0% found this document useful (0 votes)
153 views2 pages

212023.3662 - Coa - PT Sinergi Dua Mitra - 01 Ok

This document is a certificate of pre-shipment analysis for 49,300 MT of nickel ore from PT. Sambas Minerals Mining in Sulawesi Tenggara, Indonesia. It details the results of laboratory analysis of 66 sublot samples, listing the quantity, moisture content, nickel content, iron content, and levels of other elements in each sample. In general, the samples contained between 20-40% moisture and 1-2% nickel.

Uploaded by

Muh Ansari
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
153 views2 pages

212023.3662 - Coa - PT Sinergi Dua Mitra - 01 Ok

This document is a certificate of pre-shipment analysis for 49,300 MT of nickel ore from PT. Sambas Minerals Mining in Sulawesi Tenggara, Indonesia. It details the results of laboratory analysis of 66 sublot samples, listing the quantity, moisture content, nickel content, iron content, and levels of other elements in each sample. In general, the samples contained between 20-40% moisture and 1-2% nickel.

Uploaded by

Muh Ansari
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Report No : 212023.

3662

CERTIFICATE OF PRE-SHIPMENT ANALYSIS

Principal : PT. SINERGI DUA MITRA


Quantity : 49,300 MT
Quotation : Quo/CNM/OCM/ 2107-1769-rev 1
Description of Sample : Nickel Ore
Date of Sampling : July 24, 2021 Up to July 26, 2021
Place of Sampling : IUP PT. Sambas Minerals Mining, Palangga, Konawe Selatan Sulawesi Tenggara
Date of Analysis : July 28, 2021 Up to August 04, 2021
Number of Sample : 66 (Sixty Six) Sublot samples

THIS IS TO REPORT that upon the request of the principal, the samples were analyzed in the laboratory.
The results are as follows :
Qty MC Ni Fe Co Na2O MgO Al2O3 SiO2 P2O5 SO3 K2O CaO TiO2 Cr2O3 MnO

No. Sample ID % % % % % % % % % % % % % % %
MT
0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01

