - - - -
145 (16,820) - - - - -
63 (9,135) - - - - -
212 (16,112) - - - - -
340 (61,880) - - - - -
64 (1,408) - - - - -
64 (7,488) - - - - -
64 512 - - - - -
70 116,029 - - - - -
40 (87,848) - - - - -
4 1,179 - - - - -
96 73,148 - - - - -
- - - - - - -
23 15,922 - - - - -
57 32,547 - - - - -
393 (325,483) - - - - -
404 (48,402) - - - - -
68 101,599 - - - - -
- - - - - - -
34 23,256 - - - - -
50 60,172 - - - - -
- - - - - - -
88 122,675 - - - - -
- - (339,660.22)
- 16,361.60 (872,899.18)
- 10,311.20 (849,701.74)
- 3,965.85 (362,754.45)
- 3,986.77 (338,324.98)
- 2,279.56 (214,700.03)
- 2,092.96 (287,240.03)
- 1,718.49 (351,459.09)
- 37.88 (10,194.23)
- 2,750.56 651,355.11
- - -
- - -
- 13,873.28 (90,620.25)
- 11,930.67 (13,958.88)
- 14,078.25 925,931.76
- 48,479.01 (1,959,912.23)
- 3,858.39 (436,075.63)
- 770.79 (187,709.40)
- 3,414.61 648,279.79
- 373.10 (161,552.30)
- 1,231.00 (438,236.00)
- 995.16 (624,960.48)
- 1,231.28 (142,828.48)
- 373.10 (54,099.50)
- 1,617.64 (122,940.64)
- 2,676.00 (487,032.00)
- 384.00 (8,448.00)
- 384.00 (44,928.00)
- 384.00 3,072.00
- 485.07 807,155.15
- 277.43 (613,120.30)
- 22.68 7,076.16
- 1,201.14 1,359,391.10
- 281.40 275,490.60
- 165.01 168,697.72
- 438.10 515,034.45
- 2,923.73 (2,315,704.92)
- 2,328.54 (440,029.23)
- 281.03 492,742.25
- - -
- 779.68 460,346.80
- 163.99 199,173.34
- - -
- 668.55 895,357.26
(5,540,439.2)
(5,540,439.18)
-
Project : Godrej Aria sector 79 Gurgaon Date 19-Feb-20
Client Wonder City Buildcon Pvt. Ltd., RA Bill No. 24th RA
Vendor Jayant K. Furnishers, Period Up to Jan. 2021
Service FINISHING WORKS FOR GODREJ ARIA SEC-79, Gurgaon
LOI No. GPL/GGN/LOA/GODREJ ARIA/JAYANT Dated- 06.12.2016
BOQ TOTAL QTY TOTAL AMOUNT
S. No. Description Unit Pre. New Qty.
Qty. Ammend RATE Pre This Cumm. Pre This Cumm
PART - A SUBSTRUCTURE
1 FLOORING WORKS
1.1 Glazed ceramic tile
Providing and laying to pattern, commercial quality glazed Ceramic
tile of approved colour, size 200x200mm & minimum 5mm thickness
for called of areas, over 20mm thick or more cement mortar bed (to
make up required finished floor level) of 1:4 mix (1 cement:4 coarse
sand) and joints shall be pointed with the matching cement based
polymer grout as recommended by Laticrete/ Bal Endura or approved
equivalent make etc., the rate inclusive of providing necessary spacers
of size 1.6mm to ensure uniform joints etc. complete in all respect as
per drawings. (Basic price of tile - Rs.26/sft inclusive of all duties
sqm. 1099 1234 854.80 165.798756 0 166 141725 0 141725
excluding taxes F.O.R. site. )
1.2 IPS Floor
Providing and laying 40mm thick Cement Concrete 1:2:4 (1
cement :2 coarse sand : 4 graded stone aggregate of 12.5mm nominal
size) flooring finished with a floating coat of neat cement including
cement slurry, and 4 mm thick pvc strip of required size at 1.2 m c/c
both ways and part there off as required etc. complete in true lines and
level as per specification and drawing. sqm 387 387 461.19 146.57 0.00 147 67597 0 67597
2. WALL FINISHES
2.1 Cement Plaster skirting / risers/ dados / platforms.
Providing and laying 100 mm high 12-15 mm thick Cement plaster
skirting with cement mortar 1:4 (1 cement : 4 coarse sand) finished
with a floating coat of neat cement as per drawing and design.
sqm 180 180 393 0 0
PART - B SUPERSTRUCTURE
(Quoted Rates are for all heights, depths, levels, leads and lifts and
for all design and pattern shown in drawings)
Sqm 8786.64 8614 465 8372 -123.6 8249 3893618 -57499 3836119
1.3.3 sqm 1898.31 1949 1,411 1671 0.0 1671 2357611 0 2357611
Providing and laying stone in specified size (in two equal pieces) of
stone slab in treads and risers of steps as per design and pattern
shown in drawings laid over 20mm average thick CM 1:3 (1 cement :
3 coarse sand) jointed with cement slurry mixed with pigment to
match the shade of slab including chamfering, corner /edge grinding
and mirror polishing, making nosing as per profile in steps, rubbing
and mirror polishing, drilling holes and grouting for fixing of staircase
railing etc. complete as per specification and drawing.
1.5.1 Treads of steps
With 18 to 20mm thick Kota stone and joint to be filled with grey
cement slurry mixed with pigment to match the shade of stone,
providing 4Nos. 5x3mm grooves and including rubbing, grinding,
polishing and bull nosing etc. complete. (Basic rate of Kota @ Rs.
39/Sft inclusive of all duties excluding taxes F.O.R. site)
With 18 to 20mm thick Kota stone and joint to be filled with grey
cement slurry mixed with pigment to match the shade of stone
including rubbing, grinding and polishing. (Basic rate of Kota @ Rs.
39/Sqft inclusive of all duties excluding taxes F.O.R. site)
1.7.1 sqm 14734.8 14735 674.20 13873 0.0 13873 9353372 0 9353372
2.3.1 sqm 912.1 857 2,938 688 0.0 688 2021597 0 2021597
Providing and laying 6-10mm thick tile in skirting laid over 12mm
thick cement mortar 1:3 (1cement : 3 coarse sand), and joints shall
be pointed with the matching cement based polymer grout
(Laticrete/Bal grout or equivalent) of approved shade including
cutting, grouting the joints etc. complete in all respects as per
drawing.
With Vitrified Tile @ base rate Rs. 44/Sqft inclusive of all duties
2.4.1 excluding taxes F.O.R. site. sqm 1035 1100 1,944 1068 0.0 1068 2075428 0 2075428
With Anti-Skid Ceramic Tiles @ base rate Rs. 28/Sqft inclusive of
2.4.2 all duties excluding taxes F.O.R. site. sqm 1884.28 1884 1,613 1765 0.0 1765 2846431 0 2846431
1 PAINTING
(Quoted Rate shall be for all heights, depths, levels, leads and lifts )
1.1
Note: Flat area in horizontal / vertical plane will be measured for
payment. No additional payment will be made for grooves, cornices,
vatta, mouldings etc.
Acrylic Emulsion Paint of approved brand and shade as per
1.1.1 specification
Oil Bond Distemper of approved brand and shade as per sqm 105 691 184 0 0
1.1.2 specification sqm 1707.2 1251 155.72 0 0
1.3 Rmt 200 8790 330.32 4846 0.0 4846.14 1600799 0 1600799
PART - B SUPERSTRUCTURE
1 PAINTING WORKS
(Quoted Rate shall be for all heights, depths, levels, leads and lifts ).
1.1
1.2 Sqm 25430 2897 60.00 2897 0.0 2897 173833 0 173833
Providing and applying Whitewash in three or more coats on wall
and ceiling including cost of addition of gum, ultramarine blue,
including primer, scaffolding, preparation of surface by brushing and
brooming down along with sand papering wherever required to give
an even shade etc.complete. (In Service Rooms & Lift/Services Shaft,
Machine room etc.) As per Post GST Rates (Billed after 30th June-
2017)
1.2 Sqm 22533 25430 56.72 12536 0.0 12536 711043 0 711043
1.8 Mirror
PART - B SUPERSTRUCTURE
JOINERY WORKS
(Quoted Rates are for all heights, depths, levels, leads and lifts)
1 FIRE DOOR
Providing and fixing in position Hollow metal fire rated doors as per IS 3614 part-1 &
part-2 for stability and integrity. Pressed Galvanized steel confirming to IS 277 with the
following specification.
Recommended fire door shall have doors tested at CBRI or ARAI for maximum rating of
2hrs with vision panel. Test certificates should be available for vision lites /panels as
part of the fire door assembly. Independent glass test certificates will not be accepted.
Manufacturer test certificate shall cover doors both single and double leaf and all doors
supplied should be within the tested specimen, deviation in specification and sheet
thickness other than what is mentioned in the test certificates are not allowed. Proper
1.1 label confirming the type of door and the hourly rating is mandatory.
Door frame shall be double rebate frame profile of size 143 x 57mm made out of
1.60mm (16gauge) minimum thick galvanized steel sheet. Frames shall be Mitered and
field assembled with self tabs. All provision should be mortised, drilled and tapped for
receiving appropriate hardware. Frames should be provided with back plate bracket
and anchor fasteners for installation on a finished plastered RCC surface/ masonry wall
opening. Once frame installed should be grouted with cement & sand slurry necessary
for fire doors on the clear opening.
Door leaf shall be 46mm thick fully flush double skin door with or without vision lite.
Door leaf shall be manufactured from 1.2mm (18guage) minimum thick galvanised steel
sheet. The internal construction of the door should be rigid reinforcement pads for
receiving appropriate hardware. The infill material shall be resin bonded honeycomb
core. All doors shall be factory prepped for receiving appropriate hardware and
provided with necessary reinforcement for hinges, locks, and door closers. The edges
should be interlocked with lock seam. Vision lite wherever applicable should be
provided as per manufacturer's recommendation with a beeding and screws from
inside. The glass should be 6mm clear borosilicate fire rated glass of relavant rating of
the door.
All doors and frames shall be finished with polyurethane aliphatic grade paint of
approved colour. The door leaf and frame shall have passed minimum 250 hours of salt
sprey test.
TYPE - FD - : Metal Fire Doors of approved size 1100 x 2100mm including metal
frame finished with fire rated paint on both sides, of approved colour and shade as per
the Design Consultants approval (2 Hours Fire rated) of double leaf. The door to have
250mm x 750mm size 2 Hour fire rated vision panel as per the detailed drawing. The
rate is inclusive of supplying and fixing all brush finished 2 Hour fire rated ironmongery
like locks, handles, tower bolts, door closer etc. of approved make as indicated in the
detail drawing. Location-Staircase (Basic price of fire door @ Rs 7405/Sqm including
door shutter, frame, hardwares and vision panel etc. supply & installation inclusive
of duties excluding taxes F.O.R. Site)
1.1.1 Sqm 238 282 8,253 258 0.0 258 2132063.33 0 2132063.33
1.1.2 Sqm 425 272 8,253 258 0.0 258 2131403 0 2131403
1.2.1
38 mm thick with 32mm flush door & 3 mm thick decorative veneer with grooves on
outside and plain veneer on inside surface including melamine polishing as per drawing
a and design (D of size 1100x2100mm). Location- Unit Main Entrance Door Sqm 937.206 821 6,108 771 0.0 771 4707963 0 4707963
Providing and Fixing factory made 32 mm thick Enamel painted doors manufactured
from dense, homogenous high density, fibre plate moulded, decorative panels, jointed
with seasoned, treated rubber wood / hard wood stiles, and rails with solid core
construction; using ISI certified phenol formaldehyde resin as per IS: 848:1991 BWP,
type, meeting minimum product technology specifications. Rate to include providing
and fixing 4 Nos. heavy duty stainless steel butt hinges with necessary SS screws for
each shutter, providing & fixing 20mmx12mm enamel painted red mirandi architrave on
both side of doors as per drawing complete. (Basic price of Door Shutter is Rs 916/- per
SQM inclusive of duties excluding taxes F.O.R. Site. Basic rate is excluding the cost of
hinges & enamel painting)
1.2.2
a D1 of size 900x2100mm. Location- Bedroom, Kitchen, Study Sqm 2368 2368 2,898 1927 0.0 1927 5585916 0 5585916
b D2 of size 750x2100mm. Location- Toilet Sqm 1711 1544 2,898 1347 0.0 1347 3902630 0 3902630
21st RA Biil Main Abstract Page 45
BOQ TOTAL QTY TOTAL AMOUNT
S. No. Description Unit Pre. New Qty.
Qty. Ammend RATE Pre This Cumm. Pre This Cumm
c D1" of size 900x2100mm. Location- Serv. Room Entry Door Sqm 168 145 2,898 141 0.0 141 407208 0 407208
Providing and fixing mortice latch and lock with six levers and a pair of levers handles of
1.3.1 Godrej or equivalent as approved with necessary screws etc. complete Stainless Steel
With Pin Cylinder (10' forend length) - for external Doors (Basic rate @1308/ Each
a inclusive of duties excluding taxes F.O.R. Site) No. 472 472 1,661 373 0 373 619621 0 619621
With Pin Cylinder (8' forend length) - for Internal Doors (Basic rate @1177/ Each
b inclusive of duties excluding taxes F.O.R. Site) No. 1201 1270 1,585 1231 0 1231 1951063 0 1951063
Keyless Cylindrical handle with knob - For toilet doors (Basic rate @872/ Each inclusive
c of duties excluding taxes F.O.R. Site) No. 1207 1029 1,107 995 0 995 1101800 0 1101800
Providing & fixing bright finished brass/Stainless Steel AISI 316 grade tower bolt (barrel
1.3.2 type) of approved make with necessary screws etc. complete.
200 X 10 mm (Basic rate @ 196/ Each inclusive of duties excluding taxes F.O.R. Site)
a Each 1102 1270 261 1231 0 1231 321348 0 321348
250 X 10 mm (Basic rate @ 245/ Each inclusive of duties excluding taxes F.O.R. Site)
b Each 388 388 328 373 0 373 122242 0 122242
Providing and fixing bright finished brass/Stainless Steel AISI 316 grade hanging type
double floor door stopper of best quality as approved with necessary screws etc.
complete. (Basic rate @ 196/ Each inclusive of duties excluding taxes F.O.R. Site)
1.3.3 Each 2613 1658 267 1618 0 1618 431687 0 431687
Providing and fixing rubber buffer of best quality as approved with necessary screws etc.
complete. (Basic rate @ 196/ Each inclusive of duties excluding taxes F.O.R. Site)
1.3.4 Each 2697 2687 267 2676 0 2676 714123 0 714123
Providing and fixing imported Magic eye 270" of brush steel finish (Basic rate @ 147/
1.3.5 Each inclusive of duties excluding taxes F.O.R. Site) Each 388 388 210 384 0 384 80596 0 80596
Providing and fixing SS hydraulic door closer of brush steel finish (Basic rate @ 1177/
1.3.6 Each inclusive of duties excluding taxes F.O.R. Site) Each 388 388 1,544 384 0 384 592960 0 592960
Providing and fixing SS safety chain of brush steel finish (Basic rate @ 147/ Each
1.3.7 inclusive of duties excluding taxes F.O.R. Site) Each 388 388 210 384 0 384 80596 0 80596
1.1.3 Windows
Partly fixed with partly side hung openable shutter of types W11, W14, W14' (Basic
price Rs. 3182/- per Sqm, include F.O.R. cost of material, Glass, hardware, duties and
the cost of installation and fixing excluding taxes) 384 281
a Sqm 287 3,417 281 0 960170 0 960170
Partly fixed with partly side hung openable shutter and with provision for exhaust fan of
types W12,W13 (Basic price Rs. 3182/- per Sqm, include F.O.R. cost of material, Glass,
hardware, duties and the cost of installation and fixing excluding taxes)
b Sqm R/O 0 3,417 0 0 0 0 0 0
Partly fixed with 2 track sliding of types W1, W4, W5, W7, W9, W9' ,W10 (Basic price
Rs. 3182/- per Sqm, include F.O.R. cost of material, Glass, hardware, duties and the cost
of installation and fixing excluding taxes) 631 780
c Sqm 1068 3,417 780 0 2663863.8 0 2663863.8
Partly fixed with 2 track sliding and with provision for exhaust fan of types W5', W8
(Basic price Rs. 3182/- per Sqm, include F.O.R. cost of material, Glass, hardware, duties
and the cost of installation and fixing excludint taxes) 171 164
d Sqm 177 3,417 164 0 559724.15 0 559724.15
Partly Fixed with partly louvered of types W2, W3, W6 (Basic price Rs. 3182/- per Sqm,
include F.O.R. cost of material, Glass, hardware, duties and the cost of installation and
fixing excluding taxes) 372 0
e Sqm 111 3,417 0 0 0 0 0
Partly Fixed partly top hung openable with provision for exhaust fan of types V, V1
(Basic price Rs. 3135.60/- per Sqm, include F.O.R. cost of material, Glass, hardware,
duties and the cost of installation and fixing excluding taxes) 680 669
f Sqm 726 3,420 669 0 2286314 0 2286314
NOTES
Total 220,143,531.0 (57,499.0) 220,086,032.0
Pre GST Work Amount 8,701,010.0 - 8,701,010.0
Post GST Work Amount 211,442,521.0 (57,499.0) 211,385,022.0
PART - A SUBSTRUCTURE
Marble shall be procurred in sizes available in the market, quoted rates also to
include cutting of sizes as per design and skirting from standard size stone
pieces.
The rate should be inclusive of protection of flooring until the handling of the
project by covering the joints with 6mm plastic sheet etc.
1 FLOORING WORKS
1.1 Glazed ceramic tile
Providing and laying to pattern, commercial quality glazed Ceramic tile of
approved colour, size 200x200mm & minimum 5mm thickness for called of
areas, over 20mm thick or more cement mortar bed (to make up required
finished floor level) of 1:4 mix (1 cement:4 coarse sand) and joints shall be
pointed with the matching cement based polymer grout as recommended by
Laticrete/ Bal Endura or approved equivalent make etc., the rate inclusive of
providing necessary spacers of size 1.6mm to ensure uniform joints etc.
complete in all respect as per drawings. (Basic price of tile - Rs.26/sft inclusive
of all duties excluding taxes F.O.R. site. )
Abstract A Page 48
BOQ TOTAL QTY TOTAL AMOUNT
S. No. Description Unit Pre. New Qty. Remarks
Qty. Ammend RATE PRE THIS CUMM PRE THIS CUMM
Providing and laying 62 mm thick heavy duty hardonite flooring with non
metallic hardener of approved make including 4 mm thick PVC strips of
required size at 1.2 m c/c both ways and part there off as required, under layer
50mm CC 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm
nominal size) with 12mm thick topping, using grey cement hardener mix by
weight (2 hardener : 1 cement) and stone chips dry mixed in a ratio of 1:2 (1
hardener and cement mix : 2 stone chips of 6mm down gauge to form dry
mortar) complete with neat cement and broom finishing to leave the surface
rough.
Providing and laying stone flooring using stone slab of approved quality in
specified size of stone slab as per drawings and pattern in flooring/ landing
with cement mortar 1:4 (1 cement : 4 coarse sand) of adequate thickness to
match the total thickness of 50mm and joint to be filled with white cement
slurry mixed with pigment to match the shade of stone including surfaces
pointing, curing etc. complete as per specification, pattern and drawing.
With 18 to 20mm thick Prepolished Granite stone and joint to be filled with
white cement slurry mixed with pigment to match the shade of stone (Basic
rate of prepolished (one side) Granite @ Rs. 118/Sft inclusive of all duties
excluding taxes F.O.R. site)
1.4.1 sqm 25 0 2,911.14
With 18 to 20mm thick Kota stone and joint to be filled with grey cement slurry
mixed with pigment to match the shade of stone, providing 4Nos. 5x3mm
grooves and including rubbing, grinding, polishing and bull nosing etc.
complete. (Basic rate of Kota @ Rs. 39/Sft inclusive of all duties
excluding taxes F.O.R. site)
1.4.2 sqm 11 13.36 1,409 13.123 0.00 13.12 18488 0 18488
Providing and laying stone in specified size (in two equal pieces) of stone slab
in treads and risers of steps as per design and pattern shown in drawings laid
over 20mm average thick CM 1:3 (1 cement : 3 coarse sand) jointed with
cement slurry mixed with pigment to match the shade of slab including
chamfering, corner /edge grinding and mirror polishing, making nosing as per
profile in steps, rubbing and mirror polishing, drilling holes and grouting for
fixing of staircase railing etc. complete as per specification and drawing.
1.5.1 Treads of steps
With 18 to 20mm thick Prepolished Granite stone and joint to be filled with
white cement slurry mixed with pigment to match the shade of stone (Basic
rate of prepolished (one side) Granite @ Rs. 118/Sft inclusive of all duties
excluding taxes F.O.R. site)
a. sqm 18 0 3,577.18
With 18 to 20mm thick Kota stone and joint to be filled with grey cement slurry
mixed with pigment to match the shade of stone, providing 4Nos. 5x3mm
grooves and including rubbing, grinding, polishing and bull nosing etc.
complete. (Basic rate of Kota @ Rs. 39/Sft inclusive of all duties
excluding taxes F.O.R. site)
b. sqm 18.83 18.83 2,525.18 10.88 0.00 10.88 27476 0 27476
2. WALL FINISHES
2.1 Cement Plaster skirting / risers/ dados / platforms.
Providing and laying 100 mm high 12-15 mm thick Cement plaster skirting with
cement mortar 1:4 (1 cement : 4 coarse sand) finished with a floating coat of
neat cement as per drawing and design. sqm 15 15 393
Abstract A Page 50
BOQ TOTAL QTY TOTAL AMOUNT
S. No. Description Unit Pre. New Qty. Remarks
Qty. Ammend RATE PRE THIS CUMM PRE THIS CUMM
Providing and fixing prepolished stone cladding/ dado/ bands/ making
architraves/ strips/ cills/ soffits/ jambs / coping/ ledges etc in specified sizes as
per drawing laid with 20 mm avg. thickness of cement mortar 1:3 (1cement : 3
coarse sand) wet cladding. The item includes fixing grit on back of stone with
araldite etc. including filling the joints with white cement with matching
pigment, chamfering, making grooves, cutting stone for fixing of switch boxes,
pointing, edge polishing etc wherever required, scaffolding, curing etc.
complete as per drawing.
(All profiles mentioned shall be measured in Sqm under this item. Nothing
extra shall be paid unless otherwise mentioned in the BOQ)
With 18 to 20mm thick Prepolished Granite stone and joint to be filled with
white cement slurry mixed with pigment to match the shade of stone. (Basic
rate of prepolished (one side) Granite @ Rs. 118/Sqft inclusive of all duties
excluding taxes F.O.R. site)
2.3.1 sqm 9.55 9.55 2,938 4.75 0.00 4.75 13947 0 13947
Providing and laying 6-10mm thick tile in skirting laid over 12mm thick cement
mortar 1:3 (1cement : 3 coarse sand), and joints shall be pointed with the
matching cement based polymer grout (Laticrete/Bal grout or equivalent) of
approved shade including cutting, grouting the joints etc. complete in all
respects as per drawing.
With Vitrified Tile @ base rate Rs. 44/Sqft inclusive of all duties excluding
2.4.1 taxes F.O.R. site. sqm 5.168 5.519 1,944 5.89 0.00 5.89 11447 0.0 11447
Providing and laying 6-10mm thick tiles in cladding/ dado/ jamb/ soffit/ cill of
uniform thickness, size, shade and pattern as approved by Architect/Project
Manager laid with rich cement slurry over a bedding plaster of 6mm (avg.)
thick cement mortar 1:3 (1 cement : 3 fine sand) including the cost of 12mm
average thick rough base plaster of mix 1:3 (1 cement : 3 coarse sand), and
joints shall be pointed with the matching cement based polymer grout
(Laticrete/Bal grout or equivalent) of approved shade including cutting, curing
etc. complete in all respects as per drawing.
With Ceramic Tile of size 300x450mm @ base rate Rs. 28/Sqft inclusive of all
2.5.1 duties excluding taxes F.O.R. site. Sqm 65.66667 0 1,119
PART - B SUPERSTRUCTURE
Abstract A Page 51
BOQ TOTAL QTY TOTAL AMOUNT
S. No. Description Unit Pre. New Qty. Remarks
Qty. Ammend RATE PRE THIS CUMM PRE THIS CUMM
The rate should be inclusive of protection of flooring until the handling of the
project by covering the joints with 6mm plastic sheet etc.
sqm 1591.542 1551 465 1516.95 -41.00 1476.07 705458 -19011 686447
Abstract A Page 52
BOQ TOTAL QTY TOTAL AMOUNT
S. No. Description Unit Pre. New Qty. Remarks
Qty. Ammend RATE PRE THIS CUMM PRE THIS CUMM
With 18 to 20mm thick Kota stone and joint to be filled with grey cement slurry
mixed with pigment to match the shade of stone, providing 4Nos. 5x3mm
grooves and including rubbing, grinding, polishing and bull nosing etc.
complete. (Basic rate of Kota @ Rs. 39/Sft inclusive of all duties
excluding taxes F.O.R. site)
a. sqm 288.8 283.074 2,527 256.73 0.00 256.73 648805 0 648805
1.7.1
Providing and laying 60mm high laminated skirting board ( grade AC3) of
approved make and as per approved sample, colour and laid on the existing
levelled flooring with approved adhesive & underlay including skirting &
profile etc. complete as per manufacturers specification & approval of
Architect. (Basic rate @ Rs.36/rft for skirting board supply & installation,
inclusive of all duties excluding taxes F.O.R site)
1.7.2 Rmt 2389.3 2389.3 143.34 2263.56 0.00 2263.56 324448 0 324448
Providing and laying 100 mm high 12-15 mm thick Cement plaster skirting with
cement mortar 1:4 (1 cement : 4 coarse sand) finished with a floating coat of
neat cement as per drawing and design. sqm 27.233 25 397
Abstract A Page 53
BOQ TOTAL QTY TOTAL AMOUNT
S. No. Description Unit Pre. New Qty. Remarks
Qty. Ammend RATE PRE THIS CUMM PRE THIS CUMM
Providing and laying 200mm wide 18-20mm thick Gangsaw cut Gwalior White
Sand Stone coping of approved size using stone slab approved quality with
20mm avg. thick cement mortar 1:4 (1 cement : 4 coarse sand) and joint to be
filled with cement slurry mixed with pigment to match the shade of stone
including cutting, surfaces pointing, curing rubbing, grinding and polishing etc.
complete as per specification, pattern and drawing. (Basic rate of Gwalior white
sand stone @ Rs. 78/Sqft inclusive of all duties excluding taxes F.O.R. site)
2.3.2 Rmt. 2079 2252.46 573 1921.28 0.00 1921.28 1101353 0 1101353
PART - A SUBSTRUCTURE
1 PAINTING
(Quoted Rate shall be for all heights, depths, levels, leads and lifts )
Providing and applying three or more coats (as specified below) of approved
brand, manufacturer, colour and shade to give a smooth finish on plastered
surfaces over a coat of approved primer including the cost of preparing the
surfaces with filling materials (putty), along with sand papering wherever
required, including thoroughly brushing the surface free from foreign matter,
sandpapering smooth, filling in all holes and cracks etc. complete., rate to
include all tools, labour, scaffolding, primer as required, complete as directed
1.1 by the Engineer.
Note: Flat area in horizontal / vertical plane will be measured for payment.
No additional payment will be made for grooves, cornices, vatta, mouldings
etc.
1.1.1 Acrylic Emulsion Paint of approved brand and shade as per specification sqm 15 115.17 184
1.1.2 Oil Bond Distemper of approved brand and shade as per specification sqm 217 184.53 155.72
Providing and applying whitewash in three or more coats on wall and ceiling
including cost of addition of gum, ultramarine blue, including primer,
scaffolding, preparation of surface by brushing and brooming down along with
sand papering wherever required to give an even shade etc.complete. (In
1.2 Service Rooms, Basements & Lift/Services Shaft) sqm. 1326.363 1326.36 57 1257.81 0.00 1257.81 71346 0 71346
Providing and marking with three or more coats 100 mm wide to give uniform
finish with reflective/ luminous road marking paint in strips true to line in
parking area floor and wall of superior make as approved by the Project
Manager including cleaning the surface of all dirt, scales, oil, grease and other
1.3 foreign material etc. and lining out complete. Rmt 330.32
Abstract A Page 55
BOQ TOTAL QTY TOTAL AMOUNT
S. No. Description Unit Pre. New Qty. Remarks
Qty. Ammend RATE PRE THIS CUMM PRE THIS CUMM
PART - B SUPERSTRUCTURE
1 PAINTING WORKS
Acrylic Emulsion Paint of approved brand and shade as per specification As Per
1.1.1 Pre GST Rates (Billed before 30th June-2017) sqm 17075 2785.17 195 2785.17 0.00 2785.17 543108 0 543108
Acrylic Emulsion Paint of approved brand and shade as per specification As per
1.1.1 Post GST Rates (Billed after 30th June-2017) sqm 14289.83 14528 183.73 13031.50 0.00 13031.50 2394267 0 2394267
1.1.2 Oil Bond Distemper of approved brand and shade as per specification sqm 9581 6784.5 155.72 6422.97 0.00 6422.97 1000214 0 1000214
Providing and applying Whitewash in three or more coats on wall and ceiling
including cost of addition of gum, ultramarine blue, including primer,
scaffolding, preparation of surface by brushing and brooming down along with
sand papering wherever required to give an even shade etc.complete. (In
Service Rooms & Lift/Services Shaft, Machine room etc.) As Per Pre GST Rates
(Billed before 30th June-2017)
1.2 sqm. 3705 630.4 60.00 630.35 0.00 630.35 37821 0 37821
Providing and applying Whitewash in three or more coats on wall and ceiling
including cost of addition of gum, ultramarine blue, including primer,
scaffolding, preparation of surface by brushing and brooming down along with
sand papering wherever required to give an even shade etc.complete. (In
Service Rooms & Lift/Services Shaft, Machine room etc.) As per Post GST Rates
(Billed after 30th June-2017)
1.2 sqm. 3074.65 3075 56.72 2328.28 0.00 2328.28 132065 0 132065
0 0 0
Providing and applying two or more coats of polymer based weather proof
synthetic textured paint on external walls over a coat of primer in
approved finish, colour and texture (made out of synthetic fibers and
petroleum based chemicals) as per manufacturer's specification at all
1.3 levels and height. (The work should be executed by an approved agency). sqm. 3599 2574.9 282.50 2571.70 0.00 2571.70 726512 0 726512
Rates quoted to include vertical and horizontal grooves and patterns as
directed including
Providing & applying preparing the coats
two or more base surface,
of acrylicattending to broken
paints to the externaledges,
corners or
surfaces patches
whether of plastered
plastered or formsurface
finish, and
usingfilling withquality
exterior cementitious
acrylic
grout, scaffolding,
weather shield paintstaging, cleaningshade
of approved the surface
& makeetc. complete
including as directed
preparing the
by Engineer.
base surface, (Base Ratetofor
attending external
broken paint
edges, is Rs 23
corners per sft for
or patches of plastered
1.4 surface
specialised
and agency
filling with
including
cementations
material,grout,
labour
scaffolding,
and arrangement
cleaningforthe sqm. 7701 10503.10179 221.27 8811.93 0.00 8811.93 1949840 0 1949840
painting providing
surface, i.e. staging/& scaffolding/
applying STC platform
biocide,etc.,
priming
inclusive
coatofetc.
duties
complete 0 0 0
excluding
all as per manufacturers
taxes F.O.R. Site)-
guidelines
up to and
5th Floor.
as directed by the Engineer. (Base
Rate for external paint is Rs 18 per sft for specialised agency
including material, labour and arrangement for painting i.e. staging/
Providing and painting with waterproof cement based paint of approved brand
scaffolding/
(Snowcem plus) platform
two or etc.,
moreinclusive
coats andofa duties
coat ofexcluding
base coarse taxes
withF.O.R.
white shade
Site).-
(for newAbove
work) 5th Floor walls, columns, chajja, facia. Aprons etc. over
to external
plastered surface to give an even shade including preparation of base as per
manufacturer’s specifications including scaffolding and curing (Plaster work
1.5 measured separately) with all labour and materials in all floors. Sqm 50 50 126.98 0 0 0
Abstract A Page 56
Providing and fixing of false ceilings at all heights of 600mm x 600mm Grid
ceiling, ceiling tiles with Tegular/ Microlook Edge laid on prelude XL exposed BOQ TOTAL QTY TOTAL AMOUNT
grid systems with 24mm / 15mm wide T- section flanges colour white. The
S. No. framework comprise of main runner Description
spaced at 1200mm centers securely fixed Unit Pre. New Qty. Remarks
to the structural soffit by approved hangers at 1200mm maximum centers. Qty. Ammend RATE PRE THIS CUMM PRE THIS CUMM
Hangers (GI wire of 4.0mm dia) to be fixed by approved roof plug/ fastener,
level adjusters and screws etc. The last hanger at the end of each main runner
should not be greater than 450mm from the adjacent wall. Flush fitting
1200mm long cross tees (with double stitching) to be interlocked between
main runners at 600mm centers to form 1200 x 600 modules. Cut cross tees
1.6.1 longer than 600mm to be supported independently. 0 0 0
600mm x 600mm modules to be formed by fitting 600mm long flush fitting
corss tees centrally between the 1200m cross tees. Perimeter trim to be
Armstrong wall angle secured to walls at 450mm maximum centrers. The
quoted rateand
Providing shall
fixing
be inclusive
suspended forfalse
makingceiling
opening
whichfor includes
light fixtures,
providing diffusers
and fixing&
GI
ACperimeter
grills. Thechannels of size
quoted rate 0.55
shall be mm. Thk. of
inclusive having one flange
suspenders at allofheihgt
20 mm & and
extra
another flange of 30 mm and web of 27 mm along the perimeter
member required for all openings. (Basic rate of ceiling tile Rs 583/- per Sqm. of the ceiling,
screw fixed
including to brick wall/
framework partition
& grid system, with help ofall
inclusive nylon
dutiessleeves and screws,
etc. excluding at
taxes
610 mmsite).
F.O.R. centers. The suspended GI intermediate channels of size 45
mm,0.9mm thk with two flanges of 15 mm each from the soffit at 1220 mm sqm. 1044 776.29 712.54 773.82 0.00 773.82 551377 0 551377
centers with ceiling angles with ceiling angle of width 25mm x 10mm x
0.55mm thk fixed to soffit with GI cleat and steel expansion fasteners. Ceiling 0 0 0
section of 0.55 mm thk having web of 51.5 mm and two flanges of 26 mm each
with lips of 10.5mmare then fixed to the intermediate channels with help of
connecting clips and in direction perpendicular to the intermediate channel
with centers. All GI members sall be of Gypsteel or approved equivalent make.
The 12.5 mm tapered edge gypboard (Confirming to IS-2095-1982) is then
1.6.2 screw fixed to ceiling section with 25 mm dry wall screws at 230mm centers. 0 0 0
Screw fixing is done mechanically either with screw driver or drilling machine
with suitable attachment. Finally the boards are to be joined and finished so as
to have a flush look which includes finishing the tapered and square edges of
the board with joining compound. fibre tape and two coats of primer suitable
Notes:
for Gypboard
1) There (Asbe
will not perseparate
the recommendations
measurements/for practice of St. Gobain
the vertical drops upto Gyproc2'-0"or Sqm R/o 75.380 1,367.13 0 0 0
equivalent)
high, doubleThis levelincludes
ceiling,providing the surface
vaulted ceiling, curvedofceiling
false ceiling to be painted
and indirect lighting
with approved
made in Gypsum quality
board.of Plastic emulsion paint. The false ceiling surfaces shall
be prepared
2) False ceilingtorate
the quoted
satisfaction
shallof the Design
include Consultant,
providing necessary andcut-outs
shall befor applied
fixing
with
Light fixtures (Inclusive of two
two coats of primer, coatsAC
all sizes), of putty andAC
diffuser, touch up putty
dampers, if required
AC linear grillesto
achieve smooth finish. The surface shall be painted with two coats
for (supply and return air), smoke detectors, speakers etc., as directed by the of Luxol silk
emulsion
Design paint of approved
Consultants.( make to
No additional the will
rates satisfaction
be givenofforDesign Consultants.
the cut-outs) 0 0 0
1.6.3 Item same as above item no. 1.6.2 but using for Horizontal and Vertical Boxing. Sqm 86 137.03 1,550.48 63.55 0.00 63.55 98528 0 98528
0 0 0
1.7 Trap door 0 0 0
JOINERY WORKS
(Quoted Rates are for all heights, depths, levels, leads and lifts)
1 FIRE DOOR
TYPE - FD - : Metal Fire Doors of approved size 1100 x 2100mm including
metal frame finished with fire rated paint on both sides, of approved colour and
shade as per the Design Consultants approval (2 Hours Fire rated) of double
1.1.1 leaf. The door to have 250mm x 750mm size 2 Hour fire rated vision panel as Sqm 5 4.62 8,254 4.62 0.00 4.62 38131 0 38131
per the detailed drawing. The rate is inclusive of supplying and fixing all brush
finished 2 Hour fire rated ironmongery like locks, handles, tower bolts, door
closer etc. of approved make as indicated in the detail drawing. Location- Abstract A Page 57
Staircase (Basic price of fire door @ Rs 7405/Sqm including door shutter,
BOQ TOTAL QTY TOTAL AMOUNT
S. No. Description Unit Pre. New Qty. Remarks
Qty. Ammend RATE PRE THIS CUMM PRE THIS CUMM
TYPE - FD 1- : Metal Fire Doors of approved size 1100 x 2100mm including
metal frame finished with fire rated paint on both sides, of approved colour and
shade as per the Design Consultants approval (2 Hours Fire rated) of double
leaf. The door to have 250mm x 750mm size 2 Hour fire rated vision panel as
b per the detailed drawing. The rate is inclusive of supplying and fixing all brush Sqm 2.3 2.3 8,254 1.84 0.00 1.84 15187 0 15187
TYPE
finished- FD2
2 Hour: Metal Fire ironmongery
fire rated Doors of approved size 750
like locks, x 2000mm
handles, including
tower bolts, door
metal
closer frame
etc. offinished
approved with fireasrated
make paint on
indicated bothdetail
in the sides,drawing.
of approved colour and
Location-
TYPE
shade - FD3
as per- :
the Metal
DesignFire Doors of
Consultants approved
approval size
(2 1800
Hours x
Staircase (Basic price of fire door @ Rs 7405/Sqm including door shutter, 2100mm
Fire rated) including
of
metal
frame,frame
single/double finished
hardwares leaf. The
andwith
doorfire
visiontorated
have paint
panel 250mm onxboth
etc. supply &sides,
750mm of 2approved
size
installation, firecolour
Hourinclusiveratedof
and shade
vision panelasasper perthetheDesign
detailedConsultants
drawing. approval
The rate is(2inclusive
Hours Fire of rated)
supplying of and
duties
doubleexcluding
leaf. The door taxes toF.O.R. Site) x 750mm
have 250mm size 2 Hour fire rated vision
1.1.2 fixing all brush finished 2 Hour fire rated ironmongery like locks, handles, Sqm 4.7 3.00 8,253 3.00 0.00 3.00 24758 0 24758
panel vision panel as per the detailed drawing. The rate is inclusive of
tower bolts,
supplying anddoor closer
fixing etc. offinished
all brush approved makefire
2 Hour as indicated in the detail
rated ironmongery like locks,
drawing. Location-
handles, tower bolts,Electrical
door closershaft, Meter
etc. room (Basic
of approved makeprice of fire door
as indicated in the@ Rs
7405/Sqm
detail including
drawing. doorDG
Location- shutter,
room, frame,
Pumphardwares and vision
room, Electrical room.panel etc.
(Basic
supplyof&fire
price installation,
door @ Rs inclusive
7405/Sqm of duties excluding
including doortaxes
shutter,F.O.R. Site)
frame,
hardwares and vision panel etc. supply & installation, inclusive of
1.1.3 duties excluding taxes F.O.R. Site) Sqm 4 3.78 8,662.20 3.78 0.00 3.78 32743 0 32743
Providing and fixing in position Hollow metal fire rated doors as per IS 3614
PART - B SUPERSTRUCTURE
part-1 & part-2 for stability and integrity. Pressed Galvanized steel confirming
to IS 277 with the following specification.
Recommended
JOINERY WORKSfire door shall have doors tested at CBRI or ARAI for maximum
rating of 2hrs with vision panel. Test certificates should be available for vision
(Quoted Rates
lites /panels asare
partforofall
theheights,
fire doordepths, levels,
assembly. leads and lifts)
Independent glass test
1 certificates
FIRE DOOR will not be accepted. Manufacturer test certificate shall cover
doors both single and double leaf and all doors supplied
Door frame shall be double rebate frame profile of size 143 x 57mm should be within
madethe out
tested
Door
of specimen,
leaf
1.60mm shall be deviation
(16gauge)46mm minimumin specification
thick fully flush
thick and sheet
double
galvanized skin thickness
steeldoor
sheet.with other
or
Frames thanbe
without
shall
what islite.
vision
Mitered mentioned
Door
and inshall
fieldleaf the test
assembled certificates
be manufactured
with self tabs.are
Allnot
from allowed.
1.2mm
provision Proper
(18guage)
should belabel
minimum
mortised,
1.1 thick
confirming
drilled the type
galvanised
and tapped steelofsheet.
for door and
receiving the hourly
Theappropriate
internal rating
construction
hardware.is mandatory.
ofFrames
the door should
should be be
rigid reinforcement
provided with back platepads for receiving
bracket appropriate
and anchor fastenershardware. The infill on
for installation material
a
shall be resin bonded honeycomb core. All doors shall be
finished plastered RCC surface/ masonry wall opening. Once frame installed factory prepped for
receiving
should beappropriate
grouted with hardware
cement & and provided
sand with necessary
slurry necessary reinforcement
for fire doors on the
for
clearhinges, locks, and door closers. The edges should be interlocked with lock
opening.
seam. Vision lite wherever applicable should be provided as per
manufacturer's recommendation with a beeding and screws from inside. The
glass should be 6mm clear borosilicate fire rated glass of relavant rating of the
door.
All doors and frames shall be finished with polyurethane aliphatic grade paint
of approved colour. The door leaf and frame shall have passed minimum 250
hours of salt sprey test.
TYPE - FD - : Metal Fire Doors of approved size 1100 x 2100mm including
metal frame finished with fire rated paint on both sides, of approved colour and
shade as per the Design Consultants approval (2 Hours Fire rated) of double
leaf. The door to have 250mm x 750mm size 2 Hour fire rated vision panel as
1.1.1 per the detailed drawing. The rate is inclusive of supplying and fixing all brush Sqm 45 50.8 8,253 46.57 0.00 46.57 384321 0 384321
finished
TYPE - FD12 Hour
- : fire rated
Metal Fireironmongery like locks,
Doors of approved sizehandles, tower bolts,
1100 x 2100mm door
including
closer etc. offinished
metal frame approved make
with fireasrated
indicated in the
paint on bothdetail
sides,drawing. Location-
of approved colour and
Staircase (Basic
shade as per price ofConsultants
the Design fire door @approval
Rs 7405/Sqm
(2 Hoursincluding door
Fire rated) of shutter,
double
frame,
leaf. Thehardwares
door to haveand250mm
vision xpanel etc.size
750mm supply & installation
2 Hour inclusive
fire rated vision panelofas
b duties excluding taxes F.O.R. Site)
per the detailed drawing. The rate is inclusive of supplying and fixing all brush Sqm 34.5 34.5 8,253 33.12 0.00 33.12 273327 0 273327
finished
TYPE 2 Hour
- FD2 fire rated
: Metal Fire ironmongery like locks,
Doors of approved handles,
size 750 tower bolts,
x 2000mm door
including
closer frame
metal etc. offinished
approved make
with fireasrated
indicated in the
paint on bothdetail
sides,drawing. Location-
of approved colour and
Staircase
shade (Basic
as per price ofConsultants
the Design fire door @approval
Rs 7405/Sqm
(2 Hoursincluding door
Fire rated) of shutter,
frame, hardwares
single/double anddoor
leaf. The vision to panel etc. supply
have 250mm & installation
x 750mm inclusive
size 2 Hour of
fire rated
1.1.2 duties panel
vision excluding
as pertaxes F.O.R. drawing.
the detailed Site) The rate is inclusive of supplying and Sqm 80 49.5 8,253 46.08 0.00 46.08 380281 0 380281
fixing all brush finished 2 Hour fire rated ironmongery like locks, handles,
1.2 tower
DOOR bolts, door closer etc. of approved make as indicated in the detail
SHUTTER
drawing. Location- Electrical shaft, Meter room (Basic price of fire door @ Rs
7405/Sqm including door shutter, frame, hardwares and vision panel etc.
supply & installation, inclusive of duties excluding taxes F.O.R. Site)
Abstract A Page 58
BOQ TOTAL QTY TOTAL AMOUNT
S. No. Description Unit Pre. New Qty. Remarks
Qty. Ammend RATE PRE THIS CUMM PRE THIS CUMM
38 mm thick with 32mm flush door & 3 mm thick decorative veneer with
grooves on outside and plain veneer on inside surface including melamine
polishing as per drawing and design (D of size 1100x2100mm). Location- Unit
a Main Entrance Door Sqm 141 123.06 6,108 117.11 0.00 117.11 715304 0 715304
1.2.1- a D1 of size 900x2100mm. Location- Bedroom, Kitchen, Study Sqm 461 399.50 2,898 380.33 0.00 380.33 1102223 0 1102223
b D2 of size 750x2100mm. Location- Toilet Sqm 335 285.73 2,898 266.53 0.00 266.53 772423 0 772423
c D1" of size 900x2100mm. Location- Serv. Room Entry Door Sqm 56 48.22 2,898 49.18 0.00 49.18 142527 0 142527
Providing and fixing mortice latch and lock with six levers and a pair of levers
handles of Godrej or equivalent as approved with necessary screws etc.
1.3.1 complete Stainless Steel
With Pin Cylinder (10' forend length) - for external Doors (Basic rate @1308/
a Each inclusive of duties excluding taxes F.O.R. Site) No. 86 86 1,661 56.84 0.00 56.84 94396 0 94396
With Pin Cylinder (8' forend length) - for Internal Doors (Basic rate @1177/
b Each inclusive of duties excluding taxes F.O.R. Site) No. 234 260 1,585 254.80 0.00 254.80 403839 0 403839
Keyless Cylindrical handle with knob - For toilet doors (Basic rate @872/ Each
c inclusive of duties excluding taxes F.O.R. Site) No. 202 202 1,107 197.96 0.00 197.96 219173 0 219173
Providing & fixing bright finished brass/Stainless Steel AISI 316 grade tower
1.3.2 bolt (barrel type) of approved make with necessary screws etc. complete.
200 X 10 mm (Basic rate @ 196/ Each inclusive of duties excluding taxes
a F.O.R. Site) Each 260 260 261 254.80 0.00 254.80 66500 0 66500
250 X 10 mm (Basic rate @ 245/ Each inclusive of duties excluding taxes
b F.O.R. Site) Each 58 58 328 56.84 0.00 56.84 18623 0 18623
Providing and fixing bright finished brass/Stainless Steel AISI 316 grade
hanging type double floor door stopper of best quality as approved with
necessary screws etc. complete. (Basic rate @ 196/ Each inclusive of duties
excluding taxes F.O.R. Site)
1.3.3 Each 492 318 267 311.64 0.00 311.64 83165 0 83165
Providing and fixing rubber buffer of best quality as approved with necessary
screws etc. complete. (Basic rate @ 196/ Each inclusive of duties excluding
taxes F.O.R. Site)
1.3.4 Each 520 520 267 520.00 0.0 520.0 138768 0 138768
Providing and fixing imported Magic eye 270" of brush steel finish (Basic rate
1.3.5 @ 147/ Each inclusive of duties excluding taxes F.O.R. Site) Each 58 58 210 58.00 0.00 58.00 12173 0 12173
Providing and fixing SS hydraulic door closer of brush steel finish (Basic rate
1.3.6 @ 1177/ Each inclusive of duties excluding taxes F.O.R. Site) Each 58 58 1,544 58.00 0.00 58.00 89562 0 89562
Providing and fixing SS safety chain of brush steel finish (Basic rate @ 147/
1.3.7 Each inclusive of duties excluding taxes F.O.R. Site) Each 58 58 210 58.00 0.00 58.00 12173 0 12173
1.1.3 Windows
Partly fixed with partly side hung openable shutter of types W11, W14, W14'
(Basic price Rs. 3182/- per Sqm, include F.O.R. cost of material, Glass,
hardware, duties and the cost of installation and fixing excluding taxes)
a Sqm 51.39 51 3,417 19.04 0.00 19.04 65052 0 65052
Partly fixed with partly side hung openable shutter and with provision for
exhaust fan of types W12,W13 (Basic price Rs. 3182/- per Sqm, include F.O.R.
cost of material, Glass, hardware, duties and the cost of installation and fixing
excluding taxes)
b Sqm R/O 0 3,417 0.00 0.00 0.00 0 0 0
Partly fixed with 2 track sliding of types W1, W4, W5, W7, W9, W9' ,W10
(Basic price Rs. 3182/- per Sqm, include F.O.R. cost of material, Glass,
hardware, duties and the cost of installation and fixing excluding taxes)
c Sqm 305 305 3,417 222.45 0.00 222.45 760025 0 760025
Partly fixed with 2 track sliding and with provision for exhaust fan of types
W5', W8 (Basic price Rs. 3182/- per Sqm, include F.O.R. cost of material,
Glass, hardware, duties and the cost of installation and fixing excludint taxes)
d Sqm R/O 0 3,417 0.00 0.00 0.00 0 0 0
Partly Fixed with partly louvered of types W2, W3, W6 (Basic price Rs. 3182/-
per Sqm, include F.O.R. cost of material, Glass, hardware, duties and the cost
of installation and fixing excluding taxes)
e Sqm 37 72.72 3,417 0.00 0.00 0.00 0 0 0
Partly Fixed partly top hung openable with provision for exhaust fan of types
V, V1 (Basic price Rs. 3135.60/- per Sqm, include F.O.R. cost of material,
Glass, hardware, duties and the cost of installation and fixing excluding taxes)
f Sqm 144 127.37 3,420 127.11 0.00 127.11 434692 0 434692
NOTES
Abstract A Page 61
Project : Godrej Aria sector 79 Gurgaon
Vendor Jayant K. Furnishers,
Service FINISHING WORKS FOR GODREJ ARIA SEC-79, Gurgaon
LOI No. GPL/GGN/LOA/GODREJ ARIA/JAYANT Dated- 06.12.2016
Sqm Cum
3A (Flat-1, 3) 1263 45.59 2.64
Quantities in one Flat
3D (Flat- 4 ) 50.34 2.89
Typical Floor 2.02
1 Basement 1263.38
JMR
1 Ground Floor
001 3A 45.59 2.64
004 3D 50.34 2.89
003 3A 45.59 2.64
Lobby/Common area 2.02
HT Meter Room
2 1st Floor
101 3A 45.59 2.64
104 3D 50.34 2.89
103 3A 45.59 2.64
Lobby/Common area 2.02
3 2nd Floor
201 3A 45.59 2.64
202 3D 50.34 2.89
203 3A 45.59 2.64
204 3D 50.34 2.89
Lobby/Common area 2.02
3 3rd Floor
301 3A 45.59 2.64
302 3D 50.34 2.89
303 3A 45.59 2.64
304 3D 50.34 2.89
Lobby/Common area 2.02
4 4th Floor
401 3A 45.59 2.64
402 3D 50.34 2.89
403 3A 45.59 2.64
404 3D 50.34 2.89
Lobby/Common area 2.02
5 5th Floor
501 3A 45.59 2.64
502 3D 50.34 2.89
503 3A 45.59 2.64
504 3D 50.34 2.89
Lobby/Common area 2.02
6 6th Floor
601 3A 45.59 2.64
602 3D 50.34 2.89
603 3A 45.59 2.64
604 3D 50.34 2.89
Lobby/Common area 2.02
7 7th Floor
701 3A 45.59 2.64
702 3D 50.34 2.89
703 3A 45.59 2.64
704 3D 50.34 2.89
Lobby/Common area 2.02
8 8th Floor
801 3A 45.59 2.64
802 3D 50.34 2.89
803 3A 45.59 2.64
804 3D 50.34 2.89
Lobby/Common area 2.02
9 9th Floor
901 3A 45.59 2.64
902 3D 50.34 2.89
903 3A 45.59 2.64
904 3D 50.34 2.89
Lobby/Common area 2.02
10 10th Floor
1001 3A 45.59 2.64
1002 3D 50.34 2.89
1003 3A 45.59 2.64
1004 3D 50.34 2.89
Lobby/Common area 2.02
11 11th Floor
1101 3A 45.59 2.64
1102 3D 50.34 2.89
1103 3A 45.59 2.64
1104 3D 50.34 2.89
Lobby/Common area 2.02
12 12th Floor
1201 3A 45.59 2.64
1202 3D 50.34 2.89
1203 3A 45.59 2.64
1204 3D 50.34 2.89
Lobby/Common area 2.02
13 13th Floor
1301 3A 45.59 2.64
1302 3D 50.34 2.89
1303 3A 45.59 2.64
1304 3D 50.34 2.89
Lobby/Common area 2.02
14 14th Floor
1401 3A 45.59 2.64
1402 3D 50.34 2.89
1403 3A 45.59 2.64
1404 3D 50.34 2.89
Lobby/Common area 2.02
15 Terrace Floor
16 LMR
6.456
12 0 0 0 0 0 0
OH Tank OH Tank kitchen dado Toilet dado Toilet Floor Flooring Skirting
54.48 23.58
0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
3.79
46.19
2.40
0 0 0 0 0 0 0
Granite Flooring Prepolished Granite stone Fixing Imported Marble WC Ledge False Ceiling
Fixing in Toilets
2.93 3.01
4.68
4 44 45 37 1 28 794
0 0 0 0 0 0 0
210.62 87.334
283.83 106.50
N/A
210.62 87.334 170.46 75.07 536.28 142.58
251.94 106.49625
1146.75 0.00
0 2785 0 0 0 0 0
LOBBY
External FLAT SHAFT LIFT LMR FD (1.1x2.1) FD1 (1.15x2.0)
SHAFT
Flooring Skirting
Sqm Sqm Sqm Sqm Sqm Sqm Rmt Sqm Sqm
75.24 24.91 33.30 49.22 171.54 45.39 36.91 2.31 2.30
34.20 50.83 42.95 1.00 1.00
2.31 2.30
120.77 2 1
4.62 1.84
33.30 49.22
75.24
34.20 50.83 42.95
33.30 49.22
75.24 24.91 45.39 36.91
34.20 50.83 42.95
9.24
30.25 171.54 2.31
0 470 160 0 0 0 0 0 0
Sqm Sqm Sqm Sqm Sqm Sqm Nos. Nos. Nos. Nos. Sqm
1.50 3.78 2.1 6.7 4.0 - 1.0 4.0 3.0 2.613
2.00 - 2.1 6.7 5.4 1.7 1.0 4.0 4.0 1.0
3.00 -
2 1
3.00 3.78
3.00
0 0 0 0 0 0 0 0 0 0 0
96% 0% 98% 98% 98% 98% 98% 98% 98% 98% 98.0%
1.8
1.80
0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0
PART - A SUBSTRUCTURE
Marble shall be procurred in sizes available in the market, quoted rates also to
include cutting of sizes as per design and skirting from standard size stone pieces.
The rate should be inclusive of protection of flooring until the handling of the
project by covering the joints with 6mm plastic sheet etc.
1 FLOORING WORKS
1.1 Glazed ceramic tile
Providing and laying to pattern, commercial quality glazed Ceramic tile of approved
colour, size 200x200mm & minimum 5mm thickness for called of areas, over 20mm
thick or more cement mortar bed (to make up required finished floor level) of 1:4
mix (1 cement:4 coarse sand) and joints shall be pointed with the matching cement
based polymer grout as recommended by Laticrete/ Bal Endura or approved
equivalent make etc., the rate inclusive of providing necessary spacers of size
1.6mm to ensure uniform joints etc. complete in all respect as per drawings. (Basic
price of tile - Rs.26/sft inclusive of all duties excluding taxes F.O.R. site. )
Abstract B Page 98
BOQ
New TOTAL QTY TOTAL AMOUNT
Qty. Remarks
Pre. Qty. Ammen RATE PRE THIS CUMM PRE THIS CUMM
S. No. Description Unit
Providing and laying 62 mm thick heavy duty hardonite flooring with non metallic d
hardener of approved make including 4 mm thick PVC strips of required size at 1.2
m c/c both ways and part there off as required, under layer 50mm CC 1:2:4 (1
cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size) with 12mm
thick topping, using grey cement hardener mix by weight (2 hardener : 1 cement)
and stone chips dry mixed in a ratio of 1:2 (1 hardener and cement mix : 2 stone
chips of 6mm down gauge to form dry mortar) complete with neat cement and
broom finishing to leave the surface rough.
Providing and laying stone flooring using stone slab of approved quality in specified
size of stone slab as per drawings and pattern in flooring/ landing with cement
mortar 1:4 (1 cement : 4 coarse sand) of adequate thickness to match the total
thickness of 50mm and joint to be filled with white cement slurry mixed with
pigment to match the shade of stone including surfaces pointing, curing etc.
complete as per specification, pattern and drawing.
With 18 to 20mm thick Prepolished Granite stone and joint to be filled with white
cement slurry mixed with pigment to match the shade of stone (Basic rate of
prepolished (one side) Granite @ Rs. 118/Sft inclusive of all duties excluding taxes
F.O.R. site)
1.4.1 sqm 25 0 2,911.14
With 18 to 20mm thick Kota stone and joint to be filled with grey cement slurry
mixed with pigment to match the shade of stone, providing 4Nos. 5x3mm grooves
and including rubbing, grinding, polishing and bull nosing etc. complete.
(Basic rate of Kota @ Rs. 39/Sft inclusive of all duties excluding taxes
F.O.R. site)
1.4.2 sqm 11 13.36375 1,409 11.00 0.00 11.00 15494 0 15494
Providing and laying stone in specified size (in two equal pieces) of stone slab in
treads and risers of steps as per design and pattern shown in drawings laid over
20mm average thick CM 1:3 (1 cement : 3 coarse sand) jointed with cement slurry
mixed with pigment to match the shade of slab including chamfering, corner /edge
grinding and mirror polishing, making nosing as per profile in steps, rubbing and
mirror polishing, drilling holes and grouting for fixing of staircase railing etc.
complete as per specification and drawing.
1.5.1 Treads of steps
With 18 to 20mm thick Prepolished Granite stone and joint to be filled with white
cement slurry mixed with pigment to match the shade of stone (Basic rate of
prepolished (one side) Granite @ Rs. 118/Sft inclusive of all duties excluding taxes
F.O.R. site)
a. sqm 18 0 3,577.18
With 18 to 20mm thick Kota stone and joint to be filled with grey cement slurry
mixed with pigment to match the shade of stone, providing 4Nos. 5x3mm grooves
and including rubbing, grinding, polishing and bull nosing etc. complete. (Basic
rate of Kota @ Rs. 39/Sft inclusive of all duties excluding taxes F.O.R. site)
b. sqm 18.83 18.83 2,525.18 10.28 0.00 10.28 25950 0 25950
2. WALL FINISHES
2.1 Cement Plaster skirting / risers/ dados / platforms.
Providing and laying 100 mm high 12-15 mm thick Cement plaster skirting with
cement mortar 1:4 (1 cement : 4 coarse sand) finished with a floating coat of neat
cement as per drawing and design. sqm 15 15 393
Providing and laying skirting in stone in 12 mm average thick cement mortar 1:3 (1
cement : 3 coarse sand) jointed cement slurry mixed with pigment to match the
shade of slab including corner/ edge grinding, wherever required complete as per
specification, pattern and drawing.
With 18 to 20mm thick Prepolished Granite stone and joint to be filled with white
cement slurry mixed with pigment to match the shade of stone (Basic rate of
prepolished (one side) Granite @ Rs. 118/Sqft inclusive of all duties excluding
taxes F.O.R. site)
2.2.1 sqm 3.2 0 4,102
With 18 to 20mm thick Kota stone and joint to be filled with grey cement slurry
mixed with pigment to match the shade of stone including rubbing, grinding and
polishing complete. (Basic rate of Kota @ Rs. 39/Sqft inclusive of all duties
excluding taxes F.O.R. site)
2.2.2 sqm 4 4 2,646 2.93 0.00 2.93 7763 0 7763
With 18 to 20mm thick Prepolished Granite stone and joint to be filled with white
cement slurry mixed with pigment to match the shade of stone. (Basic rate of
prepolished (one side) Granite @ Rs. 118/Sqft inclusive of all duties excluding
taxes F.O.R. site)
2.3.1 sqm 9.55 9.55 2,938 5.34 0.00 5.34 15690 0 15690
Providing and laying 6-10mm thick tile in skirting laid over 12mm thick cement
mortar 1:3 (1cement : 3 coarse sand), and joints shall be pointed with the matching
cement based polymer grout (Laticrete/Bal grout or equivalent) of approved shade
including cutting, grouting the joints etc. complete in all respects as per drawing.
With Vitrified Tile @ base rate Rs. 44/Sqft inclusive of all duties excluding taxes
2.4.1 F.O.R. site. sqm 5.168 5.519325 1,944 5.89 0.00 5.89 11447 0 11447
Providing and laying 6-10mm thick tiles in cladding/ dado/ jamb/ soffit/ cill of
uniform thickness, size, shade and pattern as approved by Architect/Project
Manager laid with rich cement slurry over a bedding plaster of 6mm (avg.) thick
cement mortar 1:3 (1 cement : 3 fine sand) including the cost of 12mm average
thick rough base plaster of mix 1:3 (1 cement : 3 coarse sand), and joints shall be
pointed with the matching cement based polymer grout (Laticrete/Bal grout or
equivalent) of approved shade including cutting, curing etc. complete in all respects
as per drawing.
With Ceramic Tile of size 300x450mm @ base rate Rs. 28/Sqft inclusive of all
2.5.1 duties excluding taxes F.O.R. site. Sqm 65.6666667 0 1,119
PART - B SUPERSTRUCTURE
Marble shall be procurred in sizes available in the market, quoted rates also to
include cutting of sizes as per design and skirting from standard size stone pieces.
sqm 1591.542 1651 465 1619.84 (41.89) 1578 753306 -19480 733826
With 18 to 20mm thick Polished Imported Marble Stone and joint to be filled with
white cement slurry mixed with pigment to match the shade of stone including
rubbing and mirror polishing complete. (Basic rate @ Rs. 245/Sqft inclusive of all
duties excluding taxes F.O.R. site)
1.3.1 Sqm 36.955875 36.95588 5,808 0 0 0
With 18 to 20mm thick Prepolished Granite stone and joint to be filled with white
cement slurry mixed with pigment to match the shade of stone (Basic rate of
prepolished (one side) Granite @ Rs. 118/Sqft inclusive of all duties excluding
F.O.R. site)
1.3.2 sqm 91.605125 81.60513 2,913 0.00 0 0 0
1.3.3 sqm 357.065231 357.0652 1,411 292.18 0.00 292.18 412207 0 412207
Providing and laying stone in specified size (in two equal pieces) of stone slab in
treads and risers of steps as per design and pattern shown in drawings laid over
20mm average thick CM 1:3 (1 cement : 3 coarse sand) jointed with cement slurry
mixed with pigment to match the shade of slab including chamfering, corner /edge
grinding and mirror polishing, making nosing as per profile in steps, rubbing and
mirror polishing, drilling holes and grouting for fixing of staircase railing etc.
complete as per specification and drawing.
1.5.1 Treads of steps
With 18 to 20mm thick Kota stone and joint to be filled with grey cement slurry
mixed with pigment to match the shade of stone, providing 4Nos. 5x3mm grooves
and including rubbing, grinding, polishing and bull nosing etc. complete. (Basic
rate of Kota @ Rs. 39/Sft inclusive of all duties excluding taxes F.O.R. site)
With Vitrified Tiles of size 600x600mm @ base rate Rs. 44/Sqft inclusive of all
duties excluding taxes F.O.R. site.
1.6.1 sqm 2633 2804.26 1,184 2517.66 0.00 2517.66 2981114 0 2981114
With Anti-Skid Ceramic Tiles of size 300x300mm @ base rate Rs. 28/Sqft inclusive
of all duties excluding taxes F.O.R. site (Kitchen, Toilet, Balcony & Servent)
1.6.2 sqm 3351 3200.896 867 3141.58 0.00 3141.58 2723241 0 2723241
1.7.1 sqm 2901.31275 2901.313 674.20 2734.63 0.00 2734.63 1843692 0 1843692
0 0 0
Providing and laying 60mm high laminated skirting board ( grade AC3) of approved
make and as per approved sample, colour and laid on the existing levelled flooring
with approved adhesive & underlay including skirting & profile etc. complete as per
manufacturers specification & approval of Architect. (Basic rate @ Rs.36/rft for
skirting board supply & installation, inclusive of all duties excluding taxes F.O.R
site)
1.7.2 Rmt 2389.3 2389.3 143.34 2200.01 0.00 2200.01 315338 0 315338
Providing and laying 100 mm high 12-15 mm thick Cement plaster skirting with
cement mortar 1:4 (1 cement : 4 coarse sand) finished with a floating coat of neat
cement as per drawing and design. sqm 27.233 25 397 0 0 0
Providing and laying 100mm high skirting in stone in 12 mm average thick cement
mortar 1:3 (1 cement : 3 coarse sand) jointed cement slurry mixed with pigment to
match the shade of slab including corner/ edge grinding wherever required
complete as per specification, pattern and drawing. 0 0 0
With 18 to 20mm thick Polished Imported Marble Stone and joint to be filled with
white cement slurry mixed with pigment to match the shade of stone including
rubbing and mirror polishing etc. complete (Basic rate @ Rs. 245/Sqft inclusive of
all duties excluding taxes F.O.R. site)
2.2.1 Sqm 1.9 1.5653 6,830 0 0 0
With 18 to 20mm thick Prepolished Granite stone and joint to be filled with white
cement slurry mixed with pigment to match the shade of stone (Basic rate of
prepolished (one side) Granite @ Rs. 118/Sqft inclusive of all duties excluding
taxes F.O.R. site)
2.2.2 sqm 3.5 3.7575 4,102 0 0 0
With 18 to 20mm thick Kota stone and joint to be filled with grey cement slurry
mixed with pigment to match the shade of stone including rubbing, grinding and
polishing etc. complete. (Basic rate of Kota @ Rs. 39/Sqft inclusive of all duties
excluding taxes F.O.R. site)
2.2.3 sqm 60.9 70.5202 2,646 60.76 0.00 60.76 160761 0 160761
Providing and fixing prepolished stone cladding/ dado/ bands/ making architraves/
strips/ cills/ soffits/ jambs / coping/ ledges etc in specified sizes as per drawing laid
with 20 mm avg. thickness of cement mortar 1:3 (1cement : 3 coarse sand) wet
cladding. The item includes fixing grit on back of stone with araldite etc. including
filling the joints with white cement with matching pigment, chamfering, making
grooves, pointing, edge polishing etc wherever required, scaffolding, curing etc.
complete as per drawing.
(All profiles mentioned shall be measured in Sqm under this item. Nothing extra
shall be paid unless otherwise mentioned in the BOQ)
With 18 to 20mm thick Prepolished Granite stone and joint to be filled with white
cement slurry mixed with pigment to match the shade of stone (Basic rate of
prepolished (one side) Granite @ Rs. 118/Sqft inclusive of all duties excluding taxes
F.O.R. site)
2.3.1 sqm 193 171.3675 2,938 115.00 0.00 115.00 337853 0 337853
Providing and laying 200mm wide 18-20mm thick Gangsaw cut Gwalior White
Sand Stone coping of approved size using stone slab approved quality with 20mm
avg. thick cement mortar 1:4 (1 cement : 4 coarse sand) and joint to be filled with
cement slurry mixed with pigment to match the shade of stone including cutting,
surfaces pointing, curing rubbing, grinding and polishing etc. complete as per
specification, pattern and drawing. (Basic rate of Gwalior white sand stone @ Rs.
78/Sqft inclusive of all duties excluding taxes F.O.R. site)
2.3.2 Rmt. 2079 2252.46 573 1876.01 0.00 1876.01 1075403 0 1075403
Providing and laying 6-10mm thick tile in skirting laid over 12mm thick cement
mortar 1:3 (1cement : 3 coarse sand), and joints shall be pointed with the matching
cement based polymer grout (Laticrete/Bal grout or equivalent) of approved shade
including cutting, grouting the joints etc. complete in all respects as per drawing.
With Vitrified Tile @ base rate Rs. 44/Sqft inclusive of all duties excluding taxes
2.4.1 F.O.R. site. sqm 177.0167 177.0167 1,944 163.64 0.00 163.64 318145 0 318145
With Anti-Skid Ceramic Tiles @ base rate Rs. 28/Sqft inclusive of all duties
2.4.2 Providing
excluding and
taxeslaying 6-10mm
F.O.R. site. thick tiles in cladding/ dado/ jamb/ soffit/ cill of sqm 350.02462 350.0246 1,613 342.77 0.00 342.77 552779 0 552779
uniform thickness, size, shade and pattern as approved by Architect/Project
Manager laid with rich cement slurry over a bedding plaster of 6mm (avg.) thick
2.5 cement mortar 1:3 (1 cement : 3 fine sand) including the cost of 12mm average
Tile Dado
thick rough base plaster of mix 1:3 (1 cement : 3 coarse sand), and joints shall be
pointed with the matching cement based polymer grout (Laticrete/Bal grout or
equivalent) of approved shade including cutting, curing etc. complete in all respects
as per drawing.
With Ceramic Tile of size 300x450mm @ base rate Rs. 28/Sqft inclusive of all
2.5.1 duties excluding taxes F.O.R. site. sqm 4035 4245.864 1,119 3737.73 0.00 3737.73 4181098 0 4181098
PART - A SUBSTRUCTURE
1 PAINTING
Providing and applying whitewash in three or more coats on wall and ceiling
including cost of addition of gum, ultramarine blue, including primer, scaffolding,
preparation of surface by brushing and brooming down along with sand papering
wherever required to give an even shade etc.complete. (In Service Rooms,
1.2 Basements & Lift/Services Shaft) sqm. 1326.363 1326.363 57 1270.37 0.00 1270.37 72058 0 72058
PART - B SUPERSTRUCTURE
1 PAINTING WORKS
(Quoted Rate shall be for all heights, depths, levels, leads and lifts ).
