Hospital Project Report in PDF
Hospital Project Report in PDF
The 20 kWp SPV power plant is estimated to afford annual energy feed of 36.5 MWh considering
efficiency of the solar module as 15.1%, Inverter as 98 % and losses as 3% in the DC and AC system.
Salient features
1. Location
1.1. Place : Erode, Tamil Nadu
1.2. Name of Building : Om Sakthi Hospital
1.3. Latitude : 11.3422350
1.4. Longitude : 77.7274769
2. Area for SPV Plant
2.1. Length : 20 m
2.2. Width : 15 m
2.3. Location : Terrace South Side of hospital building
3. SPV Power Plant
3.1. Total Output :20880 Wp
3.2. Each Module Output : 290Wp
3.3. No of Modules : 72
3.4. No of Modules in series: 4
4. Technical details of a SPV Module
4.1. PV module Type : Mono crystalline
4.2. Physical Dimensions
4.2.1. Length with frame : 2007mm
4.2.2. Width with frame : 950mm
4.2.3.Thickness : 50mm
4.3. Electrical Parameter
4.3.1. Maximum Power Rating : 290Wp
4.3.2.Rated Current :8A
4.3.3. Rated Voltage : 36.25 V
4.3.4. Short Circuit Current : 8.32 A
4.3.5.Open Circuit Voltage : 44.59 V
5. Mounting Arrangement
5.1. Mounting : Fixed Type
5.2. Tilt Angle (slope) of PV : 13 Degree
6. Inverter
6.1. Number of units :1
6.2. Rated Capacity : 20Kw
6.3. Input Voltage range : 1000V DC
6.4. Output voltage : 360 – 440 V AC
6.5. Frequency :50 – 60Hz
6.6. Efficiency : 98.20 %
7. Grid Connection Details
7.1. Electrical parameters for interconnection : 440 V, 3Ph ,50 Hz
8. Annual Energy Generation
8.1. Annual Energy : 36.5 Mwh
9. Cost Estimate
9.1. Estimated Cost (Rs. Lakh) : 26
9.2. Cost per kW (Rs.Lakh) : 1.3
10. Construction Time : 2 Months
Inverter
1. The DC power produced is fed to inverter for conversion into AC.
2. The output of the inverter must synchronize automatically its AC output to the exact
AC voltage and frequency of the grid.
3. Inverter Efficiency of 98.3% is considered in the PV system.
BOQ
Basic BOQ
3 PVC Double Insulated Copper DC Cable 4Sq.mm, 1000 Volts Rated Top Cable( Spain) -Model 1x4 ZZ-F (AS) Mts 500
MC4 In line fuse - 10Amps/1000V rates OR Fuse gadrage with BizLink-Sunbolts PV cable Connector
5 Fuse Nos 8
holder /ABB
9 3 phase Energy Meter 40Amps 3 Phase/Pulse output direct type ABB Nos 1
As
15 Concrete
Required
As
16 Earthing Dedicated Earthing)/ Copper plate /green earth cable/
Required
As
17 Nut / Bolt / Screws/ Fasteners Nut and bolt to fix Pv module & Inverter in the structure Nos
Required
As
18 Conduit Pipe Heavy Duty PVC Conduit pipe Mts
Required
As
19 Accessories As Required Mts
Required