1 SUBLOT 1/ DOME 1 500 31.68 1.41 12.45 0.03 <0.01 18.35 2.06 46.21 <0.01 <0.01 <0.01 0.62 0.01 1.05 0.23

2 SUBLOT 2/ DOME 2 500 30.07 1.26 14.33 0.03 <0.01 18.22 2.05 42.84 <0.01 <0.01 <0.01 0.45 0.02 1.16 0.25

3 SUBLOT 3 / DOME 3 1000 28.38 1.49 15.03 0.04 <0.01 16.16 2.06 44.69 <0.01 <0.01 <0.01 0.59 0.02 1.15 0.27

4 SUBLOT 4 / DOME 4 1000 29.70 1.38 14.35 0.04 <0.01 16.92 1.99 45.30 <0.01 <0.01 <0.01 0.64 0.01 1.06 0.25

5 SUBLOT 5 / DOME 5 500 33.18 1.25 13.72 0.03 <0.01 18.71 1.96 44.14 <0.01 0.01 <0.01 0.43 0.02 1.06 0.23

6 SUBLOT 6 / DOME 6A 1500 30.80 1.41 26.35 0.07 <0.01 7.73 5.20 32.10 0.02 0.02 0.03 0.68 0.08 2.41 0.59

7 SUBLOT 7 / DOME 6B 1500 32.88 1.47 27.59 0.08 <0.01 6.74 5.72 30.19 0.02 0.02 0.03 0.81 0.09 2.69 0.69

8 SUBLOT 8 / DOME 7A 2000 30.34 1.55 25.71 0.08 <0.01 7.06 6.25 31.36 0.01 <0.01 0.03 1.19 0.09 2.75 0.66

9 SUBLOT 9 / DOME 7B 2000 33.46 1.50 25.44 0.08 <0.01 6.83 6.19 31.91 0.01 <0.01 0.03 1.00 0.09 2.88 0.69

10 SUBLOT 10 / DOME8A 1750 27.78 1.48 16.69 0.05 <0.01 19.94 3.20 33.92 <0.01 <0.01 <0.01 1.64 0.07 1.35 0.39

11 SUBLOT 11 / DOME 8B 1750 23.63 1.45 16.36 0.05 <0.01 20.48 2.97 34.36 <0.01 <0.01 <0.01 1.67 0.07 1.28 0.37

12 SUBLOT 12 / DOME 9A 1750 22.59 1.48 18.09 0.05 <0.01 18.56 3.53 33.35 <0.01 <0.01 <0.01 1.58 0.08 1.45 0.43

13 SUBLOT 13 / DOME 9 B 1750 24.52 1.50 17.36 0.05 <0.01 19.46 3.33 33.74 <0.01 <0.01 <0.01 1.83 0.07 1.36 0.40

14 SUBLOT 14 / DOME 10 800 30.46 1.22 24.84 0.07 <0.01 8.63 3.06 37.49 0.01 <0.01 <0.01 0.51 0.05 1.14 0.53

15 SUBLOT 15 / DOME 11 800 25.63 1.20 22.26 0.06 <0.01 9.55 2.97 40.00 0.02 <0.01 0.01 0.53 0.05 1.18 0.45

16 SUBLOT 16 / DOME 12A 2000 30.66 1.21 24.12 0.07 <0.01 8.90 3.07 37.92 0.03 <0.01 0.01 0.62 0.06 1.24 0.52

17 SUBLOT 17 / DOME 12B 2000 30.97 1.12 21.47 0.06 <0.01 9.48 3.34 41.19 0.02 <0.01 0.01 0.82 0.06 1.18 0.45

18 SUBLOT 18 / DOME 13 200 27.81 1.74 17.03 0.06 <0.01 8.87 4.92 27.63 0.01 <0.01 0.02 11.81 0.11 2.31 0.33

19 SUBLOT 19 / DOME 14 200 30.23 1.63 17.75 0.05 <0.01 4.95 5.55 28.13 0.02 <0.01 0.02 13.70 0.13 1.64 0.36

20 SUBLOT 20 / DOME 15 200 29.24 0.60 14.86 0.04 0.01 11.95 3.13 39.42 0.02 <0.01 <0.01 6.94 0.04 1.15 0.27

21 SUBLOT 21 / DOME 16 200 28.33 0.82 16.60 0.04 <0.01 10.71 4.97 43.38 0.02 <0.01 <0.01 3.13 0.07 1.19 0.27

22 SUBLOT 22 / DOME 17 200 30.38 1.91 18.99 0.06 <0.01 9.58 5.16 28.94 0.02 <0.01 0.02 9.00 0.12 1.72 0.32

23 SUBLOT 23 / DOME 18A 2000 32.50 1.25 22.59 0.06 <0.01 9.82 2.68 39.77 0.02 <0.01 <0.01 0.44 0.05 1.24 0.51

24 SUBLOT 24 / DOME 18B 2000 31.22 1.38 29.37 0.08 0.01 6.54 3.28 32.16 0.09 0.02 0.01 0.32 0.06 1.36 0.71

25 SUBLOT 25 / DOME 19 200 33.55 1.40 13.25 0.04 <0.01 19.75 2.08 44.08 <0.01 <0.01 <0.01 0.39 0.02 1.02 0.27

26 SUBLOT 26 / DOME 20 800 29.78 1.61 15.40 0.04 <0.01 16.52 2.30 43.91 <0.01 <0.01 <0.01 0.27 0.02 1.22 0.31

27 SUBLOT 27 / DOME 21 400 36.48 1.51 14.91 0.04 <0.01 15.66 2.28 45.18 <0.01 <0.01 0.01 0.27 0.02 1.25 0.32

28 SUBLOT 28 / DOME 22 400 31.48 1.59 15.69 0.04 0.01 16.28 2.41 43.35 <0.01 <0.01 <0.01 0.32 0.03 1.21 0.30

29 SUBLOT 29 / DOME 23 700 37.90 1.51 13.57 0.04 0.01 18.97 2.02 43.90 <0.01 <0.01 <0.01 0.34 0.02 1.04 0.28

30 SUBLOT 30 / DOME 24 700 36.93 1.57 16.93 0.05 0.02 13.27 2.68 43.92 <0.01 <0.01 <0.01 0.29 0.03 1.38 0.37

31 SUBLOT 31 / DOME 25 500 24.59 1.48 17.65 0.05 0.02 8.87 4.18 18.67 <0.01 <0.01 0.01 16.97 0.14 1.86 0.21

32 SUBLOT 32 / DOME 26 500 25.31 1.65 12.37 0.03 0.02 17.30 1.81 26.90 <0.01 <0.01 0.02 12.34 0.04 0.93 0.25
Report No : 212023.3662