Providing and applying three or more coats (as specified below) of approved brand,
manufacturer, colour and shade to give a smooth finish on gypsum plastered
surfaces over a coat of approved primer including the cost of preparing the surfaces
with filling materials (putty), along with sand papering wherever required, including
thoroughly brushing the surface free from foreign matter, sandpapering smooth,
filling in all holes and cracks etc. complete., rate to include all tools, labour,
scaffolding, primer as required, complete as directed by the Engineer.
1.1
Acrylic Emulsion Paint of approved brand and shade as per specificationAs per Pre
1.1.1 GST Rates (Billed before 30th June-2017) sqm 17075 2895.424 195 2895.42 0.00 2895.42 564608 0 564608
1.1.2 Oil Bond Distemper of approved brand and shade as per specification sqm 9581 6784.513 155.72 6081.05 0.00 6081.05 946968 0 946968
0 0 0
Providing and applying Whitewash in three or more coats on wall and ceiling
including cost of addition of gum, ultramarine blue, including primer, scaffolding,
preparation of surface by brushing and brooming down along with sand papering
wherever required to give an even shade etc.complete. (In Service Rooms &
Lift/Services Shaft, Machine room etc.)As per Pre GST Rates (Billed before 30th
June-2017)
1.2 sqm. 3705 630.355 60.00 630.36 0.00 630.36 37821 0.000 37821
Providing and applying Whitewash in three or more coats on wall and ceiling
including cost of addition of gum, ultramarine blue, including primer, scaffolding,
preparation of surface by brushing and brooming down along with sand papering
wherever required to give an even shade etc.complete. (In Service Rooms &
Lift/Services Shaft, Machine room etc.) As per Post GST Rates (Billed after 30th
June-2017)
1.2 sqm. 3074.65 3075 56.72 2328.28 0.00 2328.28 132065 0 132065
Providing and applying two or more coats of polymer based weather proof
synthetic textured paint on external walls over a coat of primer in approved
finish, colour and texture (made out of synthetic fibers and petroleum based
chemicals) as per manufacturer's specification at all levels and height. (The
1.3 work should be executed by an approved agency). Rates quoted to include sqm. 3599 2574.881 282.50 2420.38 0.00 2420.38 683764 0 683764
vertical and horizontal grooves and patterns as directed including preparing
Providing & applying
the base surface, two or to
attending more coatsedges,
broken of acrylic paintsortopatches
corners the external surfaces
of plastered
whether plastered
surface and fillingorwith finish, using exterior
formcementitious quality acrylic
grout, scaffolding, weather
staging, shield
cleaning the
paint
surfaceofetc.
approved
complete shade & makeby
as directed including
Engineer. preparing
(Base Ratethe base surface,paint is
for external
attending
Rs 23 pertosftbroken edges, corners
for specialised agencyor patches
includingof material,
plasteredlabour
surfaceandand filling
1.4 with cementations
arrangement grout, scaffolding,
for painting cleaning the platform
i.e. staging/ scaffolding/ surface, providing & of sqm.
etc., inclusive 7701 10503.1 221.27 8056.55 0.00 8056.55 1782696 0.0 1782696
applying
Providing STCpainting
duties excluding
and biocide, priming
taxeswith
F.O.R. coat up
Site)-
waterproof etc. tocomplete
cement5thbased all
Floor. as per
paint manufacturers
of approved brand
guidelinesplus)
(Snowcem and as twodirected
or morebycoats
the Engineer.
and a coat (Base
of baseRate
coarseforwith
external paint(for
white shade is
new
Rs 18work) to external
per sft walls, columns,
for specialised agencychajja, facia. material,
including Aprons etc. over plastered
labour and
surface to givefor
arrangement an painting
even shadei.e.including
staging/ preparation
scaffolding/ofplatform
base as per manufacturer’s
etc., inclusive of
specifications
Providing and including scaffolding
fixing of false ceilings and curing
at all (Plaster
heights work measured
of 600mm x 600mm Gridseparately)
ceiling,
1.5 duties
with allexcluding
labour andtaxes F.O.R.
materials Site).-
in all floors.Above 5th Floor
ceiling tiles with Tegular/ Microlook Edge laid on prelude XL exposed grid systems Sqm 50 50 126.98
with 24mm / 15mm wide T- section flanges colour white. The framework comprise
of main runner spaced at 1200mm centers securely fixed to the structural soffit by
1.6 False
approvedceiling
hangers at 1200mm maximum centers. Hangers (GI wire of 4.0mm dia) to
be fixed by approved roof plug/ fastener, level adjusters and screws etc. The last
hanger at the end of each main runner should not be greater than 450mm from the
adjacent wall. Flush fitting 1200mm long cross tees (with double stitching) to be
interlocked
Providing between
and main runners
fixing suspended falseatceiling
600mm centers
which to form
includes 1200 x and
providing 600 fixing
modules. GI
1.6.1 Cut cross tees
perimeter longerofthan
channels size 600mm
0.55 mm. toThk.
be supported
having one independently.
flange of 20 mm and another
flange
600mmofx30 mm and
600mm web ofto27
modules bemm along
formed bythe perimeter
fitting 600mmoflongthe ceiling, screwcorss
flush fitting fixed
to
teesbrick wall/ partition
centrally between the with1200m
help ofcross
nylon sleeves
tees. and screws,
Perimeter trim to at
be610 mm centers.
Armstrong wall
The suspended GI intermediate channels of size 45 mm,0.9mm
angle secured to walls at 450mm maximum centrers. The quoted rate shall be thk with two flanges
of 15 mmfor
inclusive each from the
making soffitfor
opening at 1220 mm centers
light fixtures, with ceiling
diffusers anglesThe
& AC grills. withquoted
ceiling
angle of width 25mm x 10mm x 0.55mm thk fixed to soffit with GI cleat and steel sqm. 1044 776.2895 712.54 753.98 0.00 753.98 537240 0.00 537240.20
rate shall befasteners.
expansion inclusiveCeiling
of suspenders
section of at all
0.55heihgt
mm thk& extra
havingmember
web ofrequired
51.5 mm forandall
openings.
two flanges(Basic
of 26rate
mmofeachceiling
withtile
lipsRsof583/- per Sqm.
10.5mmare including
then fixed toframework & grid
the intermediate
system, inclusive
channels with helpallofduties etc. excluding
connecting clips andtaxes F.O.R. site).
in direction perpendicular to the
intermediate channel with centers. All GI members sall be of Gypsteel or approved
equivalent make. The 12.5 mm tapered edge gypboard (Confirming to IS-2095-
1982) is then screw fixed to ceiling section with 25 mm dry wall screws at 230mm
1.6.2 centers.
1.6.3 Item same as above item no. 1.6.2 but using for Horizontal and Vertical Boxing. Sqm 86 137.0313 1,550.48 62.25 0.00 62.25 96517.5073354758 0.00 96517.51
Providing and fixing trap door in false ceiling, made of 12 mm thick prelaminated
partical board resting/ fixed including all hardware, hard wood lipping etc. complete
as per drawing. sqm 28 28 3,996.44
1.8 Mirror
Providing and fixing looking mirror 6 mm thick with 4 mm thick AC sheet backing
and GHANA teak wood moulding around complete including painting polishing,
and providing and fixing 300 micron HDP film as vapour barrier, all necessary fixing
1.8.1 arrangement like nails/ screws dash fastner/studs etc. complete . sqm 102 93.96 4,307.27 81.75 0.00 81.75 352098.733254157 0.00 352098.73
PART - A Providing
SUBSTRUCTURE and fixing in position Hollow metal fire rated doors as per IS 3614 part-1
& part-2 for stability and integrity. Pressed Galvanized steel confirming to IS 277
with the following specification.
JOINERY WORKSfire door shall have doors tested at CBRI or ARAI for maximum
Recommended
rating
(Quoted of Rates
2hrs with vision
are for panel. Test
all heights, certificates
depths, shouldand
levels, leads belifts)
available for vision
lites /panels as part of the fire door assembly. Independent glass test certificates
will not be accepted. Manufacturer test certificate shall cover doors both single and
1 FIRE
double DOORleaf and all doors supplied should be within the tested specimen, deviation
in specification and sheet thickness other than what is mentioned in the test
certificates
Door frame are not
shall beallowed. Properframe
double rebate label confirming the 143
profile of size typexof door made
57mm and theouthourly
of
ratingleaf
1.60mm
Door is mandatory.
(16gauge)
shall be 46mmApproved
minimum manufacturer
thickthick
fully galvanized
flush doubleShakti
steel Hormann
skinsheet. ororapproved
Frames
door with shall be vision
without Mitered
1.1 lite.
equivalent.
and field
Doorassembled
leaf shall bewith self tabs. Allfrom
manufactured provision
1.2mm should be mortised,
(18guage) minimum drilled
thickand
tapped for steel
galvanised receiving appropriate
sheet. The internal hardware. Frames
construction should
of the doorbeshould
provided with back
be rigid
plate bracket and
reinforcement padsanchor fasteners
for receiving for installation
appropriate on a finished
hardware. The infillplastered
materialRCC
shall be
surface/
resin masonry
bonded wall opening.
honeycomb Once
core. All frame
doors installed
shall should
be factory be grouted
prepped with
for receiving
cement & sand
appropriate slurry necessary
hardware and provided for fire doors
with on thereinforcement
necessary clear opening.for hinges, locks,
and door closers. The edges should be interlocked with lock seam. Vision lite
wherever applicable should be provided as per manufacturer's recommendation
with a beeding and screws from inside. The glass should be 6mm clear borosilicate
fire rated glass of relavant rating of the door.
All doors and frames shall be finished with polyurethane aliphatic grade paint of
approved colour. The door leaf and frame shall have passed minimum 250 hours of
salt sprey test.
TYPE - FD - : Metal Fire Doors of approved size 1100 x 2100mm including metal
frame finished with fire rated paint on both sides, of approved colour and shade as
per the Design Consultants approval (2 Hours Fire rated) of double leaf. The door to
have 250mm x 750mm size 2 Hour fire rated vision panel as per the detailed
drawing. The rate is inclusive of supplying and fixing all brush finished 2 Hour fire
1.1.1 rated ironmongery like locks, handles, tower bolts, door closer etc. of approved Sqm 5 4.62 8,254 4.62 - 4.62 38131 0 38131
make
TYPEas indicated
- FD1 in theFire
- : Metal detail drawing.
Doors Location-Staircase
of approved (Basic price
size 1100 x 2100mm of firemetal
including door
@ Rs 7405/Sqm
frame including
finished with door
fire rated paintshutter,
on bothframe, hardwares
sides, of approved and vision
colour and panel
shade etc.
as
supply
per & installation,
the Design inclusive
Consultants of duties
approval excluding
(2 Hours taxes
Fire rated) of F.O.R. Site)The door to
double leaf.
have 250mm x 750mm size 2 Hour fire rated vision panel as per the detailed
drawing. The rate is inclusive of supplying and fixing all brush finished 2 Hour fire
1.1.1 rated ironmongery like locks, handles, tower bolts, door closer etc. of approved Sqm 2.3 2.3 8,254 2.3 - 2.30 18983 0 18983
make as indicated in the detail drawing. Location-Staircase (Basic price of fire door
@ Rs 7405/Sqm including door shutter, frame, hardwares and vision panel etc. Abstract B Page 108
supply & installation, inclusive of duties excluding taxes F.O.R. Site)
BOQ
New TOTAL QTY TOTAL AMOUNT
Qty. Remarks
Pre. Qty. Ammen RATE PRE THIS CUMM PRE THIS CUMM
S. No. Description Unit
TYPE - FD2 : Metal Fire Doors of approved size 750 x 2000mm including metal d
frame finished with fire rated paint on both sides, of approved colour and shade as
per the Design Consultants approval (2 Hours Fire rated) of single/double leaf. The
TYPE - FD3
door to have- 250mm
: Metal Fire Doors size
x 750mm of approved sizerated
2 Hour fire 1800vision
x 2100mm
panel including
as per the metal
detailed
frame finished with fire rated paint on both sides, of approved colour and shade as
drawing. The rate
per the Design is inclusive
Consultants of supplying
approval andFire
(2 Hours fixing all brush
rated) finished
of double leaf.2The
Hour
doorfireto
1.1.2 rated ironmongery
have 250mm x 750mmlike locks, handles,
size 2 Hour firetower
rated bolts,
visiondoor
panelcloser
visionetc. of approved
panel as per the Sqm 4.7 3 8,253 3 - 3.00 24758 0 24758
make as indicated
detailed drawing. Thein the detail
rate drawing.ofLocation-
is inclusive supplyingElectrical
and fixingshaft, Meter
all brush room 2
finished
(Basicfire
Hour price of ironmongery
rated fire door @ Rs like7405/Sqm including
locks, handles, towerdoor shutter,
bolts, frame,
door closer etc. of
hardwaresmake
approved and asvision panelinetc.
indicated thesupply & installation,
detail drawing. inclusive
Location- of duties
DG room, Pump
excluding
room, taxes F.O.R.
Electrical room.Site)
(Basic price of fire door @ Rs 7405/Sqm including
door shutter, frame, hardwares and vision panel etc. supply & installation,
1.1.3 inclusive of duties excluding taxes F.O.R. Site) Sqm 4 3.78 8,662.20 3.78 - 3.78 32743 0 32743
PART - B SUPERSTRUCTURE
Providing and fixing in position Hollow metal fire rated doors as per IS 3614 part-1
& part-2 for stability and integrity. Pressed Galvanized steel confirming to IS 277
with
JOINERYthe following
WORKS specification.
Recommended
(Quoted Rates are firefor
door
all shall have
heights, doors levels,
depths, testedleads
at CBRIandorlifts)
ARAI for maximum
rating of 2hrs with vision panel. Test certificates should be available for vision
1 lites
FIRE /panels
DOOR as part of the fire door assembly. Independent glass test certificates
will not be accepted. Manufacturer test certificate shall cover doors both single and
Door
Door
double leaf
frameshall
leaf andbe
shall 46mm
be
all double
doors thick fullyshould
rebate
supplied flush double
frame profile skin door
of size
be within the with
143
tested or without
x 57mm made
specimen, vision
out of
deviation
lite.
1.60mmDoor(16gauge)
leaf shall
in specification andbe manufactured
minimum
sheet fromthan
thick galvanized
thickness other 1.2mm
steel
what(18guage)
sheet. minimum
Frames
is mentioned in thethick
shall betest
Mitered
galvanised
and
certificates steel
field assembledsheet.
are not The
with
allowed. internal
selfProper construction
tabs. All provision
label of the
should
confirming door
thebe should
of doorbe
mortised,
type rigid
drilled
and and
the hourly
1.1 reinforcement
tapped
rating isfor pads for
receiving
mandatory. receiving hardware.
appropriate appropriateFrames
hardware.
shouldThebeinfill material
provided shall
with be
back
resin bonded honeycomb core. All doors shall be factory prepped
plate bracket and anchor fasteners for installation on a finished plastered RCC for receiving
appropriate
surface/ masonry hardware
wall and provided
opening. Oncewith necessary
frame installedreinforcement
should be groutedfor hinges,
with locks,
and
cementdoor&closers. The necessary
sand slurry edges should for be
fireinterlocked
doors on the with lockopening.
clear seam. Vision lite
wherever applicable should be provided as per manufacturer's recommendation
with a beeding and screws from inside. The glass should be 6mm clear borosilicate
fire rated glass of relavant rating of the door.
All doors and frames shall be finished with polyurethane aliphatic grade paint of
approved colour. The door leaf and frame shall have passed minimum 250 hours of
salt sprey test.
TYPE - FD - : Metal Fire Doors of approved size 1100 x 2100mm including metal
frame finished with fire rated paint on both sides, of approved colour and shade as
per the Design Consultants approval (2 Hours Fire rated) of double leaf. The door to
1.1.1 have 250mm x 750mm size 2 Hour fire rated vision panel as per the detailed Sqm 45 50.82 8,253 47.5398 0.00 47.54 392328 0 392328
drawing.
TYPE - FD1 The-rate is inclusive
: Metal of supplying
Fire Doors and size
of approved fixing all xbrush
1100 finished
2100mm 2 Hourmetal
including fire
rated
frameironmongery
finished withlike firelocks, handles,
rated paint towersides,
on both bolts,ofdoor closer colour
approved etc. of and
approved
shade as
make
per theasDesign
indicated in the detail
Consultants drawing.
approval Location-Staircase
(2 Hours Fire rated) of (Basic
doubleprice of fire
leaf. The door
door to
1.1.1 @ Rs250mm
have 7405/Sqm including
x 750mm size door
2 Hour shutter, frame,
fire rated hardwares
vision panel as per andthevision panel etc. Sqm
detailed 34.5 34.5 8,253 33.81 0.00 33.81 279021 0 279021
supply
TYPE -&
drawing. FD2installation
The :rate
Metal inclusive
is inclusive
Fire Doorsof of
of duties
supplying
approvedexcluding
and 750taxes
fixing
size all F.O.R.
brush
x 2000mm Site) 2 Hour
finished
including fire
metal
rated
frameironmongery
finished withlike firelocks, handles,
rated paint towersides,
on both bolts,ofdoor closer colour
approved etc. of and
approved
shade as
make
per theasDesign
indicated in the detail
Consultants drawing.
approval Location-Staircase
(2 Hours Fire rated) of (Basic price ofleaf.
single/double fireThe
door
1.1.2 @ Rsto7405/Sqm
door have 250mm including
x 750mm door shutter,
size 2 Hourframe, hardwares
fire rated vision panelandasvision panel
per the etc. Sqm
detailed 80 49.5 8,253 47.04 0.00 47.04 388203 0 388203
supply &The
drawing. installation inclusive
rate is inclusive of of duties excluding
supplying and fixingtaxes F.O.R.
all brush Site) 2 Hour fire
finished
1.2 rated
DOORironmongery
SHUTTER like locks, handles, tower bolts, door closer etc. of approved
make as indicated in the detail drawing. Location- Electrical shaft, Meter room
Providing
(Basic price andoffixing phenol
fire door @ Rsbonded flush door
7405/Sqm shutters
including doorof approved quality and
shutter, frame,
make non decorative
hardwares and vision type coreetc.
panel of block
supplyboard constructioninclusive
& installation, with internal frame of 1st
of duties
class hard wood
excluding taxes and wellSite)
F.O.R. matched 3mm commercial ply veneering with vertical
grains or cross bands including 6 mm thick red merandi wooden lipping all around,
1.2.1 providing and fixing 4 nos. 125mm long and 3.5mm thick SS hinges and providing
& fixing 50mmx20mm melamine matt finish teakwood architrave on both side of
doors as per drawing and specification complete and approved sample. (Basic price
38 mm thick
of Door with
Shutter 32mm flush
including door
lipping and& both
3 mmsides
thickveneer-
decorative veneerper
Rs. 2616/- with
SQMgrooves
on outsideofand
inclusive plain
duties veneer on
excluding inside
taxes surface
F.O.R. Site.including
Basic ratemelamine polishing
is excluding as per
the cost of
a drawing and design (D of size 1100x2100mm). Location- Unit Main Entrance Door Sqm 141 123.0615 6,108 115.918104 0.00 116 708024 0 708024
hinges & polishing)
Providing and fixing mortice latch and lock with six levers and a pair of levers
handles of Godrej or equivalent as approved with necessary screws etc. complete
1.3.1 Stainless Steel
With Pin Cylinder (10' forend length) - for external Doors (Basic rate @1308/ Each
a inclusive of duties excluding taxes F.O.R. Site) No. 86 86 1,661 56.26 0 56 93433 0 93433
With Pin Cylinder (8' forend length) - for Internal Doors (Basic rate @1177/ Each
b inclusive of duties excluding taxes F.O.R. Site) No. 234 260 1,585 252.2 0 252 399718 0 399718
Keyless Cylindrical handle with knob - For toilet doors (Basic rate @872/ Each
c inclusive of duties excluding taxes F.O.R. Site) No. 202 202 1,107 195.94 0 196 216937 0 216937
Providing & fixing bright finished brass/Stainless Steel AISI 316 grade tower bolt
1.3.2 (barrel type) of approved make with necessary screws etc. complete.
200 X 10 mm (Basic rate @ 196/ Each inclusive of duties excluding taxes F.O.R.
a Site) Each 260 260 261 247 0 247 64464 0 64464
250 X 10 mm (Basic rate @ 245/ Each inclusive of duties excluding taxes F.O.R.
b Site) Each 58 58 328 55.1 0 55 18053 0 18053
Providing and fixing bright finished brass/Stainless Steel AISI 316 grade hanging
type double floor door stopper of best quality as approved with necessary screws
etc. complete. (Basic rate @ 196/ Each inclusive of duties excluding taxes F.O.R.
Site)
1.3.3 Each 492 318 267 318 0 318 84862 0 84862
Providing and fixing rubber buffer of best quality as approved with necessary screws
etc. complete. (Basic rate @ 196/ Each inclusive of duties excluding taxes F.O.R.
Site)
1.3.4 Each 520 520 267 520 0 520 138768 0 138768
Providing and fixing imported Magic eye 270" of brush steel finish (Basic rate @
1.3.5 147/ Each inclusive of duties excluding taxes F.O.R. Site) Each 58 58 210 58 0 58 12173 0 12173
Providing and fixing SS hydraulic door closer of brush steel finish (Basic rate @
1.3.6 1177/ Each inclusive of duties excluding taxes F.O.R. Site) Each 58 58 1,544 58 0 58 89562 0 89562
Providing and fixing SS safety chain of brush steel finish (Basic rate @ 147/ Each
1.3.7 inclusive of duties excluding taxes F.O.R. Site) Each 58 58 210 58 0 58 12173 0 12173
1.1.3 Windows
Partly fixed with partly side hung openable shutter of types W11, W14, W14' (Basic
price Rs. 3182/- per Sqm, include F.O.R. cost of material, Glass, hardware, duties
and the cost of installation and fixing excluding taxes)
a Sqm 51.39 51.39 3,417 20 0.00 20 68332 0 68332
Partly fixed with partly side hung openable shutter and with provision for exhaust
fan of types W12,W13 (Basic price Rs. 3182/- per Sqm, include F.O.R. cost of
material, Glass, hardware, duties and the cost of installation and fixing excluding
taxes)
b Sqm R/O 0 3,417 0 0 0
Partly fixed with 2 track sliding of types W1, W4, W5, W7, W9, W9' ,W10 (Basic
price Rs. 3182/- per Sqm, include F.O.R. cost of material, Glass, hardware, duties
and the cost of installation and fixing excluding taxes)
c Sqm 305 305 3,417 222.28 0 222 759444 0 759444
Partly fixed with 2 track sliding and with provision for exhaust fan of types W5', W8
(Basic price Rs. 3182/- per Sqm, include F.O.R. cost of material, Glass, hardware,
duties and the cost of installation and fixing excludint taxes)
d Sqm R/O 0 3,417 0 0 0 0
Partly Fixed with partly louvered of types W2, W3, W6 (Basic price Rs. 3182/- per
Sqm, include F.O.R. cost of material, Glass, hardware, duties and the cost of
installation and fixing excluding taxes)
e Sqm 37 72.7175 3,417 0 0 0 0
Partly Fixed partly top hung openable with provision for exhaust fan of types V, V1
(Basic price Rs. 3135.60/- per Sqm, include F.O.R. cost of material, Glass,
hardware, duties and the cost of installation and fixing excluding taxes)
f Sqm 144 127.37 3,420 127.35778 0 127 435540 0 435540
NOTES
Total Amount 39704597 (19480) 39,685,117
Pre GST Work Amount 1,853,258.0 - 1,853,258.0
Post GST Work Amount 37,851,339.0 (19,480.0) 37,831,859.0
Sqm
3A 1277 45.59
Quantities in one Flat
3D 50.34
Basement 1277
JMR
1 Ground Floor
001 3A 45.59
002 3D 50.34
003 3A 50.34
Lobby/Common area 2.02
2 1st Floor
101 3A 45.59
102 3D 50.34
103 3A 45.59
Lobby/Common area 2.02
3 2nd Floor
201 3A 45.59
202 3D 50.34
203 3A 45.59
204 3D 50.34
Lobby/Common area 2.02
3 3rd Floor
301 3A 45.59
302 3D 50.34
303 3A 45.59
304 3D 50.34
Lobby/Common area 2.02
4 4th Floor
401 3A 45.59
402 3D 50.34
403 3A 45.59
404 3D 50.34
Lobby/Common area 2.02
5 5th Floor
501 3A 45.59
502 3D 50.34
503 3A 45.59
504 3D 50.34
Lobby/Common area 2.02
6 6th Floor
601 3A 45.59
602 3D 50.34
603 3A 45.59
604 3D 50.34
Lobby/Common area 2.02
7 7th Floor
701 3A 45.59
702 3D 50.34
703 3A 45.59
704 3D 50.34
Lobby/Common area 2.02
8 8th Floor
801 3A 45.59
802 3D 50.34
803 3A 45.59
804 3D 50.34
Lobby/Common area 2.02
9 9th Floor
901 3A 45.59
902 3D 50.34
903 3A 45.59
904 3D 50.34
Lobby/Common area 2.02
10 10th Floor
1001 3A 45.59
1002 3D 50.34
1003 3A 45.59
1004 3D 50.34
Lobby/Common area 2.02
11 11th Floor
1101 3A 45.59
1102 3D 50.34
1103 3A 45.59
1104 3D 50.34
Lobby/Common area 2.02
12 12th Floor
1201 3A 45.59
1202 3D 50.34
1203 3A 45.59
1204 3D 50.34
Lobby/Common area 2.02
13 13th Floor
1301 3A 45.59
1302 3D 50.34
1303 3A 45.59
1304 3D 50.34
Lobby/Common area 2.02
14 14th Floor
1401 3A 45.59
1402 3D 50.34
1403 3A 45.59
1404 3D 50.34
Lobby/Common area 2.02
15 Terrace Floor
LMR
A Total Quantity 1277 2812
B Qty billed before 30th June 2017 1234.314
C Balance Qty to be billed 1277 1578
E=(AxD)-B Final Qty to be billed post 30th June 2017 1150 1578
Sunken Filling
Sunken Filling Anti-Skid Floor Tile
(Screed- Anti-Skid Floor Tile 300x300 Anti-Skid Floor Tile 300x300
(Screed- 300x300 (Servent RM)
Balcony) (Balcony) (Sqm) (Kitchen) (Sqm)
Toilet) (Cum) (Sqm)
(Cum)
OH Tank OH Tank kitchen dado Toilet Dado Toilet Floor Flooring Skirting
Skirting
Sqm Sqm Sqm Sqm Sqm Sqm Sqm
54.48 23.58 5.70 55.09 13.04 31.61 2.26
0.87 5.65 65.24 15.07 35.50 2.21
5.40 16.92
54.48 23.58
24 54 24 329 3485 813 1959 130
0 0 0 0 0 0 0 0
24 54 24 329 3485 813 1959 130
41.47 3.52
40.60 2.79
1.76 8.37 8.37 4.57 4.57 12.37
40.60 2.79
1.19 8.37 8.37 4.57 4.57 12.37
40.60 2.79
1.19 8.37 8.37 4.57 4.57 12.37
40.60 2.79
1.19 8.37 8.37 4.57 4.57 12.37
40.60 2.79
1.19 8.37 8.37 4.57 4.57 12.37
40.60 2.79
1.19 8.37 8.37 4.57 4.57 12.37
40.60 2.79
1.19 8.37 8.37 4.57 4.57 12.37
40.60 2.79
1.19 8.37 8.37 4.57 4.57 12.37
40.60 2.79
1.19 8.37 8.37 4.57 4.57 12.37
40.60 2.79
1.19 8.37 8.37 4.57 4.57 12.37
40.60 2.79
1.19 8.37 8.37 4.57 4.57 12.37
40.60 2.79
1.19 8.37 8.37 4.57 4.57 12.37
40.60 2.79
1.19 8.37 8.37 4.57 4.57 12.37
40.60 2.79
1.19 8.37 8.37 4.57 4.57 12.37
40.60 2.79
1.19 8.37 8.37 4.57 4.57 12.37
40.60 2.79
1.19 8.37 N/A 4.98 N/A 12.37
Balcony
Landing-S2 Skirting-S1 Skirting-S2 Toilets Kitchen Passanger Lift
Coping
2.934 2.64
2.40
2.70
232.95 24.18
24.91 33.30
34.20
190.34 80.17 0.00 558.69
24.91
24.91
34.20 33.30
178.29 78.80 142.58 594.17
24.91
24.91
34.20
33.30
170.46 75.07 142.58 544.83 24.91
34.20
24.91
33.30
170.46 75.07 487.75 142.58 75.24
34.20 33.30
170.46 75.07 487.75 142.58 75.24 24.91
34.20
24.91
34.20
33.30
170.46 75.07 487.75 142.58 75.24 24.91
34.20
24.91
34.20
33.30
170.46 75.07 487.75 142.58 75.24 24.91
34.20
24.91
34.20
33.30
170.46 75.07 487.75 142.58 75.24 24.91
34.20
24.91
34.20
33.30
170.46 75.07 487.75 142.58 75.24 24.91
34.20
24.91
34.20
33.30
170.46 75.07 487.75 142.58 75.24 24.91
34.20
24.91
34.20
33.30
170.46 75.07 487.75 142.58 75.24 24.91
34.20
24.91
34.20
33.30
170.46 75.07 487.75 142.58 75.24 24.91
33.30
170.46 75.07 487.75 142.58 75.24
34.20
24.911
34.201
33.30
170.46 75.07 487.75 142.58 75.24 24.911
34.201
24.911
34.201
33.30
170.46 75.07 487.75 142.58 75.24 24.911
34.201
24.911
34.201
33.30
170.46 75.07 487.75 142.58 75.24 24.91
34.201
24.911
34.201
33.30
170.46 75.07 487.75 142.58 75.24 24.91
34.201
LIFT LMR Flooring Skirting FD (1.1x2.1) FD1 (1.15x2.0) FD2 (0.75x2.0) FD3 (1.8x2.1)
49.22
49.22 50.83 42.95
45.39 36.91
50.83 42.95
50.83 42.95
9.24 3.00
171.54 2.31
738 172 2790 2316 49 35 48 0
0 0 0 0 0 0 0 0
738 172 2790 2316 49 35 48 0
D D1 D2 D1" D D1 D2 D1"
Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm
2.6 5.3 2.8 1.8 4.0
1.8 3.2 3.4 11.4 8.6
1.8
1.80
5 50 91 158 96 85 34 319 239 121
0 0 0 0 0 0 0 0 0 0
5 50 91 158 96 85 34 319 239 121
97% 98% 98% 98% 98% 98% 95% 98% 98% 98%
Toilet
Sqm
1.620
1.620
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
1.62
94
0
94
87%
82
Project : Godrej Aria sector 79 Gurgaon Date 19-Feb-20
Vendor Jayant K. Furnishers, RA Bill No. 24th RA
Service FINISHING WORKS FOR GODREJ ARIA SEC-79, Gurgaon. Period Up to Jan. 2021
LOI No. GPL/GGN/LOA/GODREJ ARIA/JAYANT Dated- 06.12.2016
Tower-C
BOQ
New TOTAL QTY TOTAL AMOUNT
Pre. Qty. Remarks
RATE PRE THIS CUMM PRE THIS CUMM
S. No. Description Unit Qty. Ammen
d
PART - A SUBSTRUCTURE
Marble shall be procurred in sizes available in the market, quoted rates also to
include cutting of sizes as per design and skirting from standard size stone pieces.
The rate should be inclusive of protection of flooring until the handling of the
project by covering the joints with 6mm plastic sheet etc.
1 FLOORING WORKS
1.1 Glazed ceramic tile
Providing and laying to pattern, commercial quality glazed Ceramic tile of
approved colour, size 200x200mm & minimum 5mm thickness for called of areas,
over 20mm thick or more cement mortar bed (to make up required finished floor
level) of 1:4 mix (1 cement:4 coarse sand) and joints shall be pointed with the
matching cement based polymer grout as recommended by Laticrete/ Bal Endura or
approved equivalent make etc., the rate inclusive of providing necessary spacers of
size 1.6mm to ensure uniform joints etc. complete in all respect as per drawings.
(Basic price of tile - Rs.26/sft inclusive of all duties excluding taxes F.O.R. site. )
Providing and laying stone flooring using stone slab of approved quality in specified
size of stone slab as per drawings and pattern in flooring/ landing with cement
mortar 1:4 (1 cement : 4 coarse sand) of adequate thickness to match the total
thickness of 50mm and joint to be filled with white cement slurry mixed with
pigment to match the shade of stone including surfaces pointing, curing etc.
complete as per specification, pattern and drawing.
With 18 to 20mm thick Prepolished Granite stone and joint to be filled with white
cement slurry mixed with pigment to match the shade of stone (Basic rate of
prepolished (one side) Granite @ Rs. 118/Sft inclusive of all duties excluding taxes
F.O.R. site)
1.4.1 sqm 25 0.0 2,911.14
With 18 to 20mm thick Kota stone and joint to be filled with grey cement slurry
mixed with pigment to match the shade of stone, providing 4Nos. 5x3mm grooves
and including rubbing, grinding, polishing and bull nosing etc. complete.
(Basic rate of Kota @ Rs. 39/Sft inclusive of all duties excluding taxes
F.O.R. site)
1.4.2 sqm 11 13.4 1,409 11 0 11 15497 0 15497
Providing and laying stone in specified size (in two equal pieces) of stone slab in
treads and risers of steps as per design and pattern shown in drawings laid over
20mm average thick CM 1:3 (1 cement : 3 coarse sand) jointed with cement slurry
mixed with pigment to match the shade of slab including chamfering, corner /edge
grinding and mirror polishing, making nosing as per profile in steps, rubbing and
mirror polishing, drilling holes and grouting for fixing of staircase railing etc.
complete as per specification and drawing.
1.5.1 Treads of steps
With 18 to 20mm thick Prepolished Granite stone and joint to be filled with white
cement slurry mixed with pigment to match the shade of stone (Basic rate of
prepolished (one side) Granite @ Rs. 118/Sft inclusive of all duties excluding taxes
F.O.R. site)
a. sqm 18 0.0 3,577.18
With 18 to 20mm thick Kota stone and joint to be filled with grey cement slurry
mixed with pigment to match the shade of stone, providing 4Nos. 5x3mm grooves
and including rubbing, grinding, polishing and bull nosing etc. complete.
(Basic rate of Kota @ Rs. 39/Sft inclusive of all duties excluding taxes
F.O.R. site)
b. sqm 18.83 18.8 2,525.18 10 0 10 25959 0 25959
2. WALL FINISHES
2.1 Cement Plaster skirting / risers/ dados / platforms.
Providing and laying 100 mm high 12-15 mm thick Cement plaster skirting with
cement mortar 1:4 (1 cement : 4 coarse sand) finished with a floating coat of neat
cement as per drawing and design. sqm 15 15.0 393
Providing and laying skirting in stone in 12 mm average thick cement mortar 1:3 (1
cement : 3 coarse sand) jointed cement slurry mixed with pigment to match the
shade of slab including corner/ edge grinding, wherever required complete as per
specification, pattern and drawing.
With 18 to 20mm thick Prepolished Granite stone and joint to be filled with white
cement slurry mixed with pigment to match the shade of stone (Basic rate of
prepolished (one side) Granite @ Rs. 118/Sqft inclusive of all duties excluding
taxes F.O.R. site)
2.2.1 sqm 3.2 0.0 4,102
With 18 to 20mm thick Kota stone and joint to be filled with grey cement slurry
mixed with pigment to match the shade of stone including rubbing, grinding and
polishing complete. (Basic rate of Kota @ Rs. 39/Sqft inclusive of all duties
excluding taxes F.O.R. site)
2.2.2 sqm 4 4.0 2,646 3 0 3 7753 0 7753
With 18 to 20mm thick Prepolished Granite stone and joint to be filled with white
cement slurry mixed with pigment to match the shade of stone. (Basic rate of
prepolished (one side) Granite @ Rs. 118/Sqft inclusive of all duties excluding
taxes F.O.R. site)
2.3.1 sqm 9.55 9.6 2,938 5 0 5 15690 0 15690
Providing and laying 6-10mm thick tile in skirting laid over 12mm thick cement
mortar 1:3 (1cement : 3 coarse sand), and joints shall be pointed with the matching
cement based polymer grout (Laticrete/Bal grout or equivalent) of approved shade
including cutting, grouting the joints etc. complete in all respects as per drawing.
With Vitrified Tile @ base rate Rs. 44/Sqft inclusive of all duties excluding taxes
2.4.1 F.O.R. site. sqm 5.168 5.5 1,944 5 0 5 10302 0 10302
Providing and laying 6-10mm thick tiles in cladding/ dado/ jamb/ soffit/ cill of
uniform thickness, size, shade and pattern as approved by Architect/Project
Manager laid with rich cement slurry over a bedding plaster of 6mm (avg.) thick
cement mortar 1:3 (1 cement : 3 fine sand) including the cost of 12mm average
thick rough base plaster of mix 1:3 (1 cement : 3 coarse sand), and joints shall be
pointed with the matching cement based polymer grout (Laticrete/Bal grout or
equivalent) of approved shade including cutting, curing etc. complete in all
respects as per drawing.
With Ceramic Tile of size 300x450mm @ base rate Rs. 28/Sqft inclusive of all
2.5.1 duties excluding taxes F.O.R. site. Sqm 65.66667 0.0 1,119
PART - B SUPERSTRUCTURE
sqm 1591.542 1650.6 465 1614 -41 1573 750628 -19011 731617
0 0 0
With 18 to 20mm thick Polished Imported Marble Stone and joint to be filled with
white cement slurry mixed with pigment to match the shade of stone including
rubbing and mirror polishing complete. (Basic rate @ Rs. 245/Sqft inclusive of all
duties excluding taxes F.O.R. site)
1.3.1 Sqm 36.95588 37.0 5,808 0 0 0
Providing and laying stone in specified size (in two equal pieces) of stone slab in
treads and risers of steps as per design and pattern shown in drawings laid over
20mm average thick CM 1:3 (1 cement : 3 coarse sand) jointed with cement slurry
mixed with pigment to match the shade of slab including chamfering, corner /edge
grinding and mirror polishing, making nosing as per profile in steps, rubbing and
mirror polishing, drilling holes and grouting for fixing of staircase railing etc.
complete as per specification and drawing.
1.5.1 Treads of steps
With 18 to 20mm thick Kota stone and joint to be filled with grey cement slurry
mixed with pigment to match the shade of stone, providing 4Nos. 5x3mm grooves
and including rubbing, grinding, polishing and bull nosing etc. complete.
(Basic rate of Kota @ Rs. 39/Sft inclusive of all duties excluding taxes
F.O.R. site)
a. sqm 288.8 283.1 2,527 267 0 267 673748 0 673748
Providing and laying 100 mm high 12-15 mm thick Cement plaster skirting with
cement mortar 1:4 (1 cement : 4 coarse sand) finished with a floating coat of neat
cement as per drawing and design. sqm 27.233 25.0 397 0 0 0
PART - A SUBSTRUCTURE
1 PAINTING
PART - B SUPERSTRUCTURE
1 PAINTING WORKS
(Quoted Rate shall be for all heights, depths, levels, leads and lifts ).
Acrylic Emulsion Paint of approved brand and shade as per specification As per Pre
1.1.1 GST Rates (Billed before 30th June-2017) sqm 17075 2810.3 195 2810 0 2810 548015 0 548015
Acrylic Emulsion Paint of approved brand and shade as per specification As per
1.1.1 Post GST Rates (Billed after 30th June-2017) sqm 14289.83 14503.3 183.73 12965 0 12965 2382049 0 2382049
1.1.2 Oil Bond Distemper of approved brand and shade as per specification sqm 9581 6784.5 155.72 6423 0 6423 1000214 0 1000214
Providing and applying Whitewash in three or more coats on wall and ceiling
including cost of addition of gum, ultramarine blue, including primer, scaffolding,
preparation of surface by brushing and brooming down along with sand papering
wherever required to give an even shade etc.complete. (In Service Rooms &
Lift/Services Shaft, Machine room etc.) As per Pre GST Rates (Billed before 30th
June-2017)
Providing and applying two or more coats of polymer based weather proof
synthetic textured paint on external walls over a coat of primer in approved
finish, colour and texture (made out of synthetic fibers and petroleum based
chemicals) as per manufacturer's specification at all levels and height. (The
1.3 work should be executed by an approved agency). Rates quoted to include sqm. 3599 2574.9 282.50 2536 0 2536 716389 0 716389
vertical and horizontal grooves and patterns as directed including preparing
the base surface,
Providing attending
& applying two or to
morebroken
coatsedges, corners
of acrylic paintsortopatches of plastered
the external surfaces
surface and
whether filling
plastered orwith finish, using exterior
formcementitious quality acrylic
grout, scaffolding, weather
staging, shield
cleaning the
paint
surfaceofetc.
approved
completeshade & makeby
as directed including
Engineer.preparing
(Base Ratethe base surface,paint is
for external
attending
Rs 23 pertosftbroken edges, corners
for specialised or patches
agency includingof material,
plasteredlabour
surfaceand
and filling
with cementations
arrangement grout, scaffolding,
for painting cleaning the platform
i.e. staging/ scaffolding/ surface, providing & of
etc., inclusive
1.4 applying STC biocide,
duties excluding primingSite)-
taxes F.O.R. coat up
etc.tocomplete all as per manufacturers
5th Floor. sqm. 7701 10503.1 221.27 8763 0 8763 1938913 0 1938913
guidelines and as directed by the Engineer. (Base Rate for external paint is
Rs 18 per sft for specialised agency including material, labour and
arrangement for painting i.e. staging/ scaffolding/ platform etc., inclusive of
duties excluding taxes F.O.R. Site).- Above 5th Floor
Providing and painting with waterproof cement based paint of approved brand
(Snowcem plus) two or more coats and a coat of base coarse with white shade (for
new work) to external walls, columns, chajja, facia. Aprons etc. over plastered
surface to give an even shade including preparation of base as per manufacturer’s
specifications
Providing and including scaffolding
fixing of false ceilingsandat allcuring (Plaster
heights work measured
of 600mm x 600mm Grid separately)
ceiling,
1.5 ceiling
with alltiles
labour
withand materials
Tegular/ in all floors.
Microlook Edge laid on prelude XL exposed grid systems Sqm 50 50.0 126.98 0 0 0
with 24mm / 15mm wide T- section flanges colour white. The framework comprise 0 0 0
of main runner spaced at 1200mm centers securely fixed to the structural soffit by
1.6 approved
False ceiling hangers at 1200mm maximum centers. Hangers (GI wire of 4.0mm dia) 0 0 0
to be fixed by approved roof plug/ fastener, level adjusters and screws etc. The last
hanger at the end of each main runner should not be greater than 450mm from
the adjacent wall. Flush fitting 1200mm long cross tees (with double stitching) to
be interlocked
Providing between
and fixing main runners
suspended at 600mm
false ceiling whichcenters
includes toproviding
form 1200and x 600
fixing GI
1.6.1 modules. Cut
perimeter cross tees
channels longer
of size 0.55than
mm.600mmThk. havingto beonesupported
flange ofindependently.
20 mm and another 0 0 0
flange
600mmofx30 mm and
600mm web ofto27
modules bemm along
formed bythe perimeter
fitting 600mmoflong the flush
ceiling, screwcorss
fitting fixed
to
teesbrick wall/ partition
centrally between the with1200m
help ofcross
nylon sleeves
tees. and screws,
Perimeter trim to atbe610 mm centers.
Armstrong wall
The suspended GI intermediate channels of size 45 mm,0.9mm
angle secured to walls at 450mm maximum centrers. The quoted rate shall be thk with two
flanges
inclusiveoffor15 making
mm each from the
opening forsoffit
light at 1220 mm
fixtures, centers
diffusers & with ceilingThe
AC grills. angles
quotedwith
ceiling angle of width 25mm x 10mm x 0.55mm thk fixed to soffit with GI cleat and sqm. 1044 776.3 712.54 754 0 754 537240 0 537240
rate shall be inclusive of suspenders at all heihgt & extra
steel expansion fasteners. Ceiling section of 0.55 mm thk having web of 51.5 mm member required for all
openings. (Basicof
and two flanges rate
26of
mm ceiling
eachtile
withRslips583/- per Sqm. including
of 10.5mmare then fixed framework
to the & grid 0 0 0
system, inclusive
intermediate all duties
channels withetc.helpexcluding
of connectingtaxes clips
F.O.R.and site).
in direction perpendicular
Screw
to the fixing is done channel
intermediate mechanically either with
with centers. screw
All GI driver sall
members or drilling machineor
be of Gypsteel with
suitable attachment. Finally the boards are
approved equivalent make. The 12.5 mm tapered edge gypboard to be joined and finished so as to have
(Confirming to IS-
a2095-1982)
flush look which
is thenincludes
screw fixedfinishing the tapered
to ceiling and square
section with 25 mmedges dry wallof the board
screws at
1.6.2 with joining
230mm centers. compound. fibre tape and two coats of primer suitable for Gypboard 0 0 0
(As per the recommendations / practice of St. Gobain Gyproc or equivalent) This
includes providing the surface of false ceiling to be painted with approved quality
of Plastic emulsion paint. The false ceiling surfaces shall be prepared to the
satisfaction
Notes: of the Design Consultant, and shall be applied with two coats of
primer,
1) Theretwowillcoats
not beofseparate
putty andmeasurements
touch up puttyfor if required
the verticalto achieve
drops upto smooth
2'-0"finish.
high,
The surface
double levelshall be painted
ceiling, with two
vaulted ceiling, coatsceiling
curved of Luxol silkindirect
and emulsion paintmade
lighting of in
approvedboard.
Gypsum make to the satisfaction of Design Consultants. Sqm R/o 75.4 1,367.13 0 0 0
2) False ceiling rate quoted shall include providing necessary cut-outs for fixing
Light fixtures (Inclusive of all sizes), AC diffuser, AC dampers, AC linear grilles for
(supply and return air), smoke detectors, speakers etc., as directed by the Design
Consultants.( No additional rates will be given for the cut-outs) 0 0 0
1.6.3 Item same as above item no. 1.6.2 but using for Horizontal and Vertical Boxing. Sqm 86 137.0 1,550.48 62 0 62 95512 0 95512
0 0 0
1.7 Trap door 0 0 0
Providing and fixing trap door in false ceiling, made of 12 mm thick prelaminated
partical board resting/ fixed including all hardware, hard wood lipping etc.
complete as per drawing. sqm 28 28.0 3,996.44 0 0 0
0 0 0
1.8 Mirror 0 0 0
Providing and fixing looking mirror 6 mm thick with 4 mm thick AC sheet backing
and GHANA teak wood moulding around complete including painting polishing,
and providing and fixing 300 micron HDP film as vapour barrier, all necessary fixing
1.8.1 arrangement like nails/ screws dash fastner/studs etc. complete . sqm 102 94.0 4,307.27 89 0 89 384476 0 384476
PART - A SUBSTRUCTURE
JOINERY WORKS
(Quoted Rates are for all heights, depths, levels, leads and lifts)
PART - B SUPERSTRUCTURE
JOINERY WORKS
(Quoted Rates are for all heights, depths, levels, leads and lifts)
1 FIRE DOOR
TYPE - FD - : Metal Fire Doors of approved size 1100 x 2100mm including metal
frame finished with fire rated paint on both sides, of approved colour and shade as
per the Design Consultants approval (2 Hours Fire rated) of double leaf. The door to
1.1.1 have 250mm x 750mm size 2 Hour fire rated vision panel as per the detailed Sqm 45 50.8 8,253 49 0 49 402645 0 402645
TYPE
drawing.- FD1
The-rate
: Metal Fire Doors
is inclusive of approved
of supplying and size 1100
fixing all xbrush
2100mm including
finished 2 Hourmetal
fire
frame finished withlike
rated ironmongery firelocks,
rated paint on both
handles, towersides,
bolts,ofdoor
approved
closer colour
etc. of and shade as
approved
per
maketheasDesign Consultants
indicated in the detail approval
drawing.(2 Hours Fire rated) of (Basic
Location-Staircase doubleprice
leaf. The door to
of fire
1.1.1 have Sqm 34.5 34.5 8,253 33 0 33 273327 0 273327
door 250mm x 750mmincluding
@ Rs 7405/Sqm size 2 Hour fireshutter,
door rated vision panel
frame, as per theand
hardwares detailed
vision
TYPE
drawing.- FD2
panel etc. The :rate
Metal
supply is Fire Doors
&inclusive
installation of approved
of supplying
inclusive ofsize
and 750excluding
fixing
duties x 2000mm
all including
brush finished
taxes metal
2 Hour
F.O.R. fire
Site)
frame finished withlike
rated ironmongery firelocks,
rated paint on both
handles, towersides,
bolts,ofdoor
approved
closer colour
etc. of and shade as
approved
per
maketheasDesign Consultants
indicated in the detail approval
drawing.(2 Hours Fire rated) of (Basic
Location-Staircase single/double
price ofleaf.
fireThe
1.1.2 door the detailed Sqm 80 49.5 8,253 46 0 46 380281 0 380281
door to
@have 250mm x including
Rs 7405/Sqm 750mm size 2 Hour
door fire rated
shutter, frame,vision panel asand
hardwares per vision
drawing.
panel etc.The rate is
supply &inclusive
installation of supplying
inclusive and fixingexcluding
of duties all brush finished 2 HourSite)
taxes F.O.R. fire
1.2 rated
DOORironmongery
SHUTTER like locks, handles, tower bolts, door closer etc. of approved
make as indicated
Providing and fixingin the detailbonded
phenol drawing.flushLocation- Electrical
door shutters shaft, Meter
of approved room
quality and
(Basic
make nonprice of fire door
decorative type @ Rsof7405/Sqm
core block board including door with
construction shutter, frame,
internal frame of
hardwares and vision panel etc. supply & installation, inclusive
1st class hard wood and well matched 3mm commercial ply veneering with vertical of duties
excluding taxesbands
grains or cross F.O.R. Site) 6 mm thick red merandi wooden lipping all around,
including
1.2.1 providing and fixing 4 nos. 125mm long and 3.5mm thick SS hinges and providing
& fixing 50mmx20mm melamine matt finish teakwood architrave on both side of
doors as per drawing and specification complete and approved sample. (Basic price
of Door
38 Shutter
mm thick withincluding
32mm flush lipping
doorand& both
3 mmsides
thickveneer- Rs. 2616/-
decorative veneerper SQM
with grooves
on outsideofand
inclusive plain
duties veneer on
excluding inside
taxes surface
F.O.R. Site.including
Basic ratemelamine polishing
is excluding as per
the cost of
a drawing and design
hinges & polishing) (D of size 1100x2100mm). Location- Unit Main Entrance Door Sqm 141 123.1 6,108 117 0 117 715324 0 715324
Providing and fixing mortice latch and lock with six levers and a pair of levers
handles of Godrej or equivalent as approved with necessary screws etc. complete
1.3.1 Stainless Steel
With Pin Cylinder (10' forend length) - for external Doors (Basic rate @1308/ Each
a inclusive of duties excluding taxes F.O.R. Site) No. 86 86.0 1,661 57 0 57 94396 0 94396
With Pin Cylinder (8' forend length) - for Internal Doors (Basic rate @1177/ Each
b inclusive of duties excluding taxes F.O.R. Site) No. 234 260.0 1,585 255 0 255 403395 0 403395
Keyless Cylindrical handle with knob - For toilet doors (Basic rate @872/ Each
c inclusive of duties excluding taxes F.O.R. Site) No. 202 202.0 1,107 196 0 196 216937 0 216937
0 0 0
Providing & fixing bright finished brass/Stainless Steel AISI 316 grade tower bolt
1.3.2 (barrel type) of approved make with necessary screws etc. complete. 0 0 0
200 X 10 mm (Basic rate @ 196/ Each inclusive of duties excluding taxes F.O.R.
a Site) Each 260 260.0 261 260 0 260 67857 0 67857
250 X 10 mm (Basic rate @ 245/ Each inclusive of duties excluding taxes F.O.R.
b Site) Each 58 58.0 328 58 0 58 19003 0 19003
0 0 0
Providing and fixing bright finished brass/Stainless Steel AISI 316 grade hanging
type double floor door stopper of best quality as approved with necessary screws
etc. complete. (Basic rate @ 196/ Each inclusive of duties excluding taxes F.O.R.
Site)
1.3.3 Each 492 318.0 267 318 0 318 84862 0 84862
Providing and fixing rubber buffer of best quality as approved with necessary
screws etc. complete. (Basic rate @ 196/ Each inclusive of duties excluding taxes
F.O.R. Site)
1.3.4 Each 520 520.0 267 520 0 520 138768 0 138768
Providing and fixing imported Magic eye 270" of brush steel finish (Basic rate @
1.3.5 147/ Each inclusive of duties excluding taxes F.O.R. Site) Each 58 58.0 210 58 0 58 12173 0 12173
Providing and fixing SS hydraulic door closer of brush steel finish (Basic rate @
1.3.6 1177/ Each inclusive of duties excluding taxes F.O.R. Site) Each 58 58.0 1,544 58 0 58 89562 0 89562
Providing and fixing SS safety chain of brush steel finish (Basic rate @ 147/ Each
1.3.7 inclusive of duties excluding taxes F.O.R. Site) Each 58 58.0 210 58 0 58 12173 0 12173
1.1.3 Windows
Partly fixed with partly side hung openable shutter of types W11, W14, W14' (Basic
price Rs. 3182/- per Sqm, include F.O.R. cost of material, Glass, hardware, duties
and the cost of installation and fixing excluding taxes)
a Sqm 51.39 51.4 3,417 20 0 20 68640 0 68640
Partly fixed with partly side hung openable shutter and with provision for exhaust
fan of types W12,W13 (Basic price Rs. 3182/- per Sqm, include F.O.R. cost of
material, Glass, hardware, duties and the cost of installation and fixing excluding
taxes)
b Sqm R/O 0.0 3,417 0 0 0
Partly fixed with 2 track sliding of types W1, W4, W5, W7, W9, W9' ,W10 (Basic
price Rs. 3182/- per Sqm, include F.O.R. cost of material, Glass, hardware, duties
and the cost of installation and fixing excluding taxes)
c Sqm 305 305.0 3,417 222 0 222 757599 0 757599
Partly fixed with 2 track sliding and with provision for exhaust fan of types W5',
W8 (Basic price Rs. 3182/- per Sqm, include F.O.R. cost of material, Glass,
hardware, duties and the cost of installation and fixing excludint taxes)
d Sqm R/O 0.0 3,417 0 0 0
Partly Fixed with partly louvered of types W2, W3, W6 (Basic price Rs. 3182/- per
Sqm, include F.O.R. cost of material, Glass, hardware, duties and the cost of
installation and fixing excluding taxes)
e Sqm 37 72.7 3,417 0 0 0
Partly Fixed partly top hung openable with provision for exhaust fan of types V,
V1 (Basic price Rs. 3135.60/- per Sqm, include F.O.R. cost of material, Glass,
hardware, duties and the cost of installation and fixing excluding taxes)
f Sqm 144 127.4 3,420 127 0 127 434726 0 434726
NOTES
Total Amount 40196940 (19,011.00) 40177929
Pre GST Work Amount 1,849,477.0 - 1,849,477.0
Post GST Work Amount 38,347,463.0 (19,011.0) 38,328,452.0
Basement 1308
JMR
1 Ground Floor
001 3A 45.59 2.64 1.20
002 3D 50.34 2.89 1.37
003 3A 45.59 2.64 1.20
Lobby/Common area 2.02
2 1st Floor
101 3A 45.59 2.64 1.20
102 3D 50.34 2.89 1.37
103 3A 45.59 2.64 1.20
Lobby/Common area 2.02
3 2nd Floor
201 3A 45.59 2.64 1.1964
202 3D 50.34 2.89 1.3700
203 3A 45.59 2.64 1.1964
204 3D 50.34 2.89 1.3700
Lobby/Common area 2.02
3 3rd Floor
4 4th Floor
401 3A 45.59 2.64 1.196
402 3D 50.34 2.89 1.370
403 3A 45.59 2.64 1.196
404 3D 50.34 2.89 1.370
Lobby/Common area 2.02
5 5th Floor
501 3A 45.59 2.64 1.196
502 3D 50.34 2.89 1.370
503 3A 45.59 2.64 1.196
504 3D 50.34 2.89 1.370
Lobby/Common area 2.02
6 6th Floor
601 3A 45.59 2.64 1.20
602 3D 50.34 2.89 1.37
603 3A 45.59 2.64 1.20
604 3D 50.34 2.89 1.37
Lobby/Common area 2.02
7 7th Floor
701 3A 45.59 2.64 1.20
702 3D 50.34 2.89 1.37
703 3A 45.59 2.64 1.20
704 3D 50.34 2.89 1.37
Lobby/Common area 2.02
8 8th Floor
801 3A 45.59 2.64 1.20
802 3D 50.34 2.89 1.37
803 3A 45.59 2.64 1.20
804 3D 50.34 2.89 1.37
Lobby/Common area 2.02
9 9th Floor
901 3A 45.59 2.64 1.20
902 3D 50.34 2.89 1.37
903 3A 45.59 2.64 1.20
904 3D 50.34 2.89 1.37
Lobby/Common area 2.02
10 10th Floor
1001 3A 45.59 2.64 1.20
1002 3D 50.34 2.89 1.37
1003 3A 45.59 2.64 1.20
1004 3D 50.34 2.89 1.37
Lobby/Common area 2.02
11 11th Floor
1101 3A 45.59 2.64 1.20
1102 3D 50.34 2.89 1.37
1103 3A 45.59 2.64 1.20
1104 3D 50.34 2.89 1.37
Lobby/Common area 2.02
12 12th Floor
1201 3A 45.59 2.64 1.20
1202 3D 50.34 2.89 1.37
1203 3A 45.59 2.64 1.20
1204 3D 50.34 2.89 1.37
Lobby/Common area 2.02
13 13th Floor
1301 3A 45.59 2.64 1.20
1302 3D 50.34 2.89 1.37
1303 3A 45.59 2.64 1.20
1304 3D 50.34 2.89 1.37
Lobby/Common area 2.02
14 14th Floor
1401 3A 45.59 2.64 1.20
1402 3D 50.34 2.89 1.37
1403 3A 45.59 2.64 1.20
1404 3D 50.34 2.89 1.37
Lobby/Common area 2.02
Terrace
LMR
A Total Quantity 1308 2808 160 74
OH Tank
56.43 54.03
54.48
1654 271 636 65 213 24 54
0 0 0 0 0 0 0
OH Tank
46.47
47.79 25 67.68
23.58
24 329 3527 838 2010 130 610
0 0 0 0 0 0 0
3.52
7.44 8.37 4.57 4.57 12.08 20.18
0 0 0 0 0 0 0 0
2.64 2.70
2.934
25.25
2.40
41 26 84 269 1940 44 45
0 0 0 0 0 0 0
Acrylic
Imported Marble Ladge Top Grid Ceiling False Ceiling in Oil Bond
Painting
Fixing (Sqm) in Toilets Kitchen (Sqm) Distemper (Sqm)
Toilet Ladge
Floor Skirting Flat Flat
Top Grenite
0 0 0 0 0 2810 0
232.95 24.18
24.91
34.20
190.34 80.17 0.00 601.10
24.91
24.91
34.20
178.29 78.80 99.54 635.73
24.91
24.91
34.20
170.46 75.07 131.94 586.39 24.91
34.20
24.91
34.20
170.46 75.07 536.28 142.58 75.24 24.91
34.20
24.91
34.20
170.46 75.07 536.28 142.58 75.24 24.91
34.20
24.91
34.20
170.46 75.07 536.28 142.58 75.24 24.91
34.20
24.91
34.20
170.46 75.07 536.28 142.58 75.24 24.91
34.20
24.91
34.20
170.46 75.07 536.28 142.58 75.24 24.91
34.20
24.91
34.20
170.46 75.07 536.28 142.58 75.24 24.91
34.20
24.91
34.20
170.46 75.07 536.28 142.58 75.24 24.91
34.20
170.46 75.07 536.28 142.58 75.24
24.91
34.20
170.46 75.07 536.28 142.58 75.24 24.91
34.20
24.911
34.201
170.46 75.07 536.28 142.58 75.24 24.911
34.201
24.911
34.201
170.46 75.07 536.28 142.58 75.24 24.911
34.201
24.911
34.201
170.46 75.07 536.28 142.58 75.24 24.911
34.201
24.911
34.201
170.46 75.07 536.28 142.58 75.24 24.911
34.201
1146.75 30.25
0 0 0 0 0 470
171.54 9.24
2.31
500 738 172 2790 2316 51 35
160 0 0 0 0 0 0
D D1 D2 D1" D D1 D2 D1"
Sqm Sqm Sqm Sqm Sqm Sqm Nos. Nos. Nos. Nos.
1.50 3.78 2.1 6.7 4.0 - 1.0 4.0 3.0 -
2.00 - 2.1 6.7 5.4 1.7 1.0 4.0 4.0 1.0
3.00 -
2 1
2.55 3.78
3.00
0 0 0 0 0 0 0 0 0 0
1.8
5.3 2.8
1.8 3.2 3.4 11.4 8.6
5.3 2.8
2.6 1.8
5.3 2.84
1.78 3.24 3.4 11.40 8.55
5.3 2.84
1.78 3.24 3.4 11.40 8.55
1.80
5.3 2.84
1.78 3.24 3.43 11.40 8.55
5.3 2.84
1.78 3.24 3.43 11.40 8.55
1.80
5.3 2.84
1.78 3.24 3.43 11.40 8.55
5.3 2.84
1.78 3.24 3.43 11.40 8.55
1.80
5.3 2.84
1.78 3.24 3.43 11.40 8.55
5.3 2.84
1.78 3.24 3.43 11.40 8.55
1.80
5.3 2.84
1.78 3.24 3.43 11.40 8.55
5.3 2.84
1.78 3.24 3.43 11.40 8.55
1.80
5.3 2.84
1.78 3.24 3.43 11.40 8.55
5.3 2.84
1.78 3.24 3.43 11.40 8.55
1.80
- - 5.3 - 2.84
1.78 3.24 3.43 - 11.40 8.55
- - 5.3 - 2.84
1.78 3.24 3.43 - 11.40 8.55
1.80
- 5.3 - 2.84
1.78 3.24 3.43 11.40 8.55
- 5.3 - 2.84
1.78 3.24 3.43 11.40 8.55
1.80
5.3 2.84
1.78 3.24 3.43 11.40 8.55
5.3 2.84
1.78 3.24 3.43 11.40 8.55
1.80
5.3 2.84
1.78 3.24 3.43 11.40 8.55
5.3 2.84
1.78 3.24 3.43 11.40 8.55
1.80
5.3 2.84
1.78 3.24 3.43 11.40 8.55
5.3 2.84
1.78 3.24 3.43 11.40 8.55
1.80
5.3 2.84
1.78 3.24 3.43 11.40 8.55
5.3 2.84
1.78 3.24 3.43 11.40 8.55
1.80
5.3 2.84
1.78 3.24 3.43 11.40 8.55
5.3 2.84
1.78 3.24 3.43 11.40 8.55
1.80
1.80
5 50 91 158 96 85 31 319 239
0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
97% 97% 97% 95% 94% 93% 93% 93% 94% 95%
117 114 104 20 80 37 104 32 95 89
Remarks
Project : Godrej Aria sector 79 Gurgaon Date 19-Feb-20
Vendor Jayant K. Furnishers, RA Bill No. 24th RA
Service FINISHING WORKS FOR GODREJ ARIA SEC-79, Gurgaon Period Up to Jan. 2021
LOI No. GPL/GGN/LOA/GODREJ ARIA/JAYANT Dated- 06.12.2016
Tower-D
BOQ TOTAL QTY TOTAL AMOUNT
New
S. No. Description Unit Pre. Qty. Remarks
RATE PRE THIS CUMM PRE THIS CUMM
Qty. Ammen
d
PART - A SUBSTRUCTURE
Marble shall be procurred in sizes available in the market, quoted rates also to
include cutting of sizes as per design and skirting from standard size stone pieces.
The rate should be inclusive of protection of flooring until the handling of the
project by covering the joints with 6mm plastic sheet etc.
1 FLOORING WORKS
1.1 Glazed ceramic tile
Providing and laying to pattern, commercial quality glazed Ceramic tile of
approved colour, size 200x200mm & minimum 5mm thickness for called of areas,
over 20mm thick or more cement mortar bed (to make up required finished floor
level) of 1:4 mix (1 cement:4 coarse sand) and joints shall be pointed with the sqm. R/O 0 854.80
matching cement based polymer grout as recommended by Laticrete/ Bal Endura
1.2 or
IPSapproved
Floor equivalent make etc., the rate inclusive of providing necessary spacers
of size 1.6mm
Providing to ensure
and laying uniform
40mm thickjoints
Cementetc.Concrete
complete1:2:4
in all(1respect
cementas:2per drawings.
coarse
(Basic
sand : 4price of tile
graded - Rs.26/sft
stone aggregateinclusive of all
of 12.5mm duties excluding
nominal taxes
size) flooring F.O.R.with
finished site. a)
sqm 18 17.0 461.19 14 0 14 6490 0 6490
floating coat of neat cement including cement slurry, and 4 mm thick pvc strip of
required size at 1.2 m c/c both ways and part there off as required etc. complete in
1.3 Hardonite
true flooring
lines and level as per specification and drawing.
Providing and laying 62 mm thick heavy duty hardonite flooring with non metallic
hardener of approved make including 4 mm thick PVC strips of required size at 1.2
m c/c both ways and part there off as required, under layer 50mm CC 1:2:4 (1
sqm R/O 0 1,085.00
cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size) with 12mm
thick topping, using grey cement hardener mix by weight (2 hardener : 1 cement)
1.4 Stone
and stone
flooring
chips dry mixed in a ratio of 1:2 (1 hardener and cement mix : 2 stone
chips of 6mm down gauge to form dry mortar) complete with neat cement and
broom finishing to leave the surface rough.
Providing and laying stone flooring using stone slab of approved quality in
specified size of stone slab as per drawings and pattern in flooring/ landing with
cement mortar 1:4 (1 cement : 4 coarse sand) of adequate thickness to match the
total thickness of 50mm and joint to be filled with white cement slurry mixed with
pigment to match the shade of stone including surfaces pointing, curing etc.
complete as per specification, pattern and drawing.
With 18 to 20mm thick Prepolished Granite stone and joint to be filled with white
cement slurry mixed with pigment to match the shade of stone (Basic rate of
prepolished (one side) Granite @ Rs. 118/Sft inclusive of all duties excluding
taxes F.O.R. site)
1.4.1 sqm R/O 0 2,911.14
Abstract D Page 209
BOQ TOTAL QTY TOTAL AMOUNT
New
S. No. Description Unit Pre. Qty. Remarks
Qty. Ammen RATE PRE THIS CUMM PRE THIS CUMM
With 18 to 20mm thick Kota stone and joint to be filled with grey cement slurry d
mixed with pigment to match the shade of stone, providing 4Nos. 5x3mm grooves
and including rubbing, grinding, polishing and bull nosing etc. complete.
(Basic rate of Kota @ Rs. 39/Sft inclusive of all duties excluding taxes
F.O.R. site)
1.4.2 sqm 38 13.36 1,409 13 0 13 18323 0 18323
2. WALL FINISHES
2.1 Cement Plaster skirting / risers/ dados / platforms.
Providing and laying 100 mm high 12-15 mm thick Cement plaster skirting with
cement mortar 1:4 (1 cement : 4 coarse sand) finished with a floating coat of neat
cement as per drawing and design. sqm 15 15 393
PART - B SUPERSTRUCTURE
Providing and laying 100 mm high 12-15 mm thick Cement plaster skirting with
cement mortar 1:4 (1 cement : 4 coarse sand) finished with a floating coat of neat
cement as per drawing and design. sqm 25 23.5 397
PART - A SUBSTRUCTURE
1 PAINTING
(Quoted Rate shall be for all heights, depths, levels, leads and lifts )
Providing and applying three or more coats (as specified below) of approved
brand, manufacturer, colour and shade to give a smooth finish on plastered
1.1 surfaces over a coat of approved primer including the cost of preparing the
surfaces with filling materials (putty), along with sand papering wherever
required, including thoroughly brushing the surface free from foreign matter,
Note: Flat area
sandpapering in horizontal
smooth, filling in/ all
vertical
holesplane will beetc.
and cracks measured for rate
complete., payment. No
to include
additional payment
all tools, labour, will be made
scaffolding, primer for as
grooves, cornices,
required, completevatta, mouldings
as directed byetc.
the
1.1.1 Acrylic Emulsion Paint of approved brand and shade as per specification
Engineer. sqm 15 115.1703 184
1.1.2 Oil Bond Distemper of approved brand and shade as per specification sqm 217 196.5105 155.72
Providing and applying whitewash in three or more coats on wall and ceiling
including cost of addition of gum, ultramarine blue, including primer, scaffolding,
1.2 preparation of surface by brushing and brooming down along with sand papering sqm. 1404.3 1326.653 57 1045 0 1045 59261 0 59261
wherever required to give an even shade etc.complete. (In Service Rooms,
Basementsand
Providing & Lift/Services
marking withShaft)
three or more coats 100 mm wide to give uniform
finish with reflective/ luminous road marking paint in strips true to line in parking
1.3 area floor and wall of superior make as approved by the Project Manager Rmt R/O 0 330.32
including cleaning the surface of all dirt, scales, oil, grease and other foreign
material etc. and lining out complete. Abstract D Page 214
BOQ TOTAL QTY TOTAL AMOUNT
New
S. No. Description Unit Pre. Qty. Remarks
Qty. Ammen RATE PRE THIS CUMM PRE THIS CUMM
d
Total carried over to summary
PART - B SUPERSTRUCTURE
1 PAINTING WORKS
(Quoted Rate shall be for all heights, depths, levels, leads and lifts ).
