PDF DPWH Cost Estimation Manual For Low Rise Buildings DL
PDF DPWH Cost Estimation Manual For Low Rise Buildings DL
Bureau of Construction
Cos
ostt Esti
Estim
mat
atio
ion
n Ma
Man
nual ._T
Depart
Departmen
mentt of Public
Public Works
Works and Highw
Highways
ays
Repub
Republic
lic of the Ph
Phili
ilipp
ppine
ines
s
DEPA
DEPART
RTME
MENT
NT OF PUB
PUBLI
LIC
C WO
WORK
RKS
S AN
AND
D HIGH
HIGHWA
WAYS
YS
OFFI
OFFICE
CE OF TH
THE
E SE
SECR
CRET
ETAR
ARY
Y
Manila
2 2 NOV 2011
-
DEPARTMENT ORDER ) SUBJ
SUBJEC
ECT:
T: Cost
Cost Es
Esti
tima
mati
tion
on Manu
Manual
al fo
forr Low
Low
Rise Buildings
NO. 137 l .)
Series of 201~ ~.""'"'7
In li
line
ne with
with th the
e Depa
Depart
rtme
mentnt's
's QualQualitity
y PoPoli
licy
cy to im
impl
plem
emenentt pr
proj
ojec
ects ts at the
the righ
rightt co
cost
st,, al
alll
Im
Impl
plem
emen
enti
ting
ng OffiOffice
ces
s are
are he herereby
by dire
direct
cted
ed to adop
adoptt th
thee he
here in Cost Estimat
rein Estimation
ion Manual
Manual
for Low Rise
Rise Buildi
Buildings
ngs in
in th
thee dedeteterm
rmin
inat
atio
ionn of un
unit
it cost
cost of Pa
Pay y IIte
tems
ms of Work
Work in
invo
volv
lved
ed in
the constru
constructi
ction
on and
and repa
repair/
ir/ret
retro
rofit
fittin
ting
g of low ris rise
e build
building
ing pr
proje
ojects
cts..
estab
est ablis
lish
h con
consis
sisten
tency
cy in the
the for
format
mat of prep
prepar
arati
ation
on and
and ser
serve
ve as a unif
uniform
orm ba
basis
sis/re
/refer
feren
ence
ce in
the
the de
deririva
vati
tion
on of ununit
it cost
cost for
for ea
each
ch item
item of wor
work.
k. It sh
shal
alll be d
dis
istr
trib
ibut
uted
ed to al
alll conc
concer
erne
ned
d
off
office
ices
s of the Depart
Departme
mentnt and uplo
uploade
adedd in th
the
e DPW
DPWHH Intr
Intran
anet.
et.
Th
Thisis Order
rder shshal
alll be cons
consis
iste
tent
nt with
with the
the imimpl
plem
emen
enta
tati
tion
on of D.D.O.O. No.
No. 16
163,
3, Seri
Series
es of 20 2015
15
"Stan
"St andar
dard
d For
Formsms of Progr
Program
am of Wor
Worksks (PO
(POW)W) and Appro
Approved
ved Budge
Budgett for the Contra
Contractct (ABC)"
wi
with
th modi
modifi
fica
cati
tion
on on its forma
formatt and
and dedesc
scri
ript
ptio
ion
n of item nu numb
mb8'
8'rr an
and
d sc
scop
ope
e of work
works s (A(Ann
nnex
ex
A) to conform with the DPWH Standard Specification Specificationss for Public Works Structures, Volume
III (Build
(Building
ings,
s, Ports
Ports and Har
Harbo
bors,
rs, Flood
Flood Contr
Controlol and Drai
Drainag
nage
e Struct
Structur
ures
es and
and Water
Water Su Suppl
pply
y
System
Sys tems)
s) and
and Standa
Standardi
rdized
zed Pay
Pay Ite
Items
ms of Work
Work for Buildi
Buildings
ngs as embod
embodied D.O.. OS, Series
ied in D.O
of 2017.
2017.
~~----
MARK A. VILLAR'
SecretarY
6.1.3 CSSD/
CSSD/BOC
BOC
Depa,t
Depa,trre
rrent
nt of Publi
Public
c Works
Works and Hi
Highw
ghways
ays
Office
ce of the Secretary
Secretary
1111111111111I11111111111111111111111
WIN7W02039
FOREWORD
Consi
nsiste
stent with
with its
its co
com
mmitm
itment to exc
excelle
ellenc
nce,
e, th
the
e De
Dep
partme
tment of Pu
Pub
blic
lic Work
rks
s and
Hi
High
ghwa
ways
ys (D
(DPW
PWH)
H) ha
has
s contin
continuo
uous
usly
ly form
formul
ulat
ated
ed an
and
d de
deve
velo
lope
ped
d gu
guid
ides
es an
and
d te
tech
chni
niqu
ques
es in
variou
various
s fie
fields
lds of the constr
construct
uction
ion pro
proces
cess.
s. This is to en
ensur
sure
e the highe
highest
st stand
standard
ards
s of outputs
outputs
at th
the
e righ
rightt co
cost
st.. Th
The
e DP
DPWH
WH has
has alwa
always
ys en
ende
deav
avor
ored
ed to st
stan
anda
dard
rdiz
ize
e al
alll it
its
s proc
proces
esse
ses
s to
facili
facilitat
tate
e promp
promptt and efficie
efficient
nt respo
response
nse to the nee
needs
ds of the Filipi
Filipino
no pe
peop
ople.
le.
Th
This
is Cost
Cost Es
Esti
tima
mati
tion
on Ma
Manu
nual
al for
for LoLow
w Ri
Rise
se Bui
Build
ldin
ings
gs pr
prov
ovid
ides
es Stan
Standa
dard
rd Cost
Cost Sh
Shee
eets
ts fo
for
r
commo
com mon
n pay items
items of work
work in bui
buildi
lding
ng constr
construct
uction
ion in ac
accor
corda
dance
nce wit
with
h the DPWH
DPWH Stand
Standard
ard
Sp
Spec
ecif
ific
icat
atio
ions
ns fo
forr Pu
Publ
blic
ic Struct
Structur
ures
es (V
(Vol
olum
ume
e III)
III).. Th
This
is manu
manual
al was
was pu
purp
rpos
osel
ely
y de
deve
velo
lope
ped
d to
provi
provide
de unifo
uniform
rm refer
referen
ence/
ce/ba
basis
sis in un
unit
it cos
costt estimati
estimation
on an
and
d in the
the pr
prep
epara
aratio
tion
n of Program
Program of
Work
Works
s (P
(POW
OW)) an
and
d Ap
Appr
prov
oved
ed Bu
Budg
dget
et of Cont
Contra
ract
ct (A
(ABC
BC)) in tt1e
tt1e imp
imple
leme
ment
ntat
atio
ion
n of vario
various
us
DPWH infrastru
infrastructur
cture
e proj
projects.
ects.
~~
MARK A. VILLAR
Secretary
Departmen
Departmentt of Publiicc Works and Highw
Highways
ays
Office of the Secretary
1111111111111111111111111111111111111
WIN7W02039
COST
COST EST
ESTIMAT
IMATION
ION MANU
MANUAL
AL FOR L
LOW
OW R
RISE
ISE BUI
BUILDI
LDINGS
NGS
TABLE OF CONTENTS
F()FlE:,",()Fl[)
F()FlE:,",()Fl[) ------------------
---------------------------
------------------
-----------------
-----------------
------------------
------------------
------------------
------------------
------------------
---------
TABL
TABLE:
E: ()F C(
C()) NTE:
TE:NTS
NTS- - - - --
------- - - - ----
------
------ - - ---- - ---- - - --- - - ---
------
--- - - - ----
---- - ---
---- - ---
--- - ii
[)E:FINITI()N
[)E:FINITI()N () F TE:FlMS ---------------------
------------------------------
------------------
------------------
------------------
------------------
------------------
----------------
------- i ii
UNIT
UNITS,
S, ABBF
ABBFlE
lE:V
:VIA
IATI
TI()
()NS
NS AN[) ACFl()NYMS-----------------------------------------------
AN[) vi
PFlE:F ACE:------ - - - - - - - - - - - ------- - - - ---------- - - ---- - ---- - - ---- - - ----- - - - ----- - ---- ---- ----- - vii
INTFl()[)UCTI()N-
INTFl()[)UCTI()N----------
-----------------
-----------------
-----------------
-----------------
-----------------
-----------------
-----------------
---------------.
-------. 1
B. STAN[
STAN[)AF
)AFl[)
l[) [)E:T
[)E:TAIL
AILE:[
E:[)) UNIT
UNIT PFlICE
PFlICE:: ANALYS
ANALYSIS
IS ([)UP
([)UPA)
A) SHE
SHE:E:
:E:TS
TS -----
--------
------
------
------
------
------
-----
-- 10
B.1 Summa
Summary
ry Table
Table of Ite
Items
ms of Wor
Work
k and Des
Descri
cripti
ption
on ----
-------
------
-----
-----
------
-----
-----
-----
-----
------
-----
-----
------
-----
-----
---.. 11
Partt A - Ea
Par Earth
rthwor
works
ks --
-----
------
-----
-----
------
-----
-----
------
-----
-----
-----
-----
------
-----
-----
------
-----
-----
------
-----
-----
-----
-----
------
-----
-----
------
-----
-----
-----.
--. 23
.f
Partt B - Plain
Par Plain and
and Rein
Reinfor
forced
ced Concr
Concrete
ete Wo
Work
rk -----
-------
-----
------
-----
-----
------
-----
-----
------
-----
-----
-----
-----
------
-----
-----
------
----- 38
Pa
Part
rt C - Fi
Finishing-
nishing----
-----
-----
------
-----
-----
-----
-----
------
-----
-----
------
-----
-----
------
-----
-----
-----
-----
------
-----
-----
------
-----
-----
------
-----
-----
-----
-----
------
-----
--,, 49
Part
Part D - Elec
Electr
tric
ical
al --
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
---- 20
202
2
Pa
Part
rt E - Mech
Mechan
anic
ical
al --
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
---- 25
252
2
C. CALCUL
CALCULATI(
ATI()N
)N ()F CYCLE: TIME: F()Fl
F()Fl HAULING
HAULING E:QUIPME:N
E:QUIPME:NT
T --------
------------
--------
--------
--------
--------
------
-- 272
C.1 Estima
Estimated
ted tra
travel
vel spe
speed
ed,, loa
loadin
ding/u
g/unlo
nload
ading
ing time
time & allowa
allowance
nce for delay
delay ------
--------
-----
-----
-----
------
----- 273
273
C.2 Formu
Formula
la fo
forr tthe
he calc
calcula
ulatio
tion
n of dump
dump tr
truck
uck trave
travell time ---
-----
-----
------
-----
-----
------
-----
-----
-----
-----
------
-----
-----
------
---.. 273
273
C.3 Com
Comput
putati
ation
on of cycle
cycle tim
time
e --
-----
------
-----
-----
-----
-----
------
-----
-----
------
-----
-----
------
-----
-----
-----
-----
------
-----
-----
------
-----
-----
------
-----
-----
-----
--.. 27
273
3
D.1 Basis
Basis of Computati
Computation
on'' -----
--------
------
-----
-----
-----
-----
------
-----
-----
------
-----
-----
------
-----
-----
-----
-----
------
-----
-----
------
-----
-----
-----
-----
------
-----
-----
---.. 275
D.2 Condi
Conditio
tion
n for the usage
usage of the lab
labor
or rrate
ates
s --
----
-----
------
-----
-----
------
-----
-----
------
-----
-----
-----
-----
------
-----
-----
------
-----
-----
-----.
--. 275
D.3 Sa
Sampl
mple
e tabula
tabulatio
tion
n of lab
labor
or rat
rates
es for NCR --
-----
------
-----
-----
------
-----
-----
-----
-----
------
-----
-----
------
-----
-----
------
-----
-----
-----
-----
----- 276
ii
DEFINI
DEFINITIO
TION
N OF TER
TERMS
MS
Program of Work
Works
s (POW)
_ - is the total estimated cost of the project which covers the Civil Works Cost,
Engine
Eng ineeri
ering
ng Superv
Supervisi
ision
on and
and Admi
Adminis
nistra
trativ
tive
e Ove
Overhrhead
ead,, Road
Road Right-
Right-of-
of-Way
Way Acquis
Acquisiti
ition
on Cost,
Cost,
Constru
Const ructi
ction
on Con
Contin
tingen
gency,
cy, etc.
etc. The POW
POW shallshall inclu
include
de in
infor
forma
matio
tion
n about
about the pr
proje
oject
ct locati
location
on
and
and lilimi
mits
ts,, qu
quan
anti
tity
ty and
and unit
unit cost
cost for
for ea each
ch item
item of work
work,, cons
constr
truc
ucti
tion
on du
dura
rati
tion
on,, fu
fund
ndin
ingg
source
source,, equipm
equipmenentt requir
requirem
ement
ents,
s, etc
etc..
Approved
Approved Budget
Budget for the Contract
Contract (ABC)
(ABC)
- is the
the totota
tall es
esti
tima
mate
tedd ag
agen
ency
cy es
estitima
mate
te (dir
(direc
ectt cost
cost,, in
indi
dire
rect
ct co
cost
st an
and
d tax)
tax) fo
forr ci
civi
vill
work
wo rks
s cont
contraract
ct of infras
infrastr
truc
uctu
ture
re proj
projec
ects
ts,, wher
wherei
einn it is ththe
e ceil
ceilin
ing
g of awar
awardd of cont
contra
ract
ct fofor
r
gover
governme
nmentnt locall
locally-f
y-fund
unded
ed pr proje
ojects
cts and
and ref
refer
eren
ence
ce for comparis
comparison on of bid costs
costs of contra
contracto
ctors
rs
for both
both locall
locally-f
y-fund
undeded and
and fore
foreign
ign-a
-assi
ssiste
sted d prproje
ojects
cts..
Oetailed
Oetailed Unit Price Analysis
Analysis (OUPA)
(OUPA)
- is the
the de
dete
term
rmin
inat
atio
ion
n of reas
reason
onab
able
le ununit
it cost
cost of each it item
em of work
work whic
which
h re
refl
flec
ects
ts th
the
e
brea
breakdo
kdownwn shoshowin
wingg the qua
quanti
ntitie
ties
s of wo
work
rk items,
items, un
unitit pr
price
icess of mater
material
ials,
s, eq
equip
uipmen
mentt rerenta
ntall
ra
rates
tes,, labor
labor rates
rates and
and DPW
DPWH-pH-pre
rescr
scribe
ibed
d ind
indire
irect
ct cos
costs
ts includ
including
ing taxes.
taxes.
Standard
Standard Labor Rates
Rates
.J
- are
are matr
matric
ices
es prep
preparared
ed an
and
d issu
issued
ed by Depa
Depart
rtme
ment
nt of Pu
Publblic
ic Work
Works
s and
and Hi
High
ghwa
ways
ys
(DPW
(DPWH) H) peri
period
odic
ical
ally
ly show
showin ing
g the
the requ
requir
ired
ed comp
compen
ensa
sati
tion
on fo
forr manp
manpowower
er work
workfo
forc
rce
e of
diff
differ
eren
entt cate
catego
gori
ries
es,, whic
whichh comp
compri
rise
ses
s the
the mini
minimu
mum
m wa
wagege as app
approrove
vedd by the
the NWPC
NWPC,, DOL
DOLE
E
plus
plu s the mo
monet
netar
ary
y benefi
benefits.
ts.
ACEL
ACEL Guideb
Guidebook
ook 2014
2014
- is a guide
guidebo
book
ok wh
wher
ere
e rent
rental
al rate
rates
s of comm
common
only
ly used
used equip
equipme
ment
nt fo
forr in
infr
fras
astr
truc
uctu
ture
re
projec
projects
ts are base
based.
d. It is p
publ
ublish
ished
ed by Assoc
Associat
iation
ion of Carr
Carrier
iers
s an
and
d Equipm
Equipment
ent Lessor
Lessors,
s, (ACEL)
(ACEL)
Inc..
Construct
Construction
ion Materials
Materials Price
Price Oata
Oata (CMPO)
- is a co
compmpil
ilat
atio
ion
n of unit
unit pr
pric
ices
es of cons
constr
truc
ucti
tion
on matemateririal
als
s up
upda
date
tedd qu
quar
arte
terl
rly
y peper
r
Distri
Dis trict
ct Eng
Engine
ineeri
ering
ng Off
Office
ice to be uused
sed asas re
refer
feren
ence
ce in tthehe pri
pricin
cing
g of materia
materials
ls compo
componenentnt of
the
the pay
pay it
item
emss of work
work in tthe
he prep
prepar
arat
atio
ionn of DU
DUPA
PA,, AB
ABCC & POW,
POW, inclu
including
ding new items
items .of work
work
.involv
.invo ed in a va.
lved
iii
DPWH Standard
Standard Specifica
Specifications
tions for Public Works and Highways
Highways
- commonly
commonly called as "Blue
"Blue Book",
Book", is a compilat
compilationion of detailed
detailed descripti
descriptions
ons of work
items in construct
constructing
ing public
public works and highways
highways projec
projects
ts such as roads, bridges,
bridges, building
buildings,
s,
etc.. In other
etc other words,
words, a compil
compilati
ation
on of specif
specifica
icatio
tions
ns of
of stand
standard
ard works
works accept
acceptabl
able
e to the
DPWH.
- is composed
composed of of specifica
specification
tions
s containi
containing
ng detailed
detailed descriptio
descriptionn of the workmans
workmanship,
hip,
material
mate rial requirem
requirements,
ents, technical
technical dimensions,
dimensions, materials
materials proportio
proportion,
n, datum
datum lines
lines and grades
grades
and other
other establis
established
hed reference
references s to follow or adhere to, e.g. AASHTO,AS
AASHTO,ASTM, TM,etc.;
etc.; basis
basis of
measurem
meas urement,
ent, payment
payment and unit of meas measure/m
ure/measu
easureme
rement;
nt; and basis
basis of acceptan
acceptancece and
and
special
special details
details that
that would
would give the
the user a clear
clear view of the work
work to be done.
done.
"One-s
"One-sto
tore
rey
y up to 5-st
5-stor
orey
eyss in heig
height
ht,, i.
i.e.
e. from 3. 3.00
00 m up to a maxi
maximumumm of
15.00
15. 00 meters
meters ababove
ove establis
establishe
hedd grade;
grade; while
while no
nott genera
generally
lly requir
requirin
ing
g an eleva
elevator
tor if the
buildi
building/
ng/str
struct
ucture
ure is purel
purely
y reside
residenti
ntial
al use;
use; fire
fire escape
escapes s and
and oth
other
er safety
safety system
systemss are
mandatory for all low-rise buildings/structures."
Source
Source:: Im
Imple
plemen
mentin
ting
g Rules
Rules and Regul
Regulati
ations
ons of
the
the NaNati
tion
onaal Bui
uild
ldin
ing
g Code
ode of the
the
Phil
Philip
ippi
pine
ness (PD
(PD 1096
1096),), 2005
2005 Revi
Revise
sed
d
Edition
iv
0 diameter
di AASHTO American Association of State Highway
" inch and Transportation Officials
foot ABC Approved Budget for the Contract
% percent ACCU Air Cooled
Cooled Condens
Condensing
ing Unit
A ampere ACEL Associ
Associati
ation
on of Carrie
Carriers
rs and Equip
Equipmen
mentt
bd-f
bd-ftt boar
board-
d-fo
foot
ot Lessor
Lessors,
s, Inc.
dm cubic foot per minute ACP Asphalt Concrete Pavement
-
cm centimeter ASTM Americ
American
an Societ
Societyy for
for Testi
Testing
ng and Mate
Materia
rials
ls
cyl cylinder BI Black Iron
ea each BOC Bureau of Construction
ft foot BOD Bureau
Bureau of Design
Design
ft3 cub
cubic
ic foot CFL Compact
Compact Fluore
Fluoresce
scent
nt Lamp
Lamp
Ga/# Gauge CHB Concret
Concretee Hollow
Hollow Block
Block
gal gallon CI Curb Inlet
h hour CMPD Construction Materials Price Data
ha hectare CP Contractor's Profit
hp horsepower CPMC Central Price Monitoring
Monitoring Committee
Committee
kg kilogram CWN Common Wire Nail
km kilometer DEO
DEO Dist
Distri
rict
ct Engin
nginee
eeri
ring
ng Offi
Office
ce
L liter DO De
D epartment Order
Is lump sum DOLE
DOLE Depa
Depart
rtme
ment
nt of La
Labo
borr an
and
d Empl
Employ
oyme
ment
nt
m meter EAG Exhaust
Exhaust Air Grilles
Grilles
m 2
square meter ECC Employer's Compensation Contribution
m3 cu
cubic meter ECOLA Emergency Cost Of Living Allowance
min minute EDC Estimated Direct Cost
mm milli
illim
meter
eter EMT
EMT El
Elec
ectr
tric
ical
al Meta
Metall Tubin
ubing
g
mt metric ton FAG Fresh Air Grille
pc piece FCU
Fan Coil Unit
PhP
PhP Phil
Philip
ippi
pine
ne Peso
Peso GI Galvanized Iron
psi poun
ound per
per square inch HDPE High Density
Density Polyethy
Polyethylene
lene
thk thick IMC Intermediate Metal Conduit
tph ton per hour
yd3 cubic
cubic yard LED
NCR
Light Emitting Diode
National
National Capital Region
NEMA
NEMA Nati
Nationa
onall Elect
Electri
rica
call Manu
Manufa
fact
cture
urers
rs
Association
NWPC Nation
National
al Wages and Producti
Productivity
vity
Commission
OCM Overhead,
Overhead, Continge
Contingencies
ncies & Miscellaneo
Miscellaneous
us
OS&Y Outsid
Outside
e Screw
Screw/St
/Stem
em and Yoke
Yoke Valve
Valve
PACU
PA CU Pa
Pack
ckage
age Type
Type Ai
Airc
rcon
ondi
diti
tioni
oning
ng Unit
Unit
PCCP Portla
Portland
nd Cement Concrete
Concrete Pavement
Pavement
PE Polyethylene
PN Pressure
Pressure Nominal
Nominal
POW Progra
Programm of Works
Works
PPR-C Polyprophyle
Polyprophylene
ne Random Copolymer
Copolymer
PVC Polyvinyl
Polyvinyl Chloride
Chloride
v
ACRONYMS
RC Rein
Reinfo
forc
rced
ed Co
Conc
ncre
rete
te
RCD
RCD Retu
Return
rn Ceil
Ceilin
ingg Diffus
Diffuser
er
RCPC Reinforce
Reinforced d Concrete
Concrete Pipe Culv Culvert
ert
RLD
RLD Re
Retu
turn
rn Line
Linear
ar Diff
Diffus
user
er
RO Reg
Regio
ion
nal Offic
ffice
e
RPM Raised
Raised Pav
Pavem
emenentt Mar
Marker
kers
s
RSB
RS B Rein
Reinfo
forc
rcin
ing
g StStee
eell Ba
Bar
r
R_SC
R_S C Rigid
Rigid Steel
Steel Condu
Conduit it
SCD
SC D Su
Supp
pplyly Ceil
Ceilining g Diffu
Diffuse
ser
r
SL
SLD
D Su
Supp
pplyly Lin
Linea
earr Diffu
Diffuse
ser
r
SPT
SP T St
Stan
andadard
rd Penet
Penetra rati
tion
on Te
Test
st
SSS
SS S So
Soci
cial
al Se
Secucuri
rity
ty Sys
Systetem
m
THHN Thermop
Thermoplasti
lastic c High He Heatat Nyl
Nylon-
on-coat
coated
ed
TW Ther
erm
mopla last
stic
ic WirWire
TWHN
TWH N
Thermo
Thermopla plasti
sticc Wa Water
ter and
and He Heat
at resit
resitan
antt
Nylon-coated
UPMO Unified
Unified Proj
Project
ect Mana
Managemgementent Office
Office
UPVC Unplasticized
Unplasticized Polyvinyl
Polyvinyl Chlo
Chloride
ride
VO Var
aria
iati
tio
on Order
VRF
VRF Va
Vari
riab
able
le Refr
Refrig iger
eran
antt Flow
Flow
XLPE Cross-Li
Cross-Linked
nked Polyethy
Polyethylene
lene
vi
PREFACE
Since
Since the
the Departmen
Departmentt also implements
implements the construct
construction
ion of vertical
vertical structures
structures like
buildi
buildings
ngs,, the Bureau
Bureau of Constr
Construct
uction
ion sees
sees the necess
necessity
ity of estab
establis
lishin
hing
g guide
guidelin
lines
es in
estimating cost for buildings aligned with the Department's mantra of implementing
implementing projects
at th
the
e ri
righ
ghtt co
cost
st.. Gene
Genera
rati
tion
on of this
this manu
manual
al aims
aims to prov
provid
ide
e a unif
unifor
orm
m basi
basis
s in th
the
e
prepar
preparati
ation
on of reason
reasonab
able
le cost
cost estima
estimates
tes specif
specifica
ically
lly for
for Low Rise
Rise Buildi
Building
ngs
s (up to fiv
five
e
stor
storey
eys)
s) whic
which
h th
the
e Depa
Depart
rtme
ment
nt is more
more invo
involv
lved
ed of.
of. Like
Likewi
wise
se,, tthi
his
s manu
manual
al will
will aid
aid in
facilitati
facilitating
ng a more efficient
efficient review
review and evaluation
evaluation of Detailed
Detailed Unit
Unit PriceAnal
Price Analysis
ysis(DUP
(DUPA)
A) and
Program of Works (POW).
Guidelin
Guidelines
es presented
presented in this manual
manual are structure
structured
d to be more applicablefor
applicablefor building
building
projects
projects implemen
implemented
ted by the DPWHbut
DPWH but may also be used iin
n general
general building
building constructio
construction.
n.
Sources
Sources in the formulatio
formulation
n of this manual
manual were
were collated data
data from previous
previously
ly imple
implement
mented
ed
projects
projects of the Bureau,
Bureau, contribut
contributed
ed by nonetheless
nonetheless,, its experienc
experienced
ed engineer
engineers
s who have long
vii
INTRODUCTION
Deve
Develo
lopm
pmen
entt in cons
constr
truc
ucti
tion
on tech
techno
nolo
logy
gy dr
driv
ives
es th
the
e so
soci
ciet
ety
y to in
inve
vest
st in bu
buil
ildi
ding
ng
struct
structure
ures
s desig
designe
ned
d with
with new
new innova
innovatio
tions.
ns. In kee
keepin
ping
g up wit
with
h the continu
continuous
ous pr
prog
ogres
ress
s in the
cons
constr
truc
ucti
tion
on indu
indust
stry
ry,, the
the gove
govern
rnme
ment
nt like
likewi
wise
se ha
has
s been
been in
inst
stit
itut
utin
ing
g meas
measur
ures
es in build
buildin
ing
g
struct
structure
ures
s upgr
upgrade
aded
d for resil
resilien
iency
cy at a reaso
reasonab
nable
le cos
cost.
t.
The bulk
bulk of the invol
involvem
vemen
entt of the DPW
DPWH
H is
is in the constr
construct
uctio
ion
n of horizon
horizontal
tal str
struct
ucture
ures.
s.
