0% found this document useful (0 votes)
70 views

Method Statement For Installation of CCTV Camera System: Join For Latest Articles

This document provides a method statement for installing a CCTV camera system. It outlines the necessary tools, materials handling procedures, and installation steps. The key steps include properly storing and inspecting materials upon arrival, installing cables concealed where possible, properly terminating wires, installing cameras through containment systems, and performing continuity testing of cables. Proper care must be taken when laying cables to avoid interference and stress on the cables.

Uploaded by

haytham65
Copyright
© © All Rights Reserved
0% found this document useful (0 votes)
70 views

Method Statement For Installation of CCTV Camera System: Join For Latest Articles

This document provides a method statement for installing a CCTV camera system. It outlines the necessary tools, materials handling procedures, and installation steps. The key steps include properly storing and inspecting materials upon arrival, installing cables concealed where possible, properly terminating wires, installing cameras through containment systems, and performing continuity testing of cables. Proper care must be taken when laying cables to avoid interference and stress on the cables.

Uploaded by

haytham65
Copyright
© © All Rights Reserved
You are on page 1/ 1

Home Download Method Statements Quality Plan Maintenance Procedures SWMS Privacy Support Cart


Editable Documents Full Catalog

Search … SEARCH
Method Statement For Installation Of CCTV Camera System
Join for Latest Articles
Following tools shall be required to perform the installation of CCTV system.
Enter your email address & Click Join: Digital Multimeter
Label Printer
Drill Machine
Ladders
Crimping Tool
JOIN General Tool Box
Portable Hand Tools

MATERIAL HANDLING & STORAGE:


Recent Publications 1. CCTV material at site necessary precautions shall be taken for unloading,
Block Wall Construction Control Procedure for shifting & storage as follows;
Blockwork 2. All packages for the complete CCTV reaching to site shall be identified as
per package list.
Slab Concrete Procedure for Ground Floor Slab 3. Where auxiliaries are shipped loose, these will be identified and checked
Construction Vehicle and Plant Servicing Procedure against the dispatch documents. Any item found missing or damaged will be
noted to the supplier immediately for the replacement / repair.
Drainage Piping Above Ground Installation Plumbing 4. Special attention shall be paid to the instruments and monitoring devices
Work Method of Statement supplied loose.
Touchup Paint Method for Protective Painting and 5. All materials received at site shall be inspected and ensured that the
Coating of Piping and Supports materials are as per approved material submittal, shop drawings and single
Your download is ready
line diagram.
6. Any discrepancies, damage etc., found will be notified and reported for
Combo Service Download further action.
7. Site Engineer (Electrical) has to ensure that material used at site are of free
from any damages or  deformity of any kind of damage material sent be
back to the supplier.
8. All packages shall be stored under protected dust area and in air conditioned room

INSTALLATION PROCEDURE FOR CCTV CAMERAS 


1. Ensure all civil works are completed for the area including floor paint to carry out the  installation, and clearance is
obtained from respective authorities to proceed further.
2. Prior to start the installation, refer to the approved shop drawings related top the area of installation and ensure that
required materials are available at site as per approved material submittals.
3. Wiring Method: Install cables concealed in accessible ceilings, walls, and floors where possible.
4. Wiring within Enclosures: Bundle, lace, and train conductors to terminal points with no excess and without exceeding
Popular Categories manufacturer’s limitations on bending radii. Provide and use lacing bars and distribution spools.
 Civil Method Statements (72) 5. Splices, Taps, and Terminations: For power and control wiring, use numbered terminal strips in junction, pull, and outlet
boxes; terminal cabinets; and equipment enclosures. Tighten electrical  connectors and terminals according to
 Electrical Method Statements (43) manufacturer’s published torque-tightening values.
 Fire Fighting Systems (14)
6. Installation of CCTV cables shall be taken up through the containment system for Camera from Junction Box.
7. Proper care shall be taken while laying the cable to maintain the required safe distance from electrical equipments and
 HVAC Method Statements (39) power sources to avoid the interference.
 Occupational Health and Safety (20) 8. Ensure the cabling is done in proper way without any stress on the cable, while laying at the turning etc., by keeping
enough slack and proper bending radius.
 Oil & Gas Systems (9) 9. CCTV cables shall be identified on both ends as per method shown in approved shop drawings.
 Plumbing Method Statements (32) 10. Continuity testing shall be carried for each cable by using continuity test meter and result will be recorded for review
and approval.
 Technical Guides (31) 11. After completion of entire cabling and approval by consultant, cable termination shall be carried out in Junction Boxes
 Testing & Commissioning (59) and at the Camera Points.
12. Junction Boxes will be identified by labels.
13. All work shall be carried out as per approved drawings.
14. Install cameras level and plumb.
Popular Tags 15. Set pan unit and pan-and-tilt unit stops to suit final camera position and to obtain the field of  view required for
camera. Connect all controls and alarms, and adjust.
AV System block work method statement block work 16. Install power supplies and other auxiliary components at control stations, unless otherwise indicated.
procedure CCTV ceramic floor tiles Clean Agent System 17. Dome Cameras shall be installed in the ceiling.
Commissioning COMMISSIONING PROCEDURE Drainage 18. Wall Mount Fixed Cameras shall be installed on the wall by using Camera Brackets.
piping drainage piping method statement Electric Water 19. Installed Junction Boxes & containment shall be checked and approved by consultant to proceed for the cabling works.
Heaters excavation safe work Fire Fighting System Fire
Suppression System hse management procedure
Installation Installation Method Statement installation
Procedure job safety analysis jsa safety Lightning
Protection System Method Of Statement method
statement Method Statement For Testing &
Commissioning pipe coating Precommissioning
Precommissioning & Commissioning Safe Method of
Statement Safe Method Statement safe work for
excavation safe work method of statement Safe Work
Method Statement Sanitary Wares Specifications
swimming pool civil works SWMS Testing &
Commissioning Testing & Commissioning Method
Statement Testing and Commissioning Tile Installation
Method Tower Crane Foundation Upper Floor Wall Frames
UPS Testing Procedure working at height Work Safe

Meta Previous Next

 Log in
 Entries feed

 Comments feed
 WordPress.org

Visitor Stats
664,255 Visitors

All Rights Reserved. Safework Method Of Statement. Serving Construction Industry Since 10 years.

You might also like