Providing and applying three or more coats (as specified below) of approved
brand, manufacturer, colour and shade to give a smooth finish on gypsum
1.1 plastered surfaces over a coat of approved primer including the cost of preparing
the surfaces with filling materials (putty), along with sand papering wherever
required, including thoroughly brushing the surface free from foreign matter,
Acrylic Emulsion
sandpapering Paint of
smooth, approved
filling brandand
in all holes andcracks
shadeetc.
as per specification
complete., rate toPre GST
include
1.1.1 Billed before
all tools, 30th
labour, June-2017primer as required, complete as directed by the
scaffolding, sqm 195 0 0 0
1.1.1 Engineer.
Acrylic Emulsion Paint of approved brand and shade as per specification 15143 16554.48 183.73 16068 0 16068 2952216 0 2952216
1.1.2 Oil Bond Distemper of approved brand and shade as per specification Sqm 8374 6984.338 155.72 6428 0 6428 1001044 0 1001044
Providing and applying Whitewash in three or more coats on wall and ceiling
including cost of addition of gum, ultramarine blue, including primer, scaffolding,
preparation of surface by brushing and brooming down along with sand papering
wherever required to give an even shade etc.complete. (In Service Rooms &
Lift/Services Shaft, Machine room etc.) Pre GST Billed before 30th June-2017
1.2 Sqm
Providing and applying Whitewash in three or more coats on wall and ceiling
including cost of addition of gum, ultramarine blue, including primer, scaffolding,
preparation of surface by brushing and brooming down along with sand papering
wherever required to give an even shade etc.complete. (In Service Rooms &
Lift/Services Shaft, Machine room etc.) Post GST Billed after 30th June-2017
Providing and applying two or more coats of polymer based weather proof
synthetic textured paint on external walls over a coat of primer in
approved finish, colour and texture (made out of synthetic fibers and
1.3 petroleum based chemicals) as per manufacturer's specification at all levels sqm. 3599 1643.941 282.50 1629 0 1629 460327 0 460327
and height. (The work should be executed by an approved agency). Rates
quoted to &
Providing include
applyingvertical
two orand horizontal
more grooves
coats of acrylic and to
paints patterns as directed
the external surfaces
including
whether preparing
plastered the base
or form finish, using exterior
surface, attendingquality acrylic
to broken edges,weather
cornersshield
or
paint
patches ofofapproved
plasteredshadesurface& make including
and filling with preparing
cementitious the base
grout,surface,
scaffolding,
attending to broken edges,
staging, cleaning corners or patches of plastered surface and filling
1.4 Providing and fixingthe of surface etc. complete
false ceilings as directed
at all heights of 600mm byx Engineer.
600mm Grid (Base
ceiling, sqm. 7701 11319.04 221.27 7987 0 7987 1767304 0 1767304
with
ceilingcementations
Rate for external
tiles grout,
paint
with Tegular/ scaffolding,
isMicrolook
Rs 23 per sftcleaning
Edge for on
laid the surface,
specialised
prelude XLagencyproviding
exposed &
including
grid systems
applying
material,
with 24mm STC
labour biocide,
/ 15mm andwide priming
arrangement
T- sectioncoat
foretc. complete
painting
flanges colouri.e. all as
Theper
staging/
white. manufacturers
scaffolding/
framework
Providing
guidelines
comprise
platform of and
and
etc., painting
mainasrunner
inclusive with
directed waterproof
by the
spaced
of duties cement
Engineer.
at excluding
1200mm based
(Base
centers
taxes paintfor
Rate
securely
F.O.R. of approved
external
fixed
Site)- to brand
to the
up paint is
5th
(Snowcem plus) two or morehangers
coats and aincluding
coat of base coarsecenters.
with white shade
1.5 structural
Rs 18
Floor.
(for new
per soffit
sft
work) dia)
by
for approved
specialised
to external walls,
agency at 1200mm
columns, chajja,
maximum
material,
facia.
labour
Apronslevel
Hangers
and
etc. over
(GI Sqm 50 50 126.98
wire of 4.0mm
arrangement for to be
painting fixed
i.e. by approved
staging/ roof plug/
scaffolding/ fastener,
platform etc., adjusters
inclusive
plastered
and screwssurface to last
etc. The givehanger
an evenatshade
the endincluding
of eachpreparation
main runnerofshould
base as perbe of
not
duties
greater excluding
1.6 manufacturer’s
than 450mm
False ceiling taxes
from F.O.R.
specifications Site).- Above
theincluding
adjacent 5thfitting
scaffolding
wall. Flush Floor
and curing
1200mm(Plaster
longwork
cross tees
measured
(with doubleseparately)
stitching)with
to beallinterlocked
labour andbetween
materialsmain
in allrunners
floors. at 600mm centers
to form 1200 x 600 modules. Cut cross tees longer than 600mm to be supported
1.6.1 independently.
600mm x 600mm modules to be formed by fitting 600mm long flush fitting corss
tees centrally between the 1200m cross tees. Perimeter trim to be Armstrong wall
sqm. 1044 644.165 712.54 611 0 611 435170 0 435170
angle secured to walls at 450mm maximum centrers. The quoted rate shall be
inclusive for making opening for light fixtures, diffusers & AC grills. The quoted
rate shall be inclusive of suspenders at all heihgt & extra member required for all
openings. (Basic rate of ceiling tile Rs 583/- per Sqm. including framework & grid Abstract D Page 215
system, inclusive all duties etc. excluding taxes F.O.R. site).
BOQ TOTAL QTY TOTAL AMOUNT
New
S. No. Description Unit Pre. Qty. Remarks
Qty. Ammen RATE PRE THIS CUMM PRE THIS CUMM
Providing and fixing suspended false ceiling which includes providing and fixing GI d
perimeter channels of size 0.55 mm. Thk. having one flange of 20 mm and another
1.6.2 flange of 30 mm and web of 27 mm along the perimeter of the ceiling, screw fixed
Screw
to brickfixing
wall/ispartition
done mechanically
with help ofeither
nylonwith screw
sleeves anddriver or drilling
screws, at 610 machine
mm centers. with
suitable
The suspendedattachment. Finally the channels
GI intermediate boards are ofto be45
size joined and finished
mm,0.9mm thk withso astwoto have
aflanges
flush look
of 15which
mm eachincludes
fromfinishing
the soffittheattapered
1220 mm and squarewith
centers edges of the
ceiling board
angles with Sqm R/O 0 1,367.13
Notes:
with joining
ceiling anglecompound.
of width 25mm fibrextape
10mm andx two
0.55mmcoatsthkof fixed
primer tosuitable
soffit withforGIGypboard
cleat and
1)
(AsThere
steelper willrecommendations
the
expansion notfasteners.
be separate measurements
/ practice
Ceiling sectionofofSt. for the
mmvertical
Gobain
0.55 Gyproc
thk drops upto of 2'-0"
or equivalent)
having web 51.5Thishigh,
mm
double
and twolevel
includes ceiling,
providing
flanges 26vaulted
of the surface
mm ceiling,
each ofwith curved
false of ceiling
ceiling
lips to beand
10.5mmare indirect
paintedthenwith lighting
fixed approved
to the made in
quality 0 0
Gypsum
of
intermediate board.
Plastic emulsion channels paint. The
with false
help of ceiling surfaces
connecting clipsshall
and be preparedperpendicular
in direction to the
1.6.3 2)
to False
satisfaction
thesame
Item ceiling
intermediate
as rateDesign
ofabove
the quoted
channel
item no. shall
with include
Consultant,
1.6.2 butand
centers. providing
shall
All
using GI be
for necessary
appliedsall
members
Horizontal cut-outs
with
and two
beVertical forBoxing.
coats
of Gypsteelfixing
of or Sqm 86 211.0136 1,550.48 85 0 85 131807 0 131807
Light
primer,fixtures
approved two (Inclusive
coats
equivalent of all
of putty
make. andsizes),
The 12.5ACmm
touch updiffuser,
putty
taperedifAC dampers,
required
edge AC linear
to achieve
gypboard grilles finish.
smooth
(Confirming for
to
(supply
The and return
surface
IS-2095-1982) shall beair),
is then smoke
painted
screw detectors,
with
fixed two speakers
coats
to ceiling of Luxoletc.,
section silk as
with 25directed
emulsion
mm drypaintby
wallthe
of Design
screws at
1.7 Consultants.(
approved make
Trap doorcenters.
230mm Notoadditional rates will
the satisfaction be givenConsultants.
of Design for the cut-outs)
Providing and fixing trap door in false ceiling, made of 12 mm thick prelaminated
partical board resting/ fixed including all hardware, hard wood lipping etc.
complete as per drawing. sqm 28 24 3,996.44
1.8 Mirror
Providing and fixing looking mirror 6 mm thick with 4 mm thick AC sheet backing
and GHANA teak wood moulding around complete including painting polishing,
1.8.1 and providing and fixing 300 micron HDP film as vapour barrier, all necessary sqm 102 90.18 4,307.27 84 0 84 362379 0 362379
PART - A fixing arrangement like nails/ screws dash fastner/studs etc. complete .
SUBSTRUCTURE
JOINERY WORKS
(Quoted Rates are for all heights, depths, levels, leads and lifts)
1 FIRE DOOR
TYPE - FD - : Metal Fire Doors of approved size 1100 x 2100mm including metal
TYPE
frame- finished
FD3 - : Metal
with fireFirerated
Doors of approved
paint size 1800
on both sides, x 2100mm
of approved including
colour and shademetal as Sqm
1.1.1 frame 4.62 4.62 8,254 5 0 5 38131 0 38131
per thefinished
Design with fire rated
Consultants paint on
approval (2 both
Hourssides,
Fire of approved
rated) colour
of double and
leaf. Theshade
door
TYPE
as per - FD1
the -
Design : Metal Fire
Consultants Doors of
approval approved
(2 Hours size
Fire1100 x
rated)
to have 250mm x 750mm size 2 Hour fire rated vision panel as per the detailed 2100mm
of double including
leaf. The
door
metal to
drawing. have
frame 250mm
Thefinished x 750mm
with
rate is inclusivefire of size
rated 2 Hour
paint
supplying fire
onand rated
both vision
sides,
fixing panel
allofbrush
approved vision 2panel
colour
finished andasfire Sqm
Hour
1.1.1 per theasdetailed drawing. The rate isapproval
inclusive(2 ofHours
supplying and fixing all brush 2.3 2.3 8,254 2 0 2 17085 0 17085
shade
rated per the Design
ironmongery like Consultants
locks, handles, tower bolts, door Fire rated)
closer etc. ofofdouble
approved leaf.
TYPE
finished
The door- FD2
2to
Hour: Metal
havefire Fire Doors
rated xironmongery
250mm 750mm of approved
sizelike size
locks,fire
2 Hour 750 x
handles, 2000mm including
towerpanel
rated vision bolts, as
doorpermetal
closer
the
make
frame as indicated
finished
etc. of approved with in
make the
fire detail
rated drawing.
paint
as indicated on Location-Staircase
both
in the sides, of
detail drawing.approved (Basic price
colour
Location- and of fire
room, as
shade
DGfinished
1.1.2 detailed
door @ drawing.
Rs 7405/SqmThe rate is inclusive
including door of supplying
shutter, and hardwares
frame, fixing all brush
and vision 2 Sqm 3 3 8,253 3 0 3 24758 0 24758
per
Pump
Hour thefire
Design
room,
rated Consultants
Electrical
ironmongery approval
room. (2 Hours
(Basic
like locks, price Fire
handles, oftowerrated)
fire door of @
bolts, single/double
Rs closer
door 7405/Sqm leaf.
etc. ofThe
panel
includingetc.
door to have supply
250mm
door & installation,
x 750mm
shutter, frame, inclusive
sizehardwares
2 Hour of duties
fireand
rated excluding
visionpanel
vision taxes
panel etc.
as per F.O.R.
the price
supply &
approved
Site) make as indicated in the detail drawing. Location-Staircase (Basic
1.1.3 installation,
detailed
of fire door @inclusive
drawing. RsThe7405/Sqmof is
rate duties excluding
inclusive
including ofdoor taxes
supplying
shutter, F.O.R.
and frame, Site)
fixing all brush finished
hardwares and 2 Sqm 3.78 3.78 8,662.20 4 0 4 32743 0 32743
Hour
visionfire rated
panel ironmongery
etc. like locks, handles,
supply & installation, inclusive tower bolts, excluding
of duties door closertaxes etc. of
approved
F.O.R. make as indicated in the detail drawing. Location- Electrical shaft, Meter
Site)
Total carried over to summary
room (Basic price of fire door @ Rs 7405/Sqm including door shutter, frame,
hardwares and vision panel etc. supply & installation, inclusive of duties
PART - B SUPERSTRUCTURE
excluding taxes F.O.R. Site)
JOINERY WORKS
(Quoted Rates are for all heights, depths, levels, leads and lifts)
1 FIRE DOOR
TYPE - FD - : Metal Fire Doors of approved size 1100 x 2100mm including metal
frame finished with fire rated paint on both sides, of approved colour and shade as
1.1.1 Sqm 46.2 46.2 8,253 43 0 43 354963 0 354963
per the Design Consultants approval (2 Hours Fire rated) of double leaf. The door
TYPE
to have- 250mm
FD1 - :xMetal
750mm Firesize
Doors of approved
2 Hour fire ratedsize 1100
vision x 2100mm
panel as per theincluding
detailed
metal frame
drawing. Thefinished with fire of
rate is inclusive rated paint onand
supplying both sides,
fixing allofbrush
approved colour
finished and fire
2 Hour
b Sqm 34.5 34.5 8,253 34 0 34 279021 0 279021
shade as per the Design
rated ironmongery likeFireConsultants
locks, handles, approval (2 Hours
tower bolts, door Fire rated)
closer ofofdouble
etc.including
approved leaf.
TYPE
The -
door FD2
to : Metal
have 250mm xDoors
750mm of approved
size 2 Hoursize 750
fire x
rated 2000mm
vision panel as per metal
the
make as
frame indicated
finished with infire
the rated
detailpaint
drawing. Location-Staircase
on both sides, ofandapproved (Basic price andofshade
fire as
1.1.2 detailed
doorthe drawing.
@Design
Rs 7405/SqmThe rate is inclusive
including door of supplying fixing colour
all brush
and finished 2 Sqm 46.5 46.5 8,253 46 0 46 376072 0 376072
per
Hour fire rated Consultants
ironmongery approval
like (2 shutter,
locks, Hours
handles,
frame,
Fire rated)
tower
hardwares
of single/double
bolts, door closer
vision
leaf.
etc. The
ofSite)
panel etc.
door to havesupply
250mm & installation
x 750mm inclusive
sizedetail
2 Hour of duties
fire rated excluding taxes
vision panel as per F.O.R.
the price
approved make as indicated in the drawing. Location-Staircase (Basic
detailed drawing.
of fire door @ RsThe rate is inclusive
7405/Sqm including ofdoor
supplying andframe,
shutter, fixing all brush finished
hardwares and 2 Abstract D Page 216
Hour
visionfire rated
panel ironmongery
etc. like locks, handles,
supply & installation inclusivetower bolts,excluding
of duties door closer etc. of
taxes
BOQ TOTAL QTY TOTAL AMOUNT
New
S. No. Description Unit Pre. Qty. Remarks
Qty. Ammen RATE PRE THIS CUMM PRE THIS CUMM
1.2 DOOR SHUTTER d
Providing and fixing phenol bonded flush door shutters of approved quality and
make non decorative type core of block board construction with internal frame of
1st class hard wood and well matched 3mm commercial ply veneering with
1.2.1 vertical grains or cross bands including 6 mm thick red merandi wooden lipping all
around, providing and fixing 4 nos. 125mm long and 3.5mm thick SS hinges and
providing & fixing 50mmx20mm melamine matt finish teakwood architrave on
38 mm
both thick
side with 32mm
of doors flush door
as per drawing and& specification
3 mm thick decorative veneer
complete and with grooves
approved sample.
on outside
(Basic priceand plain Shutter
of Door veneer on inside surface
including lipping including melamine
and both sides polishing
veneer- as per
Rs. 2616/-
a drawing and design (D of size 1100x2100mm). Location- Unit Main Entrance
per SQM inclusive of duties excluding taxes F.O.R. Site. Basic rate is excluding Door Sqm 141 178.227 6,108 162 0 162 990652 0 990652
the cost of hinges & polishing)
Providing and Fixing factory made 32 mm thick Enamel painted doors
manufactured from dense, homogenous high density, fibre plate moulded,
decorative panels, jointed with seasoned, treated rubber wood / hard wood stiles,
1.2.2 and rails with solid core construction; using ISI certified phenol formaldehyde
a D1 ofas
resin size
per900x2100mm.
IS: 848:1991 BWP,Location- Bedroom,
type, meeting Kitchen,
minimumStudy
product technology Sqm 461 334.068 2,898 305 0 305 884256 0 884256
b specifications. Rate to include
D2 of size 750x2100mm. providing
Location- Toiletand fixing 4 Nos. heavy duty stainless Sqm 335 236.2215 2,898 212 0 212 614325 0 614325
c steel
D1" ofbutt
sizehinges with necessary
900x2100mm. SS screws
Location- for each
Serv. Room shutter,
Entry Door providing & fixing Sqm 56 56 2,898
20mmx12mm enamel painted red mirandi architrave on both side of doors as per
drawing complete. (Basic price of Door Shutter is Rs 916/- per SQM inclusive of
1.3 Hardware for Wooden
duties excluding Doors Site. Basic rate is excluding the cost of hinges &
taxes F.O.R.
enamel painting)
Providing and fixing mortice latch and lock with six levers and a pair of levers
handles of Godrej or equivalent as approved with necessary screws etc. complete
1.3.1 Stainless Steel
With Pin Cylinder (10' forend length) - for external Doors (Basic rate @1308/
a Each inclusive of duties excluding taxes F.O.R. Site) No. 86 84 1,661 79 0 79 130733 0 130733
With Pin Cylinder (8' forend length) - for Internal Doors (Basic rate @1177/ Each
b inclusive of duties excluding taxes F.O.R. Site) No. 174 194 1,585 182 0 182 289090 0 289090
Keyless Cylindrical handle with knob - For toilet doors (Basic rate @872/ Each
c inclusive of duties excluding taxes F.O.R. Site) No. 260 167 1,107 157 0 157 174311 0 174311
Providing & fixing bright finished brass/Stainless Steel AISI 316 grade tower bolt
1.3.2 (barrel type) of approved make with necessary screws etc. complete.
200 X 10 mm (Basic rate @ 196/ Each inclusive of duties excluding taxes F.O.R.
a Site) Each 194 194 261 182 0 182 47604 0 47604
250 X 10 mm (Basic rate @ 245/ Each inclusive of duties excluding taxes F.O.R.
b Site) Each 84 84 328 79 0 79 25792 0 25792
Providing and fixing bright finished brass/Stainless Steel AISI 316 grade hanging
1.3.3 type double floor door stopper of best quality as approved with necessary screws Each 492 278 267 246 0 246 65648 0 65648
etc. complete. (Basic rate @ 196/ Each inclusive of duties excluding taxes F.O.R.
Providing and fixing rubber buffer of best quality as approved with necessary
Site)
1.3.4 screws etc. complete. (Basic rate @ 196/ Each inclusive of duties excluding taxes Each 520 445 267 436 0 436 116352 0 116352
F.O.R. Site)
Providing and fixing imported Magic eye 270" of brush steel finish (Basic rate @
1.3.5 147/ Each inclusive of duties excluding taxes F.O.R. Site) Each 58 84 210 82 0 82 17211 0 17211
Providing and fixing SS hydraulic door closer of brush steel finish (Basic rate @
1.3.6 1177/ Each inclusive of duties excluding taxes F.O.R. Site) Each 58 84 1,544 82 0 82 126622 0 126622
Providing and fixing SS safety chain of brush steel finish (Basic rate @ 147/ Each
1.3.7 inclusive of duties excluding taxes F.O.R. Site) Each 58 84 210 82 0 82 17211 0 17211
Sqm
2A 1027 14
Quantities in one Flat 2D
2E
Basement 1027 14
JMR
1 Ground Floor
001 2A
003 2A
004 2A
005 2E
006 2A
1BHK
Lobby/Common Area
2 1st Floor
101 2A
103 2A
104 2A
105 2E
106 2A
Lobby/Common Area
3 2nd Floor
201 2A
202 2D
203 2A
204 2A
205 2E
206 2A
Lobby/Common Area
3 3rd Floor
301 2A
302 2D
303 2A
304 2A
305 2E
306 2A
Lobby/Common area
4 4th Floor
401 2A
402 2D
403 2A
404 2A
405 2E
406 2A
Lobby/Common area
5 5th Floor
501 2A
502 2D
503 2A
504 2A
505 2E
506 2A
Lobby/Common Area
6 6th Floor
601 2A
602 2D
603 2A
604 2A
605 2E
606 2A
Lobby/Common Area
7 7th Floor
701 2A
702 2D
703 2A
704 2A
705 2E
706 2A
Lobby/Common Area
8 8th Floor
801 2A
802 2D
803 2A
804 2A
805 2E
806 2A
Lobby/Common Area
9 9th Floor
901 2A
902 2D
903 2A
904 2A
905 2E
906 2A
Lobby/Common Area
10 10th Floor
1001 2A
1002 2D
1003 2A
1004 2A
1005 2E
1006 2A
Lobby/Common Area
11 11th Floor
1101 2A
1102 2D
1103 2A
1104 2A
1105 2E
1106 2A
Lobby/Common Area
12 12th Floor
1201 2A
1202 2D
1203 2A
1204 2A
1205 2E
1206 2A
Lobby/Common Area
13 13th Floor
1301 2A
1302 2D
1303 2A
1304 2A
1305 2E
1306 2A
Lobby/Common Area
LMR
A Total Quantity 1027 14
B Qty billed before 30th June 2017 0 0
C Balance Qty 1027 14
62.08
44.055 49.32 5.1266
29.82
33.71 7.56 3.11 27.41 2.34
36.41 8.55 4.71 32.66 3.42
33.71 7.56 3.11 27.41 2.34 29.82
6.23
2.42
29.29 33.20 0.97 3.78 19.02
2.42 26.57 29.20 0.97 2.65 22.83
36 2260 2516 80 246 1778
0 0 0 0 0 0
36 2260 2516 80 246 1778
Activities
198.47 88.01
3.37 3.37
198.47 88.01
190.58 74.34
158.52 62.49 198.47 88.01
56 56 13937 5447 2977 1320
0 0 0 0 0 0
56 56 13937 5447 2977 1320
Acrylic Acrylic
Texture
weathershield weathershield White Wash (Sqm)
painting (sqm)
Painting (Sqm) Painting (Sqm)
120.77
18.16
11.79
18.16
523.15 122.30 55.82 33.59 49.22
18.16
18.13
18.16
18.16
11.79
18.16
523.15 122.30 55.82 33.59 49.22
18.16
18.13
18.16
18.16
11.79
18.16
33.59 49.22
18.16
18.13
523.15 122.30 55.82 18.16
18.16
11.79
18.16
33.59 49.22
18.16
18.13
523.15 122.30 55.82 18.16
18.16
11.79
18.16
33.59 49.22
18.16
18.13
523.15 122.30 55.82 18.16
18.16
11.79
18.16
33.59 49.22
18.16
18.13
523.15 122.30 55.82 18.16
18.16
11.79
18.16
33.59 49.22
18.16
18.13
523.15 122.30 55.82 18.16
18.16
11.79
18.16
33.59 49.22
18.16
18.13
523.15 122.30 55.82 18.16
18.16
11.79
18.16
33.59 49.22
18.16
18.13
523.15 122.30 55.82 18.16
18.16
11.79
18.16
33.59 49.22
18.16
18.13
523.15 122.30 55.82 18.16
18.16
11.79
18.16
33.59 49.22
18.16
18.13
523.15 122.30 55.82 18.16
7.44 1.49
7.44 1.49
7.44 1.49 1.66
8.36 0.94
7.44 1.49
8.37 8.37 4.57 4.57
7.44 1.66
8.17
7.44 N/A
8.37 N/A 4.57 N/A
7.44
8.37 N/A 4.57 N/A
8.36
7.44
636 100 23 116 138 64 59
0 0 0 0 0 0
636 100 23 116 138 64 59
154 140 32 23 43 34 46
Aluminum Doors Aluminum Sliding
FD3 (1.8x2.1)
1.0 1.8
3.78
2.14 5.46
- 2.14 5.46
2.14 5.46
3.02 5.70
2.14 5.46
2.61 1.8
2.1 5.5
- 2.1 5.5
2.1 5.5
3.0 5.7
2.1 5.5
1.8
- 2.14 5.46
2.8 11.4
2.1 5.5
2.14 5.46
3.0 5.70
2.14 5.46
1.8
- 2.1 5.46
2.8 11.4
2.1 5.5
2.14 5.46
3.0 5.70
2.1 5.46
1.8
- 2.1 5.46
2.8 11.4
2.14 5.5
2.14 5.46
3.0 5.70
2.1 5.46
1.8
- 2.1 5.5
2.8 11.4
2.1 5.5
2.1 5.7 5.5
3.0
2.14 5.46
1.8
- 2.1 5.5
2.8 11.4
2.1 5.5
2.1 5.5
3.0 5.7
2.14 5.46
1.8
- 2.14 5.46
2.8425 11.4
2.14 5.46
2.14 5.46
3.01875 5.7
2.14 5.46
1.8
- 2.14 5.46
2.8425 11.4
2.14 5.46
2.14 5.46
3.01875 5.7
2.14 5.46
1.8
- 2.14 5.46
2.8425 11.4
2.14 5.46
2.14 5.46
3.01875 5.7
2.14 5.46
1.8
- 2.14 5.46
2.8425 11.4
2.14 5.46
2.14 5.46
3.01875 5.7
2.14 5.46
1.8
- 2.14 5.46
2.8425 11.4
2.14 5.46
2.14 5.46
3.01875 5.7
2.14 5.46
1.8
- 2.14 5.46
2.8425 11.4
2.14 5.46
2.14 5.46
3.01875 5.7
2.14 5.46
1.8
- 2.14 5.46
2.8425 11.4
2.14 5.46
2.14 5.46
3.01875 5.7
2.14 5.46
- 1.8
1.8
0 3 120 42 34 29 217 305.9
0 0 0 0 0 0 0
0 119.70 42.26 34.11 28.80 216.60 305.90
Anti Skid
V Ceramic Floor Flush Door & Moulded- Shuttrs with Hardware
Ceramic Wall Tile tile- Sqm
Dado 200x200
Sqm
OH Tank OH Tank D D1 D2 D D1
Sqm Sqm Sqm Sqm Sqm Sqm Nos. Nos.
1.41 75.6315 19.305 2.06 3.35 2.69 1.00 2.00
1.41 2.06 5.02 2.69 1.00 3.00
1.41 2.06 5.02 2.69 1.00 3.00
2.06 1.67 1.35 1.00 1.00
Sqm
-
-
Toilet
with Hardware Ladge Mirror
Top
Toilet
Ganite
D2
Nos. SQM Sqm
2.00 0.32 1.08
Elevation - 04
1 Grid 1-4/G SQM 1 4.15 2.95 12.24
SD2 Wall SQM 1 3.75 2.635 9.88
SQM 1 0.60 2.635 1.58
K/1 SQM 1 1.05 2.635 2.77
Ded. SD2 SQM -1 2.10 2.38 -4.99
Add Jamb SQM 1 6.85 0.08 0.51
Balcony wall SQM 1 0.93 0.315
SQM 1 3.75 0.315
SQM 1 0.48 0.315
K/1 Outer SQM 1 0.65 2.95 1.92
Shaft SQM 1 0.30 2.95 0.89
SD wall SQM 1 3.55 2.635 9.35
Ded. SD SQM -1 2.40 2.375 -5.70
Shaft SQM 1 0.40 2.635 1.05
SQM 1 0.60 2.635 1.58
Balcony wall SQM 1 1.125 0.315
SQM 1 3.550 0.315
SQM 1 0.925 0.315
N/1-7 SQM 1 8.275 2.950 24.41
Ded. V SQM -0.5 0.600 1.175 -0.35
Ded. SQM -0.5 0.600 2.450 -0.74
Add Jamb SQM 0 6.100 0.100 0.00
Sunshade ( Chhajja) SQM 2 0.300 0.100 0.06
On Grid 7 Column SQM 1 0.600 2.950 1.77
On Grid M/7-9 SQM 1 2.600 2.950 7.67
Ded. W5' SQM -0.5 1.200 1.175 -0.71
Add Jamb SQM 0 4.750 0.075 0.00
Sunshade ( Chhajja) SQM 2 0.300 0.100 0.06
on Grid 9/M-Q SQM 1 2.750 2.950 8.11
Ded oppening SQM -0.5 1.500 1.275 -0.96
Add Jamb SQM 0 4.050 0.200 0.00
on Grid Q/2-9 SQM 1 9.25 2.950 27.29
Ded. v SQM -0.5 0.60 1.175 -0.35
on grid 6/Q SQM 1 0.40 2.950 1.18
on grid 2/R'-Q SQM 1 2 2.05 2.950 12.10
Ded. W8 SQM -0.5 2 1.00 1.175 -1.18
Side Wall SQM 1 2 1.45 2.950 8.56
SQM 1 2 0.20 2.950 1.18
Shaft SQM 1 2 0.30 2.950 1.77
SQM 1 2 3.60 2.635 18.97
Ded. D1' SQM -0.5 2 0.90 2.375 -2.14
Add Jamb SQM 0 2 5.65 0.050 0.00
Ded. W14 SQM -0.5 2 0.60 1.475 -0.89
Column Off-set SQM 1 2 0.35 2.635 1.84
Patta Balcony SQM 1 2 0.75 0.315
Texture Paint of Tower D Same Qty First Floor and Second Floor
S. No. Discription Unit No. L B/H Total Qty
Elevation - 04
1 Grid 1-4/G SQM 1 4.15 2.95 12.24
SD2 Wall SQM 1 3.75 2.635 9.88
SQM 1 0.60 2.635 1.58
K/1 SQM 1 1.05 2.635 2.77
Ded. SD2 SQM -0.5 2.10 2.38 -2.49
Add Jamb SQM 0 6.85 0.08 0.00
Balcony wall SQM 1 0.93 0.315 0.29
SQM 1 3.75 0.315 1.18
SQM 1 0.48 0.315 0.15
K/1 Outer SQM 1 0.65 2.95 1.92
Shaft SQM 1 0.30 2.95 0.89
SD wall SQM 1 3.55 2.635 9.35
Ded. SD SQM -1 2.40 2.375 -5.70
Add Jamb SQM 1 7.15 0.075 0.54
Shaft SQM 1 0.40 2.635 1.05
SQM 1 0.60 2.635 1.58
Balcony wall SQM 1 1.125 0.315 0.35
SQM 1 3.550 0.315 1.12
SQM 1 0.925 0.315 0.29
Weather proof synthetic textured paint N/O FLAT QTY N/O TOWE TOTAL QTY.
on external walls
TOWER - A, B, C
Ground Floor SQM 1 648.476 1 648.476
First Floor SQM 1 713.057 1 713.057
Second Floor SQM 1 713.057 1 713.057
Typical Floor SQM 1 55.820 11 614.020
Terrace Floor SQM 1 27.160 1 27.160
Total Qty. SQM 2715.770
Weather proof synthetic textured paint N/O FLAT QTY N/O TOWE TOTAL QTY.
on external walls
TOWER - A, B, C
Ground Floor SQM 1 0.000 1 0.000
First Floor SQM 1 0.000 1 0.000
Second Floor SQM 1 0.000 1 0.000
Typical Floor SQM 1 639.397 11 7033.371
Terrace Floor SQM 1 0.000 1 0.000
Total Qty. SQM 7033.371
BOQ
New TOTAL QTY TOTAL AMOUNT
S. No. Description Unit Remarks
Pre. Qty. Qty. RATE PRE THIS CUMM PRE THIS CUMM
Ammen
d
PART - A SUBSTRUCTURE
Marble shall be procurred in sizes available in the market, quoted rates also to
include cutting of sizes as per design and skirting from standard size stone pieces.
The rate should be inclusive of protection of flooring until the handling of the
project by covering the joints with 6mm plastic sheet etc.
1 FLOORING WORKS
1.1 Glazed ceramic tile
Providing and laying to pattern, commercial quality glazed Ceramic tile of
approved colour, size 200x200mm & minimum 5mm thickness for called of areas,
over 20mm thick or more cement mortar bed (to make up required finished floor
level) of 1:4 mix (1 cement:4 coarse sand) and joints shall be pointed with the
matching cement based polymer grout as recommended by Laticrete/ Bal Endura or sqm. R/O 0 854.80
approved equivalent make etc., the rate inclusive of providing necessary spacers of
1.2 size 1.6mm to ensure uniform joints etc. complete in all respect as per drawings.
IPS Floor
(Basic price of tile - Rs.26/sft inclusive of all duties excluding taxes F.O.R. site. )
Providing and laying 40mm thick Cement Concrete 1:2:4 (1 cement :2 coarse sand :
4 graded stone aggregate of 12.5mm nominal size) flooring finished with a floating
coat of neat cement including cement slurry, and 4 mm thick pvc strip of required
size at 1.2 m c/c both ways and part there off as required etc. complete in true lines sqm 16 16 461.19 13.79 0.00 13.79 6360 0 6360
and level as per specification and drawing.
2. WALL FINISHES
2.1 Cement Plaster skirting / risers/ dados / platforms.
Providing and laying 100 mm high 12-15 mm thick Cement plaster skirting with
cement mortar 1:4 (1 cement : 4 coarse sand) finished with a floating coat of neat
cement as per drawing and design. sqm 15 15 393
PART - B SUPERSTRUCTURE
Providing and laying 100 mm high 12-15 mm thick Cement plaster skirting with
cement mortar 1:4 (1 cement : 4 coarse sand) finished with a floating coat of neat
cement as per drawing and design. sqm 19 0 397 0 0 0
Providing and laying 200mm wide 18-20mm thick Gangsaw cut Gwalior White
Sand Stone coping of approved size using stone slab approved quality with 20mm
avg. thick cement mortar 1:4 (1 cement : 4 coarse sand) and joint to be filled with
2.3.2 cement slurry mixed with pigment to match the shade of stone including cutting, Rmt. 1470 1440.35 573 1353.30 0.00 1353.30 775765 0 775765
surfaces pointing, curing rubbing, grinding and polishing etc. complete as per
2.4 specification,
Tile Skirting pattern and drawing. (Basic rate of Gwalior white sand stone @ Rs.
78/Sqft inclusive of all duties excluding taxes F.O.R. site)
Providing and laying 6-10mm thick tile in skirting laid over 12mm thick cement
mortar 1:3 (1cement : 3 coarse sand), and joints shall be pointed with the matching
cement based polymer grout (Laticrete/Bal grout or equivalent) of approved shade
including cutting, grouting the joints etc. complete in all respects as per drawing.
PART - A SUBSTRUCTURE
1 PAINTING
(Quoted Rate shall be for all heights, depths, levels, leads and lifts )
Providing and applying three or more coats (as specified below) of approved brand,
manufacturer, colour and shade to give a smooth finish on plastered surfaces
1.1 over a coat of approved primer including the cost of preparing the surfaces with
filling materials (putty), along with sand papering wherever required, including
thoroughly brushing the surface free from foreign matter, sandpapering smooth, Abstract E Page 307
filling in all holes and cracks etc. complete., rate to include all tools, labour,
scaffolding, primer as required, complete as directed by the Engineer.
BOQ
New TOTAL QTY TOTAL AMOUNT
S. No. Description Unit Qty. Remarks
Pre. Qty. Ammen RATE PRE THIS CUMM PRE THIS CUMM
d
Note: Flat area in horizontal / vertical plane will be measured for payment. No
additional payment will be made for grooves, cornices, vatta, mouldings etc.
1.1.1 Acrylic Emulsion Paint of approved brand and shade as per specification sqm 20 115.17 184 0 0 0
1.1.2 Oil Bond Distemper of approved brand and shade as per specification sqm 316 196.51 155.72 0 0 0
Providing and applying whitewash in three or more coats on wall and ceiling
including cost of addition of gum, ultramarine blue, including primer, scaffolding,
preparation of surface by brushing and brooming down along with sand papering
wherever required to give an even shade etc.complete. (In Service Rooms,
1.2 Basements & Lift/Services Shaft) sqm. 1404 1250.0 57 975.79 0 975.79 55349 0 55349
PART - B SUPERSTRUCTURE
1 PAINTING WORKS
Acrylic Emulsion Paint of approved brand and shade as per specification As per Pre
1.1.1 GST Rates (Billed before 30th June-2017) sqm 11850 2745.33 195 2745.33 0.00 2745.33 535339 0 535339
Acrylic Emulsion Paint of approved brand and shade as per specification As per
1.1.1 Post GST Rates (Billed after 30th June-2017) sqm 9105 9931 183.73 9727.14 0.00 9727.14 1787160 0 1787160
1.1.2 Oil Bond Distemper of approved brand and shade as per specification sqm 6545 6146.7 155.72 4996.17 0.00 4996.17 778026 0 778026
Providing and applying Whitewash in three or more coats on wall and ceiling
including cost of addition of gum, ultramarine blue, including primer, scaffolding,
preparation of surface by brushing and brooming down along with sand papering
wherever required to give an even shade etc.complete. (In Service Rooms &
Lift/Services Shaft, Machine room etc.)As per Pre GST Rates (Billed before 30th
June-2017)
1.2 sqm. 4360 412.82 60.00 412.82 0.00 412.82 24769 0 24769
Providing and applying Whitewash in three or more coats on wall and ceiling
including cost of addition of gum, ultramarine blue, including primer, scaffolding,
preparation of surface by brushing and brooming down along with sand papering
wherever required to give an even shade etc.complete. (In Service Rooms &
Lift/Services Shaft, Machine room etc.) As per Post GST Rates (Billed after 30th
June-2017)
1.2 sqm. 3947 3947 56.72 1627.15 0.00 1627.15 92295 0 92295
Providing and applying two or more coats of polymer based weather proof
synthetic textured paint on external walls over a coat of primer in approved
finish, colour and texture (made out of synthetic fibers and petroleum based
chemicals) as per manufacturer's specification at all levels and height. (The
1.3 work should be executed by an approved agency). Rates quoted to include sqm. 1713.751 1563.75 282.50 1707.37 0.00 1707.37 482336 0 482336
vertical and horizontal grooves and patterns as directed including preparing
the base surface, attending to broken edges, corners or patches of plastered
surface and filling with cementitious grout, scaffolding, staging, cleaning the
surface etc. complete as directed by Engineer. (Base Rate for external paint is
Rs 23 per sft for specialised agency including material, labour and Abstract E Page 308
arrangement for painting i.e. staging/ scaffolding/ platform etc., inclusive of
BOQ
New TOTAL QTY TOTAL AMOUNT
S. No. Description Unit Qty. Remarks
Pre. Qty. Ammen RATE PRE THIS CUMM PRE THIS CUMM
Providing & applying two or more coats of acrylic paints to the external surfaces d
whether plastered or form finish, using exterior quality acrylic weather shield
paint of approved shade & make including preparing the base surface,
attending to broken edges, corners or patches of plastered surface and filling
1.4 with cementations grout, scaffolding, cleaning the surface, providing & sqm. 10338.962 10038.962 221.27 8117.86 0.00 8117.86 1796261 0 1796261
applying STC biocide, priming coat etc. complete all as per manufacturers
guidelinesand
Providing andpainting
as directed by the Engineer.
with waterproof cement(Base
basedRate
paintfor externalbrand
of approved paint is
Rs 18 per plus)
(Snowcem sft for
twospecialised agency
or more coats and aincluding material,
coat of base labour
coarse with andshade (for
white
1.5 new work) to external walls, columns, chajja, facia. Aprons etc. over plastered Sqm 40 40 126.98 0.00 0 0 0
arrangement for painting i.e. staging/ scaffolding/ platform etc., inclusive of
surface
duties to give an even shade including preparation
excluding taxes F.O.R. Site).- Above 5th Floorof base as per manufacturer’s
specifications including scaffolding and curing (Plaster work measured separately)
1.6 False ceiling
with all labour and materials in all floors.
Providing and fixing of false ceilings at all heights of 600mm x 600mm Grid ceiling,
ceiling tiles with Tegular/ Microlook Edge laid on prelude XL exposed grid systems
1.6.1 with 24mm / 15mm wide T- section flanges colour white. The framework comprise 0.00 0 0 0
of main xrunner
600mm 600mm spaced
modules at 1200mm
to be formed centersby securely fixed to
fitting 600mm theflush
long structural
fittingsoffit
corssby
approved
tees centrally hangers at 1200mm
between the 1200m maximum centers.
cross tees. PerimeterHangers
trim(GI wire
to be of 4.0mm wall
Armstrong dia)
to sqm. 1103 492.80 712.54 482.94 0.00 482.94 344115 0 344115
angle secured to walls at 450mm maximum centrers. The quoted rate shall be last
be fixed by approved roof plug/ fastener, level adjusters and screws etc. The
hanger
inclusive atfor
themaking
end of each
opening main forrunner should not
light fixtures, be greater
diffusers & ACthan grills.450mm from
The quoted
the adjacent
Providing wall.
andinclusive
fixingFlush fitting 1200mm
suspended longwhich
falseatceiling cross includes
tees (with double stitching)
providing and fixing to
rate
be shall be
interlocked between of main
suspenders
runners all600mm
at heihgt & extra member
centers to form required
1200 for allGI
x 600
perimeter
openings. channels
(Basic rateofofsize 0.55
ceiling mm.RsThk.
tile having
583/- per one
Sqm. flange of 20
including mm and
framework another
& grid
modules.
flange Cutmm cross tees longer 27than 600mm thetoperimeter
be supported independently.
1.6.2 system,ofinclusive
30 and web
all duties ofetc. mm along
excluding taxes F.O.R. site).of the ceiling, screw fixed
0.00
to brick wall/ partition with help of nylon sleeves and screws, at 610 mm centers.
Screw fixing is done
The suspended mechanically
GI intermediate either with
channels screw
of size driver or drilling
45 mm,0.9mm thk withmachine
two with
suitable
flanges of attachment.
15 mm each Finally
from thethe boards
soffit atare to be
1220 mmjoined
centersandwith
finished
ceilingsoangles
as to have
with
aceiling
flush angle
look which includes finishing the tapered and square
of width 25mm x 10mm x 0.55mm thk fixed to soffit with GI cleat edges of the boardand
steel expansion fasteners. Ceiling section of 0.55 mm thk having web of 51.5 mm Sqm
with joining compound. fibre tape and two coats of primer suitable for Gypboard R/O 0 1,367.13
Notes:
(As
andpertwothe recommendations
flanges of 26 mm each/ practicewith lips ofof St. Gobain Gyproc
10.5mmare or equivalent)
then fixed to the This
1) There providing
includes
intermediate will not bethe
channels separate
surface
with helpmeasurements
of of
false ceilingfor
connecting thepainted
toclips
be vertical
and drops
with
in direction upto
approved 2'-0" high,
quality
perpendicular
double
of
to Plastic level ceiling,paint.
emulsion
the intermediate vaulted
channel Theceiling, curvedsurfaces
falsecenters.
with ceiling ceiling
All and
shallindirect
GI members besall lighting
prepared
be tomade
the or
of Gypsteel in
Gypsum
approvedboard.
satisfaction of the Design
equivalent make.Consultant,
The 12.5 mm andtapered
shall beedgeapplied with two
gypboard coats of to IS-
(Confirming
2) False two
primer,
2095-1982) ceiling
is rateofscrew
coats
then quoted
puttyfixedshalltouch
and toinclude providing
up putty
ceiling section necessary
if required
with cut-outs
to achieve
25 mm dry wallsmooth for fixing
screws finish.
at
1.6.3 Light
The
230mm fixtures
Itemsurface
same (Inclusive
asshall
centers.above item ofno.
be painted all with
sizes),
1.6.2two ACcoats
but diffuser,
using of AC
forLuxol dampers, ACVertical
silk emulsion
Horizontal and linear
paintgrilles
of for
Boxing. Sqm 72 159.79 1,550.48 74.97 0.00 74.97 116240 0 116240
(supply
approved and return
make air),satisfaction
to the smoke detectors, of Designspeakers etc., as directed by the Design
Consultants.
Consultants.( No additional rates will be given for the cut-outs)
1.7 Trap door
Providing and fixing trap door in false ceiling, made of 12 mm thick prelaminated
partical board resting/ fixed including all hardware, hard wood lipping etc.
complete as per drawing. sqm 18 18 3,996.44
1.8 Mirror
Providing and fixing looking mirror 6 mm thick with 4 mm thick AC sheet backing
and GHANA teak wood moulding around complete including painting polishing,
and providing and fixing 300 micron HDP film as vapour barrier, all necessary fixing
1.8.1 Providing
arrangement andlike
fixing in position
nails/ Hollow
screws dash metal fire rated
fastner/studs doors as per
etc. complete . IS 3614 part-1 sqm 74 69.12 4,307.27 67.74 0.00 67.74 291764.20332542 0 291764
& part-2 for stability and integrity. Pressed Galvanized steel confirming to IS 277
PART - A SUBSTRUCTURE
with the following specification.
Recommended fire door shall have doors tested at CBRI or ARAI for maximum
rating
JOINERY of WORKS
2hrs with vision panel. Test certificates should be available for vision
lites /panels as part of the fire door assembly. Independent glass test certificates
(Quoted Rates are forManufacturer
will not be accepted. all heights, depths, levels, leads
test certificate and
shall lifts)doors both single
cover
and double leaf and all doors supplied should be within the tested specimen,
1 deviation
FIRE DOORin specification and sheet thickness other than what is mentioned in the
test certificates are not allowed. Proper label confirming the type of door and the
hourly rating is mandatory. Approved manufacturer Shakti Hormann or approved
1.1 equivalent. 0 0 0
Abstract E Page 309
BOQ
New TOTAL QTY TOTAL AMOUNT
S. No. Description Unit Qty. Remarks
Pre. Qty. Ammen RATE PRE THIS CUMM PRE THIS CUMM
TYPE- -FD3
TYPE FD-- : :Metal
MetalFire FireDoors
Doorsofofapproved
approvedsize size1800
1100x x2100mm
2100mmincluding includingmetal metal d
1.1.1 frame finished with fire rated rated paint
paint on onbothbothsides,
sides,of ofapproved
approvedcolour colourand andshade
shadeasas Sqm 5 4.62 8,254 4.62 0 4.62 38131 0 38131
per the
the Design
Design Consultants
Consultants approval approval (2 (2 Hours Fire rated) of double leaf. The door to
TYPE
to have - 250mm
FD1 - : xMetal 750mm FiresizeDoors2 Hourof approved size 1100 x 2100mm including
as permetal
have 250mm x 750mm size 2 Hour firefire rated
rated vision
vision panel
panel asvision
per the panel
detailed the
1.1.1 frame finished with fire rated paint on both sides, ofand approved colour
brushand shade as
detailed
drawing.drawing.
The rate The rate is inclusive
is inclusive of supplying of supplying
and fixing allfixing
brushallfinished 2 Hour 2fire Sqm
finished 2.3 2.3 8,254 0.69 0 0.69 5695 0 5695
per
Hour the Design Consultants approval (2 Hours Fire rated) of double leaf. The door
of to
rated fire
TYPE rated
- FD2
ironmongery ironmongery
: Metal likeFire like
Doors
locks, locks,
of
handles, handles,
approved
tower sizetower
bolts, 750
door xbolts,
closerdoor
2000mm closer
etc.including etc.metal
of approved
have
approved250mm make x 750mm
as size 2inHour
indicated the fire rated
detail visionLocation-
drawing. panel as per DG the detailed
room, Pump
1.1.2 frame
make as indicated in the detail drawing. Location-Staircase (Basic price of fire as Sqm
finished with fire rated paint on both sides, of approved colour and shade 4.7 3 8,253 4.61 0 4.61 38045 0 38045
drawing.
room, The rate room.
is inclusive of supplying anddoor
fixing@allRs brush finishedincluding
2 Hour fire
per
doorthe @Electrical
Design
Rs 7405/SqmConsultants (Basic
approval
including price
door of fire
(2 shutter,
Hours Fire of7405/Sqm
rated)hardwares
frame, single/doubleand visionleaf. The
rated ironmongery
door shutter, frame,like hardwares
locks, handles, and tower
vision bolts,
paneldooretc. closer
supplyetc. of & approved
installation,
door
paneltoetc. have 250mm
supply x 750mm sizeinclusive
& installation, 2 Hour fire rated vision
of duties excluding paneltaxes as perF.O.R.
the detailed
Site)
make as indicated
inclusive of duties in excluding
the detail drawing. Location-Staircase (Basic price of fire
1.1.3 drawing. The rate is inclusive oftaxes
supplying F.O.R. andSite)
fixing all brush finished 2 Hour fire Sqm 4 3.78 8,662.20 3.78 0 3.78 32743 0 32743
door @ Rs 7405/Sqm including door shutter, frame, hardwares and vision
rated ironmongery like locks, handles, tower bolts, door closer etc. of approved
panel etc. supply & installation, inclusive of duties excluding taxes F.O.R. Site)
make as indicated
Total carried over to in the
summarydetail drawing. Location- Electrical shaft, Meter room
(Basic price
Providing andoffixing
fire door @ RsHollow
in position 7405/Sqm metal including
fire rateddoor doors shutter,
as per frame,
IS 3614 part-1
& part-2 forand
hardwares stability
vision and integrity.
panel Pressed&Galvanized
etc. supply installation, steel confirming
inclusive to IS 277
of duties
PART - B SUPERSTRUCTURE
with the following
excluding taxes F.O.R. specification.
Site)
Recommended fire door shall have doors tested at CBRI or ARAI for maximum
rating of 2hrs with vision panel. Test certificates should be available for vision
JOINERY
lites /panels WORKSas part of the fire door assembly. Independent glass test certificates
(Quoted
will not be Rates are forManufacturer
accepted. all heights, depths, levels, leads
test certificate shalland lifts)doors both single
cover
Door
Door leaf
frame shall
leafbe
shall 46mm
be double thick fully frame
rebate flush double beskin
profile of door
size 143 with or without
x 57mm madevisionout of
1 and
FIRE
lite.
double
DOORleaf and all doors supplied should within the tested specimen,
deviation in specification and sheet thickness other than whatminimum
1.60mm Door (16gauge)shall be manufactured
minimum thick from
galvanized 1.2mmsteel (18guage)
sheet. Frames shall thick
is mentioned be Mitered
in the
galvanised
and
test field steelare
assembled
certificates sheet. with
not The internal
self
allowed. tabs. construction
All
Proper provision of the be
should
label confirming door
the should
type of be
mortised, rigid
drilled
door andandthe
reinforcement
tapped for pads
receiving
1.1 hourly rating is mandatory. for receiving
appropriate appropriate
hardware. hardware.
Frames should The be infill material
provided with shall
back be
resin
plate bonded
bracket honeycomb
and anchor fasteners core. All doors shall be factory
for installation prepped
on a finished for receiving
plastered RCC
appropriate
surface/ masonry hardwarewall andopening. providedOncewith frame necessary
installedreinforcement
should be grouted for hinges,
with
locks,
cement and door slurry
& sand closers. The edges
necessary forshould
fire doors be interlocked
on the clearwith lock seam. Vision lite
opening.
wherever applicable should be provided as per manufacturer's recommendation
with a beeding and screws from inside. The glass should be 6mm clear borosilicate
fire rated glass of relavant rating of the door.
All doors and frames shall be finished with polyurethane aliphatic grade paint of
approved colour. The door leaf and frame shall have passed minimum 250 hours of
salt sprey test.
TYPE - FD - : Metal Fire Doors of approved size 1100 x 2100mm including metal
1.1.1 frame finished with fire rated paint on both sides, of approved colour and shade as Sqm 39.27 39.27 8,253 36.2208 0 36 298916.4 0 298916
per the Design Consultants approval (2 Hours Fire rated) of double leaf. The door to
TYPE - FD1 - : Metal Fire Doors of approved size 1100 x 2100mm including metal
have 250mm x 750mm size 2 Hour fire rated vision panel as per the detailed
1.1.1 frame finished with fire rated paint on both sides, of approved colour and shade as Sqm 27.6 27.6 8,253 27.048 0 27 223216.8 0 223217
drawing. The rate is inclusive of supplying and fixing all brush finished 2 Hour fire
per the Design Consultants approval (2 Hours Fire rated) of double leaf. The door to
rated ironmongery
TYPE - FD2 : Metal likeFirelocks,
Doorshandles, tower bolts,
of approved size 750 door closer etc.including
x 2000mm of approved metal
have 250mm x 750mm size 2 Hour fire rated vision panel as per the detailed
1.1.2 make as
frame indicated
finished withinfire
the rated
detailpaint
drawing.
on both Location-Staircase
sides, of approved (Basic
colour price
andofshade
fire as
drawing. The rate is inclusive of supplying and fixing all brush finished 2 Hour fire Sqm 37.5 37.5 8,253 36.75 0 37 303283.6 0 303284
doorthe
per @Design
Rs 7405/SqmConsultants including
approval door (2 shutter,
Hours Fire frame,
rated)hardwares
of single/double and visionleaf. The
rated ironmongery like locks, handles, tower bolts, door closer etc. of approved
paneltoetc.
door have supply
250mm & installation
x 750mm size inclusive
2 Hour fire of duties
rated excluding
vision panel taxes
as perF.O.R. Site)
the detailed
make
1.2 DOOR as indicated
SHUTTER in the detail drawing. Location-Staircase (Basic price of fire
drawing. The rate is inclusive of supplying and fixing all brush finished 2 Hour fire
door @ Rs 7405/Sqm including door shutter, frame, hardwares and vision
Providing and fixing
rated ironmongery likephenol
locks,bonded
handles,flush tower door shutters
bolts, door of approved
closer etc. ofquality
approved and
panel etc. supply & installation inclusive of duties excluding taxes F.O.R. Site)
1.2.1 make non decorative
as indicated typedetail
in the core drawing.
of block board Location-construction
Electricalwith shaft,internal
Meterframe
room of 0 0 0
38
1st mm
class
(Basic thick
hardwith
price ofwood 32mm
fire and
doorwellflush
@ Rs door
matched & 33mm
7405/Sqm mmincluding
thick decorative
commercial door veneerframe,
plyshutter,
veneering with
with grooves
vertical
on outside
grains
hardwares and
or cross plain
andbands
vision veneer
panelon
including 6inside
etc. mm
supply surface
thick &red including
merandi melamine
installation, wooden
inclusive polishing
lipping as per
all around,
of duties
a drawing
providing
excluding and
and design
taxes fixing
F.O.R.(D ofSite)
4 nos. size 1100x2100mm).
125mm long and 3.5mm Location-thickUnit Main Entrance
SS hinges and providingDoor Sqm 155 136 6,108 129.23 0.00 129.23 789333 0 789333
& fixing 50mmx20mm melamine matt finish teakwood architrave on both side of
doors as per
Providing and drawing
Fixing and specification
factory made 32 mm complete and approved
thick Enamel painted sample.
doors (Basic price
of Door Shutter
manufactured including
from dense, lipping
homogenous and both highsides veneer-
density, fibre Rs. 2616/-
plate per SQM
moulded,
inclusive ofpanels,
decorative duties jointed
excluding withtaxes F.O.R.treated
seasoned, Site. Basic
rubber ratewoodis excluding
/ hard wood the cost
stiles,of
1.2.2 hinges & with
polishing)
and rails solid core construction; using ISI certified phenol formaldehyde resin
a D1per
as of size 900x2100mm.
IS: 848:1991 BWP,Location-type, meetingBedroom, Kitchen,
minimum Studytechnology
product Sqm 300 254.86 2,898 242.62 0.00 242.62 703130 0 703130
b D2 of size 750x2100mm.
specifications. Rate to include Location- Toilet and fixing 4 Nos. heavy duty stainless
providing Sqm 215 181.06 2,898 168.89 0.00 168.89 489455 0 489455
c steel
D1" ofbutt sizehinges with necessary
900x2100mm. Location- SS screws
Serv. Room for eachEntryshutter,
Door providing & fixing Sqm R/O 2,898
20mmx12mm enamel painted red mirandi architrave on both side of doors as per
drawing complete. (Basic price of Door Shutter is Rs 916/- per SQM inclusive of
1.3 Hardware
duties excluding for Wooden Doors Site. Basic rate is excluding the cost of hinges &
taxes F.O.R.
enamel painting)
Abstract E Page 310
BOQ
New TOTAL QTY TOTAL AMOUNT
S. No. Description Unit Qty. Remarks
Pre. Qty. Ammen RATE PRE THIS CUMM PRE THIS CUMM
d
Providing and fixing mortice latch and lock with six levers and a pair of levers
handles of Godrej or equivalent as approved with necessary screws etc. complete
1.3.1 Stainless Steel
With Pin Cylinder (10' forend length) - for external Doors (Basic rate @1308/ Each
a inclusive of duties excluding taxes F.O.R. Site) No. 65 65 1,661 61.44 0.00 61.44 102036 0 102036
With Pin Cylinder (8' forend length) - for Internal Doors (Basic rate @1177/ Each
b inclusive of duties excluding taxes F.O.R. Site) No. 151 148 1,585 142.08 0.00 142.08 225186 0 225186
Keyless Cylindrical handle with knob - For toilet doors (Basic rate @872/ Each
c inclusive of duties excluding taxes F.O.R. Site) No. 130 128 1,107 122.88 0.00 122.88 136048 0 136048
Providing & fixing bright finished brass/Stainless Steel AISI 316 grade tower bolt
1.3.2 (barrel type) of approved make with necessary screws etc. complete. 0 0 0
200 X 10 mm (Basic rate @ 196/ Each inclusive of duties excluding taxes F.O.R.
a Site) Each 151 148 261 142.08 0.00 142.08 37081 0 37081
250 X 10 mm (Basic rate @ 245/ Each inclusive of duties excluding taxes F.O.R.
b Site) Each 65 65 328 61.44 0.00 61.44 20130 0 20130
0 0 0
Providing and fixing bright finished brass/Stainless Steel AISI 316 grade hanging
type double floor door stopper of best quality as approved with necessary screws
etc. complete. (Basic rate @ 196/ Each inclusive of duties excluding taxes F.O.R.
Site)
1.3.3 Each 346 213 267 212 0.00 212.00 56575 0 56575
Providing and fixing rubber buffer of best quality as approved with necessary
screws etc. complete. (Basic rate @ 196/ Each inclusive of duties excluding taxes
F.O.R. Site)
1.3.4 Each 346 341 267 340 0.00 340.00 90733 0 90733
Providing and fixing imported Magic eye 270" of brush steel finish (Basic rate @
1.3.5 147/ Each inclusive of duties excluding taxes F.O.R. Site) Each 65 65 210 64 0.00 64.00 13433 0 13433
Providing and fixing SS hydraulic door closer of brush steel finish (Basic rate @
1.3.6 1177/ Each inclusive of duties excluding taxes F.O.R. Site) Each 65 65 1,544 64 0.00 64.00 98827 0 98827
Providing and fixing SS safety chain of brush steel finish (Basic rate @ 147/ Each
1.3.7 inclusive of duties excluding taxes F.O.R. Site) Each 65 65 210 64 0.00 64.00 13433 0 13433
Sunken
Type of IPS
S. no Floor no. Flat Whitewas IPS Flooring Filling
Flooring (Screed-
h (Sqm) (Sqm) Balcony)
(Cum)
Basement Basement
Sqm Sqm Sqm Cum
2A 950 26.54 1.68
Quantities in one Flat 2D 14 29.23 1.61
2E 29.69 1.56
1BHK
Lobby/ Common Area 2.47
Basement 950 14
JMR
1 Ground Floor
001 2A 26.54 1.68
003 2A 26.54 1.68
004 2A 26.54 1.68
005 2E 29.69 1.56
006 2A 26.54 1.68
Lobby/ Common Area 2.47
2 1st Floor
101 2A 26.54 1.68
103 2A 26.54 1.68
104 2A 26.54 1.68
105 2E 29.69 1.56
106 2A 26.54 1.68
Lobby/ Common Area 2.47
3 2nd Floor
201 2A 26.54 1.68
202 2D 29.23 1.61
203 2A 26.54 1.68
204 2A 26.54 1.68
205 2E 29.69 1.56
206 2A 26.54 1.68
Lobby/ Common Area 2.47
3 3rd Floor
301 2A 26.54 1.68
302 2D 29.23 1.61
303 2A 26.54 1.68
304 2A 26.54 1.68
305 2E 29.69 1.56
306 2A 26.54 1.68
Lobby/ Common Area 2.47
4 4th Floor
401 2A 26.54 1.68
402 2D 29.23 1.61
403 2A 26.54 1.68
404 2A 26.54 1.68
405 2E 29.69 1.56
406 2A 26.54 1.68
Lobby/ Common Area 2.47
5 5th Floor
501 2A 26.54 1.68
502 2D 29.23 1.61
503 2A 26.54 1.68
504 2A 26.54 1.68
505 2E 29.69 1.56
506 2A 26.54 1.68
Lobby/ Common Area 2.47
6 6th Floor
601 2A 26.54 1.68
602 2D 29.23 1.61
603 2A 26.54 1.68
604 2A 26.54 1.68
605 2E 29.69 1.56
606 2A 26.54 1.68
Lobby/ Common Area 2.47
7 7th Floor
701 2A 26.54 1.68
702 2D 29.23 1.61
703 2A 26.54 1.68
704 2A 26.54 1.68
705 2E 29.69 1.56
706 2A 26.54 1.68
Lobby/ Common Area 2.47
8 8th Floor
801 2A 26.54 1.68
802 2D 29.23 1.61
803 2A 26.54 1.68
804 2A 26.54 1.68
805 2E 29.69 1.56
806 2A 26.54 1.68
Lobby/ Common Area 2.47
9 9th Floor
901 2A 26.54 1.68
902 2D 29.23 1.61
903 2A 26.54 1.68
904 2A 26.54 1.68
905 2E 29.69 1.56
906 2A 26.54 1.68
Lobby/ Common Area 2.47
10 10th Floor
1001 2A 26.54 1.68
1002 2D 29.23 1.61
1003 2A 26.54 1.68
1004 2A 26.54 1.68
1005 2E 29.69 1.56
1006 2A 26.54 1.68
Lobby/ Common Area 2.47
Terrace Floor
LMR
A Total Quantity: 950 14 1784 106
198.47 88.01
1407.63 159.95
0 2745 0 0 0 0 0
120.77
260.28 49.82
27.16 49.22
137.40
2548 1104 369 591 137 1311 166 2255
0 300 113 0 0 0 0 0
39.24
60.93 19.28
0 0 0 0 0 0 0
2.025 1.0125
8.37 4.98
0 0 0 0 0 0 0 0 0 0
90% 98% 90% 98% 81% 95% 96% 96% 96% 96%
Balcony Passanger
Landing Skirting Toilet Kitchen Coping Lift Service Lift
S1 S2 S1 S2 Rmt
11.58 9.88 2.39 1.87 0.97 2.65 22.83 3.75 3.75
0.97 3.48 18.60
0.97 3.78 19.02
9.88 2.39
0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0
D2 D D1 D2
Sqm Nos. Nos. Nos. Sqm Sqm Sqm Sqm Sqm Sqm
2.69 1.00 2.00 2.00 2.61 2.1375 0 0 1.8 0
2.69 1.00 3.00 2.00 0 2.8425 11.4
2.69 1.00 3.00 2.00 3.01875 5.7
1.8
1.8
1.80
0 0 0 0 0 0 0 0 0 0
98% 96% 96% 96% 96.0% 98.0% 98.0% 98.0% 98.0% 98.0%
168.89 61.44 142.08 122.88 5.02 92.17 32.54 25.07 22.93 161.99
Date 19-Feb-20
RA Bill No. 24th RA
Period Up to Jan. 2021
Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm Sqm
5.4625 0 0 0 3.325 3.20625 0.885 0.705 0 1.175
0 4.275 0 1.77
4.9875 3.5625 1.77
0 0 0 0 0 0 0 0 0 0
240.35 54.86 38.48 39.19 146.30 141.08 38.94 31.02 35.40 51.70
98.0% 97.0% 97.0% 97.0% 97.0% 97.0% 98.0% 98.0% 98.0% 98.0%
235.5 53.22 37.32 38.01 141.91 136.84 38.16 30.40 34.69 50.67
indows
Remarks
Mirror
V
Toilet
Sqm Sqm
1.41 1.08
1.41 1.08
1.41 1.08
1.08
1.41 1.08
1.41 1.08
1.41 1.08
1.41 1.08
1.41 1.08
1.4 1.08
1.4 1.08
1.4 1.08
1.4 1.08
1.4 1.08
1.41 1.08
1.41 1.08
1.4 1.08
1.41 1.08
1.41 1.08
1.41 1.08
1.4 1.08
1.4 1.08
1.41 1.08
1.41 1.08
1.41 1.08
1.4 1.08
1.41 1.08
1.41 1.08
1.41 1.08
1.4 1.08
1.4 1.08
1.41 1.08
1.41 1.08
1.41 1.08
1.4 1.08
1.41 1.08
1.41 1.08
1.41 1.08
1.41 1.08
1.41 1.08
1.4 1.08
1.41 1.08
1.41 1.08
1.41 1.08
1.41 1.08
1.41 1.08
1.4 1.08
1.41 1.08
1.41 1.08
1.41 1.08
1.41 1.08
1.41 1.08
1.4 1.08
1.41 1.08
1.41 1.08
1.41 1.08
1.41 1.08
1.41 1.08
1.4 1.08
1.41 1.08
1.41 1.08
1.41 1.08
1.41 1.08
1.41 1.08
1.4 1.08
1.41 1.08
1.41 1.08
1.41 1.08
90 69
0 0
90.24 69.12
98.0% 98.0%
88.44 67.74
Project : Godrej Aria sector 79 Gurgaon Date 19-Feb-20
Vendor Jayant K. Furnishers, RA Bill No. 24th RA
Service FINISHING WORKS FOR GODREJ ARIA SEC-79, Gurgaon Tower-F Period Up to Jan. 2021
LOI No. GPL/GGN/LOA/GODREJ ARIA/JAYANT Dated- 06.12.2016
PART - A SUBSTRUCTURE
1 FLOORING WORKS
1.1 Glazed ceramic tile
Providing and laying to pattern, commercial quality glazed Ceramic tile of
approved colour, size 200x200mm & minimum 5mm thickness for called of
areas, over 20mm thick or more cement mortar bed (to make up required
sqm. R/O 0 854.80
finished floor level) of 1:4 mix (1 cement:4 coarse sand) and joints shall be
pointed with the matching cement based polymer grout as recommended by
1.2 IPS Floor Bal Endura or approved equivalent make etc., the rate inclusive of
Laticrete/
providing necessary
Providing and layingspacers
40mm thickof sizeCement
1.6mmConcrete
to ensure1:2:4
uniform joints etc.
(1 cement :2 coarse
complete
sand in all respect
: 4 graded as per drawings.
stone aggregate of 12.5mm (Basic price size)
nominal of tileflooring
- Rs.26/sft inclusive
finished with sqm 16 16 461.19 13.79 - 13.79 6360 - 6360
aoffloating
all duties excluding
coat taxes F.O.R.
of neat cement site. cement
including ) slurry, and 4 mm thick pvc strip
of required size at 1.2 m c/c both ways and part there off as required etc.
1.3 Hardonite
complete inflooring
true lines and level as per specification and drawing.
Providing and laying 62 mm thick heavy duty hardonite flooring with non
metallic hardener of approved make including 4 mm thick PVC strips of sqm R/O 1,085.00
required size at 1.2 m c/c both ways and part there off as required, under layer
50mm CCand
Providing 1:2:4 (1 cement
laying : 2 coarseusing
stone flooring sandstone
: 4 graded
slab ofstone aggregate
approved 20mm
quality in
1.4 Stone flooring
nominal
specified size) with
size of 12mm
stone slabthick
as pertopping,
drawingsusingandgrey cement
pattern hardenerlanding
in flooring/ mix by with
cement
weight (2mortar 1:4 :(11 cement
hardener cement): and 4 coarse
stonesand)
chipsof dryadequate
mixed inthickness
a ratio of to
1:2match
(1
the total thickness
hardener and cement of mix
50mm : 2 and
stonejoint to of
chips be6mm
filleddown
with white
gaugecement
to formslurry
dry
mixed
mortar)with pigment
complete with toneat
match the shade
cement of stone
and broom including
finishing surfaces
to leave the pointing,
surface
curing
rough. etc. complete as per specification, pattern and drawing.
With 18 to 20mm thick Prepolished Granite stone and joint to be filled with
white cement slurry mixed with pigment to match the shade of stone (Basic rate
of prepolished (one side) Granite @ Rs. 118/Sft inclusive of all duties
1.4.1 excluding taxes F.O.R. site) sqm R/O 2,911.14
With 18 to 20mm thick Kota stone and joint to be filled with grey cement slurry
mixed with pigment to match the shade of stone, providing 4Nos. 5x3mm
grooves and including rubbing, grinding, polishing and bull nosing etc.
1.4.2 sqm 38 13.36 1,409 12.64 - 12.64 17809.82 - 17809.82
complete. (Basic rate of Kota @ Rs. 39/Sft inclusive of all duties
excluding taxes F.O.R. site)
1.5 Staircase Flooring
2. WALL FINISHES
2.1 Cement Plaster skirting / risers/ dados / platforms.
Providing and laying 100 mm high 12-15 mm thick Cement plaster skirting with
cement mortar 1:4 (1 cement : 4 coarse sand) finished with a floating coat of
neat cement as per drawing and design. sqm 15 15 393
PART - B SUPERSTRUCTURE
Marble shall be procurred in sizes available in the market, quoted rates also to
include cutting of sizes as per design and skirting from standard size stone
pieces.
The rate should be inclusive of protection of flooring until the handling of the
project by covering the joints with 6mm plastic sheet etc.
Providing and laying 100 mm high 12-15 mm thick Cement plaster skirting with
cement mortar 1:4 (1 cement : 4 coarse sand) finished with a floating coat of
neat cement as per drawing and design. sqm 19 0 397 0 - 0
Providing and laying 200mm wide 18-20mm thick Gangsaw cut Gwalior White
Sand Stone coping of approved size using stone slab approved quality with
20mm avg. thick cement mortar 1:4 (1 cement : 4 coarse sand) and joint to be
2.3.2 filled with cement slurry mixed with pigment to match the shade of stone Rmt. 1470 1440.35 573 1353.30 - 1353.30 775765 - 775765
including cutting, surfaces pointing, curing rubbing, grinding and polishing etc.
