0% found this document useful (0 votes)
57 views16 pages

Recommended Generator Report - 2250DQKAG Project - AMNS - CGL#4 Comments - PTIN EAL1

The document provides a recommended generator configuration for a project requiring a standby generator with the following specifications: - 50Hz, 3-phase, 240/416V system - Total running load of 1460.8kW and 1686.9kVA - Maximum step load of 221.7kW in step 2 and cumulative step load of 1570.2kW - The recommended generator is an LVSI804T alternator paired with a QSK60-G11 NR2 engine with a rated capacity of 1800kW/2250kVA.

Uploaded by

Arunava Basak
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
57 views16 pages

Recommended Generator Report - 2250DQKAG Project - AMNS - CGL#4 Comments - PTIN EAL1

The document provides a recommended generator configuration for a project requiring a standby generator with the following specifications: - 50Hz, 3-phase, 240/416V system - Total running load of 1460.8kW and 1686.9kVA - Maximum step load of 221.7kW in step 2 and cumulative step load of 1570.2kW - The recommended generator is an LVSI804T alternator paired with a QSK60-G11 NR2 engine with a rated capacity of 1800kW/2250kVA.

Uploaded by

Arunava Basak
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 16

Recommended Generator Report - 2250DQKAG

Project - AMNS_CGL#4
Comments - PTIN EAL1
Project Requirements

Frequency, Hz : 50.0 Generators Running in Parallel : 1


Duty : Standby Site Altitude, ft(m) : 361(110)
Voltage : 240/416, Series Wye Site Temperature, °C : 25
Phase : 3 Max. Altr Temp Rise, °C : 80
Fuel : Diesel Project Voltage Distortion Limit, % : 10
Emissions : No Preference

Calculated Individual Generator Set Load Running and Peak Requirements

Running kW : 1460.8 Max. Step kW : 221.7 In Step 2 Cumulative Step kW : 1570.2


Running kVA : 1686.9 Max. Step kVA : 452.4 In Step 2 Cumulative Step kVA : 1948.7
Running PF : 0.87 Peak kW : None Cumulative Peak kW : None
Running NLL kVA : 1033.0 Peak kVA : None Cumulative Peak kVA : None
Alternator kW : 1838.15 Pct Rated Capacity : 81.2

Generator Set Configuration

Alternator : LVSI804T Engine : QSK60-G11 NR2


BCode : BA27 Fuel : Diesel
Excitation : PMG Displacement, cu in. (Litre) : 3673.0(60.2)
Voltage Range : 380-440 Cylinders : 16
Number of Leads : 6 Altitude Knee, ft(m) : 984(300)
Reconnectable : No Altitude Slope, % per 3281ft(1000.0m) : 10
Full Single Phase Output : No Temperature Knee, °F(°C) : 104(40)
Increased Motor Starting : No Temperature Slope, % per 10°F(5.56°C) : 14
Extended Stack : No Emissions : EPA Tier 2
Cooling Package : high ambient
Set Performance Load Requirements

Running At : 81.2% Rated Capacity


Max. Step Voltage Dip, % : 4 Max. Allowed Step Voltage Dip : 35 In Step 2
Max. Step Frequency Dip, % : 1 Max. Allowed Step Frequency Dip : 10 In Step 1
Peak Voltage Dip, % : Peak Voltage Dip Limit % : 35.0
Peak Frequency Dip, % : Peak Frequency Dip Limit % : 10
Site Rated Standby kW/kVA : 1800 / 2250 Running kW : 1460.8
Running kVA : 1686.9
Site Rated Max. SkW : 1834 Effective Step kW : 1304.5
Max. SkVA : 9719 Effective Step kVA : 1948.7
Temp Rise at Full Load, °C : 80 Percent Non-Linear Load : 65.0
Voltage Distortion : 8.4 Voltage Distortion Limit : 10
Site Rated Max Step kW Limit : Max Step kW :
*Note: Higher temperature rise at full rated load.
*Note: All generator set power derates are based on open generator sets.

Recommended Generator Report 21-Jan-2022 Page 1


Loads Summary Report
Project - AMNS_CGL#4
Comments - PTIN EAL1
Project Requirements

Frequency, Hz : 50.0 Generators Running in Parallel : 1

Duty : Standby Site Altitude, ft(m) : 361(110)

Voltage : 240/416, Series Wye Site Temperature, °C : 25

Phase : 3 Max. Altr Temp Rise, °C : 80

Fuel : Diesel Project Voltage Distortion Limit, % : 10

Emissions : No Preference

Loads Summary List


*Note: Detailed Loads and Step Report available below

Running Starting Peak Dip Limits, % VTHD%


Step No. Load Name Quantity
kW kVA kW kVA kW kVA Vdip Fdip Limit

Step01 Emergency Illumination 1 100.0 142.86 100.0 142.86 None None 35.0 10.0 0.0