However,
However, being
being one of th
the
e construc
construction
tion agen
agencies
cies of the gover
governmen
nment,
t, it has been impleme
implementin
nting
g
variou
various
s vertic
vertical
al proje
projects
cts,, spe
specif
cifica
ically
lly Low Ris
Rise
eBBuil
uildin
dings
gs (u
(up
p to five
five (5) storey)
storey).. It has also
also bee
been
n
provi
providin
ding
g techn
technica
icall assist
assistan
ance
ce on buildi
building
ng constr
construct
uction
ion to its own Impleme
Implementi
nting
ng Office
Offices
s and
other gover
other governm
nment
ent agen
agencie
cies.
s. Hen
Hence,
ce, as tec
techni
hnical
cal ass
assist
istanc
ance
e anand
d capaci
capacity
ty bu
build
ilding
ing tool,
tool, this
this
cost
cost es
esti
tima
mati
tion
on manu
manual
al is ffor
ormu
mula
late
ted
d to es
esta
tabl
blis
ish
h a ununif
ifor
orm
m ba
basi
sis
s or refe
refere
renc
nce
e in the
prep
prepar
arat
atio
ion,
n, revi
review
ew an
and
d eval
evalua
uati
tion
on of De
Deta
tail
iled
ed Un
Unit
it Pr
Pric
ice
e Anal
Analys
ysis
is (D
(DUP
UPA)
A) an
and
d Ap
Appr
prov
oved
ed
Bu
Budg
dget
et fo
forr th
the
e Cont
Contra
ract
ct (A
(ABC
BC)) parti
particu
cula
larl
rly
y for
for go
gove
vern
rnme
ment
nt bu
buil
ildi
ding
ng pr
proj
ojec
ects
ts.. Fu
Furt
rthe
her,
r, th
this
is
manua
manuall aim
aims
s to impro
improve
ve the accu
accura
racy
cy of cost est
estima
imates
tes an
and
d to facili
facilitat
tate
e a more
more efficie
efficient
nt review
review
and
and eva
evalua
luatio
tion
n of DUPA and
and Pro
Progr
gram
am of Wo
Works
rks (PO
(POW)
W) prepare
prepared
d by the
the Implem
Implement
enting
ing Off
Office
ices.
s.
This
This manua
manuall cover
covers
s only
only the commo
common
n pay
pay items
items of work
work in build
building
ing constr
construct
uction
ion wit
with
h
detai
details
ls on the
the breakd
breakdown
own for costin
costing
g of mate
materia
rials,
ls, lab
labor,
or, equipm
equipment
ent includ
including
ing the over
overhe
head
ad
re
requ
quir
ires
es th
the
e us
user
er's
's inpu
inputt for
for un
unit
it rate
rates
s of ma
mate
teri
rial
als
s an
and
d la
labo
borr ba
base
sed
d on th
the
e Depa
Depart
rtme
ment
nt's
's
Cons
Constr
truc
ucti
tion
on Ma
Mate
teri
rial
als
s Pr
Pric
ice
e Da
Data
ta (C
(CMP
MPD)
D) and St
Stan
anda
dard
rd Labo
Laborr Rate
Rates
s that
that ar
are
e va
vari
riab
able
le fo
for
r
differ
different
ent locati
location
ons
s (i.e.
(i.e. Reg
Region
ional
al and Dist
Distric
rictt Engine
Engineeri
ering
ng Office
Offices).
s). Th
This
is manua
manuall is limi
limited
ted only
only
to unit
unit cost
cost derivat
derivation
ion,, thus,
thus, me
metho
thods
ds and
and tech
techni
nique
ques
s in q
qua
uanti
ntity
ty take
take off are not discusse
discussed.
d.
1
GENERA
GENERAL
L NOT
NOTES
ES
1. The capacit
capacity
y of equipm
equipmen
entt as presen
presentedted in
in the standa
standard
rd cost shee
sheett for each
each item
item of
work may be adjusted
adjusted to a higher
higher or lower
lower capacity,
capacity, provided
provided the
the resultin
resulting
g unit cost is
more economical
economical.. Rental rates shall
shall still be basedon
based on ACELGuide
ACELGuidebookbookof
of 2014.
2014.
Example:
Exampl e: In ha
hauli
uling
ng of materi
materials
als,, use of Dump
Dump Truck
Truck with
with higher
higher capacit
capacityy of fif
fiftee
teen
n
(15) m instead of ten (10) m capa
3 3
capacity
city as
as presented
presented will result
result to a lower
lower price,
price, as the
capaci
capacity
ty gets
gets bigge
bigger,
r, the low
lower
er the result
resulting
ing cost of P45.46
P45.46/m/m3 of haulin
hauling
g cost
cost from
from
P54.10/m3• Furthermore, the utilization of a Payloaderwill be optimized.
2. The
The ccap
apac
acit
ity
y of ten
ten (10)
(10) m3 for the Dump Truck as prese
presented
nted,, may be
be reduced
reduced in cases
cases
of extrao
extraordi
rdinar
nary
y condit
condition
ionss where
where the roa
roadd ha
has
s a very
very steep
steep gradien
gradient,
t, in a severe
severelyly
deteri
deteriora
orated
ted condit
condition
ion or in cases
cases of bri
bridge
dgess with load
load limita
limitatio
tions.
ns. It is imprac
impractic
tical
al
du
duri
ring
ng th
the
e ac actu
tual
al haul
haulin
ing
g to load
load the
the full
full capa
capaci
city
ty of th
thee Dump
Dump TruTruck
ck.. A prop
proper
er
explanation/justifications
explanation /justifications shall be made,
made, however, in the preparation of estimate.
3. For items
items of work that
that involves
involves hauling
hauling and disposalof
disposalof materials
materials where
where hauling
hauling distance
distance
was indica
was indicated
ted,, in cases
cases when
when actual
actual haulin
hauling
g dista
distance
nce is shorte
shorterr or longe
longerr than the
as
assu
sume
med d ha
haul
ulin
ing
g dist
distan
ance
ce of 3 km in the the ststan
anda
dard
rd cost
cost shee
sheets
ts,, corr
corres
espo
pond
ndin
ing
g
equipmen
equi pmentt hours
hours for Dump Truck
Truck shall be adjusted
adjusted based
based onon the cycle
cycle time analysis
analysis..
The actual
actual hauling
hauling distance
distance should
should be the nearest
nearest possi
possible
ble disposal
disposal site determin
determined
ed by
the Implemen
Implementing
ting Office prior
prior to the preparat
preparation
ion of the ABC/POWa
ABC/POWand nd shall be
be indicated
indicated
in the DUPA.
4. For equipm
equipmenentt utiliz
utilizati
ation
on of less
less than
than on
one
e (1) day,
day, the schedul
scheduled
ed operat
operating
ing ho
hours
urs shall
shall
be paid at operated cost per hour and the remaining hours of the minimum 8 hours a
day shall be considered
considered for payment
payment as bare rental rates.
5. The utilization
utilization of equipment
equipment other
other than the equipmen
equipmentt model and capac
capacity
ity presented
presented in
the standard cost sheets may be allowed, provided there is a correspondingjustification
in the substitut
substitution.
ion. Rental
Rental rates of
of equipmen
equipmentt should be based
based from ACELGuideb
ACELGuidebookookor
or
the Bureau
Bureau of Equipmen
Equipmentt Rental
Rental Ratesguideline
Ratesguidelines.
s.
6. The
The pr
pres
esen
ente
ted
d DUPA
DUPA is based
based on a one
one (1)
(1) gang
gang of labo
laborr and
and equip
equipme
ment
nt with
with th
the
e
specifie
specified
d output
output per unit. To increase
increase the outp
output,
ut, addition
additional
al equipment
equipment and labor
labor may
be added or an equipment with a higher capacity may be adopted.
7. The produc
productio
tion
n ou
outpu
tputs
ts per item of work
work were
were establi
establishe
shed
d based
based on nonorma
rmall condit
condition
ion
an
and
d study
study conduc
conductedted by the Burea
Bureau u of Constr
Construct
uction
ion (BOC) fie
field
ld en
engin
ginee
eersrs during
during
construction of projects being implemented by the BOC.Any deviation to suit actual site
condit
con dition
ion that
that tends
tends to increa
increase
se the total
total unit
unit cost
cost shall
shall be subjec
subjected
ted for
for ap
appro
proval
val by
the BOC.
2
8. Th
The
e ap
appl
plic
icat
atio
ion
n of Ma
Mark
rk-U
-Up
p (O
(OCM
CM an
and
d Pr
Prof
ofit
it)) sh
shal
alll be in
in acco
accord
rdan
ance
ce wi
with
th th
the
e ra
rang
nges
es of
the Total
Total Estima
Estimated
ted Direct
Direct Cos
Costt (EDe
(EDe)) of th
the
e pr
proje
oject
ct as pres
prescri
cribed
bed under
under D.O.
D.O. No. 197,
Se
Serie
ries
s of 2016
2016 or latest
latest issuan
issuance.
ce.
9. Th
The
e co
cost
st of mate
materi
rial
als
s comp
compon
onen
entt in tthe
he Stan
Standa
dard
rd Cost
Cost Sh
Shee
eets
ts shall
shall be base
based
d on the
the
la
lates
testt Const
Constru
ructi
ction
on Ma
Mater
terial
ials
s Price
Price Da
Data
ta subm
submitt
itted
ed qu
quar
arter
terly
ly by the
the Distri
District
ct Engine
Engineer
ering
ing
Office
Offices,
s, whi
which
ch includ
includes
es payme
payment
nt of local tax
taxes
es and hau
haulin
ling/d
g/deli
eliver
very
y cost
cost to site.
site.
10. The
The co
cost
st of labor
bor sh
shal
alll be base
sed
d on the
the la
labo
borr rate
tes
s es
esta
tab
blis
lishe
hed
d fo
forr each Dist
Distrric
ictt
Engi
Engine
neer
erin
ing
g Offi
Office
ce,, foll
follow
owin
ing
g the
the mini
minimu
mum
m la
labo
borr wage
wage as appr
approv
oved
ed by the NWPC
NWPC,,
DOLE,
DOLE, plus
plus mo
mone
netar
tary
y benefi
benefits
ts cal
calcul
culate
ated
d in acc
accord
ordan
ance
ce wit
with
h D.O.
D.O. No.
No. 71, Serie
Series
s of 2012
2012
or latest
latest issuance.
issuance.
,J
3
SECTION A
COST
COST ES
ESTI
TIMA
MATI
TION
ON PROC
PROCES
ESS
S
.J
4
A. COST E
ESTIM
STIMATIO
ATION
N PROC
PROCESS
ESS
Consultant
UPMO
Assistant Secretary
BOD & BOC Undersecretary
Secretary
District
District Engineeri
Engineering
ng Office
Office (DEO):
(DEO):
1. The
The Estima
Estimator
tor sha
shallll det
deter
ermin
mine
e the items
items of wo
work
rk inv
involv
olved
ed ba
based
sed on the
the Approve
Approved
d Plans.
Plans.
2. Th
The
e Es
Esti
tima
mato
torr shal
shalll prep
prepar
are
e the
the DU
DUPA
PA,, ABC & POW
ABC POW in
inclu
cludin
ding
g its att
attach
achmen
ments
ts applyi
applying
ng
th
the
e item
items
s of work
work invo
involv
lved
ed ba
base
sed
d on th
the
e late
latest
st st
stan
anda
dard
rd la
labo
borr ra
rate
tes
s & CMPD, standard
costt she
cos sheets
ets and
and D.O
D.O.. 22, Ser
Series
ies of
of 2015
2015 .
...0
3. Th
The
e Di
Dist
stri
rict
ct En
Engi
gine
neer
er shal
shalll app
appro
rove
ve the
the AB
ABC
C & P
POW
OW,, if the
the pr
proj
ojec
ectt is wit
withi
hin
n th
the
e It
Itmi
mits
ts of
autho
authorit
rity
y delega
delegated
ted to him/h
him/her
er..
4. If beyo
beyon
nd the
the autho
thority
rity of the
the DEO
EO,, fo
forrward
ward th
the
e DUPA
DUPA,, A
AB
BC & POW and Ap
Appro
proved
ved
Cons
Constr
truc
ucti
tion
on Plan
Plans
s toge
togeth
ther
er with
with the
the re
requ
quir
ired
ed at
atta
tach
chme
ment
nts
s to th
the
e Regi
Region
onal
al Office
Office fo
for
r
revi
review
ew/e
/eva
valu
luat
atio
ion
n an
and
d ap
appr
prov
oval
al,, if the pr
proj
ojec
ectt is wi
with
thin
in th
the
e limi
limits
ts of the
the de
dele
lega
gate
ted
d
autho
authorit
rity
y of the Reg
Region
ional
al Dir
Direct
ector
or..
5. If Plan
Planni
ning
ng an
and
d Desi
Design
gn Divi
Divisi
sion
on of the
the Re
Regi
gion
onal
al Of
Offi
fice
ce will
will ma
make
ke an adju
adjust
stme
ment
nt in the
the
qu
quan
anti
titi
ties
es an and
d de
dele
lete
te/a
/add
dd pa
pay
y item
item/s
/s in tthe
he subm
submititte
ted
d cons
constrtruc
ucti
tion
on pl plan
ans,
s, the ABC
ABC &
POW
PO W shshal
alll be adju
adjust
sted
ed ac
acco
cord
rdin
ingl
gly
y by the DiDist
stri
rict
ct En
Engi
gine
neer
erin
ing
g OfOffifice
ce an
andd re
resu
subm
bmit
it th
the
e
same for approval
approval..
Regional
Regional Office
Office (RO):
1. The
The Estima
Estimator
tor shall
shall det
deter
ermin
mine
e the item
items
s of wo
work
rk inv
involv
olved
ed ba
based
sed on
on tthe
he Appro
Approved
ved Plans.
Plans.
2. Th
The
e Es
Esti
tima
mato
torr shal
shalll prep
prepar
are
e the
the DU
DUPA
PA,, AB
ABC
C & POW
POW in
inclu
cludin
ding
g its att
attach
achme
ments
nts ap
apply
plying
ing
th
the
e item
items
s of work
work invo
involv
lved
ed ba
base
sed
d on th
the
e late
latest
st st
stan
anda
dard
rd la
labo
borr ra
rate
tes
s & CMPD, standard
costt she
cos sheets
ets and
and D.O.
D.O. 22,
22, Ser
Series
ies of 2015
2015..
3. Th
The
e Regi
Region
onal
al Di
Dire
rect
ctor
or shal
shalll ap
appr
prov
ove
e the
the AB
ABC
C & POW
POW,, if the
the pr
proj
ojec
ectt is wit
withi
hin
n th
the
e limi
limits
ts of
autho
authorit
rity
y deleg
delegate
ated
d to him/h
him/her
er..
5
4. If beyon
eyond
d the
the autho
thority
ity of the
the RO
RO,, fo
forwa
warrd th
the
e DUPA
DUPA,, A
ABC
BC & POW an
and
d Appro
Approved
ved
Constr
Construct
uction
ion Plans
Plans togeth
together
er wit
with
h the requir
required
ed att
attach
achme
ments
nts to the Burea
Bureau
u of Constru
Constructi
ction
on
(B
(BOC
OC)) an
and
d Bu
Bure
reau
au of De
Desi
sign
gn (B
(BOD
OD)) resp
respec
ecti
tive
vely
ly,, fo
forr re
revi
view
ew/e
/eva
valu
luat
atio
ion
n fo
forr ap
appr
prov
oval
al of
the Ass
Assist
istant
ant Sec
Secre
retar
tary
y for Tec
Techn
hnica
icall Ser
Servic
vices,
es, Und
Under
ersec
secre
retar
tary
y for Te
Techn
chnica
icall Ser
Servic
vices
es or
Secre
Secretar
tary
y depen
dependin
ding
g on the limits
limits of autho
authorit
rity.
y.
5. If Bu
Bure
reau
au of Desi
Design
gn sha
shall
ll ma
make
ke an ad
adju
just
stme
ment
nt in the
the qu
quan
anti
titi
ties
es an
and
d de
dele
lete
te/a
/add
dd pa
pay
y
item/s
item/s in the submit
submitted
ted con
constr
struct
uction
ion pla
plans,
ns, th
the
e ABC & POW shall
shall be adjusted
adjusted accordin
accordingly
gly
by the
the Region
Regional
al Off
Office
ice and
and resub
resubmit
mit the same for ap
appro
proval
val..
Unified
Unified Project
Project Manageme
Management
nt Office
Office (UPMO):
(UPMO):
1. The
The Consul
Consultan
tantt sha
shallll de
deter
termin
mine
e the item
items
s of wo
work
rk inv
involv
olved
ed ba
based
sed on the
the Approv
Approved
ed Plans.
Plans.
2. Th
The
e Cons
Consul
ulta
tant
nt shal
shalll pr
prep
epar
are
e the
the DU
DUPA
PA,, ABC
ABC & POW
POW inc
includ
luding
ing its attachm
attachmen
ents
ts applyi
applying
ng
the ite
items
ms of wor
work
k inv
involv
olved
ed..
3. Th
The
e Pr
Proj
ojec
ectt Di
Dire
rect
ctor
or shal
shalll cond
conduc
uctt revi
review
ew/e
/eva
valu
luat
atio
ion
n of the
the pr
prop
opos
osed
ed ABC
ABC & POW and
re
recom
commen
mends
ds its ap
appro
proval
val to the aut
autho
horiz
rized
ed appr
approvi
oving
ng off
offici
icial
al concer
concerne
ned.
d.
4. Forwa
warrd the
the ABC & POW and
and App
Appro
roved
ved Constr
Construct
uction
ion Plans
Plans togeth
together
er wit
with
h the re
requi
quire
red
d
atta
ttach
chm
ments to the
the Burea
reau of Con
Constr
structi
uction
on (BO
(BOC) and Bur
ure
eau of Desi
Desig
gn (BOD
BOD)
resp
respec
ecti
tive
vely
ly,, for
for revi
review
ew/e
/eva
valu
luat
atio
ion
n to be app
appro
rove
ved
d by the Assi
Assist
stan
antt Secr
Secret
etar
ary
y fo
for
r
Techn
Technica
icall Se
Servi
rvices
ces,, Under
Undersec
secret
retar
ary
y for Techn
Technica
icall Ser
Servic
vices
es or Se
Secre
cretar
tary
y depe
dependi
nding
ng on the
limits
limits of authority.
authority.
5. If th
the
e Bu
Bure
reau
au of Des
Desig
ign
n shal
shalll ma
make
ke an adju
adjust
stme
ment
nt in the
the quant
quantit
itie
ies
s an
and
d del
delet
ete/
e/ad
add
d pa
pay
y
ite
item/s
m/s in tthe
he submitt
submitted
ed con
constr
struct
uction
ion pla
plans,
ns, the ABC & POW shall
the shall be adjusted
adjusted accordin
accordingly
gly
by the concer
concerne
ned
d UPM
UPMO
O and resubmi
resubmitt the sam
same
e for appro
approval
val..
Approv
Approval
al of th
the
e ABC
ABC 8r. POW
POW sha
shall be base
based
d on the
the fol
ollo
lowi
wing
ng (or it
its
s la
late
test
st
issuance):
1. Depa
Depart
rtme
ment
nt Orde
Orderr No.
No. 91, Ser
Serie
ies
s of 2012
2012 - Au
Auth
thor
orit
ity
y of the
the As
Assi
sist
stan
antt Se
Secr
cret
etar
ary
y for
for
Techn
Technica
icall Servi
Services
ces to Approv
Approve
e Pla
Plans,
ns, Pro
Progr
gram
am of Work
Works
s an
and
d Approve
Approved
d Budge
Budgett for the
Contract
Contract for DPWH Locally-
Locally-Fund
Funded
ed and Foreign-As
Foreign-Assiste
sisted
d Civil Works
Works Projects
Projects Costing
more
more than PhP50
PhP50 Million
Million up to PhP100
PhP100 Millio
Million.
n.
2. Depa
Depart
rtme
ment
nt Or
Orde
derr No.
No. 95, Seri
Series
es o
off 20
2013
13 - Re
Reis
issu
suan
ance
ce of
of D.O.
D.O. No.9
No.9,, S. 201
2011
1 Re:
Re:
Conduct
Condu ct of Pre-
Pre-Pro
Procur
cureme
ement,
nt, Procur
Procurem
ement
ent,, and Im
Imple
pleme
menta
ntatio
tion
n Activi
Activitie
ties
s for DPWH
DPWH
Foreign-
Foreign-Assis
Assisted
ted Civil Work
Works
s Projects.
Projects.
3. Depa
Depart
rtme
ment
nt Or
Orde
derr No.
No. 10
109,
9, Serie
Series
s of 20
2014
14 - Ap
Appr
prov
oval
al of Plan
Plans,
s, Progr
Program
am of Wor
Works
ks
(P
(POW
OW)) an
and
d Ap
Appr
prov
oved
ed Bu
Budg
dget
et for
for the
the Co
Cont
ntra
ract
ct fo
forr DPWH
DPWH Local
Locally
ly-F
-Fun
unde
ded
d Pr
Proj
ojec
ects
ts
Cost
Costin
ing
g Ph
PhP5
P50
0 Mill
Millio
ion
n an
and
d be
belo
low
w Im
Impl
plem
emen
ente
ted
d by Un
Unif
ifie
ied
d Proj
Projec
ectt Ma
Mana
nage
geme
ment
nt
Offices.
4. Depar
Departme
tment
nt Or
Orde
derr No. 140
140,, Series
Series of 2014
2014 - Inc
Incre
rease
ased
d Limits
Limits of Dele
Delega
gated
ted Authori
Authority
ty
to Regi
Region
onal
al Dire
Direct
ctor
ors
s to Ap
Appr
prov
ove
e Plan
Plans,
s, Prog
Progra
ram
m of Work
Work (POW
(POW)) an
and
d Appr
Approv
oved
ed
Budget
Budget for the Contract
Contract (ABC
(ABC)) of Locally-F
Locally-Fund
unded
ed Projects.
Projects.
5. Depa
Depart
rtme
ment
nt Orde
Orderr No.
No. 54
54,, Se
Seri
ries
es of 2011
2011 - Re
Revi
vise
sed
d Li
Limi
mits
ts of Resp
Respon
onsi
sibi
bili
liti
ties
es an
and
d
Authorities of Concerned DPWH Offices and Officials in the Conduct of Pre-
Procu
Procure
reme
ment,
nt, Pro
Procur
cureme
ement,
nt, and
and Imp
Implem
lemen
entat
tation
ion Activi
Activitie
ties
s for DPWH
DPWH Lo
Local
cally-
ly-Fu
Funde
nded
d
6
PREPARA
PREPARATION
TION OF DETAILED
DETAILED UNIT PRICE
PRICE ANALYSIS
ANALYSIS
1. Genera
Generall
a. Dete
Determ
rmin
ine
e the
the scop
scope
e of wor
works
ks ba
base
sed
d on appr
approv
oved
ed pl
plan
ans
s an
and
d sp
spec
ecif
ific
icat
atio
ion
n in
incl
clud
udin
ing
g
other
other requ
require
ireme
ments
nts adop
adoptin
ting
g the stan
standar
dard
d pay item
items
s of works
works per
per Departm
Departmen
entt Orde
Order
r
No. 96, Serie
Series
s of 201
2016.6.
b. Ca
Calc
lcul
ulat
ate
e the
the quan
quanti
tity
ty anandd cost of mater
materia
iall co
comp
mpononen
entt of ever
every
y it
item
em of wo
workrk base
based
d
on pl
plan
anss an
and
d spec
specif
ific
icat
atio
ions
ns and
and prev
prevai
aili
ling
ng prpric
ices
es of cons
constr
truc
ucti
tion
on mate
materi
rial
als
s in the
the
Construct
Constr uction
ion Ma
Mater
terial
ials
s Pri
Price
ce Dat
Data
a (CM
(CMPD)
PD) w
with
ith consid
consider
erati
ation
on of allowanc
allowance
e for waste
waste
and/or
and/or losses
losses no
nott to exc
exceed
eed 5% of the ma
mater
terial
ial's
's re
requ
quire
ireme
ment.
nt.
c. De
Dete
terrmine
mine the
the approp
ropriate
iate quantity
tity base
based
d on be
best
st norms and pract
ctic
ice
es in the
the
constr
construct
uction
ion ind
indust
ustry
ry and c
cost
ost fo
forr manpo
manpower
wer an
and
d eq
equip
uipmen
mentt re
requi
quire
reme
ment
nt to be us
used
ed
based on Standard
based Standard Lab
Labor
or Rate
Rates s per Region
Region and latest
latest ACEL rates.
rates.
d. De
Dete
term
rmin
ine
e the
the un
unit
it cost
cost per
per ite
item
m of wwor
ork
k as pr
pres
esen
ente
ted
d in Ite
Item
m 5.
2. Determ
Determina
inatio
tion
n of cate
categor
gory
y of work
work superv
superviso
isor
r
Th
The
e ap
appr
prop
opri
riat
ate
e numb
number
er and
and cate
catego
gory
ry of supe
superv
rvis
isor
or in
incl
clud
udin
ing
g un
unsk
skil
ille
led
d la
labo
borr to be
de
depl
ploy
oyed
ed de
depe
pend
nds
s on the
the spec
specif
ific
ic type
type an
and
d comp
comple
lexi
xity
ty of an item of work
work to be don
done.
e. In
thi
this
s l'!1a
l'!1anu
nual,
al, the lab
labor
or for
force
ce (cr
(crew
ew or gang)
gang) were
were estab
establis
lishe
hed
d based
based on actua
actuall study
study and
and
best
best practi
practices
ces obs
obser
erved
ved durin
during
g the con
constr
struct
uction
ion of BOC implem
implemen
ented
ted projec
projects.
ts.
Example:
Example: Item gOO-Concre
gOO-Concrete
te Works
Works
Forema n------------------------------------1
Skille
Skilled
d Work
Worker
er (Mason
(Mason,, car
carpe
pente
nter)
r)---
-----
-- 2
Unskil
Unskilled
led Labor
Labor---
-----
-----
-----
-----
------
-----
-----
------
-----
----
-- 6
3. Calculat
Calculation
ion of product
production
ion output
output per hour of
of an item of work
work
The pr
pro
oductio
ction
n outpu
tput per hour
our of an item
tem of wo
worrk sh
sho
ould be deriv
ive
ed base
ased on th
the
e
numbe
numberr of days
days and appro
appropr
priat
iate
e ma
manpo
npower
wer and
and equ
equipm
ipmen
entt utiliz
utilized
ed to comple
complete
te the work
in accor
accorda
danc
nce
e wi
with
th the
the righ
rightt cons
constr
truc
ucti
tion
on me
meth
thod
odol
olog
ogy.
y. In th
this
is manu
manual
al,, th
the
e pr
prod
oduc
ucti
tion
on
outpu
outputt was derived
derived by th
the
e Bur
Burea
eau
u of Cons
Constru
tructi
ction
on (BO
(BOC)
C) Engine
Engineer
ers
s based
based on actua
actuall study
study
and best
best pract
practice
ices
s durin
during
g the cons
constru
tructi
ction
on of BOC implem
implemen
ented
ted projec
projects.
ts.
