Bill of Materials: Description of Materials Quantity Unit Unit Cost Total Cost

This document is a bill of materials for a construction project listing various building materials, quantities, units, and unit costs. It includes items for masonry works like concrete hollow blocks, cement, sand, gravel, and steel bars. It also lists materials for concreting works such as soil poisoning, gravel, sand, cement, and steel bars. The document appears to provide an estimate of direct costs for the project by categorizing costs of materials, labor, and contingencies.

Uploaded by

ella
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
272 views

Bill of Materials: Description of Materials Quantity Unit Unit Cost Total Cost

This document is a bill of materials for a construction project listing various building materials, quantities, units, and unit costs. It includes items for masonry works like concrete hollow blocks, cement, sand, gravel, and steel bars. It also lists materials for concreting works such as soil poisoning, gravel, sand, cement, and steel bars. The document appears to provide an estimate of direct costs for the project by categorizing costs of materials, labor, and contingencies.

Uploaded by

ella
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 22

Project

Owner
Location

BILL OF MATERIALS
Description of Materials Quantity Unit Unit Cost Total Cost

1. FOUNDATION,CONCRETE COLUMNS,BEAMS,
, CONCRETE HOLLOWBLOCKS WALL,ROOF BEAM

Portland Cement (40kg) bags    260.00


Washed Sand cu.m.    1,165.00
Gravel or Crushed Stones cu.m.  1,010.00
Earth Fill cu.m.
Concrete Hollow Blocks,
100 x 200 x 400mm pcs 10
150 x 200 x 400mm pcs 16
Steel Reinforcing Steel Bars
10 mm x 6 mm pcs 156
12 mm x 6 mm pcs  223.00
16 mm x 6 mm pcs  394.00
20 mm x 6 mm 645
Wire No. 16 for Tying kgs.   65.00
Common Wire Nails
50mm(2") kgs.
75 mm(3") kgs.
100 mm(4") kgs.
125 mm(5") kgs.
Concrete Nails 75mm (3") kgs.
Form Lumber ,Rough
 2 x 3 x 10′ lumber pcs.     280.00
2 x 4 x 10 lumber pcs. 280
 6mm thk. Ordinary Plywood pcs.  330.00
 1/2″ x 4′ x 8′ Plywood pcs. 660

2. FLOORS
Steel Reinforcing Steel Bars
10 mm x 6 mm pcs
12 mm x 6 mm pcs
Wire No. 16 for Tying kgs.
Form Lumber ,Rough
Prepared By: Approved By:
ESTELLA MARIE E. TAYLARAN SKADAFLF
Civil Engineer Owner
Project
Owner
Location

BILL OF MATERIALS
Description of Materials Quantity Unit Unit Cost Total Cost
50Pcs-50mm x 75mm x 3.60 m (2"x3"x12') Bd.ft
50Pcs- 50mm x 50mm x 3.60 m (2"x2"x12') Bd.ft
Plywood (6mm x 1.2 mm x 2.40 m) pcs.
3. ROOF FRAMINGS
Truss Top Chord
Truss Bottom Chord
Diagonal and Vertical Truss Members
Rafters
Purlins
Fascia Boards
Bolts with washers
Common wire nails
Do. 100mm (4")
Do. 125mm (5")

4. ROOFING MATERIALS
Galvanized Sheets
0.40 mm x 0.81m x 2.44 m sheets
Vulcaseal Sealant 1-L Can
Plain GI roof Flashing

PVC Pipe Downspout


3'diax10' pcs
PVC Elbow (3" dia.) pcs
PVC tee (3" dia.) pcs
PVC Solvent Cement cc

5. PLUMBING PIPES AND FITTINGS

Sanitary Pipes and Fittings


Pipe
4" dia x 10"
3" dia x 10"
2" dia x 10"
Sanitary Tee
4" dia x 10"
3" dia x 10"
2" dia x 10"
Elbow 90 deg.
Prepared By: Approved By:
ESTELLA MARIE E. TAYLARAN SKADAFLF
Civil Engineer Owner
Project
Owner
Location