Step01 26V104- 1 32.0 40.0 32.0 40.0 None None 35.0 10.0 0.0
EMERGENCY-ACDB-
DB

Step01 26V102- 1 32.0 40.0 32.0 40.0 None None 35.0 10.0 0.0
EMERGENCY-ACDB-
DB

Step01 27V102- 1 25.0 31.25 25.0 31.25 None None 35.0 10.0 0.0
EMERGENCY-ACDB-
DB

Step Summary 189.0 254.0 189.0 254.0 None None 35.0 10.0 0.0

Step02 COATING POT AND 1 32.26 39.83 141.74 301.57 None None 35.0 10.0 0.0
REFRACTORY FOR
ZN WATER COOLING
SY

Step02 COATING POT AND 1 16.3 19.64 79.93 150.82 None None 35.0 10.0 0.0
REFRACTORY FOR
ZN INDUCTOR
BLOWERS

Step Summary 49.0 59.0 222.0 452.0 None None 35.0 10.0 0.0

Step03 ZINC PUMPS AND 1 16.3 19.64 79.93 150.82 None None 35.0 10.0 0.0
MOULDS ZINC
PUMPS

Step03 EMERGENCY DRIVE 1 20.0 22.22 17.78 22.22 None None 35.0 10.0 0.0
LINEUP -4 AUXILIARY
POWER

Step Summary 36.0 42.0 98.0 173.0 None None 35.0 10.0 0.0

Loads and Steps Detail Report 21-Jan-2022 Page 1


Step04 COATING POT AND 1 32.26 39.83 141.74 301.57 None None 35.0 10.0 0.0
REFRACTORY FOR
ZNMG WATER
COOLING

Step04 COATING POT AND 1 16.3 19.64 79.93 150.82 None None 35.0 10.0 0.0
REFRACTORY FOR
ZNMG INDUCTOR
BLOWE

Step Summary 49.0 59.0 222.0 452.0 None None 35.0 10.0 0.0

Step05 2.2kW VFD Motor 2 1.22 1.26 0.98 1.09 None None 35.0 10.0 10.0

Step05 3.5kW VFD Motor 26 1.45 1.49 1.16 1.29 None None 35.0 10.0 10.0

Step05 5kW VFD Motor 2 2.78 2.87 2.22 2.47 None None 35.0 10.0 10.0

Step05 UPS Load 1 1 61.34 76.67 24.54 30.67 None None 35.0 10.0 10.0

Step Summary 107.0 124.0 61.0 71.0 None None 35.0 10.0 10.0

Step06 POT Through 644kVA 1 203.88 221.61 160.0 200.0 None None 35.0 10.0 10.0
Auto Transformer

Step Summary 204.0 222.0 160.0 200.0 None None 35.0 10.0 10.0

Step07 POT Through 644kVA 1 203.88 221.61 160.0 200.0 None None 35.0 10.0 10.0
Auto Transformer

Step Summary 204.0 222.0 160.0 200.0 None None 35.0 10.0 10.0

Step08 POT Through 644kVA 1 203.88 221.61 160.0 200.0 None None 35.0 10.0 10.0
Auto Transformer

Step Summary 204.0 222.0 160.0 200.0 None None 35.0 10.0 10.0

Step09 POT Through 644kVA 1 203.88 221.61 160.0 200.0 None None 35.0 10.0 10.0
Auto Transformer

Step Summary 204.0 222.0 160.0 200.0 None None 35.0 10.0 10.0

Step10 ZINC POT CRANE 1 22.22 22.91 22.22 24.69 None None 35.0 10.0 10.0
HANDLING
EQUIPMENT FOR
POT AREA FEE

Step Summary 22.0 23.0 22.0 25.0 None None 35.0 10.0 10.0

Step11 30kW SUMP PUMP 1 32.26 39.83 141.74 301.57 None None 35.0 10.0 0.0

Step Summary 32.0 40.0 142.0 302.0 None None 35.0 10.0 10.0

Step12 30kW SUMP PUMP 1 32.26 39.83 141.74 301.57 None None 35.0 10.0 0.0

Step Summary 32.0 40.0 142.0 302.0 None None 35.0 10.0 10.0

Step13 30kW SUMP PUMP 1 32.26 39.83 141.74 301.57 None None 35.0 10.0 0.0

Step Summary 32.0 40.0 142.0 302.0 None None 35.0 10.0 10.0

Step14 30kW SUMP PUMP 1 32.26 39.83 141.74 301.57 None None 35.0 10.0 0.0

Step Summary 32.0 40.0 142.0 302.0 None None 35.0 10.0 10.0

Step15 30kW SUMP PUMP 1 32.26 39.83 141.74 301.57 None None 35.0 10.0 0.0

Step Summary 32.0 40.0 142.0 302.0 None None 35.0 10.0 10.0

Step16 30kW SUMP PUMP 1 32.26 39.83 141.74 301.57 None None 35.0 10.0 0.0

Step Summary 32.0 40.0 142.0 302.0 None None 35.0 10.0 10.0

Project
Running Max Starting Cumulative Step Cumulative Peak
VTHD%
Project Summary
kW kVA kW kVA kW kVA kW kVA Limit

1460.8 1686.9 221.7 452.4 1570.2 1948.7 0.0 0.0 10.0

*Note: Detailed Loads and Step Report available below

Loads and Steps Detail Report 21-Jan-2022 Page 2


Loads and Steps Detail Report
Project - AMNS_CGL#4
Comments - PTIN EAL1
Project Requirements

Frequency, Hz : 50.0 Generators Running in Parallel : 1

Duty : Standby Site Altitude, ft(m) : 361(110)

Voltage : 240/416, Series Wye Site Temperature, °C : 25

Phase : 3 Max. Altr Temp Rise, °C : 80

Fuel : Diesel Project Voltage Distortion Limit, % : 10

Emissions : No Preference

Calculated Individual Generator Set Load Running and Peak Requirements

Running kW : 1460.8 Max. Step kW : 221.7 In Step 2 Cumulative Step kW : 1570.2

Running kVA : 1686.9 Max. Step kVA : 452.4 In Step 2 Cumulative Step kVA : 1948.7

Running PF : 0.87 Peak kW : None Cumulative Peak kW : None

Running NLL kVA : 1033.0 Peak kVA : None Cumulative Peak kVA : None
Alternator kW : 1838.15

Step1

Calculated Individual Generator Set Step Load Requirements

Running kW : 189.0 Starting kW : 189.0 Cumulative Step kW : 189.0

Running kVA : 254.0 Starting kVA : 254.0 Cumulative Step kVA : 254.0

Running Amps : 353.0 Starting Non-linear kVA : 0.0

Running Non-linear kVA : 0.0

Alternator kW : 189.0

Voltage Distortion Limit for : 0


step

Emergency Illumination Three Phase Quantity : 1 In this Step

Category : Light - LED

Running kW : 100.0 Starting kW : 100.0 Peak kW : None

Running kVA : 142.86 Starting kVA : 142.86 Peak kVA : None

Running PF : 0.7 Starting PF : 0.7 Cyclic : No

Running Amps : 198.5 Max. % Voltage Dip : 35.0 Max. % Frequency Dip : 10.0

Alternator kW : 100.0 Voltage : 416

26V104-EMERGENCY-ACDB-DB Three Phase Quantity : 1 In this Step

Category : General Receptacle

Running kW : 32.0 Starting kW : 32.0 Peak kW : None

Running kVA : 40.0 Starting kVA : 40.0 Peak kVA : None

Running PF : 0.8 Starting PF : 0.8 Cyclic : No

Loads and Steps Detail Report 21-Jan-2022 Page 3


Running Amps : 55.58 Max. % Voltage Dip : 35.0 Max. % Frequency Dip : 10.0

Alternator kW : 32.0 Voltage : 416

26V102-EMERGENCY-ACDB-DB Three Phase Quantity : 1 In this Step

Category : General Receptacle

Running kW : 32.0 Starting kW : 32.0 Peak kW : None

Running kVA : 40.0 Starting kVA : 40.0 Peak kVA : None

Running PF : 0.8 Starting PF : 0.8 Cyclic : No

Running Amps : 55.58 Max. % Voltage Dip : 35.0 Max. % Frequency Dip : 10.0

Alternator kW : 32.0 Voltage : 416

27V102-EMERGENCY-ACDB-DB Three Phase Quantity : 1 In this Step

Category : General Receptacle

Running kW : 25.0 Starting kW : 25.0 Peak kW : None

Running kVA : 31.25 Starting kVA : 31.25 Peak kVA : None

Running PF : 0.8 Starting PF : 0.8 Cyclic : No

Running Amps : 43.42 Max. % Voltage Dip : 35.0 Max. % Frequency Dip : 10.0

Alternator kW : 25.0 Voltage : 416

Step2

Calculated Individual Generator Set Step Load Requirements

Running kW : 49.0 Starting kW : 222.0 Cumulative Step kW : 411.0

Running kVA : 59.0 Starting kVA : 452.0 Cumulative Step kVA : 707.0

Running Amps : 83.0 Starting Non-linear kVA : 0.0

Running Non-linear kVA : 0.0

Alternator kW : 48.56

Voltage Distortion Limit for : 0


step

COATING POT AND REFRACTORY FOR ZN WATER COOLING SY Three Phase Quantity : 1 In this Step

Category : Motor

Running kW : 32.26 Starting kW : 141.74 Peak kW : None

Running kVA : 39.83 Starting kVA : 301.57 Peak kVA : None

Running PF : 0.81 Starting PF : 0.47 Cyclic : No

Running Amps : 55.34 Max. % Voltage Dip : 35.0 Max. % Frequency Dip : 10.0

Alternator kW : 32.26 Voltage : 416

Shaft Hp : 40.21 Method : Across the line

Shaft kW : 30.0 Low Inertia : No

Efficiency (%) : 0.93 LRkVA Factor : 7.5

Design : IEC LRkVA Code : J

Load Factor : 100.0

COATING POT AND REFRACTORY FOR ZN INDUCTOR BLOWERS Three Phase Quantity : 1 In this Step

Category : Motor

Running kW : 16.3 Starting kW : 79.93 Peak kW : None

Running kVA : 19.64 Starting kVA : 150.82 Peak kVA : None

Running PF : 0.83 Starting PF : 0.53 Cyclic : No

Loads and Steps Detail Report 21-Jan-2022 Page 4


Running Amps : 27.29 Max. % Voltage Dip : 35.0 Max. % Frequency Dip : 10.0

Alternator kW : 16.3 Voltage : 416

Shaft Hp : 20.11 Method : Across the line

Shaft kW : 15.0 Low Inertia : No

Efficiency (%) : 0.92 LRkVA Factor : 7.5

Design : IEC LRkVA Code : J

Load Factor : 100.0

Step3

Calculated Individual Generator Set Step Load Requirements

Running kW : 36.0 Starting kW : 98.0 Cumulative Step kW : 335.0

Running kVA : 42.0 Starting kVA : 173.0 Cumulative Step kVA : 487.0

Running Amps : 58.0 Starting Non-linear kVA : 0.0

Running Non-linear kVA : 0.0

Alternator kW : 36.3

Voltage Distortion Limit for : 0


step

ZINC PUMPS AND MOULDS ZINC PUMPS Three Phase Quantity : 1 In this Step

Category : Motor

Running kW : 16.3 Starting kW : 79.93 Peak kW : None

Running kVA : 19.64 Starting kVA : 150.82 Peak kVA : None

Running PF : 0.83 Starting PF : 0.53 Cyclic : No

Running Amps : 27.29 Max. % Voltage Dip : 35.0 Max. % Frequency Dip : 10.0

Alternator kW : 16.3 Voltage : 416

Shaft Hp : 20.11 Method : Across the line

Shaft kW : 15.0 Low Inertia : No

Efficiency (%) : 0.92 LRkVA Factor : 7.5

Design : IEC LRkVA Code : J

Load Factor : 100.0

EMERGENCY DRIVE LINEUP -4 AUXILIARY POWER Three Phase Quantity : 1 In this Step

Category : General Receptacle

Running kW : 20.0 Starting kW : 17.78 Peak kW : None

Running kVA : 22.22 Starting kVA : 22.22 Peak kVA : None

Running PF : 0.9 Starting PF : 0.8 Cyclic : No

Running Amps : 30.88 Max. % Voltage Dip : 35.0 Max. % Frequency Dip : 10.0

Alternator kW : 20.0 Voltage : 416

Step4

Calculated Individual Generator Set Step Load Requirements

Running kW : 49.0 Starting kW : 222.0 Cumulative Step kW : 496.0

Running kVA : 59.0 Starting kVA : 452.0 Cumulative Step kVA : 808.0

Running Amps : 83.0 Starting Non-linear kVA : 0.0

Running Non-linear kVA : 0.0

Alternator kW : 48.56

Voltage Distortion Limit for : 0


step

Loads and Steps Detail Report 21-Jan-2022 Page 5


COATING POT AND REFRACTORY FOR ZNMG WATER COOLING Three Phase Quantity : 1 In this Step

Category : Motor

Running kW : 32.26 Starting kW : 141.74 Peak kW : None

Running kVA : 39.83 Starting kVA : 301.57 Peak kVA : None

Running PF : 0.81 Starting PF : 0.47 Cyclic : No

Running Amps : 55.34 Max. % Voltage Dip : 35.0 Max. % Frequency Dip : 10.0

Alternator kW : 32.26 Voltage : 416

Shaft Hp : 40.21 Method : Across the line

Shaft kW : 30.0 Low Inertia : No

Efficiency (%) : 0.93 LRkVA Factor : 7.5

Design : IEC LRkVA Code : J

Load Factor : 100.0

COATING POT AND REFRACTORY FOR ZNMG INDUCTOR BLOWE Three Phase Quantity : 1 In this Step

Category : Motor

Running kW : 16.3 Starting kW : 79.93 Peak kW : None

Running kVA : 19.64 Starting kVA : 150.82 Peak kVA : None

Running PF : 0.83 Starting PF : 0.53 Cyclic : No

Running Amps : 27.29 Max. % Voltage Dip : 35.0 Max. % Frequency Dip : 10.0

Alternator kW : 16.3 Voltage : 416

Shaft Hp : 20.11 Method : Across the line

Shaft kW : 15.0 Low Inertia : No

Efficiency (%) : 0.92 LRkVA Factor : 7.5

Design : IEC LRkVA Code : J

Load Factor : 100.0

Step5

Calculated Individual Generator Set Step Load Requirements

Running kW : 107.0 Starting kW : 61.0 Cumulative Step kW : 384.0

Running kVA : 124.0 Starting kVA : 71.0 Cumulative Step kVA : 486.0

Running Amps : 172.0 Starting Non-linear kVA : 71.0

Running Non-linear kVA : 124.0

Alternator kW : 149.82

Voltage Distortion Limit for : 10


step

2.2kW VFD Motor Three Phase Quantity : 2 In this Step

Category : Motor

Running kW : 1.22 Starting kW : 0.98 Peak kW : None

Running kVA : 1.26 Starting kVA : 1.09 Peak kVA : None

Running PF : 0.97 Starting PF : 0.9 Cyclic : No

Running Amps : 1.75 Max. % Voltage Dip : 35.0 Max. % Frequency Dip : 10.0

Running NLL kVA : 1.26

Starting NLL kVA : 1.09 Voltage : 416

Alternator kW : 1.71

Loads and Steps Detail Report 21-Jan-2022 Page 6


Shaft Hp : 2.95 Type : Variable Frequency Drive

Shaft kW : 2.2 Ramp Details : Fast

Rectifier Type : Active Front End IGBT THDI % : 8

Efficiency (%) : 0.9 THDV % : 10

Load Factor : 50.0

3.5kW VFD Motor Three Phase Quantity : 26 In this


Step

Category : Motor

Running kW : 1.45 Starting kW : 1.16 Peak kW : None

Running kVA : 1.49 Starting kVA : 1.29 Peak kVA : None

Running PF : 0.97 Starting PF : 0.9 Cyclic : No

Running Amps : 2.07 Max. % Voltage Dip : 35.0 Max. % Frequency Dip : 10.0

Running NLL kVA : 1.49

Starting NLL kVA : 1.29 Voltage : 416

Alternator kW : 2.03

Shaft Hp : 3.5 Type : Variable Frequency Drive

Shaft kW : 2.61 Ramp Details : Fast

Rectifier Type : Active Front End IGBT THDI % : 8

Efficiency (%) : 0.9 THDV % : 10

Load Factor : 50.0

5kW VFD Motor Three Phase Quantity : 2 In this Step

Category : Motor

Running kW : 2.78 Starting kW : 2.22 Peak kW : None

Running kVA : 2.87 Starting kVA : 2.47 Peak kVA : None

Running PF : 0.97 Starting PF : 0.9 Cyclic : No

Running Amps : 3.99 Max. % Voltage Dip : 35.0 Max. % Frequency Dip : 10.0

Running NLL kVA : 2.87

Starting NLL kVA : 2.47 Voltage : 416

Alternator kW : 3.89

Shaft Hp : 6.7 Type : Variable Frequency Drive

Shaft kW : 5.0 Ramp Details : Fast

Rectifier Type : Active Front End IGBT THDI % : 8

Efficiency (%) : 0.9 THDV % : 10

Load Factor : 50.0

UPS Load 1 Three Phase Quantity : 1 In this Step

Category : UPS

Running kW : 61.34 Starting kW : 24.54 Peak kW : None

Running kVA : 76.67 Starting kVA : 30.67 Peak kVA : None

Running PF : 0.8 Starting PF : 0.8 Cyclic : No

Running Amps : 106.53 Max. % Voltage Dip : 35.0 Max. % Frequency Dip : 10.0

Running NLL kVA : 76.67

Starting NLL kVA : 30.67 Voltage : 416

Alternator kW : 85.84

Loads and Steps Detail Report 21-Jan-2022 Page 7


Output Rated kVA : 60.0 Loading Factor % : 100

Efficiency (%) : 0.9 Battery Charging Rate (%) : 15

Ramp Details : Fast Rectifier Type : 6 pulse

THDI % : 26 THDV % : 10

Step6

Calculated Individual Generator Set Step Load Requirements

Running kW : 204.0 Starting kW : 160.0 Cumulative Step kW : 589.0

Running kVA : 222.0 Starting kVA : 200.0 Cumulative Step kVA : 739.0

Running Amps : 308.0 Starting Non-linear kVA : 200.0

Running Non-linear kVA : 222.0

Alternator kW : 285.31

Voltage Distortion Limit for : 10


step

POT Through 644kVA Auto Transformer Three Phase Quantity : 1 In this Step

Category : User Defined

Running kW : 203.88 Starting kW : 160.0 Peak kW : None

Running kVA : 221.61 Starting kVA : 200.0 Peak kVA : None

Running PF : 0.92 Starting PF : 0.8 Cyclic : No

Running Amps : 307.93 Max. % Voltage Dip : 35.0 Max. % Frequency Dip : 10.0

Running NLL kVA : 221.61

Starting NLL kVA : 200.0 Voltage : 416

Alternator kW : 285.31

Rectifier Type : 6 pulse THDI % : 26

THDV % : 10

Step7

Calculated Individual Generator Set Step Load Requirements

Running kW : 204.0 Starting kW : 160.0 Cumulative Step kW : 793.0

Running kVA : 222.0 Starting kVA : 200.0 Cumulative Step kVA : 960.0

Running Amps : 308.0 Starting Non-linear kVA : 200.0

Running Non-linear kVA : 222.0

Alternator kW : 285.31

Voltage Distortion Limit for : 10


step

POT Through 644kVA Auto Transformer Three Phase Quantity : 1 In this Step

Category : User Defined

Running kW : 203.88 Starting kW : 160.0 Peak kW : None

Running kVA : 221.61 Starting kVA : 200.0 Peak kVA : None

Running PF : 0.92 Starting PF : 0.8 Cyclic : No

Running Amps : 307.93 Max. % Voltage Dip : 35.0 Max. % Frequency Dip : 10.0

Running NLL kVA : 221.61

Starting NLL kVA : 200.0 Voltage : 416

Alternator kW : 285.31

Rectifier Type : 6 pulse THDI % : 26

THDV % : 10

Loads and Steps Detail Report 21-Jan-2022 Page 8


Step8

Calculated Individual Generator Set Step Load Requirements

Running kW : 204.0 Starting kW : 160.0 Cumulative Step kW : 997.0

Running kVA : 222.0 Starting kVA : 200.0 Cumulative Step kVA : 1182.0

Running Amps : 308.0 Starting Non-linear kVA : 200.0

Running Non-linear kVA : 222.0

Alternator kW : 285.31

Voltage Distortion Limit for : 10


step

POT Through 644kVA Auto Transformer Three Phase Quantity : 1 In this Step

Category : User Defined

Running kW : 203.88 Starting kW : 160.0 Peak kW : None

Running kVA : 221.61 Starting kVA : 200.0 Peak kVA : None

Running PF : 0.92 Starting PF : 0.8 Cyclic : No

Running Amps : 307.93 Max. % Voltage Dip : 35.0 Max. % Frequency Dip : 10.0

Running NLL kVA : 221.61

Starting NLL kVA : 200.0 Voltage : 416

Alternator kW : 285.31

Rectifier Type : 6 pulse THDI % : 26

THDV % : 10

Step9

Calculated Individual Generator Set Step Load Requirements

Running kW : 204.0 Starting kW : 160.0 Cumulative Step kW : 1201.0

Running kVA : 222.0 Starting kVA : 200.0 Cumulative Step kVA : 1403.0

Running Amps : 308.0 Starting Non-linear kVA : 200.0

Running Non-linear kVA : 222.0

Alternator kW : 285.31

Voltage Distortion Limit for : 10


step

POT Through 644kVA Auto Transformer Three Phase Quantity : 1 In this Step

Category : User Defined

Running kW : 203.88 Starting kW : 160.0 Peak kW : None

Running kVA : 221.61 Starting kVA : 200.0 Peak kVA : None

Running PF : 0.92 Starting PF : 0.8 Cyclic : No

Running Amps : 307.93 Max. % Voltage Dip : 35.0 Max. % Frequency Dip : 10.0

Running NLL kVA : 221.61

Starting NLL kVA : 200.0 Voltage : 416

Alternator kW : 285.31

Rectifier Type : 6 pulse THDI % : 26

THDV % : 10

Step10

Calculated Individual Generator Set Step Load Requirements

Running kW : 22.0 Starting kW : 22.0 Cumulative Step kW : 1267.0

Loads and Steps Detail Report 21-Jan-2022 Page 9


Running kVA : 23.0 Starting kVA : 25.0 Cumulative Step kVA : 1450.0

Running Amps : 32.0 Starting Non-linear kVA : 25.0

Running Non-linear kVA : 23.0

Alternator kW : 31.11

Voltage Distortion Limit for : 10


step

ZINC POT CRANE HANDLING EQUIPMENT FOR POT AREA FEE Three Phase Quantity : 1 In this Step