Exampl
Example:
e: Item
Item gOO-Co
gOO-Concr
ncrete
ete Works
Works
Vo
Volum
lume
e of Concre
Concrete
te = 21.50
21.50 cubic
cubic met
meter
er
Numb
Number
er of ho
hour
urs
s to comp
comple
lete
te the
the wo
work
rk whic
which
h in
incl
clud
udes
es se
sett
ttin
ing
g of equip
equipme
ment
nt an
and
d
ac
acce
cess
ssor
orie
ies,
s, ba
batc
tchi
hing
ng,, de
deli
live
very
ry an
and
d po
pour
urin
ing
g of co
conc
ncre
rete
te=
= 6 ho
hour
urs
s an
and
d 21 minut
minutes
es
(6.85 hr)
Type
Type and
and numbe
numberr of man
manpow
power
er utiliz
utilized
ed durin
during
g po
pouri
uring
ng
Forem
Forema
a n----
n-------
------
-----
-----
------
-----
-----
------
-----
-----
-----
---- 1
Skille
Skilled
d Worker
Worker (M
(Maso
ason,
n, Car
Carpen
penter
ter)) --
---- 2
Unskil
Unskilled
led Labor
Labor--
-----
-----
-----
------
-----
-----
------
-----
-----
----- 6
7
Type
Type and
and numbe
numberr of equ
equip
ipmen
mentt and
and too
tools
ls inc
includ
luding
ing lighti
lighting
ngs
s utiliz
utilized
ed durin
during
g pour
pouring
ing::
Production
Production output
output per hour=
hour=vol
volum
ume
e of con
concre
crete
te po
pour
ured/
ed/nu
numb
mber
er of
hours
hours con
consum
sumed
ed to comple
complete
te the
pouring sessi
pouring session
on
= 25
25.5
.5 cu.m
cu.m// 6.85
6.85 hr
= 3.72
3.72 cu.
cu.m/h
m/hr
r
4. Dete
Determina
rmination
tion of percentage
percentagess of Overhea
Overhead,
d, Contingenc
Contingency
y and Miscellaneous
Miscellaneous
(OCM)) expenses
(OCM expenses,, Profit
Profit and Value-Ad
Value-Added
ded Tax (VAT)
Th
The
e pe
perc
rcen
enta
tage
ges
s of OCM,
OCM, Prof
Profit
it an
and
d VA
VAT
T to be appl
applie
ied
d to th
the
e es
esti
tima
mate
ted
d di
dire
rect
ct co
cost
st (i.e
(i.e..
cost
cost of mate
materi
rial
al,, labo
laborr an
and
d eq
equi
uipm
pmen
entt rent
rental
al)) sh
shou
ould
ld be base
based
d on Depar
Departm
tmen
entt Orde
Order
r
(DO)) No. 197,
(DO 197, Serie
Series
s of 201
2016
6 (G
(Guid
uideli
elines
nes in the
the Pr
Prepa
epara
ratio
tion
n of Approv
Approved
ed Bu
Budge
dgett for the
Contract)
Contract) or lat
latest
est issuance.
issuance.
5. Determin
Determinati
ation
on of unit cost per
per item of work
work
Unit Cost=
Cost=tot
total
al unit
unit dir
direct
ect cos
costt (i.e.
(i.e. cos
costt of mater
material
ials,
s, labor
labor,,
Eq
Equip
uipmen
ment)
t) plu
plus
s ind
indire
irect
ct cos
costt (i.e.
(i.e. OCM
OCM,, Pro
Profit
fit and
VAT)
J
Exampl
Example:
e: Item
Item 900-C
900-Conc
oncret
rete
e Works
Works
DET
DETAIL
AILED
ED UNI
UNIT
T PRI
PRICE
CE ANALYSI
ANALYSIS
S (DU
(DUPA
PA))
Ilsm No.!Descnplion 90
900
0 St
Stru
ruct
ctur
ural
al Co
Conc
ncret
rete
e
Unn of Measureme
Measurement
nt m'
Designation No . o ffP
Pe rs
rs o
on
n iis
s No
o.. o f H o
ou
u riri s Ho
ou
u rrll y R a
att e Amount (PhPI
A. Labor
a Constr
Construction
uction Foreman 1 tOO 12943 12943
b..Skilled laborer 2 100 9510 19020
c Unskil
Unskilled
led Labore
Laborer
r 6 tOO 73.26 439.56
Sub
Sub·· Total
Total for A 75$.19
B. Equipment
Equipment
a. Concrete Vibrat
Vibrator
or 2 1.00 91.25 18250
b Pumpc"'le 1 0.27 2,076.00 560 52
Minor Tools (10% of tebor
tebor Cost)
Sub·
Sub· Total
Total fo
forr B 743.02
C. 1,50221
D. Outpul
Outpul per Ho
Hour
ur
E. Direct Von Cos! (C .• 0) 403 82
F. Materials
Materials
a. R
Ready
eady Mix, Class
Class All/Clas
All/Classs B/C
B/Clas
lasss CiClas
CiClasss P, 7
ays/14
ays/14 days!
days! 28 days 105 3.475 GO 3,64875
8
6. Cost estimation
estimation techniques
techniques and best practices
practices
a. Skills
Skills in the inter
interpr
preta
etatio
tion
n of the plans
plans and speci
specific
ficati
ation
ons
s
b. Wide
Wide experi
experienc
ence
e in act
actua
uall con
constr
struct
uction
ion and
and estim
estimati
ating
ng works
works
c. Famil
Familiar
iarity
ity with
with differ
differen
entt typ
types
es of co
const
nstru
ructi
ction
on mater
material
ials
s an
and
d
equipment
d. Consid
Consider
erati
ation
on on actua
actuall site
site con
condit
ditio
ion
n in tthe
he prepa
prepara
ratio
tion
n of DUPA
DUPA
i.e
i.e.. haulin
hauling
g distan
distance,
ce, ter
terra
rain,
in, etc.
etc.
e. Familiari
Familiarity
ty on laws, poli
policies,
cies, guidelines
guidelines and procedure
procedures
s
perta
pertaini
ining
ng to the imp
implem
lemen
entat
tation
ion of gov
gover
ernme
nment
nt inf
infras
rastru
tructu
cture
re
proje
projects
cts to ensur
ensure
e cost
cost est
estima
imates
tes are done
done at the rig
right
ht cost
cost
.J
9
SECTION B
STAN
STANDA
DARD
RD DETA
DETAIL
ILED
ED UN
UNIT
IT
PRIC
PRICE
E ANAL
ANALYS
YSIS
IS (DUP
(DUPA)
A)
SHEETS
.J
10
M NO. DESCRIPTION
ITEM
ITE PAGE NO.
PART A EARTHWORKS
2
800( 1) Cleari
Clearing
ng a
and
nd Gru
Grubb
bbing
ing (m ) 23
I-
800(2) Clearing and Grubbing (I.s.) 24
800(3)a Individual R
Re
emoval of Trees (Small a, 150mm 0-300 mm 0) 25
In
Indi
divi
vidu
dual
al Re
Remo
mova
vall of Tr
Tree
ees
s (Sma
(Small
ll b, abov
above
e 30
300
0 mm 0 up to
800(3)b 26
50
5000 mm 0)
In
Indi
divi
vidu
dual
al Re
Remo
mova
vall of Tr
Tree
ees
s (Sma
(Small
ll c, abo
above
ve 500 mm 0 up to
800(3)c 27
750
750 mm 0)
In
Indi
divi
vidu
dual
al Re
Remo
mova
vall of Tr
Tree
ees
s (Sma
(Small
ll d, ab
abov
ove
e 75
750
0 mm 0 up to
800(3)d 28
900 mm 0)
800(
800( 4) Individual Removal of Trees (large, above 900 mm 0 ) 29
803( 1)a S
Sttructure Excavation (Common Soil) 30
80
803(
3( 1)
1)b
b St
Stru
ruct
ctur
ure
e Ex
Exca
cava
vati
tion
on (Sof
(Softt Ro
Rock
ck)) 31
PART
PART B PLAIN
PLAIN A
AND
ND REI
REINFO
NFORCE
RCED
D CONCR
CONCRETE
ETE WORK
WORKS
S
Structur
Structural
al Con
Concre
crete
te (Re
(Read
ady
y Mix
Mix,, Class
Class AA/Cla
AA/Class
ss A/Clas
A/Class
s
900 B/Cla
B/Class
ss C/Cla
C/Class
ss P/Se
P/Seal
al Conc
Concrete
rete,, 38
7 days/
days/14
14 day
days/
s/ 28 day
days)
s)
Str
Struct
uctur
ural
al Con
Concre
crete
te for F
Foot
ooting
ing and Slab
Slab o
on
n Fill
Fill ( Rea
Ready
dy Mix
900( 1) 39
Concr
Co ncrete
ete,, Class
Class A, 7 da
days/
ys/14
14 days)
days)
Structur
Structural
al Co
Concr
ncrete
ete for Foot
Footing
ing Tie Beam
Beam,, Colum
Column,
n, Suspe
Suspend
nded
ed
900( 1) Sla
Slab,
b, Gi
Girde
rder/B
r/Bea
eamm (Re
(Read
ady
y Mix Concre
Concrete,
te, Class
Class A, 7 da
days/
ys/14
14 40
days)
11 Sum
Summa
mary
ry Tab
Table
le of Item
Items
s of Wor
Work
k and Desc
Descrip
riptio
tion
n
ITEM
ITEM NO.
NO. DESC
DESCRI
RIPT
PTIO
ION
N PAG
PAGE
E NO.
Struct
Structura
urall Con
Concre
crete
te for Fo
Footi
oting
ng and
and Slab o
on
n Fill
Fill (Cl
(Class
ass A, 2
28
8
900( 1)c2 41
days)
Structur
Structural
al Con
Concre
crete
te for Footin
Footing
g Tie Beam
Beam,, Column
Column,, Suspe
Suspend
nded
ed
900( 1) 42
Slab,
Slab, Gir
Girder
der/Be
/Beam
am (Class
(Class A, 28 da
days)
ys)
Reinfo
Reinforci
rcing
ng Ste
Steel
el of Reinfo
Reinforce
rced
d Con
Concre
crete
te Struct
Structur
ures
es for One-
One-
902( 1) 45
Store
Storey,
y, Gr
Grade
ade 40/Grad
40/Gradee 60
Reinfo
Reinforci
rcing
ng Ste
Steel
el of
of Rei
Reinfo
nforce
rced
d Con
Concre
crete
te Struct
Structur
ures
es for Two
902(1 ) 46
upto
upto Five Sto
Storey
rey,, Gr
Grad
ade
e 40/Gr
40/Grad
ade
e 60
PART C FINISHING
1001 (1
(1 )a
)a 50mm0-100mm0 PVC Pipe, Series 600/ Series 1000 50
1001 (1
(1 )a
)a 150 mm - 300 mm 0 PVC Pipe, Series 600/ Series 1000 51
1001 ( 1 )c
)c 50 mm 0 - 100 mm 0 H
Hiigh Density P
Po
olyethylene (HOPE) Pi
Pipe 57
1001(1)c
1(1)c 150 mm 0 - 300mm 0High Density Polyethylene (HO
(HOPE) Pipe 58
1001(2
001(2)) PV
PVC
C/HDP
/HDPE
E Fitti
ittin
ngs 59
1001(3
001(3)) Concr
oncre
ete Gutte
tter 60
10
1001(7)
01(7) Junc
Juncti
tion
on Bo
Box
x (C
(Con
oncr
cret
ete/
e/CH
CHB)
B) 62
10
100
01 (8)
(8) Sewer
wer Li
Lin
ne Wo
Worrks (lu
(lump su
sum) 63
12 Sum
Summar
mary
y Tab
Table
le of Item
Items
s of W
Work
ork and Des
Descr
cript
iption
ion
ITEM
ITEM NO.
NO. DESC
DESCRI
RIPT
PTIO
ION
N PAG
PAGE
E NO.
10
1001(9
01(9)) St
Stor
orm
m Drain
Drainag
age
e and
and D
Dow
owns
nspo
pout
ut (lum
(lump
p sum)
sum) 64
1002(2)a 13 mm 0 - 50 mm 0 Galv
Galvaniz
anized
ed Iron Pip
Pipe
e 65
1002(2) Galvaniz
Galvanized
ed Iron Fitti
Fittings
ngs 67
13 mm 0 - 50 mm 0 Poly
Polyprop
prophyle
hylene
ne Random
Random Copo
Copolyme
lymerr (PPR-
1002(3)a 68
C) Pipe,
Pipe, PN 10
10// PN 16/ PN 20
63 mm 0 - 100 mm 0 Pol
Polypr
yproph
ophyle
ylene
ne Random
Random Copoly
Copolyme
merr (PP
(PPR
R
1002(3)a 69
C) Pipe
Pipe PN 10
10// PN 16
16// PN 20
10
1002
02(3
(3)) Po
Poly
lypr
prop
ophy
hyle
lene
ne Ra
Rand
ndom
om Co
Copo
poly
lyme
merr (P
(PPR
PR-C
-C)) Fitti
Fitting
ngs
s 70
1002(4)a 13 mm 0 - 50 mm 0 P
Poly
olyvin
vinyl
yl Chl
Chlor
oride
ide (PVC)
(PVC) Pipe,
Pipe, Blue
Blue 71
1002(4)a 65 mm 0 - 100 mm 0 P
Poly
olyvin
vinyl
yl Chl
Chlor
oride
ide (PVC)
(PVC) Pipe,
Pipe, Blu
Blue
e 72
1002
1002(4
(4)) Po
Poly
lyvi
viny
nyll Chlo
Chlori
ride
de ((PV
PVC)
C) Fitt
Fittin
ings
gs,, Bl
Blue
ue 73
10
1002
02(5
(5)) Plum
Plumbi
bing
ng Fixt
Fixtur
ures
es 74
1002(5) Wat
Water
er Closet
Closet!! Uri
Urina
nall w
with
ith C
Com
omple
plete
te Acc
Access
essori
ories
es 75
Kit
Kitche
chen
n Sin
Sink/S
k/Scru
crub
b Up Sink/S
Sink/Slop
lop Sin
Sink
k w
with
ith Com
Comple
plete
te
1002(5) 76
Accessories
.J
Wall
Wall Hung
Hung/Co
/Count
unter
ertop
top/Un
/Under
der Cou
Counte
nterr Lavator
Lavatory
y wit
with
h Comple
Complete
te
1002(5) 77
Accessories
10
1002
02(5
(5)h
)h Fl
Floo
oorr Drai
Drain
n Plat
Plates
es 78
10
1002
02(5
(5)) So
Soap
ap Hold
Holder
er (T
(Toi
oile
lett So
Soap
ap// Liq
Liqui
uid
d So
Soap
ap)) 79
10
1002
02(5
(5)) To
Toil
ilet
et Tiss
Tissue
ue Ho
Hold
lder
er/D
/Dis
ispe
pens
nser
er 80
10
1002
02(5
(5)) Bide
Bidet!
t! Fa
Fauc
ucet
et!! Hos
Hose
e Bibb
Bibb 81
1002
1002(5
(5)n
)n St
Stai
ainl
nles
ess
s St
Stee
eell Gr
Grab
ab ba
bar
r 82
1002(5)0 Sho
Shower
wer hea
head/
d/ Sho
Shower
wer Val
Valve
ve 83
10
1002
02(5
(5)p
)p Fa
Faci
cial
al Mirr
Mirror
or 84
1002(6) Cold
Cold Wa
Water
terlin
line
e Pip
Pipes
es and
and Fit
Fittin
tings
gs 85
10
1002
02(7
(7)) Hot
Hot Wa
Wate
terl
rlin
ine
e Pipe
Pipes
s an
and
d Fitt
Fittin
ings
gs 86
4.5mm
4.5mm Fib
Fiber
er Ceme
Cement
nt Boa
Board/
rd/ 4.5 mm Mar
Marine
ine Plywoo
Plywood/
d/ 6 mm
1003(1 ) 87
Marin
Ma rine
e Ply
Plywo
wood/
od/ 6m
6mm
m Ordin
Ordinary
ary Plywoo
Plywood
d on Metal
Metal Frame
Frame Ceilin
Ceiling
g
13 Summ
Summar
ary
y Tabl
Table
e of Ite
Items
ms of W
Wor
ork
k and
and Desc
Descri
ript
ptio
ion
n
ITEM
ITEM NO.
NO. DESC
DESCRI
RIPT
PTIO
ION
N PAGE
PAGE NO.
4.5mm Fib
4.5mm Fiber
er Cemen
Cementt Board
Board// 4.5 mm Marine
Marine Plywoo
Plywood/
d/ 6 mm
1003(1 )a Marin
Marinee Ply
Plywoo
wood/
d/ 6m
6mm
m Ordin
Ordinary
ary Ply
Plywoo
wood
d in Wood
Wood Framin
Framing
g 88
Ceiling
1003
1003(( 1)e
1)e Gyps
Gypsum
um Bo
Boar
ard
d on Met
Metal
al Fr
Fram
ame
e Ceili
Ceiling
ng 89
4.
4.5m
5mm/
m/ 6.0
6.0 mm Fibe
Fiberr Ceme
Cement
nt Bo
Boar
ard/
d/ 4.
4.5m
5mm/
m/ 6.
6.0
0 mm 4' X 8' thk
thk
1003(2) fiber
fiber cem
cemen
entt board
board// 4.5m
4.5mmm Ma
Marin
rine
e Plywo
Plywood/
od/ 6.0 mm
mm Marin
Marine
e 90
Plywoo
Ply wood/
d/ 6.0 mm Ord Ordina
inary
ry Ply
Plywoo
wood d on Me
Metal
tal Frame
Frame Double
Double
Wall Part
Partition
ition
10
1004
04(2
(2)) Fi
Fini
nish
shin
ing
g Ha
Hard
rdwa
ware
re 91
Residenti
Residential
al Case
Casement
ment Steel Windows/
Windows/ Heavy
Heavy Duty Side-hin
Side-hinged
ged
1005 92
Ventilat
Ventilator/
or/ Projected
Projected Vent
Ventilato
ilator/
r/ Awning
Awning Ventilato
Ventilator/
r/ Grille
Grille Windo
Window
w
Hollow
Hollow St
Steel
eel Do
Door/
or/ Stee
Steell Flu
Flush
sh Door/
Door/ Gr
Grill
ille
e Door/
Door/ Steel
Steel Louver
Louver
1006 93
Door
10
1006
06(5
(5)) Fire
Fire Ra
Rate
ted
d Fire
Fire Exit
Exit Stee
Steell Do
Door
or 94
10
1007
07 Alum
Alumin
inum
um Glass
lass Do
Door
or (Sli
(Slidi
ding
ng Ty
Type
pe/S
/Swi
wing
ng Type)
Type) 95
Alu
Alumin
minum
um Glass
Glass Windo
Window
w (Sl
(Slidi
iding
ng// Case
Caseme
ment!
nt! Awning
Awning// Fixed
Fixed
1008 96
Type)
10
1009
09(( 1)a
1)a Jalo
Jalous
usie
ie Wind
Window
ow (Glas
(Glass)
s) 97
101 O( 1) Fr
Fram
ames
es (Jam
(Jambs
bs,, Sill
Sill,, H
Hea
ead,
d, Tr
Tran
anso
soms
ms and
and Mul
Mulli
lion
ons)
s) 98
1010
1010(2
(2)a
)a Ho
Holl
llow
ow Core
Core Flus
Flush
h Do
Door
or 99
10
1010
10(2
(2)b
)b Wood
Wooden
en P
Pan
anel
el Do
Door
or 100
1011(1 ) Ste
Steel/
el/ Alu
Alumin
minum
um Rol
Rolll Up Door
Door 101
1012(1) Tem
Tempe
pered
red Glass
Glass Door
Door (10 mm
mm// 12mm)
12mm) 102
1012(( 1)
1012 Tempe
Tempered
red Glass
Glass Wind
Windows
ows (8 mm
mm// 10mm
10mm)) 103
1013(1)
1013(1) Co
Corr
rrug
ugat
ated
ed Metal
Metal Ro
Roof
ofin
ing
g 104
Fabricate
Fabricatedd Meta
Metall Roof
Roofing
ing Acce
Accessory
ssory (Ridge/Hip
(Ridge/Hip
1013(2) 105
Rolls/
Rolls/Fla
Flashi
shing
ngs/C
s/Cou
ounte
nterr Flashi
Flashing
ngNal
Nalley
ley Roll)
Roll)
1013(2)c Fabricate
Fabricated
d Meta
Metall Roofi
Roofing
ng Accessory
Accessory (Gu
(Gutter
tter)) 106
Prepai
Prepainte
ntedd Me
Metal
tal Sheet
Sheets
s (Corru
(Corrugat
gateded,, Short
Short Spa
Span/
n/ Long
Long Span,
Span,
1014 107
below
below 0.427
0.427 thk
thk// above
above 0.4
0.427
27 thk
thk))
Prepai
Prepainte
nted
d Metal
Metal Sheets
Sheets (Rib
(Rib Typ
Type,e, Sho
Short
rt Spa
Span/
n/ Long
Long Span,
Span,
1014 108
below
below 0.427
0.427 thk
thk// above
above 0.4
0.427
27 thk
thk))
14 Summ
Summar
ary
y Table
Table of Items
Items of W
Wor
ork
k and
and Desc
Descri
ript
ption
ion
ITEM
ITEM NO. DESCRIPTION PAGE NO.
10 16
16(( 1)b
1)b Li
Liqu
quid
id Wate
Waterp
rpro
roof
ofin
ing
g 110
10
1016
16(2
(2)) Bu
Buil
ilt-
t-up
up and
and Pr
Pref
efor
orme
med
d Membr
Membran
ane
e 111
1018(1)
018(1) Glaze
lazed
d T
Til
ile
es and Trims
ims 113
10
1018
18 Ungl
Unglaz
azed
ed Ti
Tile
les/
s/ G
Gra
rani
nite
te T
Til
iles
es// Sy
Synt
nthe
heti
tic
c Gr
Gran
anit
ite
e Tile
Tiles
s 114
10 19
19(( 1) Wood
Wood TUes
TUes (Nar
(Narra
ra,, Tangu
Tanguil
ile,
e, othe
others
rs)) 115
1019(1)d La
Lami
mina
nate
ted
d Wo
Wood
od Tile
Tiles
s 116
102
020
0(1 ) Viny
Vinyll Tile
iles 117
10
1021
21(1
(1)a
)a Plai
Plain
n Ce
Ceme
ment
nt Floo
Floorr Fini
Finish
sh 118
102
021
1(3) Flo
Floor Topping
ing 119
10
1023
23(1
(1 ) Gr
Gran
anol
olit
ithi
hic
c Ma
Marb
rble
le Wo
Work
rk 120
102
026(
6( 1) Pe
Pebb
bble
le Wa
Wash
shou
outt Fini
Finish
sh 122
10
1027
27(1
(1)) Ceme
Cement
nt Plas
Plaste
terr Fini
Finish
sh 123
.J
10
1032
32(1
(1 )a Pa
Pain
inti
ting
ng Wor
Works
ks (M
(Mas
ason
onry
ry Pa
Pain
inti
ting
ng)) 124
1032(1 )b Painti
Painting
ng Wor
Works
ks (Wood Paintin
Painting)
g) 125
1032(1 )c Painting
Painting Works
Works (Metal
(Metal P
Painti
ainting)
ng) 126
1032(2
2(2) Varni
rnish
shiing Work
rks
s 127
1034( 1) Damproof
Damproofing
ing (Polye
(Polyethyle
thylene
ne Sheets)
Sheets) 129
103
038(
8( 1) Refl
Reflec
ecti
tive
ve Insu
Insula
lati
tion
on 130
1042(1) Stainl
Stainless
ess Steel
Steel Doo
Doorr and
and F
Fra
rames
mes 131
10
1043
43(( 1) PVC
PVC Doo
Doors
rs an
and
d Fra
Frame
mes
s (set
(set)) 132
10
1045
45(( 1) Perf
Perfor
orat
ated
ed Alum
Alumin
inum
um Ce
Ceil
ilin
ing
g Pa
Pane
nels
ls 133
100
100 mm CHB Non LoadLoad Bea
Bearin
ring/L
g/Load
oad Bearin
Bearing
g (including
1046 134
Reinforci
Reinforcing
ng Stee
Steel)
l)
150mm
150mm CHB Non
Non-Lo
-Load
adBea
Bearin
ring/
g/ Load
Load Bearin
Bearing
g (in
(inclu
cludin
ding
g
1046 135
Reinforci
Reinforcing
ng Stee
Steel)
l)
15 Su
Summ
mmar
ary
y Tabl
Table
e of Ite
Items
ms of Wo
Work
rk and
and De
Desc
scri
ript
ption
ion
10
1047
47(2
(2)b
)b St
Stru
ruct
ctur
ural
al Ste
Steel
el Ro
Roof
of Tr
Trus
uss
s 138
-
1047(2)c Structural Steel Purlins 139
10
1047
47(3
(3)a
)a Meta
Metall St
Stru
ruct
ctur
ure
e Acce
Access
ssor
orie
ies
s (A
(Anc
ncho
horr Bolt
Bolts)
s) 140
10
1047
47(3
(3)b
)b Meta
Metall S
Str
truc
uctu
ture
re Ac
Acce
cess
ssor
orie
ies
s (S
(Sag
ag ro
rods
ds)) 141
10
1047
47(3
(3)c
)c Meta
Metall St
Stru
ruct
ctur
ure
e Access
Accessor
orie
ies
s (T
(Tur
urnb
nbuc
uckl
kle)
e) 142
1047(3)d Metal
Metal Stru
Structure
cture Accesso
Accessories
ries (Cro
(Crossbr
ssbracin
acing)
g) 143
10
1047
47(4
(4)) Meta
Metall St
Stru
ruct
ctur
ure
e Acces
Accesso
sori
ries
es (Cro
(Cross
ssbr
brac
acin
ing)
g) 144
10
1048
48(1
(1 ) Carb
Carbon
on Fiber
Fiber (1 laye
layer)
r) 146
10
1049
49(( 1)a
1)a Jet
Jet Grou
Grouti
ting
ng (0.8
(0.80
0 m diam
diamet
eter
er)) 148
1052
1052(1
(1 ) Untr
Untrea
eate
ted
d Timb
Timber
er Piles
Piles,, furn
furnis
ishe
hed
d 149
.J
1052
1052(2
(2)) Tr
Trea
eate
ted
d Timbe
Timberr Pil
Piles
es,, pres
preser
erve
ved,
d, furn
furnis
ishe
hed
d 150
10
1052
52(3
(3)) Stee
Steell H-Pi
H-Pile
les,
s, furn
furnis
ishe
hed
d 151
Precast
Precast Concr
Concrete
ete Piles,
Piles, furnishe
furnished
d
1052(4)a.1 152
(400
(400mm
mm x 40
400m
0mmm - typ
typee A)
Prec
Precast
ast Concr
Concrete
ete Piles,
Piles, furnishe
furnished
d
1052(4)a.2 153
(400
(400mm
mm x 40400m
0mmm - ttyp
ype
e B)
Prec
Precast
ast Concr
Concrete
ete Piles,
Piles, furn
furnishe
ished
d
1052(4)b.1 154
(450
(450mm
mm x 45450m
0mmm - ttyp
ype
e C)
Precast
Precast Concr
Concrete
ete Piles,
Piles, furn
furnishe
ished
d
1052(4)b.2 155
(450
(450mm
mm x 4450
50mm
mm - ttyp
ype
e D)
Precast,
Precast, Prestr
Prestresse
essed
d Concrete
Concrete Piles, furnishe
furnished
d
1052(5)a 156
(400
(400 mm x 400 mmmm))
Precast,
Precast, Prest
Prestress
ressed
ed Conc
Concrete
rete Pile
Piles,
s, furnishe
furnished
d
1052(5)b 157
(450
(450 mm x 450 mmmm))
10
1052
52(6
(6)) St
Stru
ruct
ctur
ural
al St
Stee
eell Shee
Sheett Pil
Piles
es,, furn
furnis
ishe
hed
d 158
10
1052
52(7
(7)a
)a Pr
Prec
ecas
astt Co
Conc
ncre
rete
te Sh
Shee
eett Pile
Piles,
s, furn
furnis
ishe
hed
d (0
(0.5
.50
0 m x 0.
0.35
35 m) 159
16 Summ
Summar
ary
y Ta
Tabl
ble
e of It
Item
ems
s of Wo
Work
rk and
and Desc
Descri
ript
ptio
ion
n
Precas
Precastt Con
Concre
crete
te She
Sheetet Pil
Piles,
es, ffurn
urnish
ished
ed (0
(0.50
.50 m x 0.35
0.35 m),
1052(7)b 160
'Ready
'Ready Mix Conc
Concrete
rete))
1052(8) Untr
Untreate
eated
d Timb
Timber
er Piles,
Piles, driv
driven
en 161
10
1052
52(9
(9)) Trea
Treate
ted
d Timb
Timber
er Pil
Piles
es,, dr
driv
iven
en 162
1052
1052(1
(10)
0) St
Stee
eell H-Pi
H-Pile
les,
s, dr
driv
iven
en 163
10
1052
52(( 11) St
Stee
eell Pipe
Pipe Pil
Piles
es,, furn
furnis
ishe
hed
d and
and dr
driv
iven
en 164
1052(12) Struct
Structurq
urqll Ste
Steel
el She
Sheet
et Pile
Piles,
s, d
driv
riven
en 165
10
1052
52(1
(14)
4)a
a Pr
Prec
ecas
astt Conc
Concre
rete
te Pile
Piles,
s, d
dri
rive
ven
n (so
(soft
ft st
stra
rata
ta)) 167
1052( 15)b Precast, Prestressed Concrete Piles, driven (hard strata) 170
10
1052
52(( 16
16)b
)b Te
Test
st Pile
Piles,
s, furni
furnish
shed
ed and
and driv
driven
en (t
(typ
ype
e A, B, C or D)
D),, hard
hard strata
strata 172
Concr
Concrete
ete Pil
Piles
es cast
cast in Drille
Drilled Holes,, 0.80 m 0, fc' = 28 MPa
d Holes
1052(17)a 173
(ordina
(ordinary
ry soil condition
condition)) .J
Con
Concre
crete
te Pil
Piles
es ca
cast
st in Dri
Drille
lled
d Holes, 1.00 m 0, fc' = 28 MPa
Holes,
1052( 17)b 174
(ordina
(ordinary
ry soil condition)
condition)
Con
Concre
crete
te Pil
Piles
es cast
cast in Dri
Drille
lled
d Hol
Holes,
es, 1.20 m 0, fc' = 28 MPa
1.20
1052( 17)c 175
(ordinar
(ordinaryy soil condition)
condition)
Concre
Concrete
te Pil
Piles
es ca
cast
st in Dri
Drille
lled
d Hol
Holes,
es, 1.50 m 0, fc' = 28 MPa
1.50
1052( 17)d 176
(ordinar
(ordinary
y soil condition)
condition)
Concre
Concrete
te Pil
Piles
es ca
cast
st in Dri
Drille
lled
d Ho
Holes
les,, 1.80 m 0, fc' = 28 MPa
1.80
1052( 17)e 177
(ordinar
(ordinary
y soil condition
condition))
Concre
Concrete
te Pil
Piles
es ca
cast
st in Dri
Drille
lled
d Holes,, 2.00 m 0, fc' = 28 MPa
Holes
1052( 17)f 178
(ordinar
(ordinary
y soil conditi
condition)
on)
1052(18)a Concrete Piles cast in Steel Shells, furnished and driven 179
Concre
Concrete
te Pil
Piles
es cast
cast in Stee
Steell Shells,
Shells, fur
furnis
nishe
hed
d an
and
d driven
driven (Ready
(Ready
1052(18)b 180
Mix Concrete)
10
1052
52(1
(19)
9)a
a Conc
Concre
rete
te Pile
Piles
s cas
castt in Ste
Steel
el Pip
Pipes
es,, fur
furni
nish
shed
ed and
and driv
driven
en 181
Concre
Concrete
te Pil
Piles
es cast in Ste
Steel
el Pip
Pipes,
es, fur
furnis
nishe
hed
d an
and
d driven
driven (Read
(Ready
y
1052( 19)b 182
Mix Concrete)
17 Summar
Summary
y Tab
Table
le of Item
Items
s of W
Work
ork and Des
Descr
cript
iption
ion
1052(20) Pile
Pile Shoes
oes 183
10
1052
52(2
(23)
3)a
a Bo
Bore
red
d Pile
Piles, 0.80 m 0 (o
s, 0.80 (ordin
rdinary
ary soil condition)
condition) 184
10
1052
52(2
(23)
3)b
b Bo
Bore
red
d Pi
Pile
les,
s, 1
1.00 m 0 (ordinary soil condition)
.00 185
1052(23)c
Bored
Bored Pil
Piles,
es, 1.20
1.20 m 0 (ordinary soil condition) 186
10
1052
52(2
(23)
3)d
d Bo
Bore
red
d Pile
Piles,
s, 1
1.50 m 0 (ord
.50 (ordinar
inary
y soil condition)
condition) 187
1052(23)e Bored
Bored Pil
Piles, 1.80 m 0 (ordinary soil condition)
es, 1.80 188
10
1052
52(2
(23)
3)ff Bo
Bore
red
d P
Pil
iles 2.00 m 0 ((ordi
es,, 2.00 ordinary
nary soil conditio
condition)
n) 189
10
1052
52(( 24)a
24)a Perm
Perman
anen
entt Ca
Casi
sing
ng (0.80 m 0)
(0.80 190
1052(24)b Per
Perma
manen
nentt Casing (1.00 m 0)
Casing (1.00 191
10
1052
52(2
(24)
4)c
c Pe
Perm
rman
anen
entt Casi
Casing
ng ((1.20 m 0)
1.20 192
10
1052
52(2
(24)
4)d
d Pe
Perm
rman
anen
entt Casi
Casing
ng (1.50 m 0)
(1.50 193
10
1052
52(2
(24
4 )e Pe
Perm
rman
anen
entt Casi
Casing
ng (1.80 m 0)
(1.80 194
10
1052
52(2
(24)
4)ff Perm
Perman
anen
entt Casi
Casing
ng (2.00 m 0)
(2.00 195
10
1052
52(2
(25)
5) Spli
Splici
cing
ng of R
RC
C Pile
Piles
s wi
with
th Ep
Epox
oxy
y (400
(400 mm x 400
400 m
mm)
m) 196
10
1052
52(2
(26)
6) Spli
Splici
cing
ng of R
RC
C Pi
Pile
les
s wi
with
th Ep
Epox
oxy
y (450
(450 mm x 45
456
6 mm)
mm) 197
1052(
1052(27
27)a
)a Pil
Pile
e Inte
Integr
grity
ity Testi
Testing
ng (So
(Sonic
nic),
), ordi
ordina
nary
ry soi
soill con
condit
dition
ion 198
.
1052(
1052(27
27)b
)b Pil
Pile
e Inte
Integr
grity
ity Testin
Testing
g (PI
(PIT),
T), or
ordin
dinar
ary
y soi
soill condit
condition
ion 199
1052(22)b High
High Stra
Strain
in Dyn
Dynam
amic
ic Tes
Testin
ting
g (P
(PDA)
DA),, or
ordin
dinar
ary
y soil
soil co
cond
nditi
ition
on 200
10
1052
52 (29)
(29) Micr
Micro
o Piles
Piles In Dr
Dril
ille
led
d Hol
Holes
es,, 0.20m 0 (o
0.20m (ordin
rdinary
ary soil condition)
condition) 201
D. ELECTRICAL
15 mm 0 - 25 mm 0 Rigid
Rigid Steel
Steel Cond
Conduit
uit (RSC)!lnt
(RSC)!lnterm
ermedia
ediate
te
11OO(1) 202
metal
me tal Con
Condui
duitt (IM
(IMC)!
C)! Ele
Electr
ctrica
icall Met
Metal
al Tubing
Tubing (EM
(EMT)
T)
32 mm 0 - 40 mm 0 Rig
Rigid
id Ste
Steelel Con
Condui
duitt (RSC)!
(RSC)! Int
Inter
ermed
mediat
iate
e
11OO(1) 203
. metal
me tal Co
Condu
nduit
it (IM
(IMC)!
C)! Electr
Electrica
icall Me
Metal
tal Tubing
Tubing (EMT)
(EMT)
50 mm 0 - 65 mm 0 Rig
Rigid
id Ste
Steel
el Cond
Conduit
uit!! Int
Inter
erme
media
diate
te metal
metal
11OO(1) 204
Condui
Conduitt (IM
(IMC)!
C)! Electr
Electrica
icall Met
Metal
al Tubing
Tubing (EMT)
(EMT)
18 Su
Summ
mmar
ary
y Ta
Tabl
ble
e of It
Item
ems
s of W
Wor
ork
k and
and Desc
Descri
ript
ptio
ion
n
80 mm 0 - 100 mm 0 Rigi
Rigid
d Ste
Steel
el Con
Condui
duitt (RSC)/
(RSC)/ Int
Inter
erme
media
diate
te
11 OO( 1) 205
metal
me tal Con
Condu
duitit (IM
(IMC)/
C)/ Electr
Electrica
icall Me
Metal
tal Tubing
Tubing (EMT)
(EMT)
11
1100
00(3
(30)
0) Cond
Condui
uitt Work
Works,
s, Bo
Boxe
xes
s an
and
d Fitt
Fittin
ings
gs 210
2 2
1101(2) 1.6 mm - 5.5 mm Electric
Electric Wire (TWI
(TWITHHNI
THHNITWHN
TWHN2)
2) 211
2 2
1101(2) 8.00
8.00 mm - 22 mm Elec
Electric
tric Wire (TWI
(TWITHHNI
THHNITWHN
TWHN2)
2) 212
2 2
1101(2) 30.00
30.00 mm - 38 mm Elec
Electric
tric Wire (TWI
(TWITHHN
THHNITWHN
ITWHN2)
2) 213
2 2
1101(2) 50.00
50.00 mm - 60 mm Elec
Electric
tric Wire (TW/
(TW/THHN
THHN/TWHN
/TWHN2)
2) 214
1101
1101 (2) 80.00 mm2 - 125 mm2 Elec
80.00 Electric
tric Wire (TWI
(TWITHHN/
THHN/TWHN
TWHN2)
2) 215
2 2
1101(2) 150.00
150.00 mm - 250
250 mm Elec
Electric
tric Wire (TW/THHN
(TW/THHNITWHN
ITWHN2)
2) 216
2 2
1101(2) 325.00
325.00 mm - 400
400 mm Elec
Electric
tric Wire (TWITHHN
(TWITHHN/TWHN
/TWHN2)
2) 217
2
1101(2)a23 500.0
500.00
0 mm
mm Elect
Electric
ric Wire (TWI
(TWITHHN/
THHN/TWHN
TWHN2}
2} 218
2 2
1101(7) 2.0
2.00
0 mm - 5.5 mm Bare Copper
Copper Wire 220
2 2
1101(7) 8.0
8.00
0 mm - 22.00
22.00 mm Bare Copper
Copper Wire 221
2 2
1101(7) 30.00
30.00 mm - 38.00
38.00 mm Bar
Bare
e Copper
Copper Wire 222
2 2
1101(7) 50.00
50.00 mm - 60.0
60.00
0 mm Bar
Bare
e Copper
Copper Wire 223
2 2
1101(7) 80.00
80.00 mm - 125.00
125.00 mm Bare Copper
Copper Wire 224
2 2
1101(7) 200.0
200.00
0 mm - 250
250.00
.00 mm Bare Copper
Copper Wire 225
Single Co
Single Conve
nvenie
nience
nce Ou Outle
tlet/R
t/Rece
ecepta
ptacle
cle,, Groun
Groundin
dingg Type
Type (GT)/
(GT)/
Heavy
Hea vy Dut
Duty
y Conven
Convenien ience
ce OutOutlet
let/Re
/Recep
ceptac
tacle,
le, GrGroun
oundin
dingg Type
Type
11
1101
01 (G
(GT)
T)// Weat
Weathe
herr Pr
Prooooff Sing
Single
le Conv
Conven enie
ienc
ncee Outl
Outlet
et/R
/Rec
ecep
epta
tacl
cle,
e, 227
Gr
Grou
oundi
nding
ng Type
Type (G (GT)/
T)/ Pop-u
Pop-up p Type/F
Type/Flooloorr Tri
Triple
plex
x Conven
Convenienience
ce
Outle
Ou tlet/R
t/Rece
ecepta
ptacle
cle,, GrGroun
oundin
dingg Typ
Type e (GT)
(GT)
19 Summ
Summar
ary
y Ta
Tabl
ble
e of It
Item
ems
s of W
Wor
ork
k and
and Desc
Descri
ript
ptio
ion
n
ITEM
ITEM NO . DESCRIPTION PAGE
PAGE NO.
•
Duplex Convenie
Duplex Convenience
nce Outle
Outlet/R
t/Rece
ecepta
ptacle
cle,, Groun
Groundin
ding
g Type
Type (G(GT)
T) /
Weather
Weat her Proof
Proof Dupl
Duplex
ex Convenie
Convenience
nce Outlet/Re
Outlet/Recept
ceptacle
acle,,
Groundi
Grounding
ng Type (GT)/
(GT)/ Spec
Special
ial Purpose
Purpose Convenie
Convenience
nce
1101 Outle
Outlet/R
t/Rece
ecepta
ptacle
cle,, Grou
Groundnding
ing Typ
Type
e for ACU,
ACU, WH, etc/
etc/ 228
Explosio
Explosionn Proo
Prooff Type Dupl
Duplex
ex Conv
Convenie
enience
nce Outlet/Re
Outlet/Recepta
ceptacle,
cle,
- Groundi
Grounding
ng Type (GT(GT)/
)/ Dupl
Duplexex Conv
Convenie
enience
nce Outlet/Re
Outlet/Recept
ceptacle
acle
with Ground Fau
Fault
lt Circu
Circuit
it Inte
Interup
rupter
ter
Pop-up Type/Floor
Pop-up Type/Floor Sing
Singlele Conv
Convenie
enience
nce Outlet/Re
Outlet/Recept
ceptacle
acle,,
Groun
Gro undin
ding
g Typ
Typee (GT)
(GT)// Pop
Pop-up-up Type/Fl
Type/Floooorr Duplex
Duplex Conven
Convenienience
ce
Out
Outlet
let/Re
/Recep
ceptac
tacle,
le, Gr
Grououndi
nding
ng Type
Type (GT
(GT)/)/ Expl
Explosi
osion
on Proo
Prooff Type
Type
1101 229
Single
Single Conve
Convenie
nience
nce Outle
Outlet/R
t/Rece
ecepta
ptacle
cle,, Groun
Groundin
ding
g Type
Type (GT)/
(GT)/
Single
Single Con
Conven
venien
ience
ce Ou
Outletlet/R
t/Rece
ecepta
ptacle
cle wit
withh Grou
Ground
nd Fault
Fault Circ
Circuit
uit
Interrupter
1101(42) Wires
Wires and Wir
Wiring
ing Devices
Devices 230
Panel
Panel Board
Board w
with
ith Main
Main Bre
Breake
aker/B
r/Bra
ranch
nches,
es, 3 wires,
wires, 1 neutr
neutral,
al, 250
1102 231
Amp - 400 Amp
Panel
Panel Boar
Board
d wi
with
th Main
Main Brea
Breaker
ker/Br
/Bran
anche
ches,
s, 3 wires,
wires, 1 neutr
neutral,
al, 50
1102 232
Amp - 200 Amp
NEMA
NEMA I (Enclo
(Enclosed
sed Cir
Circui
cuitt Breake
Breaker)
r) Sin
Single
gle Ph
Phase
ase or
or Three
Three Phase
Phase
1102 233
Commerci
Comm ercial/In
al/Industr
dustrial
ial Type
NEMA
NEMA 3R (En
(Enclo
closed
sed Cir
Circui
cuitt Breake
Breaker)
r) Sin
Single
gle P~a
P~ase
se or Three
Three
1102 234
Phase
Phase Comme
Commercia
rcial/Ind
l/Industr
ustrial
ial Type
.
Mo
Motor
tor Con
Contro
troll Cen
Center
ter with
with main
main,, bra
branch
nch breake
breakerr and motor
motor
1102 235
starte
starterr (NEMA
(NEMA 1, NEM
NEMA A 3R and
and 4X) Flu
Flush
sh or Surface
Surface Moun
Mounted
ted
Gener
Generato
atorr (St
(Stan
and
d by and
and C
Cont
ontinu
inuou
ous),
s), Syncho
Synchoniz
nizing
ing Pan
Panel
el for
1102(8) 236
Gener
Generato
ator,
r, High
High Volt
Voltag
age
e Swi
Switch
tch Ge
Gear
ar
Main Enc
Main Enclos
losed
ed Aut
Autom
omati
atic
c Cir
Circui
cuitt Breake
Breakerr 50 AT, 60 AT, 70 AT,
1102 3P, 240V:
240V: NEMA I, NEM
NEMA A 3R, NEM
NEMA A 4x Flushe
Flushed/
d/ Su
Surfa
rface
ce 237
Mounted
Main Enclosed
Main Enclosed Aut
Autom
omati
atic
c Cir
Circui
cuitt Breake
Breakerr 50 AT,
AT, 60 AT,
AT, 70 AT ,
1102 2P,
2P, 24
240V
0V NEM
NEMA A I, NEMA
NEMA 3R, NEMA
NEMA 4x Flushe
Flushed/
d/ Surface
Surface 238
Mounted
Main Enc
Main Enclos
losed
ed Aut
Autom
omati
atic
c Cir
Circui
cuitt Breake
Breakerr 10
100
0 AT,
AT, 125 AT, 205
1102 AT
AT,, 22
225
5 AT,
AT, 3P,
3P, 2240
40V
V NEMA
NEMA I, NEMA
NEMA 3R,
3R, NEMA
NEMA 4x
4x Flus
Flushe
hed/
d/ 239
Surface
Surface Moun
Mounted
ted
20 Sum
Summar
mary
y Tab
Table
le of Item
Items
s of Wo
Work
rk and Des
Descr
cript
iption
ion
Main Enc
Main Enclos
losed
ed Aut
Autom
omati
atic
c Cir
Circui
cuitt Br
Break
eaker
er 10
100
0 AT,
AT, 12
125
5 AT,
AT, 20
200
0
1102 AT , 2P, 225 AAT
T, 2P,
2P, 2
24
40V NEM
NEMA I, NEMAEMA 3R
3R,, NEM
NEMAA 4x 240
Flushedf
Flushedf Surf
Surface
ace Mou
Mounted
nted
Low Voltag
Voltage
e Swi
Switch
tch Boar
Board
d Main 250
2500-
0-400
4000
0 AT, 3P, 24
240V
0V NEMA
NEMA
1102 241
I with
with Brea
Breaker
ker
11
1102
02 Main
Main En
Encl
clos
osed
ed Au
Auto
toma
mati
tic
c Br
Brea
eake
kerr 2
250
50-5
-500
00 Amp
Amp 242
11
1103
03(1
(1 ) Li
Ligh
ghti
ting
ng F
Fix
ixtu
ture
res
s 243
Fluor
Fluoresc
escen
entt Lig
Lighti
hting
ng Fixtu
Fixture
re wit
with
h Ba
Balla
llast
st fligh
flightt Emitti
Emitting
ng Diode
Diode
1103(2) 244
(L
(LED)
ED) Bulb,
Bulb, 1 B
Bulb
ulb
Fluor
Fluoresc
escent
ent Lig
Lighti
hting
ng Fix
Fixtur
ture
e with
with B
Bal
allas
lastt fl
fligh
ightt Emitti
Emitting
ng Diode
Diode
1103(2) 245
(L
(LED)
ED) Bulb,
Bulb, 2 Bul
Bulbs
bs
Fluor
Fluoresc
escent
ent Lig
Lighti
hting
ng Fixtu
Fixture
re wit
with
h Balla
Ballast
st flig
flight
ht Emitti
Emitting
ng Diode
Diode
1103(2) 246
(L
(LED)
ED) Bulb,
Bulb, 3 Bul
Bulbs
bs
Fluor
Fluoresc
escent
ent Lig
Lighti
hting
ng Fixtu
Fixture
re wit
with
h Balla
Ballast
st flig
flight
ht Emitti
Emitting
ng Diode
Diode
1103(2) 247
(L
(LED)
ED) Bulb,
Bulb, 4 Bulb
Bulbs
s
Downli
Downlight
ght/Pi
/Pinli
nligh
ghtt Fix
Fixtur
ture
e with
with On
One-
e- C
Comp
ompact
act Fluore
Fluorecen
centt Lamp
Lamp
1103(5) 248
(CFL)
(CFL) or LED Bulb,
Bulb, 1 Bul
Bulb
b
Downli
Downlight
ght/Pi
/Pinli
nligh
ghtt Fix
Fixtur
ture
e with
with Two-
Two- Com
Compa
pact
ct Fluore
Fluorecen
centt La
Lamp
mp
1103(5) 249
(CFL)
(CFL) or LED Bulb, 2 Bulb
f
1103(12) Die
Die-Ca
-Cast
st Alumin
Aluminum
um Flo
Flood
odlig
light
ht with Ele
Electr
ctroco
ocoat
at Paint
Paint Fini
Finish
sh 251
PART E MECHANICAL
12
1200
00 Air
Air Cond
Condit
itio
ioni
ning
ng and
and Re
Refr
frig
igir
irat
atio
ion
n Syst
System
em 252
12
1201(1
01(1 ) Water
Water Pu
Pump
mping
ing Syst
System
em 253
1202(1 ) Autom
Automati
atic
c Wa
Water
ter Sprin
Sprinkle
klerr Syste
System
m 254
1202(2)a Fir
Fire
e Pump
Pump with co
comp
mplet
lete
e con
contro
troll and
and sta
stand
ndard
ard access
accessori
ories
es 255
1202(2)b Jockey
Jockey Pump
Pump wit
with
h comple
complete
te con
contro
troll an
and
d standa
standard
rd access
accessor
ories
ies 256
1202(3)a Sprinkle
Sprinklerr Head
Head,, u
uprig
pright/p
ht/pend
endent/w
ent/wall
all 257
12
1202
02(3
(3)b
)b Alar
Alarm
m Chec
Check
k Valv
Valve
e 258
1202(3
(3))c Flow
low Meter
ter 259
21 Summar
Summary
y Tab
Table
le of Item
Items
s of Wo
Work
rk and Desc
Descrip
riptio
tion
n
ITEM
ITEM NO
NO.. DESC
DESCRI
RIPT
PTIO
ION
N PAGE
PAGE NO
NO..
12
1202
02(3
(3)e
)e Pr
Pres
essu
sure
re Ga
Gaug
uge
e 261
1202(3)g Floor
Floor Cont
Control
rol Valve
Valve 263
_ 1202(3)h1
1202(3)h1 Inspector
Inspector Test
Test Valve
Valve 264
12
1202
02(3
(3)h
)h2
2 In
Insp
spec
ecto
torr Test
Test C
Con
onne
nect
ctio
ion
n 265
1202(4) 25 mm 0 - 50 mm 0 Bl
Black
ack Iron
Iron (B.I.)
(B.I.) Pipe
Pipe 266
12
1202
02(1
(10)
0) Fi
Fire
re Hose
Hose Va
Valv
lve
e siam
siames
es 150 mm 0 x 2 w x 65 mm 0 with cap
150 269
12
1202
02(1
(12)
2) Fi
Fire
re Ex
Exti
ting
ngui
uish
sher
er 271
f
22 Summ
Summar
ary
y Ta
Tabl
ble
e of Ite
Items
ms of W
Wor
ork
k and
and Desc
Descri
ript
ptio
ion
n
DETAIL
DETAILED
ED UNIT
UNIT PRICE ANALYS
ANALYSIS
IS (DU
(DUPA)
PA)
Item No./Description 80
800(
0(1)
1) Clea
Cleari
ring
ng an
and
d Gr
Grub
ubbi
bing
ng
2
Unit of Measuremen
Measurementt m
2
Output
Output per hour
hour 50
500.
0.00
00 m
A. Labor
a. Const
Construc
ructio
tion
n Forema
Foreman
n 1 1.00 Labor Rates are variable per Region/District
b. Unskilled Laborer 2 1.00 based
based on minimu
minimumm wage as approved
approved by
Sub
Sub - T
Tot
otal
al fo
forr A
Name
Name and Capaci
Capacity
ty No of Unitls No. of HourIs Hourly Rate Amount (P h P )
B. Equipment
3
a. Dum
Dumpt
ptru
ruck
ck (1
(12
2 yd ) 2 1.00 See lates
latestt AGEL rental
rental rates
rates..
d
b. Pay
Paylo
load
ader
er (1
(1.5
.50
0 m ) 1 1.00
c. Bulldo
Bulldozer
zer (155
(155 hp)
hp),, D65A-8
D65A-8 1 1.00
Note:
Assumed hauling distance is 3 km. If actual
hauling distance
hauling distance is short
shorter
er or longer
longer than 3 km, the time
of dump truck will be adjusted
adjusted accordin
accordingly
gly base
based
d on the
Based on assumed
assumed 150 mm
mm cut all throughout. A
corr
correspo
esponding
nding adju
adjustmen
stmentt in the output
output shal
shalll be
computed
compu ted based
based on the actual field requireme
requirements
nts .
.J
Sub
Sub - Tot
Total
al fo
forr B
C. Total (A + B)
2
D. Outp
Output per Hour =
ut per 500.
500.00
00 m
E. Dir
Direct
ect Unit
Unit Cost (C + D)
F. Mater
Materials
ials
Sub
Sub - Tot
Total
al fo
forr F
G. D
Dir
irec
ectt Un
Unit
it Co
Cost
st (E + F)
H. Overhead,
Overhead, Conti
Contingencies & Miscel
ngencies Miscellan
laneou
eous
s (OCM)
(OCM) Expens
Expenses
es 15%/12%/10%/8% of G
I. Co
Contr
ntract
actor'
or's
s Profit
Profit (CP) 10%/
10%/8%
8% of G
J. Value
Value Added
Added Tax (VAT
(VAT)) 5% of (G + H + I)
K. Tota
Totall Unit
Unit Cos
Costt (G + H + I + J)
23 Part A - Earth
Earthwork
works
s
DETAILE
DETAILED
D UNI
UNIT
T PRICE
PRICE ANAL
ANALYSI
YSIS
S (DUPA)
(DUPA)
A. labor
See d~rivation
d~rivations
s for Item Nos. 800(1),
800(1), 800(3
800(3)) and 800(4)
B. Equipment
See derivati
derivations
ons for Item Nos. 800(
800(1),
1), 800
800(3)
(3) and 800(4)
800(4)
f
F. Materials
Materials
See derivati
derivations
ons for Item Nos. 800(1),
800(1), 80
800(3)
0(3) and
and 800(4)
24 Part A - Earth
Earthwork
works
s
DETAILE
DETAILED
D UNI
UNIT
T PRICE
PRICE ANAL
ANALYSIS
YSIS (DUPA)
(DUPA)
A. Labor
a. Construction Foreman 1 0.33 Labor Rates are variable per RegioniDistrict
b. Skilled
Skilled Laborer
Laborer 1 0.33 based
based on minimu
minimumm wage
wage as
as approved
approved by
c. Unskill
Unskilled
ed Labo
Laborer
rer 2 0.
0.33 DOLE. Refer to
to the Schedule of Labor Rates.
Sub
Sub - T
Tot
otal
al fo
forr A
Name
Name and Capac
Capacity
ity No of Unitls No. of Houris Hourly Rate Amoun
Amountt (PhP
(PhP))
B. Equipment
3
a. Back
Backho
hoe
e (0
(0.8
.80
0 m ) 1 0.25 See lates
latestt ACEL rental
rental rates
rates..
b. Dumptr
Dumptruck
uck (12 yd3) 1 0.17
c. Chain
Chain Saw 1 0.17
Minor
Minor Tools
Tools (5% of Labor
Labor Cost)
Cost)
Note:
Add Boom Truck if necessary for trimming in urban
areas
areas.
.J
Sub
Sub - Tot
Total
al fo
forr B
C. Total (A + B)
D. Outp
Output
ut per
per Ho
Hour
ur =
1.00
1.00 ea
E. Dir
Direc
ectt Unit Costt (C + D)
Unit Cos
F. Materi
Materials
als
a. Rope
Rope,, 1" 0-
0- 5 uses
uses m 20.00 Prices
Prices of materials
materials are variable
variable per Regio
Regionl
nl
District
District based
based on the pre
prevaili
vailing
ng unit pprices
rices in
the locality
locality which include
include paymen
paymentt of local
local
taxes and hauling
hauling cost to the proje
project
ct site.
Refer to the Construction
Construction Material
Material Price Data
establish
esta blished
ed quar
quarterly
terly by Central
Central Office
Office Price
Monitoring Committee.
Sub
Sub - Tot
Total
al fo
forr F
G. Dir
Direct
ect Unit
Unit Cos
Costt (E + F)
H. Overhe
Overhead,
ad, Contin
Contingen
gencie
cies
s & Miscel
Miscellan
laneou
eous
s (OCM
(OCM)) Expens
Expenses
es 15%/12%/10%/8% of G
I. Contr
Contract
actor'
or's
s Pro
Profit
fit (CP) 10%1 8%
10%1 8% o f G
J. Va
Value
lue Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. T
Tota
otall Unit
Unit Cost
Cost (G + H + I + J)
25 Part A - Earthwor
Earthworks
ks
DETAILE
DETAILED
D UNI
UNIT
T PRICE
PRICE ANAL
ANALYSI
YSIS
S (DUPA)
(DUPA)
A. Labor
a. Construction Foreman 1 0.67 Labor Rates are variable per RegionlDistrict
b. SkiUed Laborer
Laborer 1 0.67 base
based
d on minim
minimum
um wage
wage as
as approved
approved by
c. Unskill
Unskilled
ed Labore
Laborer
r 2 0
0..67 DOLE. Refer to the Schedule
Schedule of Labor
Labor Rates
Rates..
Sub
Sub - Tot
Total
al fo
forr A
Name
Name and Capaci
Capacity
ty No of Unitls No. of HourIs Hourly
Hourly Rate
Rate Amoun
Amountt (PhP
(PhP))
B. Equipment
a. Bac
Backh
khoe
oe (0
(0.80 m3)
.80 1 0.50 See latest
latest ACEL renta
rentall rates.
rates.
b. Dump
Dumptru
truck
ck yd3)
(12 yd 1 0.33
c. Chain
Chain Saw 1 0.33
Minor
Minor Tools
Tools (5% of Labor
Labor Cost)
Cost)
Note:
Add Boom Truck if necessary for trimming in urban
areas
areas.
.J
Sub
Sub - T
Tot
otal
al fo
forr B
C. Total (A + B)
D. Output per Hour - 1.00 ea
E. Direct Unit Cost (C + D)
Direct Unit
F. Materials
Sub
Sub - Tot
Total
al fo
forr F
G. Dir
Direc
ectt Unit
Unit Cost
Cost (E + F)
F)
H. Overhe
Overhead,
ad, Contin
Contingen
gencie
cies
s & Miscel
Miscellan
laneou
eous
s (OCM
(OCM)) Exp
Expens
enses
es 15%/12%/10%/8% ofG
I. C
Cont
ontrac
ractor
tor's
's Profit
Profit (CP) 10%/
10%/8%
8% ofG
ofG
J. Value
Value Added
Added TaTax
x (VAT) 5% of (G + H + I )
K. Total
Total Unit
Unit Cost
Cost (G + H + I + J)
26 Part A - Earthwork
Earthworkss
DETAILE
DETAILED
D UNI
UNIT
T PRICE ANALYS
ANALYSIS
IS (DU
(DUPA)
PA)
Item No.lDescription 80
800(
0(3)
3)c
c In
Indi
divi
vidu
dual
al Re
Remo
mova
vall of Tr
Tree
ees
s (S
(Sma
mall
ll c, abov
above 500 mm 0 up to 750 mm 0)
e 500
Unit of Measureme
Measurement
nt ea
Output
Output per hour
hour 1.0
1.00
0 ea
A. labor
a. Construction Foreman 1 3.33 Labor Rates are variable per RegionlDistrict
b. S killed laborer 1 3.33 based
based on minimu
minimum m wage a s approved
approved by
c. Unskilled laborer 2 3.33 DOLE. Refer to
to the Schedule of Labor Rates.
Sub
Sub - To
Tota
tall fo
forr A
Name
Name and Capaci
Capacity
ty No of Unitls No. of HourIs Hourly Rate Amou
Amount
nt (PhP
(PhP))
B. Equipment
a. Bac
Backh
khoe
oe (0
(0.80 m3)
.80 1 2.50 See lates
latestt ACEL rental
rental rates
rates..
3
b. Dum
Dumpt
ptru
ruck
ck (1
(12
2 yd ) 1 1.67
c. Chain
Chain Saw 1 1.67
Mino
Minorr To
Tool
ols
s (5
(5%
% of lab
labor
or Cost
Cost))
Note:
Add Boom Truck if necessary
necessary for trimming
trimming in urban
areas
areas.
.J
Sub
Sub - T
Tot
otal
al fo
forr B
C. To
Tota
tall (A + B)
D. Output
Output per Ho
Hour
ur =
1.0
1.00
0 ea
E. Dire
Direct
ct Unit
Unit Cost
Cost (C + D)
F. Mater
Materials
ials
Sub
Sub - T
Tot
otal
al fo
forr F
G. Di
Dire
rect
ct Un
Unit
it Cost
Cost (E + F)
F)
H. Overh
Overhead,
ead, Contingencies & Miscel
Contingencies Miscellan
laneou
eous
s (OCM)
(OCM) Expens
Expenses
es 15%/12%/10%/8% of G
I. Cont
Contrac
ractor
tor's
's Profit
Profit (CP) 10%1 8%
10%1 8% o f G
J. Value
Value Add
Added
ed Tax (VAT
(VAT)) 5% of (G + H + I)
K. Tota
Totall Unit
Unit Cos
Costt (G + H + I + J)
27 Part A - Earthwor
Earthworks
ks
DETAIL
DETAILED
ED UNIT
UNIT PRICE ANALYS
ANALYSIS
IS (DU
(DUPA)
PA)
A. Labor
a. Construction
Construction Forema
Foreman
n 1 6.67 Labor Rates are variable per Region/District
b. Skilled Labor
Laborer
er 1 6.67 based
based on minim
minimum
um wage as approved
wage as approved by
c. Unskilled Laborer DOLE. Refer to the Schedule
Schedule of Labor
Labor Rates
Rates..
2 6
6..67
B. Equipment
Note:
Add Boom Truck if necessary for trimming in urban
areas.
f
F. Materials
Materials
.
a. Rope, 1" 0- 5 uses m 20.00 Prices
Prices of materials
materials are varia
variable
ble per Regio
Region/ n/
District
District based
based on the prev
prevailin
ailing
g unit p prices
rices in
the locality
locality which include
include payment of local local
taxes
taxe s and hauling
hauling cost to the proje
projectct site
site..
Refer to the Construct
Construction
ion Mater
Materialial Price Data
establish
esta blished
ed quart
quarterly
erly by Central Office Price
Monitoring Committee.
28 Part A - Earth
Earthwork
works
s
DETAIL
DETAILED
ED UNIT
UNIT PRICE
PRICE ANALY
ANALYSIS
SIS (DU
(DUPA)
PA)
A. Labor
a. Construction Foreman 1 8.33 Labor Rates are variable per Region/District
b. SkiUed Laborer 1 8.33 based
based on minimu
minimumm wage
wage as
as approved
approved by
c. Unskilled Laborer 2 8.33 DOLE. Refer to the Schedule
Schedule of Labor
Labor Rates
Rates..
Sub
Sub - T
Tot
otal
al fo
forr A
Name
Name and Cap
Capaci
acity
ty No of Unitls No. of HourIs Hourly Rate Amoun
Amountt (PhP)
(PhP)
B. Equipment
3
a. Bac
Backh
khoe
oe (0
(0.8
.80
0 m ) 1 6.25 See lates
latestt ACEL rental
rental rates
rates..
3
b. Dum
Dumptr
ptruck
uck (12 yd ) 1 4.16
c. Chain
Chain Saw 1 4.16
Minor
Minor Too
Tools
ls (5% of Labor
Labor Cost)
Cost)
Note:
Add Boom Truck if necessary for trimming in urban
areas
areas.
.
J
Sub
Sub - T
Tot
otal
al fo
forr B
C. Total (A + B)
D. Outpu
Outputt per Hour
Hour =
1.0
1.00
0 ea
E. Di
Dire
rect
ct Unit
Unit Cost (C + D)
F. Mater
Materials
ials
a. Rope
Rope,, 1"
1" (11- 5 uses m 20.00 Prices
Prices of materials
materials are variable
variable per Regio
Region/
n/
District based
District based on the prev
prevailin
ailing
g unit pprices
rices in
the locality
locality which include
include payment of local
taxes and hauling
hauling cost to the proje
project
ct site.
Refer to the Cons
Construct
truction
ion Mater
Material
ial Price Data
establishe
estab lished
d quar
quarterly
terly by Central
Central Office
Office Price
Monitoring Committee.
Sub
Sub - Tot
Total
al fo
forr F
G. Dir
Direct
ect Unit
Unit Cost
Cost (E + F)
H. Ove
Overhe
rhead,
ad, Contin
Contingen
gencie
cies
s & Miscel
Miscellan
laneou
eous
s (OC
(OCM)
M) Expens
Expenses
es 15%/12%/10%/8% ofG
I. C
Cont
ontrac
ractor
tor's
's Profit
Profit (CP) 10%/8% of G
J. Value
Value Added
Added Ta
Tax
x (VAT) 5% of (G + H + I)
K. T
Tota
otall Unit
Unit Cos
Costt (G + H + I + J)
No
Note
te:: Th
The
e pres
presen
ente
ted
d DU
DUPA
PA is bas
based
ed on a one
one (1) gang
gang of lab
labor
or an
and
d eq
equi
uipm
pmen
entt with
with the speci
specifi
fied
ed outp
output
ut of 1.00
1.00 ea for
for 8.33h
8.33h..
To increa
increase
se the outpu
output,
t, add
additi
itiona
onall equ
equipm
ipment
ent and labor
labor may be add
added.
ed.
29 Part A - Earth
Earthwork
works
s
DETAIL
DETAILED
ED UNIT
UNIT PRIC
PRICE
E ANALY
ANALYSIS
SIS (DU
(DUPA)
PA)
A. Labor
B. Equipment
.J
F. Materials
Materials
30 Part A - Earth
Earthwork
works
s
DETAIL
DETAILED
ED UNI
UNIT
T PRIC
PRICE
E ANALY
ANALYSIS
SIS (DU
(DUPA)
PA)
Item No./Description 80
803(
3(1)
1)b
b St
Stru
ruct
ctur
ure
e Exca
Excava
vati
tion
on (So
(Soft
ft Ro
Rock
ck))
3
Unit of Measureme
Measurement
nt m
3
Output
Output per hou
hour
r 14.
14.00
00 m
A. Labor
Sub
Sub - T
Tot
otal
al fo
forr A
Name
Name and Capaci
Capacity
ty No of Uni
Unitls
tls No. of HourIs Hourly Rate Amoun
Amountt (PhP
(PhP))
B. Equipment
3
a. Dump
Dump Tr
Truc
uck
k (1
(12
2 yd ) 2 1.00 See latest
latest AGEL renta
rentall rates.
rates.
3
b. Ba
Back
ckho
hoe
e (0
(0.8
.80
0 m ) 1 0.50
c. Ba
Back
ckho
hoe
e wi
with
th Break
Breaker
er (0
(0.8
.80
0 m3) 1 0.50
Minor
Minor Tools
Tools (10%
(10% of La
Labor
bor Cost)
Cost)
.J
Sub
Sub - T
Tot
otal
al fo
forr B
C. Total (A + B)
3
D. Ou
Outp
tput
ut per Hour
per Hour = 14.0
14.00
0 m
E. Di
Dire
rect
ct Unit Cost (C + D)
Unit Cost
F. Mater
Materials
ials
G. Di
Dire
rect
ct Un
Unit
it Cost
Cost (E + F)
F)
H. Overhead,
Overhead, Conti
Contingencies & Miscel
ngencies Miscellan
laneou
eous
s (OCM)
(OCM) Exp
Expens
enses
es 15%/12%/10%/8% of G
I. Contr
Contract
actor'
or's
s Profit
Profit (CP) 10%1 8 % of G
10%1
J. Value Added Tax (VAT) 5% of (G + H + I)
K. Total Unit Cost (G + H + I + J)
31 Part A - Earthw
Earthworks
orks
DETAIL
DETAILED
ED UNIT
UNIT PRICE
PRICE ANAL
ANALYSI
YSIS
S (DUPA)
(DUPA)
A. Labor
B. Equipment
.J
F. Materials
Materials
DETAILE
DETAILED
D UNI
UNIT
T PRICE
PRICE ANAL
ANALYSI
YSIS
S (DUPA)
(DUPA)
Item No.lDescription 80
803(
3(2)
2) Trimm
Trimmin
ing
g Wo
Work
rks
s
2
Unit of Measurement m
2
Output per hour 5.00 m
A. Labor
B. Equipment
.J
F. Mater
Materials
ials
33 Part A - Earthw
Earthworks
orks
DETAIL
DETAILED
ED UNIT
UNIT PRIC
PRICE
E ANALY
ANALYSIS
SIS (DU
(DUPA)
PA)
A. Labor
Sub
Sub - To
Tota
tall fo
forr A
Name
Name and Capaci
Capacity
ty No of Unitls No. of HourIs Hourly Rate Amount (P hP)
B. Equipment
.J
Sub
Sub - T
Tot
otal
al fo
forr B
C. To
Tota
tall (A + B)
D. Output per Hour =
Output
E. Di
Dire
rect
ct Un
Unit
it Cost
Cost (C + D )
F. Materials
G. D
Dir
irec
ectt Unit
Unit Co
Cost
st (E + F)
H. Overhe
Overhead,
ad, Contin
Contingen
gencie
cies
s & Miscel
Miscellan
laneou
eous
s (OC
(OCM)
M) Expens
Expenses
es 15%/12%/10%/8% of G
I. Co
Contr
ntract
actor'
or's Profit
Profit (CP) 10%1 8%
10%1 8% o f G
J. Va
Value
lue Added
Added Tax (VAT(VAT)) 5% of (G + H + I)
K. Total
Total Unit
Unit Cost
Cost (G + H + I + J)
No
Note
te:: Th
This
is It
Item
em shall
shall de
depe
pend
nd on the
the meth
method
od re
reco
comme
mmend
nded
ed by th
the
e desig
designe
ner.
r. At
Atta
tach
ch at leas
leastt 3 quo
quota
tati
tion
ons
s fr
from
om sp
spec
ecia
ialt
lty
y
contractor.
34 Part A - Earth
Earthwork
works
s
DETA
DETAIL
ILED
ED UNIT
UNIT PRI
PRICE
CE ANAL
ANALYS
YSIS
IS (DUP
(DUPA)
A)
A. labor
Sub
Sub - T
Tot
otal
al fo
forr A
Name
Name and Cap
Capaci
acity
ty No of Unitls No. of HourIs Hourly Rate Amoun
Amountt (PhP)
(PhP)
B. Equipment
a. Plat
Plate
e Co
Comp
mpac
acto
torr (5 hp
hp)) 1 0.75 See lates
latestt AGEL rental
rental rates.
rates.
3
b. Bac
Backh
khoe
oe (0
(0.8
.80
0 m ) 1 0.75
Mino
Minorr To
Tool
ols
s (1
(10%
0% of llab
abor
or Co
Cost
st))
.J
Sub
Sub - Tot
Total
al fo
forr B
C. Total
Total (A + B)
D. Outp
Output 9.84 m3
ut per Hour = 9.84
E. Dire
Direct
ct Unit
Unit Cos
Costt (C + D)
F. Materi
Materials
als
G. Dir
Direct
ect Unit
Unit Cos
Costt (E + F)
H. Overhead,
Overhead, Contingencies & Miscel
Contingencies Miscellan
laneou
eous
s (OCM)
(OCM) Expens
Expenses
es 15%/12%/10%/8% of G
I. Co
Cont
ntra
ract
ctor
or's
's Pr
Prof
ofit
it (CP) 10%/
10%/8%
8% ofG
ofG
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. T
Tota
otall Unit
Unit Cost
Cost (G + H + I + J)
35 Part A Earth
Earthwork
works
s
DETAILE
DETAILED
D UNI
UNIT
T PRICE
PRICE ANAL
ANALYSI
YSIS
S (DUPA)
(DUPA)
A. Labor
B. Equipment
f
F. Materials
Prices
Price s of materials
materials are variable per Region!
a. Embankment
Embankment Materials
Materials m3 1.25 District
District based
based on the prev
prevailin
ailing
g unit prices
prices in
(wI 25%
25% Shrinkage Factor)
Factor) the loca
locality
lity which inclu
include
de payme
payment nt of local
local
taxes
taxe s and hauling
hauling cost to the projec
projectt site.
Refer to the Construct
Construction
ion Mater
Material
ial Price Data
establish
esta blished
ed quar
quarterly
terly by Central
Central Office
Office Price
Monitoring Committee.
Part A - Earth
Earthwork
works
s
36
DETAILE
DETAILED
D UNI
UNIT
T PRICE AN
ANALY
ALYSIS
SIS (DUPA)
(DUPA)
Output
Output per hour
hour 1.20 m3
1.20
A. Labor
Sub
Sub - To
Tota
tall fo
forr A
Name
Name and Cap
Capaci
acity
ty No of Unitls No. of HourIs Hourly
Hourly Rate
Rate Amoun
Amountt (P
(PhP
hP))
B. Equipment
a. Plate Compactor
Compactor 1 0.50 See latest
latest ACEL renta
rentall rates
rates..
Minor
Minor Too
Tools
ls (10%
(10% of Labor
Labor Cost)
Cost)
.J
Sub
Sub - T
Tot
otal
al fo
forr B
C. Total (A + B )
3
D. Ou
Outp
tput per Hour
ut per = 1.20
1.20 m
E. Direct
Direct Unit
Unit Cost (C + D)
F. Mater
Materials
ials
Prices of materials
materials are vari
variable
able per Region/
Region/
a. Grav
Gravel
el Beddin
Bedding
g (G1)
(G1) m3 1.05 District
District based
based on the prev prevailin
ailing
g unit prices
prices iinn
(wI
(wI 5%
5% Shrinkag
Shrinkage
e Fac
Factor
tor)) the locality which include payment of local
local
taxes and hauling
hauling cost to the pro
project
ject site.
Refer to the ConsConstruct
truction
ion Mater
Material
ial Price Data
establishe
estab lished d quar
quarterly
terly by Central
Central Office
Office Price
Monitoring Committee.
G. D
Dir
irec
ectt Un
Unit
it Cost
Cost (E + F)
H. Overhe
Overhead,
ad, Con
Contin
tingen
gencie
cies
s & Miscel
Miscellan
laneou
eous
s (OC
(OCM)
M) Expens
Expenses
es 15%/12%/10%/8% of G
I. C
Cont
ontrac
ractor
tor's
's Pro
Profit
fit (CP) 10%/8% of G
J. Value
Value Added
Added Tax (VAT(VAT)) 5 % of ( G + H + I)
K. To
Total
tal Unit
Unit Cost
Cost ( G + H + I + J)
37 Part A - Earth
Earthwork
works
s
DETAILE
DETAILED
D UNI
UNIT
T PRICE
PRICE ANAL
ANALYSI
YSIS
S (DUPA)
(DUPA)
A. labor
Sub
Sub - Tot
Total
al fo
forr A
.
Name
Name and Capaci
Capacity
ty No of Unitls No. of HourIs Hourly
Hourly Rate
Rate Amoun
Amountt (PhP
(PhP))
B. Equipment
a. Concre
Concrete
te Vibrat
Vibrator
or 2 1
1..00 See lates
latestt ACEL rental
rental rates
rates..
b. Pumpcrete
Pumpcrete 1 0.27
Mino
Minorr To
Tool
ols
s (1
(10%
0% of lab
labor
or Co
Cost
st))
f
Sub
Sub - T
Tot
otal
al fo
forr B
C. Total (A + B)
Total
D. Ou
Outp
tput
ut per Hour =
per Hour 3.72 m3
3.72
E. D
Dire
irect
ct Unit
Unit Cost (C + D)
F. Materials
a. Ready
Ready Mix,
Mix, Class
Class AAlClass B/Class C/Class P, 7
AAlClass Prices
Price s of materials
materials are variable
variable per Regio
Regionl
nl
3
days/14
days/14 daysl 28 days m 1.05 District
District based
based on the prev
prevailin
ailing
g unit
unit prices
prices in
the locality
locality which include
include payment of local
taxes
taxe s and hauling
hauling cost to the projec
projectt site.
Refer to the Construction
Construction Material
Material Price Data
establish
esta blished
ed quar
quarterly
terly by Central
Central Office
Office Price
Monitoring Committee.
Sub
Sub - T
Tot
otal
al fo
forr F
G. Dir
Direct
ect Unit Cost (E + F)
Unit Cost
H. Ove
Overhe
rhead,
ad, Contin
Contingen
gencie
cies
s & Miscel
Miscellan
laneou
eous
s (OCM
(OCM)) Exp
Expens
enses
es 15%/12%/10%/8% of G
I. Co
Contr
ntract
actor'
or's
s Profit
Profit (CP) 10%/8% ofG
J. Value
Value Added
Added Tax (VA (VAT)
T) 5% of (G + H + I)
K. T
Tota
otall Unit
Unit Cost
Cost (G + H + I + J)
Note:
Note: 1. Thi
This
s cos
costt she
sheet
et shall
shall be used
used for concr
concrete
ete pou
pourin
ring
g by pump
pumpcre
crete.
te. Item
Item Nos.
Nos. 900(1
900(1 )a1,
)a1, 900(
900(1
1 ))b1,
b1, 90
900(1
0(1 )c1,
)c1, 900(
900(2)a
2)a,,
900(2)
900(2)b,
b, 900(2)
900(2)c,
c, 900(3)
900(3)a,
a, 900
900(3)
(3)b,
b, 900
900(3)
(3)c,
c, 900
900(4)
(4)a,
a, 900
900(4)
(4)b,
b, 900
900(4)
(4)c,
c, 900(5)
900(5) and 900(6
900(6)) sha
shall
ll used thi
this
s cost sheet
sheet..
38 Part
Part B - Plai
Plain
n and
and Rein
Reinfo
forc
rced
ed Conc
Concre
rete
te Work
Works
s
DETAILE
DETAILED
D UNI
UNIT
T PRICE
PRICE ANAL
ANALYSIS
YSIS (DUPA)
(DUPA)
A. Labor
Sub
Sub - To
Tota
tall fo
forr A
Name
Name and Capaci
Capacity
ty No of Unitls No. of HourIs Hourly Rate Amoun
Amountt (PhP
(PhP))
B. Equipment
.f
Sub
Sub - Tot
Total
al fo
forr B
C. Total (A + B)
r =
3
D. Output
Output per Hou
Hour 3.32
3.32 m
E. D
Dire
irect
ct Unit
Unit Cost (C + D)
F. Mater
Materials
ials
a. Read
Ready
y Mix
Mix Concr
Concret
ete,
e, 7 days/14 days 3
1.05 Prices of material
materials
s are variable
variable per Regio
Region/ n/
m
District based
District based on the prevaprevailing
iling unit prices
prices in
the locality which include payment
payment of local
local
taxes
taxes and hauling
hauling cost to the proje
project
ct site
site..
Refer to the Construction
Construction Material
Material Price Data
establish
established
ed quart
quarterly
erly by Central
Central Office
Office Price
Monitoring Committee.
Sub
Sub - To
Tota
tall F
G. D
Dir
irec
ectt Un
Unit
it Cost (E + F)
H. Overhe
Overhead,
ad, Contin
Contingen
gencie
cies
s & Miscel
Miscellan
laneou
eous
s (OC
(OCM)
M) Expens
Expenses
es 15%/12%/10%/8% of G
I. C
Cont
ontrac
ractor
tor's
's Profit
Profit (CP) 10%/8% ofG
J. Va
Value
lue Added
Added Tax (VAT)
(VAT) 5 % o f ( G + H + I)
K. Tota
Totall Unit
Unit Cost
Cost (G + H + I + J)
No
Note
te:: 1. Th
This
is cost
cost sheet
sheet shal
shalll be use
used
d fo
forr concr
concret
etin
ing
g fo
foot
otin
ings
gs an
and
d slab on fi
fill
ll by usin
using
g read
ready
y mix
mix co
conc
ncre
rete
te and
and manu
manual
al pour
pourin
ing
g of
con
concre
crete
te applic
applicabl
able
e for Item
Item Nos.
Nos. 900
900(1
(1 ))b2
b2 and
and 900(1
900(1 )c2.
)c2.
39 Part
Part B - Plai
Plain
n and
and Rein
Reinfo
forc
rced
ed Conc
Concre
rete
te Work
Works
s
DETAIL
DETAILED
ED UNIT
UNIT PRICE ANA
ANALYSI
LYSIS
S (DUPA)
(DUPA)
A. Labor
B. Equipment
a. Concrete Vibrat
Vibrator
or 2 1.00 See latest
latest ACEL rental
rental rate
rates.
s.
Minor Tools (10% of Labor Cost)
,J
F. Mater
Materials
ials
Sub - Total F
G. Direct Unit Cost (E + F)
H. Overhe
Overhead,
ad, Conti
Contingenc
ngencies
ies & Miscellaneous
Miscellaneous (OCM) Expens
Expenses
es 15%/12%/10%/8% of G
I. Contractor's
Contractor's Profit (CP) 10%/8% of G
J. Value Added Tax (VAT) 5% of (G + H + I)
K. Total Unit Cost (G + H + I + J)
Note: 1. This cost shee
sheett shall be used for
for concreti
concreting
ng footing
footing tie beam, colu
column,
mn, sus
suspende
pended d slab, girderlbea
girderlbeam
m by using
using ready mix
mix
concrete
concre te and manua
manuall pourin
pouring
g of concrete applic
applicable
able for Item Nos. 900(1)a3
900(1)a3,, 900(1)a4, 900
900(1)a5,
(1)a5, 900
900(1)a6,
(1)a6, 900(1)b3,
DETAIL
DETAILED
ED UNIT
UNIT PRICE ANAL
ANALYSIS
YSIS (DUPA)
(DUPA)
Item No./Description 90
900(
0(1
1 )c2
)c2 St
Stru
ruct
ctur
ural
al Co
Conc
ncre
rete
te fo
forr Footin
Footing
g an
and
d Sl
Slab
ab on Fill
Fill (C
(Cla
lass
ss A, 28 days
days))
3
Unit of Measuremen
Measurementt m
3
Output
Output per hour
hour 0.