BILL OF MATERIALS
Description of Materials Quantity Unit Unit Cost Total Cost
4" dia x 10"
3" dia x 10"
2" dia x 10"
Sanitary Wye
4" dia x 10"
3" dia x 10"
2" dia x 10"
Reducer Wye
Reducer Tee
Coupling
Teflon Tape
Floor Drain
Clean Out w/plug

Water System
Blue PVC pipe
Pipe
4" dia x 10"
3" dia x 10"
2" dia x 10"
Sanitary Tee
4" dia x 10"
3" dia x 10"
2" dia x 10"
Elbow 90 deg.
4" dia x 10"
3" dia x 10"
2" dia x 10"
Reducer Wye
Reducer Tee
Coupling
Teflon Tape

6. PLUMBING FIXTURES AND ACCESSORIES


Water Claoset
Lavatory
Kitchen Sink
Toilet paper holder
Prepared By: Approved By:
ESTELLA MARIE E. TAYLARAN SKADAFLF
Civil Engineer Owner
Project
Owner
Location

BILL OF MATERIALS
Description of Materials Quantity Unit Unit Cost Total Cost
Shower Head
Floor Drain

7. CEILING ,PARTITIONS ,FLOORS AND OTHER


INTERRIOR WORKS

Hanger Wire
Aluminum Edge Molding
Aluminum I-Section
Ceiling Panel Hrdeflex
Floor Tiles
Toilet and Bathroom Tiles
Prime White Cement

8. ELECTRICAL MATERIALS
Automatic Circuit Breaker
Electric Wire
Outlet
switch

9. DOORS AND WINDOWS


Entrance Door
Service Door
Steel Frame Casement Window

9.PAINTING MATERIALS
Acrylic Semi Gloss Paint
Sandpaper
Brush

10.MISCELLANEOUS MATERIALS

Prepared By: Approved By:


ESTELLA MARIE E. TAYLARAN SKADAFLF
Civil Engineer Owner
Project
Owner
Location

BILL OF MATERIALS
Description of Materials Quantity Unit Unit Cost Total Cost

Project
Owner
Location

SUMMARY COST ESTIMATES FOR MATERIALS ,LABOR AND OTHER


CONSTRUCTION EXPENCES

A. ESTIMATED COST OF MATERIALS FROM BOQ

1. FOUNDATION,CONCRETE COLUMNS,BEAMS,
, CONCRETE HOLLOWBLOCKS WALL,ROOF BEAM
2. FLOORS
3. ROOF FRAMINGS
4. ROOFING MATERIALS
5. PLUMBING PIPES AND FITTINGS
6. PLUMBING FIXTURES AND ACCESSORIES
7. CEILING ,PARTITIONS ,FLOORS AND OTHER
INTERRIOR WORKS
8. ELECTRICAL MATERIALS
9. DOORS AND WINDOWS
9.PAINTING MATERIALS
10.MISCELLANEOUS MATERIALS

B. ESTIMATED COST OF LABOR

C. ESTIMATED EXPENCES FOR CONTENGENCIES

ESTIMATED DIRCET COST

Prepared by:

ESTELLA MARIE E. TAYLARAN

Prepared By: Approved By:


ESTELLA MARIE E. TAYLARAN SKADAFLF
Civil Engineer Owner
Project
Owner
Location

BILL OF MATERIALS
Description of Materials Quantity Unit Unit Cost Total Cost
ENGINEER

Approved by:

OWNER

Prepared By: Approved By:


ESTELLA MARIE E. TAYLARAN SKADAFLF
Civil Engineer Owner
Project
Owner
Location

BILL OF MATERIALS

Description of Materials Quantity Unit Unit Cost


1.MASONRY WORKS
Concrete Hollow Blocks (CHB) 4″ pc 10.00
Concrete Hollow Blocks (CHB) 6″ pc 16.00
Portland Cement, 40 kg. bag 265.95
Washed sand cu.m. 1165.00
10 mm. Dia. x 6.0 M. pc. 156.20
Tie Wire #16 kg. 65.00
Stone Masonry (1:2)
Cement bag 260.00
Sand cu.m. 1232.05
Gravel Fill cu.m. 1207.05
Weep Holes (PVC) Lm. 228.33
Filter Cloth sq.m. 280.00
Boulders cu.m. 1282.05
Screened Sand cu.m. 1521.00
Screened Gravel cu.m. 1581.00
2. CONCRETING WORKS
Concrete
Soil Poisoning – Termicide Liter 325.00
Gravel cu.m 1,010.00
Wash Sand cu.m 1,035.00
Portland Cement, 40kg Bag 260.00
Pozzolan Cement, 40kg Bag 260.00
Steel Bars
 10mm Diameter Deformed Bars pc 156.00
 12mm Diameter Deformed Bars pc 223.00
 16mm Diameter Deformed Bars pc 394.00
 20mm Diameter Deformed Bars pc 645.00
 #16 G.I. Tie Wire kg 16.00
Formworks
 2 x 3 x 10′ Coco lumber pc 280.00
 2 x 4 x 10 Coco lumber pc 280.00
 1/2″ x 4′ x 8′ Plywood pc 660.00
 6mm thk. Lawanit board pc 209.00
 6mm thk. Ordinary Plywood pc 330.00
 1″x2″x8′ Hard wood or its equivalent pc 65.00
 2″x2″x8′ Hard wood or its equivalent pc 65.00
 2″x2″x8’Hardwood or its equivalent pc 65.00
 2″x24″x8′ Hard wood or its equivalent pc 65.00

Prepared By: Approved By:


ESTELLA MARIE E. TAYLARAN SKADAFLF
Civil Engineer Owner
Project
Owner
Location

BILL OF MATERIALS

Description of Materials Quantity Unit Unit Cost


3. ROOFING AND TRUSS WORKS
6mm thk.x 65mm x 65mm x 6.0 Angle bar(T & B Chord) pc 2248.70
6mm thk. x 50mm x 50mm x 6.0 Angle bar(Web Member) pc 1704.66
10mm thk. Gusset plate welded to truss sq.m. 4246.00
150mm x 65mm x 20mm x 2mm LC-Purlins pcs. 1089.00
255mm x 90mm x 25mm x 5mm thk.  LC- Channel beam pcs. 4058.00
300mmx12mm dia. Plain Bar w/ standard nuts & washers @
pcs. 75.00
both ends: Sagrod
350mmx12mm dia. Plain Bar w/ standard nuts & washers @
pcs. 77.00
both ends: Sagrod
380mmx12mm dia. Plain Bar w/ standard nuts & washers @
pcs. 79.00
both ends: Sagrod
465mmx12mm dia. Plain Bar w/ standard nuts & washers @
pcs. 83.00
both ends: Sagrod
550mmx12mm dia. Plain Bar w/ standard nuts & washers @
pcs. 88.00
both ends: Sagrod
12mm. Thk. Buckle Plate sq.m. 5120.00
16mm dia. Plain Bar cross bracing pc. 420.00
16 mm dia. Turn buckle pc. 138.00
12mm x 250mm x 300mm Base Plate sq.m. 5100.00
100 x 100 x 6mm thk. Angular base plate pc. 1880.00
50 x 50 x 5mm Angular Bar pc. 1400.00
75 x 75 x 6mm x 130mm Clip Angle to Purlins pc. 2700.00
Welding Rod (Fuji) box 2330.00
Oxygen(content only) tank 1600.00
Acetylene(content only) tank 2000.00
Hacksaw Blade pc. 65.00
Paint brush # 4 pc. 65.00
Paint brush # 2 pc. 35.00
Red Lead Primer gal. 430.00
Paint Thiner gal. 600.00

4. PAINTING WORKS
Paint Tinting Color Ltr 183.00
Paint Aluminum gal 665.00
Paint Enamel gal 680.00
Paint Latex Gloss gal 650.00
Paint Latex Semi-Gloss gal 660.00
Paint Red Lead gal 600.00
Thinner Paint gal 320.00
Thinner Lacquer gal 485.00

Prepared By: Approved By:


ESTELLA MARIE E. TAYLARAN SKADAFLF
Civil Engineer Owner
Project
Owner
Location

BILL OF MATERIALS

Description of Materials Quantity Unit Unit Cost


Paint Metal Epoxy gal 780.00
Paint Primer Solvent gal 750.00
Brush Paint (101mm) pc 78.00
Brush Roller (152mm) pc 95.00
Brush Steel (101mm) pc 40.00
Oil Paint Ltr 110.00
Spar Varnish Ltr 1300.00
Lacquer Putty Kg 656.00
Concrete neutralizer gal 430.00
Putty Knife pc 25.00
Roller paint # 9 w/ tray pc 150.00
2″paint brush pc 35.00
Putty Knife pc 25.00
Paint thinner gal 280.00
Sand paper #120 dozen 120.00