Category : Motor

Running kW : 22.22 Starting kW : 22.22 Peak kW : None

Running kVA : 22.91 Starting kVA : 24.69 Peak kVA : None

Running PF : 0.97 Starting PF : 0.9 Cyclic : No

Running Amps : 31.83 Max. % Voltage Dip : 35.0 Max. % Frequency Dip : 10.0

Running NLL kVA : 22.91

Starting NLL kVA : 24.69 Voltage : 416

Alternator kW : 31.11

Shaft Hp : 26.81 Type : Variable Frequency Drive

Shaft kW : 20.0 Ramp Details : None

Rectifier Type : Active Front End IGBT THDI % : 8

Efficiency (%) : 0.9 THDV % : 10

Load Factor : 100.0

Step11

Calculated Individual Generator Set Step Load Requirements

Running kW : 32.0 Starting kW : 142.0 Cumulative Step kW : 1409.0

Running kVA : 40.0 Starting kVA : 302.0 Cumulative Step kVA : 1750.0

Running Amps : 55.0 Starting Non-linear kVA : 0.0

Running Non-linear kVA : 0.0

Alternator kW : 32.26

Voltage Distortion Limit for : 10


step

30kW SUMP PUMP Three Phase Quantity : 1 In this Step

Category : Motor

Running kW : 32.26 Starting kW : 141.74 Peak kW : None

Running kVA : 39.83 Starting kVA : 301.57 Peak kVA : None

Running PF : 0.81 Starting PF : 0.47 Cyclic : No

Running Amps : 55.34 Max. % Voltage Dip : 35.0 Max. % Frequency Dip : 10.0

Alternator kW : 32.26 Voltage : 416

Shaft Hp : 40.21 Method : Across the line

Shaft kW : 30.0 Low Inertia : No

Efficiency (%) : 0.93 LRkVA Factor : 7.5

Design : IEC LRkVA Code : J

Load Factor : 100.0

Step12

Calculated Individual Generator Set Step Load Requirements

Running kW : 32.0 Starting kW : 142.0 Cumulative Step kW : 1441.0

Loads and Steps Detail Report 21-Jan-2022 Page 10


Running kVA : 40.0 Starting kVA : 302.0 Cumulative Step kVA : 1789.0

Running Amps : 55.0 Starting Non-linear kVA : 0.0

Running Non-linear kVA : 0.0

Alternator kW : 32.26

Voltage Distortion Limit for : 10


step

30kW SUMP PUMP Three Phase Quantity : 1 In this Step

Category : Motor

Running kW : 32.26 Starting kW : 141.74 Peak kW : None

Running kVA : 39.83 Starting kVA : 301.57 Peak kVA : None

Running PF : 0.81 Starting PF : 0.47 Cyclic : No

Running Amps : 55.34 Max. % Voltage Dip : 35.0 Max. % Frequency Dip : 10.0

Alternator kW : 32.26 Voltage : 416

Shaft Hp : 40.21 Method : Across the line

Shaft kW : 30.0 Low Inertia : No

Efficiency (%) : 0.93 LRkVA Factor : 7.5

Design : IEC LRkVA Code : J

Load Factor : 100.0

Step13

Calculated Individual Generator Set Step Load Requirements

Running kW : 32.0 Starting kW : 142.0 Cumulative Step kW : 1473.0

Running kVA : 40.0 Starting kVA : 302.0 Cumulative Step kVA : 1829.0

Running Amps : 55.0 Starting Non-linear kVA : 0.0

Running Non-linear kVA : 0.0

Alternator kW : 32.26

Voltage Distortion Limit for : 10


step

30kW SUMP PUMP Three Phase Quantity : 1 In this Step

Category : Motor

Running kW : 32.26 Starting kW : 141.74 Peak kW : None

Running kVA : 39.83 Starting kVA : 301.57 Peak kVA : None

Running PF : 0.81 Starting PF : 0.47 Cyclic : No

Running Amps : 55.34 Max. % Voltage Dip : 35.0 Max. % Frequency Dip : 10.0

Alternator kW : 32.26 Voltage : 416

Shaft Hp : 40.21 Method : Across the line

Shaft kW : 30.0 Low Inertia : No

Efficiency (%) : 0.93 LRkVA Factor : 7.5

Design : IEC LRkVA Code : J

Load Factor : 100.0

Step14

Calculated Individual Generator Set Step Load Requirements

Running kW : 32.0 Starting kW : 142.0 Cumulative Step kW : 1506.0

Running kVA : 40.0 Starting kVA : 302.0 Cumulative Step kVA : 1869.0

Running Amps : 55.0 Starting Non-linear kVA : 0.0

Loads and Steps Detail Report 21-Jan-2022 Page 11


Running Non-linear kVA : 0.0

Alternator kW : 32.26

Voltage Distortion Limit for : 10


step

30kW SUMP PUMP Three Phase Quantity : 1 In this Step

Category : Motor

Running kW : 32.26 Starting kW : 141.74 Peak kW : None

Running kVA : 39.83 Starting kVA : 301.57 Peak kVA : None

Running PF : 0.81 Starting PF : 0.47 Cyclic : No

Running Amps : 55.34 Max. % Voltage Dip : 35.0 Max. % Frequency Dip : 10.0

Alternator kW : 32.26 Voltage : 416

Shaft Hp : 40.21 Method : Across the line

Shaft kW : 30.0 Low Inertia : No

Efficiency (%) : 0.93 LRkVA Factor : 7.5

Design : IEC LRkVA Code : J

Load Factor : 100.0

Step15

Calculated Individual Generator Set Step Load Requirements

Running kW : 32.0 Starting kW : 142.0 Cumulative Step kW : 1538.0

Running kVA : 40.0 Starting kVA : 302.0 Cumulative Step kVA : 1909.0

Running Amps : 55.0 Starting Non-linear kVA : 0.0

Running Non-linear kVA : 0.0