0.35
357
7 m
A. labor
Sub
Sub - T
Tot
otal
al fo
forr A
Name
Name and Cap
Capaci
acity
ty No of Unitls No. of Houris Hourly Rate A mount (P hP)
B. Equipment
a. One
One Bagger
Bagger Mixer
Mixer 1 1
1..00 See latest
latest ACEL renta
rentall rates.
rates.
Mino
Minorr To
Tool
ols
s (1
(10%
0% of labo
laborr Cost
Cost))
r
Sub
Sub - Tot
Total
al fo
forr B 0.00
C. Total (A + B) 0.00
3
D. Outp
Output per Hour =
ut per 0.35
0.357
7 m
E. Dire
Direct
ct Unit
Unit Cos
Costt (C + D)
F. Materials
a. Gravel
Gravel 3 Prices
Prices of materials
materials are variable
variable per Regio
Region/
n/
m 1.00
District based
District based on the preprevaili
vailing
ng unit pr
prices
ices in
b.Sand m3 0.50 the locality
locality which include
include paymen
paymentt of local
c. Portla
Portland
nd Cement
Cement bags 9.10 taxes and haulhauling
ing cost to the project
project site.
Refer to the Construction
Construction Material
Material Price Data
establish
esta blisheded quar
quarterly
terly by Central
Central Office
Office Price
Monitoring Committee.
Sub
Sub - Tot
Total
al fo
forr F
G. D
Dir
irec
ectt Un
Unit
it Cost
Cost (E + F)
H. Overhe
Overhead,
ad, Contin
Contingen
gencie
cies
s & Miscel
Miscellan
laneou
eous
s (OCM
(OCM)) Expens
Expenses
es 15%/12%/10%/8% of G
I. C
Cont
ontrac
ractor
tor's
's Pro
Profit
fit (CP) 10%1 8%
10%1 8% o f G
J. Value
Value Added
Added Tax (VAT
(VAT)) 5% o f ( G + H + I )
K. T
Tota
otall Unit
Unit Cost
Cost (G + H + I + J)
No
Note
te:: 1. Th
This
is cost
cost sheet
sheet shal
shalll be use
used
d fo
forr concr
concret
etin
ing
g fo
foot
otin
ings
gs an
and
d slab
slab on fil
filll by usi
using
ng manu
manual
al mixi
mixing
ng and
and manu
manual
al pour
pourin
ing
g of
concrete.
41 Part
Part B - Pl
Plain
ain and
and Rein
Reinfo
forc
rced
ed Conc
Concre
rete
te Wo
Works
rks
DETAILE
DETAILED
D UNI
UNIT
T PRICE
PRICE ANAL
ANALYSI
YSIS
S (DU
(DUPA)
PA)
Item No./Description 90
900(
0(1)
1) St
Stru
ruct
ctur
ural
al Co
Conc
ncre
rete
te fo
forr Foot
Footin
ing
g Tie
Tie Beam,
Beam, Colu
Column
mn,, Susp
Suspen
ende
ded
d Sl
Slab
ab,, Gird
Girder
er/B
/Bea
eam
m (Cla
(Class
ss A, 28
28 d
day
ays)
s)
Unit of Measuremen
Measurementt
Output
Output per hour
hour
A. labor
-
a. Const
Construc
ructio
tion
n Forema
Foreman
n 1 1.00 Labor Rates are variable per Region/District
based on minim
based minimum
um wage
wage as
as approved
approved by
b. Skilled
Skilled laborer
laborer 1 1.00 DOLE. Refer to the Schedule of Labor Rates.
b. Unskilled laborer 4 1.00
Sub
Sub - Tot
Total
al fo
forr A
Name
Name and Capaci
Capacity
ty No of Unitls No. of Hour/s Hourly Rate Amoun
Amountt (PhP
(PhP))
B. Equipment
J
Sub
Sub - T
Tot
otal
al fo
forr B .
C. Total (A + B)
D. Ou
Outp
tput
ut per
per Hour
Hour = 0.270 m3
0.270
E. Dire
Direct
ct Unit
Unit Cos
Costt (C + D)
F. Mater
Materials
ials
3 Prices of materials
materials are variable
variable per Region/
a. Gravel
Gravel m 1.00
District
District based
based on the prev prevaili
ailing
ng unit prices
prices in
3
b. Sand m 0.50 the locality which include payment
payment of local
local
c. Portlan
Portland
d Cement
Cement bags 9.
9.10 taxes
taxes and haul hauling
ing cost to the project
project site
site..
Refer to the Construct
Construction
ion Mater
Material
ial Price Data
establish
esta blished
ed quar
quarterly
terly by Central
Central Office Price
Monitoring Committee.
Sub
Sub - T
Tot
otal
al fo
forr F
G. D
Dir
irec
ectt Unit
Unit Co
Cost
st (E + F)
H. Overhe
Overhead,
ad, Contin
Contingen
gencie
cies
s & Miscel
Miscellan
laneou
eous
s (OCM
(OCM)) Exp
Expens
enses
es 15%/
15%/12
12%/
%/10
10%/
%/8%
8% of G
I. C
Cont
ontrac
ractor
tor's
's Profit
Profit (CP) 10%/
10%/ 8% of G
J. Value
Value Added
Added Ta Tax
x (VAT) 5% of (G + H + I )
K. To
Total
tal Unit
Unit Cost
Cost (G + H + I + J)
No
Note
te:: 1. Th
This
is co
cost
st sheet
sheet shal
shalll be use
used
d fo
forr conc
concre
reti
ting
ng fo
foot
otin
ing
g ti
tie
e beam,
beam, colu
column
mn,, su
susp
spen
ende
ded
d sl
slab
ab,, and
and gir
girde
der/
r/be
beam
am by us
usin
ing
g manu
manual
al
mixing
mixing and man
manual
ual pourin
pouring
g of co
concr
ncrete
ete app
applic
licabl
able
e for Item Nos. 900
900(1
(1 )c3,
)c3, 900(1
900(1 )c4
)c4,, 900(1 )c5 an
and
d 900(1
900(1 ))c6.
c6. Ideal
Ideally,
ly, thi
this
s
cos
costt she
sheet
et sha
shall
ll be used
used for one-s
one-stor
torey
ey to ttwo-
wo-sto
storey
rey bui
buildi
ldings
ngs inv
involv
olving
ing one to two s
span
pans
s in remote
remote areas.
areas.
42 Par
Partt B - P
Plai
lain
n an
and
d Reinf
Reinfor
orce
ced
d Conc
Concre
rete
te Wo
Works
rks
DETAILE
DETAILED
D UNI
UNIT
T PRICE
PRICE ANAL
ANALYSIS
YSIS (DUPA)
(DUPA)
Item No./Description 90
901(
1(1)
1) Le
Lean
an Con
Concr
cret
ete
e (Rea
(Ready
dy Mi
Mix,
x, 28 da
days
ys))
3
Unit of Measureme
Measurement
nt m
3
Output
Output per hour
hour 3.
3.72
72 m
A. Labor
Sub
Sub - Tot
Total
al fo
forr A
Name
Name and Capaci
Capacity
ty No of Unitls No. of HourIs Hourly Rate Amoun
Amountt (PhP
(PhP))
B. Equipment
.J
Sub
Sub - T
Tot
otal
al fo
forr B
C. Total (A + B)
3
D. Ou
Outp
tput
ut per Hour
per Hour = 3.72
3.72 m
E. D
Dire
irect
ct Unit
Unit Cost (C + D)
F. Mater
Materials
ials
a. Read
Ready
y Mix Conc
Concret
rete,
e, Lean
Lean Con
Concre
crete,
te, 28d
28days
ays 3
1.05 Prices
Prices of materials
materials are variable
variable per Regio
Region/ n/
m
District
District based
based on the prev
prevailin
ailing
g unit pr
prices
ices in
the locality
locality which include
include paymen
paymentt of local
taxes
taxe s and hauling
hauling cost to the proj
project
ect site.
site.
Refer to the Construction
Construction Material
Material Price Data
establish
esta blished
ed quart
quarterly
erly by Central
Central Office
Office Price
Monitoring Committee.
Sub
Sub - T
Tot
otal
al fo
forr F
G. Dir
Direct
ect Unit Cost (E + F)
Unit Cost
H. Overhe
Overhead,
ad, Contin
Contingen
gencie
cies
s & Miscel
Miscellan
laneou
eous
s (OC
(OCM)
M) Expens
Expenses
es 15%/12%/10%/8% of G
I. C
Cont
ontrac
ractor
tor's
's Profit
Profit (CP) 10%/8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. Total Unit Cost (G + H + I + J)
43 Part B - Plain and Reinforced C
Cooncrete W
Wo
orks
DETAILE
DETAILED
D UNI
UNIT
T PRICE
PRICE ANALY
ANALYSIS
SIS (DUPA)
(DUPA)
A. Labor
Sub
Sub - T
Tot
otal
al fo
forr A
Name
Name and Capaci
Capacity
ty No of Unitls
Unitls No. of HourIs
HourIs Hourly
Hourly Rate
Rate Amoun
Amountt (PhP
(PhP))
B. Equipment
J
E. Dir
Direct Unit Cost (C + D)
ect Unit
F. Mater
Materials
ials
Prices
Prices of materials
materials are vari
variable
able per Regio
Region/ n/
a. Gravel
Gravel m3 1.00
3
District based
District based on the preva
prevailing
iling unit prices
prices in
b.Sand m 0.50 the locality
locality which include
include payment of local
c. Portland Cement bags 6.00 taxes
taxes and hauling
hauling cost to the project
project site
site..
Refer to the Construct
Construction
ion Mater
Material
ial Price Data
establish
esta blished
ed quarterly
quarterly by Central
Central Office
Office Price
Monitoring Committee.
Sub
Sub - T
Tot
otal
al fo
forr F
G. D
Dir
irec
ectt Unit
Unit Co
Cost
st (E + F)
H. Overhea
Overhead,
d, Contin
Contingen
gencie
cies
s & Miscel
Miscellan
laneou
eous
s (OC
(OCM)
M) Expens
Expenses
es 15%/12%/10%/8% of G
I. Contr
Contract
actor'
or's Profit
Profit (CP) 10%/8% of G
J. Valu
Value
e Added
Added Tax (VAT
(VAT)) 5% of (G + H + I )
K. To
Total
tal Unit
Unit Cost
Cost ( G + H + I + J)
No
Note
te:: 1. Th
This
is cost
cost sheet
sheet shal
shalll be use
used
d fo
forr lean
lean conc
concre
rete
te by us
usin
ing
g manu
manual
al mixi
mixing
ng and
and manu
manual
al pour
pourin
ing
g of con
concr
cret
ete.
e.
44 Part
Part B - Plai
Plain
n and
and Rein
Reinfo
forc
rced
ed Conc
Concre
rete
te Work
Works
s
DETAIL
DETAILED
ED UNIT
UNIT PRICE AN
ANALY
ALYSIS
SIS (DU
(DUPA)
PA)
A. La bor
a. COr:!structi
COr:!struction
on Foreman
Foreman 1 1.00 Labor Rates are variable per RegionlDistrict
b. Skilled Laborer 3 1.00 base
based
d on minim
minimum
um wage
wage as
as approved
approved by
c. Unskill
Unskilled
ed Labore
Laborer
r 12 1.
1 .0 0 DOLE. Refer to the Schedule
Schedule of Labor
Labor Rates
Rates..
Sub
Sub - To
Tota
tall fo
forr A
Name
Name and Capaci
Capacity
ty No of Unit/s No. of HourIs Hourly Rate Amount (P h P )
B. Equipment
a. Bar Cutter
Cutter 1 0.50 See lates
latestt ACEL rental
rental rates.
rates.
b. Bar Bender
Bender 1 0.50
Minor
Minor Tools
Tools (10%
(10% of Labor
Labor Cost)
Cost)
.J
Sub
Sub - T
Tot
otal
al fo
forr B
C. Total (A + B)
D. Ou
Outp
tput per Hour
ut per = 143.43
143.438
8 kg
E. Di
Dire
rect
ct Un
Unit Cost (C + D)
it Cost
F. Materials
a. Deform
Deformed
ed Reinfo
Reinforci
rcing
ng Steel
Steel kg 1.00 Price
Pricess of materials
materials are variable
variable per Regio
Regionl
nl
District
District based on the prevailin
prevailing
g unit p
price
rices
s in
b. #16 Galv
Galvani
anized
zed Iron
Iron Wire kg 0.015 the locality
locality which include
include payment of loca
local l
c. Con
Consum
sumabl
ables
es (5% of
of Ma
Mater
terial
ials
s Cos
Cost)
t) taxe
taxes
s and haul
hauling
ing cost to the project
project site.
site.
Refer to the Construction
Construction Material
Material Price Data
establish
established
ed quart
quarterly
erly by Central
Central Office
Office Price
Monitoring Committee.
Sub
Sub - T
Tot
otal
al fo
forr F
G. Dir
Direc
ectt Unit
Unit Cos
Costt (E + F)
H. Overhead,
Overhead, Contingencies & Miscel
Contingencies Miscellan
laneou
eous
s (OCM)
(OCM) Expens
Expenses
es 15%/12%/10%/8% of G
I. C
Cont
ontrac
ractor
tor's
's Profit
Profit (CP) 10%/8% ofG
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. Total Unit Cost (G + H + I + J)
No
Note
te:: 1. Use
Use this cost
cost shee
sheett for
for It
Item
em No
Nos
s 90
902(
2(1
1 )a1
)a1 and 90
902(
2(1
1 )a2.
)a2.
45 Part
Part B - P
Plai
lain
n an
and
d Rein
Reinfo
force
rced
d Conc
Concre
rete
te Wo
Work
rks
s
DETAILE
DETAILED
D UNI
UNIT
T PRICE AN
ANALY
ALYSIS
SIS (DUPA)
(DUPA)
Item No./Description 90
902(
2( 1) Re
Rein
info
forc
rcin
ing
g St
Stee
eell of R
Rei
einf
nfor
orce
ced
d Co
Conc
ncre
rete
te St
Stru
ruct
ctur
ures
es for
for Two up
upto
to Five
Five Store
Storey
y
Unit of Measuremen
Measurementt kg
Output
Output per hour
hour 129
129.09
.094
4 kg
A. Labor
a. COllStructio
COllStruction
n Fore
Foreman
man 1 1.00 Labor Rates are variable per Region/District
b. Skilled
Skilled Laborer
Laborer 3 1.00 based
based on minim
minimum
um wage
wage as
as approved
approved by
DOLE. Refer to the Schedule
Schedule of Labor
Labor Rates
Rates..
c. Unskil
Unskilled
led Laborer
Laborer 12 1.
1 .0 0
Sub
Sub - T
Tot
otal
al fo
forr A
Name
Name and Cap
Capaci
acity
ty No of Unitls No. of HourIs Hourly
Hourly Rate
Rate Amou
Amount
nt (P
(PhP
hP))
B. Equipment
a. Bar Cutter
Cutter 1 0.50 See latest
latest ACEL rental
rental rate
rates.
s.
b. Bar Bender
Bender 1 0.50
Minor
Minor Tools
Tools (10%
(10% of Labor
Labor Cost)
Cost)
.J
Sub
Sub - T
Tot
otal
al fo
forr B
C. Total (A + B )
Total
D. Ou
Output p er
er Hour - 129.094 kg
E. Dir
Direct
ect Unit Cost (C + D)
Unit Cost
F. Materials
a. Deform
Deformed
ed Reinfo
Reinforci
rcing
ng Ste
Steel
el Prices
Prices of materials
materials are vari
variable
able per Region/
Region/
kg 1.00
District
District based
based on the prev
prevailin
ailing
g unit pprice
rices
s in
b. #16 Galv
Galvani
anized
zed Iron
Iron Wir
Wire
e kg 0.015 the loca
locality
lity which inclu
include
de payme
payment nt of local
local
c. Consum
Consumabl
ables
es (5% of Materi
Materials
als Cost)
Cost) taxes and hauling
hauling cost to the project
project site.
Refer to the Construct
Construction
ion Mater
Material
ial Price Data
establishe
estab lishedd quar
quarterly
terly by Central
Central Office
Office Price
Monitoring Committee.
Sub
Sub - T
Tot
otal
al for
for F
G. Dir
Direct
ect Unit Cost (E + F)
Unit Cost
H. Ove
Overhe
rhead,
ad, Contin
Contingen
gencie
cies
s & Miscel
Miscellan
laneou
eous
s (OC
(OCM)
M) Exp
Expens
enses
es 15%/
15%/12
12%/
%/10
10%/
%/8%
8% ofG
ofG
I. Co
Contr
ntract
actor'
or's
s Profit
Profit (CP) 10%/
10%/ 8% of G
J. Va
Value
lue Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. T
Tota
otall Unit
Unit Cos
Costt (G + H + I + J)
46 Part
Part B - P
Pla
lain
in and
and Rein
Reinfo
force
rced
d Concre
Concrete
te Wo
Works
rks
DETAILE
DETAILED
D UNI
UNIT
T PRICE
PRICE ANAL
ANALYSI
YSIS
S (DUPA)
(DUPA)
A. Labor
Installation
a. Construction Foreman 1 1 .0 0 Labor Rates are variable per Region/District
b. Skilled Laborer 4 1 .0 0 based
based on minimu
minimumm wage
wage as
as approved by
DOLE. Refer to the Schedu
Schedulele of Labor Rates.
c. Unskilled Laborer 6 1
1..00
Stripping
a. Construction
Construction Foreman
Foreman 1 0.56
b. Unskilled Laborer 6 0.56
Sub - Total for A
B. Equipment
Area = 205.01 m
2
F. Materials
Materials
Prices of materials
Prices materials are variable
variable per Regio
Regionl nl
District
District based
based on the prev
prevailin
ailing
g unit pr
prices
ices in
a. Phenolic Board (0.019 x 1.2 x 2.4) - 5 uses pc
pc 0.347 the locality
locality which include
include paym
paymentent of local
c. Good Lumber - 3 uses bd ft 4.727 taxes
taxes and hauling
hauling cost to the project
project site.
site.
Refer to the Construct
Construction
ion Mater
Material
ial Price Data
b. Consumable
Consumabless (5% of Materials Cost)
establish
esta blished
ed quar
quarterly
terly by Central
Central Office
Office Price
Monitoring Committee.
DETAIL
DETAILED
ED UNI
UNIT
T PRICE
PRICE ANALYS
ANALYSIS
IS (DU
(DUPA)
PA)
Designation No
No.. o f P e
err so
so n/
n/ s No.
No. o f Hou
Hou riris Hourly
Hourly Rate
Rate Amou
Amount
nt (PhP
(PhP))
A. Labor
-
Installation
a. Const
Construc
ructio
tion
n Forema
Foreman
n 1 1.00 Labor Rates are variable per Region/District
b. Skilled
Skilled Laborer
Laborer based
based on minimu
minimumm wage as approved by
2 1.00
DOLE. Refer to the Schedule
Schedule of Labor Rates.
c. Unskilled
Unskilled Laborer
Laborer 4 1
1..00
Stripping
a. Cons
Constru
tructi
ction
on For
Forema
eman
n 1 0.41
b. Unski
Unskilled
lled Laborer
Laborer 6 0.41
Sub
Sub - To
Tota
tall fo
forr A
Name
Name and Capaci
Capacity
ty Quantity No. of Dayls Daily Rental Rate Amount (P hP )
B. Equipment
Mino
Minorr To
Tool
ols
s (1
(10
0 % ofLab
ofLabor
or Co
Cost
st))
.J
Sub
Sub - T
Tot
otal
al fo
forr 6
C. Sub
Sub - Tot
Total
al for
for C (6 + Area)
D. Ou
Outp
tput per Hour
ut per = 3.24
3.24 m2
E. Dire
Direct
ct Unit Costt (A + D) + C
Unit Cos
F. Mater
Materials
ials
a. Ordin
Ordinary
ary Plywoo
Plywood
d - 3 uses
uses Prices
Prices of materials
materials are variable
variable per Regio
Region/ n/
pcs 0.347
District based
District based on the pre
prevaili
vailing
ng unit p
prices
rices in
b. Goo
Good
d Lumb
Lumber
er - 3 uses
uses bd ft 7.190 the locality
locality which include
include payment of local
c. Asso
Assort
rted
ed Comm
Common
on Wi
Wire
re Na
Nail
ils
s kg 0.21 taxes
taxes and hauling
hauling cost to the project
project site.
site.
d. Consum
Consumabl
ables
es (5% of
of Ma
Mater
terial
ials
s Cost)
Cost) Refer to the Construct
Construction
ion Mater
Material
ial Price Data
establish
esta blished
ed quar
quarterl
terly
y by Central
Central Office Price
Monitoring Committee.
Sub
Sub - T
Tot
otal
al fo
forr F
G. Di
Dire
rect
ct Un
Unit Cost (E + F)
it Cost
H. Ove
Overhe
rhead,
ad, Con
Contin
tingen
gencie
cies
s & Miscel
Miscellan
laneou
eous
s (OCM)
(OCM) Expens
Expenses
es 15%/
15%/12
12%/
%/10
10%/
%/8%
8% ofG
ofG
I. Co
Contr
ntract
actor'
or's
s Profit
Profit (CP) 10%/
10%/ 8% of G
J. Valu
Value
e Added
Added Tax (VAT
(VAT)) 5% of (G + H + I)
T
Tota
otall Unit
Unit Cost
Cost
K. (G + H + I + J)
No
Note
te:: 1. Th
This
is co
cost
st sheet
sheet anal
analys
ysis
is is on
only
ly ap
appl
plic
icab
able
le fo
forr Fo
Form
rmwo
work
rks
s an
and
d Fa
Fals
lsew
ewor
orks
ks co
cons
nsid
ider
erin
ing
g wood
wood scafscaffo fold
ldin
ings
gs for
for a o
one
ne-s
-sto
tore
rey
y
building.
48 Part
Part B - P
Pla
lain
in an
and
d Rein
Reinfo
forc
rced
ed Con
Concre
crete
te Wo
Work
rks
s
DETAILE
DETAILED
D UNI
UNIT
T PRICE ANA
ANALYS
LYSIS
IS (DU
(DUPA)
PA)
A. Labor
Sub
Sub - To
Tota
tall fo
forr A
B. Equipment
Minor
Minor Tools
Tools (10%
(10% of Labor
Labor Cost)
Cost)
.J
Sub
Sub - To
Tota
tall fo
forr B
C. Total (A + B)
D. Outpu
Outputt per
per Ho
Hour
ur - 5.40
5.40 L
E. Dir
Direct Unit Cost (C + D)
ect Unit
F. Materials
Sub
Sub - T
Tot
otal
al fo
forr F
G. Dire
Direct
ct Unit
Unit Cos
Costt (E + F)
H. Overhead
Overhead,, Contin
Contingen
gencie
cies
s & Miscel
Miscellan
laneou
eous
s (OC
(OCM)
M) Exp
Expens
enses
es 15%/12%/10%/8% of G
I. Contr
Contract
actor'
or's Profit
Profit (CP) 10%/8% of G
J. Va
Value
lue Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. To
Total
tal Unit
Unit Cost
Cost (G + H + I + J)
49 Par
Partt C - Fin
Finishi
ishing
ng
DETAIL
DETAILED
ED UNI
UNIT
T PRICE
PRICE ANALYS
ANALYSIS
IS (DU
(DUPA)
PA)
Designation No
No.. of P e
err so
so n/
n/ s No.
No. of Hou
Hour Is
Is Hourly
Hourly Rate
Rate Amoun
Amountt (PhP
(PhP))
A. Labor
a. Const
Construct
ruction
ion Foreman
Foreman 1 1.00 Labor
Labor R
Rate
ates
s a are
re variab
variable
le pper
er Reg
Region/
ion/Dis
Distri
trict
ct
b. Skilled
Skilled Labo
Laborer
rer base
based
d on mi
mini
nimu
mum wage as app
m wage approv
roved
ed by
1 1.00
DOLE. Refer to the Schedule
DOLE. Refer Schedule of Labo
Laborr Rat
Rates.
es.
c. Unskill
Unskilled
ed Labo
Laborer
rer 2 1.00
Su
Sub
b - Tota
Totall fo
forr A
Name
Name and Capaci
Capacity
ty No of Unit/s No. of HourIs Hou
Hourly
rly Rate
Rate Amoun
Amountt (PhP
(PhP))
B. Equipment
Minor
Minor Tools
Tools (10%
(10% of Lab
Labor
or Cos
Cost)
t)
.J
Su
Sub
b - T
Tot
otal
al fo
forr B
C. Total (A + B )
D. O ut
utput p
peer Hour - 3.00m
E. Direc
Directt Unit
Unit Cost (C + D)
F. Mate
Materials
rials
Prices
Prices of materi
materials
als are var variabl
iablee per Reg Region/
ion/
a. 50 mm - 100 mm 0 PVC
PVC Pipe,
Pipe, Ser
Series
ies 600/Series
m 1.00 Di
Dist
stri
rict
ct bas
based
ed on the the prev
prevail
ailin
ing
g uni unitt price
pricess in
1000
the
the loca
locali
lity
ty wh
whic
ichh incl
include
ude papaym
ymen entt of lac lacal
al
b. Con
Consum
sumabl
ables
es (5% of Mater
Material
ials
s Cost)
Cost) taxe
taxess and ha hauli
uling
ng co cost
st to the
the proje
project
ct site
site..
Re
Refe
ferr to the
the Cons
Constr truc
ucti
tion
on Ma Mateteri
rial
al Pr Pric
icee DaData
ta
establi
establishe
shed d qua
quarter
rterly
ly by C Cent
entral
ral Office
Office Pric
Pricee
Monitoring
Monito ring Committee.
Committee.
Sub
Sub - Tot
Total
al fo
forr F
G. Di
Dire
rect
ct Unit
Unit Cost (E + F)
H. Overhead
Overhead,, Contin
Contingen
gencie
cies
s & M
Misc
iscell
ellane
aneous
ous (OCM)
(OCM) Expens
Expenses
es 15%/12%/10%/8% of G
I. Con
Contra
tracto
ctor's
r's Profit
Profit (CP)
(CP) 10%/8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. To
Total
tal Unit
Unit Cost
Cost ( G + H + I + J)
Note:
Note: 1. Use this
this cos
costt sheet
sheet for It
Item
em Nos.
Nos. 1001(1)
1001(1)a1,
a1, 100
1001(1
1(1)a2
)a2,10
,1001(
01(1)a
1)a3,
3, 1001(1
1001(1)a5
)a5,, 1001(1
1001(1)a5
)a5,, and 1001(
1001(1)a
1)a7.
7.
50 Par
Partt C - Finishing
DETAIL
DETAILED
ED UNI
UNIT
T PRICE ANA
ANALYS
LYSIS
IS (DU
(DUPA)
PA)
Item No./Description 10 01
01 (1
(1 )a
)a 15 0 mm - 3 00 mm 0 PV
00 mm PVC
C Pipe,
Pipe, Series
Series 6001
6001 Series
Series 1000
Unit of Measu
Measureme
rement
nt m
Output
Output per hou
hour
r 4.
4.00
00 m
A. Labor
Sub
Sub - To
Tota
tall fo
forr A
Name
Name and Capaci
Capacity
ty No of Unitls No. of HourIs Hourly Rate Amoun
Amountt (PhP
(PhP))
B. Equipment
Minor
Minor Tools
Tools (10%
(10% of Lab
Labor
or Cost)
Cost)
.J
Sub
Sub - To
Tota
tall fo
forr B
C. Total (A + B)
D. Ou
Outp
tput per Hour
ut per = 4.00m
E. Dire
Direct
ct Unit
Unit Cost
Cost (C + D)
F. Materials
a. 150 mm 0 PVC
150 PVC Pipe,
Pipe, Series
Series 6001
6001 Se
Serie
ries
s 100
1000
0 m 1.00 Prices of materials are variable per Region/
Prices
District based on the prevailing unit prices in
b. Con
Consum
sumabl
ables
es (5% of Mater
Material
ials
s Cos
Cost)
t)
the locality which include payment of local
local
taxes and hauling cost to the proje
project
ct site.
Refer to the Construction
Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.
Sub
Sub - T
Tot
otal
al fo
forr F
G. Dire
Direct Unit Cost (E + F)
ct Unit
H. Overhead
Overhead,, Contin
Contingen
gencie
cies
s & Miscel
Miscellan
laneou
eous
s (OCM)
(OCM) Expens
Expenses
es 15%/12%/10%/8% of G
I. Contr
Contract
actor'
or's
s Profit
Profit (CP) 10%/8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. To
Total
tal Unit
Unit Cost
Cost (G + H + I + J)
No
Note
te:: 1. Us
Uset
ethi
hisc
scos
osts
tshe
heet
etfo
forl
rlte
tem
m No
Nos.
s.10
1001
01(1
(1)a
)a4,
4,10
1001
01(1
(1)a
)a8,
8,10
1001
01(1
(1)a
)a9,
9,10
1001
01(1
(1)a
)a10
10an
and
d 1001
1001(1
(1)a
)a11
11..
51 Part C - Fini
Finishin
shing
g
DETAIL
DETAILED
ED UNI
UNIT
T PRIC
PRICE
E ANALYS
ANALYSIS
IS (DU
(DUPA)
PA)
A. Labor
-
a. Construction Foreman 1 0.98 Labor
Labor RRate
ates
s are var
variabl
iable
e pper
er Region/
Region/Dis
Distri
trict
ct
base
based
d on mi
mini
nimu
mum
m wagewage as app
approv
roved
ed by
b. Skilled Laborer 2 0.98
DOLE.
DOL E. Refer
Refer to th
the
e Sch
Schedul e of L
edule Labor
abor Rates.
Rates.
c. Unskilled Laborer 4 0.98
Sub - Total
Total for A
Name
Name and Capaci
Capacity
ty No of Unitls No. of Hour/s Hourly Rate Amoun
Amountt (PhP
(PhP))
B. Equipment
a. Plate
Plate Compa
Compacto
ctorr (5 hp)
hp) 0.09
Minor
Minor Tools
Tools (10%
(10% of Lab
Labor
or Cost)
Cost)
.J
Sub
Sub - T
Tot
otal
al fo
forr B
C. Total (A + B)
D. Output - 1.00 m
E. Direc
Directt Unit
Unit Cost (C + D)
F. Mater
Materials
ials
Sub
Sub - T
Tot
otal
al fo
forr F
G. Dire
Direct
ct Unit
Unit Cos
Costt (E + F)
H. Overhead,
Overhead, Contingencies & Miscellan
Contingencies Miscellaneous
eous (OCM) Expenses
Expenses 15
15%/
%/12
12%/
%/10
10%/
%/8%
8% of G
I. Contra
Contracto
ctor's
r's Profit
Profit (CP) 10%/
10%/8%
8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of ( G + H + I )
K. Total Unit Cost (G + H + I + J)
52 Par
Partt C - Fin
Finish
ishing
ing
DETAIL
DETAILED
ED UNI
UNIT
T PRICE ANA
ANALYS
LYSIS
IS (DU
(DUPA)
PA)
A. Labor
Sub
Sub - T
Tot
otal
al fo
forr A
Name
Name and Capaci
Capacity
ty No of Unitls No. of HourIs Hourly Rate Amoun
Amountt (PhP
(PhP))
B. Equipment
Equipment
.J
Sub
Sub - T
Tot
otal
al fo
forr B
C. Total (A + B)
Output =
D. Output 1.0
1.00
0 m
E. Direct
Direct Unit
Unit Cost (C + D)
F. Mater
Materials
ials
Sub
Sub - T
Tot
otal
al fo
forr F
G. D
Dir
irec
ectt Unit
Unit Co
Cost
st (E + F)
H. Overhead
Overhead,, Con
Contin
tingen
gencie
cies
s & Miscel
Miscellan
laneou
eous
s (OC
(OCM)
M) Exp
Expens
enses
es 15
15%/
%/12
12%/
%/10
10%/
%/8%
8% of G
I. Contra
Contracto
ctor's
r's Profit
Profit (CP) 10%/
10%/8%
8% of G
J. Value Added Tax (VAT) 5% of (G + H + I)
K. Total Unit Cost (G + H + I + J)
53 Part C - Fin
Finishi
ishing
ng
DETAIL
DETAILED
ED UNI
UNIT
T PRICE ANA
ANALYS
LYSIS
IS (DU
(DUPA)
PA)
A. Labor
a. Const
Construct
ruction
ion Foreman
Foreman 1 1.17 Labo
Laborr Rates
Rates are var
variabl
iable
e per Regi
Region/
on/Dis
Distri
trict
ct
bas
based
ed on mi
mini
nimum
mum wa ge as approv
wage approved
ed by
b. Skilled
Skilled Laborer
Laborer 2 1.17
DOLE.
DOL E. Refer
Refer to th
the
e Sch
Schedul e of L
edule Labor
abor Rates.
Rates.
c. Unskill
Unskilled
ed Labo
Laborer
rer 4 1.17
Sub
Sub - To
Tota
tall fo
forr A
Name
Name and Capaci
Capacity
ty No of Unitls No. of HourIs Hourly Rate Amount (P h P )
B. Equipment
a. Plate
Plate Compac
Compactor
tor (5 hp)
hp) 0.12
Minor
Minor Tools
Tools (10%
(10% of Labor
Labor Cost)
Cost)
.J
Sub
Sub - T
Tot
otal
al fo
forr B
C. Total (A + B)
D. Output = 1.0
1.00
0 m
E. Di
Direc
rectt Unit Costt (C + D)
Unit Cos
F. Materials
Sub
Sub - Tot
Total
al fo
forr F
G. Dire
Direct
ct Unit
Unit Cost
Cost (E + F)
H. Overhead
Overhead,, Con
Contin
tingen
gencie
cies
s & Miscel
Miscellan
laneou
eous
s (OCM
(OCM)) Exp
Expens
enses
es 15%/12%/10%/8% of G
I. Contra
Contracto
ctor's
r's Profit
Profit (CP) 10%/8% of G
J. Value
Value Add
Added
ed Tax (VAT)
(VAT) 5% of (G + H + I)
K. To
Total
tal Unit
Unit Cost
Cost (G + H + I + J)
54 Part C - Fini
Finishin
shing
g
DETAIL
DETAILED
ED UNI
UNIT
T PRIC
PRICE
E ANALY
ANALYSIS
SIS (DUPA)
(DUPA)
A. Labor
a. COrlStruc
COrlStruction
tion Foreman
Foreman 1 1.26 Labor Rates are var variab
iable
le per RegRegion/
ion/Dis
Distri
trict
ct
ba
base
sed
d on minim
minimum um wage wage as app
appro
rove
ved
d by
b. Skilled
Skilled Labo
Laborer
rer 2 1.26
DOLE.
DOL E. Ref er to the
Refer Schedule of Labor Rates.
the Schedule
c. Unskill
Unskilled
ed Labo
Laborer
rer 4 1.26
Sub - Total
Total for A
Name
Name and Capaci
Capacity
ty No of Unitls
Unitls No. of HourIs Hourly Rate Amoun
Amountt (PhP
(PhP))
B. Equipment
a. Plate
Plate Compa
Compacto
ctorr (5 hp)
hp) 0.13
Minor
Minor Tools
Tools (10%
(10% of Labor
Labor Cost)
Cost)
.J
Sub
Sub - T
Tot
otal
al fo
forr B
C. Total (A + B)
D. Outp
Output
ut - 1 pc
E. Di
Dire
rect
ct Unit
Unit Co
Cost
st (C + D)
F. Mater
Materials
ials
Sub
Sub - T
Tot
otal
al fo
forr F
G. Dir
Direct
ect Unit Cost (E + F)
Unit Cost
H. O
Over
verhea
head,
d, Contin
Contingen
gencie
cies
s & M
Misc
iscell
ellane
aneous
ous (OC
(OCM)
M) Expens
Expenses
es 15%/12%/10%/8% of G
I. Contractor's Profit (CP) 10%/8% of G
J. Value Added Tax (VAT) 5% of (G + H + I)
K. Total Unit Cost (G + H + I + J)
55 Par
Partt C - Fin
Finishi
ishing
ng
DETAILE
DETAILED
D UNI
UNIT
T PRICE ANAL
ANALYSI
YSIS
S (DUPA)
(DUPA)
Item No./Description 10
1001
01(1
(1)b
)b5
5 350
350 mm 121 Concre
Concrete
te Pipe
Pipe
Unit of Measuremen
Measurementt m
Output 1.0
1.00
0 m
A. Labor
Sub
Sub - To
Tota
tall fo
forr A
Name
Name and Capaci
Capacity
ty No of Unitls No. of Hour/s Hourly Rate Amou
Amount
nt (PhP
(PhP))
B. Equipment
.J
Sub
Sub - T
Tot
otal
al fo
forr B
C. To
Tota
tall (A + B)
D. Output - 1.00 m
E. Direct
Direct Unit
Unit Cost (C + D)
F. Mater
Materials
ials
Sub
Sub - Tot
Total
al fo
forr F
G. D
Dir
irec
ectt Unit
Unit Cost (E + F)
H. Overh
Overhead
ead,, Con
Contin
tingen
gencie
cies
s & Misc
Miscell
ellane
aneous
ous (OCM)
(OCM) Expens
Expenses
es 15
15%/
%/12
12%/
%/10
10%/
%/8%
8% of G
I. Contra
Contracto
ctor's
r's Profit
Profit (CP) 10%/
10%/8%
8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. Total
Total Unit
Unit Cos
Costt (G + H + I + J)
56 Part
Part C - Fin
Finishi
ishing
ng
DETAIL
DETAILED
ED UNI
UNIT
T PRIC
PRICE
E ANALY
ANALYSIS
SIS (DUPA)
(DUPA)
A. Labor
a. Const
Constructi
ruction
on Foreman
Foreman 1 1.00 Labor Rates are variable per Region/District
b. Skilled
Skilled Labo
Laborer
rer 1 1.00 based
based on minim
minimum
um wage
wage as
as approved by
DOLE. Refer to the Schedule of Labor Rates.
c. Unskilled Laborer 2 1.00
Sub
Sub - To
Tota
tall fo
forr A
Name
Name and Capaci
Capacity
ty No of Unitls No. of HourIs Hourly Rate Amou
Amount
nt (PhP
(PhP))
B. Equipment
Minor
Minor Tools
Tools (10%
(10% of Labor
Labor Cost)
Cost)
.J
Sub
Sub - T
Tot
otal
al fo
forr B
C. Total (A + B)
Total
D. Out
Outpu
putt per
per Hour
Hour - 3.00
3.00 m
E. Direct
Direct Unit
Unit Cos
Costt (C + D)
F. Mater
Materials
ials
a. 50 mm 0 High Density Polyethylene (HDPE) P ipe m 1.00 Prices of materials are variable per Region/
District
District based
based on the prev
prevailin
ailing
g unit price
prices s in
b. Con
Consum
sumabl
ables
es (5% of Mater
Material
ials
s Cos
Cost)
t)
the locality
locality which include
include paymen
paymentt of local
taxes
taxe s and hauling
hauling cost to the project site
site..
Refer to the Construct
Construction
ion Mater
Material
ial Price Data
established quarterly by Central Office Price
Monitoring Committee.
Sub
Sub - Tot
Total
al fo
forr F
G. Dir
Direct
ect Unit Cost (E + F)
Unit Cost
H. Overhead,
Overhead, Contingencies & Miscellane
Contingencies Miscellaneous
ous (OCM) Expenses
Expenses 15%/
15%/12
12%/
%/10
10%/
%/8%
8% of G
I. Contra
Contracto
ctor's
r's Profit
Profit (CP) 10%/
10%/8%
8% of G
J. V alue Added Tax (V AT) 5% of (G + H + I)
K. Total Unit Cost (G + H + I + J)
No
Note
te:: 1. Us
Use
e this
this cost
cost shee
sheetf
tfor
or It
Item
em No
Nos.
s. 10
1001
01 (1)c1,
(1)c1, 10
1001
01 (1)c2,
(1)c2, an
and
d 10
1001
01 (1)c3.
(1)c3.
57 Par
Partt C - Fin
Finishi
ishing
ng
DETAIL
DETAILED
ED UNI
UNIT
T PRICE ANA
ANALYSI
LYSIS
S (DU
(DUPA)
PA)
A. Labor
a. Const
Constructi
ruction
on Foreman
Foreman 1 1.00 Labor Rates are variable per Region/District
b. Skilled
Skilled Laborer
Laborer 1 1.00 based
based on minimum
minimum wage
wage as
as approved by
DOLE. Refer to the Schedule of Labor Rates.
c. Unskil
Unskilled
led Labo
Laborer
rer 2 1.00
Sub
Sub - T
Tot
otal
al fo
forr A
Name
Name and Capaci
Capacity
ty No of Unitls No. of HourIs Hou
Hourly
rly Rate
Rate Amou
Amount
nt (PhP
(PhP))
B. Equipment
Minor
Minor Tool
Tools
s (10%
(10% of Labor
Labor Cost)
Cost)
oJ
Sub
Sub - To
Tota
tall fo
forr B
C. Total (A + B)
D. Output pe
per Hour - 4.00 m
E. Di
Dire
rect
ct Unit
Unit Cos
Costt (C + D)
F. Mater
Materials
ials
a. 150 mm 0 Hig
High
h Densit
Density
y Polyet
Polyethyl
hylene
ene (HDPE)
(HDPE) Pipe
Pipe m 1.00 Prices of materials are variable per Regionl
District based on the prevailing unit prices in
b. Con
Consum
sumabl
ables
es (5% of Mater
Material
ials
s Cos
Cost)
t)
the locality which include payment of local
taxes
taxe s and hauling
hauling cost to the proje
project
ct site.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.
Sub
Sub - Tot
Total
al fo
forr F
G. Dire
Direct
ct Unit
Unit Cost (E + F)
H. Overh
Overhead
ead,, Con
Contin
tingen
gencie
cies
s & Miscel
Miscellan
laneou
eous
s (OCM)
(OCM) Expens
Expenses
es 15%/12%/10%/8% of G
I. Contr
Contract
actor'
or's
s Profit
Profit (CP) 10%/
10%/8%
8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. To
Total
tal Unit
Unit Cost
Cost (G + H + I + J)
Note:
Note: 1. Use thi
this
s cos
costt she
sheetf
etfor
or Item
Item Nos.
Nos. 100
1001(1
1(1 )c4
)c4,, 100
1001(1
1(1 )c5
)c5,, 100
1001(1
1(1 )c6 and
and 1001(1
1001(1 ))c7.
c7.
58 Par
Partt C - Fin
Finish
ishing
ing
DETAIL
DETAILED
ED UNI
UNIT
T PRICE ANAL
ANALYSIS
YSIS (DU
(DUPA)
PA)
A. Labor
(La
(Labor
bor cos
costt for these
these ite
items
ms are to be c
cons
onside
idered
redll inc
includ
luded
ed in the ins
instal
tallat
lation
ion of pipes
pipes.)
.) Labor Rates are variable per Region/District
based
based on minimu
minimumm wage
wage as
as approved
approved by
DOLE. Refer to the Schedule of Labor Rates.
Sub
Sub - To
Tota
tall fo
forr A
Name
Name and Capaci
Capacity
ty No of Unitls
Unitls No. of Houris Hourly Rate Amou
Amount
nt (PhP
(PhP))
B. Equipment
.J
Sub
Sub - Tot
Total
al fo
forr B
C. Total (A + B)
D. Ou
Outp
tput per Hour
ut per = 1 ea
E. Direc
Directt Unit
Unit Cos
Costt (C
(C + D)
F. Materials
a. PVC/
PVC/HD
HDPE
PE Fi
Fitt
ttin
ings
gs (E
(Elb
lbow
owll Cl
Clea
ean
n Out!
Out! Couplingl Prices of materials are variable per Region/
ea 1.00
District
District based
based on the prev
prevailin
ailing
g unit price
pricess in
Wyel Teel Reduce
Reducerl
rl P-trap
P-trapll Bushin
Bushingl
gl Plug)
Plug)
the locality
locality which include
include payment
payment of local
taxes
taxe s and hauling
hauling cost to the project site
site..
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.
Sub
Sub - To
Tota
tall fo
forr F
G. Direc
Directt Unit Costt (E + F)
Unit Cos
H. Overhead
Overhead,, Con
Contin
tingen
gencie
cies
s & Miscel
Miscellan
laneou
eous
s (OC
(OCM)
M) Exp
Expens
enses
es 15%/12%/10%/8% of G
I. Contr
Contract
actor'
or's Profit
Profit (CP) 10%/8% of G
J. Value Added Tax (VAT) 5% of (G + H + I)
K. To
Total
tal Unit
Unit Cost
Cost (G + H + I + J )
No
Note
te:: 1. Al
Alll it
item
ems
s unde
underr Item
Item No 100
1001(
1(2)
2) ar
are
e consi
conside
dere
red
d as fitt
fittin
ings
gs.. Us
Use
e this
this co
cost
st sheet
sheet for
for Item Nos. 1001(2
1001(2)a
)a to 10
1001
01(2
(2)w
)w..
59 Part C - Fin
Finishi
ishing
ng
DETAIL
DETAILED
ED UNIT
UNIT PRI
PRICE
CE ANALYS
ANALYSIS
IS (DUPA)
(DUPA)
A. Labor
Sub
Sub - T
Tot
otal
al fo
forr A
Name
Name and Capaci
Capacity
ty No of Unitls No. of HourIs Hourly Rate Amoun
Amountt (PhP
(PhP))
B. Equipment
J
Sub
Sub - T
Tot
otal
al fo
forr B
C. Total (A + B)
D. Output Hour
Output per Hour =
E. Direc
Directt Unit
Unit Cost (C + D)
F. Materials
3
a. Item 900 - Reinfor
Reinforced
ced Concre
Concrete
te m
b. Item 902 - Reinforcing Steel kg
a. Item 903 - For
Formwo
mworks
rks and Falsewor
Falseworks
ks m2
Sub
Sub - Tot
Total
al fo
forr F
G. Di
Dire
rect
ct Unit
Unit Cost
Cost (E + F)
H. Overhead
Overhead,, Contin
Contingen
gencie
cies
s & M
Misc
iscell
ellane
aneous
ous (OCM)
(OCM) Expens
Expenses
es 15%/12%/10%/8% of G
I. Contra
Contracto
ctor's
r's Profit
Profit (CP) 10%/8% of G
J. Value Added Tax (VAT) 5% of (G + H + I)
K. To
Total
tal Unit
Unit Cos
Costt (G + H + I + J)
No
Note
te:: 1. Th
This
is it
item
em shall
shall be base
based
d on the
the s
sta
tand
ndar
ard
d De
Deta
tail
iled
ed Un
Unit
it Pric
Price
e Analy
Analysi
sis
s (DUPA
(DUPA)) of eac
each
h co
comp
mpon
onen
entt it
item
em suc
such
h as
Ite
Item
m Nos.
Nos. 900,90
900,902,
2, and 90
903.
3.
60 Part
Part C - Fini
Finishin
shing
g
DETAILE
DETAILED
D UNI
UNIT
T PRICE ANA
ANALYSI
LYSIS
S (DU
(DUPA)
PA)
A. Labor
a. Item-80
Item-803
3 - Str
Struct
ucture
ure Excava
Excavatio
tion
n m
Sub
Sub - To
Tota
tall fo
forr A
Name
Name and Capaci
Capacity
ty No of Unitls
Unitls No. of HourIs Hourly Rate Amoun
Amountt (PhP
(PhP))
B. Equipment
.J
Sub
Sub - To
Tota
tall fo
forr B
C. Total (A + B)
Total
D. Output
Output = 1.00 ea
E. Direct
Direct Unit
Unit Cost (C + D)
F. Mater
Materials
ials
Sub
Sub - T
Tot
otal
al fo
forr F
G. Dir
Direct
ect Unit Cost (E + F)
Unit Cost
H. Overhead,
Overhead, Contingencies & Miscellane
Contingencies Miscellaneous
ous (OCM) Expenses
Expenses 15%/12%/10%/8% of G
I. Contra
Contracto
ctor's
r's Profit
Profit (CP) 10%/8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. To
Total
tal Unit
Unit Cost
Cost (G + H + I + J)
Note:
Note: 1. The
Thesese ite
items
ms are variab
variable
le in dim
dimens
ension
ionss based
based on a actu
ctual
al con
condit
dition
ion which
which combines
combines compon
component
ent ite
items,
ms, hence sta
standa
ndard
rd est
estima
imate
te
shall
shall be ba
based
sed on the
the standar
standard
d Detail
Detailed
ed Unit
Unit Price Analysi
Analysis
s (DU
(DUPA)
PA) of e
each
ach com
compon
ponent
ent ite
item
m such as Items 803, 900
900,, 902
61 Part C - Fini
Finishin
shing
g
DETAIL
DETAILED
ED UNI
UNIT
T PRICE
PRICE ANALYS
ANALYSIS
IS (DU
(DUPA)
PA)
A. Labor
3
a. Item 803 - Stru
Structu
cture
re Excava
Excavatio
tion
n m
Su
Sub
b - Tota
Totall fo
forr A
Name
Name and Capaci
Capacity
ty No of Unitls No. of HourIs Hourly Rate Amoun
Amountt (PhP
(PhP))
B. Equipment
.J
Sub
Sub - T
Tot
otal
al fo
forr B
C. Total (A + B)
Total
D. Output
Output = 1.00
1.00 ea
E. Direc
Directt Unit
Unit Cost (C + D)
F. Materials
3
a. Item 900 - Reinfor
Reinforced
ced Concre
Concrete
te m
b. Item
Item 902 - Reinfo
Reinforci
rcing
ng Steel
Steel kg
2
c. Item
Item 1046
1046 - CHB Wa
Wall
ll m
Sub
Sub - Tot
Total
al fo
forr F
G. Dir
Direct
ect Unit Cost (E + F)
Unit Cost
H. Overhead
Overhead,, Con
Contin
tingen
gencie
cies
s & Miscel
Miscellan
laneou
eous
s (OCM)
(OCM) Exp
Expens
enses
es 15%/
15%/12
12%/
%/10
10%/
%/8%
8% of G
I. Con
Contra
tracto
ctor's
r's Profit
Profit (CP)
(CP) 10%/
10%/8%
8% of G
J. Value
Value Add
Added
ed Tax (VAT)
(VAT) 5% of (G + H + I)
K. To
Total
tal Unit
Unit Cost
Cost (G + H + I + J)
Note:
Note: 1. The
These
se ite
items
ms are varia
variable
ble in dim
dimens
ension
ions
s based
based on act
actual
ual conditi
condition
on which
which combines
combines compon
component
ent ite
items,
ms, henc
hence
e standard
standard est
estima
imate
te
sha
shall
ll be based
based on the stand
standard
ard Detail
Detailed
ed Unit
Unit Price Analysi
Analysis
s (DUPA)
(DUPA) of ea
each
ch compon
component
ent item
item suc
such
h as Ite
Items
ms 803,90
803,900,9
0,902
02
and 1046
1046..
62 Part C - Fin
Finishi
ishing
ng
DETAIL
DETAILED
ED UNI
UNIT
T PRICE ANA
ANALYS
LYSIS
IS (DU
(DUPA)
PA)
A. Labor
See derivations
derivations for Item Nos. 1001(1)a,
1001(1)a, 1001(
1001(1)c,
1)c, and 1001(
1001(2).
2).
Sub - Total
Total for A
Name
Name and Capaci
Capacity
ty No of Unit/s No. of HourIs Hourly Rate Amoun
Amountt (PhP
(PhP))
B. Equipment
.J
Su
Sub
b - T
Tot
otal
al fo
forr B
C. To
Tota
tall (A + B)
D. Output
Output = 1.00I.s.
E. Dir
Direct Unit Cost (C + D)
ect Unit
F. Materials
See derivations
derivations for Item Nos. 1001(1)a,
1001(1)a, 1001(
1001(1)c,
1)c, and 1001(2).
Su
Sub
b - T
Tot
otal
al fo
forr F
G. Dire
Direct
ct Unit
Unit Co
Cost
st (E + F)
H. Overhea
Overhead,
d, Contin
Contingen
gencie
cies
s & Miscel
Miscellan
laneou
eous
s (OC
(OCM)
M) Exp
Expens
enses
es 15%/12%/10%/8% of G
I. Contractor's P rofit (CP) 10%/8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. T
Tota
otall Unit
Unit Cos
Costt (G + H + I + J)
No
Note
te:: 1. The
The "Ium
"Iumps
psum
um"" unit
unit of me
meas
asur
urem
emen
entt as per
per Blue Boo
Book
k shal
shalll be bas
based
ed on the
the de
deri
rive
ved
d outp
output
uts
s of It
Item
em Nos.
Nos. 1001(1
1001(1 )a,
)a, 100
1001
1 (1)c,
and 1001(2)
1001(2)
63 Part
Part C - Fin
Finishi
ishing
ng
DETAIL
DETAILED
ED UNI
UNIT
T PRICE ANALYSIS
ANALYSIS (DU
(DUPA)
PA)
A. Labor
See der
deriva
ivatio
tions
ns for Item
Item Nos.
Nos. 100
1001(1
1(1)c,
)c, 100
1001(3
1(3),
), 100
1001(4
1(4),
), 100
1001(5
1(5),
), 100
1001(6
1(6)) and 1001(7)
1001(7)..
Su
Sub
b - Tota
Totall fo
forr A
Name
Name and Capaci
Capacity
ty No of Unitls No. of Houris Hourly Rate Amou
Amount
nt (PhP)
(PhP)
B. Equipment
.J
Sub
Sub - T
Tot
otal
al fo
forr B .
C. To
Tota
tall (A + B)
Output =
D. Output 1.00I.s.
E. Direc
Directt Unit
Unit Cost (C + D)
F. Materials
See der
deriva
ivatio
tions
ns for Item
Item Nos.
Nos. 100
1001(1
1(1)c,
)c, 100
1001(3
1(3),
), 100
1001(4
1(4),
), 100
1001(5
1(5),
), 100
1001(6
1(6)) and 1001(7).
1001(7).
Sub
Sub - Tot
Total
al fo
forr F
G. D
Dir
irec
ectt Unit
Unit Cost (E + F)
H. Overhea
Overhead,
d, Contin
Contingen
gencie
cies
s & Miscel
Miscellan
laneou
eous
s (OCM
(OCM)) Exp
Expens
enses
es 15%/
15%/12
12%/
%/10
10%/
%/8%
8% of G
I. Contrac
Contractor
tor's
's Profit
Profit (CP) 10%/
10%/8%
8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. To
Total
tal Unit
Unit Cost
Cost (G + H + I + J)
No
Note
te:: 1. Th
The
e "Ium
"Iumps
psum
um"" unit
unit of me
meas
asur
urem
emen
entt as per
per Blu
Blue
e Bo
Book
ok shal
shalll be bas
based
ed on the
the de
deri
rive
ved
d outp
output
uts
s of Ite
Item
m Nos.
Nos. 1001
1001 (1)c
(1)c,, 100
1001
1 (3
(3),
),
1001(4),
1001(4), 1001
1001(5),
(5), 1001
1001(6)
(6) and 1001(7).