2.4 Providing
complete and
as
Tile Skirting perlaying 6-10mm thick
specification, tileand
pattern in skirting
drawing.laid over rate
(Basic 12mm thick cement
of Gwalior white
mortar 1:3 @
sand stone (1cement : 3 coarse
Rs. 78/Sqft sand),
inclusive of and jointsexcluding
all duties shall be pointed with the
taxes F.O.R. site)
matching cement based polymer grout (Laticrete/Bal grout or equivalent) of
approved shade including cutting, grouting the joints etc. complete in all
respects as per drawing. 0 - 0
With Vitrified Tile @ base rate Rs. 44/Sqft inclusive of all duties excluding
2.4.1 taxes F.O.R. site. sqm 171 170.59 1,944 174.26 - 174.26 338792 - 338792
With Anti-Skid Ceramic Tiles @ base rate Rs. 28/Sqft inclusive of all duties
2.4.2 excluding taxes F.O.R. site. sqm 253 252.50 1,613 233.45 - 233.45 376480 - 376480
Providing and laying 6-10mm thick tiles in cladding/ dado/ jamb/ soffit/ cill of
uniform thickness, size, shade and pattern as approved by Architect/Project
2.5 Tile Dadolaid with rich cement slurry over a bedding plaster of 6mm (avg.) thick
Manager
cement mortar 1:3 (1 cement : 3 fine sand) including the cost of 12mm average
thick rough base plaster of mix 1:3 (1 cement : 3 coarse sand), and joints shall
be pointed with the matching cement based polymer grout (Laticrete/Bal grout
or equivalent) of approved shade including cutting, curing etc. complete in all
respects as per drawing. 0 - 0
PART - A SUBSTRUCTURE
1 Providing
PAINTINGand applying three or more coats (as specified below) of approved
brand, manufacturer, colour and shade to give a smooth finish on plastered
(Quoted Rate ashall
surfaces over coatbeoffor all heights,
approved depths,
primer levels,the
including leads
costand lifts )
of preparing the
surfaces with filling materials (putty), along with sand papering wherever
required, including thoroughly brushing the surface free from foreign matter,
sandpapering smooth, filling in all holes and cracks etc. complete., rate to
include all tools, labour, scaffolding, primer as required, complete as directed
1.1 by the Engineer.
Note: Flat area in horizontal / vertical plane will be measured for payment.
No additional payment will be made for grooves, cornices, vatta, mouldings
etc.
1.1.1 Acrylic Emulsion Paint of approved brand and shade as per specification sqm 20 115.17 184
1.1.2 Oil Bond Distemper of approved brand and shade as per specification sqm 316 196.51 155.72
PART - B SUPERSTRUCTURE
1 PAINTING WORKS
(Quoted Rate shall be for all heights, depths, levels, leads and lifts ).
Providing and applying three or more coats (as specified below) of approved
brand, manufacturer, colour and shade to give a smooth finish on gypsum
plastered surfaces over a coat of approved primer including the cost of
1.1 preparing the surfaces with filling materials (putty), along with sand papering
wherever required, including thoroughly brushing the surface free from foreign
matter, sandpapering smooth, filling in all holes and cracks etc. complete., rate
to include
Acrylic all tools,
Emulsion labour,
Paint scaffolding,
of approved primer
brand as required,
and shade complete as As per
as per specification
1.1.1 directed
Pre by the(Billed
GST Rates Engineer.
before 30th June-2017) sqm 11850 2745.33 195 2751.21 - 2751.21 536486 - 536486
Acrylic Emulsion Paint of approved brand and shade as per specification As per
1.1.1 Post GST Rates (Billed after 30th June-2017) sqm 9099 9931 183.73 9721.26 - 9721 1786079 - 1786079
1.1.2 Oil Bond Distemper of approved brand and shade as per specification sqm 6545 6146.7 155.72 4996.17 - 4996.17 778026 - 778026
Providing and applying Whitewash in three or more coats on wall and ceiling
including cost of addition of gum, ultramarine blue, including primer,
scaffolding, preparation of surface by brushing and brooming down along with
1.2 sand papering wherever required to give an even shade etc.complete. (In sqm. 4360 412.82 60.00 593.33 - 593.33 35600 - 35600
Service
ProvidingRooms & Lift/Services
and applying Shaft,inMachine
Whitewash three orroom
moreetc.)
coatsAsonper Pre
wall GST
and Rates
ceiling
(Billed before
including 30th
cost of June-2017)
addition of gum, ultramarine blue, including primer,
scaffolding, preparation of surface by brushing and brooming down along with
1.2 sand papering wherever required to give an even shade etc.complete. (In sqm. 3767 3947 56.72 1485.68 - 1485.68 84271 - 84271
Service Rooms & Lift/Services Shaft, Machine room etc.) As per Post GST Rates
(Billed after 30th June-2017)
Providing and applying two or more coats of polymer based weather proof
synthetic textured paint on external walls over a coat of primer in
approved finish, colour and texture (made out of synthetic fibers and
petroleum based chemicals) as per manufacturer's specification at all
1.3
levels and height. (The work should be executed by an approved agency). sqm. 1713.751 1563.75 282.50 1705.49 - 1705.49 481807 - 481807
Rates quoted to include vertical and horizontal grooves and patterns as
Providing & applying
directed including two or more
preparing the coats of acrylicattending
base surface, paints to the externaledges,
to broken
surfaces
corners orwhether
patchesplastered or formsurface
of plastered finish, and exterior
usingfilling withquality acrylicgrout,
cementitious
weather
scaffolding,shield paintcleaning
staging, of approved shade &
the surface etc.make including
complete preparing
as directed by the
1.4 base surface, attending to broken edges, corners or patches of plastered sqm. 10338.96 10038.96 221.27 6743.14 - 6743.14 1492074 - 1492074
Engineer.and
Providing (Base Rate with
painting for external
waterproofpaint is Rs based
cement 23 perpaint
sft for specialised
of approved brand
surface
agency and
(Snowcem filling
plus)
including with cementations
twomaterial,
or more coats and
labour andagrout, scaffolding,
coat of base coarse
arrangement cleaning
with white
for painting theshade
i.e.
(for new providing
surface,
staging/ work) to external
scaffolding/ walls,etc.,
& platform
applying columns,
STC chajja,
biocide,
inclusive facia. Aprons
priming
of duties coat etc.
etc.
excluding over
complete
taxes all
plastered
as surface to give
per manufacturers an even shade
guidelines and asincluding
directedpreparation of base (Base
by the Engineer. as per
F.O.R. Site)- up to 5th Floor.
manufacturer’s specifications including scaffolding and curing (Plaster work
Rate for external paint is Rs 18 per sft for specialised
1.5 measured separately) with all labour and materials in all floors. agency Sqm 40 40 126.98
including material, labour and arrangement for painting i.e. staging/
scaffolding/ platform etc., inclusive of duties excluding taxes F.O.R.
Site).-ceiling
1.6 False Above 5th Floor
Abstract F Page 349
Providing and fixing of false ceilings at all heights of 600mm x 600mm Grid
ceiling, ceiling tiles with Tegular/ Microlook Edge laid on prelude XL exposed
grid systems with 24mm / 15mm wide T- section flanges colour white. The BOQ TOTAL QTY TOTAL AMOUNT
framework comprise of main runner spaced at 1200mm centers securely fixed New
S. No. to the structural soffit by approved Description
hangers at 1200mm maximum centers. Unit Pre. Qty. Remarks
Hangers (GI wire of 4.0mm dia) to be fixed by approved roof plug/ fastener, RATE PRE THIS CUMM PRE THIS CUMM
Qty. Ammen
level adjusters and screws etc. The last hanger at the end of each main runner
Providing
should notand be fixing
greater suspended
than 450mm falsefrom
ceiling
thewhich
adjacent includes
wall. providing
Flush fitting and fixing d
GI perimeter
1200mm longchannels
cross tees of(with
size 0.55
doublemm.stitching)
Thk. having to be one flange of 20
interlocked mm and
between
another flange of 30 mm and web of 27 mm along
main runners at 600mm centers to form 1200 x 600 modules. Cut cross tees the perimeter of the ceiling,
1.6.1 screw
longerfixedthan to brick wall/
600mm to bepartition
supported with help of nylon sleeves and screws, at
independently.
610 mm centers. The suspended GI intermediate channels of size 45
600mm
mm,0.9mm x 600mm
thk with modules to be formed
two flanges of 15 mm by each
fittingfrom600mm long flush
the soffit at 1220fitting
mm
corss
centers tees centrally
with ceilingbetween
angles withthe 1200m cross of
ceiling angle tees.
widthPerimeter
25mm trim x 10mmto bex 0.55mm
Armstrong
Screw
thk fixedfixing wall
is done
to soffit angle
with secured
mechanically
GI to walls
cleat and steelatexpansion
either 450mm
with screw maximum
driver orcentrers.
fasteners. drilling The of
Ceiling machine
section sqm. 1103 482.94 - 482.94 344115 - 344115.44
492.80 712.54
quoted
with
0.55 mm rate
thkshall
suitable havingbe inclusive
attachment.
web ofFinallyfor mm
51.5 makingandopening
the boards twoare tofor
flanges belight26fixtures,
joined
of mmandeach diffusers
finished
with so &
as
lips
to
of have
AC10.5mmare
grills.a flush look fixed
The then
quoted which includes
ratetoshall
the be finishing of
intermediate
inclusive the taperedwith
channels
suspenders and square
athelp
all edges
of connecting
heihgt of
& extra
the
clipsboard
and inwith joining
direction compound.
perpendicular fibre
to tape
the and two
intermediate coats
member required for all openings. (Basic rate of ceiling tile Rs 583/- per Sqm. of
channel primer
with suitable
centers.
for
All Gypboard
GI members
including (Assall
framework per
be&the recommendations
ofgrid
Gypsteel
system, orinclusive
approved / practice
dutiesofetc.
allequivalent St.make.
Gobain The
excluding Gyproc
12.5
taxesmmor
equivalent)
tapered
F.O.R. site).edge This includes(Confirming
gypboard providing the surface of falseisceiling
to IS-2095-1982) to be fixed
then screw painted
to
1.6.2 with
ceilingapproved
section withquality
25 ofmm Plastic emulsion
dry wall screwspaint. The false
at 230mm ceiling surfaces shall
centers.
be prepared to the satisfaction of the Design Consultant, and shall be applied
Notes:
with
1) twowill
There coats notofbeprimer,
separatetwomeasurements
coats of putty and for thetouch up putty
vertical drops if required
upto 2'-0"to
achieve
high, smooth
double levelfinish. Thevaulted
ceiling, surfaceceiling,
shall be painted
curved withand
ceiling twoindirect
coats oflighting
Luxol silk
emulsion
made paint ofboard.
in Gypsum approved make to the satisfaction of Design Consultants. Sqm R/O 0 1,367.13
2) False ceiling rate quoted shall include providing necessary cut-outs for fixing
Light fixtures (Inclusive of all sizes), AC diffuser, AC dampers, AC linear grilles
for (supply and return air), smoke detectors, speakers etc., as directed by the
Design Consultants.( No additional rates will be given for the cut-outs)
1.6.3 Item same as above item no. 1.6.2 but using for Horizontal and Vertical Boxing. Sqm 72 159.79 1,550.48 75.89 - 75.89 117664 - 117664.14
1.8 Mirror
PART - B SUPERSTRUCTURE
Providing and fixing in position Hollow metal fire rated doors as per IS 3614
part-1 & part-2 for stability and integrity. Pressed Galvanized steel confirming
to IS 277 WORKS
JOINERY with the following specification.
Recommended fire door shall have doors tested at CBRI or ARAI for maximum
rating
(Quoted Rateswith
of 2hrs vision
are for panel. Test
all heights, certificates
depths, shouldand
levels, leads belifts)
available for vision
lites /panels as part of the fire door assembly. Independent glass test
1 certificates
FIRE DOOR will not be accepted. Manufacturer test certificate shall cover doors
both single and double leaf and all doors supplied should be within the tested
specimen, deviation in specification and sheet thickness other than what is
mentioned in the test certificates are not allowed. Proper label confirming the
1.1 type of door and the hourly rating is mandatory.
TYPE - FD - : Metal Fire Doors of approved size 1100 x 2100mm including
metal frame finished with fire rated paint on both sides, of approved colour and
shade as per the Design Consultants approval (2 Hours Fire rated) of double
1.1.1 leaf. The door to have 250mm x 750mm size 2 Hour fire rated vision panel as Sqm 45 39.27 8,253 36.2208 - 36.22 298916 - 298916.35
TYPE
per the-detailed
FD1 - :drawing.
Metal Fire The Doors ofinclusive
rate is approvedofsize 1100 x 2100mm
supplying and fixingincluding
all brush
metal
finishedframe finished
2 Hour with ironmongery
fire rated fire rated paint onlocks,
like both sides, of approved
handles, tower bolts, colour
doorand
shade as per the Design Consultants approval (2 Hours
closer etc. of approved make as indicated in the detail drawing. Location-Fire rated) of double
1.1.1 leaf. The door
Staircase (Basic to price
have 250mm x 750mm
of fire door @ Rssize 2 Hour including
7405/Sqm fire rated vision panel as Sqm
door shutter,
27.6 27.6 8,253 27.048 - 27.05 223217 - 223216.76
TYPE
per the - FD2
detailed: Metal Fire
drawing. Doors
The rateofisapproved
inclusive size
of 750 x
supplying
frame, hardwares and vision panel etc. supply & installation inclusive 2000mm
and including
fixing all brush
of
metal
dutiesframe
finished finished
2 Hour
excluding fire with
rated
taxes fire rated
Site)paint
ironmongery
F.O.R. onlocks,
like both sides, of approved
handles, tower bolts, colour
doorand
shade as per the Design Consultants approval (2 Hours
closer etc. of approved make as indicated in the detail drawing. Location-Fire rated) of
1.1.2 single/double leaf. Theof door Sqm 80 37.5 8,253 36.75 - 36.75 303284 - 303283.64
Staircase (Basic price firetodoor
have@250mm x 750mm
Rs 7405/Sqm size 2 Hour
including door fire rated
shutter,
vision panel as per the detailed drawing. The rate is inclusive
frame, hardwares and vision panel etc. supply & installation inclusive of of supplying and
fixing
duties all brush finished
excluding 2 Hour Site)
taxes F.O.R. fire rated ironmongery like locks, handles,
1.2 tower
DOORbolts,
SHUTTER door closer etc. of approved make as indicated in the detail
Providing and fixingElectrical
drawing. Location- phenol bonded flush room
shaft, Meter door shutters of approved
(Basic price quality
of fire door @andRs
make
7405/Sqmnon decorative
including typedoorcore of block
shutter, board
frame, construction
hardwares andwith
visioninternal
panelframe
etc.
of 1st class hard wood and well matched 3mm commercial
supply & installation, inclusive of duties excluding taxes F.O.R. Site) ply veneering with 0 - 0
1.2.1
vertical
38 grainswith
mm thick or cross
32mm bands
flushincluding
door & 3 6mm mmthick
thickdecorative
red merandi wooden
veneer withlipping
all around,
grooves on providing
outside and andplain
fixing 4 nos.on125mm
veneer long andincluding
inside surface 3.5mm thickmelamineSS hinges
and providing
polishing as per &drawing
fixing 50mmx20mm
and design (Dmelamine matt finish teakwood
of size 1100x2100mm). Location- architrave
Unit
a on both
Main doors as per drawing and specification complete and approved Sqm
side of Door
Entrance 155 136 6,108 129.23 - 129.23 789333 - 789333
sample. (Basic price of Door Shutter including lipping and both sides veneer-
Rs. 2616/- per SQM inclusive of duties excluding taxes F.O.R. Site. Basic rate
Providing
is excluding andtheFixing
cost offactory
hingesmade 32 mm thick Enamel painted doors
& polishing)
manufactured from dense, homogenous high density, fibre plate moulded,
decorative panels, jointed with seasoned, treated rubber wood / hard wood
1.2.2 stiles, and rails with solid core construction; using ISI certified phenol
a formaldehyde resin as perLocation-
D1 of size 900x2100mm. IS: 848:1991 BWP,Kitchen,
Bedroom, Study minimum product Sqm
type, meeting 461 254.86 2,898 242.62 - 242.62 703130 - 703130
technology specifications. Rate to include providing and fixing 4 Nos. heavy
b D2 of size 750x2100mm. Location- Toilet
duty stainless steel butt hinges with necessary SS screws for each shutter, Sqm 335 181.06 2,898 168.89 - 168.89 489455 - 489455
providing & fixing 20mmx12mm enamel painted red mirandi architrave on both Abstract F Page 351
side of doors as per drawing complete. (Basic price of Door Shutter is Rs 916/-
BOQ TOTAL QTY TOTAL AMOUNT
New
S. No. Description Unit Pre. Qty. Remarks
RATE PRE THIS CUMM PRE THIS CUMM
Qty. Ammen
d
c D1" of size 900x2100mm. Location- Serv. Room Entry Door Sqm 56 2,898 0 - 0
Providing and fixing mortice latch and lock with six levers and a pair of levers
handles of Godrej or equivalent as approved with necessary screws etc.
1.3.1 complete Stainless Steel
With Pin Cylinder (10' forend length) - for external Doors (Basic rate @1308/
a Each inclusive of duties excluding taxes F.O.R. Site) No. 86 65 1,661 63 - 63.00 104627 - 104627
With Pin Cylinder (8' forend length) - for Internal Doors (Basic rate @1177/
b Each inclusive of duties excluding taxes F.O.R. Site) No. 174 148 1,585 145 - 145.00 229814 - 229814
Keyless Cylindrical handle with knob - For toilet doors (Basic rate @872/ Each
c inclusive of duties excluding taxes F.O.R. Site) No. 260 128 1,107 125 - 125.00 138395 - 138395
Providing & fixing bright finished brass/Stainless Steel AISI 316 grade tower bolt
1.3.2 (barrel type) of approved make with necessary screws etc. complete. 0 - 0
200 X 10 mm (Basic rate @ 196/ Each inclusive of duties excluding taxes
a F.O.R. Site) Each 202 148 261 145 - 145.00 37843 - 37843
250 X 10 mm (Basic rate @ 245/ Each inclusive of duties excluding taxes
b F.O.R. Site) Each 58 65 328 63 - 63.00 20641 - 20641
Providing and fixing bright finished brass/Stainless Steel AISI 316 grade
hanging type double floor door stopper of best quality as approved with
necessary screws etc. complete. (Basic rate @ 196/ Each inclusive of duties
excluding taxes F.O.R. Site)
1.3.3 Each 492 213 267 212 - 212 56575 - 56575
Providing and fixing rubber buffer of best quality as approved with necessary
1.3.4 screws etc. complete. (Basic rate @ 196/ Each inclusive of duties excluding Each 520 341 267 340 - 340 90733 - 90733
taxes F.O.R. Site)
Providing and fixing imported Magic eye 270" of brush steel finish (Basic rate
1.3.5 @ 147/ Each inclusive of duties excluding taxes F.O.R. Site) Each 58 65 210 64 - 64 13433 - 13433
Providing and fixing SS hydraulic door closer of brush steel finish (Basic rate
1.3.6 @ 1177/ Each inclusive of duties excluding taxes F.O.R. Site) Each 58 65 1,544 64 - 64 98827 - 98827
Providing and fixing SS safety chain of brush steel finish (Basic rate @ 147/
1.3.7 Each inclusive of duties excluding taxes F.O.R. Site) Each 58 65 210 64 - 64 13433 - 13433
1.1.3 Windows
Partly fixed with partly side hung openable shutter of types W11, W14, W14'
a (Basic price Rs. 3182/- per Sqm, include F.O.R. cost of material, Glass, Sqm 74 69.96 3,417 67.86 - 67.86 231851 - 231851
hardware, duties and the cost of installation and fixing excluding taxes)
Partly fixed with partly side hung openable shutter and with provision for
b exhaust fan of types W12,W13 (Basic price Rs. 3182/- per Sqm, include F.O.R. Sqm R/O 3,417 - 0 - 0
cost of material, Glass, hardware, duties and the cost of installation and fixing
Partly fixed with 2 track sliding of types W1, W4, W5, W7, W9, W9' ,W10
excluding taxes)
c (Basic price Rs. 3182/- per Sqm, include F.O.R. cost of material, Glass, Sqm 41 37.17 3,417 34.34 - 34.34 117326 - 117326
hardware, duties and the cost of installation and fixing excluding taxes)
Partly fixed with 2 track sliding and with provision for exhaust fan of types
d W5', W8 (Basic price Rs. 3182/- per Sqm, include F.O.R. cost of material, Sqm 54 51.7 3,417 50.15 - 50.15 171343 - 171343
Glass, hardware, duties and the cost of installation and fixing excludint taxes)
Partly Fixed with partly louvered of types W2, W3, W6 (Basic price Rs. 3182/-
e per Sqm, include F.O.R. cost of material, Glass, hardware, duties and the cost of Sqm R/O 47.0525 3,417 - 0 - 0
installation and fixing excluding taxes)
Partly Fixed partly top hung openable with provision for exhaust fan of types
f V, V1 (Basic price Rs. 3135.60/- per Sqm, include F.O.R. cost of material, Sqm 90 90.24 3,420 87.53 - 87.53 299336 - 299336
Glass, hardware, duties and the cost of installation and fixing excluding taxes)
NOTES
Total Amount 29681651.0 0.0 29681651.0
Pre GST Work Amount 1,603,023.0 - 1,603,023.0
Post GST Work Amount 28,078,628.0 - 28,078,628.0
Type of
S. no Floor no. IPS Flooring IPS Flooring
Flat Whitewash
(Sqm) (Sqm)
Basement Basement
2E 29.69
Lobby/Common Area 2.47
Basement 931 14
JMR
1 Ground Floor
001 2A 26.54
003 2A 26.54
004 2A 26.54
005 2E 29.69
006 2A 26.54
Lobby/Common Area 2.47
2 1st Floor
101 2A 26.54
103 2A 26.54
104 2A 26.54
105 2E 29.69
106 2A 26.54
Lobby/Common Area 2.47
3 2nd Floor
201 2A 26.54
202 2D 29.23
203 2A 26.54
204 2A 26.54
205 2E 29.69
206 2A 26.54
Lobby/Common Area 2.47
3 3rd Floor
301 2A 26.54
302 2D 29.23
303 2A 26.54
304 2A 26.54
305 2E 29.69
306 2A 26.54
Lobby/Common Area 2.47
4 4th Floor
401 2A 26.54
402 2D 29.23
403 2A 26.54
404 2A 26.54
405 2E 29.69
406 2A 26.54
Lobby/Common Area 2.47
5 5th Floor
501 2A 26.54
502 2D 29.23
503 2A 26.54
504 2A 26.54
505 2E 29.69
506 2A 26.54
Lobby/Common Area 2.47
6 6th Floor
601 2A 26.54
602 2D 29.23
603 2A 26.54
604 2A 26.54
605 2E 29.69
606 2A 26.54
Lobby/Common Area 2.47
7 7th Floor
701 2A 26.54
702 2D 29.23
703 2A 26.54
704 2A 26.54
705 2E 29.69
706 2A 26.54
Lobby/Common Area 2.47
8 8th Floor
801 2A 26.54
802 2D 29.23
803 2A 26.54
804 2A 26.54
805 2E 29.69
806 2A 26.54
Lobby/Common Area 2.47
9 9th Floor
901 2A 26.54
902 2D 29.23
903 2A 26.54
904 2A 26.54
905 2E 29.69
906 2A 26.54
Lobby/Common Area 2.47
10 10th Floor
1001 2A 26.54
1002 2D 29.23
1003 2A 26.54
1004 2A 26.54
1005 2E 29.69
1006 2A 26.54
Lobby/Common Area 2.47
Terrace
LMR
E=(AxD)-B Qty to be billed post 30th June 2017 791.03 13.79 574.37
Sunken Acrylic
Sunken Filling Acrylic Oil Bond Oil Bond
Filling Acrylic weathershield
(Screed- Painting Distemper Distemper
(Screed- Painting (Sqm) Painting
Balcony) (Cum) (Sqm) (Sqm) (Sqm)
Toilet) (Cum) (Sqm)
198.47 88.01
1407.63
65.53 0 2751 0 0 0 0
Acrylic
Texture
weathershiel Anti Skid Ceramic Floor tile-
painting(sqm White Wash (Sqm)
d Painting Balcony (Sqm)
)
(Sqm)
120.77
260.28
33.59 49.22
122.30 713.06 18.16 16.75 2.91
18.13 15.39 2.58
18.16 33.59 49.22 16.75 2.91
0 0 432 161 0 0 0 0
3.37 3.37
34.91 8.41
0 0 0 0 0 0 0
47.15 5.61
43.20
29.82 1.92
3.11 27.41 2.34
4.71 32.66 3.42
3.11 27.41 2.34
29.82 1.92
29.82 1.92
3.11 27.41 2.34
0.00 0.00 29.82 1.92
60.93 19.28
0 0 0 0 0 0 0
Laminated Wooden Flooring Window Cill Staircase Quantity per floor (Sqm)
2.025 1.0125
26.57 29.20
26.57 29.20
26.57 29.20 7.44 8.37 4.57 4.57 11.58
29.29 33.20
26.57 29.20
26.57 29.20
26.57 29.20
26.57 29.20 1.66 8.37 8.37 4.57 4.57 11.58
29.29 33.20
26.57 29.20
26.57 29.20
28.86 33.00
26.57 29.20
1.66 8.37 8.37 4.57 4.57 11.58
1.66 8.37 8.37 4.57 4.57 11.58
26.57 29.20
29.29 33.20
26.57 29.20
26.57 29.20
28.86 33.00
26.57 29.20
1.66 8.37 8.37 4.57 4.57 11.58
26.57 29.20
29.29 33.20
26.57 29.20
26.57 29.20
28.86 33.00
26.57 29.20
1.66 8.37 8.37 4.57 4.57 11.58
26.57 29.20
29.29 33.20
26.57 29.20
26.57 29.20
28.86 33.00
26.57 29.20
1.66 8.37 8.37 4.57 4.57 11.58
26.57 29.20
29.29 33.20
26.57 29.20
26.57 29.20
28.86 33.00
26.57 29.20
1.66 8.37 8.37 4.57 4.57 11.58
26.57 29.20
29.29 33.20
26.57 29.20
26.57 29.20
28.86 33.00
26.57 29.20
1.66 8.37 8.37 4.57 4.57 11.58
26.57 29.20
29.29 33.20
1.66 8.37 8.37 4.57 4.57 11.58
26.57 29.20
26.57 29.20
28.86 33.00
26.57 29.20
1.66 8.37 8.37 4.57 4.57 11.58
26.57 29.20
29.29 33.20
26.57 29.20
26.57 29.20
28.86 33.00
26.57 29.20
1.66 8.37 8.37 4.57 4.57 11.58
26.57 29.20
29.29 33.20
26.57 29.20
26.57 29.20
28.86 33.00
26.57 29.20
1.66 8.37 4.57 11.58
26.57 29.20
29.29 33.20
26.57 29.20
0 0 0 0 0 0 0 0
S2 S1 S2
9.88 2.39 1.87 0.97 2.65 22.83 7.44
0.97 3.48 18.60 8.17
0.97 3.78 19.02 8.36
1.72
2.39
0 0 0 0 0 0 0
0 0 0 0 0 0 0
77 37 28 38 0 132 248
lush Door & Moulded Doors -Shutters with Hardware ED2 D1' DW2
0 0 0 0 0 0 0
5.46 3.33
5.46 3.33
5.46 3.33
5.7 4.9875 3.5625
5.46 3.33
1.8
5.5 3.3
5.5 3.3
5.5 3.3
5.7 5.0 3.6
5.5 3.3
1.80
5.46 3.33
2.8 11.4 4.3
5.5 3.3
5.46 3.33
5.70 4.99 3.56
5.46 3.33
1.80
5.46 3.33
2.8 11.4 4.3
5.5 3.3
5.46 3.33
5.70 4.99 3.56
5.46 3.33
1.80
5.46 3.33
2.8 11.4 4.3
5.5 3.3
5.46 3.33
5.70 4.99
5.46 3.56 3.33
1.80
5.46 3.33
2.8 11.4 4.3
5.5 3.3
5.46 3.33
5.70 4.99 3.56
5.46 3.33
1.80
5.46 3.33
2.8 11.4 4.3
5.5 3.3
5.46 3.33
5.70 4.99 3.56
5.46 3.33
1.80
5.46 3.33
2.8 11.4 4.3
5.5 3.3
5.46 3.33
5.70 4.99 3.56
5.46 3.33
1.80
5.46 3.33
2.8 11.4 4.3
5.5 3.3
5.46 3.33
5.70 4.99 3.56
5.46 3.33
1.80
5.46 3.33
2.8 11.4 4.3
5.5 3.3
5.46 3.33
5.70 4.99 3.56
5.46 3.33
1.80
5.46 3.33
2.8 11.4 4.3
5.5 3.3
5.46 3.33
5.70 4.99 3.56
5.46 3.33
1.80
1.80
0 0 0 0 0 0 0 0
Mirror in Remarks
SD10 W14 W14' W5 W8 V
Toilet
Sqm
Sqm Sqm Sqm Sqm Sqm Sqm
1.08
3.21 0.89 0.71 0.00 1.18 1.41 1.08
1.77 1.41 1.08
1.77 1.41 1.08
138 39 31 35 52 90 69
0 0 0 0 0 0 0
PART - A SUBSTRUCTURE
PART - B SUPERSTRUCTURE
1.5 Staircase flooring
1.5.1 Treads of steps
With 18 to 20mm thick Kota stone and joint to be filled with grey cement slurry
mixed with pigment to match the shade of stone, providing 4Nos. 5x3mm
grooves and including rubbing, grinding, polishing and bull nosing etc.
complete. (Basic rate of Kota @ Rs. 39/Sft inclusive of all duties
excluding taxes F.O.R. site)
a. sqm 33 2,527 83,397 27.95 0.00 27.95 70627 0 70627
PART - A SUBSTRUCTURE
1 PAINTING
(Quoted Rate shall be for all heights, depths, levels, leads and lifts )
Providing and applying three or more coats (as specified below) of approved
brand, manufacturer, colour and shade to give a smooth finish on plastered
surfaces over a coat of approved primer including the cost of preparing the
surfaces with filling materials (putty), along with sand papering wherever
required, including thoroughly brushing the surface free from foreign matter,
sandpapering smooth, filling in all holes and cracks etc. complete., rate to
include all tools, labour, scaffolding, primer as required, complete as directed by
1.1 the Engineer.
Note: Flat area in horizontal / vertical plane will be measured for payment. No
additional payment will be made for grooves, cornices, vatta, mouldings etc.
1.1.1 Acrylic Emulsion Paint of approved brand and shade as per specification sqm
1.1.2 Oil Bond Distemper of approved brand and shade as per specification sqm 108.20 155.72 16,849 0.00 0.00 0.00 0 0 0
Providing and applying whitewash in three or more coats on wall and ceiling
including cost of addition of gum, ultramarine blue, including primer, scaffolding,
preparation of surface by brushing and brooming down along with sand
papering wherever required to give an even shade etc.complete. (In Service
1.2 Rooms, Basements & Lift/Services Shaft) sqm. 4787.13 57 271,536 0.00 0.00 0.00 0 0 0
PART - B SUPERSTRUCTURE
1 PAINTING WORKS
Page 387 of 832
BOQ TOTAL QTY TOTAL AMOUNT
S. No. Description Unit New Qty. Remarks
Ammend RATE AMOUNT PRE THIS CUMM PRE THIS CUMM
Providing and applying two or more coats of polymer based weather proof
synthetic textured paint on external walls over a coat of primer in
approved finish, colour and texture (made out of synthetic fibers and
petroleum based chemicals) as per manufacturer's specification at all levels
1.3 and height. (The work should be executed by an approved agency). Rates sqm. 1583.8 282.50 447,423 1254.64 0.00 1254.64 354438 0 354438
quoted to include vertical and horizontal grooves and patterns as directed
PART - A including preparing the base surface, attending to broken edges, corners or
SUBSTRUCTURE
patches of plastered surface and filling with cementitious grout,
scaffolding,
JOINERY WORKSstaging, cleaning the surface etc. complete as directed by
Engineer. (Base Rate for external paint is Rs 23 per sft for specialised
(Quoted Rates are for all heights, depths, levels, leads and lifts)
agency including material, labour and arrangement for painting i.e.
staging/ scaffolding/ platform etc., inclusive of duties excluding taxes
1 FIRE DOOR
F.O.R. Site)- up to 5th Floor.
TYPE - FD - : Metal Fire Doors of approved size 1100 x 2100mm including
metal frame finished with fire rated paint on both sides, of approved colour and
shade as per the Design Consultants approval (2 Hours Fire rated) of double leaf.
1.1.1 The door to have 250mm x 750mm size 2 Hour fire rated vision panel as per the Sqm 4.62 8,253.57 38,131
detailed drawing. The rate is inclusive of supplying and fixing all brush finished
2Total
Hour fire rated
carried overironmongery
to summary like locks, handles, tower bolts, door closer etc. of
approved make as indicated in the detail drawing. Location-Staircase (Basic
price of fire door @ Rs 7405/Sqm including door shutter, frame, hardwares
PART - B SUPERSTRUCTURE
and vision panel etc. supply & installation, inclusive of duties excluding taxes
F.O.R. Site)
JOINERY WORKS
(Quoted Rates are for all heights, depths, levels, leads and lifts)
1 FIRE DOOR
1.1.1 TYPE - FD - : Metal Fire Doors of approved size 1100 x 2100mm including Sqm
metal
TYPEframe- FD1finished
- : Metal withFirefire ratedofpaint
Doors on both
approved sizesides,
1100ofx approved colour and
2100mm including
b shade as per the Design Consultants approval (2 Hours Fire rated) of double leaf. Sqm
metal
TYPE frame
- FD2 finished
: Metal with
Firexfire
Doors rated paint on both
of approved size sides,
750 x of approved
2000mm colour and
including
1.1.2 The
shade door
as to have
per the 250mm
Design 750mm
Consultants size 2 Hour
approval (2 fire
Hoursrated vision
Fire rated)panel
of as permetal
double the Sqm
leaf. 1.5 8,253 12,379 0.00 0.00 0.00 0 0 0
frame
detailedfinished
drawing. withThefirerate
rated paint on both sides, ofand approved colour andfinished
shade
The
as door
per the to have 250mm
Design Consultantsxis750mm
inclusive
approvalsizeof(22supplying
Hour fire
Hours Fire ratedfixing
vision
rated)
allpanel
brush as per leaf.
of single/double the
2detailed
Hour fire rated ironmongery
drawing. The rate is like locks,
inclusive of handles,
supplying tower
and bolts,
fixing door
all closer
brush etc. of
finished
The door to
approved makehaveas250mm
indicated x 750mm
in the size 2drawing.
detail Hour fireLocation-Staircase
rated vision panel(Basic
as per the
1 2detailed
Hour fire
FAÇADE
price fire
rated ironmongery
GLAZING
of drawing.
door WORKS
The
@ rate7405/Sqm
Rs
like locks,
is inclusive handles, tower
of supplying
including door and bolts, all
fixing
shutter,
door
frame,
closer
brush etc. of
finished
hardwares
approved firemake asironmongery
indicated in like
the detail
locks,drawing. Location-Staircase (Basic
1.1 2and Hour
ALUMINIUM
vision rated
DOOR
panel etc.AND WINDOW
supply & installation handles, towerofbolts,
inclusive dutiesdoor closer
excluding etc. of
taxes
price of fire
approved make door @ Rs 7405/Sqm
as indicated including
in the detail door
drawing. shutter,Electrical
Location- frame, hardwares
shaft,
F.O.R.
and Site)
vision panel etc. supply & installation inclusive of duties excluding taxes
Meter room (Basic price of fire door @ Rs 7405/Sqm including door shutter,
1.1.1 Doors
F.O.R.
frame,andSite)Door cum
hardwares andWindows
vision panel etc. supply & installation, inclusive of
Side hung
duties openable
excluding Door
taxes with 12mm
F.O.R. Site) thk laminated MDF panel of type Da'
(Basic price Rs. 3276/- per Sqm, include F.O.R. cost of material, Glass,
hardware, duties and the cost of installation and fixing excluding taxes)
c Sqm 5.4 3,529 19,056 0.00 0.00 0.00 0 0 0
Partly fixed, Partly side hung openable and with provision for exhaust fan of
types DW2, DW3 (Basic price Rs. 3276/- per Sqm, include F.O.R. cost of
material, Glass, hardware, duties and the cost of installation and fixing excluding
taxes)
d Sqm
PART - A SUBSTRUCTURE
PART - B SUPERSTRUCTURE
Providing and laying 100 mm high 12-15 mm thick Cement plaster skirting with
cement mortar 1:4 (1 cement : 4 coarse sand) finished with a floating coat of 8.2 397 3,256
neat cement as per drawing and design. sqm
Providing and laying 6-10mm thick tile in skirting laid over 12mm thick cement
mortar 1:3 (1cement : 3 coarse sand), and joints shall be pointed with the
matching cement based polymer grout (Laticrete/Bal grout or equivalent) of
approved shade including cutting, grouting the joints etc. complete in all
respects as per drawing.
With Vitrified Tile @ base rate Rs. 44/Sqft inclusive of all duties excluding taxes
2.4.1 F.O.R. site. sqm 5.00 1,944 9,721 0.00 0 0 0
With Anti-Skid Ceramic Tiles @ base rate Rs. 28/Sqft inclusive of all duties
2.4.2 excluding taxes F.O.R. site. sqm
Providing and laying 6-10mm thick tiles in cladding/ dado/ jamb/ soffit/ cill of
uniform thickness, size, shade and pattern as approved by Architect/Project
Manager laid with rich cement slurry over a bedding plaster of 6mm (avg.) thick
cement mortar 1:3 (1 cement : 3 fine sand) including the cost of 12mm average
thick rough base plaster of mix 1:3 (1 cement : 3 coarse sand), and joints shall
be pointed with the matching cement based polymer grout (Laticrete/Bal grout
or equivalent) of approved shade including cutting, curing etc. complete in all
respects as per drawing.
With Ceramic Tile of size 300x450mm @ base rate Rs. 28/Sqft inclusive of all
2.5.1 duties excluding taxes F.O.R. site. sqm 177.00 1,119 197,996 98.96 0.00 98.96 110696 0 110696
PART - A SUBSTRUCTURE
1 PAINTING
(Quoted Rate shall be for all heights, depths, levels, leads and lifts )
BOQ TOTAL QTY TOTAL AMOUNT
S. No. Description Unit New Qty. Remarks
Ammend RATE AMOUNT PRE THIS CUMM PRE THIS CUMM
Providing and applying three or more coats (as specified below) of approved
brand, manufacturer, colour and shade to give a smooth finish on plastered
surfaces over a coat of approved primer including the cost of preparing the
surfaces with filling materials (putty), along with sand papering wherever
required, including thoroughly brushing the surface free from foreign matter,
sandpapering smooth, filling in all holes and cracks etc. complete., rate to
include all tools, labour, scaffolding, primer as required, complete as directed by
1.1 the Engineer.
Note: Flat area in horizontal / vertical plane will be measured for payment. No
additional payment will be made for grooves, cornices, vatta, mouldings etc.
1.1.1 Acrylic Emulsion Paint of approved brand and shade as per specification sqm
1.1.2 Oil Bond Distemper of approved brand and shade as per specification sqm 108.20 155.72 16,849 0.00 0.00 0.00 0 0 0
Providing and applying whitewash in three or more coats on wall and ceiling
including cost of addition of gum, ultramarine blue, including primer, scaffolding,
preparation of surface by brushing and brooming down along with sand
papering wherever required to give an even shade etc.complete. (In Service
1.2 Rooms, Basements & Lift/Services Shaft) sqm. 4787.13 57 271,536 0.00 0.00 0.00 0 0 0
Providing and marking with three or more coats 100 mm wide to give uniform
finish with reflective/ luminous road marking paint in strips true to line in
parking area floor and wall of superior make as approved by the Project
Manager including cleaning the surface of all dirt, scales, oil, grease and other
1.3 foreign material etc. and lining out complete. Rmt
PART - B SUPERSTRUCTURE
1 PAINTING WORKS
(Quoted Rate shall be for all heights, depths, levels, leads and lifts ).
Providing and applying three or more coats (as specified below) of approved
brand, manufacturer, colour and shade to give a smooth finish on gypsum
plastered surfaces over a coat of approved primer including the cost of
preparing the surfaces with filling materials (putty), along with sand papering
wherever required, including thoroughly brushing the surface free from foreign
matter, sandpapering smooth, filling in all holes and cracks etc. complete., rate
to include all tools, labour, scaffolding, primer as required, complete as directed
by the Engineer.
1.1
Acrylic Emulsion Paint of approved brand and shade as per specification As per
1.1.1 Post GST Rates (Billed after 30th June-2017) sqm 458 183.73 84,148 219.17 0.00 219.17 40267 0 40267
1.1.2 Oil Bond Distemper of approved brand and shade as per specification sqm 46.0 155.72 7,163 44.14 0.00 44.14 6873 0 6873
BOQ TOTAL QTY TOTAL AMOUNT
S. No. Description Unit New Qty. Remarks
Ammend RATE AMOUNT PRE THIS CUMM PRE THIS CUMM
Providing and applying Whitewash in three or more coats on wall and ceiling
including cost of addition of gum, ultramarine blue, including primer, scaffolding,
preparation of surface by brushing and brooming down along with sand
papering wherever required to give an even shade etc.complete. (In Service
Rooms & Lift/Services Shaft, Machine room etc.) As per Post GST Rates (Billed
after 30th June-2017)
1.8 Mirror
Providing and fixing looking mirror 6 mm thick with 4 mm thick AC sheet backing
and GHANA teak wood moulding around complete including painting polishing,
and providing and fixing 300 micron HDP film as vapour barrier, all necessary
1.8.1 fixing arrangement like nails/ screws dash fastner/studs etc. complete . sqm 4 4,307.27 17,229
PART - A SUBSTRUCTURE
JOINERY WORKS
PART - B SUPERSTRUCTURE
JOINERY WORKS
1.1.3 Windows
Partly fixed with 2 track sliding of types W1, W4, W5, W7, W9, W9' ,W10
(Basic price Rs. 3182/- per Sqm, include F.O.R. cost of material, Glass,
hardware, duties and the cost of installation and fixing excluding taxes)
c Sqm 19 3,417 64,916
SUMMARY OF EXT
Activ
E=(AxD)-B Qty to be billed post 30th June 2017 0.00 104.92 0.00
MMARY OF EXTENDED BASEMENT
Activities
3.72 56.09
SQM SQM
OBD IN
ACRYLIC Texture Parrapet Top Acrylic
SHOPING IPS FLOORING
PAINT WALL painting (sqm) Kota Stone Painting (Sqm)
CEILING
31.05
Oil Bond
Texture White Wash
Distemper Fire Door
painting (sqm) (Sqm)
(Sqm)
Common Area External LMR FD (1.1x2.1) FD1 (1.15x2.0) FD2 (0.75x2.0) FD3 (1.8x2.1)
328.09
437.84
742.99
0 1509 0 0 0 0 0
83%
PART - A SUBSTRUCTURE
FLOORING,
(Quoted COUNTERS,
Rates for allWALL FINISHES WORKS
Marble shall beare
procurred heights,
in sizesdepths, levels,
available in theleads and quoted
market, lifts andrates
for allalso
design
to
and pattern
include shown
cutting in drawings)
of sizes as per design and skirting from standard size stone
pieces.
The rate should be inclusive of protection of flooring until the handling of the
project by covering the joints with 6mm plastic sheet etc.
1 FLOORING WORKS
1.1 Glazed ceramic tile
Providing and laying to pattern, commercial quality glazed Ceramic tile of
approved colour, size 200x200mm & minimum 5mm thickness for called of
areas, over 20mm thick or more cement mortar bed (to make up required finished
floor level) of 1:4 mix (1 cement:4 coarse sand) and joints shall be pointed with
the matching cement based polymer grout as recommended by Laticrete/ Bal
Endura or approved equivalent make etc., the rate inclusive of providing
necessary spacers of size 1.6mm to ensure uniform joints etc. complete in all
respect as per drawings. (Basic price of tile - Rs.26/sft inclusive of all duties
excluding taxes F.O.R. site. )
Providing and laying 100 mm high 12-15 mm thick Cement plaster skirting with
cement mortar 1:4 (1 cement : 4 coarse sand) finished with a floating coat of
neat cement as per drawing and design. sqm 90 393 35,358
PART - A SUBSTRUCTURE
1 PAINTING
(Quoted Rate shall be for all heights, depths, levels, leads and lifts )
Providing and applying three or more coats (as specified below) of approved
brand, manufacturer, colour and shade to give a smooth finish on plastered
surfaces over a coat of approved primer including the cost of preparing the
surfaces with filling materials (putty), along with sand papering wherever
required, including thoroughly brushing the surface free from foreign matter,
sandpapering smooth, filling in all holes and cracks etc. complete., rate to
include all tools, labour, scaffolding, primer as required, complete as directed by
1.1 the Engineer.
Note: Flat area in horizontal / vertical plane will be measured for payment. No
additional payment will be made for grooves, cornices, vatta, mouldings etc.
1.1.1 Acrylic Emulsion Paint of approved brand and shade as per specification sqm
1.1.2 Oil Bond Distemper of approved brand and shade as per specification sqm 155.72 0 0.00 0.00 0.00 0 0 0
Providing and applying whitewash in three or more coats on wall and ceiling
including cost of addition of gum, ultramarine blue, including primer, scaffolding, sqm. 23373.45 57 1,325,791 25314.89 0.00 25314.89 1435913 0 1435913
preparation of surface by brushing and brooming down along with sand
papering wherever required to give an even shade etc.complete. (In Service
1.2 Rooms, Basements & Lift/Services Shaft)
Providing and marking with three or more coats 100 mm wide to give uniform
finish with reflective/ luminous road marking paint in strips true to line in
parking area floor and wall of superior make as approved by the Project
Manager including cleaning the surface of all dirt, scales, oil, grease and other Rmt 8790 330.32 2,903,553.44 4846.14 0.00 4846.14 1600799 0 1600799
foreign material etc. and lining out complete. (Rates Include the Numbering of
Parking also)
1.3
PART - B SUPERSTRUCTURE
1 PAINTING WORKS
Providing and applying two or more coats of polymer based weather proof
synthetic textured paint on external walls over a coat of primer in
approved finish, colour and texture (made out of synthetic fibers and
petroleum based chemicals) as per manufacturer's specification at all levels
1.3 and height. (The work should be executed by an approved agency). Rates sqm. 282.50 0 0.00 0 0 0
PART - A SUBSTRUCTURE
quoted to include vertical and horizontal grooves and patterns as directed
Providing and fixing in position Hollow metal fire rated doors as per IS 3614 part-
including preparing
1 & part-2 for stabilitytheandbase surface,
integrity. attending
Pressed to broken
Galvanized steel edges, corners
confirming to IS or
patches
277 withof
JOINERY theplastered
followingsurface
WORKS and filling with cementitious grout,
specification.
scaffolding,
(Quoted Ratesstaging,
Recommended firefor
are cleaning
door
all the
shall have
heights, surface
doors
depths, etc.leads
tested
levels, complete
at CBRI as directed
andorlifts)
ARAI by
for maximum
rating of 2hrs
Engineer. withRate
(Base visionforpanel. Test paint
external certificates
is Rs should
23 per besftavailable for vision
for specialised
lites
agency/panels as partmaterial,
including of the firelabour
door assembly. Independent
and arrangement glass testi.e.
for painting
1 certificates
FIRE DOOR will not be accepted. Manufacturer test certificate shall cover doors
staging/
both singlescaffolding/
and doubleplatform etc.,
leaf and all inclusive
doors suppliedofshould
duties be
excluding
within thetaxes
tested
F.O.R.
specimen,Site)- up to 5th
deviation Floor.
in specification and sheet thickness other than what is
mentioned in the test certificates are not allowed. Proper label confirming the
type of door and the hourly rating is mandatory. Approved manufacturer Shakti
1.1 Hormann or approved equivalent.
TYPE - FD - : Metal Fire Doors of approved size 1100 x 2100mm including
metal frame finished with fire rated paint on both sides, of approved colour and
shade as per the Design Consultants approval (2 Hours Fire rated) of double leaf.
1.1.1 The door to have 250mm x 750mm size 2 Hour fire rated vision panel as per the Sqm 2.31 8,253.57 19,066
detailed drawing. The rate is inclusive of supplying and fixing all brush finished
2 Hour fire rated ironmongery like locks, handles, tower bolts, door closer etc. of
approved make as indicated in the detail drawing. Location-Staircase (Basic
price of fire door @ Rs 7405/Sqm including door shutter, frame, hardwares
and vision panel etc. supply & installation, inclusive of duties excluding taxes Page 401 of 832
F.O.R. Site)
BOQ TOTAL QTY TOTAL AMOUNT
TYPE - FD3 - : Metal Fire Doors of approved size 1800 x 2100mm including metal
S. No. Description
frame finished with fire rated paint on both sides, of approved colour and shade Unit New Qty. Remarks
as per the Design Consultants approval (2 Hours Fire rated) of double leaf. The Ammend RATE AMOUNT PRE THIS CUMM PRE THIS CUMM
door to have 250mm x 750mm size 2 Hour fire rated vision panel vision panel as
per the detailed drawing. The rate is inclusive of supplying and fixing all brush
finished 2 Hour fire rated ironmongery like locks, handles, tower bolts, door
closer etc. of approved make as indicated in the detail drawing. Location- DG
room, Pump room, Electrical room. (Basic price of fire door @ Rs
7405/Sqm including door shutter, frame, hardwares and vision panel
1.1.3 etc. supply & installation, inclusive of duties excluding taxes F.O.R. Site) Sqm 4 8,662.20 34,649 0.00 0.00 0.00 0 0 0
PART - B SUPERSTRUCTURE
JOINERY WORKS
(Quoted Rates are for all heights, depths, levels, leads and lifts)
1 FIRE DOOR
1.1.1 TYPE - FD - : Metal Fire Doors of approved size 1100 x 2100mm including Sqm 4.6 8,253 38,127 0.00 0.00 0.00 0 0 0
metal frame
TYPE - FD1finished
- : Metal withFirefire ratedofpaint
Doors on both
approved sizesides,
1100ofx approved colour and
2100mm including
b shade frame
as per finished
the Design Consultants approval (2 Hours Fireapproved
rated) of colour
doubleand leaf. Sqm
metal
TYPE - FD2 : Metal with
Fire xfire
Doors rated paint
of approvedon both
size sides,
750 x of
2000mm including
1.1.2 The
shade door
as to have
per the 250mm
Design 750mm
Consultants size 2 Hour
approval (2 fire
Hoursrated vision
Fire rated)panel
of as permetal
double the Sqm
leaf. 0 0.00 0.00 0.00 0 0 0
frame
detailedfinished
drawing. withThefirerate
rated paint on both
is750mm
inclusive sides, ofand
of2supplying approved
fixing colour
allpanel
brushandfinished
shade
The
as door
per the to have 250mm x size Hour fire rated vision as per the
2detailed
Hour fireDesign Consultants approval
rated ironmongery like locks, (2handles,
Hours Fire rated)
tower of single/double
bolts, door closer leaf.
etc. of
The doordrawing.
approved to
make
The ratexis750mm
haveas250mm
indicated
inclusive
in the sizeof2drawing.
detail
supplying and
ratedfixing
visionallpanel
Hour fireLocation-Staircase brush asfinished
per the
(Basic
1 2FAÇADE
Hour
detailed
price
fire rated
GLAZING
of drawing.
fire door
ironmongery
WORKS
The
@ Rs rate7405/Sqm like
is inclusivelocks, handles,
of supplying
including door
tower
and bolts, door
fixingframe,
shutter,
closer
all brush finishedof
etc.
hardwares
approved firemake asironmongery
indicated in like
the detail
locks,drawing. Location-Staircase (Basic
1.1 2andHour
ALUMINIUM
vision rated
DOOR
panel AND
etc. WINDOW
supply & installationhandles, towerofbolts,
inclusive dutiesdoor closer
excluding etc.
taxesof
price of fire
approved make door @ Rs 7405/Sqm
as indicated including
in the detail door
drawing. shutter,Electrical
Location- frame, hardwares
shaft,
F.O.R.
and Site)
vision panel etc. supply & installation inclusive of duties excluding taxes
Meter room (Basic price of fire door @ Rs 7405/Sqm including door shutter,
1.1.1 Doors
F.O.R.
frame,andSite)Door cum
hardwares andWindows
vision panel etc. supply & installation, inclusive of
Side hung
duties openable
excluding Door
taxes with 12mm
F.O.R. Site) thk laminated MDF panel of type Da'
(Basic price Rs. 3276/- per Sqm, include F.O.R. cost of material, Glass,
hardware, duties and the cost of installation and fixing excluding taxes)
c Sqm 3,529 0 0.00 0.00 0.00 0 0 0
Partly fixed, Partly side hung openable and with provision for exhaust fan of
types DW2, DW3 (Basic price Rs. 3276/- per Sqm, include F.O.R. cost of
material, Glass, hardware, duties and the cost of installation and fixing excluding
taxes)
d Sqm
Elevation No. 01
Piller Sqm 1 0.2 2.95 0.590
Column Sqm 1 0.75 2.95 2.213
Beam Side Sqm 0 2.375 0.23 0.000
Sqm 0 3.65 0.23 0.000
Shaft Sqm 2 1.15 2.95 6.785
Sqm 2 0.55 2.95 3.245
Sqm 2 2.375 2.95 14.013
Sqm 2 0.6 2.95 3.540
Sqm 1 4.775 2.95 14.086
Sqm 2 1.925 2.95 11.358
Sqm 2 1.4 2.95 8.260
Ded. Op Sqm -1 0.6 1.175 -0.705
Sqm 1 3.55 0.05 0.178
GL Oppening Sqm -1 0.9 2 -1.800
2 Grid 21/ K- G' Sqm 1 3.55 2.95 10.473
S/C Oppening Sqm -0.5 1.20 1.45 -0.870
W7 Sqm -0.5 1.00 1.475 -0.738
Balcony Area Sqm 1 1.80 2.625 4.725
Patta Wall Sqm 1 0.20 2.625 0.525
Sqm 1 0.30 2.625 0.788
SD 7 Side wall Sqm 1 1.925 2.625 5.053
Ded. SD7 Sqm -1 1.65 2.275 -3.754
Add Jamb Sqm 1 6.20 0.075 0.465
Balcony Facia Patta Sqm 1 1.80 0.325 N/A
Sqm 1 3.30 0.325 N/A
Sqm 1 3.93 0.325 N/A
Sqm 1 0.75 0.325 N/A
Shaft Door Area Sqm 1 1.05 2.625 2.756
Sqm 1 0.30 2.950 0.885
Grid 19/D-A Sqm 1 4.80 2.950 14.160
V1 Ded. Sqm -0.5 0.50 1.175 -0.294
W9 Ded. Sqm -0.5 0.90 1.475 -0.664
W7, V1, W9 Side Patta of Chhajja Sqm 1 0.30 3 0.165 0.149
Balcony Wall Patta Sqm 1 0.50 2 2.625 2.625
Sqm 1 0.20 2 2.625 1.050
Sqm 1 0.30 2 2.625 1.575
SD 6 Side Wall Sqm 1 1.93 2 2.625 10.106
Ded. SD6 Sqm -1 1.70 1 2.275 -3.868
Ded. SD8 Sqm -1 1.50 1 2.275 -3.413
Shaft Door Area Sqm 1 0.70 2 2.625 3.675
Balcony Facia Patta Sqm 1 0.60 2 0.325 N/A
Sqm 1 2.00 2 0.325 N/A
Elevation No. 04
Grid 1/E-U Sqm 1 15.25 1 2.95 44.988
Ded. Oppening Sqm -0.5 1.20 1 2.375 -1.425
Add Jamb Sqm 0 7.15 1 0.2 0.000
Ded. 9' Sqm -0.5 0.90 2 2.225 -2.003
Add Jamb Sqm 0 6.25 1 0.05 0.000
Total Elevation No. 4 G/ Floor Sqm 41.560
Elevation No. 04
Grid 1/E-U Sqm 1 15.25 1 2.95 44.988
Ded. Oppening Sqm -0.5 1.20 1 2.375 -1.425
Add Jamb Sqm 0 7.15 1 0.2 0.000
Ded. 9' Sqm -0.5 0.90 2 2.225 -2.003
Add Jamb Sqm 0 6.25 1 0.05 0.000
Total Elevation No. 4 F/ Floor Sqm 41.560
Elevation No. 04
Grid 1/E-U Sqm 1 15.25 1 2.95 44.988
Ded. Oppening Sqm -0.5 1.20 1 2.375 -1.425
Add Jamb Sqm 0 7.15 1 0.2 0.000
Ded. 9' Sqm -0.5 0.90 2 2.225 -2.003
Add Jamb Sqm 0 6.25 1 0.05 0.000
Total Elevation No. 4 S/Floor Sqm 41.560
Elevation No. 04
Grid 1/E-U Sqm 1 15.25 1 2.95
Ded. Oppening Sqm 5 1.20 1 2.375
Add Jamb Sqm 0 7.15 1 0.2
Ded. 9' Sqm -0.5 0.90 2 2.225
Add Jamb Sqm 0 6.25 1 0.05
Total Elevation No. 4 Typical Floor Sqm 0.000
Elevation No. 04 0
Total Elevation No. 4 Terrace Floor Sqm 0.000
Elevation No. 04
Grid 1/E-U Sqm 1 15.25 1 2.95 44.988
Ded. Oppening Sqm -0.5 1.20 1 2.375 -1.425
Add Jamb Sqm 0 7.15 1 0.2 0.000
Ded. 9' Sqm -0.5 0.90 2 2.225 -2.003
Add Jamb Sqm 0 6.25 1 0.05 0.000
Total Elevation No. 4 Typical Floor Sqm 41.560
Elevation No. 04
Grid 1/E-U Sqm 1 15.25 1 2.89 44.118
Total Elevation No. 4 Terrace Sqm
Floor 44.118
Tower - A, C
SUMMARY Acrylic weather shield N/O FLAT QTY N/O TOWE TOTAL QTY.
paint
TOWER - A, B, C
TYPE - 3A Balcony Ceiling SQM 30 32.800 1 984.000
TYPE - 3D Balcony Ceiling SQM 28 36.146 1 1012.095
TOWER - A, B, C Typical Floor
3rd Floor to 14th Floor SQM 1 536.278 12 6435.340
Terrace Floor SQM 1 1146.747 1 1146.747
Total Qty. SQM 9578.182
SUMMARY External Texture Paint N/O FLAT QTY N/O TOWE TOTAL QTY.
TOWER - A, B, C
Ground Floor SQM 1 601.100 1 601.100
First Floor SQM 1 635.727 1 635.727
Second Floor SQM 1 586.391 1 586.391
Typical Floor SQM 1 75.242 12 902.906
Terrace Floor SQM 1 30.250 1 30.250
Total Qty. SQM 2756.374
Wall
Wall Name Length Height Nos. Total
Number
Texture Or Acrylic
Texture
Texture
Acrylic
Acrylic
50% Texture
82.32188
164.64
Texture
Texture
Acrylic
Acrylic
50% Texture
58.45875
116.92
281.56
Tower A Primer Area Calculation
Balcony Area
Height/
S. No. Item Length Nos. Area (Sq.M.) Area (Sq.F.)
Width
1 B1 Ceiling area 2.55 1.8 27 123.93
B1 Facia 5.35 0.325 27 46.95
Ded. Shaft -1.125 0.4 27 -12.15
2 B2 Ceiling area 5 1.8 27 243.00
B2 Facia 7.8 0.325 27 68.45
6.975 0.3 2 4.19
3 B3 Ceiling area 1 3.925 1.8 28 197.82
B3 Ceiling area 2 1.5 1.8 28 75.60
B3 Facia 9.775 0.325 28 88.95
Above 14th Chhajja 1.825 0.275 2 1.00
4 B4 Ceiling area 2.75 1.8 28 138.60
0.6 0.2 28 3.36
Shaft -0.7 0.1 28 -1.96
Wall -0.2 0.3 28 -1.68
B4 Wall outer 2.8 1.375 30 115.50
B4 Wall inner 2.5 1.05 30 78.75
B4 Facia 3.65 0.325 28 33.22
Above 14th Chhajja 1.85 0.275 2 1.02
5 B5 Ceiling area 2.6 1.8 28 131.04
0.6 0.2 28 3.36
Shaft -0.7 0.1 28 -1.96
Wall -0.2 0.3 28 -1.68
B5 Wall outer 2.8 1.375 30 115.50
B5 Wall inner 2.5 1.05 30 78.75
B5 Facia 3.5 0.325 28 31.85
Above 14th Chhajja 1.7 0.275 2 0.94
6 B6 Ceiling area 1 2.55 1.8 28 128.52
B6 Ceiling area 2 1.5 1.8 28 75.60
B6 Facia 8.75 0.325 28 79.63
Terrace Lvl 2.2 0.7 2 3.08
0.65 0.7 2 0.91
1.4 0.325 2 0.91
7 B7 Ceiling area 1.8 1.825 28 91.98
B7 Facia 4.725 0.325 28 43.00
Terrace Lvl 1.825 0.7 2 2.56
1.4 0.325 2 0.91
8 B8 Ceiling area 1.8 3.25 27 157.95
B8 Facia 6.1 0.325 27 53.53
Above 14th Chhajja 3.1 0.3 2 1.86
9 B9 Ceiling area 1.8 4.1 27 199.26
B9 Facia 6.95 0.325 27 60.99
Above 14th Chhajja 4 0.3 2 2.40
10 B10 Ceiling area 1 2.75 1.8 27 133.65
B10 Ceiling area 2 0.6 1.0 27 16.20
B10 Facia 2.35 0.325 27 20.62
B10 Wall outer 2.9 1.375 28 111.65
B5 Wall inner 2.9 1.05 28 85.26
Above 14th Chhajja 2.625 0.7 2 3.68
Total balcony Primer Area 2836.46
Terrace Area Tower A
S. No. Item No. L B/H Area(Sq.M.)
on Grid J/7-13 1 7.015 6.14 43.07
Ded. W3 -1 1.4 1.475 -2.07
-1 1.4 1.475 -2.07
Ded. Perrapet Wall -1 2.695 1.5 -4.04
-1 1.03 1.5 -1.55
Water Tank Patta 1 0.33 2.84 0.94
Water Tank 1 7.055 2.84 20.04
Column 1 0.55 4.9 2.70
1 0.75 2.06 1.55
Column 1 0.485 2.84 1.38
1 0.715 2.06 1.47
Column 1 0.98 2.84 2.78
1 0.98 2.06 2.02
Wall 1 1.35 2.84 3.83
Wall 1 4.06 2.84 11.53
Wall Door Side 1 1.795 6.2 11.13
-1 1.2 2.1 -2.52
W7 -1 1 1.475 -1.48
Chhajja 1 1.2 0.275 0.33
Side 2 0.275 0.125 0.07
Wall 1 1.3 6.2 8.06
1 2.2 6.2 13.64
1 2.75 4.7 12.93
1 1.975 4.7 9.28
1 2.075 6.2 12.87
-2 1.745 1.5 -5.24
-1 1.2 2.1 -2.52
Wall 1 1.25 4.7 5.88
-2 0.9 1.5 -2.70
Passanger lift wall 1 4.025 4.7 18.92
1 0.225 4.7 1.06
Back 1 3.275 6.2 20.31
1 1.3 6.2 8.06
1 1.825 6.2 11.32
Ded. Door -1 1.2 2.1 -2.52
-1 1 1.475 -1.48
Sunshade 1 1.825 0.275 0.50
side 1 0.275 0.125 0.03
Wall 1 1.625 6.2 10.08
1 3.25 6.2 20.15
Ceiling of Water Tank 1 7.345 3.83 28.13
Beam Side 4 3.6 0.4 5.76
Wall Meter Shaft 1 3.5 2.06 7.21
1 5.925 2.06 12.21
Ded. Door -1 1.2 2.06 -2.47
Beam Side 2 1.25 0.4 1.00
1 3.45 0.4 1.38
1 1.875 0.4 0.75
Wall - 7 2 3.92 1.5 11.76
Parragola Wall 4 4.3 3.5 60.20
Beam Jucn. Ded. -14 0.2 0.45 -1.26
2 4.955 3.5 34.69
2 1.05 3.5 7.35
-14 0.2 0.45 -1.26
Patta 2 0.2 3.5 1.40
2 0.9 3.5 6.30
Parrapet
Wall No. 6 1 11.075 1.2 13.29
Wall No. 7, 7' 2 4.805 1.2 11.53
Wall No. 8, 8' 2 2.225 1.2 5.34
Wall No. 9, 9' 2 5.905 1.2 14.17
Wall No. 10, 10' 2 2.25 1.2 5.40
Wall No. 11, 11' 4 1.775 1.2 8.52
Wall No. 12, 12' 2 2.75 1.2 6.60
Wall No. 13, 13' 2 2.3 1.2 5.52
Wall No. 15, 15' 2 1.7 1.2 4.08
Wall No. 16, 16' 2 1.05 1.2 2.52
Wall No. 17, 17' 4 1.75 1.2 8.40
Wall No. 18, 18' 2 2.65 1.2 6.36
Wall No. 19, 19, 2 2.425 1.2 5.82
Wall No. 21-22-04 1 11.105 1.2 13.33
Wall No. 03 1 3.425 1.2 4.11
Wall No. 01 1 1.625 1.2 1.95
only B side Exp. Jnt 1 12.65 0.5 6.33
Outer Big wall Twr A 1 15.25 2.75 41.938
Wall No. 24, 24' 2 3.45 1.2 8.28
Wall No. 26, 26' 2 3.885 1.2 9.32
Wall No. 27, 27' 2 2.375 1.2 5.70
Wall No. 28-30, 28'-30' 2 4.25 1.2 10.20
Wall No. 31, 31' 2 3.875 1.2 9.30
Top 1 104.55 0.1 10.46
Total Qty 619.33
Tower A
B SUMMARY External Texture Paint TOTAL QTY.
Total Qty. SQM 2939.03
Tower B
B SUMMARY External Texture Paint TOTAL QTY.
Total Qty. SQM 2799.78
Tower C
B SUMMARY External Texture Paint TOTAL QTY.
