Leadstar College of Leadership and Management: Painting Works Contract Agreement No#1/2020
Leadstar College of Leadership and Management: Painting Works Contract Agreement No#1/2020
SEMERE AREGAWI G.C (hereinafter referred to as the contractor) whose address is Addis Ababa
YEKA Sub City, Woreda 04, House No. new, Telephone:
Purpose
The purpose of this contract is for painting external HBC, BEAMS COLOMUNS works of
Building block at kirkos Sub City, aroud bambis, wereda for the project by the contractor.
Whereas: both parties have agreed to enter in to this agreement, committed to fulfill all terms
and conditions obligated by this agreement as outlined below:
Article
2.Contract documents
It is agreed and understood that the following documents will be part of the contract agreement.
The above stated documents shall be known as “contract document” and represent the agreement
between the Client and the Contractor and that there is no other agreement or any other
documents relating to or in any way affecting this agreement at this stage and that these
documents supersede all other agreements and drawings prior to the Data hereof.
3.1 All works should be to the best standard acceptable by the project engineer, see the
attached standard plan and bill of quantities which is now made an integral part of this
contract.
3.2 The contractor will ensure qualified personnel are employed in carrying out the work.
3.3 The contractor will be responsible for all labor, materials, machineries and equipment costs
associated with the work.
3.4 The contractor will ensure that ‘the works’ will be completed within the agreed timeframe
50 of calendar days.
3.5 The contractor will be responsible for the payment of any government duties and taxes.
3.6 The Contractor would be responsible for the works he has executed.
3.7 Amending the design based on site works or client’s demand may vary in quantity and total
contract amount of the agreement.
Article 4
Responsibility of the Client
4.1 The Client has the right to discontinue the agreement if the work is not to the standard
quality accepted by the conditions and regulations of the government of Ethiopia.
4.2 In consideration of the payments to be made by The Client to The contractor herby
covenants with The project to execute and complete the works and remedy and defects
there in conformity in all respect with the supervision of the contractor and The Client
hereby covenants to pay The contractor in consideration of the execution and
completion of the works and the remedying of defects there in contract price for.
4.3 The Client will pay the contractor after takeoff sheet and payment certificate is
approved.
The Contractor agrees that the contract agreement covers all services, and will not charge
or penalize the Client for extra time, provided it is still within the limit of calendar days. Any
delay in the delivery of construction material caused by the Contractor delay in submitting
materials requisition, will not warrant such time extension, therefore the construction
should still be completed within the agreed calendar days timeframe.
5.1 The Contractor agrees that any delay in the completion of the construction activities
without prior consent of the Client will be a prorated daily penalty for The Contractor.
WAIVER
The Contractor and The Client has agreed that any dispute regarding the fulfillment if this
agreement shall be settled amicably, and shall not be taken to the court of law, and as such, both
waived its rights to such claims.
Name______________________ Name________________________
Signature________________ Signature________________
Witnesses
1. ____________________________ ______________________
2. ____________________________ _____________________
3.___________________________ ______________________
Purpose
The purpose of this contract is for the work of supper-structure works of one school Building
block-C
Bole Sub City, Summit,
wereda 09 for the project by the contractor.
Whereas: both parties have agreed to enter in to this agreement, committed to fulfill all terms
and conditions obligated by this agreement as outlined below:
Article
2.Contract documents
It is agreed and understood that the following documents will be part of the contract agreement.
The above stated documents shall be known as “contract document” and represent the agreement
between the Client and the Contractor and that there is no other agreement or any other
documents relating to or in any way affecting this agreement at this stage and that these
documents supersede all other agreements and drawings prior to the Data hereof.
3.8 All works should be to the best standard acceptable by the project engineer, see the
attached standard plan and bill of quantities which is now made an integral part of this
contract.
3.9 The contractor will ensure qualified personnel are employed in carrying out the work.
3.10 The contractor will be responsible for all labor, materials, machineries and equipment
costs associated with the work.
3.11 The contractor will ensure that ‘the works’ will be completed within the agreed
timeframe 120 of calendar days.
3.12 The contractor will be responsible for the payment of any government duties and taxes.
3.13 The Contractor would be responsible for the works he has executed.
3.14 Amending the design based on site works or client’s demand may vary in quantity and
total contract amount of the agreement.
Article 4
Responsibility of the Client
4.4 The Client has the right to discontinue the agreement if the work is not to the standard
quality accepted by the conditions and regulations of the government of Ethiopia.
4.5 In consideration of the payments to be made by The Client to The contractor herby
covenants with The project to execute and complete the works and remedy and defects
there in conformity in all respect with the supervision of the contractor and The Client
hereby covenants to pay The contractor in consideration of the execution and
completion of the works and the remedying of defects there in contract price for.
The Contractor agrees that the contract agreement covers all services, and will not charge
or penalize the Client for extra time, provided it is still within the limit of calendar days. Any
delay in the delivery of construction material caused by the Contractor delay in submitting
materials requisition, will not warrant such time extension, therefore the construction
should still be completed within the agreed calendar days timeframe.
5.2 The Contractor agrees that any delay in the completion of the construction activities
without prior consent of the Client will be a prorated daily penalty for The Contractor.
with VAT Advanced payment for this work will be 30% of the total contract
amount released within Two days from the date of signing of this contract agreement;
and it will be deducted by the same percentage from each payment.
6.7 First payment is after completing 40% of the total work executed
6.8 Final payment is up on the completion of all the contract works.
6.9 All payments shall be endorsed to the company’s account.
Article
7. Agreement Enforcement
The Contractor shall be accountable for any harm that might result from mal function of
their respective obligation herein contained under the civil code of Ethiopia. If dispute arise
between the CLIENT and the Contractor the party here by agree to resolve it through
mutual discussion. In case of failing to rich consensus the party has agreed to take the case
to an authorized court of appropriate jurisdiction under Ethiopian law.
WAIVER
The Contractor and The Client has agreed that any dispute regarding the fulfillment if this
agreement shall be settled amicably, and shall not be taken to the court of law, and as such, both
waived its rights to such claims.
IN WITNESS WHEREOF the parties hereto have executed this Agreement under their respective
corporate seals and by the hands of their proper officers hereunto duly authorized.
Signature________________ Signature________________
Witnesses
3. ____________________________ ______________________
4. ____________________________ _____________________
3.___________________________ ______________________
Date amount(birr)
This provisional acceptance by the order of the dr. Tsehaye university project and after due
notification to all concerned parties.
Have examined; contracts, drawings and specifications and have processed with the inspection
and ascertainment of the completion of the works provisional acceptance of the above project on
the bases of the following information: