Plant ID Opolo
Equipment Number: ABC-1234 Equipment: Separator
Equipment Type: Vessel Date: 29th August 2014
Introduction
The following Level 1 and Level 2, Fitness-For-Service assessments were carried out on Grid Refe
01, in accordance with API 579-1, Part 4, for Type 'A' pressurized components subject to general
resulting from internal corrosion, using the methods outlined in API 579-2, 4.2. The assessement
are based on a thickness averaging approach. As per API 579-2, 4.2, the longitudinal weld seam
area of assessed corrosion is not considered to be a major structural discontinuity, though the we
efficiency of 0.85 has been taken into account.
Summary
The Level 1 assessment criteria are not satisfied due to the average measured thickness in the lo
The Level 2 assessment criteria are not satisfied.
Nomenclature
Plant ID Opolo
Equipment Number: ABC-1234 Equipment: Separator
Equipment Type: Vessel Date: 29th August 2014
Inspection Data
The grid used for the inspection and the thickness readings are shown below. The grid spacing se
Equipment Inspector in the circumferential and longitudinal directions is 1.5 inches based on the
M5
M6 Weld
Seam
M7
Plant ID Opolo
Equipment Number: ABC-1234 Equipment: Separator
Equipment Type: Vessel Date: 29th August 2014
Perform a Level 1 assessment for internal pressure as per API 579-1, paragraph 4.4.2
(a) STEP 1 - Calculate the minimum required thickness. API 579 referenc
PR 0.430 in
C
tmin
(SE 0.6P)
PR 0.212 in
L
tmin
(SE 0.4P)
0.430 in
tmin max[tmin
C L
, tmin ]
(b) STEP 2 - Thickness profiles are provided, the data for thickness readings is in Table 1, above.
0.360 in
tmm
0.650 in
tc trd FCA
(e) STEP 5 - Compute the length for thickness averaging from API 579-1, Table 4.5,
with Rt = 0.400 in
RSFa = 0.9 Table 2.3
0.5
2
1 R for Rt < RSFa for Rt ≥ RSFa
Q 1.123 t
1 Q= 50
(1 Rt / RSFa )
Plant ID Opolo
Equipment Number: ABC-1234 Equipment: Separator
Equipment Type: Vessel Date: 29th August 2014
2.564 in
L Q Dtc
(f) STEP 6 - Establish the Critical Thickness Profiles (CTP's) from the thickness profile data. Deter
measured thickness tsam based on the longitudinal CTP and the average measured thickness
circumferential CTP.
Longitudinal CTP
tleft
tright
0.55
0.48 t1 tmm t2 0.48 0.49
0.47
0.36
L = 2.564 in
Grid spacing = 1.5 in
tmm = 0.360 in
tleft = 0.550 in
tright = 0.480 in
L= 2.564 in
(L / 2) (L / 2)
t1 tmm (tleft tmm) t2 tmm (tright tmm)
(grid spacing) (grid spacing)
t1 = 0.522 in
t2 = 0.463 in
API 579-1 Fitness-For Service Assessment
Plant ID Opolo
Equipment Number: ABC-1234 Equipment: Separator
Equipment Type: Vessel Date: 29th August 2014
A2 = 0.527 in2
A1 + A2 = 1.093 in2
(A1 A2 )
s
tam
L
s
tam 0.426 in
Circumferential CTP
tleft
tright
0.55 tmm
0.48 t3 t4 0.48 0.49
0.36
L = 2.564
in
t3 = 0.522 in
t4= 0.463 in
Plant ID Opolo
Equipment Number: ABC-1234 Equipment: Separator
Equipment Type: Vessel Date: 29th August 2014
A4 = 0.527 in2
A3 + A4 = 1.093 in2
(A3 A4 )
c
tam
L
c
tam 0.426 in
(g) STEP 7 - Determine the acceptability for continued operation using Level 1 criteria in API 579
The average measured thickness acceptance is used in this example.
s
tam FCA 0.326 in
c
tmin 0.430 in from STEP 1
s
tam FCA tmin
c
NO
c
tam FCA 0.326 in
L
tmin 0.212 in from STEP 1
c
tam FCA tmin
L
YES
The Level 1 assessment criteria are not satisfied due to the average measured thickn
API 579-1 Fitness-For Service Assessment
Plant ID Opolo
Equipment Number: ABC-1234 Equipment: Separator
Equipment Type: Vessel Date: 29th August 2014
tlim 0.150 in
Level 2 Assessment
s
(tam FCA) 0.326 in
s
(tam FCA) (RSFa tmin ) NO
Opolo
Opolo
including FCA
excluding FCA
including FCA
excluding FCA
ess readings are shown below. The grid spacing set by the Fixed
longitudinal directions is 1.5 inches based on the corrosion profile.
Grid Reference
CML-01
Grid
Spacing
0
1.5
3
4.5
6
7.5
9
Page 3
Opolo
Opolo
files (CTP's) from the thickness profile data. Determine the average
nal CTP and the average measured thickness tcam based on the
Page 5
Opolo
Page 6
Opolo
Opolo