Alternator kW : 32.26

Voltage Distortion Limit for : 10


step

30kW SUMP PUMP Three Phase Quantity : 1 In this Step

Category : Motor

Running kW : 32.26 Starting kW : 141.74 Peak kW : None

Running kVA : 39.83 Starting kVA : 301.57 Peak kVA : None

Running PF : 0.81 Starting PF : 0.47 Cyclic : No

Running Amps : 55.34 Max. % Voltage Dip : 35.0 Max. % Frequency Dip : 10.0

Alternator kW : 32.26 Voltage : 416

Shaft Hp : 40.21 Method : Across the line

Shaft kW : 30.0 Low Inertia : No

Efficiency (%) : 0.93 LRkVA Factor : 7.5

Design : IEC LRkVA Code : J

Load Factor : 100.0

Step16

Calculated Individual Generator Set Step Load Requirements

Running kW : 32.0 Starting kW : 142.0 Cumulative Step kW : 1570.0

Running kVA : 40.0 Starting kVA : 302.0 Cumulative Step kVA : 1949.0

Running Amps : 55.0 Starting Non-linear kVA : 0.0

Running Non-linear kVA : 0.0

Alternator kW : 32.26

Loads and Steps Detail Report 21-Jan-2022 Page 12


Voltage Distortion Limit for : 10
step

30kW SUMP PUMP Three Phase Quantity : 1 In this Step

Category : Motor

Running kW : 32.26 Starting kW : 141.74 Peak kW : None

Running kVA : 39.83 Starting kVA : 301.57 Peak kVA : None

Running PF : 0.81 Starting PF : 0.47 Cyclic : No

Running Amps : 55.34 Max. % Voltage Dip : 35.0 Max. % Frequency Dip : 10.0

Alternator kW : 32.26 Voltage : 416

Shaft Hp : 40.21 Method : Across the line

Shaft kW : 30.0 Low Inertia : No

Efficiency (%) : 0.93 LRkVA Factor : 7.5

Design : IEC LRkVA Code : J

Load Factor : 100.0

Loads and Steps Detail Report 21-Jan-2022 Page 13


Steps and Dips Details Report
Project - AMNS_CGL#4
Project Requirements

Frequency, Hz : 50.0 Generators Running in Parallel : 1


Duty : Standby Site Altitude, ft(m) : 361(110)
Voltage : 240/416, Series Wye Site Temperature, °C : 25
Phase : 3 Max. Altr Temp Rise, °C : 80
Fuel : Diesel Project Voltage Distortion Limit, % : 10
Emissions : No Preference

Calculated Individual Generator Set Load Running and Peak Requirements

Running kW : 1460.8 Max. Step kW : 221.7 In Step 2 Cumulative Step kW : 1570.2


Running kVA : 1686.9 Max. Step kVA : 452.4 In Step 2 Cumulative Step kVA : 1948.7
Running PF : 0.87 Peak kW : None Cumulative Peak kW : None
Running NLL kVA : 1033.0 Peak kVA : None Cumulative Peak kVA : None
Alternator kW : 1838.15

Generator Set Configuration

Model : 2250DQKAG Alternator : LVSI804T


Engine Model : QSK60-G11 NR2 Excitation : PMG
Fuel : Diesel high ambient

Step Level Dips Summary


Step # Voltage Dip Expected Voltage Frequency Expected Frequency
Limit (%) Step Voltage Recovery Time Dip Limit Frequency recovery
Dip (%) (s) ** (%) Dip (%) Time (s) **

1 35 3 0.1 10 1 0.1

2 35 4 0.1 10 1 0.1

3 35 2 0.1 10 1 0.1

4 35 4 0.1 10 1 0.1

5 35 1 0.1 10 1 0.1

6 35 3 0.1 10 1 0.1

7 35 3 0.1 10 1 0.1

8 35 3 0.1 10 1 0.1

9 35 3 0.1 10 1 0.1

10 35 1 0.1 10 1 0.1

11 35 3 0.1 10 1 0.1

12 35 3 0.1 10 1 0.1

13 35 3 0.1 10 1 0.1

14 35 3 0.1 10 1 0.1

15 35 3 0.1 10 1 0.1

16 35 3 0.1 10 1 0.1
Note: Please refer to the model Spec. sheet for bandwidths used to report recovery times. For products manufactured in the United
Kingdom it may be assumed that recovery times are based on ISO8528-5 G2 class bandwidths. Voltage and frequency recovery times
are estimates. Typically, allow five to ten seconds between application of load steps when designing your system.
**Please note that in some cases the voltage and frequency recovery time estimates are not shown in list. This is a result of "dummy"
data points temporarily being used to fill data gaps in the GenSize database. Please disregard these blank results.

Steps and Dips Detail Report 21-Jan-2022 Page 1


Value
0.0 2.5 5.0 7.5 10.0 12.5 15.0 17.5 20.0 22.5 25.0 27.5 30.0 32.5 35.0

Step 1 3.0 35.0


Step 2 4.0 35.0
Step 3 2.0 35.0
Step 4 4.0 35.0
Step 5 1.0 35.0
Step 6 3.0 35.0
Step 7 3.0 35.0
Step #

Step 8 3.0 35.0


Step 9 3.0 35.0
Step 10 1.0 35.0
Step 11 3.0 35.0
Step 12 3.0 35.0
Step 13 3.0 35.0
Step 14 3.0 35.0
Step 15 3.0 35.0
Step 16 3.0 35.0

VDip Actual VDip Limit

Value
0 1 2 3 4 5 6 7 8 9 10

Step 1 1.0 10.0


Step 2 1.0 10.0
Step 3 1.0 10.0
Step 4 1.0 10.0
Step 5 1.0 10.0
Step 6 1.0 10.0
Step 7 1.0 10.0
Step #

Step 8 1.0 10.0


Step 9 1.0 10.0
Step 10 1.0 10.0
Step 11 1.0 10.0
Step 12 1.0 10.0
Step 13 1.0 10.0
Step 14 1.0 10.0
Step 15 1.0 10.0
Step 16 1.0 10.0

FDip Actual FDip Limit

Steps and Dips Detail Report 21-Jan-2022 Page 2