5.PLUMBING AND SANITARY WORKS


100mm dia. PVC pc 755.00
75mm dia. PVC pc 485.00
50mm dia PVC (vp & wp) pc 330.00
PVC Clean Out w/ plug & sealing ring 100mm pc 95.00
PVC Clean Out w/ plug & sealing ring 150mm pc 114.00
PVC P-Trap w/ plug & sealing ring 50mm pc 66.00
PVC Te (150mm) pc 95.00
PVC Tee (100mm) pc 95.00
PVC WYE (100mm) pc 95.00
PVC WYE REDUCER (100mmX50mm) pc 85.00
PVC WYE REDUCER (100mmX75mm) pc 95.00
PVC ELBOW 90° (100mm) pc 95.00
PVC ELBOW 90° (75mm) pc 85.00
PVC Elbow 90° (50mm) pc 66.00
PVC Elbow 45° (100mm) pc 95.00
PVC Elbow 45° (75mm) pc 85.00
PVC Elbow 45° (50mm) pc 66.00
PVC Coupling (100mm) pc 95.00
Vulca Seal pc 440.00
Cold Water Lines
20mmØ Polypropylene, Type 3, PN20 pc. 250.00
20mmØ Coupling pc. 95.00
20mmØ Tee pc. 95.00

Prepared By: Approved By:


ESTELLA MARIE E. TAYLARAN SKADAFLF
Civil Engineer Owner
Project
Owner
Location

BILL OF MATERIALS

Description of Materials Quantity Unit Unit Cost


20mmØ Elbow pc. 95.00
Teflon Tape roll 27.50

6. ELECTRICAL WORKS
Pipe and Fitting
20mmdia UPVC  pipe pcs 85.00
20mmdia RSC conduit pcs 216.00
20mmdia RSC coupling pcs 20.00
20mmdia UPVC coupling pcs 5.00
20mmdia  UPVC adoptor pcs 80.00
20mm dia. Locknut& bushing pcs 8.00
20mm dia. RSC Locknut& bushing pcs 15.00
Boxes and Gutter
Junction box depth type,metal gauge 16 w/ cover pcs 25.00
Utility box depth type, metal gauge 16 w/cover pcs 25.00
4×4 square box depth, metal gauge 16 w/cover pcs 50.00
Miscellaneous and Consumables
Electrical tape big pcs. 40.00
Rubber tape big pcs. 90.00
Solvent cement 100cc pcs. 240.00
G.I. Wire No. 12 kls. 70.00
Concrete nail no.3 kls. 120.00
CWN no.3 kls. 70.00
Entrance cap pcs. 35.00
Terminal Lugs lot 600.00
Red Led Paint pcs. 430.00
Cable Tie pc 1.00
Secondary Rack pc 540.00
Black Paint gal 610.00
Wires
8.0mm2 THHN m 45.00
5.5mm2 THHN m 37.00
3.5mm2 THHN m 25.00
2.0mm2 THHN m 25.00
Wiring Devices
1-gang Switch, 10A, 240V set 110.00
2-gang  switch, 10A, 240V set 140.00
2-gang  3  way  switch, 10A, 240V set 240.00
1-gang Convenince Outlet, 10A, 240V set 250.00
2-gang  Convenience Outlet, 3 prong 10A, 240V set 351.00

Prepared By: Approved By:


ESTELLA MARIE E. TAYLARAN SKADAFLF
Civil Engineer Owner
Project
Owner
Location

BILL OF MATERIALS

Description of Materials Quantity Unit Unit Cost


Lighting Fixtures
24  Watts light bulb set 285.50
1-18watts Compact flourescent lighting fixtures set 680.00
2-36 watts ,220v,Flourescent (box type) set 1200.00
1 x 18, 230V, Compact Flourescent (Keyless Type Porcelain
set 680.00
Receptacle Outlet)
Power Load Center Switch Gear and Panel Board
Main :40AT/50AF,1PCB,240V,18KAIC, BOLT-ON set 12500.00
Branches
2-15AT/50AF,1PCB,240V,10KAIC,,BOLT-ON PC 316.00
3-20AT/50AF,1PCB,240V,10KAIC,,BOLT-ON PC 316.00