Total Qty. SQM 3121.07
8'
Slab Deduction -2.125 0.325 14 -9.669
8' SD7 -1.65 2.325 15 -57.544
SD7 Jamb 6.3 0.045 15 4.253
Wall 8.1 0.3 2.625 15 11.813
Wall 37 4.15 47.05 1 195.258
Slab Deduction -1.8 0.325 14 -8.190
W7 -1 1.475 15 -22.125
37
W7 Jamb 4.95 0.045 15 3.341
W Lintel Side 0.6 0.165 15 1.485
W Lintel Top/ bottom 0.3 1.2 30 10.800
38 Wall 38 5.63 45.50 1 256.165
Wall 39 1.975 47.05 1 92.924
Wall 39' 0.95 45.9 1 43.605
39
Opening -1.75 1.35 16 -37.800
Opening Jamb 6.25 0.2 15 18.750
40 Wall 40 2.55 47.05 1 119.978
41 Wall 41 1.075 45.50 1 48.913
Wall 31 2.05 45.50 1 93.275
V -0.6 1.175 15 -10.575
V Jamb 3.55 0.045 15 2.396
31'
Projection Side 0.3 0.165 30 1.485
Projection Top /Bottom 0.3 0.8 30 7.200
Wall 31.1 0.35 45.50 1 15.925
Wall 30 1.525 45.50 1 69.388
W7 -1 1.475 15 -22.125
30' W7 Jamb 4.95 0.045 15 3.341
Projection Side 0.3 0.165 30 1.485
Projection Top /Bottom 0.3 1.2 30 10.800
Wall 29 1 45.50 1 45.500
Slab Deduction -1 0.325 14 -4.550
29
D2' -0.75 2.325 15 -26.156
D2' Jamb 5.4 0.045 15 3.645
Wall 28 3.65 45.50 1 166.075
Slab Deduction -3.35 0.325 14 -15.243
28 DW1 Door -0.9 2.325 15 -31.388
DW1 Window -1.1 1.175 15 -19.388
DW1 Jamb 6.75 0.045 15 4.556
27 Wall 27 2.375 45.50 1 108.063
Slab Deduction -0.7 0.325 14 -3.185
Wall 26 4.1 45.50 1 186.550
Slab Deduction -4.1 0.325 14 -18.655
26
SD -2.4 2.325 15 -83.700
SD Jamb 7.125 0.045 15 4.809
25 Wall 25 1.175 47.10 1 55.343
Ceiling/Floor 0.75 0.6 30 13.500
Shaft Opening -0.6 2.625 16 -25.200
Shaft 5.85 0.045 16 4.212
Wall 24 3.55 45.50 1 161.525
24
Slab Deduction -3.25 0.325 14 -14.788
24
SD -2.4 2.325 15 -83.700
SD Jamb 7.05 0.045 15 4.759
Wall 23 1.8 47.05 1 84.690
23
Wall 23.1 0.2 45.50 1 9.100
Total 7911.856
S. No. Description ( Tower B External Paint MB) Unit No L B H Total Qty
External Texture Paint Ground Floor
Elevation No. 01
Piller Sqm 1 0.2 2.95 0.590
Column Sqm 1 0.75 2.95 2.213
Beam Side Sqm 0 2.375 0.23 0.000
Sqm 0 3.65 0.23 0.000
Shaft Sqm 2 1.15 2.95 6.785
Sqm 2 0.55 2.95 3.245
Sqm 2 2.375 2.95 14.013
Sqm 2 0.6 2.95 3.540
Sqm 1 4.775 2.95 14.086
Sqm 2 1.925 2.95 11.358
Sqm 2 1.4 2.95 8.260
Ded. Op Sqm -1 0.6 1.175 -0.705
Sqm 1 3.55 0.05 0.178
GL Oppening Sqm -1 0.9 2 -1.800
2 Grid 21/ K- G' Sqm 1 3.55 2.95 10.473
S/C Oppening Sqm -0.5 1.20 1.75 -1.050
W7 Sqm -0.5 1.00 1.475 -0.738
Add Jamb Sqm 0 4.95 0.05 0.000
Balcony Area Sqm 1 1.80 2.625 4.725
Patta Wall Sqm 1 0.20 2.625 0.525
Sqm 1 0.30 2.625 0.788
SD 7 Side wall Sqm 1 1.93 2.625 5.053
Ded. SD7 Sqm -1 1.65 2.400 -3.960
Balcony Facia Patta Sqm 1 1.80 0.325 N/A
Sqm 1 3.30 0.325 N/A
Sqm 1 3.93 0.325 N/A
Sqm 1 0.75 0.325 N/A
Shaft Door Area Sqm 1 1.05 2.625 2.756
Sqm 1 0.30 2.950 0.885
Grid 19/D-A Sqm 1 4.80 2.950 14.160
V1 Ded. Sqm -0.5 0.50 1.175 -0.294
Add Jamb Sqm 0 3.35 0.050 0.000
W9 Ded. Sqm -0.5 0.90 1.475 -0.664
Add Jamb Sqm 0 4.75 0.050 0.000
W7, V1, W9 Side Patta of Chhajja Sqm 1 0.30 3 0.165 0.149
Balcony Wall Patta Sqm 1 0.50 2 2.625 2.625
Sqm 1 0.20 2 2.625 1.050
Sqm 1 0.30 2 2.625 1.575
SD 6 Side Wall Sqm 1 1.93 2 2.625 10.106
Ded. SD6 Sqm -1 1.70 1 2.275 -3.868
Ded. SD8 Sqm -1 1.50 1 2.275 -3.413
Shaft Door Area Sqm 1 0.70 2 2.625 3.675
Elevation No. 04
Grid 1/E-U Sqm 1 15.25 1 2.95
Ded. Oppening Sqm -0.5 1.20 1 2.375
Add Jamb Sqm 0 7.15 1 0.2
Ded. 9' Sqm -0.5 0.90 2 2.225
Add Jamb Sqm 0 6.25 1 0.05
Total Elevation No. 4 G/ Floor Sqm 0.000
Elevation No. 04
Grid 1/E-U Sqm 1 15.25 1 2.95
Ded. Oppening Sqm -0.5 1.20 1 2.375
Add Jamb Sqm 0 7.15 1 0.2
Ded. 9' Sqm -0.5 0.90 2 2.225
Add Jamb Sqm 0 6.25 1 0.05
Total Elevation No. 4 F/ Floor Sqm 0.000
Elevation No. 04
Grid 1/E-U Sqm 1 15.25 1 2.95
Ded. Oppening Sqm -0.5 1.20 1 2.375
Add Jamb Sqm 0 7.15 1 0.2
Ded. 9' Sqm -0.5 0.90 2 2.225
Add Jamb Sqm 0 6.25 1 0.05
Total Elevation No. 4 S/Floor Sqm 0.000
Elevation No. 04
Grid 1/E-U Sqm 1 15.25 1 2.95
Ded. Oppening Sqm 5 1.20 1 2.375
Add Jamb Sqm 0 7.15 1 0.2
Ded. 9' Sqm -0.5 0.90 2 2.225
Add Jamb Sqm 0 6.25 1 0.05
Total Elevation No. 4 Typical Floor Sqm 0.000
Elevation No. 04 0
Total Elevation No. 4 Terrace Floor Sqm 0.000
Elevation No. 04
Grid 1/E-U Sqm 1 15.25 1 2.95
Ded. Oppening Sqm -0.5 1.20 1 2.375
Add Jamb Sqm 0 7.15 1 0.2
Ded. 9' Sqm -0.5 0.90 2 2.225
Add Jamb Sqm 0 6.25 1 0.05
Total Elevation No. 4 Typical Floor Sqm 0.000
Sqm
Total Elevation No. 3 Terrace Floor 486.158
Elevation No. 04
Grid 1/E-U Sqm 1 15.25 1 2.89
Total Elevation No. 4 Terrace Floor Sqm 0.000
Tower - B
SUMMARY Acrylic weather shield paint N/O FLAT QTY N/O TOWE TOTAL QTY.
TOWER - B Typical Floor
TYPE - 3A Balcony Ceiling SQM 30 32.800 1 984.000
TYPE - 3D Balcony Ceiling SQM 28 36.146 1 1012.095
TOWER - B Typical Floor
3rd Floor to 14th Floor SQM 1 487.750 12 5852.995
Terrace Floor SQM 1 1102.629 1 1102.629
Total Qty. SQM 8951.719
SUMMARY External Texture Paint N/O FLAT QTY N/O TOWE TOTAL QTY.
TOWER - B
Ground Floor SQM 1 558.689 1 558.689
First Floor SQM 1 594.167 1 594.167
Second Floor SQM 1 544.831 1 544.831
Typical Floor SQM 1 75.242 12 902.906
Terrace Floor SQM 1 30.250 1 30.250
Total Qty. SQM 2630.843
Total-Tower C 1308
CLUB HOUSE
CEILING sqm 1 3121.29 3121.29
Less staircase and lift lobby sqm -1 53.93 -53.93
less column heads sqm -61 0.232 -14.15
sqm -3 0.335 -1.01
sqm -4 0.35 0.75 -1.05
sqm -2 1 0.5 -1.00
sqm -3 0.75 0.5 -1.13
sqm -10 0.9 0.5 -4.50
sqm -2 0.9 0.35 -0.63
sqm -3 0.75 0.55 -1.24
sqm -1 1.1 0.5 -0.55
sqm -1 1.275 0.23 -0.29
sqm -1 0.45 0.23 -0.10
sqm -1 0.19625 -0.20
less cutout
sqm -2 1.2 3.5 -8.40
sqm -1 3 1.5 -4.50
14.11.2018 Lift Lobby 1st Floor, Tower A, Lift Cladding 2 1.05 0.24 0.50
2 1.05 0.24 0.50
4 2.1 0.24 2.02
4 2.25 0.15 1.35
2 1.035 0.15 0.31
Total SQM 4.68
NOS OF
SR NO TYPE OF FLATS UNIT N/O Flat N/O Twr Total Qty. Remark
DOORS
A, B, C - Tower
1 3 A TYPE SQM 2.1 30.00 3.00 185.44
D - Tower
D - Tower
3 2 A TYPE SQM 2.1 44.00 2.00 181.32
NOS OF
SR NO TYPE OF FLATS UNIT N/O Flat N/O Twr Total Qty. Remark
DOORS
A, B, C - Tower
1 3 A TYPE SQM 6.7 30.00 3.00 602.21
D - Tower
D - Tower
3 2 A TYPE SQM 3.3 44.00 2.00 294.41
NOS OF
SR NO TYPE OF FLATS UNIT N/O Flat N/O Twr Total Qty. Remark
DOORS
A, B, C - Tower
1 3 A TYPE SQM 4.0 30.00 3.00 363.53
D - Tower
D - Tower
3 2 A TYPE SQM 2.7 44.00 2.00 236.97
NOS OF
SR NO TYPE OF FLATS DOORS TOWER A QTY TOWER B QTY TOWER C QTY
1 3 A TYPE
3 2 A TYPE
4 2 D TYPE
5 2 E TYPE
6 1BHK TYPE
46.8384 46.8384 46.8384
SQM SQM SQM
NOS OF
SR NO TYPE OF FLATS UNIT N/O Flat N/O Twr Total Qty. Remark
DOORS
A, B, C - Tower
1 3 A TYPE Nos. 1.0 30.00 3.00 90.00
D - Tower
D - Tower
3 2 A TYPE Nos. 1.0 44.00 2.00 88.00
NOS OF
SR NO TYPE OF FLATS UNIT N/O Flat N/O Twr Total Qty. Remark
DOORS
A, B, C - Tower
1 3 A TYPE Nos. 4.0 30.00 3.00 360.00
D - Tower
D - Tower
3 2 A TYPE Nos. 2.0 44.00 2.00 176.00
NOS OF
SR NO TYPE OF FLATS UNIT N/O Flat N/O Twr Total Qty. Remark
DOORS
A, B, C - Tower
1 3 A TYPE Nos. 3.0 30.00 3.00 270.00
D - Tower
D - Tower
3 2 A TYPE Nos. 2.0 44.00 2.00 176.00
NOS OF
SR NO TYPE OF FLATS DOORS TOWER A QTY TOWER B QTY TOWER C QTY
1 3 A TYPE
3 2 A TYPE
4 2 D TYPE
5 2 E TYPE
6 1BHK TYPE
28.0000 28.0000 28.0000
NOS NOS NOS
A 3A FLATS
B 3D FLATS
B 2A FLATS
B 2D FLATS
B 2E FLATS
B 1BHK FLATS
TOWER A
TOWER B
TOWER C
TOWER D
TOWER E
TOWER F
A 2A TYPE FLATS
QTY PER TOWER D TOWER E TOWER F
SRN DESCPTION QTY QTY QTY
FLAT FLATS FLATS FLATS
B 2E TYPE FLATS
QTY PER TOWER D TOWER E TOWER F
SRN DESCPTION FLAT FLATS QTY FLATS QTY FLATS QTY
C 2D TYPE FLATS
QTY PER TOWER D TOWER E TOWER F
SRN DESCPTION QTY QTY QTY
FLAT FLATS FLATS FLATS
1 SD 5.70 1 5.70 0 0
2 V 0.71 1 0.71 0 0
E 3D TYPE FLATS
QTY PER TOWER A TOWER B TOWER C
SRN DESCPTION FLAT FLATS QTY FLATS QTY FLATS QTY
kitchen 1.00 W8
utility 1.00 D1'
3.325
smt
5.7
smt
5.7
smt
3A FLATS ALU DOOR AND WINDOW
W7 SD7
SR NO DESCRIPTION NOS TYPE
LENGTH HEIGHT TOTAL LENGTH HEIGHT
1.475
smt
3D FLATS ALU DOOR AND WINDOW
D2' V
SR NO DESCRIPTION NOS TYPE
LENGTH HEIGHT TOTAL LENGTH HEIGHT
1.78125
smt
Project : Godrej Aria Sector - 79, Gurugram Date : 19-Feb-20
Vender : Jayant K. Furnishers, RA Bill No.: 24th RA
Service : Finishing Work For Godrej Period : Up to Jan. 2021
LOI No. GPL/GGN/LOI/GODREJ ARIA/ JAYANT Dated - 06.12.2016
MAIN MEASUREMENT SHEET
S. No. Description Location Unit No. Length Width Height Total Qty.
2 Type : 3D
Bed Room No. - 03 SQM 1.00 3.29 4.87 16.022
Master Bed Room SQM 1.00 3.50 4.95 17.325
SQM 1.00 1.30 0.10 0.130
SQM 1.00 1.95 1.68 3.266
Bed Room No.- 02 SQM 1.00 3.40 4.000 13.600
Total SQM 50.344
3 Common area
FHC Shaft SQM 1.00 1.20 0.72 0.864
LV Shaft SQM 1.00 0.80 0.72 0.576
Ele. Shaft SQM 1.00 0.80 0.72 0.576
Total SQM 2.016
2 Type : 2D
MASTER BEDROOM SQM 1.00 3.825 3.80 14.535
SQM 1.00 1.775 1.00 1.775
BEDROOM NO2 SQM 1.00 3.80 3.40 12.920
Total SQM 29.230
1 Type : 2E
MASTER BEDROOM SQM 1.00 3.85 3.40 13.090
BEDROOM NO2 SQM 1.00 3.90 3.80 14.820
SQM 1.00 1.775 1.00 1.775
Total SQM 29.685
3 Common area
FHC Shaft SQM 1.00 1.23 0.85 1.046
LV Shaft SQM 1.00 0.80 0.85 0.680
Ele. Shaft SQM 1.00 0.87 0.85 0.740
Total SQM 2.465
SUMMARY IPS FLOORING N/O FLAT QTY N/O TOWER TOTAL QTY.
TOWER - A, B, C
TYPE - 3A SQM 30 45.588 3 4102.952
TYPE - 3D SQM 28 95.932 3 8058.280
Common Area SQM 16 2.016 3 96.768
TOWER - D
TYPE - 2A SQM 56 26.538 1 1486.100
TYPE - 2D SQM 14 29.230 1 409.220
TYPE - 2E SQM 13 29.685 1 385.905
TYPE - 1 BHK SQM 1 16.607 1 16.607
Common Area SQM 15 2.465 1 36.975
TOWER - E, F
TYPE - 2A SQM 44 26.538 2 2335.300
TYPE - 2D SQM 9 29.230 2 526.140
TYPE - 2E SQM 11 29.685 2 653.070
Common Area SQM 12 2.465 2 59.160
Total Qty. SQM 18166.476
Providing and laying stone flooring using stone slab of
approved quality in specified size of stone slab as per
drawings and pattern in flooring/ landing with cement
mortar 1:4 (1 cement : 4 coarse sand) of adequate
1.3 thickness to match the total thickness of 50mm and
Stone flooring
joint to be filled with white cement slurry mixed with
pigment to match the shade of stone including
surfaces pointing, curing etc. complete as per
specification, pattern and drawing.
With 18 to 20mm thick Prepolished Granite stone and
1.3.1 joint to be filled with white cement slurry mixed with
pigment to match the shade of stone (Basic rate of
Imported
prepolishedMarble (Bottochino)
(one side) Granite @ Rs. 118/Sft
1 inclusive
In front ofofED2
all duties excluding taxes F.O.R. site) SQM 1 4.175 4.205 17.556
Less Column SQM -1 0.75 0.3 -0.225
Beyond ED2 towards Entry SQM 1 5.48 2.875 15.755
Less column SQM -2 0.75 0.3 -0.450
Strips near expansion Joint SQM 3 3.2 0.45 4.320
Total SQM 36.956
With 18 to 20mm thick Prepolished Granite stone and
joint to be filled with white cement slurry mixed with
pigment to match the shade of stone (Basic rate of
prepolished (one side) Granite @ Rs. 118/Sqft
inclusive of all duties excluding F.O.R. site)
1.3.2 0
Stairecase 02
At Ground Floor SQM 1 3.6 4.25 15.300
SQM -1 0.45 1.55 -0.698
Mid-Landing SQM 1 3.6 1.55 5.580
SQM 1 3.6 0.3 0.000
Total SQM 20.183
Stairecase 02 A,B,C
Typical Floor
Mid-Landing SQM 1 3.6 1.55 5.580
SQM 1 3.6 0.3 1.080
Total SQM 6.660
Stairecase 01 D, E, F
At Ground Floor Landing SQM 2 1.5 1.55 4.650
FD Door Cill SQM 2 1.1 0.2 0.440
Mid-Landing SQM 1 3.2 1.5 4.800
Total SQM 9.890
At First Floor Mid Landing Typical upto Terrace Floor,LMR SQM 1 3.2 1.5 4.800
Floor Landing SQM 1 3.2 2.05 6.560
Door Cill FD SQM 1 1.1 0.2 0.220
Total SQM 11.580
Stairecase 02
At Ground Floor SQM 1 3.2 5.7 18.240
SQM -1 0.45 1.55 -0.698
Mid-Landing SQM 1 3.2 1.5 4.800
Opening Cill SQM 1 1.4 0.2 0.280
1st Floor Landing SQM 1 3.2 1.5 4.800
SQM 1 1.4 0.2 0.280
Total SQM 27.703
Stairecase 02 D,E,F
Typical Floor
Mid-Landing & Floor SQM 2 3.2 1.5 9.600
SQM 1 1.4 0.2 0.280
Total SQM 9.880
D,E,F Window Cill , 900mm HT Parrapet top Cill S/c Arae , Lift lobby common Area
1 Lobby Window cill Granite with Moulding
At Ground Floor
Window Cill S/C - 01 SQM 1 1.4 0.225 0.315
Window Cill S/C - 02 SQM 1 1.43 0.225 0.322
Window Cill S/C - 02 1100 HT Parapet wall SQM 1 3.05 0.225 0.686
Window Cill Lobby- Passanger lift side SQM 1 1.5 0.225 0.338
A, B, C Window Cill , 900mm HT Parrapet top Cill S/c Arae , Lift lobby common Area
1 Lobby Window cill Granite with Moulding
At Ground Floor
Window Cill S/C - 01 SQM 1 1.4 0.225 0.315
Window Cill S/C - 02 SQM 1 1.2 0.225 0.270
Window Cill Lobby- Passanger lift side SQM 1 1.775 0.225 0.399
Window Cill Lobby- Maiterial lift side SQM 1 0.925 0.225 0.208
Window Cill Lobby- LV Shaft lift side SQM 1 1.82 0.225 0.410
Staircase No. 02
GROUND FLOOR TO FIRST FLOOR
Tread SQM 18 1.55 0.3 8.370
FIRST FLOOR TO 14TH FlOOR
Tread SQM 18 1.55 0.3 8.370
Total SQM 16.740
KOTA STONE TO UP LOUVERS - Non Tower
3 Louver Between Kota Stone SQM 1.00 1.57 0.25 2 0.785
SQM 1.00 3.47 0.25 2 1.735
SQM 1.00 1.18 0.25 2 0.588
SQM 1.00 0.25 1.23 2 0.613
SQM 1.00 1.13 0.25 2 0.565
SQM 1.00 0.25 1.12 2 0.560
SQM 1.00 1.74 0.25 2 0.870
SQM 1.00 0.25 3.68 2 1.840
SQM 1.00 1.52 0.25 2 0.760
SQM 1.00 0.25 5.20 2 2.600
Ground Side SQM 1.00 1.73 0.25 2 0.865
SQM 1.00 0.25 3.53 2 1.763
Club House Side SQM 2.00 1.55 0.25 2 1.550
SQM 2.00 0.25 3.53 2 3.525
SQM 1.00 2.20 0.25 2 1.100
SQM 1.00 0.25 3.15 2 1.575
SQM 1.00 1.30 0.25 2 0.650
SQM 1.00 0.25 3.90 2 1.950
Tower D (Between Flat 01-02) SQM 1.00 1.68 0.25 2 0.840
SQM 1.00 0.25 0.86 2 0.430
STP Side SQM 1.00 1.61 0.25 2 0.805
SQM 1.00 0.25 0.62 2 0.310
STP Side Ramp Side SQM 1.00 1.73 0.25 2 0.865
SQM 1.00 0.25 3.54 2 1.770
Tower C SQM 1.00 1.70 0.25 2 0.850
SQM 1.00 0.25 4.44 2 2.220
SQM 1.00 1.53 0.25 2 0.765
SQM 1.00 0.25 0.75 2 0.375
Tower B SQM 1.00 1.22 0.25 2 0.610
SQM 1.00 0.25 1.01 2 0.505
SQM 1.00 3.24 0.25 2 1.620
SQM 1.00 0.25 1.44 2 0.720
Tower A SQM 1.00 1.25 0.25 2 0.625
SQM 1.00 0.25 1.04 2 0.520
SQM 1.00 3.50 0.25 2 1.750
SQM 1.00 0.25 1.46 2 0.730
Total SQM 40.203
Staircase No. - 02
Riser 20 1.55 0.15 4.573
2 Type : 3D
DINING / LIVING ROOM SQM 1 1.775 1.125 1.997
SQM 1 7.48 4.075 30.461
Typical Floor
Passage Area SQM 1.00 12.70 1.63 20.638
Lift Lobby SQM 1.00 3.05 2.20 6.710
Main Stairecase Bobby SQM 1.00 2.83 2.65 7.486
SQM 1.00 1.30 1.15 1.495
SQM 1.00 2.50 0.85 2.125
SQM 1.00 1.675 1.125 1.884
Door Cill SQM 5.00 0.98 0.04 0.196
Servent Door Cill SQM 2.00 0.78 0.04 0.062
Total SQM 40.597
Lift Lobby Vitrified Flooring Terrace Floor (300x300 tile ) Lvl. A,B,C
Terrace Floor
FD To FD SQM 1 11.08 1.625 18.005
SQM 1 3.05 2.2 6.710
SQM 1 2.5 0.85 2.125
SQM 1 1.675 1.125 1.884
Total SQM 28.724
2 Type : 2D
DINING / LIVING ROOM SQM 1 6.375 3.800 24.225
SQM 1 1.250 2.000 2.500
Dood cill SQM 1 1.100 0.060 0.066
STUDY ROOM SQM 1 2.700 3.350 9.045
SUMMARY VITRIFIED FLOOR TILE N/O FLAT QTY N/O TOWER TOTAL QTY.
TOWER - A, B, C
TYPE - 3A SQM 30 31.606 3 2844.567
TYPE - 3D SQM 28 35.504 3 2982.319
COMMON AREA LOBBY
BASEMENT FLOOR SQM 1 57.371 3 172.113
GROUND FLOOR FLOOR SQM 1 46.031 3 138.092
TYPICAL FLOOR FLOOR SQM 13 40.597 3 1583.264
TERRACE FLOOR SQM 1 28.724 3 86.173
TOWER - D
TYPE - 2A SQM 56 27.412 1 1535.065
TYPE - 2D SQM 14 35.836 1 501.704
TYPE - 2E SQM 13 32.655 1 424.519
TYPE - 1 BHK SQM 1 33.707 1 33.707
COMMON AREA LOBBY
BASEMENT FLOOR SQM 1 68.981 1 68.981
GROUND FLOOR FLOOR SQM 1 36.430 3 109.290
FIRST FLOOR AND TYPICAL FLOOR SQM 11 29.823 1 328.048
TERRACE FLOOR SQM 1 0.000 1 0.000
TOWER - E, F
TYPE - 2A SQM 44 27.412 2 2412.245
TYPE - 2D SQM 9 35.836 2 645.048
TYPE - 2E SQM 11 32.655 2 718.417
COMMON AREA LOBBY
BASEMENT FLOOR SQM 1 68.981 2 137.962
1ST FLOOR FLOOR SQM 1 36.430 3 109.290
TYPICAL FLOOR FLOOR SQM 9 29.823 2 536.805
TERRACE FLOOR SQM 1 0.000 2 0.000
Total Qty. SQM 15367.610
SUMMARY BALCONY FLOOR TILE N/O FLAT QTY N/O TOWER TOTAL QTY.
TOWER - A, B, C
TYPE - 3A SQM 30 10.477 3 942.903
TYPE - 3D SQM 28 9.577 3 804.443
TOWER - D
TYPE - 2A SQM 56 8.712 1 487.855
TYPE - 2D SQM 14 7.889 1 110.449
TYPE - 2E SQM 13 9.849 1 128.040
TYPE - 1 BHK SQM 1 8.500 1 8.500
TOWER - E, F
TYPE - 2A SQM 44 8.712 2 766.630
TYPE - 2D SQM 9 7.889 2 142.006
TYPE - 2E SQM 11 9.849 2 216.682
Total Qty. SQM 3607.507
SUMMARY TOILET FLOOR TILE N/O FLAT QTY N/O TOWER TOTAL QTY.
TOWER - A, B, C
TYPE - 3A SQM 30 13.039 3 1173.480
TYPE - 3D SQM 28 15.066 3 1265.520
TOWER - D
TYPE - 2A SQM 56 7.561 1 423.415
TYPE - 2D SQM 14 8.285 1 115.995
TYPE - 2E SQM 13 8.545 1 111.090
SUMMARY BALCONY FLOOR TILE N/O FLAT QTY N/O TOWER TOTAL QTY.
TOWER - A, B, C
TYPE - 3A SQM 30 26.365 3 2372.850
TYPE - 3D SQM 28 28.794 3 2418.662
TOWER - D
TYPE - 2A SQM 56 16.753 1 938.140
TYPE - 2D SQM 14 16.018 1 224.245
TYPE - 2E SQM 13 15.388 1 200.038
TYPE - 1 BHK SQM 1 9.608 1 9.608
TOWER - E, F
TYPE - 2A SQM 44 16.753 2 1474.220
TYPE - 2D SQM 9 16.018 2 288.315
TYPE - 2E SQM 11 15.388 2 338.525
Total Qty. SQM 8264.602
2 Type : 3D
BEDROOM NO3 SQM 1 3.325 4.93 16.376
MASTER BEDROOM SQM 1 3.475 4.93 17.114
Dress SQM 1 1.675 1.93 3.224
SQM 1 1.300 0.10 0.130
BEDROOM NO2 SQM 1 3.425 4.05 13.871
Door Cill SQM 4 0.785 0.04 0.113
Total Wooden Laminate Flooring SQM 50.829
2 Type : 2D
BEDROOM NO2 SQM 1 3.78 3.38 12.741
MASTER BEDROOM SQM 1 3.78 3.80 14.345
SQM 1 1.78 0.98 1.731
Cill SQM 2 0.63 0.04 0.045
Total Wooden Laminate Flooring SQM 28.862
1 Type : 2E
BEDROOM NO2 SQM 1 3.375 3.825 12.909
MASTERBEDROOM SQM 1 1.750 0.975 1.706
SQM 1 3.775 3.875 14.628
Cill SQM 2 0.63 0.04 0.045
SUMMARY OF WOODEN LAMINATE FLOORING N/O FLAT QTY N/O TOWER TOTAL QTY.
TOWER - A, B, C
TYPE - 3A SQM 30 45.394 3 4085.418
TYPE - 3D SQM 28 50.829 3 4269.608
TOWER - D
TYPE - 2A SQM 56 26.565 1 1487.655
TYPE - 2D SQM 14 28.862 1 404.063
TYPE - 2E SQM 13 29.289 1 380.758
TYPE - 1 BHK SQM 1 16.380 1 16.380
TOWER - E, F
TYPE - 2A SQM 44 26.565 2 2337.744
TYPE - 2D SQM 9 28.862 2 519.509
TYPE - 2E SQM 11 29.289 2 644.360
Total Qty. SQM 14145.495
2 Type : 3D
BEDROOM NO3 RMT 2 3.325 6.650
RMT 2 4.925 9.850
D1 RMT -1 0.900 -0.900
SD RMT -1 2.400 -2.400
MASTER BED ROOM RMT 2 3.475 6.950
RMT 2 4.925 9.850
RMT 2 1.675 3.350
RMT 2 1.925 3.850
RMT -2 1.300 -2.600
D1 RMT -1 0.900 -0.900
D2 RMT -1 0.750 -0.750
SD RMT -1 2.400 -2.400
BEDROOM NO2 RMT 2 3.425 6.850
RMT 2 4.05 8.100
DW2 RMT -1 0.900 -0.900
D2 RMT -1 0.750 -0.750
D1 RMT -1 0.900 -0.900
2 Type : 2D
MASTERBEDROOM RMT 2 3.78 7.550
RMT 2 3.80 7.600
SD4 RMT -1 1.80
Dress RMT 2 1.78 3.550
D RMT -1 0.90
BEDROOM NO2 RMT 2 3.78 7.550
RMT 2 3.38 6.750
D1 RMT -1 0.90
SD RMT -1 2.40
SUMMARY OF WOODEN LAMINATE SKIRTING N/O FLAT QTY N/O TOWER TOTAL QTY.
TOWER - A, B, C
TYPE - 3A SQM 30 36.905 3 3321.450
TYPE - 3D SQM 28 42.950 3 3607.800
TOWER - D
TYPE - 2A SQM 56 29.200 1 1635.200
TYPE - 2D SQM 14 33.000 1 462.000
TYPE - 2E SQM 13 33.200 1 431.600
TYPE - 1 BHK SQM 1 19.800 1 19.800
TOWER - E, F
TYPE - 2A SQM 44 29.200 2 2569.600
TYPE - 2D SQM 9 33.000 2 594.000
TYPE - 2E SQM 11 33.200 2 730.400
Total Qty. SQM 13371.850
Skirting
Staircase No. - 02
Skirting
Flight SQM 28 3.076 0.1 8.613
SQM 252 0.15 0.15 5.576
Midlanding Skirting SQM 1 11.8 0.1 1.180
SQM 14 6.7 0.1 9.380
SIDE SKIRTING SQM 28 0.3 0.1 0.840
G. Total Skirting Staircase No. -02 SQM 25.588
Skirting
Staircase No. - 02 Tower D,E,F
Skirting
Flight SQM 20 3.076 0.1 6.152
SQM 180 0.15 0.15 3.983
Midlanding Skirting SQM 1 11.8 0.1 1.180
SQM 10 6.75 0.1 6.750
SIDE SKIRTING SQM 20 0.3 0.1 0.600
2 Type : 3D
bedroom no3 balcony SQM 1.00 2.40 0.20 0.480
Master bed balcony SQM 1.00 2.45 0.20 0.490
Toilet SQM 1.00 0.70 0.10 0.070
Bedroom2 balcony SQM 1.00 0.90 0.20 0.180
Toilet SQM 1.00 0.75 0.10 0.075
Total SQM 1.295
2 Type : 2D
Master bed room balcony SQM 1.00 1.82 0.20 0.364
Toilet SQM 1.00 0.75 0.10 0.075
Bedroom No- 2 balcony SQM 1.00 2.45 0.20 0.490
SUMMARY GRANITE THRESHOLDS AND CILL N/O FLAT QTY N/O TOWER TOTAL QTY.
TOWER - A, B, C
TYPE - 3A SQM 30 1.244 3 111.960
TYPE - 3D SQM 28 2.539 3 213.276
TOWER - D
TYPE - 2A SQM 56 0.641 1 35.896
TYPE - 2D SQM 14 0.929 1 13.006
TYPE - 2E SQM 13 0.995 1 12.935
TYPE - 1 BHK SQM 1 0.565 1 0.565
TOWER - E, F
TYPE - 2A SQM 44 0.641 2 56.408
TYPE - 2D SQM 9 0.929 2 16.722
TYPE - 2E SQM 11 0.995 2 21.890
Total Qty. SQM 482.658
1 3A FLATS
T1 SQM 1.00 0.75 0.26 0.191
T2 SQM 1.00 0.75 0.26 0.191
T3 SQM 1.00 0.75 0.18 0.131
Total Qty. SQM 0.514
2 3D FLATS
T1 SQM 1.00 0.75 0.18 0.131
T2 SQM 1.00 0.75 0.26 0.191
T3 SQM 1.00 0.75 0.18 0.131
Total Qty. SQM 0.454
3 2A FLATS
T1 SQM 1.00 0.75 0.26 0.191
T2 SQM 1.00 0.75 0.18 0.131
Total Qty. SQM 0.323
4 2D FLATS
T1 SQM 1.00 0.75 0.18 0.131
T2 SQM 1.00 0.75 0.21 0.154
Total Qty. SQM 0.285
5 2E FLATS
T1 SQM 1.00 0.75 0.18 0.131
T2 SQM 1.00 0.75 0.21 0.154
Total Qty. SQM 0.285
6 1BHK FLATS
T1 SQM 1.00 0.75 0.18 0.131
Total Qty. SQM 0.131
2 Type : 3D
Utility RMT 1.000 5.150 5.150
Bedroom no3 RMT 1.000 6.750 6.750
Master bedroom RMT 1.000 5.900 5.900
Bedroom no2 RMT 1.000 5.550 5.550
Living/dining RMT 1.000 8.000 8.000
MEASURMENT SHEET Page 627 of 832
MAIN MEASUREMENT SHEET
S. No. Description Location Unit No. Length Width Height Total Qty.
2 Type : 2D
Utility RMT 1.000 4.68 4.675
Master bedroom RMT 1.000 5.20 5.200
Bedroom no2 RMT 1.000 8.73 8.725
2 Type : 3D
Main Door Jambs SQM 1 0.025 0.100 0.003
Basment Lift Lobby passage Flooring Tiles Skirting 600 X 600 MM A,B,C
Terrace Flooring Lift Lobby 300 X300 MM Vitrified Tiles ABC. Tower Skirting
SQM 1 0.75 0.10 0.075
SQM 1 0.275 0.10 0.028
SQM 1 4.53 0.10 0.453
SQM 1 3.05 0.10 0.305
SQM 1 0.855 0.10 0.086
SQM 1 0.2 0.10 0.020
SQM 1 1.325 0.10 0.133
SQM 1 0.75 2.00 1.500
SQM 1 0.445 0.10 0.045
SQM 1 1.775 0.10 0.178
SQM 1 0.58 0.10 0.058
SQM 1 2.2 0.10 0.220
SQM 1 3.5 0.10 0.350
SQM 1 0.275 0.10 0.028
SQM 1 0.22 0.10 0.022
SQM 1 6.475 0.10 0.648
SQM 1 3.5 0.10 0.350
SQM 1 0.2 0.10 0.020
MEASURMENT SHEET Page 630 of 832
MAIN MEASUREMENT SHEET
S. No. Description Location Unit No. Length Width Height Total Qty.
Total SQM 4.516
Grand Total of Tower A, B, C Vitrified Skirting (One Tower Qty) SQM 183.312
2 Type : 2D
LIVING ROOM SQM 2 6.375 0.10 1.275
SQM 2 3.800 0.10 0.760
Sliding Door SD SQM -1 2.400 0.10 -0.240
Deductions: Door Opening-D SQM -1 1.100 0.10 -0.110
Door Opening-D1 SQM -3 0.900 0.10 -0.270
Door Opening-D2 SQM -1 0.750 0.10 -0.075
Opening SQM -1 0.900 0.10 -0.090
Entrance Foyer SQM 2 2.000 0.10 0.400
STUDY ROOM SQM 2 2.700 0.10 0.540
SQM 2 3.550 0.10 0.710
Door Opening-D1 SQM -1 0.900 0.10 -0.090
GROUND FLOOR Lift Lobby passage Flooring Tiles Skirting 600 X 600 MM D, E, F
SUMMARY VITRIFIED FLOOR SKIRTING N/O FLAT QTY N/O TOWER TOTAL QTY.
TOWER - A, B, C
TYPE - 3A SQM 30 2.257 3 203.121
TYPE - 3D SQM 28 2.213 3 185.850
COMMON AREA LOBBY
BASEMENT FLOOR SQM 1 6.542 3 19.626
1ST FLOOR FLOOR SQM 1 3.517 3 10.550
TYPICAL FLOOR FLOOR SQM 13 2.792 3 108.869
TERRACE FLOOR SQM 1 4.516 3 13.547
TOWER - D
TYPE - 2A SQM 56 2.341 1 131.068
TYPE - 2D SQM 14 2.810 1 39.340
TYPE - 2E SQM 13 3.424 1 44.512
TYPE - 1 BHK SQM 1 3.133 1 3.133
COMMON AREA LOBBY
BASEMENT FLOOR SQM 1 6.921 1 6.921
1ST FLOOR FLOOR SQM 1 0.000 3 0.000
TYPICAL FLOOR FLOOR SQM 13 2.418 1 31.434
TERRACE FLOOR SQM 1 0.000 1 0.000
TOWER - E, F
TYPE - 2A SQM 44 2.341 2 205.964
TYPE - 2D SQM 9 2.810 2 50.580
TYPE - 2E SQM 11 3.424 2 75.328
COMMON AREA LOBBY
BASEMENT FLOOR SQM 1 6.921 2 13.842
1ST FLOOR FLOOR SQM 1 0.000 3 0.000
TYPICAL FLOOR FLOOR SQM 10 2.418 2 48.360
MEASURMENT SHEET Page 633 of 832
MAIN MEASUREMENT SHEET
S. No. Description Location Unit No. Length Width Height Total Qty.
TERRACE FLOOR SQM 1 0.000 2 0.000
Total Qty. SQM 1192.044
K2- 3D
K2 3D SQM 1.00 2.80 0.10 0.280
K2 3D SQM 1.00 2.80 0.10 0.280
K2 3D SQM 1.00 2.58 0.10 0.258
K2 3D SQM 1.00 2.58 0.10 0.258
Grand Total of Tower A,B,C SQM 1.075
K3- 2A
K3 2A SQM 1.00 2.48 0.10 0.248
K3 2A SQM 1.00 2.48 0.10 0.248
K3 2A SQM 1.00 2.60 0.10 0.260
K3 2A SQM 1.00 2.60 0.10 0.260
SUMMARY KITCHEN FLOOR SKIRTING N/O FLAT QTY N/O TOWER TOTAL QTY.
SUMMARY BALCONY FLOOR SKIRTING N/O FLAT QTY N/O TOWER TOTAL QTY.
TOWER - A, B, C
TYPE - 3A SQM 30 4.253 3 382.806
TYPE - 3D SQM 28 5.136 3 431.407
TOWER - D
TYPE - 2A SQM 56 2.909 1 162.876
TYPE - 2D SQM 14 2.320 1 32.480
TYPE - 2E SQM 13 2.580 1 33.537
TYPE - 1 BHK SQM 1 1.484 1 1.484
TOWER - E, F
TYPE - 2A SQM 44 2.909 2 255.948
TYPE - 2D SQM 9 2.320 2 41.760
TYPE - 2E SQM 11 2.580 2 56.756
Total Qty. SQM 1399.054
Providing and laying 6-10mm thick tiles in cladding/
dado/ jamb/ soffit/ cill of uniform thickness, size,
shade and pattern as approved by Architect/Project
Manager laid with rich cement slurry over a bedding
plaster of 6mm (avg.) thick cement mortar 1:3 (1
2.5 cement
Tile Dado: 3 fine sand) including the cost of 12mm
average thick rough base plaster of mix 1:3 (1 cement
: 3 coarse sand), and joints shall be pointed with the
matching cement based polymer grout (Laticrete/Bal
grout or equivalent) of approved shade including
cutting, curing etc. complete in all respects as per
drawing.
With Ceramic Tile of size 300x450mm @ base rate
Rs. 28/Sqft inclusive of all duties excluding taxes
F.O.R. site.
2.5.1
checked by Himanhu sir dtd. 6.08.2018
Kitchen DadoTile
K1- 3A
Kitchen Dado Tiles ( Ceramic Tiles) A SQM 1 0.60 3.45 2.070
Kitchen Dado Tiles ( Ceramic Tiles) B SQM 1 0.60 4.30 2.580
Kitchen Dado Tiles ( Ceramic Tiles) C LHS. SQM 1 0.60 0.60 0.360
Kitchen Dado Tiles ( Ceramic Tiles) C RHS. SQM 1 0.60 0.60 0.360
Ded. DW3 ( Window Part) SQM -1 0.21 0.35 -0.074
Add Cill Jambs SQM 1 0.21 0.07 0.015
SQM 1 0.35 0.07 0.025
Kitchen Dado Tiles ( Ceramic Tiles) R RHS. SQM 1 0.60 0.60 0.360
Total Qty. SQM 5.696
K2- 3D
Kitchen Dado Tiles ( Ceramic Tiles) A SQM 1 0.60 2.10 1.260
Ded. W SQM -1 0.21 1.05 -0.221
Jamb SQM 1 0.21 0.04 0.008
Cill SQM 1 1.05 0.04 0.042
Kitchen Dado Tiles ( Ceramic Tiles) RHS B SQM 1 0.60 1.25 0.750
Kitchen Dado Tiles ( Ceramic Tiles) C SQM 1 0.60 2.58 1.545
Kitchen Dado Tiles ( Ceramic Tiles) D SQM 1 0.60 2.58 1.545
SQM 2 0.60 0.60 0.720
Total Qty. SQM 5.650
K3- 2A
Kitchen Dado Tiles ( Ceramic Tiles) A SQM 0.00 0.00 0.000
K4- 2D
Kitchen Dado Tiles ( Ceramic Tiles) A SQM 1 0.60 0.60 0.360
Kitchen Dado Tiles ( Ceramic Tiles) B LHS SQM 1 0.60 0.60 0.360
Kitchen Dado Tiles ( Ceramic Tiles) B RHS SQM 1 0.60 0.60 0.360
Kitchen Dado Tiles ( Ceramic Tiles) C SQM 1 0.60 3.20 1.920
Kitchen Dado Tiles ( Ceramic Tiles) D SQM 1 0.60 2.35 1.411
K5- 2E
Kitchen Dado Tiles ( Ceramic Tiles) A SQM 1 0.60 2.05 1.230
Kitchen Dado Tiles ( Ceramic Tiles) B SQM 1 0.60 4.00 2.400
Kitchen Dado Tiles ( Ceramic Tiles) C LHS. SQM 1 0.60 0.60 0.360
Kitchen Dado Tiles ( Ceramic Tiles) D LHS. SQM 1 0.60 0.60 0.360
Kitchen Dado Tiles ( Ceramic Tiles) D RHS. SQM 1 0.60 0.60 0.360
Total Qty. SQM 4.710
K6- 1BHK
Kitchen Dado Tiles ( Ceramic Tiles) A SQM 1 0.60 2.70 1.620
Kitchen Dado Tiles ( Ceramic Tiles) B SQM 1 0.60 0.60 0.360
Kitchen Dado Tiles ( Ceramic Tiles) C SQM 1 0.60 0.60 0.360
Kitchen Dado Tiles ( Ceramic Tiles) D SQM 1 0.60 3.10 1.860
Dw W8 SQM 1 -0.21 1.20 -0.252
Add Jamb SQM 1 1.62 0.04 0.065
SUMMARY TOILET DADO TILE N/O FLAT QTY N/O TOWER TOTAL QTY.
TOWER - A, B, C
TYPE - 3A SQM 30 55.095 3 4958.537
TYPE - 3D SQM 28 65.239 3 5480.093
TOWER - D
TYPE - 2A SQM 56 33.710 1 1887.740
TYPE - 2D SQM 14 35.762 1 500.661
TYPE - 2E SQM 13 36.408 1 473.299
TYPE - 1 BHK SQM 1 18.293 1 18.293
TOWER - E, F
TYPE - 2A SQM 44 33.710 2 2966.449
TYPE - 2D SQM 9 35.762 2 643.707
TYPE - 2E SQM 11 36.408 2 800.968
MISC. TOILET (SHOPPING, BASEMENT) FLOOR SQM 1 91.407 1 91.407
DADO SQM 1 219.432 1 219.432
Total Qty. SQM 17821.155
SUMMARY KITCHEN DADO TILE N/O FLAT QTY N/O TOWER TOTAL QTY.
TOWER - A, B, C
TYPE - 3A K1 SQM 30 5.696 3 512.613
TYPE - 3D K2 SQM 28 5.650 3 474.592
TOWER - D
TYPE - 2A K3 SQM 56 3.111 1 174.205
TYPE - 2D K4 SQM 14 4.411 1 61.748
TYPE - 2E K5 SQM 13 4.710 1 61.230
TYPE - 1 BHK K5 SQM 1 4.013 1 4.013
TOWER - E, F
TYPE - 2A K3 SQM 44 3.111 2 273.750
TYPE - 2D K4 SQM 9 4.411 2 79.391
TYPE - 2E K5 SQM 11 4.710 2 103.620
K4- 2D
CC Granite Counter C SQM 0.625 3.225 2.016
DD Granite Counter D SQM 0.625 2.35 1.469
K5- 2E
AA Granite Counter A SQM 0.625 2.05 1.281
BB Granite Counter B SQM 0.625 4.0 2.500
K6- 1BHK
AA Granite Counter A SQM 0.625 2.7 1.688
DD Granite Counter D SQM 0.625 2.505 1.566
SUMMARY KITCHEN COUNTER N/O FLAT QTY N/O TOWER TOTAL QTY.
TOWER - A, B, C
Providing
TYPE - 3A and laying machine cut pre-polished stone SQM 30 4.844 3 435.938
slab in required size of approved quality in counters
TYPE
fixed -over
3D 19mm thick Marine ply supported with SQM 28 4.406 3 370.125
TOWER
MS angle- Dframe with anchor fasteners including
providing
TYPE - 2A and applying two or more coats of SQM 56 2.647 1 148.225
approved
TYPE - 2D synthetic enamel paint over a coat of SQM 14 3.484 1 48.781
primer including surface preparation and
TYPE - 2E SQM 13 3.781 1 49.156
including front fascia, verticals, pointing with
TYPE - 1white
tinted BHK cement, polishing, curing etc. SQM 1 3.253 1 3.253
complete
TOWER - E,allF as per drawings and as per detailed
specifications,
TYPE - 2A and joints neatly finished with SQM 44 2.647 2 232.925
white cement paste mixed with matching
TYPE - 2D SQM 9 3.484 2 62.719
pigment to match the shade of stone making
TYPE - 2E holes for wash basin, mixers, soap
openings/ SQM 11 3.781 2 83.188
dispenser,
Total Qty. ledge/ sorrounding of bath tub, back SQM 1434.309
splash, facia, ledges of shower area etc. as
required including edge chamfering, moulding,
mirror polishing of moulding and cut edges, and
filling silicon
Counter StoneatFixing
junctions with sanitary fixtures
and corners with wall whereever required etc.
complete as per drawing. Rate to include cost of
necessary MS framework. Plan area shall be
measured, with all lead and lift and as directed by
2.6.2 Project Consultant/Engineer in charge. -For Toilet
With 18 to 20mm thick Prepolished Granite stone and
joint to be filled with white cement slurry mixed with
a. pigment to match the shade of stone (Basic rate of
prepolished (one side) Granite @ Rs. 118/Sqft
Toilets
inclusiveCounters
of all duties excluding taxes F.O.R. site) Counters
3A FLATS
T1 SQM 0.625 0.775 0.484
T2 SQM 0.625 0.775 0.484
T3 SQM 0.625 0.775 0.484
Total Qty. SQM 1.453
3D FLATS Counters
T1 SQM 0.63 0.775 0.484
T2 SQM 0.63 0.775 0.484
T3 SQM 0.63 0.775 0.484
2A FLATS Counters
T1 SQM 0.63 0.775 0.484
T2 SQM 0.63 0.775 0.484
2D FLATS Counters
T1 SQM 0.63 0.775 0.484
T2 SQM 0.63 0.775 0.484
2E FLATS Counters
T1 SQM 0.625 0.775 0.484
T2 SQM 0.625 0.775 0.484
SUMMARY TOILET COUNTER N/O FLAT QTY N/O TOWER TOTAL QTY.
TOWER - A, B, C
TYPE - 3A SQM 30 1.453 3 130.781
TYPE - 3D SQM 28 1.453 3 122.063
TOWER - D
TYPE - 2A SQM 56 0.969 1 54.250
TYPE - 2D SQM 14 0.969 1 13.563
TYPE - 2E SQM 13 0.969 1 12.594
TYPE - 1 BHK SQM 1 0.484 1 0.484
TOWER - E, F
TYPE - 2A SQM 44 0.969 2 85.250
TYPE - 2D SQM 9 0.969 2 17.438
TYPE - 2E SQM 11 0.969 2 21.313
Total Qty. SQM 457.734
3.1
Sunken area Filling Work
Type - 3A Flat
Balcony
BALCONY BR2 CUM 1 2.400 1.700 0.100 0.408
CUM 1 0.500 0.100 0.100 0.005
BALCONY MBR CUM 1 2.550 1.700 0.100 0.434
MEASURMENT SHEET Page 643 of 832
MAIN MEASUREMENT SHEET
S. No. Description Location Unit No. Length Width Height Total Qty.
CUM 1 0.500 0.100 0.100 0.005
BALCONY Liv & Din CUM 1 3.100 1.700 0.100 0.527
CUM 1 2.025 1.700 0.100 0.344
BALCONY BR3 CUM 1 3.100 1.700 0.100 0.527
CUM 1 1.700 0.650 0.100 0.111
UTILITY ROOM Balcony CUM 1 1.625 1.700 0.100 0.276
2.637
TOILET SUNKEN
T1 CUM 1 2.690 1.645 0.100 0.443
T2 CUM 1 2.390 1.520 0.100 0.363
T3 CUM 1 2.520 1.550 0.100 0.391
1.196
Total Qty. CUM 3.833
Type - 3D Flat
Balcony
BED ROOM NO3 BALCONY CUM 1 3.90 1.70 0.100 0.663
MASTER BEDROOM BALCONY CUM 1 3.05 1.70 0.100 0.519
BEDROOM NO2 BALCONY CUM 1 1.70 2.35 0.100 0.400
DINNING BALCONY CUM 1 4.80 1.70 0.100 0.816
UTILITY ROOM CUM 1 0.70 0.90 0.100 0.063
CUM 1 2.55 1.70 0.100 0.434
2.894
TOILET SUNKEN
T1 CUM 1 2.690 1.675 0.100 0.451
T2 CUM 1 1.465 2.395 0.100 0.351
T3 CUM 1 2.770 1.545 0.100 0.428
T4 CUM 1 0.990 1.420 0.100 0.141
1.370
Total Qty. CUM 4.263
Type - 2A Flat
Balcony
LIVING BALCONY CUM 1 1.701 2.350 0.100 0.400
BEDROOM NO2 BALCONY CUM 1 2.125 1.700 0.100 0.361
CUM 1 0.400 0.100 0.100 0.004
MASTER BEDROOM BALCONY CUM 1 2.200 1.700 0.100 0.374
CUM 1 0.400 0.100 0.100 0.004
UTILITY ROOM CUM 1 1.350 3.400 0.100 0.459
CUM 1 0.350 2.100 0.100 0.074
CUM 1 0.050 0.900 0.100 0.005
1.680
TOILET SUNKEN
T1 CUM 1 2.365 1.57 0.100 0.371
T2 CUM 1 2.245 1.395 0.100 0.313
0.684
Total Qty. CUM 2.364
Type - 2D Flat
Balcony
MEASURMENT SHEET Page 644 of 832
MAIN MEASUREMENT SHEET
S. No. Description Location Unit No. Length Width Height Total Qty.
BEDROOM NO2 BALCONY CUM 1 5.525 1.700 0.100 0.939
MASTER ROOM BALCONY CUM 1 1.975 1.700 0.100 0.336
UTILITY CUM 1 3.700 0.900 0.100 0.333
1.608
TOILET SUNKEN
T1 CUM 1 2.645 1.675 0.100 0.443
T2 CUM 1 2.390 1.52 0.100 0.363
0.806
Total Qty. CUM 2.414
Type - 2E Flat
Balcony
MASTER BEDROOM BALCONY CUM 1 1.425 3.550 0.100 0.506
CUM -1 1.050 0.100 0.100
BEDROOM NO2 BALCONY CUM 1 3.350 1.425 0.100 0.477
LIVING / DINING BALCONY CUM 1 1.925 1.700 0.100 0.327
UTILITY CUM 1 1.475 1.700 0.100 0.251
1.561
TOILET SUNKEN
T1 CUM 1 2.495 1.675 0.100 0.418
T2 CUM 1 2.670 1.395 0.100 0.372
0.790
Total Qty. CUM 2.352
Type - 1 BHK
Balcony
MASTER BEDROOM BALCONY CUM 1 1.425 3.350 0.100 0.477
DINING/ LIVING BALCONY CUM 1 0.375 3.550 0.100 0.133
CUM 1 1.050 3.350 0.100 0.352
0.962
TOILET SUNKEN
T1 CUM 1 1.675 2.7 0.100 0.452
PART - A SUBSTRUCTURE
1 PAINTING
(Quoted Rate shall be for all heights, depths, levels,
leads and lifts )
PART - B SUPERSTRUCTURE
1 PAINTING WORKS
(Quoted Rate shall be for all heights, depths, levels,
leads and lifts ).
S.no Description Unit Nos. Length Width Height Total Area Remarks
1 Master Bedroom
On A b/w 14-19 SQM 2 3.90 2.74 21.372
Less (-) D1 SQM -0.5 0.90 2.04 -0.918
Less (-) W9 SQM -0.5 0.90 1.48 -0.664
Less (-) D2 SQM -1 0.75 2.04 -1.530
2 Bedroom 2
On A b/w 11-14 SQM 2 3.60 2.74 19.728
Less (-) D1 SQM -0.5 0.90 2.04 -0.918
Column off-set SQM 2 0.10 2.74 0.548
On 11 B/w A-B SQM 2 3.73 2.74 20.413
SQM 2 0.53 2.74 2.877
Less(-) SD8 SQM -1 1.50 2.44 -3.653
add Soffit and Jamb SQM 1 6.13 0.08 0.460
W14' SQM -0.5 0.60 1.18 -0.353
3 Bedroom 3
On B/9-13 SQM 2 4.25 2.74 23.290
Less (-) DW SQM -1 1.65 2.34 -3.861
SQM -1 0.45 1.18 -0.529
add soffit and Jambs SQM 1 5.70 0.08 0.428
On 9 B/w B & F SQM 2 3.60 2.74 19.728
Less (-) D2 SQM -1 0.75 2.10 -1.575
Less (-) D1 SQM -0.5 0.90 2.10 -0.945
Column off-set SQM 2 0.03 2.74 0.164
4 Kitchen
On F b/w 9 & 13 SQM 2 4.30 2.69 23.134
On 9 b/w F & H SQM 2 2.43 2.69 13.047
Less (-) Dw3 SQM -0.5 0.90 2.28 -1.024
SQM -0.5 0.60 1.18 -0.353
Less (-) D1 SQM -0.5 0.90 2.00 -0.900
Less Tile SQM -1 4.30 0.65 -2.795
SQM -1 3.45 0.65 -2.243
DW Wall Tile SQM -1 0.60 0.65 -0.390
DW Wall Tile SQM -1 0.60 0.44 -0.264
D1 Wall Tile SQM -1 0.60 0.65 -0.390
5 Living Dining
On H b/w 13-21 SQM 2 7.43 2.68 39.724
SQM 1 1.30 2.68 3.478
Column Off-set SQM 2 0.09 2.68 0.455
SQM 2 0.04 2.68 0.187
Less (-) D1 SQM -1 0.90 2.00 -1.800
Less (-) D1 SQM -1 1.10 2.00 -2.200
Less (-) SD7 SQM -1 1.65 2.28 -3.754
3 Bedroom-2
on M b/w 1&2 SQM 2 3.500 2.74 19.180
on 1 b/w M and K SQM 2 4.075 2.74 22.331
IS1200/13/3.2.
Less (-W9') SQM -0.5 0.900 2.225 -1.001 1/b/2
IS1200/13/3.2.
Less (-) D2 SQM -1 0.750 2.040 -1.530 1/b/3
Less (-)DW2 SQM -0.5 0.900 2.315 -1.042
SQM -0.5 0.750 1.175 -0.441
IS1200/13/3.2.
Less (-) D1 SQM -0.5 0.900 2.040 -0.918 1/b/1
4 Bedroom 3
On S b/w 3 & 4 SQM 2 3.350 2.74 18.358
Less (-) SD SQM -1 2.400 2.315 -5.556
Add Soffit and Jamb SQM 1 7.030 0.075 0.527
5 Kitchen
On Q b/w 4 & 6 SQM 2 3.700 2.690 19.906
B/w Q and M on 3 SQM 2 2.575 2.690 13.854
IS1200/13/3.2.
Less (-) D1 SQM -0.5 0.900 2.000 -0.900 1/b/1
Less (-) DW1 SQM -1 0.900 2.275 -2.048
SQM -1 1.100 1.175 -1.293
SQM 1 6.550 0.075 0.491
Less (-) Tiles SQM -1 2.150 0.650 -1.398
Less (-) Tiles SQM -1 1.250 0.650 -0.813
Less (-) Tiles SQM -1 2.575 0.650 -1.674
SQM -1 2.375 0.650 -1.544
6 Servant Room
On M b/w 6 & 9 SQM 2 3.175 2.675 16.986
IS1200/13/3.2.
Less (-) D1'' SQM -0.5 0.900 2.000 -0.900 1/b/1
On 6 B/w M & Q SQM 2 3.475 2.675 18.591
IS1200/13/3.2.
Less (-) D2 SQM -0.5 0.750 2.000 -0.750 1/b/3
IS1200/13/3.2.
Less(-) D2' SQM -0.5 0.750 2.275 -0.853 1/b/2
On R b/w 6 & 8 SQM 1 1.075 2.675
IS1200/13/3.2.
Less (-) W7 SQM -0.5 1.000 1.475 -0.738 1/b/2
Column off-set SQM 2 0.200 2.675 1.070
7 Living/Dining
Already
Deducted from
Less (-) D1 SQM -1 0.900 2.000 -1.800 one face
IS1200/13/3.2.
Less (-) D SQM -0.5 1.100 2.000 -1.100 1/b/2
T3 Outside Wall SQM 2 1.775 2.675 9.496
Already
Deducted from
Less (-) D2 SQM -1 0.750 2.000 -1.500 other face
Already
Deducted from
Less (-) D1 SQM -1 0.900 2.000 -1.800 other face
Foyer Staircase Wall SQM 1 1.700 2.675 4.548
Column off-set SQM 2 0.150 2.675 0.803
Beam Side Entrance MBR and BR - 2 SQM 2 1.65 0.425 1.403
Beam Side Servent Room SQM 2 0.925 0.2 0.370
Total Qty. 3D Flat No.- 4 SQM 251.945
8 Ceiling
3 Bedroom-2
on M b/w 1&2 SQM 2 3.500 2.74 19.180
on 1 b/w M and K SQM 2 4.075 2.74 22.331
IS1200/13/3.2.
Less (-) D2 SQM -1 0.750 2.040 -1.530 1/b/3
Less (-)DW2 SQM -0.5 0.900 2.315 -1.042
SQM -0.5 0.750 1.175 -0.441
IS1200/13/3.2.
Less (-) D1 SQM -0.5 0.900 2.040 -0.918 1/b/1
4 Bedroom 3
On S b/w 3 & 4 SQM 2 3.350 2.74 18.358
Less (-) SD SQM -1 2.400 2.315 -5.556
Add Soffit and Jamb SQM 1 7.030 0.075 0.527
IS1200/13/3.2.
Less (-) D1 SQM -0.5 0.900 2.040 -0.918 1/b/1
on 3 B/w M & S SQM 2 4.950 2.74 27.126
Column off-set SQM 2 0.080 2.74 0.438
5 Kitchen
On Q b/w 4 & 6 SQM 2 3.700 2.690 19.906
B/w Q and M on 3 SQM 2 2.575 2.690 13.854
Already
Deducted from
Less (-) D1 SQM -1 0.900 2.000 -1.800 one face
IS1200/13/3.2.
Less (-) D SQM -0.5 1.100 2.000 -1.100 1/b/2
T3 Outside Wall SQM 1 1.775 2.675 4.748
Already
Deducted from
Less (-) D2 SQM -1 0.750 2.000 -1.500 other face
Already
Deducted from
Less (-) D1 SQM -1 0.900 2.000 -1.800 other face
Foyer Staircase Wall SQM 1 1.700 2.675 4.548
Column off-set SQM 2 0.150 2.675 0.803
Beam Side Entrance MBR and BR - 2 SQM 2 1.65 0.425 1.403
Beam Side Servent Room SQM 2 0.925 0.2 0.370
Total Qty. Flat No. - 2 SQM 283.827
8 Ceiling
1 Master Bedroom
On A b/w 3 and 5 SQM 2 3.5 2.74 19.180
B/w A and C on 3 SQM 2 4.1 2.74 22.468
IS1200/13/3.2.
Less (-) D2 SQM -1 0.75 2.04 -1.530 1/b/3
IS1200/13/3.2.
Less (-) D1 SQM -0.5 0.9 2.04 -0.918 1/b/1
Less (-) SD9 SQM -1 1.4 2.375 -3.325
add soffit and Jambs SQM 1 6.03 0.075 0.452
IS1200/13/3.2.
Less (-) W14 SQM -0.5 0.6 1.475 -0.443 1/b/2
SQM
2 Bedroom 2 SQM
On A b/w 5 & 8 SQM 2 3.25 2.74 17.810
On 5 b/w A & B SQM 2 3.75 2.74 20.550
IS1200/13/3.2.
Less (-) D1 SQM -0.5 0.9 2.1 -0.945 1/b/1
Less (-) SD10 SQM -1 1.35 2.275 -3.071
Add Jamb and soffit SQM 1 5.98 0.075 0.449
IS1200/13/3.2.
Less (-) W14 SQM -0.5 0.6 1.175 -0.353 1/b/2
3 Kitchen
On C b/w 2 & 5 SQM 2 2.475 2.675 13.241
B/w C & D on 2 SQM 2 3.5 2.675 18.725
IS1200/13/3.2.
Less (-) D1' SQM -0.5 0.9 2.275 -1.024 1/b/2
IS1200/13/3.2.
Less (-) W8 SQM -0.5 1 1.175 -0.588 1/b/2
IS1200/13/3.2.
Less Opening SQM -1 0.9 2.000 -1.800 1/b/1
Less Tiles SQM -2 0.6 0.65 -0.780
Chimney Wall tiles SQM -1 1.7 0.65 -1.105
Window Wall tiles SQM -1 2.3 0.65 -1.495
Add W8 Portion overlap SQM 1 1 0.2 0.200
4 Living & Dining SQM
On B b/w 6 & 10 SQM 2 6.3 2.675 33.705
on 10 b/w C & D SQM 2 3.8 2.675 20.330
Foyer SQM 2 1.33 2.675 7.116
Kitchen Lobby SQM 2 1.625 2.675 8.694
IS1200/13/3.2.
Less (-) D SQM -0.5 1.1 2.000 -1.100 1/b/2
Already
Deducted from
Less (-) D1 SQM -1 0.9 2.00 -1.800 one face
Less (-) SD1 SQM -1 2.3 2.275 -5.233
3 Kitchen
On H/13 & 16 SQM 2 2.450 2.690 13.181
On 13 b/w H & F SQM 2 3.200 2.690 17.216
IS1200/13/3.2.
Less (-) DW3 SQM -1 0.900 2.275 -2.048 1/b/2
SQM -1 0.600 1.175 -0.705
Add soffit and jamb SQM 1 6.050 0.075 0.454
IS1200/13/3.2.
Less Kitchen Entrance SQM -0.5 0.900 2.000 -0.900 1/b/1
Less Tiles
IS1200/13/3.2.
Entrance Door wall SQM -1 0.600 0.650 -0.390 1/a
IS1200/13/3.2.
DW3 Wall Tile SQM -1 0.300 0.600 -0.180 1/a
IS1200/13/3.2.
SQM -1 0.300 0.300 -0.090 1/a
IS1200/13/3.2.
SQM -1 0.600 0.650 -0.390 1/a
Chimney Wall Tile SQM -1 2.350 0.650 -1.528
4 Liv/Din
On H b/w 13 & 20 SQM 2 6.375 2.675 34.106
Less (-) Kitchen opening SQM -0.5 0.900 2.000 -0.900
Less (-) D2 SQM -1 0.750 2.000 -1.500
Already
Deducted from
Less (-) D1 SQM -1 0.900 2.000 -1.800 one face
Less (-) SD SQM -1 2.400 2.275 -5.460
Add soffit and jamb SQM 1 6.950 0.075 0.521
On 20 b/w H & L SQM 2 3.800 2.675 20.330
Already
Deducted from
Less (-) D1 SQM -1 0.900 2.000 -1.800 one face
IS1200/13/3.2.
Less (-)D SQM -0.5 1.100 2.000 -1.100 1/b/2
Col. Off-set SQM 2 0.080 2.675 0.428
5 Foyer SQM 2 2.000 2.675 10.700
6 Study Room
On P b/w 13 & 16 SQM 2 3.350 2.675 17.923
IS1200/13/3.2.
Less D1 SQM -0.5 0.900 2.000 -0.900 1/b/1
IS1200/13/3.2.
Less Cutout SQM -0.5 0.700 0.450 -0.158 1/b/2
On 16 b/w L & P SQM 2 2.700 2.675 14.445
IS1200/13/3.2.
Less (-) W5 SQM -0.5 1.200 1.475 -0.885 1/b/2
Beam Side SQM 2 1.00 0.43 0.850
Total Qty. SQM 186.230
7 Ceiling
MBR SQM 1 3.80 3.25 12.350
SQM 1 1.00 1.78 1.775
BR2 SQM 1 3.40 3.80 12.920
T1 SQM 0 1.68 2.73 0.000
T2 SQM 0 1.55 2.60 0.000
Kitchen SQM 1 2.45 3.20 7.840
Study Room SQM 1 3.35 2.70 9.045
Living Dining SQM 1 6.38 3.80 24.225
Foyer SQM 1 2.00 1.25 2.500
Total Qty. SQM 70.655
1 Master Bedroom
On N b/w 1 & 4 SQM 2 3.90 2.74 21.372
on 4 b/w N & K SQM 2 3.80 2.74 20.824
Less (-) SD SQM -1 2.40 2.38 -5.700
Add soffit and Jamb SQM 1 7.03 0.08 0.527
IS1200/13/3.2.
Less(-) D1 SQM -0.5 0.90 2.00 -0.900 1/b/1
IS1200/13/3.2.
Less (-) D2 SQM -1 0.75 2.00 -1.500 1/b/3
4 Living Dining
On 7 b/w E and K SQM 2 5.83 2.68 31.164
On E B/w 4 and 7 SQM 2 3.43 2.68 18.324
Foyer SQM 2 2.80 2.68 14.980
Already
Deducted from
Less (-) Kitchen Opening SQM -0.5 0.90 2.00 -0.900 one face
Less (-) SD8 SQM -1 1.50 2.28 -3.413
Add Jambs and Soffit SQM 1 6.05 0.08 0.454
IS1200/13/3.2.
Less(-) D SQM -0.5 1.10 2.00 -1.100 1/b/2
Already
Deducted from
Less(-)D1 SQM -3 0.90 2.00 -5.400 one face
IS1200/13/3.2.
Less (-) D2 SQM -1 0.75 2.00 -1.500 1/b/3
column off-set SQM 2 0.13 2.68 0.696
5 Study Room SQM 0.000
On 9 b/w K and M SQM 2 3.13 2.68 16.746
on K b/w 7 and 9 SQM 2 2.70 2.68 14.445
IS1200/13/3.2.
Less (-) D1 SQM -0.5 0.90 2.00 -0.900 1/b/1
IS1200/13/3.2.
Less (-) W5 SQM -0.5 1.20 1.48 -0.885 1/b/2
Total Qty. SQM 190.580
6 Ceiling
MBR SQM 1 3.90 3.80 14.820
BR2 SQM 1 3.85 3.40 13.090
Liv/Dining SQM 1 3.80 5.83 22.135
Foyer SQM 1 2.35 1.17 2.750
on 7 b/w J and H SQM 1 3.37 0.45 1.517
MBR T1 Lobby SQM 1 1.78 1.00 1.775
Kitchen SQM 1 4.00 2.45 9.800
Study Room SQM 1 2.70 3.13 8.451
T1 SQM 1 1.68 2.70 0.000
T2 SQM 1 1.55 2.75 0.000
Beam Side
Total Qty. SQM 74.337
1 Master Bedroom
On N b/w 1 & 4 SQM 2 3.90 2.78 21.645
on 4 b/w N & K SQM 2 3.80 2.78 21.090
Less (-) SD SQM -1 2.40 2.38 -5.700
Add soffit and Jamb SQM 1 7.15 0.08 0.536
IS1200/13/3.2.
Less(-) D1 SQM -0.5 0.90 2.10 -0.945 1/b/1
IS1200/13/3.2.
Less (-) D2 SQM -0.5 0.75 2.10 -0.788 1/b/3
T1 Lobby SQM 2 1.78 2.78 9.851
3 Kitchen
On D b/w 6 & 9 SQM 2 3.13 2.68 16.746
IS1200/13/3.2.
Less (-) Opening SQM -0.5 0.90 2.00 -0.900 1/b/1
On 9 b/w D & E SQM 2 2.70 2.68 14.445
IS1200/13/3.2.
Less (-) W5' SQM -0.5 1.20 1.48 -0.885 1/b/2
Less Tiles SQM -1 6.96 0.65 -4.524
add W5 overlap SQM 1 1.20 0.20 0.240
4 Living Dining
On 7 b/w E and K SQM 2 7.83 2.68 41.864
On E B/w 4 and 7 SQM 2 3.40 2.68 18.190
Foyer SQM 2 2.35 2.68 12.573
Already
Deducted from
Less (-) Kitchen Opening SQM -0.5 0.90 2.00 -0.900 one face
Less (-) SD2 SQM -1 2.10 2.28 -4.778
Add Jambs and Soffit SQM 1 6.65 0.08 0.499
IS1200/13/3.2.
Less(-) D SQM -0.5 1.10 2.00 -1.100 1/b/2
Already
Deducted from
Less(-)D1 SQM -0.5 0.90 2.00 -0.900 one face
IS1200/13/3.2.
Less (-) study opening SQM -0.5 0.90 2.00 -0.900 1/b/3
SQM
5 Study Room SQM
On 9 b/w K and M SQM 2 1.55 2.68 8.293
on K b/w 7 and 9 SQM 2 2.75 2.68 14.713
IS1200/13/3.2.
Less (-) opening SQM -0.5 0.90 2.00 -0.900 1/b/1
IS1200/13/3.2.