Qty MC Ni Fe Co Na2O MgO Al2O3 SiO2 P2O5 SO3 K2O CaO TiO2 Cr2O3 MnO

No. Sample ID % % % % % % % % % % % % % % %
MT
0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01

33 SUBLOT 33 / DOME 27 500 27.48 1.60 11.10 0.03 0.02 20.27 1.56 28.45 <0.01 <0.01 0.02 10.85 0.03 0.87 0.23

34 SUBLOT 34 / DOME 1 FIT 1 200 31.54 0.91 14.08 0.04 <0.01 16.32 2.87 45.15 <0.01 <0.01 <0.01 0.64 0.03 1.14 0.36

35 SUBLOT 35 / DOME 2 FIT 1 300 32.33 1.51 15.69 0.04 <0.01 13.20 2.59 44.60 <0.01 <0.01 0.01 0.43 0.03 1.45 0.31

36 SUBLOT 36 / DOME 3 FIT 1 300 36.47 1.16 11.87 0.03 <0.01 <I720.01 1.78 42.88 <0.01 <0.01 <0.01 0.30 0.02 0.89 0.23

37 SUBLOT 37 / DOME 4 FIT 1 200 34.15 1.15 12.37 0.03 <0.01 20.16 2.10 43.62 <0.01 <0.01 <0.01 0.45 0.02 1.08 0.26

38 SUBLOT 38 / DOME 5 FIT 1 400 32.85 0.98 14.20 0.04 <0.01 17.65 2.48 43.88 <0.01 <0.01 <0.01 0.52 0.03 1.06 0.30

39 SUBLOT 39 / DOME 6 FIT 1 400 35.22 1.09 17.90 0.05 0.03 12.80 3.43 42.24 <0.01 <0.01 <0.01 0.41 0.06 1.48 0.37

40 SUBLOT 40 / DOME 7 FIT 1 500 30.42 0.74 14.14 0.04 <0.01 18.07 2.96 43.35 <0.01 <0.01 <0.01 0.66 0.04 1.12 0.36

41 SUBLOT 41 / DOME 8 FIT 1 800 34.05 1.19 13.38 0.03 <0.01 18.13 2.38 44.12 <0.01 <0.01 0.01 0.59 0.02 1.10 0.27

42 SUBLOT 42 / DOME 9 FIT 1 800 37.48 1.56 14.99 0.04 <0.01 15.54 2.75 43.40 <0.01 <0.01 <0.01 0.43 0.03 1.31 0.35

43 SUBLOT 43 / DOME 10 FIT 1 300 37.20 1.69 17.27 0.05 <0.01 15.54 3.25 39.19 <0.01 <0.01 <0.01 0.46 0.05 1.39 0.41

44 SUBLOT 44 / DOME 11 FIT 1 200 33.45 1.47 14.54 0.04 0.01 18.92 2.42 41.53 <0.01 <0.01 <0.01 0.61 0.03 1.23 0.33

45 SUBLOT 45 / DOME 12 FIT 1 800 36.65 1.48 14.58 0.04 <0.01 18.21 2.37 42.05 <0.01 <0.01 <0.01 0.46 0.03 1.25 0.29

46 SUBLOT 46 / DOME 13 FIT 1 700 39.36 1.57 15.55 0.04 <0.01 17.54 2.57 41.09 <0.01 <0.01 <0.01 0.40 0.03 1.30 0.32

47 SUBLOT 47 / DOME 14 FIT 2 600 41.94 1.83 16.51 0.04 0.01 16.34 2.22 41.27 <0.01 <0.01 <0.01 0.22 0.02 1.23 0.31

48 SUBLOT 48 / DOME 15 FIT 2 600 35.27 1.41 14.51 0.04 <0.01 16.92 2.26 44.69 <0.01 <0.01 <0.01 0.38 0.02 1.11 0.29

49 SUBLOT 49 / DOME 16 FIT 2 600 39.43 1.41 14.21 0.04 0.02 18.00 1.90 43.78 <0.01 <0.01 <0.01 0.28 0.02 1.10 0.27

50 SUBLOT 50 / DOME 17 FIT 2 600 41.49 1.60 16.33 0.04 0.02 15.57 2.16 41.87 <0.01 <0.01 <0.01 0.26 0.02 1.28 0.34

51 SUBLOT 51 / DOME 18 FIT 2 600 36.49 1.00 14.43 0.04 0.01 18.40 1.71 42.05 <0.01 <0.01 <0.01 0.23 <0.01 1.16 0.33

52 SUBLOT 52 / DOME 19 FIT 3 300 33.38 1.57 13.38 0.04 <0.01 24.46 1.54 31.26 <0.01 <0.01 0.01 4.51 0.01 0.97 0.29

53 SUBLOT 53 / DOME 20 FIT 3 400 30.46 1.38 19.06 0.06 <0.01 20.11 3.08 28.21 <0.01 <0.01 <0.01 2.56 0.06 2.29 0.30

54 SUBLOT 54 / DOME 21 FIT 3 700 31.54 1.20 12.79 0.03 <0.01 21.32 1.85 38.37 <0.01 <0.01 0.01 2.36 0.02 1.09 0.24

55 SUBLOT 55 / DOME 22 FIT 3 700 26.34 0.99 9.74 0.02 <0.01 26.67 1.33 35.07 <0.01 <0.01 0.01 4.64 <0.01 0.73 0.19

56 SUBLOT 56 / DOME 23 FIT 3 500 25.51 1.42 11.37 0.03 0.01 17.25 1.92 26.37 <0.01 <0.01 <0.01 13.78 0.05 1.00 0.23

57 SUBLOT 57 / DOME 24 FIT 3 1000 30.99 1.60 22.08 0.07 0.01 12.50 3.51 32.19 0.02 0.03 <0.01 1.21 0.09 2.22 0.49

58 SUBLOT 58 / DOME 25 FIT 3 1000 25.57 1.58 17.02 0.06 0.01 9.12 3.92 21.60 0.02 <0.01 0.02 15.34 0.17 2.13 0.23

59 SUBLOT 59 / DOME 26 FIT 3 300 24.49 1.56 17.74 0.07 0.01 5.00 4.41 17.60 0.02 <0.01 0.02 19.68 0.16 2.64 0.28

60 SUBLOT 60 / DOME 27 FIT 3 400 24.72 1.43 14.96 0.05 <0.01 10.86 3.75 23.71 0.02 <0.01 0.02 15.26 0.19 2.24 0.20

61 SUBLOT 61 / DOME 28 FIT 3 300 19.58 1.19 14.70 0.05 <0.01 5.70 3.27 18.10 0.03 <0.01 0.01 22.92 0.23 2.26 0.25

62 SUBLOT 62 / DOME 29 FIT 3 200 21.34 1.35 17.16 0.06 1.83 4.91 3.58 19.25 0.02 <0.01 0.03 18.73 0.14 2.09 0.22

63 SUBLOT 63 / DOME 30 FIT 3 400 25.54 1.64 9.90 0.02 2.22 6.85 1.45 23.57 <0.01 0.01 0.03 23.31 0.02 0.76 0.21

64 SUBLOT 64 / DOME 31 FIT 3 700 23.71 1.36 9.20 0.02 <0.01 28.52 1.22 33.91 <0.01 <0.01 0.01 4.43 0.01 0.66 0.18

65 SUBLOT 65 / DOME 32 FIT 3 400 22.11 1.57 15.41 0.05 0.01 4.93 3.13 19.09 0.02 0.01 0.02 21.70 0.12 1.72 0.27

66 SUBLOT 66 / DOME 33 FIT 3 300 26.74 1.35 11.71 0.03 0.01 13.69 1.67 26.59 0.01 <0.01 0.03 15.86 0.03 0.95 0.25

CUMMULATIVE 49300 30.48 1.40 18.57 0.05 0.03 13.90 3.21 36.14 0.01 <0.01 0.01 2.81 0.06 1.50 0.40

This report is made and issued by the Company upon the Principal/Applicant's request and the analysis contained therein reflects the Company's findings on
the sample(s) submitted by Principal/Applicant and/or sample(s) drawn by the Company at the time and place of performing the inspection/testing only. Due
to effects of weather, transport, storage or other factors or fifteen days after shipment loading. Furthermore the shall not be responsible to any parties
on any business and/or any legal consequences for any transaction by using this report/analysis.

Kendari, August 04, 2021


PT. CARSURIN

Muhammad Salman AL Farisi


Laboratory Manager

For verification of authenticity of certificate or reports, scan the secure QR code using the Validator App or visit verify.carsurin.com

You might also like