Electrical Rigid Steel Conduit (12.7mm D) L 230.00


Electrical Rigid Steel Conduit (19mm D) L 490.00
Electrical Rigid Steel Conduit (25.4mm D) L 740.00
Bushing and Locknut (12.7mm) PR 6.00
Bushing and Locknut (19mm) PR 9.00
Bushing and Locknut (25.4mm) pc 12.00
Elbow 90 Degrees (Rigid Steel) (25.4mm D) pc 195.00
PVC Conduit Pipe (3m x 12.7mm D) pc 72.00
PVC Conduit Pipe (3m x 19mm D) pc 94.00
PVC Conduit Pipe (3m x 25.4mm D) pc 125.00
PVC Conduit Elbow 90 Degrees (25.4mm D) pc 20.00
PVC Adapter with Locknut (12.7mm D) pc 9.00

Prepared By: Approved By:


ESTELLA MARIE E. TAYLARAN SKADAFLF
Civil Engineer Owner
Project
Owner
Location

BILL OF MATERIALS

Description of Materials Quantity Unit Unit Cost


PVC Adapter with Locknut (19mm D) pc 15.00
PVC Adapter with Locknut (25.4mm D) pc 17.00
RS Conduit Coupling (12.7mm D) pc 16.00
RS Conduit Coupling (25.4mm D) pc 23.00
PVC Conduit Coupling (12.7mm D) pc 25.00
PVC Conduit Coupling (19mm D) pc 6.00
PVC Conduit Coupling (25.4mm D) pc 8.00
Octagonal Junction Box Type Gauge #16 (101mm x 101mm
pc 32.00
x 53mm) Deep
Utility Box Gauge #16 (50mm x 101mm x 53mm) Deep pc 33.00
Square Box (101mm x 53mm) Deep Type Gague #16 pc 31.00
Square Box (101mm x 63mm) Deep Type Gague #16 pc 38.00
Metal Pull Box (152mm x 152mm x 101mm) Gauge #16 pc 345.00
Metal Pull Box (304mm x 304mm x 101mm) Gauge #16 pc 760.00
Telephone Cabinet (304mm x 457mm x 127mm) Gauge #16 set 1700.00
Telephone Cabinet (304mm x 610mm x 152mm) Gauge #16 set 1900.00
Condulet Type ‘F’ (12.7mm) pc 68.00
Condulet Type ‘F’ (19mm) pc 98.00
Service Entrance Cap (12.7mm) pc 31.00
Service Entrance Cap (19mm) pc 93.00
Service Entrance Cap (25.4mm) pc 191.00
Mica Tubing pc 35.00
Electric Wire THWN/THHN 2.0mm2 pc 25.00
Electric Wire THWN/THHN 3.5mm2 pc 25.00
Electric Wire THWN/THHN 5.5mm2 pc 25.00
Telephone Jacketed Wire CAT 5E pc 30.00
Single Gang Switch set 92.00
Two-Gang Switch set 130.00
Three-Gang Switch set 1750.00
Two-way Switch set 150.00
Duplex Convenience Outlet set 130.00
Heavy Duty Outlet set 355.00
Polarized 3-Prongs (ACU Outlet) set 460.00
Enclosed Air Circuit Breaker 100AF, 3P, 220V, 70AT NEMA I set 1360.00
Enclosed Air Circuit Breaker 50AF, 3P, 220V, 40AT NEMA I set 1250.00
Enclosed Air Circuit Breaker 50AF, 2P, 220V, 40AT NEMA I set 590.00
Electrical Tape 3/4″ x 20 YDS pc 26.00

Prepared By: Approved By:


ESTELLA MARIE E. TAYLARAN SKADAFLF
Civil Engineer Owner
Project
Owner
Location

BILL OF MATERIALS

Description of Materials Quantity Unit Unit Cost


Panelboard and Cabinets (Enclosed 30Amp, 2 PST) set 1300.00
Panelboard and Cabinets (Enclosed 60Amp, 2 PST) set 1550.00
1 x 20 W Box Type FLF set 310.00
1 x 40 W Box Type FLF set 390.00
2 x 40 W Box Type FLF set 725.00
1 x 20 W Industrial Type FLF set 370.00
2 x 40 W Industrial Type FLF set 840.00
1 x 40 W Troffer Type Aluminum Louver Recess set 625.00
2 x 40 W Troffer Type Aluminum Louver Recess set 1180.00
1 x 40 W Troffer Type Aluminum Louver Surface set 990.00
2 x 40 W Troffer Type Aluminum Louver Surface set 1240.00
6″ D Pinlight with 18W 220V CFL set 350.00
Equipment for Fire Alarm Station (Manual) set 1280.00
Equipment for Fire Alarm Bell (Vibrating 6″ D) set 1350.00
Equipment for Fire Alarm, Annunciator set 3900.00
Equipment for Fire Alarm, Control Panel set 13400.00
Equipment for Fire Alarm, Smoke Detector set 1900.00
Floor Outlet Pop-up set 3650.00
Telephone Outlet RJ 45 set 165.00

Prepared By: Approved By:


ESTELLA MARIE E. TAYLARAN SKADAFLF
Civil Engineer Owner
Total Cost

Prepared By: Approved By:


ESTELLA MARIE E. TAYLARAN SKADAFLF
Civil Engineer Owner
Total Cost

Prepared By: Approved By:


ESTELLA MARIE E. TAYLARAN SKADAFLF
Civil Engineer Owner
Total Cost

Prepared By: Approved By:


ESTELLA MARIE E. TAYLARAN SKADAFLF
Civil Engineer Owner
Total Cost

Prepared By: Approved By:


ESTELLA MARIE E. TAYLARAN SKADAFLF
Civil Engineer Owner
Total Cost

Prepared By: Approved By:


ESTELLA MARIE E. TAYLARAN SKADAFLF
Civil Engineer Owner
Total Cost

Prepared By: Approved By:


ESTELLA MARIE E. TAYLARAN SKADAFLF
Civil Engineer Owner
Total Cost

Prepared By: Approved By:


ESTELLA MARIE E. TAYLARAN SKADAFLF
Civil Engineer Owner
Project :
Owner :
Location :

SUMMARY COST ESTIMATES FOR MATERIALS ,LABOR AND OTHER


CONSTRUCTION EXPENCES

A. ESTIMATED COST OF MATERIALS FROM BOQ

1.MASONRY WORKS
2. CONCRETING WORKS
3. ROOFING AND TRUSS WORKS
4. PAINTING WORKS
5.PLUMBING AND SANITARY WORKS
6. ELECTRICAL WORKS

B. ESTIMATED COST OF LABOR

C. ESTIMATED EXPENCES FOR CONTENGENCIES

ESTIMATED DIRCET COST

Prepared by:

ESTELLA MARIE E. TAYLARAN


ENGINEER

Approved by:

OWNER
Project : SINGLE STOREY RESIDENTIAL BUILDING
Location : PRK. PARADISE ,NEW CALANGIT,DALANGIN, TITAN ,ZAMBOANGA
Owner : SIBUGAY
MARCELO E. SUMODLAYON

SUMMARY

I CONCRETE WORKS ₱ 125,368.39


II MASONRY WORKS ₱ 75,951.00
III ROOFING WORKS ₱ 55,126.00
IV CEILING WORKS ₱ 32,948.00
V HARDWARE ₱ 4,080.00
VI DOOR & WINDOW FAB ₱ 44,700.00
VII PLUMBING WORKS ₱ 32,511.00
VIII ELECTRICAL WORKS ₱ 17,095.00
IX TILE WORKS ₱ 35,000.00
X PAINTING WORKS ₱ 35,000.00
TOTAL MATERIAL COST ₱ 457,779.39
TOTAL LABOR COST ₱ 45,777.94
CONTINGENCIES ₱ 13,733.38
TOTAL PROJECT COST ₱ 517,290.71

Checked by:

ESTELLA MARIE E. TAYLARAN


Civil Engineer
Approved by:

MARCELO E. SUMODLAYON
Owner