Less (-) W14 SQM -0.5 0.60 1.48 -0.443 1/b/2
Total Qty. SQM 157.022
6 Ceiling
MBR SQM 1 3.90 3.80 14.820
Liv/Dining SQM 1 3.40 7.83 26.605
Foyer SQM 1 2.35 1.17 2.750
MBR T1 Lobby SQM 1 1.78 1.00 1.775
Kitchen SQM 1 2.70 3.13 8.451
Study Room SQM 1 1.55 2.75 4.263
MEASURMENT SHEET Page 656 of 832
MAIN MEASUREMENT SHEET
S. No. Description Location Unit No. Length Width Height Total Qty.
Total Qty. SQM 58.663
TOWER D
3 2 A TYPE SQM 56 158.519 1 8877.08
4 2 D TYPE SQM 14 186.230 1 2607.22
5 2 E TYPE SQM 13 190.580 1 2477.54
6 1BHK TYPE SQM 1 157.022 1 157.02
7 LOBBY 1 2381.618 1 2381.62
TOWER - E, F
1 2 A TYPE SQM 44 158.519 2 13949.69
2 2 D TYPE SQM 9 186.230 2 3352.14
3 2 E TYPE SQM 11 190.580 2 4192.76
4 LOBBY SQM 1 1889.184 2 3778.37
TOWER D
3 2 A TYPE SQM 56 62.488 1 3499.30
4 2 D TYPE SQM 14 70.655 1 989.17
5 2 E TYPE SQM 13 74.337 1 966.38
6 1BHK TYPE SQM 1 58.663 1 58.66
7 LOBBY 1 1056.072 1 1056.07
TOWER - E, F
1 2 A TYPE SQM 44 62.488 2 5498.90
2 2 D TYPE SQM 9 70.655 2 1271.79
3 2 E TYPE SQM 11 74.337 2 1635.41
4 LOBBY SQM 1 845.071 2 1690.14
1 Basement
on 16 b/w S and P 1.00 3.305 4.63 15.29
On 17 Lift Wall 1.00 3.825 4.63 17.69
Lesss Lift Opening -1.00 1.2 2.00 -2.40
On L b/w 8 and 16 1.00 9.59 4.63 44.35
Less (-FD) -0.50 1.1 2.00 -1.10
On 8 b/w L and M 1.00 1.495 4.63 6.91
On M b//w 8 and 12 1.00 6.15 4.63 28.44
Less Shaft doors FD2 -1.00 0.75 2.00 -1.50
Less Da" -0.50 0.9 2.00 -0.90
On 12 Lift Wall + Shear Wall 1.00 3.905 4.63 18.06
Less lift opening (-) -0.50 1.02 2.00 -1.02
On 13 b/w S and R 1.00 2.305 4.63 10.66
Front Entry 1.00 1.675 4.63 7.75
Less FD -0.50 1.1 0.50 -0.28
Elec Room 1.00 15.462 2.95 45.61
Less FD3 -1.00 1.8 2.00 -3.60
Add soffit and jambs 1.00 24.9 0.08 1.87
Total Qty. SQM 185.842 Not yet
decided which
Ceiling paint to be
Frony Entry near FD 1.00 1.675 2.31 done
In front of lift 1.00 0.58 2.20
1.00 3.05 2.50
Shaft long passage 1.00 9.2 1.63
Elec Room 1.00 3.58 4.15
Total Qty. SQM 0.000
Staircase
Long Walls 1.00 6.335 4.75 30.09
Long Walls 1.00 6.745 4.75 32.04
less flight -2.00 3.525 0.1 -0.71
-1.00 2.15 0.1 -0.22
-26.00 0.15 0.168 -0.66
Less FD -0.50 1.1 2.00 -1.10
Short Walls 1.00 3.13 4.6 14.40
1.00 3.725 4.6 17.14
Total Qty. SQM 90.988
Soffits of Staircase
Flight 1.00 3.225 1.55 5.00
1.00 3.525 1.55 5.46
1.00 2.15 1.55 3.33
Landing 2.00 3.2 1.50 9.60
1.00 1.5 0.53 0.79
Total Qty. SQM 24.183
1 Ground Floor Lobby
Soffits of Staircase
Flights 2.00 3.018 1.55 9.36
Midlanding 1.00 3.6 1.55 5.58
Total Qty. SQM 14.936
Soffits of Staircase
Flight 2.00 3.018 1.55 9.36
Landing 1.00 3.2 1.50 4.80
1.00 3.2 2.05 6.56
1.00 0.525 1.50 0.79
Total Qty. SQM 21.503
Soffits of Staircase
Flights 2.00 3.018 1.55 9.36
Midlanding 1.00 3.6 1.55 5.58
Total Qty. SQM 14.936
Soffits of Staircase
Flights 2.00 3.018 1.55 9.36
Midlanding 1.00 3.6 1.55 5.58
Total Qty. SQM 14.936
LMR Area at +44750 lvl
ceiling
Gr.8-21/L-M 1 11.080 1.625 18.01
Gr.12-17/P-M 1 2.200 3.050 6.71
Gr.12-17/P-R 1 2.500 0.850 2.13
Gr.13-16/R-S 1 1.125 1.675 1.88
over parapet area 1 2.700 0.200 0.54
stairacse Ceiling 1 6.250 3.200 20.00
1 0.525 1.500 0.79
less cutout -1 1.000 1.400 -1.40
Total Qty. SQM 48.652
Basement Floors
Ceiling
Front Entrance FD 1.00 2.67 1.83 Not Decided
1.00 0.55 2.40
Lift Lobby Area 1.00 4.781 2.15
1.00 2.57 1.04
Fire Staircase Lobby 1.00 6.08 2.60
-1.00 2.2 0.45
Elec Room 1.00 3.3 3.85
Main Staircase-ST2
Long Walls 2.00 4.250 2.800 23.80
Short Wall 1.00 3.600 2.800 10.08
Less Flights -2.00 3.018 0.100 -0.60
Less Mid landing -1.00 6.700 0.150 -1.01
less skirting -18.00 0.150 0.164 -0.44
Total Qty. SQM 31.829
Soffits of Staircase
Flights 2.00 3.018 1.55 9.36
Midlanding 1.00 3.6 1.55 5.58
Total Qty. SQM 14.936
Ceiling
Front Entrance ED2 1.00 2.60 1.50 3.90
MEASURMENT SHEET Page 663 of 832
MAIN MEASUREMENT SHEET
S. No. Description Location Unit No. Length Width Height Total Qty.
1.00 2.20 2.15 4.73
Lift Lobby Area 1.00 2.60 2.45 6.37
1.00 2.15 5.80 12.47
1.00 0.45 1.20 0.54
above parapet 1.00 1.50 0.20 0.30
1.00 1.48 1.25 1.85
ST-2 1.00 3.43 1.50 5.15
Total Qty. SQM 35.305
Walls
Foyer Wall 1.00 2.60 2.68 6.96
Less D -1.00 1.10 2.00 -2.20
Parapet wall 1.00 1.50 1.10 1.65
ST-1 Wall 1.00 9.41 2.68 25.17
Less D -0.50 1.10 2.00 -1.10
Less FD -0.50 1.10 2.00 -1.10
ST-2 Wall 1.00 18.85 2.68 50.42
Less D -1.50 1.10 2.00 -3.30
Less ED2 -0.50 1.10 2.28 -1.25
Less LIFT ENTRY -1.00 1.02 2.00 -2.04
Less FD1 -0.50 1.15 2.00 -1.15
ST-1 Wall 1.00 5.13 2.68 13.72
Less Da' -0.50 0.75 2.00 -0.75
Less FD2 -1.00 0.75 2.00 -1.50
Total Qty. SQM 83.532
Fire Staircase-ST1
Long Walls 1.00 6.250 2.80 17.50
1.00 6.250 2.80 17.50
2.00 3.200 2.80 17.92
Less FD -0.50 1.100 2.10 -1.16
less flight -2.00 2.817 0.10 -0.56
less skirting -16.00 0.150 0.16 -0.39
less landing skirting -1.00 7.300 0.15 -1.10
less landing skirting -1.00 6.200 0.15 -0.93
Total Qty. SQM 48.783
Soffits of Staircase
Flight 2.00 2.817 1.55 8.73
Landing 1.00 3.200 1.50 4.80
1.00 3.200 2.05 6.56
Total Qty. SQM 20.093
Main Staircase-ST2
Long Walls 2.00 4.250 2.80 23.80
Short Wall 1.00 3.600 2.80 10.08
Less Flights -2.00 3.018 0.10 -0.60
Less Mid landing -1.00 6.700 0.15 -1.01
less skirting -18.00 0.150 0.16 -0.44
Total Qty. SQM 31.829
Soffits of Staircase
Flights 2.00 3.018 1.55 9.36
Midlanding 1.00 3.600 1.55 5.58
Total Qty. SQM 14.936
Typical Floor 2nd to 13th
Ceiling
Front Entrance ED2 1.00 2.60 1.50 3.90
1.00 2.20 2.15 4.73
Lift Lobby Area 1.00 2.60 2.45 6.37
1.00 2.15 5.80 12.47
1.00 0.45 1.20 0.54
above parapet 1.00 1.50 0.20 0.30
1.00 1.48 1.25 1.85
MEASURMENT SHEET Page 664 of 832
MAIN MEASUREMENT SHEET
S. No. Description Location Unit No. Length Width Height Total Qty.
ST-2 1.00 3.43 1.50 5.15
Total Qty. SQM 35.305
Walls
Foyer Wall 1.00 2.60 2.68 6.96
Less D -1.00 1.10 2.00 -2.20
Parapet wall 1.00 1.50 1.10 1.65
ST-1 Wall 1.00 9.41 2.68 25.17
Less D -0.50 1.10 2.00 -1.10
Less FD -0.50 1.10 2.00 -1.10
ST-2 Wall 1.00 18.85 2.68 50.42
Less D -1.50 1.10 2.00 -3.30
Less ED2 -0.50 1.10 2.28 -1.25
Less LIFT ENTRY -1.00 1.02 2.00 -2.04
Less FD1 -0.50 1.15 2.00 -1.15
ST-1 Wall 1.00 5.13 2.68 13.72
Less Da' -0.50 0.75 2.00 -0.75
Less FD2 -1.00 0.75 2.00 -1.50
Total Qty. SQM 83.532
Typical Floor Staircase
Fire Staircase
Long Walls 1.00 6.250 2.80 17.50
1.00 6.250 2.80 17.50
2.00 3.200 2.80 17.92
Less FD -0.50 1.100 2.10 -1.16
less flight -2.00 2.817 0.10 -0.56
less skirting -16.00 0.150 0.16 -0.39
less landing skirting -1.00 7.300 0.15 -1.10
less landing skirting -1.00 6.200 0.15 -0.93
Total Qty. SQM 48.783
Soffits of Staircase
Flight 2.00 2.817 1.550 8.73
Landing 1.00 3.200 1.500 4.80
1.00 3.200 2.050 6.56
Total Qty. SQM 20.093
Main Staircase
Long Walls 2.00 4.25 2.80 23.80
Short Wall 1.00 3.60 2.80 10.08
Less Flights -2.00 3.02 0.10 -0.60
Less Mid landing -1.00 6.70 0.15 -1.01
less skirting -18.00 0.15 0.16 -0.44
Total Qty. SQM 31.829
Soffits of Staircase
Flights 2.00 3.018 1.55 9.36
Midlanding 1.00 3.600 1.55 5.58
Total Qty. SQM 14.936
LMR Area at +41850 lvl
ceiling
Lobby 1 8.850 2.150 19.03
1 0.450 2.450 1.10
1 3.430 1.250 4.29
stairacse Ceiling 1 6.250 3.200 20.00
less cutout -1 1.000 1.400 -1.40
Total Qty. SQM 43.018
SQM 88.275
Tower D,E & F- Toilet False Ceilings -R1 TOILET FALSE CEILING DETAIL
checked by Himanhu sir dtd. 6.08.2018
Type 2A T1 SQM 1 2.475 1.65 4.084
Type 2A T2 SQM 1 2.275 1.475 3.356
SUMMARY TOILET FALSE CEILING N/O FLAT QTY N/O TOWER TOTAL QTY.
TOWER - A, B, C
TYPE - 3A SQM 30 12.908 3 1161.675
TYPE - 3D SQM 28 14.516 3 1219.313
TOWER - D
TYPE - 2A SQM 56 7.439 1 416.605
Providing and fixing suspended false ceiling which
TYPE - 2Dproviding and fixing GI perimeter channels of
includes SQM 14 8.172 1 114.406
size
TYPE0.55
- 2Emm. Thk. having one flange of 20 mm and SQM 13 8.356 1 108.631
another flange of 30 mm and web of 27 mm along the
TYPE - 1 BHK
perimeter of the ceiling, screw fixed to brick wall/ SQM 1 4.523 1 4.523
TOWER - with
partition E, F help of nylon sleeves and screws, at 610
mm
TYPEcenters.
- 2A The suspended GI intermediate channels SQM 44 7.439 2 654.665
of size 45 mm,0.9mm thk with two flanges of 15 mm
TYPE - 2D the soffit at 1220 mm centers with ceiling
each from SQM 9 8.172 2 147.094
TYPE - 2E
angles with ceiling angle of width 25mm x 10mm x SQM 11 8.356 2 183.838
0.55mm
Total Qty.thk fixed to soffit with GI cleat and steel
expansion fasteners. Ceiling section of 0.55 mm thk SQM 4010.749
having web of 51.5 mm and two flanges of 26 mm
each with lips of 10.5mmare then fixed to the
intermediate channels with help of connecting clips
and in direction perpendicular to the intermediate
channel with centers. All GI members sall be of
Gypsteel or approved equivalent make. The 12.5 mm
tapered edge gypboard (Confirming to IS-2095-1982)
is then screw fixed to ceiling section with 25 mm dry
1.6.2 wall screws at 230mm centers.
Total 0.938
Total 1.484
TOWER - D, E, F
TYPE - 2A SQM 1 0.625 2.385 1.491
Total 1.491
Total 0.938
Total 0.938
SUMMARY KITCHEN GYPSUM FALSE CEILING N/O FLAT QTY N/O TOWER TOTAL QTY.
TOWER - A, B, C
TYPE - 3A SQM 28 0.938 3 78.750
TYPE - 3D SQM 26 1.484 3 115.781
TOWER - D
TYPE - 2A SQM 52 1.491 1 77.513
TYPE - 2D SQM 13 0.938 1 12.188
TYPE - 2E SQM 12 0.938 1 11.250
TYPE - 1 BHK SQM 1 0.000 1 0.000
TOWER - E, F
TYPE - 2A SQM 40 1.491 2 119.250
TYPE - 2D SQM 8 0.938 2 15.000
TYPE - 2E SQM 10 0.938 2 18.750
Total Qty. SQM 448.481
1.8 Mirror
SUMMARY OF MIRROR IN TOILETS N/O FLAT QTY N/O TOWER TOTAL QTY.
TOWER - A, B, C
TYPE - 3A SQM 28 1.620 3 136.080
TYPE - 3D SQM 26 1.620 3 126.360
TOWER - D
TYPE - 2A SQM 52 1.080 1 56.160
TYPE - 2D SQM 13 1.080 1 14.040
TYPE - 2E SQM 12 1.080 1 12.960
TYPE - 1 BHK SQM 1 1.080 1 1.080
TOWER - E, F
TYPE - 2A SQM 40 1.080 2 86.400
TYPE - 2D SQM 8 1.080 2 17.280
TYPE - 2E SQM 10 1.080 2 21.600
Total Qty. SQM 471.960
PART - A SUBSTRUCTURE
JOINERY WORKS
(Quoted Rates are for all heights, depths, levels, leads
and lifts)
1 FIRE DOOR
Providing and fixing in position Hollow metal fire rated
doors as per IS 3614 part-1 & part-2 for stability and
integrity. Pressed Galvanized steel confirming to IS
277 with the following specification.
1.1 Recommended fire door shall have doors tested at
CBRI or ARAI for maximum rating of 2hrs with vision
Door frame
panel. shall be double
Test certificates should rebate frame profile
be available of
for vision
size 143 x 57mm
lites /panels as part madeof the outfireof door
1.60mm (16gauge)
assembly.
minimum
Independent thick galvanized
glass steel sheet.
test certificates willFrames
not be shall be
Mitered
accepted.and field assembled
Manufacturer test with self tabs.
certificate shallAll
cover
provision
doors bothshould singlebe and mortised,
double leaf drilledandand tapped for
all doors
receiving
supplied appropriate hardware. Frames should be
Door
provided leafshould
with bebe46mm
shall back within
plate thick
the tested
bracket fully specimen,
flush
and double
anchor skin
fasteners
deviation
door with in
or specification
without vision and sheet
lite. Door thickness
leaf shall other
be
for installation
than what is mentioned on a finished plastered
in the test certificatesRCC surface/
are not
manufactured
masonry from 1.2mm
wall opening. Once(18guage)
frame minimum thick
allowed. Proper
galvanised steel label
sheet.& confirming
The internal theinstalled
type of should
construction doorofand be
grouted
the hourlywith cement
rating is sand
mandatory. slurry necessary
Approved for fire
the door
doors on should
the clear beopening.
rigid reinforcement pads for
manufacturer
receiving appropriate Shakti Hormann
hardware. orThe
approved
infill material
equivalent.
shall be resin bonded honeycomb core. All doors shall
All doors and frames shall be
be factory prepped for receiving appropriate finished with
polyurethane
hardware andaliphatic providedgrade paint of approved
with necessary reinforcement
colour.
for hinges, Thelocks,
door leaf
and and doorframeclosers. shall
Thehaveedgespassed
should
minimum 250 hours of salt sprey
be interlocked with lock seam. Vision lite wherever test.
TYPE
applicable - FDshould
- : Metal Fire Doors
be provided as ofperapproved size
manufacturer's
1100 x 2100mm including
recommendation with a beeding metal frameand screwsfinishedfrom with
inside.
fire Thepaint
rated glassonshould be 6mm
both sides, clear borosilicate
of approved colour and fire
rated
shade glass
as perofthe relavant
Designrating of the door.
Consultants approval (2 Hours
1.1.1 Fire rated) of double leaf. The door to have 250mm x
750mm
TYPE - size FD22: Hour Metalfire Firerated
Doors vision panel as size
of approved per the
750
xdetailed
2000mm drawing.
including Themetalrate isframeinclusive of supplying
finished with fire
and fixing
rated paint all
on brush finished
both sides, 2 Hour fire
of approved ratedand shade
colour
1.1.2 ironmongery
as per the Design like locks,
Consultantshandles, tower bolts,
approval (2 HoursdoorFire
TYPE
closer- of
rated) FD3
etc. - :approved
of Metal Fire
single/double makeDoors
leaf. as of
The approved
indicated
door size
in the
to have 1800
detail
250mm
xdrawing.
x 2100mm including
size 2 Hourmetal
750mmLocation-Staircase frame
fire rated (Basic finished
visionprice
panel with
of fire fire
as per door
the
rated
@ Rs paint
detailed7405/Sqm on both
drawing. sides,
including
The rate of approved
isdoor shutter,
inclusive colour
of frame,and
supplying
1.1.3 shade as
hardwares per the
and Design
vision Consultants
panel2etc. approval
supply & (2 Hours
and
Fire fixing
rated) all brush
of double finished
leaf. The Hour
door firehave
to rated250mm x
installation,
ironmongery inclusive
like locks, ofhandles,
duties excluding
tower taxes
bolts, doorpanel
750mm size 2 Hour fire rated vision panel vision
F.O.R.
Total
closer Site)
as percarried
etc.
the of over
approved
detailed todrawing.
summary
make The as indicated in the detail
rate is inclusive of
drawing.
supplyingLocation-
and fixingElectrical shaft, Meter
all brush finished 2 Hourroom fire(Basic
rated
price of fire door @ Rshandles,7405/Sqm including door
PART - B ironmongery
SUPERSTRUCTURE like locks, tower bolts, door
closer
shutter,etc. of approved
frame, hardwares makeand as indicated
vision panel in theetc.detail
supply &Location-
drawing. installation, DGinclusive
room, Pump of dutiesroom, excluding
Electrical
JOINERY
taxes room.
WORKS
F.O.R. Site) (Basic price of fire door @ Rs
7405/Sqm including door shutter, frame,
(Quoted Rates are for all heights, depths, levels, leads
hardwares
and lifts) and vision panel etc. supply &
Door leaf shallinclusive
installation, be 46mmofthick fullyexcluding
duties flush double skin
taxes
door
1 FIRE with
Site) without vision lite. Door leaf shall be
DOOR
F.O.R. or
manufactured
Providing and fixing from 1.2mm
in position (18guage)
Hollow minimum
metal firethick rated
galvanised
doors as persteel sheet.
IS 3614 The internal
part-1 & part-2construction
for stability and of
the door should
integrity. PressedbeGalvanized
rigid reinforcement
steel confirming pads for to IS
1.1 receiving
277 with the appropriate
followinghardware.specification. The infill material
shall be resin bonded
Recommended honeycomb havecore. Alltested
doorsat shall
Door
be factory shallfire
frameprepped bedoor
double
for
shallrebate
receiving
doors
frame
appropriate profile of
CBRI
size or ARAI
143 x 57mm for maximum
made out rating
of of 2hrs(16gauge)
1.60mm with vision
hardware
panel. and
Testthick providedshould
certificates with necessary
be availablereinforcement
for shall
visionbe
minimum
for hinges, locks, galvanized
andofdoor steel
closers.sheet.
The Frames
edges should
lites
Mitered /panels
and as
fieldpartassembledthe fire door
with assembly.
self tabs. All
be interlockedglass
Independent withtest
lockcertificates
seam. Vision willlite
notwherever
be for
provision
applicable should
shouldbe bemortised,
provided drilled
as per and tapped
manufacturer's
accepted.appropriate
receiving Manufacturer test certificate
hardware. Frames shall
should cover
be
recommendation
doors both single withdouble
and a beeding leafandandscrews
all doors from
provided
inside. The with
glass back platebebracket
should 6mm and
clear anchor
borosilicatefasteners
fire
supplied
for shouldon
installation beawithin
finished theplastered
tested specimen,
RCC surface/
All
rated doors
deviation and
glassin frames
ofspecification
relavant shall
ratingbe of
and finished
the door.
sheet with
thickness other
masonry
polyurethane wall opening.
aliphatic grade Once framepaint installed should be
than
grouted what is mentioned
with cement & sand test of
in theslurry approved
certificates
necessary arefire
for not
colour.
allowed. The door
Proper leaf and
label frame shall
confirming the haveof
type passed
door and
doors
minimum on the clear opening.
the hourly250 rating hours of salt sprey test.
is mandatory.
TYPE - FD - : Metal Fire Doors of approved size
1100 x 2100mm including metal frame finished with
1.1.1
fire rated paint on both sides, of approved colour and
TYPE
shade as - FD2
per the: Metal
Design Fire Doors of approved
Consultants approval size 750
(2 Hours
xFire
2000mm
rated) including
of double metalThe
leaf. framedoor finished
to have with
250mm fire x
1.1.2
rated
750mm paint
sizeon2 both
Hoursides,fire ratedof approved
vision panel colour as and shade
per the
as per thedrawing.
detailed Design Consultants
The rate is inclusiveapprovalof(2supplying
Hours Fire
1.2 rated)
DOOR
and SHUTTER
of
fixing single/double
all brush finished leaf. The 2 Hourdoorfire to have
rated 250mm
xironmongery
750mm size
Providing andlike 2fixing
Hour
locks, fire
phenol rated
handles, vision
bondedtower panel
flush asdoor
door
bolts, per the
detailed
shutters
closer etc.drawing.
of approved
of approvedThequality
rate
make isand
inclusive
make of
as indicated nonsupplying
indecorative
the detail
and
type fixing ofallblock
brushboard
core Location-Staircase
drawing. finished 2 Hour price
construction
(Basic fire
withrated
ofinternal
fire door
1.2.1 38 mmofthick
ironmongery with 32mm
like including
locks, flushand
handles, door & 3matched
tower mm thick
bolts, door
frame
@ Rs 1st class
7405/Sqm hard wood door well
shutter, frame, 3mm
decorative
closer
commercial veneer
etc. ofand
plyapproved with
veneering grooves
make with as on outside
indicated
vertical and plain
in theordetail
grains cross
hardwares
veneer on inside vision
surface panel etc.
including supply
melamine & polishing
drawing.
bands
installationLocation-
including 6
inclusive mmElectrical
thick
of duties redshaft, Meter
merandi room
taxes (Basic
wooden
as per drawing and design (D of excluding
size 1100x2100mm).
a price
F.O.R.ofall
lipping
Location- fire
Site)
Unit door
around, Main @ Rs 7405/Sqm
providing
Entrance and
Door including
fixing 4 nos. 125mmdoor
shutter,
long and frame,
3.5mm hardwares
thick SS hinges and and vision panel etc.
providing &
MEASURMENT supply
fixing & installation,
50mmx20mm
SHEET inclusivematt
melamine of duties excluding
finish teakwood Page 670 of 832
taxes F.O.R.
architrave on bothSite) side of doors as per drawing and
specification complete and approved sample. (Basic
MAIN MEASUREMENT SHEET
S. No. Description Location Unit No. Length Width Height Total Qty.
Tower-A
CEILING sqm 1 689.91 689.91
Less staircase and lift lobby sqm -1 92.161 -92.161
less column heads sqm -56 0.75 0.4 -16.8
less column heads sqm -1 0.6 0.23 -0.138
less cutout
sqm -2 0.93 0.25 -0.465
sqm -2 0.45 0.25 -0.225
sqm -2 0.925 0.3 -0.555
sqm -2 0.3 0.3 -0.18
sqm -2 0.55 0.575 -0.6325
sqm -10 0.6 0.3 -1.8
sqm -2 0.95 0.3 -0.57
sqm -2 0.99 0.3 -0.594
576
External walls of staircase and lift lobby sqm 1 68.63 4.95 339.7185
Less (-FD) sqm -0.50 1.1 2.10 -1.155
Less (-FD3) sqm -1.00 1.8 2.10 -3.78
Less (-FD1) sqm -1.00 1.15 2.00 -2.3
332
Total Qty. Tower Area Basement 908.27
Hold Qty. Deu to Measurement Checking 200.00
Total Qty. Tower Area Basement 708.27
External walls of staircase and lift lobby sqm 1 68.63 4.95 339.7185
Less (-FD) sqm -0.50 1.1 2.10 -1.155
Less (-FD3) sqm -1.00 1.8 2.10 -3.78
Less (-FD1) sqm -1.00 1.15 2.00 -2.3
332
Total Qty. Tower Area Basement 908.27
Hold Qty. Deu to Measurement Checking 200.00
Total Qty. Tower Area Basement 708.27
External walls of staircase and lift lobby sqm 1 63.3 4.95 313.335
Less (-FD) sqm -0.50 1.1 2.10 -1.155
Less (-FD3) sqm -1.00 1.8 2.10 -3.78
Less (-FD2) sqm -2.00 0.75 2.00 -3
Less (-Da') sqm -1.00 0.9 2.00 -1.8
304
Total Qty. Tower Area Basement 902.99
Hold Qty. Deu to Measurement Checking 150.00
Total Qty. Tower Area Basement 752.99
External walls of staircase and lift lobby sqm 1 52.515 4.95 259.95
Less (-FD2) sqm -2.00 0.75 2.00 -3
257
Total Qty. Tower Area Basement 2268.25
Tower D SQM
3 2 A TYPE 1.0800 56.00 1.0000 60.48
Tower E, F SQM
3 2 A TYPE 1.0800 44.00 2.0000 95.04
Elevation 1
Ground Floor 69.93 136.44 69.93 136.44 69.93
First Floor 81.42 139.05 47.16 81.42 139.05 47.16 81.42
Second Floor 85.42 138.41 60.75 85.42 138.41 60.75 85.42
Typical Floor 1954.14 731.40 729.00 1954.14 731.40 729.00 1954.14
Terrace Floor 252.67 34.83 252.67 34.83 252.67
LMR Floor 268.73 268.73 268.73
Pergola 98.98 98.98 98.98
Water Tank 40.55 40.55 40.55
Elevation 2
Ground Floor 39.67 56.61 39.67 56.61 39.67
First Floor 38.76 55.67 38.76 55.67 38.76
Second Floor
Typical Floor
Terrace Floor
Elevation 3
Ground Floor 82.68 165.79 82.68 165.79 82.68
First Floor 82.68 165.79 52.38 82.68 165.79 52.38 82.68
Second Floor 68.99 224.66 71.19 68.99 224.66 71.19 68.99
Typical Floor 2553.14 500.91 854.28 2553.14 500.91 854.28 2553.14
Terrace Floor 239.85 123.62 239.85 123.62 239.85
Pergola 98.98 98.98 98.98
Elevation 4
Ground Floor 49.79 49.79
First Floor 49.79 49.79
Second Floor 49.79 49.79
Typical Floor 597.53 597.53
Terrace Floor 107.10 107.10
Balcony Ceilings
Elv -75 BR 2 Balcony Ceiling OBD 1 1.8 2.6 4.68
Elv -75 MBR balcony Ceiling OBD 1 4.75 1.8 8.55
Elv -3850 BR3 Balcony OBD 1 3.3 1.8 5.94
1 1.8 0.75 1.35
Elv -6125 Liv/Din Balcony OBD 1 3.925 1.8 7.07
1 1.5 1.8 2.70
Utility Balcony OBD 1 1.8 1.825 3.29
Elv -12975 Liv/Din Balcony OBD 1 5 1.8 9.00
Elv -12975 BR2 Balcony OBD 1 2.55 1.8 4.59
47.16
For Second Floor
Elevation+0- Toilet Front Wall Texture F2 1 2.75 2.95 8.11
Less (-) V -0.5 0.6 1.175 -0.35
Elevation +600 Toilet Side walls Paint F1 2 2.575 2.95 15.19
Elevation -75 to -1875 Balcony Upstand BR2 Paint F1 1 6.296 0.325 2.05
Elevation -75 to -1875 Balcony Upstand MBR Paint F1 1 6.45 0.325 2.10
Elevation -1875 Balcony wall BR2 Texture F2 1 2.794 2.83 7.91
Less (-) SD8 -1 1.5 2.375 -3.56
add soffit and jambs 1 6.25 0.075 0.47
Less(-) Trap Door -0.5 0.6 1.73 -0.52
Elevation -1875 Balcony wall MBR Texture F2 1 2.94 2.83 8.32
Less (-) SD6 -1 1.7 2.375 -4.04
add soffit and jambs 1 6.45 0.075 0.48
Less(-) Trap Door -0.5 0.6 1.275 -0.38
Elevation -1875 to -5650 BR2 Side Wall Paint F1 1 4.575 2.95 13.50
Less (-) W14' -0.5 0.6 1.175 -0.35
Elevation -1875 to -6125 MBR Side Wall Paint F1 1 5.796 2.95 17.10
Less (-) W9 -0.5 0.9 1.475 -0.66
Less (-) V1 -0.5 0.5 1.175 -0.29
Elevation -5650 BR3 Balcony Wall Texture F2 1 3.2 2.83 9.06
Less (-) DW -1 1.85 2.375 -4.39
-1 0.4 1.63 -0.65
add soffit and jambs 1 7.4 0.075 0.56
Less (-) trap Door -0.5 0.6 1.275 -0.38
Elevation -3850 to -5650 Balcony upstand Paint F1 1 8.73 0.325 2.84
Elv -6300 to Utility Balcony- BR3 Toilet Wall Texture F2 1 5.65 2.95 16.67
Less (-) V -0.5 0.6 1.175 -0.35
Elevation -6125 to -7925 Liv/Din Bal Wall Texture F2 1 3.275 2.95 9.66
Less (-) trap Door -0.5 0.6 1.275 -0.38
Less SD 7 -1 1.65 2.375 -3.92
add soffit and jambs 1 6.4 0.075 0.48
Elevation -6125 to -7925 Liv/Din Bal Upstand Paint F1 1 9.785 0.325 3.18
Elv -7625 to -12975 Liv/Din Side Wall Paint F1 1 5.85 2.95 17.26
Less(-) W7 -0.5 1 1.475 -0.74
Utility Balcony Elevation Wall Texture F2 1 2.518 2.83 7.13
Less (-) DW3 -1 0.9 2.375 -2.14
-1 0.6 1.175 -0.71
add soffit and jambs 1 6.85 0.075 0.51
Utility Balcony Upstand Paint F1 1 4.722 0.325 1.53
Staircase wall to Elv -12675 Texture F2 1 4.04 2.95 11.92
Less W3 -0.5 1.4 1.475 -1.03
Elv -12975 Liv/Din Wall upto Bal Texture F2 2 2.035 2.95 12.01
Elv -12675 Liv/Din Wall upto Bal Paint F1 2 2.005 0.4 1.60
4 2.005 0.3 2.41
Elv -12975 Liv/Din Balcony Wall Texture F2 2 5.4 2.83 30.56
Less (-) Shaft -1 0.3 2.83 -0.85
Less (-) SD' -2 3.6 2.375 -17.10
add soffit and jambs 2 8.35 0.075 1.25
Elv -12975 Common Toilet Wall Texture F2 2 1.95 2.95 11.51
Less (-) V -1 0.6 1.175 -0.71
Bedroom 2 Balcony Wall Texture F2 2 3.05 2.83 17.26
Less (-) DW2' -2 0.9 2.375 -4.28
-2 0.75 1.45 -2.18
add soffit and jambs 2 7.15 0.075 1.07
Less Shaft Door -1 0.6 1.275 -0.77
Bedroom 2 Balcony Upstand lvl -11175 Paint F1 2 6.152 0.325 4.00
Lvl -12695 BR2 wall and Toilet side wall Texture F2 2 5.45 2.95 32.16
Elv Lvl -8950 Extended Shaft Wall Paint F1 2 0.8 2.95 4.72
138.41
85.42
Balcony Ceilings
Elv -75 BR 2 Balcony Ceiling OBD 1 1.8 2.6 4.68
Elv -75 MBR balcony Ceiling OBD 1 4.75 1.8 8.55
Elv -3850 BR3 Balcony OBD 1 3.3 1.8 5.94
1 1.8 0.75 1.35
Elv -6125 Liv/Din Balcony OBD 1 3.925 1.8 7.07
1 1.5 1.8 2.70
Utility Balcony OBD 1 1.8 1.825 3.29
Elv -12975 Liv/Din Balcony OBD 2 5 1.8 18.00
Elv -12975 BR2 Balcony OBD 2 2.55 1.8 9.18
60.75
For Typical Floor- 3rd to 14
Elevation+0- Toilet Front Wall Texture F2 1 2.75 2.95 8.11
Less (-) V -0.5 0.6 1.175 -0.35
Elevation +600 Toilet Side walls Paint F1 2 2.575 2.95 15.19
Elevation -75 to -1875 Balcony Upstand BR2 Paint F1 1 6.296 0.325 2.05
Elevation -75 to -1875 Balcony Upstand MBR Paint F1 1 6.45 0.325 2.10
Elevation -1875 Balcony wall BR2 Paint F1 1 2.794 2.83 7.91
Less (-) SD8 -1 1.5 2.375 -3.56
add soffit and jambs 1 6.25 0.075 0.47
Less(-) Trap Door -0.5 0.6 1.73 -0.52
Elevation -1875 Balcony wall MBR Paint F1 1 2.94 2.83 8.32
Less (-) SD6 -1 1.7 2.375 -4.04
add soffit and jambs 1 6.45 0.075 0.48
Less(-) Trap Door -0.5 0.6 1.275 -0.38
Elevation -1875 to -5650 BR2 Side Wall Paint F1 1 4.575 2.95 13.50
Less (-) W14' -0.5 0.6 1.175 -0.35
Elevation -1875 to -6125 MBR Side Wall Paint F1 1 5.796 2.95 17.10
Less (-) W9 -0.5 0.9 1.475 -0.66
Less (-) V1 -0.5 0.5 1.175 -0.29
Elevation -5650 BR3 Balcony Wall Paint F1 1 3.2 2.83 9.06
Less (-) DW -1 1.85 2.375 -4.39
-1 0.4 1.63 -0.65
add soffit and jambs 1 7.4 0.075 0.56
Less (-) trap Door -0.5 0.6 1.275 -0.38
Elevation -3850 to -5650 Balcony upstand Paint F1 1 8.73 0.325 2.84
Elv -6300 to Utility Balcony- BR3 Toilet Wall Texture F2 1 5.65 2.95 16.67
Less (-) V -0.5 0.6 1.175 -0.35
Elevation -6125 to -7925 Liv/Din Bal Wall Paint F1 1 3.275 2.95 9.66
Less (-) trap Door -0.5 0.6 1.275 -0.38
Less SD 7 -1 1.65 2.375 -3.92
add soffit and jambs 1 6.4 0.075 0.48
Elevation -6125 to -7925 Liv/Din Bal Upstand Paint F1 1 9.785 0.325 3.18
Elv -7625 to -12975 Liv/Din Side Wall Paint F1 1 5.85 2.95 17.26
Less(-) W7 -0.5 1 1.475 -0.74
Utility Balcony Elevation Wall Paint F1 1 2.518 2.83 7.13
Less (-) DW3 -1 0.9 2.375 -2.14
-1 0.6 1.175 -0.71
Add soffit and jambs 1 6.4 0.075 0.48
Utility Balcony Upstand Paint F1 1 4.72 0.325 1.53
Staircase wall to Elv -12675 Paint F1 1 4.04 2.95 11.92
Less W3 -0.5 1.4 1.475 -1.03
Elv -12975 Liv/Din Wall upto Bal Paint F1 2 2.035 2.95 12.01
Elv -12675 Liv/Din Wall upto Bal Paint F1 2 2.005 0.4 1.60
Paint F1 4 2.005 0.3 2.41
Elv -12975 Liv/Din Balcony Wall Paint F1 2 5.4 2.83 30.56
Less (-) Shaft -1 0.3 2.83 -0.85
Less (-) SD' -2 3.6 2.375 -17.10
Add soffit and jambs 2 8.35 0.075 1.25
Elv -12975 Common Toilet Wall Paint F1 2 1.95 2.95 11.51
Less (-) V -1 0.6 1.175 -0.71
Bedroom 2 Balcony Wall Paint F1 2 3.05 2.83 17.26
Less (-) DW2' -2 0.9 2.375 -4.28
-2 0.75 1.45 -2.18
Add soffit and jambs 2 7.15 0.075 1.07
Less Shaft Door -1 0.6 1.275 -0.77
Bedroom 2 Balcony Upstand lvl -11175 Paint F1 2 6.152 0.325 4.00
Lvl -12695 BR2 wall and Toilet side wall Texture F2 2 5.45 2.95 32.16
Elv Lvl -8950 Extended Shaft Wall Texture F2 2 0.8 2.95 4.72
Total Texture 60.95
Total paint 162.84
Balcony Ceilings
Elv -75 BR 2 Balcony Ceiling OBD 1 1.8 2.6 4.68
Elv -75 MBR balcony Ceiling OBD 1 4.75 1.8 8.55
Elv -3850 BR3 Balcony OBD 1 3.3 1.8 5.94
1 1.8 0.75 1.35
Elv -6125 Liv/Din Balcony OBD 1 3.925 1.8 7.07
1 1.5 1.8 2.70
Utility Balcony OBD 1 1.8 1.825 3.29
Elv -12975 Liv/Din Balcony OBD 2 5 1.8 18.00
Elv -12975 BR2 Balcony OBD 2 2.55 1.8 9.18
60.75
Terrace Floor
Front elevation LMR room
Parapet above 3A Toilet Texture F2 2 2.745 1.4 7.69
Side wall Paint F1 2 3.67 1.4 10.28
Parapet Wall on Grid A LHS Paint F1 2 2.1 1.4 5.88
Parapet Wall on Grid A RHS Paint F1 2 2.25 1.4 6.30
wall on 11 b/w A & B Paint F1 1 4.57 3.75 17.14
wall on 17 b/w A & B Paint F1 1 4.5 3.75 16.88
wall on 19 b/w A & E Paint F1 1 6.88 3.3 22.70
wall on 21 b/w A & G Paint F1 1 4.65 3.75 17.44
Parapet from grid B to J Paint F1 2 11.626 1.4 32.55
Parapet from grid E to F Texture F2 2 2.85 1.4 7.98
Staircase on K Paint F1 1 8.605 3.75 32.27
Parapet wall on K b/w 1 & 2 Texture F2 2 5.169 1.4 14.47
Parapet wall on K b/w 2 & 6 Paint F1 2 11.075 1.4 31.01
Parapet wall b/w 21 and 26 on K Paint F1 2 11.075 1.4 31.01
wall on 26 b/w G & K Paint F1 2 10.675 3 64.05
Parapet Wall b/w 26 & 27 on G Texture F2 2 1.675 1.4 4.69
Total for Texture 34.83
Total for Paint 252.67
Elevation 2
Elevation 3
PAINT F1 TEXTURE-F2
For GF and First
Elevation+0- Toilet Front Wall Texture F2 1 2.75 2.95 8.1125
Less (-) V -0.5 0.6 1.18 -0.3525
Elevation +600 Toilet Side walls Paint F1 2 2.575 2.95 15.1925
Elevation -75 to -1875 Balcony Upstand BR2 Paint F1 1 6.296 0.10 0.6296
Elevation -75 to -1875 Balcony Upstand MBR Paint F1 1 6.45 0.10 0.645
Elevation -1875 Balcony wall BR2 Texture F2 1 2.794 2.83 7.90702
Less (-) SD8 -1 1.5 2.38 -3.5625
Add soffit and Jambs 1 6.25 0.08 0.46875
Less(-) Trap Door -0.5 0.6 1.73 -0.519
Elevation -1875 Balcony wall MBR Texture F2 1 2.94 2.83 8.3202
Less (-) SD6 -1 1.7 2.38 -4.0375
Add soffit and Jambs 1 6.45 0.08 0.48375
Less(-) Trap Door -0.5 0.6 1.28 -0.3825
Elevation -1875 to -5650 BR2 Side Wall Paint F1 1 4.575 2.95 13.49625
Less (-) W14' -0.5 0.6 1.18 -0.3525
Elevation -1875 to -6125 MBR Side Wall Paint F1 1 5.796 2.95 17.0982
Less (-) W9 -0.5 0.9 1.48 -0.66375
Less (-) V1 -0.5 0.5 1.18 -0.29375
Elevation -5650 BR3 Balcony Wall Texture F2 1 3.2 2.83 9.056
Less (-) DW -1 1.85 2.38 -4.39375
-1 0.4 1.63 -0.652
Add soffit and Jambs 1 7.4 0.08 0.555
Less (-) trap Door -0.5 0.6 1.28 -0.3825
Elevation -3850 to -5650 Balcony upstand Paint F1 1 8.73 0.10 0.873
Elv -6300 to Utility Balcony- BR3 Toilet Wall Texture F2 1 5.65 2.95 16.6675
Less (-) V -0.5 0.6 1.18 -0.3525
Elevation -6125 to -7925 Liv/Din Bal Wall Texture F2 1 3.275 2.95 9.66125
Less (-) trap Door -0.5 0.6 1.28 -0.3825
Less SD 7 -1 1.65 2.38 -3.91875
Add soffit and Jambs 1 7.4 0.08 0.555
Elevation -6125 to -7925 Liv/Din Bal Upstand Paint F1 1 9.785 0.10 0.9785
Elv Liv/Din Side Wall Paint F1 1 4.65 2.95 13.7175
Less(-) W7 -0.5 1 1.48 -0.7375
Utility Balcony Elevation Wall Texture F2 1 2.518 2.83 7.12594
Less (-) DW3 -1 0.9 2.38 -2.1375
-1 0.6 1.18 -0.705
Add soffit and Jambs 1 7.15 0.08 0.53625
Utility Balcony Upstand Paint F1 1 4.722 0.10 0.4722
Liv Din Wall on T bw 14 and 21 Texture F2 1 5.7 2.95 16.815
Wall on 16 b/w T and P Texture F2 1 2.925 2.95 8.62875
Less parapet opening -1 1.775 1.73 -3.07075
Add soffit and Jambs 1 7.01 0.10 0.701
Lift Shear Wall Texture F2 1 6.075 2.95 17.92125
Lift Back side wall and Entrance wall Paint F1 1 7.177 2.95 21.17215
Less parapet opening -1 2.525 1.73 -4.36825
Add soffit and Jambs 1 8.51 0.10 0.851
001 Kitchen Wall on LHS and Entrance Wall Texture F2 1 6.525 2.95 19.24875
Less parapet opening -0.5 0.925 1.73 -0.80013
Lift Shear Wall + Serv. Toilet Wall Texture F2 1 6.35 2.95 18.7325
Less V -0.5 0.6 1.18 -0.3525
Servant Room Wall and Utility Balcony Wall Texture F2 1 6.62 2.95 19.529
Less Door D2' -0.5 0.75 2.38 -0.89063
Less Dw1 -1 0.9 2.38 -2.1375
-1 1.1 1.18 -1.2925
Add soffit and Jambs 1 7.85 0.08 0.58875
Utility Balcony Upstand Paint F1 1 5.25 0.33 1.70625
BR3 Wall Texture F2 1 1.936 2.95 5.7112
BR3 Balcony Wall Elv 11900 Texture F2 1 4.85 2.83 13.7255
Less SD -1 2.4 2.38 -5.7
Add soffit and Jambs 1 7.15 0.08 0.53625
BR3 Bal Upstand Paint F1 1 6.95 0.33 2.25875
Shaft Wall Texture F2 1 1.175 2.95 3.46625
MBR Balcony Wall Texture F2 1 4.2 2.95 12.39
Less SD -1 2.4 2.38 -5.7
Add soffit and Jambs 1 7.15 0.08 0.53625
Total For Texture 165.7884
Total For Paint 82.68
Balcony Ceilings
Elv -75 BR 2 Balcony Ceiling OBD 1 1.8 2.60 4.68
Elv -75 MBR balcony Ceiling OBD 1 4.75 1.80 8.55
Elv -3850 BR3 Balcony OBD 1 3.3 1.80 5.94
1 1.8 0.75 1.35
Elv -6125 Liv/Din Balcony OBD 1 3.925 1.80 7.065
1 1.5 1.80 2.7
Utility Balcony- 3A OBD 1 1.8 1.83 3.285
Elv -12475 Utility Balcony Ceiling OBD 1 2.75 1.80 4.95
1 0.7 0.90 0.63
Elv -10100 BR3 Balcony OBD 1 4.1 1.80 7.38
Elv 10100 MBR Balcony OBD 1 3.25 1.80 5.85
52.38
For Second Floor
Elevation+0- Toilet Front Wall Texture F2 1 2.75 2.95 8.1125
Less (-) V -0.5 0.6 1.18 -0.3525
Elevation +600 Toilet Side walls Paint F1 2 2.575 2.95 15.1925
Elevation -75 to -1875 Balcony Upstand BR2 Paint F1 1 6.296 0.10 0.6296
Elevation -75 to -1875 Balcony Upstand MBR Paint F1 1 6.45 0.10 0.645
Elevation -1875 Balcony wall BR2 Texture F2 1 2.794 2.83 7.90702
Less (-) SD8 -1 1.5 2.38 -3.5625
Add soffit and Jambs 1 6.25 0.08 0.46875
Less(-) Trap Door -0.5 0.6 1.73 -0.519
Elevation -1875 Balcony wall MBR Texture F2 1 2.94 2.83 8.3202
Less (-) SD6 -1 1.7 2.38 -4.0375
Add soffit and Jambs 1 6.45 0.08 0.48375
Less(-) Trap Door -0.5 0.6 1.28 -0.3825
Elevation -1875 to -5650 BR2 Side Wall Paint F1 1 4.575 2.95 13.49625
Less (-) W14' -0.5 0.6 1.18 -0.3525
Elevation -1875 to -6125 MBR Side Wall Paint F1 1 5.796 2.95 17.0982
Less (-) W9 -0.5 0.9 1.48 -0.66375
Less (-) V1 -0.5 0.5 1.18 -0.29375
Elevation -5650 BR3 Balcony Wall Texture F2 1 3.2 2.83 9.056
Less (-) DW -1 1.85 2.38 -4.39375
-1 0.4 1.63 -0.652
Add soffit and Jambs 1 7.4 0.08 0.555
Less (-) trap Door -0.5 0.6 1.28 -0.3825
Elevation -3850 to -5650 Balcony upstand Paint F1 1 8.73 0.10 0.873
Elv -6300 to Utility Balcony- BR3 Toilet Wall Texture F2 1 5.65 2.95 16.6675
Less (-) V -0.5 0.6 1.18 -0.3525
Elevation -6125 to -7925 Liv/Din Bal Wall Texture F2 1 3.275 2.95 9.66125
Less (-) trap Door -0.5 0.6 1.28 -0.3825
Less SD 7 -1 1.65 2.38 -3.91875
Add soffit and Jambs 1 6.4 0.08 0.48
Elevation -6125 to -7925 Liv/Din Bal Upstand Paint F1 1 9.785 0.10 0.9785
Elv Liv/Din Side Wall Paint F1 1 4.65 2.95 13.7175
Less(-) W7 -0.5 1 1.48 -0.7375
Utility Balcony Elevation Wall Texture F2 1 2.518 2.83 7.12594
Less (-) DW3 -1 0.9 2.38 -2.1375
-1 0.6 1.18 -0.705
Add soffit and Jambs 1 6.85 0.08 0.51375
Utility Balcony Upstand Paint F1 1 4.722 0.10 0.4722
Liv Din Wall on T bw 14 and 21 Texture F2 1 5.7 2.95 16.815
Wall on 16 b/w T and P Texture F2 1 2.925 2.95 8.62875
Less parapet opening -1 1.775 1.73 -3.07075
Add soffit and Jambs 1 7.01 0.10 0.701
Lift Shear Wall Texture F2 1 2.55 2.95 7.5225
001 Kitchen Wall on LHS and Entrance Wall Texture F2 1 6.525 2.95 19.24875
Less parapet opening -1 0.925 1.73 -1.60025
Add soffit and Jambs 1 5.31 0.10 0.531
Lift Shear Wall + Serv. Toilet Wall Texture F2 2 6.35 2.95 37.465
Less V -1 0.6 1.18 -0.705
Servant Room Wall and Utility Balcony Wall Texture F2 2 6.62 2.95 39.058
Less Door D2' -1 0.75 2.38 -1.78125
Less Dw1 -2 0.9 2.38 -4.275
-2 1.1 1.18 -2.585
Add soffit and Jambs 2 7.85 0.08 1.1775
Utility Balcony Upstand Paint F1 2 5.25 0.33 3.4125
BR3 Wall Texture F2 2 1.936 2.95 11.4224
BR3 Balcony Wall Elv 11900 Texture F2 2 4.85 2.83 27.451
Less SD -2 2.4 2.38 -11.4
Add soffit and Jambs 2 7.15 0.08 1.0725
BR3 Bal Upstand Paint F1 2 6.95 0.33 4.5175
Shaft Wall Texture F2 2 2.875 2.95 16.9625
MBR Balcony Wall Texture F2 2 4.2 2.95 24.78
Less SD -2 2.4 2.38 -11.4
Add soffit and Jambs 2 7.15 0.08 1.0725
Total for texture 224.6643
Total for Paint 68.99
Balcony Ceilings
Elv -75 BR 2 Balcony Ceiling OBD 1 1.8 2.60 4.68
Elv -75 MBR balcony Ceiling OBD 1 4.75 1.80 8.55
Elv -3850 BR3 Balcony OBD 1 3.3 1.80 5.94
1 1.8 0.75 1.35
Elv -6125 Liv/Din Balcony OBD 1 3.925 1.80 7.065
1 1.5 1.80 2.7
Utility Balcony- 3A OBD 1 1.8 1.83 3.285
Elv -12475 Utility Balcony Ceiling OBD 2 2.75 1.80 9.9
2 0.7 0.90 1.26
Elv -10100 BR3 Balcony OBD 2 4.1 1.80 14.76
Elv 10100 MBR Balcony OBD 2 3.25 1.80 11.7
71.19
For Typical Floor 3rd to 14th
Elevation+0- Toilet Front Wall Texture F2 1 2.75 2.95 8.1125
Less (-) V 0.5 0.6 1.18 0.3525
Elevation +600 Toilet Side walls Paint F1 2 2.575 2.95 15.1925
Elevation -75 to -1875 Balcony Upstand BR2 Paint F1 1 6.296 0.10 0.6296
Elevation -75 to -1875 Balcony Upstand MBR Paint F1 1 6.45 0.10 0.645
Elevation -1875 Balcony wall BR2 Paint F1 1 2.794 2.83 7.90702
Less (-) SD8 -1 1.5 2.38 -3.5625
Add soffits and Jambs 1 6.25 0.08 0.46875
Less(-) Trap Door 0.5 0.6 1.73 0.519
Elevation -1875 Balcony wall MBR Paint F1 1 2.94 2.83 8.3202
Less (-) SD6 -1 1.7 2.38 -4.0375
Add soffits and Jambs 1 6.45 0.08 0.48375
Less(-) Trap Door -0.5 0.6 1.28 -0.3825
Elevation -1875 to -5650 BR2 Side Wall Paint F1 1 4.575 2.95 13.49625
Less (-) W14' -0.5 0.6 1.18 -0.3525
Elevation -1875 to -6125 MBR Side Wall Paint F1 1 5.796 2.95 17.0982
Less (-) W9 -0.5 0.9 1.48 -0.66375
Less (-) V1 -0.5 0.5 1.18 -0.29375
Elevation -5650 BR3 Balcony Wall Paint F1 1 3.2 2.83 9.056
Less (-) DW -1 1.85 2.38 -4.39375
-1 0.4 1.63 -0.652
Add soffits and Jambs 1 7.4 0.08 0.555
Less (-) trap Door -0.5 0.6 1.28 -0.3825
Elevation -3850 to -5650 Balcony upstand Paint F1 1 8.73 0.10 0.873
Elv -6300 to Utility Balcony- BR3 Toilet Wall Texture F2 1 5.65 2.95 16.6675
Less (-) V -0.5 0.6 1.18 -0.3525
Elevation -6125 to -7925 Liv/Din Bal Wall Paint F1 1 3.275 2.95 9.66125
Less (-) trap Door -0.5 0.6 1.28 -0.3825
Less SD 7 -1 1.65 2.38 -3.91875
Add soffits and Jambs 1 6.4 0.08 0.48
Elevation -6125 to -7925 Liv/Din Bal Upstand Paint F1 1 9.785 0.10 0.9785
Elv Liv/Din Side Wall Paint F1 1 4.65 2.95 13.7175
Less(-) W7 -0.5 1 1.48 -0.7375
Utility Balcony Elevation Wall Paint F1 1 2.518 2.83 7.12594
Less (-) DW3 -1 0.9 2.38 -2.1375
-1 0.6 1.18 -0.705
Add soffits and Jambs 1 6.85 0.08 0.51375
Utility Balcony Upstand Paint F1 1 4.722 0.10 0.4722
Liv Din Wall on T bw 14 and 21 Paint F1 1 5.7 2.95 16.815
Wall on 16 b/w T and P Paint F1 1 2.925 2.95 8.62875
Less parapet opening -1 1.775 1.73 -3.07075
Add soffits and Jambs 1 7.01 0.10 0.701
Lift Shear Wall Paint F1 1 2.55 2.95 7.5225
001 Kitchen Wall on LHS and Entrance Wall Paint F1 1 6.525 2.95 19.24875
Less parapet opening -1 0.925 1.73 -1.60025
Add soffits and Jambs 1 5.31 0.10 0.531
Lift Shear Wall + Serv. Toilet Wall Paint F1 2 6.35 2.95 37.465
Less V -1 0.6 1.18 -0.705
Servant Room Wall and Utility Balcony Wall Paint F1 2 6.62 2.95 39.058
Less Door D2' -1 0.75 2.38 -1.78125
Less Dw1 -2 0.9 2.38 -4.275
-2 1.1 1.18 -2.585
Add soffits and Jambs 2 6.585 0.10 1.317
Utility Balcony Upstand Paint F1 2 5.25 0.33 3.4125
BR3 Wall Paint F1 2 1.936 2.95 11.4224
BR3 Balcony Wall Elv 11900 Paint F1 2 4.85 2.83 27.451
Less SD -2 2.4 2.38 -11.4
Add soffits and Jambs 2 7.15 0.10 1.43
BR3 Bal Upstand Paint F1 2 6.95 0.33 4.5175
Shaft Wall Texture F2 2 2.875 2.95 16.9625
MBR Balcony Wall Paint F1 2 4.2 2.95 24.78
Less SD -2 2.4 2.38 -11.4
Add soffits and Jambs 2 7.15 0.10 1.43
Total for Texture 41.7425
Total For Paint 212.76206
Balcony Ceilings
Elv -75 BR 2 Balcony Ceiling OBD 1 1.8 2.60 4.68
Elv -75 MBR balcony Ceiling OBD 1 4.75 1.80 8.55
Elv -3850 BR3 Balcony OBD 1 3.3 1.80 5.94
1 1.8 0.75 1.35
Elv -6125 Liv/Din Balcony OBD 1 3.925 1.80 7.065
1 1.5 1.80 2.7
Utility Balcony- 3A OBD 1 1.8 1.83 3.285
Elv -12475 Utility Balcony Ceiling OBD 2 2.75 1.80 9.9
2 0.7 0.90 1.26
Elv -10100 BR3 Balcony OBD 2 4.1 1.80 14.76
Elv 10100 MBR Balcony OBD 2 3.25 1.80 11.7
71.19
Terrace Floor
Front elevation
Parapet above 3A Toilet Texture F2 2 2.745 1.40 7.69
Side wall Paint F1 1 3.67 1.40 5.14
Side wall Paint F1 1 3.67 3.75 13.76
Parapet Wall on Grid A LHS Paint F1 2 2.1 1.40 5.88
Parapet Wall on Grid A RHS Paint F1 2 2.25 1.40 6.30
wall on 11 b/w A & B Paint F1 1 4.57 3.75 17.14
wall on 17 b/w A & B Paint F1 1 4.5 3.75 16.88
wall on 19 b/w A & E Paint F1 1 6.88 3.30 22.70
wall on 21 b/w A & G Paint F1 1 4.65 3.75 17.44
Parapet from grid B to J Paint F1 2 11.626 1.40 32.55
Parapet from grid E to F Texture F2 2 2.85 1.40 7.98
Parapet Wall on Lift shear Wall to MBR shaft Paint F1 4 21.216 1.40 118.8096
Shaft Walls Texture F2 2 17.993 3.00 107.958
gr. 27-27/S Paint F1 4 3.45 1.40 19.32
Gr on 27 b/w T and P Paint F1 2 10.02 3.00 60.12
Parapet on 27 b/w P & G Paint F1 2 9.8 1.40 27.44
123.62
239.85
Pergola Beam Paint F1
Bottom 14 5.05 0.2 14.14
Top 14 5.05 0.2 14.14
Side 28 5.05 0.50 70.7
98.98
Elevation 4
Tower D.E.F
Balcony Ceilings
MBR Balcony OBD 2 2.4 1.8 8.64
BR2 Balcony OBD 2 2.325 1.8 8.37
Utility Balcony OBD 2 3.6 1.8 12.96
Liv/Din Balcony OBD 2 2.55 1.8 9.18
Total paint-F1 39.15
Second Floor
Elv +1800 Toilet Wall Texture F2 2 2.425 2.95 14.3075
Less - V -1 0.6 1.175 -0.705
Toilet Side Walls Paint F1 4 0.6 2.95 7.08
4 0.2 2.95 2.36
4 1.7 2.95 20.06
Shaft Wall Texture F2 4 0.3 1.73 2.076
Elv +0 MBR balcony Texture F2 2 2.31 2.83 13.0746
Less SD9 -2 1.4 2.375 -6.65
Add soffit and Jambs 2 6.15 0.075 0.9225
Less Trap Door -1 0.6 1.73 -1.038
MBR Balcony Upstand ELV +1800 Paint F1 2 6 0.325 3.9
Elv +0 BR2 Balcony Wall Texture F2 2 2.32 2.83 13.1312
Shaft Wall Texture F2 2 0.3 2.95 1.77
Less Trap Door -1 0.6 1.73 -1.038
Less SD 10 -2 1.35 2.375 -6.4125
Add soffit and Jambs 2 6.1 0.075 0.915
Elv +1800 BR2 balcony upstand Paint F1 2 5.925 0.325 3.85125
Elv +0 MBR balcony Wall Pillar Paint F1 4 1 2.83 11.32
MBR Side Wall Paint F1 2 1.65 2.95 9.735
Utility balcony Wall Paint F1 2 2.2 2.83 12.452
Less W 14 -1 0.6 1.475 -0.885
Texture F2 2 2.445 2.83 13.8387
Less D1' -1 0.9 2.375 -2.1375
Shaft Wall Texture F2 2 0.3 2.95 1.77
BR2 Side Wall Paint F1 2 3.35 2.95 19.765
Less W14' -1 0.6 1.175 -0.705
Shaft Wall Texture F2 2 0.3 2.95 1.77
Living Dining Balcony Wall Elv -2050 Texture F2 2 2.95 2.83 16.697
Less SD1 -2 2.3 2.375 -10.925
Add soffit and Jambs 2 7.05 0.075 1.0575
Balcony Upstand liv/Din Paint F1 2 5.75 0.325 3.7375
Elv -2025 Partition Wall Texture F2 1 4.45 2.95 13.1275
Elv -5.75 Shaft Ext Wall Paint F1 2 2.4 2.95 14.16
Kitchen Wall Texture F2 2 4.775 2.95 28.1725
Less - W 8 -1 1 1.175 -1.175
Toilet Wall Texture F2 1 3.925 2.95 11.57875
Staircase Wall Texture F2 1 2.38 2.95 7.021
Less opening over parapet -0.5 1.95 1.43 -1.39425
Common toilet wall Living Dining Texture F2 1 1.145 2.95 3.37775
Less V -0.5 0.6 1.175 -0.3525
Flat 2D Utility Balcony Texture F2 1 4.925 2.83 13.93775
Less DW3 -1 0.9 2.375 -2.1375
-1 0.6 1.175 -0.705
Add soffit and Jambs 1 6.85 0.075 0.51375
Less V -0.5 0.6 1.175 -0.3525
Utility Balcony Upstand Paint F1 1 4.875 0.325 1.584375
Common Toilet Wall Texture F2 1 3.2 2.95 9.44
Less V -0.5 0.6 1.175 -0.3525
MBR Balcony Wall Texture F2 1 2.85 2.83 8.0655
Less SD4 -1 1.8 2.375 -4.275
Add soffit and Jambs 1 6.55 0.075 0.49125
Wall at Elv -9025 Paint F1 1 1.625 2.95 4.79375
Total Texture F2 137.4055
Paint F1 113.208875
Balcony Ceilings
MBR Balcony OBD 2 2.4 1.8 8.64
BR2 Balcony OBD 2 2.325 1.8 8.37
Utility Balcony OBD 2 3.6 1.8 12.96
Liv/Din Balcony OBD 2 2.55 1.8 9.18
MBR 2 D Balcony OBD 1 2.175 1.8 3.915
Utility Balcony OBD 1 3.9 1 3.9
46.965
Typical Floor
Elv +1800 Toilet Wall Texture F2 2 2.425 2.95 14.3075
Less - V -1 0.6 1.175 -0.705
Toilet Side Walls Paint F1 4 0.6 2.95 7.08
4 0.2 2.95 2.36
4 1.7 2.95 20.06
Shaft Wall Paint F1 4 0.3 1.73 2.076
Elv +0 MBR balcony Paint F1 2 2.31 2.83 13.0746
Less SD9 -2 1.4 2.375 -6.65
Add soffit and Jambs 2 7.55 0.075 1.1325
Less Trap Door -1 0.6 1.73 -1.038
MBR Balcony Upstand ELV +1800 Paint F1 2 6 0.325 3.9
Elv +0 BR2 Balcony Wall Paint F1 2 2.32 2.83 13.1312
Shaft Wall Paint F1 2 0.3 2.95 1.77
Less Trap Door -1 0.6 1.73 -1.038
Less SD 10 -2 1.35 2.375 -6.4125
Add soffit and Jambs 2 6.1 0.075 0.915
Elv +1800 BR2 balcony upstand Paint F1 2 5.925 0.325 3.85125
Elv +0 MBR balcony Wall Pillar Paint F1 4 1 2.83 11.32
MBR Side Wall Paint F1 2 1.65 2.95 9.735
Utility balcony Wall Paint F1 2 2.2 2.83 12.452
Less W 14 -1 0.6 1.475 -0.885
Paint F1 2 2.445 2.83 13.8387
Less D1' -1 0.9 2.375 -2.1375
Shaft Wall Paint F1 2 0.3 2.95 1.77
BR2 Side Wall Paint F1 2 3.35 2.95 19.765
Less W14' -1 0.6 1.175 -0.705
Shaft Wall Paint F1 2 0.3 2.95 1.77
Living Dining Balcony Wall Elv -2050 Paint F1 2 2.95 2.83 16.697
Less SD1 -2 2.3 2.375 -10.925
Add soffit and Jambs 2 7.05 0.075 1.0575
Balcony Upstand liv/Din Paint F1 2 5.75 0.325 3.7375
Elv -2025 Partition Wall Texture F2 1 4.45 2.95 13.1275
Elv -5.75 Shaft Ext Wall Paint F1 2 2.4 2.95 14.16
Kitchen Wall Paint F1 2 4.775 2.95 28.1725
Less - W 8 -10 1 1.175 -11.75
Toilet Wall Paint F1 1 3.925 2.95 11.57875
Staircase Wall Paint F1 1 2.38 2.95 7.021
Less opening over parapet -0.5 1.95 1.43 -1.39425
Common toilet wall Living Dining Paint F1 1 1.145 2.95 3.37775
Less V -0.5 0.6 1.175 -0.3525
Flat 2D Utility Balcony Paint F1 1 4.925 2.83 13.93775
Less DW3 -1 0.9 2.375 -2.1375
-1 0.6 1.175 -0.705
Add soffit and Jambs 1 6.85 0.075 0.51375
Less V -0.5 0.6 1.175 -0.3525
Utility Balcony Upstand Paint F1 1 4.875 0.325 1.584375
Common Toilet Wall Paint F1 1 3.2 2.95 9.44
Less V -0.5 0.6 1.175 -0.3525
MBR Balcony Wall Paint F1 1 2.85 2.83 8.0655
Less SD4 -1 1.8 2.375 -4.275
Add soffit and Jambs 1 6.55 0.075 0.49125
Wall at Elv -9025 Paint F1 1 1.625 2.95 4.79375
26.73
213.52
Balcony Ceilings
MBR Balcony OBD 2 2.4 1.8 8.64
BR2 Balcony OBD 2 2.325 1.8 8.37
Utility Balcony OBD 2 3.6 1.8 12.96
Liv/Din Balcony OBD 2 2.55 1.8 9.18
MBR 2 D Balcony OBD 1 2.175 1.8 3.915
Utility Balcony OBD 1 3.9 1 3.9
46.965
Elevation 2
Ground, first and Second Floor
Flat 2 A RHS Toilet Wall Texture F2 1 6.45 2.95 19.0275
Less V -0.5 0.6 1.175 -0.3525
Wall on 13 b/w P & Q Texture F2 1 2.75 2.95 8.1125
Less Parapet -0.5 1.5 1.83 -1.3725
Study Room Wall Texture F2 1 2.6 2.95 7.67
Less - W5 -0.5 1.2 1.475 -0.885
Toilet and MBR Wall Paint F1 1 9.675 2.95 28.54125
Less v -1 0.6 1.175 -0.705
MBR Balcony Wall Texture F2 1 3.75 2.83 10.6125
1 0.3 2.95 0.885
Less SD -1 2.4 2.375 -5.7
Add soffit and Jambs 1 7.15 0.075 0.53625
MBr balcony upstand 1 5.6 0.325 1.82
Shaft wall Paint F1 1 1.9 2.95 5.605
BR2 Balcony Wall Texture F2 1 3.35 2.83 9.4805
Less SD2 -1 2.1 2.375 -4.9875
Add soffit and Jambs 1 6.85 0.075 0.51375
BR2 Balcony Upstand 1 5.15 0.325 1.67375
Balcony Pillar Paint F1 1 0.8 2.83 2.264
BR2 Wall Paint F1 1 3.55 2.95 10.4725
Shaft wall Texture F2 1 0.3 2.95 0.885
Liv.Din Balcony Texture F2 1 2.525 2.83 7.14575
Less SD8 -1 1.5 2.375 -3.5625
Add soffit and Jambs 1 6.25 0.075 0.46875
Liv Din Wall Texture F2 1 2.475 2.95 7.30125
Utility Balcony Texture F2 1 3.2 2.83 9.056
Less DW2 -1 0.9 2.375 -2.1375
-1 0.75 1.175 -0.88125
Add soffit and Jambs 1 7.15 0.075 0.53625
Shaft and toilet Wall Texture F2 1 1.145 2.95 3.37775
Less -0.5 0.6 1.175 -0.3525
-0.5 0.6 1.73 -0.519
68.35225
46.17775
Balcony Celiings
MBR OBD 1 1.55 3.55 5.5025
BR2 OBD 1 1.525 3.75 5.71875
Liv/Din OBD 1 1.8 2.125 3.825
Utility OBD 1 1.8 1.675 3.015
18.06125
Typical Floor
Flat 2 A RHS Toilet Wall Paint F1 1 6.45 2.95 19.0275
Less V -0.5 0.6 1.175 -0.3525
Wall on 13 b/w P & Q Paint F1 1 2.75 2.95 8.1125
Less Parapet -0.5 1.5 1.83 -1.3725
Study Room Wall Paint F1 1 2.6 2.95 7.67
Less - W5 -0.5 1.2 1.475 -0.885
Toilet and MBR Wall Paint F1 1 9.675 2.95 28.54125
Less v -1 0.6 1.175 -0.705
MBR Balcony Wall Paint F1 1 3.75 2.83 10.6125
1 0.3 2.95 0.885
Less SD -1 2.4 2.375 -5.7
Add soffit and Jambs 1 7.15 0.075 0.53625
MBr balcony upstand 1 5.6 0.325 1.82
Shaft wall Paint F1 1 1.9 2.95 5.605
BR2 Balcony Wall Paint F1 1 3.35 2.83 9.4805
Less SD2 -1 2.1 2.375 -4.9875
Balcony Celiings
MBR OBD 1 1.55 3.55 5.5025
BR2 OBD 1 1.525 3.75 5.71875
Liv/Din OBD 1 1.8 2.125 3.825
Utility OBD 1 1.8 1.675 3.015
18.06125
Elevation 3
Balcony Ceilings
MBR Balcony OBD 2 2.4 1.8 8.64
BR2 Balcony OBD 2 2.325 1.8 8.37
Utility Balcony OBD 2 3.6 1.8 12.96
Liv/Din Balcony OBD 2 2.55 1.8 9.18
39.15
Second Floor
Elv +1800 Toilet Wall Texture F2 2 2.425 2.95 14.3075
Less - V -1 0.6 1.175 -0.705
Toilet Side Walls Paint F1 4 0.6 2.95 7.08
4 0.2 2.95 2.36
4 1.7 2.95 20.06
Shaft Wall Texture F2 4 0.3 1.73 2.076
Elv +0 MBR balcony Texture F2 2 2.31 2.83 13.0746
Less SD9 -2 1.4 2.375 -6.65
Less Trap Door -2 0.6 1.73 -2.076
MBR Balcony Upstand ELV +1800 Paint F1 2 6 0.325 3.9
Elv +0 BR2 Balcony Wall Texture F2 2 2.32 2.83 13.1312
Shaft Wall Texture F2 2 0.3 2.95 1.77
Less Trap Door -2 0.6 1.73 -2.076
Less SD 10 -2 1.35 2.375 -6.4125
Elv +1800 BR2 balcony upstand Paint F1 2 5.925 0.325 3.85125
Elv +0 MBR balcony Wall Pillar Paint F1 4 1 2.83 11.32
MBR Side Wall Paint F1 2 1.65 2.95 9.735
Utility balcony Wall Paint F1 2 2.2 2.83 12.452
Less W 14 -2 0.6 1.475 -1.77
Texture F2 2 2.445 2.83 13.8387
Less D1' -1 0.9 2.375 -2.1375
Shaft Wall Texture F2 2 0.3 2.95 1.77
BR2 Side Wall Paint F1 2 3.35 2.95 19.765
Less W14' -1 0.6 1.175 -0.705
Shaft Wall Texture F2 2 0.3 2.95 1.77
Living Dining Balcony Wall Elv -2050 Texture F2 2 2.95 2.83 16.697
Less SD1 -2 2.3 2.375 -10.925
Balcony Upstand liv/Din Paint F1 2 5.75 0.325 3.7375
Elv -2025 Partition Wall Texture F2 1 4.45 2.95 13.1275
Elv -5.75 Shaft Ext Wall Paint F1 2 2.4 2.95 14.16
Kitchen Wall Texture F2 2 4.775 2.95 28.1725
Less - W 8 -2 1 1.175 -2.35
Toilet Wall Texture F2 1 3.925 2.95 11.57875
101.8818
102.0458
Balcony Ceilings
MBR Balcony OBD 2 2.4 1.8 8.64
BR2 Balcony OBD 2 2.325 1.8 8.37
Utility Balcony OBD 2 3.6 1.8 12.96
Liv/Din Balcony OBD 2 2.55 1.8 9.18
MBR 2 D Balcony OBD 1 2.175 1.8 3.915
Utility Balcony OBD 1 3.9 1 3.9
46.965
Typical Floor
Elv +1800 Toilet Wall Texture F2 2 2.425 2.95 14.3075
Less - V -1 0.6 1.175 -0.705
Toilet Side Walls Paint F1 4 0.6 2.95 7.08
4 0.2 2.95 2.36
4 1.7 2.95 20.06
Shaft Wall Paint F1 4 0.3 1.73 2.076
Elv +0 MBR balcony Paint F1 2 2.31 2.83 13.0746
Less SD9 -2 1.4 2.375 -6.65
Less Trap Door -2 0.6 1.73 -2.076
MBR Balcony Upstand ELV +1800 Paint F1 2 6 0.325 3.9
Elv +0 BR2 Balcony Wall Paint F1 2 2.32 2.83 13.1312
Shaft Wall Paint F1 2 0.3 2.95 1.77
Less Trap Door -2 0.6 1.73 -2.076
Less SD 10 -2 1.35 2.375 -6.4125
Elv +1800 BR2 balcony upstand Paint F1 2 5.925 0.325 3.85125
Elv +0 MBR balcony Wall Pillar Paint F1 4 1 2.83 11.32
MBR Side Wall Paint F1 2 1.65 2.95 9.735
Utility balcony Wall Paint F1 2 2.2 2.83 12.452
Less W 14 -2 0.6 1.475 -1.77
Paint F1 -2 2.445 2.83 -13.8387
Less D1' -1 0.9 2.375 -2.1375
Shaft Wall Paint F1 2 0.3 2.95 1.77
BR2 Side Wall Paint F1 2 3.35 2.95 19.765
Less W14' -1 0.6 1.175 -0.705
Shaft Wall Paint F1 2 0.3 2.95 1.77
Living Dining Balcony Wall Elv -2050 Paint F1 2 2.95 2.83 16.697
Less SD1 -2 2.3 2.375 -10.925
Balcony Upstand liv/Din Paint F1 2 5.75 0.325 3.7375
Elv -2025 Partition Wall Texture F2 1 4.45 2.95 13.1275
Elv -5.75 Shaft Ext Wall Paint F1 2 2.4 2.95 14.16
Kitchen Wall Paint F1 2 4.775 2.95 28.1725
Less - W 8 -2 1 1.175 -2.35
26.73
137.9414
Balcony Ceilings
MBR Balcony OBD 2 2.4 1.8 8.64
BR2 Balcony OBD 2 2.325 1.8 8.37
Utility Balcony OBD 2 3.6 1.8 12.96
Liv/Din Balcony OBD 2 2.55 1.8 9.18
MBR 2 D Balcony OBD 1 2.175 1.8 3.915
Utility Balcony OBD 1 3.9 1 3.9
46.965
Elevation 4
For GF
Double height area shaft Texture 1 2.85 2.95 8.4075
1 2.15 2.5 5.375
Double height entrance lobby Paint F1 1 17.115 2.95 50.48925
Less ED2 1 1.1 2.375 2.6125
Double Height Coulmns Texture 2 2.1 2.95 12.39
Paint F1 2 2.1 2.95 12.39
Staircase and lobby wall Texture 1 8.256 2.95 24.3552
50.5277
65.49175
Balcony Ceilings
BR2/LivDin Balcony OBD 1 5.725 1.8 10.305
Terrace lvl
Gr. E-m/1 1 10.725 0.200 2.15
Gr. E-m/1 1 8.825 3.30 29.12
Col 1 0.700 3.30 2.31
Gr.L/1 shaft 1 0.400 0.100 0.04
1 0.400 0.100 0.04
Gr.L/1-6 1 6.355 1.40 8.90
1 6.355 0.100 0.64
Col 1 0.500 1.40 0.70
1 0.200 0.200 0.04
Gr. L-P/6 1 2.570 1.40 3.60
col 1 0.200 1.40 0.28
1 0.200 0.200 0.04
Gr. P/6-9 1 3.500 1.40 4.90
Gr. P/6-9 1 3.500 0.100 0.35
Gr. 8-9/Q 1 1.400 1.40 1.96
1 1.400 0.100 0.14
Gr.8/Q 1 0.400 1.40 0.56
1 0.400 0.100 0.04
Gr. 7-8/Q 1 1.725 1.40 2.42
1 1.725 0.100 0.17
Gr.8/Q 1 0.400 1.40 0.56
1 0.400 0.100 0.04
Gr. 3-6/Q 1 2.725 1.40 3.82
1 2.725 0.100 0.27
1 0.200 0.100 0.02
Gr. Q-Q+/3 4 side 4 3.620 1.40 20.27
4 3.620 0.100 1.45
Gr. S/3 4 side 4 0.250 1.40 1.40
4 side 4 0.350 0.100 0.14
Gr. S-T/4 4 side 4 4.650 3.75 69.75
4 4.650 0.200 3.72
4 side 4 0.200 3.75 3.00
4 0.200 3.75 3.00
Gr. 4-6/T 4 side 4 2.000 1.40 11.20
4 2.000 0.100 0.80
4 0.250 3.75 3.75
4 0.200 3.75 3.00
Gr. 6/T 4 2.750 0.200 2.20
4 2.050 3.75 30.75
Gr. 7-8/T+ 4 2.425 1.40 13.58
4 2.425 0.100 0.97
4 6.480 0.20 5.18
4 6.680 3.75 100.20
4 3.980 3.75 59.70
Gr. 9-10/T 4 1.925 1.40 10.78
4 1.925 0.100 0.77
Gr.S-T/10 4 3.980 3.75 59.70
4 4.380 0.200 3.50
Gr. S/10 4 0.200 3.75 3.00
4 0.130 3.75 1.95
Gr. 10-12/S 4 side 4 3.150 1.40 17.64
4 3.150 0.100 1.26
col 2 0.400 1.40 1.12
2 0.200 0.200 0.08
WHITEWASH
SR NO Ttower A, B, C UNIT QTY PER FLATS No. of Flats No. of TWR Total Qty.
Ttower D
Ttower E, F
16033.42
2 Type- 3 A, -
Kitchen shaft 2 0.60 2.95 3.54
2 0.40 2.95 2.36
Less Door -1 0.60 1.73 (1.04)
Room's 1,2 & 3 balcony shaft 6 0.60 2.95 10.62
6 0.40 2.95 7.08
Less Door -2 0.60 1.73 (2.08)
Living balcony Shaft 1 0.90 2.95 2.66
2 0.30 2.95 1.77
Qty for 1 flat 24.91 Sqm
3 Type- 3 D
Servant bath room 2 1.13 2.95 6.67
2 0.40 2.70 2.16
Less Door -1 0.60 1.80 (1.08)
Kitchen shaft 2 0.60 2.70 3.24
2 0.40 2.70 2.16
Less Door -1 0.60 1.73 (1.04)
Living balcony Shaft 2 0.40 2.70 2.16
1 0.30 2.70 0.81
Master Bedroom Toilet Shaft 2 0.60 2.70 3.24
2 0.45 2.70 2.43
Less Door -1 0.60 1.73 (1.04)
BedRoom-2 Toilet Shaft 1 0.90 2.70 2.43
2 0.30 2.70 1.62
Common Toilet Shaft Ceiling 1 1.50 0.70 1.05
Wall 2 1.50 2.70 8.10
2 0.70 2.70 3.78
Less window -1 0.60 1.45 (0.87)
-1 0.60 2.70 (1.62)
Qty for 1 flat 34.20 Sqm
LMR A, B, C
S. No. Description Unit No. L B/H Total Remark
1 Grid L/08-21 Sqm 1 11.08 2.60 28.81
Ded. Door (FD 1100x2100) Sqm -0.5 1.10 2.10 (1.16)
2 Grid L-S/08-09,19-20 Sqm 2 5.77 2.60 30.00
Dedc. Window (W7 1000x1475) Sqm -1 1.00 1.475 (1.48)
Sqm -0.5 0.90 1.475 (0.66)
Sqm -0.5 1.75 1.475 (1.29)
3 Grid M/16-20 Sqm 1 3.50 2.60 9.10
Sqm 1 2.20 2.60 5.72
4 M/8-9 Sqm 1 1.33 2.60 3.46
5 N/10-13 (Bothway) Sqm 2 3.20 2.60 16.64
Sqm -2 0.10 2.60 (0.52)
6 P/16-18 Sqm 1 2.78 2.60 7.23
7 R/10-13 Sqm 1 4.06 2.60 10.54
8 R-S/13-16 Sqm 1 1.68 2.60 4.36
9 Ele. Shaft Sqm 2 0.82 2.60 4.26
Sqm 2 0.72 2.60 3.74
Sqm 1 1.00 2.60 2.60
Sqm 1 0.80 2.60 2.08
FD2 (750x2000) Sqm -1 0.75 2.00 (1.50)
Ceiling
Grid L-M/8-20 Sqm 1 11.08 1.625 18.01
Grid R-M/10-16 Sqm 1 5.67 3.05 17.29
Sqm -1 0.23 3.20 (0.74)
Grid P-M/16-18 Sqm 1 2.78 2.00 5.56
Grid P-S/13-16 Sqm 1 1.68 1.13 1.88
Beam Side
on M Sqm 2 6.25 0.35 4.38
Sqm 2 0.59 0.35 0.41
Servive lift Sqm 2 2.00 0.35 1.40
Passanger Lift Sqm 2 2.00 0.35 1.40
Total Sqm 171.54 Checked By Himans
Tower D,E,F
Sl. No Particulars Nos Length Br/Ht Quantity Remarks
1 Lobby Shaft
FHC Shaft 2 1.23 2.70 6.64
2 0.85 2.70 4.59
Less Door -1 0.90 2.00 (1.80)
33.59 Sqm
2 2A
BR2 Balcony Shaft 1 0.60 2.70 1.62
2 0.40 2.70 2.16
MBR Balcony Shaft 1 0.60 2.70 1.62
2 0.40 2.70 2.16
Utility/Kitchen Shaft 2 0.40 2.70 2.16
1 0.60 2.70 1.62
Living/Dining Balcony Shaft 1 0.30 2.70 0.81
2 0.30 2.70 1.62
Toilet Shaft 2 0.30 2.70 1.62
1 1.03 2.70 2.77
18.16 Sqm
3 2E
MBR Balcony Shaft 1 0.30 2.70 0.81
2 0.30 2.70 1.62
Living Balcony Shaft 3 0.30 2.70 2.43
Kitchen/Utility Shaft 2 1.43 2.70 7.72
2 0.30 2.70 1.62
Less Opening -1 0.60 2.00 (1.20)
Toilet Shaft 2 0.95 2.70 5.13
18.13 Sqm
4 2D
MBR Balcony Shaft 2 0.30 2.70 1.62
1 0.28 2.70 0.74
BR2 Balcony Shaft 3 0.30 2.70 2.43
Utility Shaft 3 0.30 2.70 2.43
Toilet Shaft 1 0.95 2.70 2.57
2 0.37 2.70 2.00
11.79 Sqm
LMR D, E, F
S. No. Description Unit No. L B/H Total Remark
1 Grid 7, 8, 9, 11/F-M Sqm 2 8.85 2.60 46.02
Ded. Window W7 Sqm -0.5 1.00 1.48 (0.74)
Ded. Window W5 Sqm -0.5 1.20 1.48 (0.89)
Ded. FD Sqm -0.5 1.10 2.050 (1.13)
Ded. Opening Sqm -0.5 1.20 2.250 (1.35)
Grid M/09-11 Sqm 1 2.60 2.250 5.85
Ded. Window W7 Sqm -0.5 1.00 1.48 (0.74)
Grid J/07-09 Sqm 1 2.75 2.60 7.15
Sqm 1 0.45 2.60 1.17
Grid G/07 Sqm 1 0.45 2.60 1.17
Grid F/07-11 Sqm 1 5.35 2.60 13.91
Elect Room Sqm 2 3.13 2.60 16.28
Sqm 2 2.10 2.60 10.92
Ded. Window W7 Sqm -0.5 1.00 1.48 (0.74)
Ded. Opening Sqm -0.5 1.20 2.250 (1.35)
Ded. FD2 Sqm -0.5 1.15 1.950 (1.12)
Elec. Shaft Sqm 2 0.59 2.600 3.07
Sqm 2 0.87 2.600 4.52
Ded. FD2 Sqm -0.5 1.15 1.950 (1.12)
Ceiling -
Grid F-J/07-11 Sqm 1 5.35 4.200 22.47
Ded. Sqm -1 2.20 0.450 (0.99)
Beam Side Sqm 2 4.20 0.350 2.94
Grid 09-11/J-M Sqm 1 2.60 4.650 12.09
Total Sqm 137.40
Project : Godrej Aria sector 79 Gurgaon Date 19-Feb-20
Vendor Jayant K. Furnishers, RA Bill No. 24th RA
Service FINISHING WORKS FOR GODREJ ARIA SEC-79, Gurgaon Period Up to Jan. 2021
LOI No. GPL/GGN/LOA/GODREJ ARIA/JAYANT Dated- 06.12.2016
EXTENDED BASEMENT
BOQ TOTAL QTY TOTAL AMOUNT
S. No. Description Unit Remarks
QTY RATE PRE THIS CUMM PRE THIS CUMM
PART - B SUPERSTRUCTURE
PART - A SUBSTRUCTURE
1 PAINTING
1.6.1
Vitrified Tiles, 600x600 mm (146,267.08) - (146,267.08) (144,051.07) - (144,051.07) (146,386.75) - (146,386.75)
1.6.2
Anti Skid Ceramic- for Balcony- 300x300 mm (172,646.36) - (172,646.36) (172,646.36) - (172,646.36) (175,760.85) - (175,760.85)
1.6.2
Anti Skid Ceramic- for Kitchen Floor 300x300 mm (58,978.30) - (58,978.30) (58,978.30) - (58,978.30) (63,018.24) - (63,018.24)
1.6.2
Anti Skid Ceramic- for Toilet floor 300x300 mm (67,612.96) - (67,612.96) (67,612.96) - (67,612.96) (69,722.62) - (69,722.62)
2.5
Ceramic Tile Dado 300x450mm (227,611.60) - (227,611.60) (227,934.32) - (227,934.32) (230,464.91) - (230,464.91)
1.5.1
Kota Stone 3'x2' (38,286.70) - (38,286.70) (38,185.63) - (38,185.63) (39,637.76) - (39,637.76)
1.3.3
Kota Stone 2'x2' (50,916.21) - (50,916.21) (50,349.49) - (50,349.49) (52,260.00) - (52,260.00)
1.7.2
Gwalior Stone (66,798.53) - (66,798.53) (65,224.59) - (65,224.59) -64737.49464 - (64,737.49)
1.3.1
Imported Marble (10,194.23) - (10,194.23) - - - 0 - -
2.6
Granite Stone- Jet Black 129,084.21 - 129,084.21 110,433.18 - 110,433.18 108065.1048048 - 108,065.10
1.7.1
Laminated Wooden flooring (17,827.85) - (17,827.85) (17,862.63) - (17,862.63) -18044.906174916 - (18,044.91)
1.7.2
Laminated Wooden Skirting (2,648.37) - (2,648.37) (2,574.01) - (2,574.01) -2655.290547 - (2,655.29)
External Paint - Weather Proof Synthetic Texture Paint 165,432.11 - 165,432.11 155,698.20 - 155,698.20 163127.055660976 - 163,127.06
External Paint - Acrylic Weather Shield Paint (521,128.60) - (521,128.60) (476,456.31) - (476,456.31) -518208.17849685 - (518,208.18)
1.6.1
600mm x 600mm Grid ceiling, ceiling tiles (87,457.14) - (87,457.14) (85,214.75) - (85,214.75) -85214.7489625 - (85,214.75)
1.2.1
Veneer Door (37,006.76) - (37,006.76) (36,630.12) - (36,630.12) -13585.123776 - (13,585.12)
1.2.2
Moulded Door 81,673.33 - 81,673.33 80,459.31 - 80,459.31 223069.090944 - 223,069.09
a With Pin Cylinder (10' forend length) - for external Doors (24,611.72) - (24,611.72) (24,360.58) - (24,360.58) -24611.72 - (24,611.72)
b With Pin Cylinder (8' forend length) - for Internal Doors (90,708.80) - (90,708.80) (89,783.20) - (89,783.20) -90609.12 - (90,609.12)
c Keyless Cylindrical handle with knob - For toilet doors (124,318.88) - (124,318.88) (123,050.32) - (123,050.32) -123050.32 - (123,050.32)
- - - - - - 0 - -
1.3.3 Hanging type double floor door stopper (23,684.64) - (23,684.64) (24,168.00) - (24,168.00) -24168 - (24,168.00)
1.3.4 Fixing rubber buffer. (94,640.00) - (94,640.00) (94,640.00) - (94,640.00) -94640 - (94,640.00)
1.3.5 Magic eye 270'' (1,276.00) - (1,276.00) (1,276.00) - (1,276.00) -1276 - (1,276.00)
1.3.6 SS hydraulic door closer (6,786.00) - (6,786.00) (6,786.00) - (6,786.00) -6786 - (6,786.00)
Pre This Cumm Pre This Cumm Pre This Cumm Pre This Cumm
1.6.1
Vitrified Tiles, 600x600 mm (166,562.17) - (166,562.17) (128,563.21) - (128,563.21) (141,068.89) - (141,068.89) - - -
1.6.2
Anti Skid Ceramic- for Balcony- 300x300 mm (129,813.33) - (129,813.33) (112,045.66) - (112,045.66) (86,789.19) - (86,789.19) - - -
1.6.2
Anti Skid Ceramic- for Kitchen Floor 300x300 mm (74,376.37) - (74,376.37) (58,789.39) - (58,789.39) (48,613.86) - (48,613.86) - - -
1.6.2
Anti Skid Ceramic- for Toilet floor 300x300 mm (53,193.96) - (53,193.96) (39,772.21) - (39,772.21) (40,410.27) - (40,410.27) - - -
2.5
Ceramic Tile Dado 300x450mm (190,551.50) - (190,551.50) (143,769.88) - (143,769.88) (147,544.17) - (147,544.17) - - -
1.5.1
Kota Stone 3'x2' (38,169.54) - (38,169.54) (28,851.24) - (28,851.24) (28,937.00) - (28,937.00) (2,632.17) - (2,632.17)
1.3.3
Kota Stone 2'x2' (50,121.04) - (50,121.04) (41,713.97) - (41,713.97) (41,879.32) - (41,879.32) - - -
1.7.2
Gwalior Stone -60596 - (60,596.17) (47,051.16) - (47,051.16) -47051 - (47,051.16) 0 - -
1.3.1
Imported Marble 0 - - 0 -
2.6
Granite Stone- Jet Black 109006 - 109,005.79 85,058.13 - 85,058.13 109242 - 109,241.94 0 - -
1.7.1
Laminated Wooden flooring -14470 - (14,469.77) (11,207.54) - (11,207.54) -11208 - (11,207.54) 0 - -
1.7.2
Laminated Wooden Skirting -2414 - (2,413.66) (1,845.17) - (1,845.17) -1822 - (1,822.39) 0 - -
External Paint - Weather Proof Synthetic Texture Paint 109871 - 109,871.23 115,124.38 - 115,124.38 114998 - 114,998.09 84598 - 84,597.57
External Paint - Acrylic Weather Shield Paint -155251 - (155,251.11) (157,794.88) - (157,794.88) -131073 - (131,073.15) 0 - -
1.6.1
600mm x 600mm Grid ceiling, ceiling tiles -69025 - (69,024.75) (54,582.12) - (54,582.12) -54582 - (54,582.12) 0 - -
1.2.1
Veneer Door -18814 - (18,814.04) (40,836.68) - (40,836.68) (40,836.68) - (40,836.68) - - -
1.2.2
Moulded Door 166505 - 166,504.89 48,286.58 - 48,286.58 48287 - 48,286.58 0 - -
a With Pin Cylinder (10' forend length) - for external Doors -34085.76 - (34,085.76) (26,603.52) - (26,603.52) -27279 - (27,279.00) 0 - -
b With Pin Cylinder (8' forend length) - for Internal Doors -64934.4 - (64,934.40) (50,580.48) - (50,580.48) -51620 - (51,620.00) 0 - -
c Keyless Cylindrical handle with knob - For toilet doors -98872.32 - (98,872.32) (77,168.64) - (77,168.64) -78500 - (78,500.00) 0 - -
0 - - - - - 0 - - 0 - -
1.3.3 Hanging type double floor door stopper -18696 - (18,696.00) (16,112.00) - (16,112.00) -16112 - (16,112.00) 0 - -
1.3.4 Fixing rubber buffer. -79352 - (79,352.00) (61,880.00) - (61,880.00) -61880 - (61,880.00) 0 - -
1.3.5 Magic eye 270'' -1804 - (1,804.00) (1,408.00) - (1,408.00) -1408 - (1,408.00) 0 - -
1.3.6 SS hydraulic door closer -9594 - (9,594.00) (7,488.00) - (7,488.00) -7488 - (7,488.00) 0 - -
Total Escalation (873,099) - (873,099) (817,998) - (817,998) (745,456) - (745,456) 81,965 - 81,965
1 Cement - -
1.6.1
Vitrified Tiles, 600x600 mm - - - - - -
1.6.2
Anti Skid Ceramic- for Balcony- 300x300 mm - - - - - -
1.6.2
Anti Skid Ceramic- for Kitchen Floor 300x300 mm - - - - - -
1.6.2
Anti Skid Ceramic- for Toilet floor 300x300 mm - - - - - -
2.5
Ceramic Tile Dado 300x450mm (6,034.65) - (6,035) (6,541.42) - (6,541.42)
1.5.1
Kota Stone 3'x2' - - - - - -
1.3.3
Kota Stone 2'x2' - - - - - -
1.7.2
Gwalior Stone 0 - - 0 - -
1.3.1
Imported Marble 0 - - 0 -
2.6
Granite Stone- Jet Black 467 - 467 0 - -
1.7.1
Laminated Wooden flooring 0 - - 0 - -
1.7.2
Laminated Wooden Skirting 0 - - 0 - -
1.6.1
600mm x 600mm Grid ceiling, ceiling tiles 0 - - 0 - -
1.2.1
Veneer Door - - - - - -
1.2.2
Moulded Door 0 - - 0 - -
a 200 X 10 mm 0 - - 0 - -
b 250 X 10 mm 0 - - 0 - -
0 - - 0 - -
Total
Pre This Bill Executed
S.no Base Rate Items Unit Quantity Quantity Quantity Remarks
c Sqm 29.988 0 30
Partly fixed, Partly side hung openable and with
provision for exhaust fan of types DW2, DW3
d Sqm 83.57 0 84
1.1.3 Windows
Partly fixed with partly side hung openable
a shutter of types W11, W14, W14' Sqm 19.04 0 19
Partly fixed with 2 track sliding of types W1,
c W4, W5, W7, W9, W9' ,W10 Sqm 222.45 0 222
Partly Fixed partly top hung openable with
f provision for exhaust fan of types V, V1 Sqm 127.11 0 127
1.6.1 Vitrified Tiles Sqm 2781 474 1,317,104.56 421.02 1,170,837.48 (146,267.08)
1.6.2 Anti Skid Ceramic- for Balcony Sqm 2055 301 619,366.64 217.38 446,720.29 (172,646.36)
1.6.2 Anti Skid Ceramic- for Kitchen Floor Sqm 633 301 190,659.71 208.16 131,681.42 (58,978.30)
1.6.2 Anti Skid Ceramic- for Toilet floor Sqm 797 301 240,131.09 216.53 172,518.14 (67,612.96)
2.5 Ceramic Tile Dado Sqm 3732 301 1,124,927.28 240.41 897,315.68 (227,611.60)
1.5.1 Kota Stone 3'x2' Sqm 407 420 170,649.27 325.6 132,362.58 (38,286.70)
1.3.3 Kota Stone 2'x2' Sqm 371 420 155,743.70 282.6 104,827.49 (50,916.21)
1.7.2 Gwalior Stone Sqm 327 840 274,225.52 635 207,427.00 (66,798.53)
1.3.1 Imported Marble Sqm 38 2,637 99,903.50 2368 89,709.26 (10,194.23)
Page 715 of 832
2.6 Granite Stone- Jet Black Sqm 545 1,270 692,360.77 1507 821,444.98 129,084.21
Granite Stone- Adhunik Polished Sqm 0 1,270 - 1507 - -
Granite Stone- Adhunik Sandblast Sqm 0 - - -
1.7.1 Laminated Wooden flooring Sqm 2729 624 1,703,940.98 618 1,686,113.13 (17,827.85)
1.7.2 Laminated Wooden Skirting Rmt 2264 118 267,281.16 116.91 264,632.80 (2,648.37)
1.3 External Paint - Weather Proof Synthetic Texture Paint-A,B,C Sqm 2572 247.57 636,680.12 312 802,112.23 165,432.11
1.4 External Paint - Acrylic Weather Shield Paint Sqm 8812 193.75 1,707,328.64 115 1,012,490.51 (521,128.60)
1.6.1 600mm x 600mm Grid ceiling, ceiling tiles Sqm 774 583.00 451,137.06 470 363,679.92 (87,457.14)
1.2.1 Veneer Door Sqm 117 2,616 306,359.76 2300 269,353.00 (37,006.76)
1.2.2 Moulded Door Sqm 696 916 637,572.64 1033.34 719,245.97 81,673.33
1.3 Hardware for Wooden Doors - - -
1.3.1 Mortice Latch Lock No. - - -
a With Pin Cylinder (10' forend length) - for external Doors No. 57 1308 74,346.72 875 49,735.00 (24,611.72)
b With Pin Cylinder (8' forend length) - for Internal Doors No. 255 1177 299,899.60 821 209,190.80 (90,708.80)
c Keyless Cylindrical handle with knob - For toilet doors No. 198 872 172,621.12 244 48,302.24 (124,318.88)
- - -
1.3.2 Tower bolt - - -
a 200 X 10 mm Each 255 196 49,940.80 80 20,384.00 (29,556.80)
b 250 X 10 mm Each 57 245 13,925.80 100 5,684.00 (8,241.80)
- - -
1.3.3 Hanging type double floor door stopper Each 312 196 61,081.44 120 37,396.80 (23,684.64)
1.3.4 Fixing rubber buffer. Each 520 196 101,920.00 14 7,280.00 (94,640.00)
1.3.5 Magic eye 270'' Each 147 8,526.00 125 7,250.00 (1,276.00)
58
1.3.6 SS hydraulic door closer Each 1177 68,266.00 1060 61,480.00 (6,786.00)
58
1.3.7 SS safety chain Each 58 147 8,526.00 155 8,990.00 464.00
Fire Door - - -
1.1.1 FD, FD1 Sqm 86 7405 637,937.79 9069 781,290.72 143,352.93
1.1.2 FD2 Sqm 49 7405 363,437.40 5195 254,970.60 (108,466.80)
1.1.3 FD3 Sqm 4 7405 27,990.90 7717 29,170.26 1,179.36
1.1.1 Aluminum Doors and Windows - - -
Partly fixed with partly side hung openable shutter of types 975,658.32 1,333,935.78 358,277.46
a ED, ED1, ED2, D1', D2', DW, DW2' Sqm 298 3276 4479
Partly fixed, 2 track Sliding, Partly side hung openable and
with provision for exhaust fan of types DW1 308,337.12 400,480.60 92,143.48
b Sqm 94 3276 4255
Side hung openable Door with 12mm thk laminated MDF
panel of type Da' (Basic price Rs. 3276/- per Sqm, include 3276 98,240.69 4421 132,576.95 34,336.26
c F.O.R. cost of material, Glass, hardware, duties and the cost Sqm 30
Partly fixed, Partly
of installation side hung
and fixing openable
excluding and with provision
taxes) 273,775.32 389,937.62 116,162.30
d for exhaust fan of types DW2, DW3 Sqm 84 3276 4666
- - -
1.1.2 Sliding Doors - - -
a Partly fixed, 3 track Sliding, of types SD, SD1 Sqm 542 3510 1,901,858.40 2731 1,479,765.04 (422,093.36)
b Partly fixed, 2 track Sliding, of types SD2 - SD10 Sqm 339 3416 1,156,828.40 3190 1,080,293.50 (76,534.90)
- - -
1.1.3 Windows - - -
Partly fixed with partly side hung openable shutter of types
W11, W14, W14' 60,585.28 98,570.08 37,984.80
a Sqm 19 3182 5177
Partly fixed with partly side hung openable shutter and with
provision for exhaust fan of types W12,W13 (Basic price - - -
b Sqm 0 3182
Rs. 3182/- per Sqm, include F.O.R. cost of material, Glass,
Partly fixedduties
hardware, with and
2 track
the sliding
cost of of types W1,and
installation W4, W5, W7,
fixing
W9, W9' ,W10 707,835.90 837,301.80 129,465.90
c excluding taxes) Sqm 222 3182 3764
Partly fixed with 2 track sliding and with provision for
exhaust fan of types W5', W8 (Basic price Rs. 3182/- per - - -
d Sqm 0 3182
Sqm, include F.O.R. cost of material, Glass, hardware,
Partly
duties Fixed
and thewith
costpartly louvered and
of installation of types W2,
fixing W3, W6
excludint taxes)
(Basic price Rs. 3182/- per Sqm, include F.O.R. cost of - - -
e Sqm 0 3182
material, Glass, hardware, duties and the cost of installation
Partly Fixed
and fixing partly top
excluding hung openable with provision for
taxes)
exhaust fan of types V, V1 398,616.96 566,020.83 167,403.87
f Sqm 127 3136 4453
Total (1,059,340)
Total Executed
S.no Base Rate Items Unit Pre Quantity This Bill Quantity Quantity Remarks
3 Anti Skid Ceramic- for Kitchen Floor & dado Sqm 633 0 633
4 Anti Skid Ceramic- for Toilet Floor Sqm 797 0 797
5 Ceramic Tile Dado Sqm 3738 0 3738
6 Kota Stone 3'x2' Sqm 405.4 0 405
7 Kota Stone 2'x2' Sqm 366.9 0 367
8 Gwalior Stone Sqm 318.9 0 319
9 Imported Marble Sqm 0.0 0 0
10 Granite Stone- Jet Black Sqm 466.3 0 466
11 Granite Stone- Adhunik Polished Sqm 0 0 0
12 Granite Stone- Adhunik Sandblast Sqm 0 0 0
13 Laminated Wooden flooring Sqm 2734.6347819 0 2735
14 Laminated Wooden Skirting Rmt 2200.00525 0 2200
15 External Paint - Weather Proof Synthetic TexturSqm 2420.38 0 2420
16 External Paint - Acrylic Weather Shield Paint Sqm 8056.55 0 8057
17 600mm x 600mm Grid ceiling, ceiling tiles Sqm 753.979375 0 754
18 Veneer Door Sqm 115.918104 0 116
19 Moulded Door Sqm 685.693776 0 686
Fire Door Sqm
1.1.1 FD, FD1 Sqm 88.2698 0 88
1.1.2 FD2 Sqm 50.04 0 50
1.1.3 FD3 Sqm 3.78 0 4
1.1.1 Doors and Door cum Windows
Partly fixed with partly side hung openable
shutter of types ED, ED1, ED2, D1', D2', DW,
DW2'
a Sqm 297.77 0 298
Partly fixed, 2 track Sliding, Partly side hung
openable and with provision for exhaust fan of
types DW1
b Sqm 94.12 0 94
Side hung openable Door with 12mm thk
laminated MDF panel of type Da' (Basic price
Rs. 3276/- per Sqm, include F.O.R. cost of
material, Glass, hardware, duties and the cost
of installation and fixing excluding taxes)
c Sqm 32.49 0 32
Partly fixed, Partly side hung openable and
with provision for exhaust fan of types DW2,
DW3
d Sqm 83.57 0 84
0 0
1.1.2 Sliding Doors 0 0
Partly fixed, 3 track Sliding, of types SD, SD1
a Sqm 547.43 0 547
Partly fixed, 2 track Sliding, of types SD2 -
b SD10 Sqm 338.65 0 339
0 0
1.1.3 Windows 0 0
Partly fixed with partly side hung openable
a shutter of types W11, W14, W14' Sqm 20 0 20
Partly fixed with 2 track sliding of types W1,
c W4, W5, W7, W9, W9' ,W10 Sqm 222.28 0 222
Partly Fixed partly top hung openable with
f provision for exhaust fan of types V, V1 Sqm 127.35778 0 127
1.6.1 Vitrified Tiles Sqm 2739 474 1,297,149.8 421 1,153,098.77 (144,051.07)
1.6.2 Anti Skid Ceramic- for Balcony Sqm 2055 301 619,366.64 217 446,720.29 (172,646.36)
1.6.2 Anti Skid Ceramic- for Kitchen Floor & dado Sqm 633 301 190,659.71 208 131,681.42 (58,978.30)
1.6.2 Anti Skid Ceramic- for Toilet Floor Sqm 797 301 240,131.09 217 172,518.14 (67,612.96)
2.5 Ceramic Tile Dado Sqm 3738 301 1,126,522.2 240 898,587.93 (227,934.32)
1.5.1 Kota Stone 3'x2' Sqm 405 420 170,198.80 325.6 132,013.17 (38,185.63)
1.3.3 Kota Stone 2'x2' Sqm 367 420 154,010.21 282.6 103,660.72 (50,349.49)
1.7.2 Gwalior Stone Sqm 319 840 267,764.11 635 202,539.52 (65,224.59)
1.3.1 Imported Marble Sqm 0 2,637 - 2368 - -
2.6 Granite Stone- Jet Black Sqm 466 1,270 592,323.45 1507 702,756.63 110,433.18
1.7.1 Laminated Wooden flooring Sqm 2735 624.31 1,707,265.31 618 1,689,402.68 (17,862.63)
Page 717 of 832
1.7.2 Laminated Wooden Skirting Rmt 2200 118.08 259,776.62 117 257,202.61 (2,574.01)
1.3 External Paint - Weather Proof Synthetic Texture Paint-A, Sqm 2420 247.57 599,218.32 312 754,916.52 155,698.20
1.4 External Paint - Acrylic Weather Shield Paint Sqm 8057 193.75 1,560,972.68 115 925,697.60 (476,456.31)
1.6.1 600mm x 600mm Grid ceiling, ceiling tiles Sqm 754 583.00 439,569.98 470 354,355.23 (85,214.75)
1.2.1 Veneer Door Sqm 116 2,616 303,241.76 2300 266,611.64 (36,630.12)
1.2.2 Moulded Door Sqm 686 916 628,095.50 1033 708,554.81 80,459.31
1.3 Hardware for Wooden Doors
1.3.1 Mortice Latch Lock
With Pin Cylinder (10' forend length) - for No. 56 1308 73,588.08 875 49,227.50 (24,360.58)
a external Doors
With Pin Cylinder (8' forend length) - for No. 252 1177 296,839.40 821 207,056.20 (89,783.20)
b Internal Doors
Keyless Cylindrical handle with knob - For No. 196 872 170,859.68 244 47,809.36 (123,050.32)
c toilet doors
- - -
1.3.2 Tower bolt - - -
a 200 X 10 mm Each 247 196 48,412.00 80 19,760.00 (28,652.00)
b 250 X 10 mm Each 55 245 13,499.50 100 5,510.00 (7,989.50)
- - -
1.3.3 Hanging type double floor door stopper Each 318 196 62,328.00 120 38,160.00 (24,168.00)
1.3.4 Fixing rubber buffer. Each 520 196 101,920.00 14 7,280.00 (94,640.00)
1.3.5 Magic eye 270'' Each 147 8,526.00 125 7,250.00 (1,276.00)
58
1.3.6 SS hydraulic door closer Each 1177 68,266.00 1060 61,480.00 (6,786.00)
58
1.3.7 SS safety chain Each 58 147 8,526.00 155 8,990.00 464.00
Fire Door
1.1.1 FD, FD1 Sqm 88 7405 653,637.87 9069 800,518.82 146,880.95
1.1.2 FD2 Sqm 50 7405 370,546.20 5195 259,957.80 (110,588.40)
1.1.3 FD3 Sqm 4 7405 27,990.90 7717 29,170.26 1,179.36
1.1.1 Aluminum Doors and Windows
Partly fixed with partly side hung openable Sqm 298 3276 975,494.52 4479 1,333,711.83 358,217.31
a shutter of types ED, ED1, ED2, D1', D2',
DW,
PartlyDW2'
fixed, 2 track Sliding, Partly side hung
openable and with provision for exhaust fan Sqm 94 3276 308,337.12 4255 400,480.60 92,143.48
b of types DW1
Side hung openable Door with 12mm thk
laminated MDF panel of type Da' (Basic Sqm 32 3276 106,437.2 4421 143,638.29 37,201.05
c price Rs. 3276/- per Sqm, include F.O.R. cost
Partly fixed,Glass,
of material, Partlyhardware,
side hungduties
openable
and and
the Sqm 84 3276 273,775.32 4666 389,937.62 116,162.30
d with provision
cost of for exhaust
installation fanexcluding
and fixing of types DW2,
DW3
taxes) - - -
1.1.2 Sliding Doors - - -
a Partly fixed, 3 track Sliding, of types SD, Sqm 547 3510 1,921,479.3 2731 1,495,031.33 (426,447.97)
b SD1
Partly fixed, 2 track Sliding, of types SD2 - Sqm 339 3416 1,156,828.4 3190 1,080,293.50 (76,534.90)
SD10 - - -
1.1.3 Windows - - -
Partly fixed with partly side hung openable
shutter of types W11, W14, W14' Sqm 20 3182 63,640.00 5177 103,540.00 39,900.00
a
Partly fixed with partly side hung openable
shutter and with provision for exhaust fan of Sqm - - -
b
types W12,W13 (Basic price Rs. 3182/- per
Partly fixed with 2 track sliding of types W1,
Sqm, include F.O.R. cost of material, Glass, Sqm 222 3182 707,294.96 3764 836,661.92 129,366.96
c W4, W5, W7, W9, W9' ,W10
hardware, duties and the cost of installation
and fixing
Partly fixedexcluding taxes)
with 2 track sliding and with
provision for exhaust fan of types W5', W8 Sqm - - -
d
(Basic price Rs. 3182/- per Sqm, include
Partly Fixed with partly louvered of types
F.O.R. cost of material, Glass, hardware, Sqm - - -
e W2, W3, W6 (Basic price Rs. 3182/- per
duties and the cost of installation and fixing
Sqm, include F.O.R. cost of material, Glass,
excludint taxes)
Partly Fixed partly top hung openable with
hardware, duties and the cost of installation Sqm 127 3136 399,394.00 4453 567,124.19 167,730.20
f provision for exhaust fan of types V, V1
and fixing excluding taxes)
(1,022,161)
Total
c Sqm 29.2536 0 29
Partly fixed, Partly side hung openable
and with provision for exhaust fan of
d types DW2, DW3 Sqm 83 0 83
0 0
1.1.2 Sliding Doors 0 0
Partly fixed, 3 track Sliding, of types SD,
a SD1 Sqm 541.84 0 542
Partly fixed, 2 track Sliding, of types SD2
b - SD10 Sqm 335.2 0 335
0 0
1.1.3 Windows 0 0
Partly fixed with partly side hung
openable shutter of types W11, W14,
W14'
a Sqm 20.09 0 20
Partly fixed with 2 track sliding of types
W1, W4, W5, W7, W9, W9' ,W10
c Sqm 221.74 0 222
Partly Fixed partly top hung openable
with provision for exhaust fan of types V,
f V1 Sqm 127.12 0 127
1.6.1 Vitrified Tiles Sqm 2783 473.62 1,318,182.10 421.02 1,171,795.35 (146,386.75)
1.6.2 Anti Skid Ceramic- for Balcony Sqm 2092 301.39 630,539.84 217.38 454,778.99 (175,760.85)
1.6.2 Anti Skid Ceramic- for Kitchen Floor Sqm 676 301.39 203,719.67 208.16 140,701.43 (63,018.24)
1.6.2 Anti Skid Ceramic- for Toilet Floor Sqm 822 301.39 247,623.68 216.53 177,901.06 (69,722.62)
2.5 Ceramic Tile Dado Sqm 3779 301.39 1,139,029.20 240.41 908,564.30 (230,464.91)
1.5.1 Kota Stone 3'x2' Sqm 421 420 176,671.15 325.6 137,033.39 (39,637.76)
1.3.3 Kota Stone 2'x2' Sqm 381 420 159,854.12 282.6 107,594.12 (52,260.00)
1.7.2 Gwalior Stone Sqm 317 840 265,764.45 635 201,026.96 (64,737.49)
1.3.1 Imported Marble Sqm 0 2,637 - 2368 - -
2.6 Granite Stone- Jet Black Sqm 456 1,270 579,621.93 1507 687,687.03 108,065.10
1.7.1 Laminated Wooden flooring Sqm 2763 624.31 1,724,686.38 618 1,706,641.48 (18,044.91)
1.7.2 Laminated Wooden Skirting Rmt 2269 118.08 267,980.09 117 265,324.80 (2,655.29)
1.3 External Paint - Weather Proof Synthetic Texture Paint-A,B,C Sqm 2536 247.57 627,808.91 312 790,935.96 163,127.06
1.4 External Paint - Acrylic Weather Shield Paint Sqm 8763 193.75 1,697,760.72 115 1,006,816.48 (518,208.18)
1.6.1 600mm x 600mm Grid ceiling, ceiling tiles Sqm 754 583.00 439,569.98 470 354,355.23 (85,214.75)
1.2.1 Veneer Door Sqm 117 2,616.00 306,367.96 2500 292,782.84 (13,585.12)
1.2.2 Moulded Door Sqm 693 916.00 634,569.22 1238 857,638.31 223,069.09
1.3 Hardware for Wooden Doors
1.3.1 Mortice Latch Lock
a With Pin Cylinder (10' forend length) - for external Doors No. 57 1308 74,346.72 875 49,735.00 (24,611.72)
b With Pin Cylinder (8' forend length) - for Internal Doors No. 255 1177 299,570.04 821 208,960.92 (90,609.12)
c Keyless Cylindrical handle with knob - For toilet doors No. 196 872 170,859.68 244 47,809.36 (123,050.32)
- - -
1.3.2 Tower bolt - - -
a 200 X 10 mm Each 260 196 50,960.00 80 20,800.00 (30,160.00)
b 250 X 10 mm Each 58 245 14,210.00 100 5,800.00 (8,410.00)
- - -
1.3.3 Hanging type double floor door stopper Each 318 196 62,328.00 120 38,160.00 (24,168.00)
1.3.4 Fixing rubber buffer. Each 520 196 101,920.00 14 7,280.00 (94,640.00)
8,526.00 7,250.00 (1,276.00)
1.3.5 Magic eye 270'' Each 58 147 125
68,266.00 61,480.00 (6,786.00)
1.3.6 SS hydraulic door closer Each 58 1177 1060
1.3.7 SS safety chain Each 58 147 8,526.00 155 8,990.00 464.00
Fire Door
1.1.1 FD, FD1 Sqm 89 7405 657,786.15 9069 805,599.27 147,813.1
1.1.2 FD2 Sqm 49 7405 360,105.15 5195 252,632.85 (107,472.30)
1.1.3 FD3 Sqm 4 7405 27,990.90 7717 29,170.26 1,179.36
1.1.1 Aluminum Doors and Windows
Partly fixed with partly side hung openable shutter of 965,699.28 1,320,319.62 354,620.34
a types ED, ED1, ED2, D1', D2', DW, DW2' Sqm 295 3276 4479
Partly fixed, 2 track Sliding, Partly side hung openable
and with provision for exhaust fan of types DW1 305,192.16 396,395.80 91,203.64
b Sqm 93 3276 4255
Side hung openable Door with 12mm thk laminated MDF
panel of type Da' (Basic price Rs. 3276/- per Sqm, include 3276 95,834.79 4421 129,330.17 33,495.37
c F.O.R. cost of material, Glass, hardware, duties and the Sqm 29
Partly
cost offixed, Partlyand
installation sidefixing
hungexcluding
openable and with provision
taxes) 271,908.00 387,278.00 115,370.00
d for exhaust fan of types DW2, DW3 Sqm 83 3276 4666
1.1.3 Windows
Partly fixed with partly side hung openable shutter of
types W11, W14, W14' 63,926.38 104,005.93 40,079.55
a Sqm 20 3182 5177
Partly fixed with partly side hung openable shutter and
with provision for exhaust fan of types W12,W13 (Basic - - -
b Sqm
price Rs. 3182/- per Sqm, include F.O.R. cost of material,
Partly fixed with 2 track sliding of types W1, W4, W5,
Glass, hardware, duties and the cost of installation and 705,576.68 834,629.36 129,052.68
c W7, W9, W9' ,W10 Sqm 222 3182 3764
fixing excluding taxes)
Total (913,773)
Project Godrej Aria sector 79 Gurgaon Date 19-Feb-20
VendorJayant K. Furnishers, RA Bill No. 24th RA
Service FINISHING WORKS FOR GODREJ ARIA SEC-79, Gurgaon Period Up to Jan. 2021
LOI No. GPL/GGN/LOA/GODREJ ARIA/JAYANT Dated 06th Dec'16
Calculation for Tower-D
Quantity executed upto 25 Oct.-2020
Total
Pre This Bill Executed
S.no Base Rate Items Unit Quantity Quantity Quantity Remarks
1.6.1 Vitrified Tiles Sqm 3167 473.62 1,499,857.60 421.02 1,333,295.43 (166,562.17)
1.6.2 Anti Skid Ceramic- for Balcony Sqm 1545 301.39 465,703.71 217.38 335,890.38 (129,813.33)
1.6.2 Anti Skid Ceramic- for Kitchen Floor Sqm 798 301.39 240,437.22 208.16 166,060.85 (74,376.37)
1.6.2 Anti Skid Ceramic- for Toilet Floor Sqm 627 301.39 188,921.23 216.53 135,727.27 (53,194)
2.5 Ceramic Tile Dado Sqm 3125 301.39 941,764.73 240.41 751,213.23 (190,551)
1.5.1 Kota Stone 3'x2' Sqm 405 420 170,127.11 325.6 131,957.56 (38,169.54)
1.3.3 Kota Stone 2'x2' Sqm 365 420 153,311.42 282.6 103,190.38 (50,121.04)
1.7.2 Gwalior Stone Sqm 296 840 248,763.22 635 188,167.05 (60,596.17)
1.3.1 Imported Marble Sqm 0 2,637 - 2368 - -
2.6 Granite Stone- Jet Black Sqm 460 1,270 584,667.41 1507 693,673.20 109,005.79
Granite Stone- Adhunik Polished 0 - - -
Granite Stone- Adhunik Sandblast 0 - - -
1.7.1 Laminated Wooden flooring Sqm 2215 624.31 1,382,984.23 618 1,368,514.46 (14,469.77)
1.7.2 Laminated Wooden Skirting Rmt 2063 118.08 243,593.84 117 241,180.19 (2,413.66)
1.3 External Paint - Weather Proof Synthetic Texture Paint-D,E Sqm 1629 247.57 403,408.67 315 513,279.90 109,871.23
1.4 External Paint - Acrylic Weather Shield Paint Sqm 7987 193.75 1,547,495.29 116 926,490.84 (155,251.11)
1.6.1 600mm x 600mm Grid ceiling, ceiling tiles Sqm 611 583.00 356,055.82 470 287,031.07 (69,024.75)
1.2.1 Veneer Door Sqm 162 2,616.00 424,289.04 2500 405,475.00 (18,814.04)
1.2.2 Moulded Door Sqm 517 916.00 473,659.88 1238 640,164.77 166,504.89
1.3 Hardware for Wooden Doors
1.3.1 Mortice Latch Lock
a With Pin Cylinder (10' forend length) - for external Doors No. 79 1308 102,965.76 875 68,880.00 (34,085.76)
b With Pin Cylinder (8' forend length) - for Internal Doors No. 182 1177 214,684.80 821 149,750.40 (64,934.40)
c Keyless Cylindrical handle with knob - For toilet doors No. 157 872 137,287.68 244 38,415.36 (98,872.32)
1.3.5 Magic eye 270'' Each 147 12,054.00 125 10,250.00 (1,804.00)
82
1.3.6 SS hydraulic door closer Each 1177 96,514.00 1060 86,920.00 (9,594.00)
82
1.3.7 SS safety chain Each 82 147 12,054.00 155 12,710.00 656.00
Fire Door
1.1.1 FD, FD1 Sqm 84 7405 618,407.84 9069 757,372.14 138,964.3
1.1.2 FD2 Sqm 49 7405 359,660.85 5195 252,321.15 (107,339.70)
1.1.3 FD3 Sqm 4 7405 27,990.90 7717 29,170.26 1,179.36
1.1.1 Aluminum Doors and Windows
Partly fixed with partly side hung openable shutter of
types ED, ED1, ED2, D1', D2', DW, DW2' Sqm 117 3276 384,569.64 4479 525,789.81 141,220.17
a
Partly fixed, 2 track Sliding, Partly side hung openable
and with provision for exhaust fan of types DW1 Sqm 0 3276 - 4255 - -
b
Side hung openable Door with 12mm thk laminated MDF
panel of type Da' (Basic price Rs. 3276/- per Sqm, include Sqm 28 3276 90,574.85 4421 122,231.81 31,656.96
c F.O.R. cost of material, Glass, hardware, duties and the
Partly
cost offixed, Partlyand
installation sidefixing
hungexcluding
openable and with provision
taxes)
for exhaust fan of types DW2, DW3 Sqm 73 3276 240,196.32 4666 342,111.12 101,914.80
d
0
1.1.2 Sliding Doors 0
a Partly fixed, 3 track Sliding, of types SD, SD1 Sqm 502 3510 1,760,616 2731 1,369,870 (390,746.40)
b Partly fixed, 2 track Sliding, of types SD2 - SD10 Sqm 505 3416 1,723,542.80 3190 1,609,514.50 (114,028.30)
1.1.3 Windows
Partly fixed with partly side hung openable shutter of Sqm 85 3182 271,997.36 5177 442,529.96 170,532.60
a types W11, W14, W14'
Partly fixed with partly side hung openable shutter and
with provision for exhaust fan of types W12,W13 (Basic Sqm 0 - - -
b price Rs. 3182/- per Sqm, include F.O.R. cost of material,
Partly
Glass, fixed with duties
hardware, 2 trackand
sliding of types
the cost W1, W4, W5,
of installation and Sqm 44 3182 140,580.76 3764 166,293.52 25,712.76
c W7,
fixingW9, W9' ,W10
excluding taxes)
Partly fixed with 2 track sliding and with provision for
exhaust fan of types W5', W8 (Basic price Rs. 3182/- per Sqm 63 3182 201,006.94 4420 279,211.40 78,204.46
d Sqm, include F.O.R. cost of material, Glass, hardware,
duties and the cost of installation and fixing excludint
taxes)
Page 722 of 832
Partly Fixed with partly louvered of types W2, W3, W6
(Basic price Rs. 3182/- per Sqm, include F.O.R. cost of Sqm 0 - - -
e material, Glass, hardware, duties and the cost of
Partly Fixedand
installation partly topexcluding
fixing hung openable
taxes) with provision for
exhaust fan of types V, V1 Sqm 111 3136 348,080.95 4453 494,261.63 146,180.68
f
Total (753,779)
Total
Pre This Bill Executed
S.no Base Rate Items Unit Quantity Quantity Quantity Remarks
1.6.1 Vitrified Tiles Sqm 2444 473.62 1,157,684.88 421.02 1,029,121.66 (128,563.21)
1.6.2 Anti Skid Ceramic- for Balcony - Pre GST approval Sqm 440 344.45 151,697.54 252.95 111,401.12 (40,296.42)
1.6.2 Anti Skid Ceramic- for Balcony Sqm 854 301.39 257,399.50 217.38 185,650.26 (71,749.24)
1.6.2 Anti Skid Ceramic- for Kitchen Floor - Pre GST approval Sqm 631 344.45 217,346.69 242.19 152,821.89 (64,524.80)
1.6.2 Anti Skid Ceramic- for Kitchen Floor Sqm -62 301.39 (18,540.91) 208.16 (12,805.50) 5,735.41
1.6.2 Anti Skid Ceramic- for Toilet floor Sqm 469 301.39 141,253.16 216.53 101,480.95 (39,772.21)
2.5 Ceramic Tile Dado Sqm 2358 301.39 710,555.43 240.41 566,785.55 (143,769.88)
1.5.1 Kota Stone 3'x2' Sqm 306 420 128,594.11 325.6 99,742.87 (28,851.24)
1.3.3 Kota Stone 2'x2' Sqm 304 420 127,595.66 282.6 85,881.69 (41,713.97)
1.7.2 Gwalior Stone Sqm 230 840 193,157.38 635 146,106.22 (47,051.16)
2.6 Jet Black Granite Sqm 359 1,270 456,220.86 1507 541,278.99 85,058.13
1.7.1 Laminated Wooden flooring Sqm 1716 624.31 1,071,188.57 618 1,059,981.02 (11,207.54)
1.7.2 Laminated Wooden Skirting Rmt 1577 118.08 186,220.43 117 184,375.25 (1,845.17)
1.3 External Paint - Weather Proof Synthetic Texture Paint-D,E, Sqm 1707 247.57 422,696.41 315 537,820.79 115,124.38
1.4 External Paint - Acrylic Weather Shield Paint Sqm 8118 193.75 1,572,850.82 116 941,671.28 (157,794.88)
1.6.1 600mm x 600mm Grid ceiling, ceiling tiles Sqm 483 583.00 281,555.28 470 226,973.16 (54,582.12)
J.1.2 Joinery- Flush Door, D Sqm 129 2,616.00 338,065.68 2300 297,229.00 (40,836.68)
1.2.2 Moulded Door Sqm 412 916.00 376,943.16 1033 425,229.74 48,286.58
1.3 Hardware for Wooden Doors - - -
1.3.1 Mortice Latch Lock - - -
a With Pin Cylinder (10' forend length) - for external Doors No. 61 1308 80,363.52 875 53,760.00 (26,603.52)
b With Pin Cylinder (8' forend length) - for Internal Doors No. 142 1177 167,228.16 821 116,647.68 (50,580.48)
c Keyless Cylindrical handle with knob - For toilet doors No. 123 872 107,151.36 244 29,982.72 (77,168.64)
1.3.3 Hanging type double floor door stopper Each 212 196 41,552.00 120 25,440.00 (16,112.00)
1.3.4 Fixing rubber buffer. Each 340 196 66,640.00 14 4,760.00 (61,880.00)
1.3.5 Magic eye 270'' Each 147 9,408.00 125 8,000.00 (1,408.00)
64
1.3.6 SS hydraulic door closer Each 1177 75,328.00 1060 67,840.00 (7,488.00)
64
1.3.7 SS safety chain Each 64 147 9,408.00 155 9,920.00 512.00
Fire Door - - -
1.1.1 FD, FD1 Sqm 68.6 7405 507,826.01 9069 621,941.14 114,115.12
1.1.2 FD2 Sqm 41.4 7405 306,270.80 5195 214,865.20 (91,405.60)
1.1.3 FD3 Sqm 3.8 7405 27,990.90 7717 29,170.26 1,179.36
1.1.1 Aluminum Doors and Windows - - -
Partly fixed with partly side hung openable shutter of types
ED, ED1, ED2, D1', D2', DW, DW2' 97 318,394.44 392,302.58 73,908.14
a Sqm 3276 4036
Partly fixed, 2 track Sliding, Partly side hung openable and
with provision for exhaust fan of types DW1 0 - - -
b Sqm 3276 4255
Side hung openable Door with 12mm thk laminated MDF
panel of type Da' (Basic price Rs. 3276/- per Sqm, include 23 3276 75,125.23 3977.47 91,211.34 16,086.11
c Sqm
F.O.R. cost of material, Glass, hardware, duties and the cost
Partly fixed, Partly side hung openable and with provision
of installation and fixing excluding taxes) 58 188,730.36 221,608.39 32,878.03
d for exhaust fan of types DW2, DW3 Sqm 3276 3846.7
- - -
1.1.2 Sliding Doors - - -
a Partly fixed, 3 track Sliding, of types SD, SD1 Sqm 398 3510 1,395,365.40 2682.81 1,066,524.29 (328,841.11)
b Partly fixed, 2 track Sliding, of types SD2 - SD10 Sqm 407 3416 1,391,336.80 3296.25 1,342,562.63 (48,774.18)
- - -
1.1.3 Windows - - -
Partly fixed with partly side hung openable shutter of types 69 218,157.92 320,804.58 102,646.66
a Sqm 3182 4679.18
W11, W14, W14'
Partly fixed with partly side hung openable shutter and with
provision for exhaust fan of types W12,W13 (Basic price 0 - 3859.22 - -
b Sqm 3182
Rs. 3182/- per Sqm, include F.O.R. cost of material, Glass,
Partly fixed with 2 track sliding of types W1, W4, W5, W7, 35 110,383.58 133,876.34 23,492.76
c hardware, duties and the cost of installation and fixing Sqm 3182 3859.22
W9, W9' ,W10
excluding
Partly fixedtaxes)
with 2 track sliding and with provision for
exhaust fan of types W5', W8 51 161,231.94 222,028.34 60,796.40
d Sqm 3182 4381.85
Partly Fixed with partly louvered of types W2, W3, W6
(Basic price Rs. 3182/- per Sqm, include F.O.R. cost of 0 - - -
e Sqm 3182 4381.85
material, Glass, hardware, duties and the cost of installation
Partly Fixed partly top hung openable with provision for 88 277,347.84 401,298.27 123,950.43
f and fixing excluding taxes) Sqm 3136 4537.52
exhaust fan of types V, V1
Total (804,441)
This Bill
BOQ Executed Qty Total Executed
Item no Description of Item Unit Pre Qty Qty Quantity Remarks
b Sqm 0 - -
Partly fixed with 2 track sliding of
types W1, W4, W5, W7, W9,
W9' ,W10
c Sqm 34 - 34.34
Partly fixed with 2 track sliding and
with provision for exhaust fan of types
W5', W8
d Sqm 50 - 50.15
Partly Fixed partly top hung openable
with provision for exhaust fan of types
V, V1
f Sqm 88 - 87.53
0 -
Page 726 of 832
Calculation of Escalation/Descalation Amount on Basic Rate of Item
As per Tender As per Actual Remarks
BOQ Item Total Qty Escalation/De-
no. Item Description Unit Consumed as escalation amount
per Abstract Base Rate Amount Procured Amount Payable
Rate
1.6.1 Vitrified Tiles- Pre GST approval Sqm 1435 538.20 772,166.30 477.00 684,361.44 (87,804.86)
1.6.1 Vitrified Tiles Sqm 1013 473.62 479,631.42 421.02 426,367.40 (53,264.02)
1.6.2 Anti Skid Ceramic- for Balcony- Pre GST approva Sqm 949 344.45 326,721.49 252.95 239,932.30 (86,789.19)
1.6.2 Anti Skid Ceramic- for Balcony Sqm 321 301.39 96,720.95 217.38 69,760.32 (26,960.64)
1.6.2 Anti Skid Ceramic- for Kitchen Floor- Pre GST ap Sqm 475 344.45 163,751.96 242.19 115,138.09 (48,613.86)
1.6.2 Anti Skid Ceramic- for Kitchen Floor Sqm 182 301.39 54,879.26 208.16 37,903.02 (16,976.24)
1.6.2 Anti Skid Ceramic- for Toilet floor Sqm 476 301.39 143,519.26 216.53 103,108.99 (40,410.27)
2.5 Ceramic Tile Dado Sqm 2419 301.39 729,209.17 240.41 581,665.00 (147,544.17)
1.5.1 Kota Stone 3'x2' Sqm 307 420 128,976.32 325.6 100,039.33 (28,937.00)
1.3.3 Kota Stone 2'x2' Sqm 305 420 128,101.44 282.6 86,222.12 (41,879.32)
2.3.2 Gwalior Stone Sqm 230 840 193,157.38 635 146,106.22 (47,051.16)
2.6 Granite Stone- Jet Black Sqm 461 1,270 585,934.06 1507 695,176.00 109,241.94
1.7.1 Laminated Wooden flooring Sqm 1716 624.31 1,071,188.57 618 1,059,981.02 (11,207.54)
1.7.2 Laminated Wooden Skirting Rmt 1558 118.08 183,921.41 117 182,099.02 (1,822.39)
1.3 External Paint - Weather Proof Synthetic Textur Sqm 1705 247.57 422,232.70 315 537,230.79 114,998.09
1.4 External Paint - Acrylic Weather Shield Paint Sqm 6743 193.75 1,306,496.82 116 782,204.21 (131,073.15)
1.6.1 600mm x 600mm Grid ceiling, ceiling tiles Sqm 483 583.00 281,555.28 470 226,973.16 (54,582.12)
J.1.2 Joinery- Flush Door, D Sqm 129 2,616.00 338,065.68 2300 297,229.00 (40,836.68)
1.2.2 Moulded Door Sqm 412 916.00 376,943.16 1033 425,229.74 48,286.58
1.3 Hardware for Wooden Doors - - -
1.3.1 Mortice
With PinLatch Lock(10' forend length) - for
Cylinder - - -
a external
With Pin Doors
Cylinder (8' forend length) - for No. 63 1308 82,404.00 875 55,125.00 (27,279.00)
b Internal Doors
Keyless Cylindrical handle with knob - For No. 145 1177 170,665.00 821 119,045.00 (51,620.00)
c toilet doors No. 125 872 109,000.00 244 30,500.00 (78,500.00)
1.3.3 Hanging type double floor door stopper Each 212 196 41,552.00 120 25,440.00 (16,112.00)
1.3.4 Fixing rubber buffer. Each 340 196 66,640.00 14 4,760.00 (61,880.00)
9,408.00 8,000.00 (1,408.00)
1.3.5 Magic eye 270'' Each 64 147 125
75,328.00 67,840.00 (7,488.00)
1.3.6 SS hydraulic door closer Each 64 1177 1060
1.3.7 SS safety chain Each 64 147 9,408.00 155 9,920.00 512.00
Fire Door
1.1.1 FD, FD1 Sqm 69.7 7405 516,341.76 9069 632,370.49 116,028.72
1.1.2 FD2 Sqm 39.8 7405 294,348.75 5195 206,501.25 (87,847.50)
1.1.3 FD3 Sqm 3.8 7405 27,990.90 7717 29,170.26 1,179.36
1.1.1 Aluminum Doors and Windows - - -
Partly fixed with partly side hung openable
shutter of types ED, ED1, ED2, D1', D2', DW, 315,118.44 4036.45 388,266.13 73,147.69
a Sqm 96 3276
DW2'
Partly fixed, 2 track Sliding, Partly side hung
openable and with provision for exhaust fan of - - -
b types DW1 Sqm 0 3276 4255
Side hung openable Door with 12mm thk
laminated MDF panel of type Da' (Basic price 3276 74,358.65 3977.47 90,280.61 15,921.97
c Rs. 3276/- per Sqm, include F.O.R. cost of Sqm 23
Partly fixed,
material, Partly
Glass, side hung
hardware, openable
duties and theand
cost
with provisionand
for fixing
exhaustexcluding
fan of types DW2, 186,830.28 219,377.30 32,547.02
d of installation taxes) Sqm 57 3276 3846.7
DW3 - - -
1.1.2 Sliding Doors - - -
a Partly fixed, 3 track Sliding, of types SD, SD1 Sqm 393 3510 1,381,114.80 2682.81 1,055,632.08 (325,482.72)
b Partly fixed, 2 track Sliding, of types SD2 - Sqm 404 3416 1,380,713.04 3296.25 1,332,311.3 (48,401.75)
SD10 - - -
1.1.3 Windows - - -
Partly fixed with partly side hung openable 215,930.52 317,529.15 101,598.63
a shutter of types W11, W14, W14' Sqm 68 3182 4679.18
Partly fixed with 2 track sliding of types W1, 109,269.88 132,525.61 23,255.73
c W4, W5, W7, W9, W9' ,W10 Sqm 34 3182 3859.22
Partly fixed with 2 track sliding and with
provision for exhaust fan of types W5', W8 159,577.30 219,749.78 60,172.48
d Sqm 50 3182 4381.85
Page 727 of 832
Partly Fixed partly top hung openable with
provision for exhaust fan of types V, V1 274,494.08 397,169.13 122,675.05
f Sqm 88 3136 4537.52
Total (778,161)
1.1.3 Windows
Partly fixed with partly side hung openable
shutter of types W11, W14, W14'
a Sqm -
Partly fixed with partly side hung openable
shutter and with provision for exhaust fan
of types W12,W13 (Basic price Rs. 3182/-
b per Sqm, include F.O.R. cost of material, Sqm -
Partly
Glass, fixed with duties
hardware, 2 trackand
sliding of types
the cost of
c W1, W4, W5,
installation andW7, W9,excluding
fixing W9' ,W10 taxes) Sqm -
Partly fixed with 2 track sliding and with
provision for exhaust fan of types W5', W8
d Sqm -
Partly Fixed partly top hung openable with
provision for exhaust fan of types V, V1
f Sqm -
Calculation of Escalation/Descalation Amount on Basic Rate of Item
1.3.3 Hanging type double floor door stopper Each 196 - 120 - -
1.3.4 Fixing rubber buffer. Each 196 - 14 - -
- - -
1.3.5 Magic eye 270'' Each 147 125
- - -
1.3.6 SS hydraulic door closer Each 1177 1060
1.3.7 SS safety chain Each 147 - 155 - -
Fire Door
1.1.1 FD, FD1 Sqm 7405 - 9069 - -
1.1.2 FD2 Sqm 7405 - 5195 - -
1.1.3 FD3 Sqm 7405 - 7717 - -
1.1.1 Aluminum Doors and Windows - - -
Partly fixed with partly side hung openable shutter
of types ED, ED1, ED2, D1', D2', DW, DW2' - 4036.45 - -
a Sqm 3276
Partly fixed, 2 track Sliding, Partly side hung
openable and with provision for exhaust fan of types Sqm - - -
b 3276 4255
DW1
Side hung openable Door with 12mm thk laminated
MDF panel of type Da' (Basic price Rs. 3276/- per 3276 - 3977.47 - -
c Sqm
Sqm, include F.O.R. cost of material, Glass,
Partly fixed, Partly side hung openable and with
hardware, duties and the cost of installation and - - -
d provision for exhaust fan of types DW2, DW3 Sqm 3276 3846.7
fixing excluding taxes)
- - -
1.1.2 Sliding Doors - - -
a Partly fixed, 3 track Sliding, of types SD, SD1 Sqm 3510 - 2682.81 - -
b Partly fixed, 2 track Sliding, of types SD2 - SD10 Sqm 3416 - 3296.25 - -
- - -
1.1.3 Windows - - -
Partly fixed with partly side hung openable shutter
- - -
a of types W11, W14, W14' Sqm 3182 4679.18
Partly fixed with 2 track sliding of types W1, W4, - - -
c W5, W7, W9, W9' ,W10 Sqm 3182 3859.22
d Partly fixed with 2 track sliding and with provision Sqm 3182 - 4381.85 - -
e for exhaust
Partly Fixedfan of partly
with types W5', W8 of types W2, W3,
louvered Sqm - - - -
f W6 (Basic
Partly Fixedprice Rs.top
partly 3182/-
hungper Sqm, include
openable with F.O.R. Sqm 3136 - 4537.52 - -
provision for exhaust fan of types V, V1
Total 81,965
Project : Godrej Aria sector 79 Gurgaon Date 19-Feb-20
Vendor Jayant K. Furnishers, RA Bill No. 24th RA
Service FINISHING WORKS FOR GODREJ ARIA SEC-79, Gurgaon Up to Jan.
