Earthing & Lightning Protection System Training
Earthing & Lightning Protection System Training
J19--0
ABU OHABI PORTS \
Contract 4201·230 • Design & Construction of Borouge Permanent Warehouses.
'RAINING DESCRIPTION: Operation & Maintanance Training of Earthing & Lightning Protection system
22·Nov·21
4201-230 DESIGN & CONSTRUCTION OF BOROUGE PERMANENT WAREHOUSES
KHIA7-2C, KIZAD ABU DHABI UAE
1
Project Code: 4201-230
Project Name:
Borouge Permanent Warehouses
Training Module:
Operation and Maintenance Training of Earthing &
Lightning Protection system
3
Section 01
Introduction
This TRAINING MANUAL of the Earthing & Lightning Protection system installed at
the project (AD Port Project 4201-230) DESIGN & CONSTRUCTION OF BOROUGE
PERMANENT WAREHOUSES in KIZAD is for the safe and reliable operation and
maintenance.
The safe Inspection & Maintenance procedures of the Earthing & Lightning Protection
system
9
Section 03
Warning
WARNING
DO NOT ATTEMPT TO OPERATE OR CARRY OUT MAINTENANCE ON ANY SYSTEM OR
PART THEREOF UNLESS QUALIFIED AND AUTHORISED.
WARNING
DO NOT OPEN OR TOUCH ANY LIVE ELECTRICAL SWITCHBOARD OR ELECTRICAL
EQUIPMENT UNLESS QUALIFIED AND AUTHORISED
WARNING
DO NOT TURN OFF ELECTRIC MOTORS ONLY AT THE POWER ISOLATING SWITCH.
ALWAYS USE THE CONTROL ISOLATOR AND THEN ISOLATE AT THE MOTOR
ISOLATOR.
WARNING
DO NOT MODIFY OR ALTER ANY PART OF THE CONTROL CIRCUIT WITHOUT
AUTHORISATION.
11
Section 04
Training Module
Ensure that all staff, technicians and workers performing any repairs,
replacements or maintenance are adequately trained in the technical and safety
aspects of the mechanical, electrical, plumbing or fire protection equipment and
systems prior to allowing the works to commence.
Further Information and additional instructions for a complete understanding of
the operation and maintenance characteristics of the building services are given in
the Operation and Maintenance Manuals.
All staff, technicians and workers must undergo a site induction to identify the site
working conditions, site environment, site safety requirements and site
orientation for emergency evacuations.
Section 05
System
Description
The Earthing & Lightning Protection system in the Borouge Permanent warehouses and
its subsidiary buildings complies with the ADDC and BS standards.
15
Section 06
Operation
Procedures
The Earthing & Lightning Protection system is a standstill/Passive system, hence operation is
not applicable.
A regular inspection and record keeping of the status of the system is necessary to ensure that
Earthing & Lightning Protection system does not deteriorate but continues to fulfill the
requirements to which it was originally designed and installed.
Section 07
Maintenance
Procedures
A well-planned maintenance program is essential to the efficient operation of the
wiring and lighting system. Maintenance to the should be executed by the
experienced technician and as per the manufacturers’ recommendations.
20
Tools, Equipment & Safety:
All tools and equipment should be kept clean and in good condition. They
should be regularly inspected and any signs, which show excessive, wear or
defect, should be replaced immediately.
The following are a few notes on the use of tools and equipment:
Only use each tool for purpose of which it was designed
Never leave tools lying about. Collect them when finished and return them to
correction location
Use Calibrated instruments
21
Section 08
Emergency
Contact
Supplier:
SAFE LINE ELECTRICAL AND MECHANICAL LLC
3rd Floor, Al Masaood Tower
Fatima Bint Mubarak Street (Najda)
P.O Box : 45350, Abu Dhabi, UAE
Tel: +971 2 650 4999
Fax: +971 2 650 4998
Email: [email protected]
Contractor:
Asia-Prime General Contracting Co. LLC
P.O. Box 3346,
Sharjah, UAE
Telephone: +971 657 42226
Fax: +971 65744848
Email: [email protected]
Website: www.asia-prime.com
QUESTIONS ARE WELCOME
PLEASE SIGN OFF THE ATTENDANCE SHEET
THANKS