Period
2021
LOI No. GPL/GGN/LOA/GODREJ ARIA/JAYANT Dated 06th Dec'16
Calculation for Shopping
Quantity executed upto 25 Oct.-2020
1.1.3 Windows
Partly fixed with partly side hung
a openable shutter of types W11, W14, Sqm -
W14'
Partly fixed with partly side hung
b openable shutter and with provision Sqm -
for exhaust
Partly fixedfan
withof2types
trackW12,W13
sliding of
(Basic priceW4,
types W1, Rs.W5,
3182/-
W7,per
W9, Sqm,
c include F.O.R. cost of material, Glass, Sqm -
W9' ,W10
Partly fixedduties
with and
2 track
hardware, the sliding
cost of and
d with provision
installation andfor exhaust
fixing fan of taxes)
excluding types Sqm -
W5',
PartlyW8
Fixed with partly louvered of
e types W2, W3, W6 Sqm -
Partly Fixed partly top hung openable
f with provision for exhaust fan of types Sqm -
V, V1
Calculation of Escalation/Descalation Amount on Basic Rate of Item
As per Tender As per Actual Remarks
BOQ Item Total Qty Escalation/De-
Item Description Unit Consumed as escalation amount
no.
per Abstract Procured Payable
Base Rate Amount Rate Amount
- - -
1.3.3 Hanging type double floor door stopper Each 196 120
1.3.4 Fixing rubber buffer. Each 196 - 14 - -
1.3.5 Magic eye 270'' Each 147 - 125 - -
1.3.6 SS hydraulic door closer Each 1177 - 1060 - -
1.3.7 SS safety chain Each 147 - 155 - -
Fire Door
1.1.1 FD, FD1 Sqm 7405 - 9069 - -
FD2
- - -
1.1.2 Sqm 7405 5195
FD3
- - -
1.1.3 Sqm 7405 7717
- - -
1.1.1 Aluminum Doors and Windows
Partly fixed with partly side hung openable
shutter of types ED, ED1, ED2, D1', D2', - 4036.45 - -
a Sqm 3276
DW, DW2' - - -
b Partly fixed, 2 track Sliding, Partly side hung Sqm 3276 4255
c openable
Side hungand with provision
openable Door withfor12mm
exhaust
thkfan Sqm 3276 - 3977.47 - -
d laminated MDF panel of type Da' (Basic
Partly fixed, Partly side hung openable and Sqm 3276 - 3846.7 - -
with provision for exhaust fan of types DW2, - - -
DW3
Sliding Doors - - -
1.1.2
a Partly fixed, 3 track Sliding, of types SD, Sqm 3510 - 2682.81 - -
b SD1
Partly fixed, 2 track Sliding, of types SD2 - Sqm 3416 - 3296.25 - -
SD10 - - -
1.1.3 Windows - - -
a Partly fixed with partly side hung openable Sqm 3182 - 4679.18 - -
b shutterfixed
Partly of types
withW11,
partlyW14,
side W14'
hung openable Sqm - - - -
c shutter and with
Partly fixed withprovision for exhaust
2 track sliding fanW1,
of types of Sqm 3182 - 3859.22 - -
types W12,W13
W4, W5, W7, W9, (Basic
W9' price
,W10Rs. 3182/- per
Sqm, include F.O.R. cost of material, Glass,
hardware, duties and the cost of installation
and fixing excluding taxes)
d Partly fixed with 2 track sliding and with Sqm 3182 - 4381.85 - -
e provision
Partly forwith
Fixed exhaust fanlouvered
partly of types of
W5', W8
types Sqm - - - -
f W2, W3,
Partly W6partly
Fixed (Basictop
price
hungRs.openable
3182/- perwith Sqm 3136 - 4537.52 - -
Sqm, include
provision F.O.R.
Total cost
for exhaust material,
fan of types V, V1Glass, 11,515
hardware, duties and the cost of installation
and fixing excluding taxes)
Project : Godrej Aria sector 79 Gurgaon Date 19-Feb-20
Vendor Jayant K. Furnishers, RA Bill No. 24th RA
Service FINISHING WORKS FOR GODREJ ARIA SEC-79, Gurgaon Up to Jan.
Period
2021
LOI No. GPL/GGN/LOA/GODREJ ARIA/JAYANT Dated 06th Dec'16
Calculation for Ext. Besement
Quantity executed upto 25 Oct.-2020
1.1.3 Windows
Partly fixed with partly side hung
openable shutter of types W11, W14,
a Sqm -
W14'
Partly fixed with partly side hung
openable shutter and with provision
b Sqm -
for exhaust fan of types W12,W13
Partly fixed with 2 track sliding
(Basic price Rs. 3182/- per Sqm, of
types
includeW1, W4, cost
F.O.R. W5, of W7, W9, Glass,
material,
c Sqm -
W9' ,W10 duties and the cost of
hardware,
Partly fixed with 2 track sliding and
installation andfor
with provision fixing excluding
exhaust fan of taxes)
types
d Sqm -
W5', W8
Partly Fixed with partly louvered of
types W2, W3, W6
e Sqm -
Partly Fixed partly top hung openable
with provision for exhaust fan of types
f Sqm -
V, V1
Calculation of Escalation/Descalation Amount on Basic Rate of Item
As per Tender As per Actual Remarks
Total Qty Escalation/De-
BOQ Item Consumed as escalation
no. Item Description Unit
per Abstract Base Rate Amount Procured Amount amount Payable
Rate
1.3.3 Hanging type double floor door stopper Each 196 - 120 - -
1.3.4 Fixing rubber buffer. Each 196 - 14 - -
1.3.5 Magic eye 270'' Each 147 - 125 - -
1.3.6 SS hydraulic door closer Each 1177 - 1060 - -
1.3.7 SS safety chain Each 147 - 155 - -
Fire Door
1.1.1 FD, FD1 Sqm 7405 - 9069 - -
1.1.2 FD2 Sqm 7405 - 5195 - -
1.1.3 FD3 Sqm 7405 - 7717 - -
1.1.1 Aluminum Doors and Windows - - -
a Partly fixed with partly side hung openable Sqm 3276 - 4036.45 - -
shutter of types
Partly fixed, ED, Sliding,
2 track ED1, ED2, D1',side
Partly D2',hung
DW, - - -
b Sqm 3276 4255
DW2'
openable
c Side hungand with provision
openable Door withfor12mm
exhaustthkfan of Sqm 3276 - 3977.47 - -
d laminated
Partly MDF
fixed, panel
Partly of hung
side type Da' (Basicand
openable price Sqm 3276 - 3846.7 - -
with provision for exhaust fan of types DW2, - - -
DW3
Sliding Doors - - -
1.1.2
a Partly fixed, 3 track Sliding, of types SD, SD1 Sqm 3510 - 2682.81 - -
Partly fixed, 2 track Sliding, of types SD2 - - - -
b SD10 Sqm 3416 3296.25
1.1.3 Windows - - -
a Partly fixed with partly side hung openable Sqm 3182 - 4679.18 - -
shutter of types W11, W14, W14'
Partly fixed with 2 track sliding of types W1,
- - -
c W4, W5, W7, W9, W9' ,W10 Sqm 3182 3859.22
d Partly fixed with 2 track sliding and with Sqm 3182 - 4381.85 - -
provision forwith
Partly Fixed exhaust fanlouvered
partly of types of
W5', W8W2,
types - - -
e Sqm -
W3, W6 (Basic price Rs. 3182/- per Sqm,
Partly Fixed partly top hung openable with - - -
f Sqm 3136 4537.52
include
provisionF.O.R. cost offan
for exhaust material, Glass,
of types V, V1
hardware, dutiesTotal
and the cost of installation and (6,541)
fixing excluding taxes)
Godrej Aria - Finishing Work - Jayant K Furnishers
Partly fixed with partly side hung openable shutter and with
36 provision for exhaust fan - W
37 Partly fixed with 2 track sliding - W Sqmt 3400 3182 Sqmt
Sqmt 3400 3182 Sqmt
38 Partly fixed with 2 track sliding and with provision for exhaust fa
39 Partly Fixed with partly louvered Sqmt 3400 3182 Sqmt
Partly Fixed partly top hung openable with provision for exhaust Sqmt 3350 3136 Sqmt
40 fan - V
FOR-A,B,C,D
41 Partly fixed with partly side hung openable shutter - D Sqmt 3500 3276 Sqmt
42 Partly fixed, 2 track Sliding, Partly side hung openable D Sqmt 3500 3276 Sqmt
Side hung openable Door with 12mm thk laminated MDF panel - Sqmt 3500 3276 Sqmt
43 D
Sqmt 3500 3276 Sqmt
44 Partly fixed, Partly side hung openable - D
45 Partly fixed, 3 track Sliding - D Sqmt 3750 3510 Sqmt
46 Partly fixed, 2 track Sliding - D Sqmt 3650 3416 Sqmt
47 Partly fixed with partly side hung openable shutter - W Sqmt 3400 3182 Sqmt
Sqmt 3400 3182 Sqmt
Partly fixed with partly side hung openable shutter and with
48 provision for exhaust fan - W
49 Partly fixed with 2 track sliding - W Sqmt 3400 3182 Sqmt
Sqmt 3400 3182 Sqmt
50 Partly fixed with 2 track sliding and with provision for exhaust fa
51 Partly Fixed with partly louvered Sqmt 3400 3182 Sqmt
Partly Fixed partly top hung openable with provision for exhaust Sqmt 3350 3136 Sqmt
52 fan - V
41 Aluminium Structural Glazing - Fixed Sqmt 3750 3510 Sqmt
42 Aluminium Structural Glazing - Openable Sqmt 3850 3604 Sqmt
(BOQ) Revised Basic Rate Approval Rate Approval Date Inclusions Exclusion
upto date
201 167 18/05/2018 Duties FOR Site Only GST shall be extra
280 171 1/6/2018 Duties FOR Site Only GST shall be extra
1270 1507 7/11/2017 Duties FOR Site Only GST shall be extra
420 283 29/08/2017 Duties FOR Site Only GST shall be extra
420 326 29/08/2017 Duties FOR Site Only GST shall be extra
474 421 6/9/2017 Duties FOR Site Only GST shall be extra
301 217 6/9/2017 Duties FOR Site Only GST shall be extra
301 208 6/9/2017 Duties FOR Site Only GST shall be extra
301 208 6/9/2017 Duties FOR Site Only GST shall be extra
301 217 6/9/2017 Duties FOR Site Only GST shall be extra
301 240 6/9/2017 Duties FOR Site Only GST shall be extra
2637 2368 15/9/2017 Duties FOR Site Only GST shall be extra
624 526 30/5/2018 Duties FOR Site Only GST shall be extra
118 114 30/5/2018 Duties FOR Site Only GST shall be extra
840 635 7/2/2018 Duties FOR Site Only GST shall be extra
248 312 16/5/2018 Duties FOR Site Only GST shall be extra
194 115 16/5/2018 Duties FOR Site Only GST shall be extra
248 315 16/5/2018 Duties FOR Site Only GST shall be extra
194 116 16/5/2018 Duties FOR Site Only GST shall be extra
7405 9069 11/6/2018 Duties FOR Site Only GST shall be extra
7405 5195 11/6/2018 Duties FOR Site Only GST shall be extra
7405 7717 11/6/2018 Duties FOR Site Only GST shall be extra
7405 9069 11/6/2018 Duties FOR Site Only GST shall be extra
7405 5195 11/6/2018 Duties FOR Site Only GST shall be extra
2616 2300 2/2/2018 Duties FOR Site Only GST shall be extra
916 1033 2/2/2018 Duties FOR Site Only GST shall be extra
1308 875 16/3/2018 Duties FOR Site Only GST shall be extra
1177 821 16/3/2018 Duties FOR Site Only GST shall be extra
872 244 16/3/2018 Duties FOR Site Only GST shall be extra
196 80 16/3/2018 Duties FOR Site Only GST shall be extra
245 100 16/3/2018 Duties FOR Site Only GST shall be extra
196 120 16/3/2018 Duties FOR Site Only GST shall be extra
196 14 16/3/2018 Duties FOR Site Only GST shall be extra
147 125 16/3/2018 Duties FOR Site Only GST shall be extra
1177 1060 16/3/2018 Duties FOR Site Only GST shall be extra
147 155 16/3/2018 Duties FOR Site Only GST shall be extra
3276 4036.45 28/8/2017 Duties FOR Site Only GST shall be extra
3276 3866.39 28/8/2017 Duties FOR Site Only GST shall be extra
3276 3977.47 28/8/2017 Duties FOR Site Only GST shall be extra
3276 3846.7 28/8/2017 Duties FOR Site Only GST shall be extra
3510 2682.81 28/8/2017 Duties FOR Site Only GST shall be extra
3416 3296.25 28/8/2017 Duties FOR Site Only GST shall be extra
3182 4679.18 28/8/2017 Duties FOR Site Only GST shall be extra
3182 28/8/2017 Duties FOR Site Only GST shall be extra
3182 3859.22 28/8/2017 Duties FOR Site Only GST shall be extra
3182 4381.85 28/8/2017 Duties FOR Site Only GST shall be extra
3182 3264.19 28/8/2017 Duties FOR Site Only GST shall be extra
3136 4537.52 28/8/2017 Duties FOR Site Only GST shall be extra
3276 4479 28/8/2017 Duties FOR Site Only GST shall be extra
3276 4255 28/8/2017 Duties FOR Site Only GST shall be extra
3276 4421 28/8/2017 Duties FOR Site Only GST shall be extra
3276 4666 28/8/2017 Duties FOR Site Only GST shall be extra
3510 2731 28/8/2017 Duties FOR Site Only GST shall be extra
3416 3190 28/8/2017 Duties FOR Site Only GST shall be extra
3182 5177 28/8/2017 Duties FOR Site Only GST shall be extra
3182 28/8/2017 Duties FOR Site Only GST shall be extra
0
3182 3764 28/8/2017 Duties FOR Site Only GST shall be extra
3182 4420 28/8/2017 Duties FOR Site Only GST shall be extra
3182 3318 28/8/2017 Duties FOR Site Only GST shall be extra
3136 4453 28/8/2017 Duties FOR Site Only GST shall be extra
S.no.
Make
Approved
Description Unit basic Rate
4 Somany Pias Almond KSN 2 Kitchen Dado tile 300x300 Sqm 208.222
7 RAK Plain Ivory Glossy 300x450mm Toilet Wall Tile Sqm 227.1
8 RAK Plain Ivory Glossy 300x450mm Toilet Wall Tile Sqm 262.76
Doors
Amit
densified 38mm veneer -
( door) doors2.040x1.010mm
pvt.ltd
21 Sqm 2300
V.K. patel
32 mm moulded door-2040x820
and co
22 Sqm 1033
V.K. patel
32 mm moulded door-2040x660
and co
23 Sqm 1033
Doors Hardware
acme With Pin Cylinder (8' forend length)
locks ltd - for Internal Doors
22 Nos 821
Aluminum Doors
Partly fixed with partly side hung openable shutter
of types ED, ED1, ED2, D1', D2', DW, DW2'
24 Indo Alusys Sqm 4479
Partly fixed, 2 track Sliding, Partly side hung
openable and with provision for exhaust fan of
types DW1
25 Indo Alusys Sqm 4255
Side hung openable Door with 12mm thk
laminated MDF panel of type Da' (Basic price Rs.
3276/- per Sqm, include F.O.R. cost of material,
Glass, hardware, duties and the cost of installation
and fixing excluding taxes)
4421
Partly fixed, Partly side hung openable and with
provision for exhaust fan of types DW2, DW3
26 Indo Alusys Sqm 4666
Sliding Doors
27 Indo Alusys Partly fixed, 3 track Sliding, of types SD, SD1 Sqm 2731
Partly fixed, 2 track Sliding, of types SD2 - SD10
28 Indo Alusys Sqm 3190
Windows
Partly fixed with partly side hung openable shutter
29 Indo Alusys of types W11, W14, W14' Sqm 5177
Partly fixed with 2 track sliding of types W1, W4,
30 Indo Alusys W5, W7, W9, W9' ,W10 Sqm 3764
Partly Fixed partly top hung openable with
31 Indo Alusys provision for exhaust fan of types V, V1 Sqm 4453
Aluminum Doors
Partly fixed with partly side hung openable shutter
of types ED, ED1, ED2, D1', D2', DW, DW2'
32 Kaenat Sqm 4036
Partly fixed, Partly side hung openable and with
provision for exhaust fan of types DW2, DW3
33 Kaenat Sqm 3847
Sliding Doors
34 Kaenat Partly fixed, 3 track Sliding, of types SD, SD1 Sqm 2683
Partly fixed, 2 track Sliding, of types SD2 - SD10
35 Kaenat Sqm 3296
Windows
Partly fixed with partly side hung openable shutter
36 Kaenat of types W11, W14, W14' Sqm 4679
Partly fixed with 2 track sliding and with
37 Kaenat provision for exhaust fan of types W5', W8 Sqm 4382
Partly Fixed partly top hung openable with
38 Kaenat provision for exhaust fan of types V, V1 Sqm 4538
FD 1100X2100 8484.83
FD1 1150X2000 4565.57
Total Amount
3011 1,254,241
2,045,277 940,681
Amount of Advance Recovered Qty Quantity for Amount of Advance
Provided in SA-3 (Recover 100% which Provided in SA-4
if DOI is older Advance
than 60 Days) Provided in
SA-4
Quantity for
Recovered Qty which
(Recover 100% Advance
if DOI is older Provided in
than 60 Days) SA-3
Date of SA-3 Bill Invoice : 15-Jan-18 Date of SA-4 Bill Invoice : 7-Feb-18
12030 363908
4732 124215
173 774797
38 161384
69 320798
230 629227
160 509246
22 114475
73 273159
126 560566
39 157123
14 53005
68 182361
188 620902
30 141306
29 125703
76 344946
4,156,938 8,378,550
3,117,703 6,283,913
Recovery of Secured Advance Pr
Recovered Qty Quantity for Amount of Advance Recovered Qty Quantity for Amount of Advance
(Recover 100% which Provided in SA-5 (Recover 100% which Provided in SA-6
if DOI is older Advance if DOI is older Advance
than 60 Days) Provided in than 60 Days) Provided in
SA-5 SA-6
Date of SA-5 Bill Invoice : 15-May-18 Date of SA-6 Bill Invoice : 31-May-18
1500
1483
12030
4732
173 0 0
38 0 0
0
69 0 0
0
0
230 0 0
160 0 0
0
0
22 0 0
73 0 0
126 0 0
0
39 0 0
14 0 0
0
0
68 0 0
188 0 0
0
0
30 0 0
29 0 0
76 0 0
5,509,188 1,609,380
4,131,891 1,207,035
Secured Advance Provided upto 31st july-18
Recovered Qty Quantity for Amount of Recovered Qty Quantity for Amount of
(Recover 100% which Advance (Recover 100% which Advance Provided
if DOI is older Advance Provided in SA-7 if DOI is older Advance in SA-8
than 60 Days) Provided in than 60 Days) Provided in
SA-7 SA-8
31-May-18 Date of SA-7 Bill Invoice : 30-June-18 Date of SA-8 Bill Invoice : 31st-July-18
0 0 0
0
0 0 0
0
0
0 52 118452 52 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0
0 0 0
0
0
0 0 0
0 0 0
0
0
0 0 0
0 0 0
0 0 0
0
0 0 0
0 0 0
0
0
0 0 0
0 0 0
0
0
0 0 0
0 0 0
0 0 0
1,419,927 307,390
1,064,945 230,542.2
Recovered Qty Quantity for Amount of Recovered Qty Quantity for Amount of
(Recover 100% which Advance Advance (Recover 100% which Advance Advance
if DOI is older Provided in SA- Provided in SA-9 if DOI is older Provided in SA- Provided in SA-
than 60 Days) 9 than 60 Days) 10 10
l Invoice : 31st-July-18 Date of SA-9 Bill Invoice : 12th-Sep-18 Date of SA-10 Bill Invoice : 20th-Nov.-18
600 18150
3000 78750
4445 231140
0 11 49269 11
0 10 42550 10
0 12 57392 12
0 12 32772 12
0 14 44660 14
0 17 88009 17
0 16 58342 16
0 7 29838 7
0 3 12109 3
0 2.52 9675 3
0 3 8048 3
0 2 9358 2
0 2 8764 2
0 2 9075 2
14097 7614520.76
13030 1523289.77
297.99 2528394.49
200.10 913570.56
279.00 1198165.50
22.68 166924.80
1,455,980 1,864,053
1,091,985.0 15,342,905.6
Recovered Qty Quantity for Amount of Recovered Qty Quantity for Amount of
(Recover 100% which Advance Advance (Recover 100% which Advance Advance
if DOI is older Provided in SA- Provided in if DOI is older Provided in SA- Provided in
than 60 Days) 11 SA-11 than 60 Days) 12 SA-12
Invoice : 20th-Nov.-18 Date of SA-11 Bill Invoice : 31st-Dec.-18 Date of SA-12 Bill Invoice : 30-Apr.-19
304 63215
600
3000
0 700 36400
214 25710
87 199042 87
44 195281 44
1 3645 1
50 223216 50
11 52483 11
68 185718 68
86 273815 86
25 128492 25
3 10961 3
14097
298
200
279
23
2,520,477 1989287
1,890,358 1491966
Date 19-Feb-20
RA Bill No. 24th RA
Period Up to Jan. 2021
Recovered Qty Total Qty Total Qty for Total Amount for Total Qty Qty for which
(Recover 100% Received which SA which SA provided Executed Secured
if DOI is older provided Advance to be
than 60 Days) recovered
0 0.0
0 0.0
0 0 0.0
49 49 207578.5 248 49
50 50 223216.3 149 50
92 92 430672.3 321 92
0 0 0.0
0 0 0.0
310 310 847717.6 2548 310
64 64 330976.7 236 64
88 88 331500.6 747 88
42 42 169231.9 80 42
19 19 73640.7 27 19
0 0 0.0
0 0 0.0
71 71 190409.7 354 71
32 32 150664.3 110 32
31 31 134466.3 394 31
78 78 354021.4 78 78
0 0 0.0
14097 14097 7614520.8 0 14097
0 13030 1523289.8 0 13030
0 0.0
23 23 166924.8 0 23
33,192,447
38,839,205.00
Total Recovery
Amount
3,500,101
301,042
300,544
304,736
927,137
3,686,295
150,352
506,542
875,515
572,923
2,787,403
639,181
327,287
267,540
27,770
4,692,802
3,009
1,324,451
115,993
166,999
212,629
-
1,004,642
1,209,944
486,837
1,093,028
111,264
1,094,012
1,019,347
207,578
223,216
430,672
-
-
847,718
827,722
-
-
330,977
331,501
590,404
-
169,232
73,641
-
-
190,410
620,902
-
-
150,664
134,466
354,021
-
7,614,521
1,523,290
-
2,528,394
913,571
1,198,166
166,925
33,192,447
38,839,205.00
MAIN ABSTRACT
(Consider basic rate of cement Rs.230/bag inclusive of all duties & taxes F.O.R. site)
(Quoted Rates are for all heights, depths, levels, leads and lifts and for all design and pattern shown in drawings)
QUANTITY AMOUNT
S. NOS DESCRIPTION UNIT APPROVED BOQ QTY. REMARK
Providing and laying granite cill( z black granite) of size upto 75 RATE BOQ AMOUNT PREV. THIS BILL TOTAL PREV. THIS BILL TOTAL
A mm at Window
Extra Item No. 01 using slab of approved quality , as per drawings
and pattern in flooring with cement mortar 1:4 (1 cement : 4
1 coarse
Granitesand)
workof adequate thickness to match the total thickness
of 50mm and joint to be filled with white cement slurry mixed
Providing
with pigment and to
laying
matchgranite threshold
the shade of size
of stone 45mm surfaces
including to Toilet
a doors cill curing
pointing, using slab
etc. of approved
complete as quality , as per drawings
per specification and
and approval RMT 315.00 1,560.00 491,400.00 1,474.02 - 1,474.02 464,316.00 - 464,316.00
pattern in Manager.
of Project flooring with cement mortar 1:4 (1 cement : 4 coarse
sand) of adequate thickness to match the total thickness of
50mm and joint to be filled with white cement slurry mixed with
b pigment to match the shade of stone including surfaces pointing, RMT 315.00 509.00 160,335.00 318.65 - 318.65 100,376.00 - 100,376.00
curing etc. complete as per specification..
Providing and fixing of 12mm Ply ceiling (1m x 1m) at double SQM 2,207.77 42.00 92,726.00 40.00 - 40.00 88,311.00 - 88,311.00
height with backing of frame of pinewood with paint approved
12 by Project manager. (i/c In Entrance Lobby Exp. Joint Area)
Total Amount of Extra Item No. 01 B 6,567,576.00 5,404,270.00 - 5,404,270.00
B Extra Item No. 02
QUANTITY AMOUNT
S. NOS DESCRIPTION UNIT APPROVED BOQ QTY. REMARK
RATE BOQ AMOUNT PREV. THIS BILL TOTAL PREV. THIS BILL TOTAL
Door Frame 2000X2100 Nos. 3,968.00 2.00 7,936.00 1.80 1.80 - 7,142.00 7,142.00
Door Frame 1800X2100 Nos. 3,840.00 2.00 7,680.00 1.80 1.80 - 6,912.00 6,912.00
Door Frame 1500X2100 Nos. 3,648.00 1.00 3,648.00 0.90 0.90 - 3,283.00 3,283.00
Door Frame 1100X2100 Nos. 3,392.00 8.00 27,136.00 7.20 7.20 - 24,422.00 24,422.00
Door Frame 900X2100 Nos. 3,264.00 2.00 6,528.00 1.80 1.80 - 5,875.00 5,875.00
Door Frame 750X2100 Nos. 3,168.00 5.00 15,840.00 4.50 4.50 - 14,256.00 14,256.00
QUANTITY AMOUNT
S. NOS Providing and laying granite DESCRIPTION UNIT APPROVED BOQ QTY. BOQ REMARK
cill( z black granite) of size upto 75 RATE AMOUNT PREV. THIS BILL TOTAL PREV. THIS BILL TOTAL
mm at Window using slab of approved quality , as per
A Extra Itemand
drawings No.pattern
01 in flooring with cement mortar 1:4 (1
1 cement
Granite :work
4 coarse sand) of adequate thickness to match the
total thickness of 50mm and joint to be filled with white
cement slurry
Providing mixed granite
and laying with pigment
thresholdto match
of sizethe shade
45mm to of stone
Toilet
a including
doors cill surfaces
using slabpointing, curingquality
of approved etc. complete as per and
, as per drawings RMT 315.00 286.42 90222.00 268.47 - 268.47 84,568.05 - 84,568.05
specification
pattern and approval
in flooring of Project
with cement mortarManager.
1:4 (1 cement : 4 coarse
sand) of adequate thickness to match the total thickness of
50mm and joint to be filled with white cement slurry mixed
b with pigment to match the shade of stone including surfaces RMT 315.00 76.56 24116.00 65.77 - 65.77 20,718.18 - 20,718.18
pointing, curing etc. complete as per specification..
QUANTITY AMOUNT
S. NOS DESCRIPTION UNIT APPROVED BOQ QTY. BOQ REMARK
RATE AMOUNT PREV. THIS BILL TOTAL PREV. THIS BILL TOTAL
Providing and applying aprx 25mm thick extra rough cement
plaster over cistern in cement mortar 1:4 (1 cement : 4 coarse
1 SQM 422.00 73.08 30,840.00 62.12 62.12 26,213.80 26,213.80
sand) in toilets as per site requerment including all labour and
materials at all floors, heights and levels. The rate shall include
all tools, labour,
Providing scaffolding
and fixing 6mm marineetc. required to 300mmx300mm
ply of size complete the work
as directed
for exhaustby fanthe project
fixing andin-charge .
making cutout of size 200x200mm
2 and finished with 2 coats of synthetic enamel paint of approved Nos. 375.00 202.00 75,750.00 151.50 151.50 56,812.50 56,812.50
shade. The rate shall include all tools, labour, scaffolding (if
needed) etc.closure
Temporary requiredof to complete
existing 100-the work sleeves
150mm as directed
thosebywere
the
project in-charge
provided for enrouting A/C refrigant and drain lines and not
3 used due to change of locations of indoor units in flats. Item Nos. 126.00 290.00 36,540.00 290.00 290.00 36,540.00 36,540.00
includes closure with broken AAC blocks and applying a layer of
12- 15 mmmaking
Providing, POP plaster internally
and fixing woodenanddoor
externally
Frames with
of Birla level
plast. The rate shall
100mmx65mm thickinclude all tools,
red marandi (of labour, scaffolding opening
below mentioned etc.
4 required
sizes) to complete
at Basement the work
Drivers' Toiletasarea
directed by the project in-
and Convenient -
charge
Shopping . Complex, Plant Room, Filteration Plant, OWC, Grbage
Room,Frame
Door FTTH, 2000X2100
Energy Meter Room, CCTV etc. The frames shall Nos. 3,968.00 - - - -
be fixed with 3 Nos on each side 300x 40x5mm GI holdfasts
Door Frame 1800X2100
embeded in concrete block of (1:2:4, 1cement:2 coarse sand: 4 Nos. 3,840.00 - - - -
Door
xcoarseFrame 1500X2100
aggregates) of sizes 300x200/100x 200mm. The rates to Nos. 3,648.00 - - - -
include all tools,
Door Frame labour, scaffolding, CC Block etc as required, Nos.
1100X2100 3,392.00 - - - -
complete as directed by the project in-charge . Note: the
Door Frame
painting shall900X2100
be paid in seperate extra item no: 04 already Nos. 3,264.00 - - - -
approved.
Door Frame 750X2100 Nos. 3,168.00 - - - -
Providing and fixing 32mm phenol bonded flush door shutters
5 of approved quality and make non decorative type core of block -
board construction with internal frame of 1st class hard wood
including 6 mm thick red merandi wooden lipping all around, 4
nos. 100
With mm long
synthetic and 3.5mm
enamel paint ofthick SS hinges
approved make Ball
andBearing
shade and
a) Hinges and 200 mm -
1 No.X200x10mm SSmortice door lock with keys/ safety letch
tower Bolt
(of approved make) as per drawing and specification complete
Flush Door Shutter
and approved sample. 2000X2100= 2 Nos. 8,889.00 - - - -
Flush Door Shutter 1800X2100= 2 Nos. 8,283.00 - - - -
Flush Door Shutter 1500X2100= 1 Nos. 7,374.00 - - - -
Flush Door Shutter 1100X2100= 2 Nos. 5,025.00 - - - -
-
QUANTITY AMOUNT
S. NOS DESCRIPTION UNIT APPROVED BOQ QTY. BOQ REMARK
RATE AMOUNT PREV. THIS BILL TOTAL PREV. THIS BILL TOTAL
Sub Total Amount Item 01 and 02 A+B = 1719310.00 1008175.00 192717.00 1200892.00
ABSTRACT TOWER - B
Providing and laying granite cill( z black granite) of APPROVED QUANTITY AMOUNT
S. NOS size upto 75 mm at Window DESCRIPTIONusing slab of approved UNIT BOQ QTY. REMARK
RATE BOQ AMOUNT PREV. THIS BILL TOTAL PREV. THIS BILL TOTAL
quality , as per drawings and pattern in flooring with
A Providing
Extra
cement Item and
No.laying
mortar 1:4 (1granite
01 cementthreshold
: 4 coarseofsand)
size 45mm
of
1 to Toilet doors
adequate cill using
thickness to slab ofthe
match approved
total quality of
thickness , as
Granite work
per drawings andtopattern inwith
flooring with cement
50mm and joint be filled white cement slurry
mortar 1:4 (1
mixed with cementto: 4match
pigment coarsethesand)
shadeof of
adequate
stone
a thickness to matchpointing,
including surfaces the totalcuring
thickness of 50mm and
etc. complete as RMT 315.00 286.42 90222.00 268.47 - 268.47 84,568.05 - 84,568.05
joint to be filled with white cement slurry
per specification and approval of Project Manager. mixed with
pigment to match the shade of stone including
b surfaces pointing, curing etc. complete as per RMT 315.00 76.56 24116.00 65.77 - 65.77 20,718.18 - 20,718.18
specification..
Providing and fixing Kota(18mm-20mm Thick)
cladding of 450mmx600mm Size over Plinth area SQM 1797.00 136.97 246141.00 113.70 - 113.70 204,318.81 - 204,318.81
2 With V-Groove of thikness 3mm in between Stones.
QUANTITY AMOUNT
S. NOS Providing and laying graniteDESCRIPTION APPROVED BOQ QTY. BOQ AMOUNT
cill( z black granite) of size upto UNIT RATE PREV. THIS BILL TOTAL PREV. THIS BILL TOTAL
REMARK
75 mm at Window using slab of approved quality , as per
A Extra Itemand
drawings No.pattern
01 in flooring with cement mortar 1:4 (1
1 cement
Granite : 4
workcoarse
Providing and laying sand) of adequate
granite thresholdthickness to match
of size 45mm to the
total
Toiletthickness
doors cillofusing
50mm slaband
of joint to bequality
approved filled with
, aswhite
per
cement slurry
drawings mixed with
and pattern pigment
in flooring to match
with cementthe shade1:4
mortar of (1
a stone including
cement surfaces
: 4 coarse pointing,
sand) of adequate curing etc. complete
thickness to matchasthe RMT 315.00 286.42 90,222.00 268.47 - 268.47 84,568.05 - 84,568.05
per specification
total thickness ofand50mmapproval of Project
and joint Manager.
to be filled with white
cement slurry mixed with pigment to match the shade of
b stone including surfaces pointing, curing etc. complete as RMT 315.00 76.56 24,116.00 65.77 - 65.77 20,718.18 - 20,718.18
per specification..
Providing and fixing Kota(18mm-20mm Thick) cladding of
450mmx600mm Size over Plinth area With V-Groove of SQM 1,797.00 145.36 261,213.00 120.65 - 120.65 216,815.15 - 216,815.15
2 thikness 3mm in between Stones.
QUANTITY AMOUNT
S. NOS DESCRIPTION UNIT APPROVED BOQ QTY. BOQ AMOUNT REMARK
RATE PREV. THIS BILL TOTAL PREV. THIS BILL TOTAL
Total Amount of Extra Item No. 01 A 1,104,606.0 910,214.0 - 910,214.00
B Extra Item No. 02
Providing and applying aprx 25mm thick extra rough
1 cement plaster over cistern in cement mortar 1:4 (1 cement SQM 422.00 73.08 30,840.00 62.12 62.12 - 26,213.80 26,213.80
: 4 coarse sand) in toilets as per site requerment including
Providing
all labour and materials
fixing 6mm atmarine plyheights
all floors, of size 300mmx300mm
and levels. The
2 for
rateexhaust fan fixing
shall include andlabour,
all tools, makingscaffolding etc. required Nos.
cutout of size 375.00 202.00 75,750.00 151.50 151.50 - 56,812.50 56,812.50
200x200mm
to complete the andwork
finished with 2 coats
as directed by the ofproject
synthetic enamel.
in-charge
Temporary closureshade.
paint of approved of existing
The rate100-shall
150mm sleeves
include those
all tools,
were provided for enrouting A/C refrigant
labour, scaffolding (if needed) etc. required to complete and drain lines
the Nos.
3 and not used dueby tothe
change of locations 126.00 290.00 36,540.00 290.00 290.00 - 36,540.00 36,540.00
work as directed project in-charge of indoor units in
flats. Item includes closure with broken AAC blocks and
applying
Providing,a making
layer of and
12- 15 mmwooden
fixing POP plaster
door internally
Frames ofand
4 externally
100mmx65mm with Birla
thicklevel plast. The
red marandi (ofrate shall
below include all
mentioned -
tools,
opening labour,
sizes)scaffolding
at Basement etc.Drivers'
required to complete
Toilet area and the work
as directed
Door Frame by
Convenient the project
2000X2100
Shopping in-charge
Complex, Plant. Room, Filteration Nos. 3,968.00 - - - -
Plant, OWC, Grbage
Door Frame 1800X2100 Room, FTTH, Energy Meter Room, CCTV Nos. 3,840.00 - - - -
etc. The frames shall be fixed with 3 Nos on each side 300x
Door
40x5mm Frame 1500X2100
GI holdfasts embeded in concrete block of (1:2:4, Nos. 3,648.00 - - - -
1cement:2
Door Frame coarse sand: 4 xcoarse aggregates) of sizes
1100X2100 Nos. 3,392.00 - - - -
300x200/100x
Door Frame 900X2100 200mm. The rates to include all tools, labour, Nos. 3,264.00 - - - -
scaffolding, CC Block etc as required, complete as directed
Door
by theFrame
project750X2100
in-charge . Note: the painting shall be paid in Nos. 3,168.00 - - - -
seperate extra
Providing and fixing
item no:
32mm 04 already
phenol bonded
approved.flush door
5 shutters of approved quality and make non decorative type -
core of block board construction with internal frame of 1st
class
With hard woodenamel
synthetic including 6 mm
paint thick red make
of approved merandiandwooden
shade
a) lipping all around, 4 nos. -
and 1 No.X200x10mm SS100
tower mmBolt
long and 3.5mm thick SS
hinges Ball Bearing Hinges and 200 mm mortice door lock
Flush Door safety
with keys/ Shutter 2000X2100=
letch (of approved 2 make) as per drawing Nos. 8,889.00 - - - -
and specification
Flush Door Shutter complete
1800X2100=and approved
2 sample. Nos. 8,283.00 - - - -
Flush Door Shutter 1500X2100= 1 Nos. 7,374.00 - - - -
Flush Door Shutter 1100X2100= 2 Nos. 5,025.00 - - - -
-
b) With 1mm thick laminate of approved shade on both side of -
door shutter
Laminated Door Shutter 1100X2100= 6 Nos. 6,771.00 - - - -
Laminated Door Shutter 900X2100= 2 Nos. 5,830.00 - - - -
Laminated Door Shutter 750X2100= 11 Nos. 4,343.00 - - - -
-
Providing & Fixing suspended false ceiling of size aprx
[70x600]mm & [150x600mm] consisting of 12.5mm thick
Gypsum plaster board in Toilet over ventilator with Nos. 347.00 1,029.00 357,063.00 - 161.60 161.60 - 56,075.20 56,075.20
6
necessary fixing arrangements of Powder coated 20mm
perimeter andbe
Painting shall necessary
paid extrascrews/
in the fasteners
main BOQtoitemfix it on soffit -
beam including
Modification of Aluminium
all labour and
frame
materials
as per requirement
at all floors, to fix
heights and
exhaust fan on
levels.The
ventilation
ratewindows
shall include
including
all tools,
all labour
labour,and
scaffoldingat(ifallneeded)
materials floors, heights
etc. required
and levels.
to complete
The ratethe shall
work Nos. 368.00 58.00 21,344.00 - 46.40 46.40 - 17,075.20 17,075.20
7 as directed
include by thelabour,
all tools, projectscaffolding
in-charge.etc. required to
complete the work as directed by the project in-charge
Location: 3BHK common toilets
Total Amount of Extra Item No. 02 B 521,537.00 - 192,717.00 192,717.00
ABSTRACT TOWER - C
QUANTITY AMOUNT
S. NOS DESCRIPTION UNIT APPROVED BOQ QTY. BOQ AMOUNT REMARK
RATE PREV. THIS BILL TOTAL PREV. THIS BILL TOTAL
Sub Total Amount Item 01 and 02 A+B = 1626143.00 910214.00 192717.00 1102931.00
ABSTRACT TOWER - D
QUANTITY AMOUNT
S. NOS Providing and laying granite DESCRIPTION APPROVED
cill( z black granite) of size upto 75 UNIT RATE
BOQ QTY.
BOQ AMOUNT PREV. THIS BILL TOTAL PREV. THIS BILL TOTAL
REMARK
mm at Window using slab of approved quality , as per
A Extra Item No. 01
drawings and pattern in flooring with cement mortar 1:4 (1
1 cement
Granite :work
4 coarse sand) of adequate thickness to match the
total thickness of 50mm and joint to be filled with white
cement slurry
Providing mixed granite
and laying with pigment
thresholdto match
of sizethe shade
45mm to of stone
Toilet
a including RMT 315.00 277.8 87507.00 260.30 - 260.30 81,994.50 - 81,994.50
doors cill surfaces
using slabpointing, curing
of approved etc. complete
quality as per and
, as per drawings
specification
pattern and approval
in flooring of Project
with cement mortarManager.
1:4 (1 cement : 4 coarse
sand) of adequate thickness to match the total thickness of
b 50mm and joint to be filled with white cement slurry mixed RMT 315.00 110.22 34719.00 47.63 - 47.63 15,002.82 - 15,002.82
with pigment to match the shade of stone including surfaces
pointing, curing etc. complete as per specification..
Providing and fixing Kota(18mm-20mm Thick) cladding of
450mmx600mm Size over Plinth area With V-Groove of SQM 1797.00 162.07 291237.00 134.37 - 134.37 241,462.03 - 241,462.03
2 thikness 3mm in between Stones.
QUANTITY AMOUNT
S. NOS DESCRIPTION UNIT APPROVED BOQ QTY. REMARK
RATE BOQ AMOUNT PREV. THIS BILL TOTAL PREV. THIS BILL TOTAL
Providing and applying aprx 25mm thick extra rough cement
1 plaster over cistern in cement mortar 1:4 (1 cement : 4 coarse SQM 422.00 70.14 29,599.00 59.62 59.62 - 25,159.22 25,159.22
sand) in toilets as per site requerment including all labour and
Providing
materials at and allfixing 6mm
floors, marine
heights andply of size
levels. The300mmx300mm
rate shall include Nos.
2 for exhaust fan fixing and making cutouttoofcomplete
size 200x200mm 375.00 251.00 94,125.00 188.25 188.25 - 70,593.75 70,593.75
all tools, labour, scaffolding etc. required the work
and
as finished with
directed closure 2 coats
by the project of synthetic
in-charge . enamel paint of approved
Temporary
shade. The rate shall of include
existingall100-
tools, 150mm
labour,sleeves those(ifwere
scaffolding
3 provided for required
enroutingtoA/C refrigant Nos. 126.00 251.00 31,626.00 200.80 200.80 - 25,300.80 25,300.80
needed) etc. complete theandworkdrain lines and
as directed bynotthe
used
project due to change of locations of indoor units in flats. Item
in-charge
Providing,
includes closuremaking andbroken
with fixing wooden
AAC blocks door Frames
and of a layer of
applying
100mmx65mm
12- 15 mm POP thick plasterredinternally
marandi and (of below mentioned
externally opening
with Birla level
4 sizes) -
plast. atTheBasement
rate shallDrivers'
includeToilet arealabour,
all tools, and Convenient
scaffolding etc.
Shopping Complex, Plant Room, Filteration
required to complete the work as directed by the project in- Plant, OWC, Grbage
Room,
Door
charge FTTH,
Frame
. Energy Meter Room, CCTV etc. The frames shall Nos.
2000X2100 3,968.00 - - - -
be fixed with 3 Nos on each side 300x 40x5mm GI holdfasts
Door
embeded Frame 1800X2100
in concrete block of (1:2:4, 1cement:2 coarse sand: 4 Nos. 3,840.00 - - - -
Door
xcoarse Frame 1500X2100
aggregates) of sizes 300x200/100x 200mm. The rates to Nos. 3,648.00 - - - -
include
Door all tools,
Frame labour, scaffolding, CC Block etc as required, Nos.
1100X2100 3,392.00 - - - -
complete as directed by the project in-charge . Note: the
Door Frame 900X2100
painting shall be paid in seperate extra item no: 04 already Nos. 3,264.00 - - - -
approved.
Door Frame 750X2100 Nos. 3,168.00 - - - -
Providing and fixing 32mm phenol bonded flush door shutters
5 of approved quality and make non decorative type core of block -
board construction with internal frame of 1st class hard wood
including 6 mm thick red merandi wooden lipping all around, 4
nos. 100
With mm long
synthetic and 3.5mm
enamel paint ofthick SS hinges
approved make Ball
andBearing
shade and
a) Hinges and 200 mm -
1 No.X200x10mm SSmortice
tower Boltdoor lock with keys/ safety letch
(of approved make) as per drawing and specification complete
Flush Door Shutter
and approved sample.2000X2100= 2 Nos. 8,889.00 - - - -
Flush Door Shutter 1800X2100= 2 Nos. 8,283.00 - - - -
Flush Door Shutter 1500X2100= 1 Nos. 7,374.00 - - - -
Flush Door Shutter 1100X2100= 2 Nos. 5,025.00 - - - -
-
Providing and laying granite cill( z black granite) of size QUANTITY AMOUNT
S. NOS upto 75 mm at Window DESCRIPTION UNIT APPROVED BOQ QTY. BOQ REMARK
using slab of approved quality RATE AMOUNT PREV. THIS BILL TOTAL PREV. THIS BILL TOTAL
, as per drawings and pattern in flooring with cement
A Extra
mortarItem1:4 No. 01
(1 cement : 4 coarse sand) of adequate
1 thickness
Granite work to match the total thickness of 50mm and
joint to beand
Providing filled withgranite
laying white cement slurry
threshold mixed
of size 45mmwithto
pigment
Toilet to match
doors cill the slab
using shadeof of stone including
approved quality , as per
a surfaces pointing, curing etc. complete as per mortar RMT 315.00 211.60 66654.00 204.16 - 204.16 64,308.83 - 64,308.83
drawings and pattern in flooring with cement
specification
1:4 (1 cementand approval
: 4 coarse of Project
sand) Manager.
of adequate thickness
to match the total thickness of 50mm and joint to be
b filled with white cement slurry mixed with pigment to RMT 315.00 84.48 26611.00 36.86 - 36.86 11,609.33 - 11,609.33
match the shade of stone including surfaces pointing,
curing etc. complete as per specification..
Providing and fixing Kota(18mm-20mm Thick)
cladding of 450mmx600mm Size over Plinth area With SQM 1797.00 156.17 280637.0 122.66 - 122.66 220,428.00 - 220,428.00
2 V-Groove of thikness 3mm in between Stones.
QUANTITY AMOUNT
S. NOS DESCRIPTION UNIT APPROVED BOQ QTY. BOQ REMARK
RATE AMOUNT PREV. THIS BILL TOTAL PREV. THIS BILL TOTAL
Total Amount of Extra Item No. 01 A 1,006,406.0 801,875.0 - 801,875.00
B Extra Item No. 02
Providing and applying aprx 25mm thick extra rough
13 cement plaster over cistern in cement mortar 1:4 (1 SQM 422.00 53.76 22,687.00 45.70 45.70 - 19,283.71 19,283.71
cement : 4 coarse sand) in toilets as per site
Providing
requerment andincluding
fixing 6mm marineand
all labour ply materials
of size at all
14 300mmx300mm
floors, heights and for exhaust
levels. The fan
ratefixing and making
shall include all Nos. 375.00 192.00 72,000.00 144.00 144.00 - 54,000.00 54,000.00
cutout of size scaffolding
tools, labour, 200x200mm and
etc. finishedtowith
required 2 coatsthe
complete of
Temporary
synthetic closure
enamel
work as directed of
theexisting
paint
by of 100-
approved
project 150mm
shade.. The
in-charge sleeves
rate
15 those were provided
shall include all tools, for enrouting
labour, A/C refrigant
scaffolding (if needed) and Nos. 126.00 192.00 24,192.00 153.60 153.60 - 19,353.60 19,353.60
drain lines and
etc. required tonot used due
complete theto change
work of locations
as directed by theof
Providing,
indoor
project units making and
in flats.
in-charge fixing
Item wooden
includes door with
closure Frames of
100mmx65mm
broken AAC blocks thickandredapplying
marandia (of layerbelow
of 12- 15 mm
16 -
mentioned
POP plasteropening
internally sizes)
and at Basement
externally Drivers'
with Toilet
Birla level
area
plast.and
TheConvenient Shopping
rate shall include Complex,
all tools, Plant Room,
labour,
Filteration
scaffolding
Door Frame Plant,
etc. OWC, Grbage
required
2000X2100 Room,the
to complete FTTH,workEnergy
as Nos. 3,968.00 - - - -
Meter
directed Room,
by theCCTV etc. in-charge
project The frames . shall be fixed with
Door Frame 1800X2100
3 Nos on each side 300x 40x5mm GI holdfasts Nos. 3,840.00 - - - -
Door
embededFrame 1500X2100
in concrete block of (1:2:4, 1cement:2 Nos. 3,648.00 - - - -
coarse sand: 1100X2100
Door Frame 4 xcoarse aggregates) of sizes Nos. 3,392.00 - - - -
300x200/100x 200mm. The rates to include all tools,
Door Frame
labour, 900X2100
scaffolding, CC Block etc as required, Nos. 3,264.00 - - - -
complete
Door Frame as directed
750X2100 by the project in-charge . Note: Nos. 3,168.00 - - - -
the painting
Providing andshall be32mm
fixing paid inphenol
seperate extra flush
bonded item no:
door04
already
shuttersapproved.
of approved quality and make non decorative
17 -
type core of block board construction with internal
frame of 1st class hard wood including 6 mm thick red
merandi wooden
With synthetic lipping
enamel all around,
paint of approved 4 nos.make100 mmand
a) long and -
shade and3.5mm thick SS hinges
1 No.X200x10mm Ball Bearing
SS tower Bolt Hinges
and 200 mm mortice door lock with keys/ safety letch
Flush Door Shutter
(of approved make) 2000X2100=
as per drawing 2 and specification Nos. 8,889.00 - - - -
complete
Flush Doorand approved
Shutter sample. 2
1800X2100= Nos. 8,283.00 - - - -
Flush Door Shutter 1500X2100= 1 Nos. 7,374.00 - - - -
Flush Door Shutter 1100X2100= 2 Nos. 5,025.00 - - - -
-
QUANTITY AMOUNT
S. NOS DESCRIPTION UNIT APPROVED BOQ QTY. BOQ REMARK
Modification of Aluminium frame as per requirement RATE AMOUNT PREV. THIS BILL TOTAL PREV. THIS BILL TOTAL
to fix exhaust fan on ventilation windows including all
labour and materials at all floors, heights and levels. Nos. 368.00 174.00 64,032.00 - - - -
19 The rate shall include all tools, labour, scaffolding etc.
required to complete the work as directed by the
project
Location:in-charge
3BHK common toilets
Total Amount of Extra Item No. 02 B 539,974.00 - 128,170.00 128,170.00
Sub Total Amount Item 01 and 02 A+B = 1546380.00 801875.00 128170.00 930045.00
ABSTRACT TOWER - F
Providing and laying granite cill( z black granite) of size QUANTITY AMOUNT
S. NOS upto 75 mm at Window DESCRIPTION APPROVED BOQ QTY.
using slab of approved quality UNIT RATE BOQ AMOUNT PREV. THIS BILL TOTAL PREV. THIS BILL TOTAL
REMARK
, as per drawings and pattern in flooring with cement
A Extra
mortarItem
1:4 No. 01
(1 cement : 4 coarse sand) of adequate
1 thickness
Granite workto match the total thickness of 50mm and
joint to beand
Providing filled withgranite
laying white cement slurry
threshold mixed
of size 45mmwithto
pigment
Toilet to match
doors cill the slab
using shadeof of stone including
approved quality , as per RMT
a surfaces pointing, curing etc. complete as per mortar 315.00 211.60 66654.00 204.16 - 204.16 64,308.83 - 64,308.83
drawings and pattern in flooring with cement
specification
1:4 (1 cementand approval
: 4 coarse of Project
sand) Manager.
of adequate thickness
to match the total thickness of 50mm and joint to be
b filled with white cement slurry mixed with pigment to RMT 315.00 84.48 26611.00 36.86 - 36.86 11,609.33 - 11,609.33
match the shade of stone including surfaces pointing,
curing etc. complete as per specification..
Providing and fixing Kota(18mm-20mm Thick)
cladding of 450mmx600mm Size over Plinth area With SQM 1797.00 156.17 280637.00 122.66 - 122.66 220,428.00 - 220,428.00
2 V-Groove of thikness 3mm in between Stones.
B 3D FLATS
B 2A FLATS
B 2D FLATS
B 2E FLATS
B 1BHK FLATS
SR NOS DESCRITION NOS LENGTH HEIGHT AREA
FLAT SUMMARY
S. NO. DESCRIPTIONS T- A T- B T- C T- D T- E T- F
3A 30 30 30
3D 28 28 28
2A 56 44 44
2D 14 9 9
2E 13 11 11
1 BHK 1
TOTAL R/MTR 386
S. No. FLAT SUMMARY FLOOR WISE TOWER A,B,C Toilet Door cill Nm of Flat T- A T- B T- C REMARK
1 Ground Floor 3A 1.26 1.26 1.26
3D 1.26 1.26 1.26
3A 1.26 1.26 1.26
2 1st Floor 3A 1.26 1.26 1.26
3D 1.26 1.26 1.26
3A 1.26 1.26 1.26
3 2nd Floor 3A 1.26 1.26 1.26
3D 1.26 1.26 1.26
3A 1.26 1.26 1.26
3D 1.26 1.26 1.26
4 3rd Floor 3A 1.26 1.26 1.26
3D 1.26 1.26 1.26
3A 1.26 1.26 1.26
3-D
2 SD MB 1 2.4 2.4
DW2 BED2 1 0.9 0.9
SD BED3 1 2.4 2.4
2-D
4 SD4 MB 1 1.8 1.8
SD BED2 1 2.4 2.4
FLAT SUMMARY
S. NO. DESCRIPTIONS T- A T- B T- C T- D T- E T- F
3A 30 30 30
3D 28 28 28
2A 56 44 44
2D 14 9 9
2E 13 11 11
1 BHK 1
TOTAL R/MTR 386.00
S. No. FLAT SUMMARY FLOOR WISE TOWER A,B,C Window Cill Nm of Flat T- A T- B T- C REMARK
1 Ground Floor 3A 4.1 4.1 4.1
3D 5.7 5.7 5.7
3A 4.1 4.1 4.1
2 1st Floor 3A 4.1 4.1 4.1
3D 5.7 5.7 5.7
3A 4.1 4.1 4.1
3 2nd Floor 3A 4.1 4.1 4.1
3D 5.7 5.7 5.7
3A 4.1 4.1 4.1
3D 5.7 5.7 5.7
4 3rd Floor 3A 4.1 4.1 4.1
3D 5.7 5.7 5.7
3A 4.1 4.1 4.1
3D 5.7 5.7 5.7
5 4th Floor 3A 4.1 4.1 4.1
3D 5.7 5.7 5.7
3A 4.1 4.1 4.1
3D 5.7 5.7 5.7
6 5th Floor 3A 4.1 4.1 4.1
3D 5.7 5.7 5.7
3A 4.1 4.1 4.1
3D 5.7 5.7 5.7
7 6th Floor 3A 4.1 4.1 4.1
3D 5.7 5.7 5.7
3A 4.1 4.1 4.1
3D 5.7 5.7 5.7
8 7th Floor 3A 4.1 4.1 4.1
3D 5.7 5.7 5.7
3A 4.1 4.1 4.1
3D 5.7 5.7 5.7
9 8th Floor 3A 4.1 4.1 4.1
3D 5.7 5.7 5.7
3A 4.1 4.1 4.1
3D 5.7 5.7 5.7
10 9th Floor 3A 4.1 4.1 4.1
3D 5.7 5.7 5.7
3A 4.1 4.1 4.1
3D 5.7 5.7 5.7
11 10th Floor 3A 4.1 4.1 4.1
3D 5.7 5.7 5.7
S. No. FLAT SUMMARY FLOOR WISE TOWER D, E, F Window Cill Nm of Flat T- D T- E T- F REMARK
1 Ground Floor
001 2A 2.75 2.75 2.75
003 2A 2.75 2.75 2.75
004 2A 2.75 2.75 2.75
2 005 2E 4.5 4.5 4.5
006 2A 2.75 2.75 2.75
1BHK 1BHK 2.4 2.4 2.4
1st Floor
101 2A 2.75 2.75 2.75
103 2A 2.75 2.75 2.75
4 104 2A 2.75 2.75 2.75
105 2E 4.5 4.5 4.5
106 2A 2.75 2.75 2.75
102 2D 4.2 4.2 4.2
2nd Floor
201 2A 2.75 2.75 2.75
202 2D 4.2 4.2 4.2
6 203 2A 2.75 2.75 2.75
204 2A 2.75 2.75 2.75
205 2E 4.5 4.5 4.5
206 2A 2.75 2.75 2.75
3rd Floor
301 2A 2.75 2.75 2.75
8 302 2D 4.2 4.2 4.2
303 2A 2.75 2.75 2.75
304 2A 2.75 2.75 2.75
305 2E 4.5 4.5 4.5
9 306 2A 2.75 2.75 2.75
4th Floor
10 401 2A 2.75 2.75 2.75
402 2D 4.2 4.2 4.2
403 2A 2.75 2.75 2.75
404 2A 2.75 2.75 2.75
11 405 2E 4.5 4.5 4.5
406 2A 2.75 2.75 2.75
12 5th Floor
501 2A 2.75 2.75 2.75
502 2D 4.2 4.2 4.2
Page 806 of 832
503 2A 2.75 2.75 2.75
13 504 2A 2.75 2.75 2.75
505 2E 4.5 4.5 4.5
506 2A 2.75 2.75 2.75
6th Floor
601 2A 2.75 2.75 2.75
602 2D 4.2 4.2 4.2
15 603 2A 2.75 2.75 2.75
604 2A 2.75 2.75 2.75
605 2E 4.5 4.5 4.5
606 2A 2.75 2.75 2.75
7th Floor
701 2A 2.75 2.75 2.75
702 2D 4.2 4.2 4.2
703 2A 2.75 2.75 2.75
704 2A 2.75 2.75 2.75
705 2E 4.5 4.5 4.5
706 2A 2.75 2.75 2.75
8th Floor
801 2A 2.75 2.75 2.75
802 2D 4.2 4.2 4.2
803 2A 2.75 2.75 2.75
804 2A 2.75 2.75 2.75
805 2E 4.5 4.5 4.5
806 2A 2.75 2.75 2.75
9th Floor
901 2A 2.75 2.75 2.75
902 2D 4.2 4.2 4.2
903 2A 2.75 2.75 2.75
904 2A 2.75 2.75 2.75
905 2E 4.5 4.5 4.5
906 2A 2.75 2.75 2.75
10th Floor
1001 2A 2.75 2.75 2.75
1002 2D 4.2 4.2 4.2
1003 2A 2.75 2.75 2.75
1004 2A 2.75 2.75 2.75
1005 2E 4.5 4.5 4.5
1006 2A 2.75 2.75 2.75
11th Floor
1101 2A 2.75 N/A N/A
1102 2D 4.2 N/A N/A
1103 2A 2.75 N/A N/A
1104 2A 2.75 N/A N/A
1105 2E 4.5 N/A N/A
1106 2A 2.75 N/A N/A
12th Floor
1201 2A 2.75 N/A N/A
1202 2D 4.2 N/A N/A
1203 2A 2.75 N/A N/A
1204 2A 2.75 N/A N/A
1205 2E 4.5 N/A N/A
1206 2A 2.75 N/A N/A
13th Floor
1301 2A 2.75 N/A N/A
1302 2D 4.2 N/A N/A
1303 2A 2.75 N/A N/A
1304 2A 2.75 N/A N/A
1305 2E 4.5 N/A N/A
1306 2A 2.75 N/A N/A
TOTAL QTY. 274 214.9 214.9
Flat 1BHK
on Grid N/7-9 SQM 1 2.600 0.55 1.00 1.43
SQM 1 0.600 0.55 1.00 0.33
SQM 1 9.200 0.55 1.00 5.06
Balcony SQM 1 7.600 0.55 1.00 4.18
SQM 1 1.125 0.55 1.00 0.62
SQM 1 3.525 0.55 1.00 1.94
SQM 2 1.705 0.55 1.00 1.88
SQM 1 0.575 0.55 1.00 0.32
SQM 1 1.045 0.55 1.00 0.57
SQM 1 0.300 0.55 1.00 0.17
Total 1BHK 16.49
Total 162.02
Tower E 156.12
Tower F 156.12
Flat 1BHK
on Grid N/7-9 SQM 1 2.600 2.60
SQM 1 0.600 0.60
SQM 1 9.200 9.20
Balcony SQM 1 7.600
SQM 1 1.125
SQM 1 3.525
SQM 2 1.550
SQM 1 0.575
SQM 1 1.045
SQM 1 0.300
Total 1BHK 12.40
No of
Tower NOS OF LIFT NOS OF
SR NOS TOWERS Unit PER FLOOR FLOOR total nos of lift
5 Applying extra cement plaster of thickness of 15-20mm in tanks for Dado Tile .
A TOWER A
domestic tank 2 3.6 1.57 11.304
2 4.03 1.57 12.654
recycle tank 2 3.6 1.57 11.304
2 1.42 1.57 4.459
fire tank 2 3.6 1.57 11.304
2 1.1 1.57 3.454
A1 FIRE ROOM PLASTER
EXTERNAL - LHS 1 1.625 5.475 8.897
1 4.3 2.18 9.374
1 1.175 0.76 0.893
1 1.175 0.13 0.153
RHS 1 1.60 5.47 8.752
-0.5 0.88 2 -0.880
0 0.26 2 0
1 4.3 2.2 9.46
1 1.175 0.76 0.893
1 1.175 0.26 0.3055
B TOWER B
domestic tank 2 3.6 1.57 11.304
2 4.03 1.57 12.654
recycle tank 2 3.6 1.57 11.304
Page 816 of 832
2 1.42 1.57 4.459
fire tank 2 3.6 1.57 11.304
2 1.1 1.57 3.454
INTERNAL - LHS 1 3.25 2.95 9.588
RHS 1 1.90 2.95 5.605
DED. -1 1.33 2.95 -3.924
TOTAL TOWER BTotal of Cement Plaster 65.748 SQM
C TOWER C
domestic tank 2 3.6 1.57 11.304
2 4.03 1.57 12.654
recycle tank 2 3.6 1.57 11.304
2 1.42 1.57 4.459
fire tank 2 3.6 1.57 11.304
2 1.1 1.57 3.454
TOTAL TOWER CTotal of Cement Plaster 54.479 SQM
D TOWER D
domestic tank 2 3 2.45 14.700
2 4.11 2.45 20.139
recycle tank 2 3.00 2.45 14.700
2 1.55 2.45 7.595
fire tank 2 3.00 2.45 14.700
2 0.775 2.45 3.798
TOTAL TOWER DTotal of Cement Plaster 75.632 SQM
E TOWER E
domestic tank 2 3.97 2.025 16.079
2 3 2.025 12.150
recycle tank 2 1.45 2.025 5.873
2 3 2.025 12.150
fire tank 2 1 2.025 4.050
2 3 2.025 12.150
TOTAL TOWER ETotal of Cement Plaster 62.451 SQM
F TOWER F
domestic tank 2 3.97 2.025 16.079
2 3 2.025 12.150
recycle tank 2 1.45 2.025 5.873
2 3 2.025 12.150
fire tank 2 1 2.025 4.050
2 3 2.025 12.150
TOTAL TOWER FTotal of Cement Plaster 62.451 SQM
6 Providing and laying extra 50mm screed to tank foor for laying of tiles flooring
a TOWER E
Domestic tank 1 3.975 3.00 0.05 0.59625
Recycle tank 1 1.45 3.00 0.05 0.2175
Fire tank 1 1.10 3.00 0.05 0.165
0.979
b TOWER F
Domestic tank 1 3.975 3.00 0.05 0.59625
Recycle tank 1 1.45 3.00 0.05 0.2175
Fire tank 1 1.10 3.00 0.05 0.165
0.979
c TOWER A
Domestic tank 1 3.60 4.03 0.05 0.7254
Page 817 of 832
Recycle tank 1 3.60 1.42 0.05 0.2556
Fire tank 1 3.60 1.1 0.05 0.198
1.179
d TOWER B
Domestic tank 1 3.60 4.03 0.05 0.7254
Recycle tank 1 3.60 1.42 0.05 0.2556
Fire tank 1 3.60 1.1 0.05 0.198
1.179
e TOWER C
Domestic tank 1 3.60 4.03 0.05 0.7254
Recycle tank 1 3.60 1.42 0.05 0.2556
Fire tank 1 3.60 1.1 0.05 0.198
1.179
f TOWER D
Domestic tank 1 3.00 4.11 0.05 0.6165
Recycle tank 1 3.00 1.55 0.05 0.2325
Fire tank 1 3.00 0.75 0.05 0.1125
0.9615
Total of screed 6.456 CUM
B 3D FLATS
B 2D FLATS
B 1BHK FLATS
Tower D,E & F- Gypsum Plaster Toilet top up Dado Tile-R1 TOILET DETAIL
Type 2A T1 SQM 2 2.53 0.150 0.758
SQM 2 1.65 0.150 0.495
Type 2A T2 SQM 2 2.33 0.150 0.698
SQM 2 1.48 0.150 0.443
Total Qty. SQM 2.393
S. No. No of Gypsum Plaster in toilet top-up Dado tile UNIT T- D T- E T- F No of Flat REMARK
Flat
Lift Wall Gupsum Plaster Basement Floor Sqm 2.09 2.09 2.09
1 Ground Floor
2A 001 Sqm 2.39 2.39 2.39 2A
2A 003 Sqm 2.39 2.39 2.39 2A
2A 004 Sqm 2.39 2.39 2.39 2A
2E 005 Sqm 2.57 2.57 2.57 2E
2A 006 Sqm 2.39 2.39 2.39 2A
1BHK 1BHK Sqm 1.29 1BHK
Lift Wall Gupsum Plaster Sqm 2.09 2.09 2.09
2 1st Floor
2A 101 Sqm 2.39 2.39 2.39 2A
2A 103 Sqm 2.39 2.39 2.39 2A
2A 104 Sqm 2.39 2.39 2.39 2A
2E 105 Sqm 2.57 2.57 2.57 2E
2A 106 Sqm 2.39 2.39 2.39 2A
2D 102 Sqm 2.54 2.54 2.54 2D
Lift Wall Gupsum Plaster Sqm 2.09 2.09 2.09
3 2nd Floor
2A 201 Sqm 2.39 2.39 2.39 2A
2D 202 Sqm 2.39 2.39 2.39 2D
2A 203 Sqm 2.39 2.39 2.39 2A
2A 204 Sqm 2.57 2.57 2.57 2A
2E 205 Sqm 2.39 2.39 2.39 2E
2A 206 Sqm 2.54 2.54 2.54 2A
Lift Wall Gupsum Plaster Sqm 2.09 2.09 2.09
4 3rd Floor
2A 301 Sqm 2.39 2.39 2.39 2A
2D 302 Sqm 2.39 2.39 2.39 2D
2A 303 Sqm 2.39 2.39 2.39 2A
2A 304 Sqm 2.57 2.57 2.57 2A
2E 305 Sqm 2.39 2.39 2.39 2E
2A 306 Sqm 2.54 2.54 2.54 2A
Lift Wall Gupsum Plaster Sqm 2.09 2.09 2.09
5 4th Floor
2A 401 Sqm 2.39 2.39 2.39 2A
2D 402 Sqm 2.39 2.39 2.39 2D
2A 403 Sqm 2.39 2.39 2.39 2A
2A 404 Sqm 2.57 2.57 2.57 2A
2E 405 Sqm 2.39 2.39 2.39 2E
2A 406 Sqm 2.54 2.54 2.54 2A
Lift Wall Gupsum Plaster Sqm 2.09 2.09 2.09
6 5th Floor
2A 501 Sqm 2.39 2.39 2.39 2A
2D 502 Sqm 2.39 2.39 2.39 2D
2A 503 Sqm 2.39 2.39 2.39 2A
2A 504 Sqm 2.57 2.57 2.57 2A
Page 824 of 832
2E 505 Sqm 2.39 2.39 2.39 2E
2A 506 Sqm 2.54 2.54 2.54 2A
Lift Wall Gupsum Plaster Sqm 2.09 2.09 2.09
7 6th Floor
2A 601 Sqm 2.39 2.39 2.39 2A
2D 602 Sqm 2.39 2.39 2.39 2D
2A 603 Sqm 2.39 2.39 2.39 2A
2A 604 Sqm 2.57 2.57 2.57 2A
2E 605 Sqm 2.39 2.39 2.39 2E
2A 606 Sqm 2.54 2.54 2.54 2A
Lift Wall Gupsum Plaster Sqm 2.09 2.09 2.09
8 7th Floor
2A 701 Sqm 2.39 2.39 2.39 2A
2D 702 Sqm 2.39 2.39 2.39 2D
2A 703 Sqm 2.39 2.39 2.39 2A
2A 704 Sqm 2.57 2.57 2.57 2A
2E 705 Sqm 2.39 2.39 2.39 2E
2A 706 Sqm 2.54 2.54 2.54 2A
Lift Wall Gupsum Plaster Sqm 2.09 2.09 2.09
9 8th Floor
2A 801 Sqm 2.39 2.39 2.39 2A
2D 802 Sqm 2.39 2.39 2.39 2D
2A 803 Sqm 2.39 2.39 2.39 2A
2A 804 Sqm 2.57 2.57 2.57 2A
2E 805 Sqm 2.39 2.39 2.39 2E
2A 806 Sqm 2.54 2.54 2.54 2A
Lift Wall Gupsum Plaster Sqm 2.09 2.09 2.09
10 9th Floor
2A 901 Sqm 2.39 2.39 2.39 2A
2D 902 Sqm 2.39 2.39 2.39 2D
2A 903 Sqm 2.39 2.39 2.39 2A
2A 904 Sqm 2.57 2.57 2.57 2A
2E 905 Sqm 2.39 2.39 2.39 2E
2A 906 Sqm 2.54 2.54 2.54 2A
Lift Wall Gupsum Plaster Sqm 2.09 2.09 2.09
11 10th Floor
2A 1001 Sqm 2.39 2.39 2.39 2A
2D 1002 Sqm 2.39 2.39 2.39 2D
2A 1003 Sqm 2.39 2.39 2.39 2A
2A 1004 Sqm 2.57 2.57 2.57 2A
2E 1005 Sqm 2.39 2.39 2.39 2E
2A 1006 Sqm 2.54 2.54 2.54 2A
Lift Wall Gupsum Plaster Sqm 2.09 2.09 2.09
12 11th Floor
2A 1101 Sqm 2.39 N/A N/A 2A
2D 1102 Sqm 2.39 N/A N/A 2D
2A 1103 Sqm 2.39 N/A N/A 2A
2A 1104 Sqm 2.57 N/A N/A 2A
2E 1105 Sqm 2.39 N/A N/A 2E
2A 1106 Sqm 2.54 N/A N/A 2A
Lift Wall Gupsum Plaster Sqm 2.09 N/A N/A
13 12th Floor
2A 1201 Sqm 2.39 N/A N/A 2A
2D 1202 Sqm 2.39 N/A N/A 2D
2A 1203 Sqm 2.39 N/A N/A 2A
2A 1204 Sqm 2.57 N/A N/A 2A
Tower D
3 2-A T-1 1.00 0.7 0.6 56 23.52
T-2 1.00 0.7 0.6 56 23.52
4 2-D T-1 1.00 0.7 0.6 14 5.88
T-2 1.00 0.7 0.6 14 5.88
Door Frame 1100X2100= 8 Nos 2.00 1]. Driver Toilet Entry Gate
Nos 2.00 2]. Desable Toilet Entry Door
Nos 1.00 3]. Enargy Meter Room
Nos 1.00 4]. CCTV in
Nos 1.00 5]. FTHT
Nos 1.00 6]. Shopping Area
Total Nos 90% 7.20
Door Frame 750X2100= 11 But 5 No Installation Nos 2.00 1]. Driver Toilet
Nos 3.00 2]. Shopping Area
Total Nos 90% 4.50