64 Part C - Fini
Finishin
shing
g
DETAIL
DETAILED
ED UNI
UNIT
T PRICE ANAL
ANALYSIS
YSIS CDU
CDUPA)
PA)
A. Labor
Sub
Sub - T
Tot
otal
al fo
forr A
Name
Name and Capaci
Capacity
ty No of Unitls
Unitls No. of HourIs Hourly Rate Amoun
Amountt (PhP
(PhP))
B. Equipment
Minor
Minor Tools
Tools (10%
(10% of Lab
Labor
or Cost)
Cost)
.J
Sub
Sub - T
Tot
otal
al fo
forr B
C. Total (A + B)
D. Output = 1 pc
E. Dire
Direct
ct Unit
Unit Cost (C + D )
F. Materials
a.13 mm 0 - 50 mm 0 Galvan
a.13 Galvanize
ized
d Iron
Iron Pipe pc 1.00 Prices of
Prices of materials are variable per Regionl
District based on
on the prevailing unit pric
prices
es in
b. Cons
Consuma
umable
bles
s (5% of Mater
Material
ials
s Cos
Cost)
t)
the locality which include payment
payment of local
local
taxes and hauling
taxes hauling cost to the project site.
Refer to the Constructio
Construction n Material
Material Price Data
established quarterly by Central Office Price
Monitoring Committee.
G. Direc
Directt Unit Costt (E + F)
Unit Cos
H. Overhead
Overhead,, Con
Contin
tingen
gencie
cies
s & Miscel
Miscellan
laneou
eous
s (OCM)
(OCM) Expens
Expenses
es 15%/12%/10%/8% of G
I. Contra
Contracto
ctor's
r's Profit
Profit (CP) 10%/
10%/8%
8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. To
Total
tal Unit
Unit Cost
Cost (G + H + I + J)
Note:
Note: 1. Use th
this
is cost sheet
sheet for Item
Item Nos.
Nos. 100
1002(1
2(1 )a1,
)a1, 1002(1)
1002(1)a2,
a2, 100
1002(1
2(1)a3
)a3,, 1002(1
1002(1 )a4,
)a4, and 1002
1002(1
(1 )a5.
)a5.
65 Par
Partt C - Fini
Finishin
shing
g
DETAILE
DETAILED
D UNI
UNIT
T PRICE ANAL
ANALYSI
YSIS
S (DUPA)
(DUPA)
Item No./Description 10 02
02 (2
(2 )a
)a 6 5 mm 0- 150 mm 0 Galvan
Galvanize
ized
d Iron
Iron Pipe
Unit of Measu
Measuremen
rementt pc
Output 1 pc
A Labor
Labo
Laborr Rat
Rates
es are variabl
variable
e per Regi
Region/
on/Dis
Distri
trict
ct
a. Const
Constructi
ruction
on Foreman
Foreman 1 1.50
ba
base
sed
d on mi
mininimu
mum
m wage
wage as app
approv
roved
ed by
b. Skilled
Skilled Labo
Laborer
rer 1 1.50 DO
DOLE
LE.. Re
Refe
ferr to the
the Sche
Schedu
dule
le of L Labo
aborr Ra
Rate
tes.
s.
c. Unskill
Unskilled
ed Labo
Laborer
rer 2 1.50
Sub
Sub - To
Tota
tall fo
forr A
.
Name
Name and Capaci
Capacity
ty No of Unitls No. of HourIs Hou
Hourly
rly Rate
Rate Amou
Amount
nt (PhP)
(PhP)
B. Equipment
Minor
Minor Tools
Tools (10%
(10% of Labor
Labor Cost)
Cost)
.J
Sub
Sub - T
Tot
otal
al fo
forr B
C. Total (A + B)
D. Output
Output = 1 pc
E. Direc Unit Cost (C + D)
Directt Unit
F. Materials
a. 65
65 mm 0 - 150
150 mm 0x 6 m Ga
Galv
lvan
aniz
ized
ed Ir
Iron
on Pipe
Pipe pc 1.00 Prices
Prices of materia
materials
ls are var variabl
iablee per Reg Region/
ion/
Di
Dist
stric
rictt ba base
sed
d on thethe prev
prevail
ailin
ing
g un unit
it pric
prices
es in
b. Con
Consum
sumabl
ables
es (5% of Mater
Material
ials
s Cos
Cost)
t)
the
the loca
locali lity
ty wh
whic
ich
h includ
include e pa
paym
ymentent of loc local
al
taxe
taxess and hauli hauling
ng co cost
st to the projprojec
ectt site
site..
Re
Refe
ferr to the the Cons
Constrtruc
ucti
tion
on Ma Mateteri
rial
al PrPric
icee DaData
ta
establ
establish
isheded quarquarter
terly
ly by C Cent
entral
ral Office
Office Pric
Price e
Monitoring
Monito ring Committee.
Committee.
Sub
Sub - T
Tot
otal
al fo
forr F
G. Dir
Direct
ect Unit Cost (E + F)
Unit Cost
H. Overhead,
Overhead, Contingencies & Miscellan
Contingencies Miscellaneous
eous (OCM) Expenses
Expenses 15%/12%/10%/8% of G
•.
I. Contr
Contract
actor'
or's
s Profit
Profit (CP) 10%/8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. To
Total
tal Unit
Unit Cost
Cost (G + H + I + J)
Note:
Note: 1. U
Use
se this
this cos
costt sheet for Item Nos. 100
1002(1
2(1)a6
)a6,, 100
1002(1
2(1 )a7,
)a7, 100
1002(1
2(1 )a8,
)a8, and 1002(1
1002(1 lag.
lag.
66 Part
Part C - Fini
Finishin
shing
g
DETAIL
DETAILED
ED UNI
UNIT
T PRICE
PRICE ANA
ANALYSI
LYSIS
S (DU
(DUPA)
PA)
A Labor
(Labor
(Labor.co
.cost
st for these
these ite
items
ms are tto
o be consi
consider
deredl
edlinc
includ
luded
ed in the ins
instal
tallat
lation
ion of pipes
pipes.)
.)
Sub
Sub - T
Tot
otal
al fo
forr A
Name
Name and Capaci
Capacity
ty No of Unit/s No. of HourIs Hourly Rate Amou
Amount
nt (PhP
(PhP))
B. Equipment
.J
Sub
Sub - Tot
Total
al fo
forr B
C. Total (A + B)
D. Ou
Output pe
per Hour - 1 pc
E. Direc
Directt Unit
Unit Cos
Costt (C + D)
F. Mater
Materials
ials
a. Galva
Galvaniz
nized
ed Iron
Iron Fittin
Fittings (Elbowll Teel Reducer-Teel
gs (Elbow pc 1.00 Prices of materials are variable per Region/
District
District based
based on the prev
prevailin
ailing
g unit prices
prices in
Socket
Socket!! Coupli
Couplingl
ngl Reduce
Reducerr Cou
Coupli
pling)
ng)
the locality
locality which include
include payme
paymentnt of local
taxes
taxe s and hauling
hauling cost to the proje
project
ct site.
Refer to the Constructi
Construction
on Material
Material Price Data
established quarterly by Central Office Price
Monitoring Committee.
Sub
Sub - T
Tot
otal
al fo
forr F
G. Dire
Direct Unit Cost (E + F)
ct Unit
H. Over
Overhea
head.
d. Contin
Contingen
gencie
cies
s & Misc
Miscell
ellane
aneous
ous (OC
(OCM)
M) Expens
Expenses
es 15%/12%/10%/8% of G
I. Contr
Contract
actor'
or's
s Profit
Profit (CP) 10%/8% of G
J. Value
Value Added
Added Tax (VA
(VAT)
T) 5% of (G + H + I)
K. To
Total
tal Unit
Unit Cost
Cost (G + H + I + J)
No
Note
te:: 1. Us
Use
e this
this cost shee
sheett for
for Item
Item No
Nos.
s. 1002(
1002(2)
2)b
b to 100
1001
1 (2
(2)f
)f..
67 Part C - Fini
Finishin
shing
g
DETAIL
DETAILED
ED UNI
UNIT
T PRICE ANA
ANALYSI
LYSIS
S (DU
(DUPA)
PA)
Designation No
No.. of P e
err so
so n/
n/ s No.
No. of Hou
Hou rI
rIs Hourly Rate Amount (P h P )
A. Labor
a. COrlStructi
COrlStruction
on Foreman
Foreman 1 1.33 Labor Rates are variable per Region/District
based on minimum wage as approved
approved by
b. Skilled
Skilled Laborer
Laborer 1 1.33 DOLE. Refer to the Schedule of Labor Rates.
c. Unskill
Unskilled
ed Labo
Laborer
rer 2 1.33
Sub
Sub - To
Tota
tall fo
forr A
Name
Name and Capaci
Capacity
ty No of Unitls No. of HourIs Hourly Rate Amou
Amount
nt (PhP
(PhP))
B. Equipment
Minor
Minor Tools
Tools (10%
(10% of Lab
Labor
or Cost)
Cost)
.J
Sub
Sub - T
Tot
otal
al fo
forr B
C. Total (A + B)
D. Output - 1 pc
E. Direc
Directt Unit
Unit Cos
Costt (C + D)
F. Materials
a. 13 mm 0 - 50 mm 0 x 4.00
4.00 m Polyproph
Polyprophylen
ylene
e Prices of materials are variable per Region/
District
District based
based on the prev
prevailin
ailing
g unit prices
prices iin
n
Random
Ran dom Copoly
Copolymer
mer (PPR-C)
(PPR-C) Pipe,Pipe, PN
PN 101 PN 161 PN pc 1.00
the locality which include payment of local
20 taxes and hauling cost to the project
project site.
b. Con
Consum
sumabl
ables
es (5% of Mater
Material
ials
s Cost)
Cost) Refer to the Construct
Construction
ion Mater
Material
ial Price Data
established quarterly by Central Office Price
Monitoring Committee.
Sub
Sub - T
Tot
otal
al fo
forr F
G. D
Dir
irec
ectt Unit
Unit Cost (E + F)
H. Overhead
Overhead,, Con
Contin
tingen
gencie
cies
s & M
Misc
iscell
ellane
aneous
ous (OC
(OCM)
M) Expens
Expenses
es 15%/12%/10%/8% of G
I. Contra
Contracto
ctor's
r's Profit
Profit (CP) 10%/8% of G
J. Value
Value Add
Added
ed Tax (VAT)
(VAT) 5 % o f ( G + H + I)
K. To
Total
tal Unit
Unit Cos
Costt (G + H + I + J)
No
Note
te:: 1. Us
Use
e this
this cost
cost shee
sheett for
for Item
Item No
Nos.
s. 1002(
1002(3)
3)a1
a1 to 10
1002
02(3
(3)a
)a18
18..
68 Part C - Fin
Finishi
ishing
ng
DETAIL
DETAILED
ED UNI
UNIT
T PRICE ANAL
ANALYSIS
YSIS (DU
(DUPA)
PA)
A. Labor
Sub
Sub - To
Tota
tall fo
forr A
.
Name
Name and Capaci
Capacity
ty No of Unit/s No. of HourIs Hourly Rate Amoun
Amountt (PhP
(PhP))
B. Equipment
Minor
Minor Tools
Tools (10%
(10% of Labor
Labor Cos
Cost)
t)
.J
Sub
Sub - T
Tot
otal
al fo
forr B
C. Total (A + B)
D. Output - 1 pc
E. Di
Direc
rectt Unit
Unit Cost (C + D)
F. Materials
a. 63 mm 0 - 100 mm 0 x 4.00
4.00 m Polyproph
Polyprophylen
ylenee Prices of materials are variable per Region/
District
District based
based on the preva
prevailing
iling unit pri
prices
ces in
Ra
Rand
ndom
om Copo
Copoly
lyme
merr (P
(PPR-
PR-C) Pipe PN 101 PN 161 PN
C) Pipe pc 1.00 the locality which include payment
payment of local
20Copo
20Copolym
lymer
er (PPR-C)
(PPR-C) Pipe
Pipe taxes and hauling cost
taxes hauling cost to
to the project
project site.
b. Consum
Consumabl
ables
es (5% of Mater
Material
ials
s Cos
Cost)
t) Refer to the Construct
Construction
ion Mate
Material
rial Price Data
established quarterly by Central Office Price
Monitoring Committee.
Sub
Sub - T
Tot
otal
al fo
forr F
G. Dir
Direct
ect Unit Cost (E + F)
Unit Cost
H. Overhea
Overhead,
d, Contin
Contingen
gencie
cies
s & Miscel
Miscellan
laneou
eous
s (OC
(OCM)
M) Expens
Expenses
es 15%/12%/10%/8% of G
I. Contra
Contracto
ctor's
r's Profit
Profit (CP) 10%/8% of G
J. Value Added Tax (VAT) 5% of (G + H + I)
K. Total Unit Cost (G + H + I + J)
No
Note
te:: 1. Us
Use
e this
this cost
cost sh
shee
eett for
for It
Item
em Nos. 1002(3
1002(3)a
)a 19 to 1002
1002(3
(3)a
)a28
28..
69 Part
Part C - Fin
Finishi
ishing
ng
DETAIL
DETAILED
ED UNI
UNIT
T PRICE ANA
ANALYSI
LYSIS
S (DU
(DUPA)
PA)
A. Labor
Labo
Laborr Rat
Rates
es are variab
variable
le per Reg
Regionl
ionlDis
Distri
trict
ct
(La
(Labor
bor_co
_cost
st for these
these ite
items
ms are to be consid
considere
ered/i
d/incl
nclude
uded
d in the
the insta
installa
llatio
tion
n of pipes.
pipes.)) ba
base
sed
d on mini
minimu
mumm wa ge as app
wage appro
rove
ved
d by
DO
DOLE
LE.. Re
Refe
ferr to the
the Sche
Schedul
dulee of L Lab
abor
or Ra
Rate
tes.
s.
Sub
Sub - T
Tot
otal
al fo
forr A
Name
Name and Capaci
Capacity
ty No of Unitls No. of Houris Hourly Rate Amou
Amount
nt (PhP
(PhP))
B. Equipment
.J
Sub
Sub - T
Tot
otal
al fo
forr B
C. Total (A + B)
D. Output- 1 pc
E. Direct Unit Cost (C + D)
Direct Unit
F. Materials
a. Polypr
Polyproph
ophyle
ylene
ne Ran
Random
dom Copoly
Copolymer
mer (PP
(PPR-C)
R-C) pc 1.00 Prices
Prices o off materi
materials
als are variabvariable
le per Reg Regionl
ionl
Di
Dist
stri
rict
ct bas
based
ed on the the prev
prevai
ailin
ling
g uniunitt price
prices s in
Fit
Fittin
tings
gs (Elbow
(Elbowll Tee/
Tee/ Female
Female Threade
Threaded
d Tee/
Tee/ Female
Female
the
the loca
locali
lity
ty wh
whic
ich
h incl
include
ude pay
paymementnt of loc local
al
Elbow/
Elbow/ FeFemal
male
e Thread
Threaded
ed Adapto
Adaptorl
rl Mal
Male
e Threade
Threaded
d taxe
taxess and haulin
hauling
g co cost
st to the
the proj
projec
ectt site
site..
Adaptorl End Cap) Re
Refe
ferr to the
the Co
Consnstr
truc
ucti
tion
on Materi
Materialal PrPric
ice
e Da Data
ta
establi
establishe
shed d qua
quarte
rterly
rly by Cent
Centralral Office
Office Pric
Price e
Monitoring
Monito ring Commit
Committee.tee.
Sub
Sub - T
Tot
otal
al fo
forr F
G. Dir
Direct
ect Unit
Unit Cost
Cost (E + F)
H. Overhea
Overhead,
d, Contingen cies & Miscellane
Contingencies Miscellaneous
ous (OCM) Expenses
Expenses 15%/12%/10%/8% of G
I. Contra
Contracto
ctor's
r's Profit
Profit (CP) 10%/
10%/8%
8% of G
J. Value Added Tax (VAT) 5% of (G + H + I)
K. To
Total
tal Unit
Unit Cost
Cost (G + H + I + J)
No
Note
te:: 1. Us
Use
e this
this cost
cost sh
shee
eett for
for Item Nos.
Nos. 10
1002
02(3
(3)b
)b to 1001
1001 (3
(3)1
)1..
70 Part
Part C - Fin
Finishi
ishing
ng
DETAIL
DETAILED
ED UNI
UNIT
T PRICE ANALYSI
ANALYSIS
S (DU
(DUPA)
PA)
A. Labor
Sub
Sub - To
Tota
tall fo
forr A
Name
Name and Capaci
Capacity
ty No of Unitls No. of HourIs Hou
Hourly
rly Rate
Rate Amoun
Amountt (PhP
(PhP))
B. Equipment
Minor
Minor Tools
Tools (10%
(10% of Lab
Labor
or Cost)
Cost)
.J
Sub
Sub - T
Tot
otal
al fo
forr B
C. Total (A + B)
D. Ou
Outp
tput
ut per hour =
per hour 1 pc
E. Direc
Directt Unit
Unit Cost (C + D)
F. Mater
Materials
ials
Sub
Sub - T
Tot
otal
al fo
forr F
G. Dire
Direct
ct Unit Costt (E + F)
Unit Cos
H. Over
Overhea
head,
d, Contin
Contingen
gencie
cies
s & M
Misc
iscell
ellane
aneous
ous (OC
(OCM)
M) Exp
Expens
enses
es 15%/12%/10%/8% of G
I. Contractor's P rofit (CP) 10%/8% of G
J. Value Added Tax (VAT) 5% of (G + H + I)
K. To
Total
tal Unit
Unit Cost
Cost (G + H + I + J)
Note:
Note: 1. Use thi
this
s cost
cost sheet
sheetfor
for Item
Item Nos.
Nos. 1002(4)
1002(4)a1,
a1, 100
1002(4
2(4)a2
)a2,, 100
1002(4
2(4)a3
)a3,, 1002(4
1002(4)a4
)a4,, 1002(4
1002(4)a5
)a5,, and 1
1002
002(4)
(4)a6.
a6.
71 Part C - Fin
Finishi
ishing
ng
DETAIL
DETAILED
ED UNI
UNIT
T PRICE ANA
ANALYSI
LYSIS
S (DU
(DUPA)
PA)
A. Labor
Sub - Total
Total for A
Name
Name and Capaci
Capacity
ty No of Unit/s No. of Houris Hourly
Hourly Rate
Rate Amou
Amount
nt (PhP
(PhP))
B. Equipment
Minor
Minor Tools
Tools (10%
(10% of Labor
Labor Cos
Cost)
t)
.J
Sub
Sub - T
Tot
otal
al fo
forr B
C. Total (A + B)
D. Output
Output = 1 pc
E. Direc
Directt Unit Costt (C + D)
Unit Cos
F. Materials
Prices
Prices of materi
materials
als are var
variab
iable
le per Reg
Region/
ion/
a. 65 mm 0 100 mm 0 x 3 m Polyvi
Polyvinyl
nyl Chlori
Chloride
de
pc 1.00 Di
Dist
stri
rict
ct base
based
d on thethe prev
prevai
aifi
fing
ng uni
unitt pric
prices
es in
(PVC)
(PV C) Pipe,
Pipe, blu
blue
e the
the loca
locali
lity
ty wh
whic
ich
h incl
include
ude pa
paym
ymen
entt of loc
local
al
b. Con
Consum
sumabl
ables
es (5% of Mater
Material
ials
s Cost)
Cost) taxe
taxes
s and ha haul
uling
ing co
cost
st to the
the proje
project
ct site
site..
Re
Refe
ferr to the
the Cons
Constrtruc
ucti
tion
on Materi
Material
al Pr
Pricice
e Da
Data
ta
establi
establishe
shed
d qua
quarte
rterly
rly by Central
Central Office
Office Pric
Price
e
Monitoring
Monitoring Commit
Committee.
tee.
Sub
Sub - T
Tot
otal
al fo
forr F
G. D
Dire
irect
ct Unit Cost (E + F)
Unit Cost
H. Overhead
Overhead,, Con
Contin
tingen
gencie
cies
s & M
Misc
iscell
ellane
aneous
ous (OC
(OCM)
M) Expens
Expenses
es 15%/12%/10%/8% of G
I. Contra
Contracto
ctor's
r's Profit
Profit (CP) 10%/8% of G
J. Value Added Tax (VAT) 5% of (G + H + I)
K. To
Total
tal Unit
Unit Cost
Cost (G + H + I + J)
No
Note
te:: 1. Us
Use
e this
this cost
cost sheet
sheetfo
forr It
Item
em Nos.
Nos. 10
1002
02(4
(4)a
)a7,
7, 10
1002
02(4
(4)a
)a8,
8, an
and
d 1002(4
1002(4)a
)a9.
9.
72 Part
Part C - Fin
Finishi
ishing
ng
DETAIL
DETAILED
ED UNI
UNIT
T PRICE
PRICE ANA
ANALYSI
LYSIS
S (DU
(DUPA)
PA)
A. Labor
(La
(Labor
bor-co
-cost
st for these
these ite
items
ms are to be cons
conside
idered
redlin
linclu
cluded
ded in the instal
installat
lation
ion of pipes.
pipes.)) Labor
d Rates
based
base areum
on minim
minimumvariable
wage per approved
wage as
as RegionlDistrict
by
DOLE. Refer to the Schedule of Labor
Labor Rates.
Sub
Sub - To
Tota
tall fo
forr A
Name
Name and Capaci
Capacity
ty No of Unitls
Unitls No. of Hou
HourIs
rIs Hourly
Hourly Rate
Rate Amou
Amount
nt (PhP
(PhP))
B. Equipment
.J
Sub
Sub - T
Tot
otal
al fo
forr B
C. Total (A + B)
D. Ou
Outp
tput
ut - 1 pc
E. Di
Dire
rect
ct Un
Unit
it Cost
Cost (C + D)
F. Materials
a. Po
Polyv
lyviny
inyll Chlori
Chloride
de (PVC)
(PVC) Fittin
Fittings,
gs, Blu
Blue
e (El
(Elbow
bowll pc 1.00 Prices of materials are variable per Regionl
District
District based
based on the prevprevailin
ailing
g unit price
pricess in
Teel Tee
Tee-Re
-Reduc
ducerl
erl Elbow
Elbow Reduce
Reducerlrl Socket
Socket!! Coupli
Couplingl
ngl
the locality which include payment of local
local
Reduce
Reducerl
rl Male
Male Threade
Threaded
d Ada
Adapto
ptorl
rl Female
Female Thread
Threaded
ed taxes
taxe s and haul
hauling
ing cost to the project site
site..
Adaptorl Cap) Refer to the Construct
Construction
ion Mate
Material
rial Price Data
established quarterly by Central Office Price
Monitoring Committee.
Sub
Sub - T
Tot
otal
al fo
forr F
G. Dire
Direct
ct Unit
Unit Co
Cost
st (E + F)
H. Overhead,
Overhead, Contingencies & Miscellane
Contingencies Miscellaneous
ous (OCM) Expenses 15%/12%110%/8% of G
I. Co
Contr
ntract
actor'
or's
s Profit
Profit (CP) 10%/8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. To
Total
tal Unit
Unit Cost
Cost (G + H + I + J)
No
Note
te:: 1. Us
Use
e thiS
thiS c
cos
ostt sh
shee
eett for
for Item
Item No
Nos.
s. 10
1002
02(4
(4)b
)b to 1001
1001 (4
(4)1
)1..
73 Part C - Fin
Finishi
ishing
ng
DETAILE
DETAILED
D UNI
UNIT
T PRICE ANAL
ANALYSI
YSIS
S (DUPA)
(DUPA)
A. Labor
See df!rivation
df!rivation for Item Nos. 1002
1002(5)a
(5)a to 1002 (5)s.
Sub
Sub - To
Tota
tall fo
forr A
Name
Name and Capaci
Capacity
ty No of Unitls No. of HourIs Hourly Rate Amou
Amount
nt (PhP
(PhP))
B. Equipment
.J
Sub
Sub - T
Tot
otal
al fo
forr B
C. Total (A + B)
Output =
D. Output 1.00I.s.
E. Direc
Directt Unit
Unit Cos
Costt (C + D)
F. Materials
See derivation
derivation for Item Nos.
Nos. 1002(5)a to 1002 (5)
(5)s.
s.
Sub
Sub - T
Tot
otal
al fo
forr F
G. Dir
Direct
ect Unit
Unit Cost
Cost (E + F)
H. Overhead,
Overhead, Contingencies & Miscellan
Contingencies Miscellaneous
eous (OCM) Expenses
Expenses 15%/12%/10%/8% of G
I. Contr
Contract
actor'
or's
s Profit
Profit (CP) 10%/8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. To
Total
tal Unit
Unit Cost
Cost (G + H + I + J)
No
Note
te:: 1. Th
The
e "Ium
"Iumps
psum
um"" unit
unit of m
mea
easu
sure
reme
ment
nt as per
per Blu
Blue
e Bo
Book
ok shall
shall be b
bas
ased
ed on the
the der
deriv
ived
ed outp
output
uts
s of Item
Item Nos. 1002(
1002(5)
5)a
a to
1002(5)s.
74 Part
Part C - Fini
Finishin
shing
g
DETAIL
DETAILED
ED UNI
UNIT
T PRICE ANAL
ANALYSIS
YSIS (DU
(DUPA)
PA)
A. Labor
Sub
Sub - To
Tota
tall fo
forr A
Name
Name and Capaci
Capacity
ty No of Unitls No. of Houris Hourly Rate Amou
Amount
nt (PhP
(PhP))
B. Equipment
Minor
Minor Tools
Tools (10%
(10% of Labor
Labor Cost)
Cost)
.J
Sub
Sub - T
Tot
otal
al fo
forr B
C. Total
Total (A + B)
D. Output = 1 set
E. Direc
Directt Unit Costt (C + D)
Unit Cos
F. Mater
Materials
ials
a. Water
Water Closet I Urinal
Closet Urinal with complete accessor
accessories
ies set 1.00 Prices of materials are variable per Region/
District
District based
based on the prev
prevailin
ailing
g unit price
pricess in
b. Consum
Consumabl
ables
es (5% of Mater
Material
ials
s Cost)
Cost)
the locality
locality which include
include paymen
paymentt of local
taxes
taxe s and hauling
hauling cost to the projec
projectt site
site..
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.
Sub
Sub - Tot
Total
al fo
forr F
G. Dir
Direct
ect Unit
Unit Cost
Cost (E + F)
H. Overhead
Overhead.. Conti
Contingencies & Miscellane
ngencies Miscellaneous
ous (OCM) Expenses
Expenses 15
15%/
%/12
12%/
%/10
10%/
%/8%
8% of G
I. Contr
Contract
actor'
or's Profit
Profit (CP) 10%/
10%/8%
8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. Total Unit Cost (G + H + I + J)
No
Note
te:: 1. Us
Use
e this
this cost sheet
sheet for
for Item Nos.
Nos. 10
1002
02(5
(5)a
)a an
and
d 10
1002
02(5
(5)b
)b..
75 Part C - Fin
Finishi
ishing
ng
DETAILE
DETAILED
D UNI
UNIT
T PRICE ANA
ANALYSI
LYSIS
S (DU
(DUPA)
PA)
A. Labor
Labor
Labor R
Rate
ates
s a
are
re variabl
variable
e per
per Regi
Region/
on/Dis
Distri
trict
ct
a. Construction Foreman 1 2.00
base
based
d on mini
minimu
mumm wage
wage as app
approv
roved
ed by
b. S killed Laborer 1 2.00 DOLE.
DOL E. Ref
Refer
er to the Sch
Schedul
edulee of L
Labor
abor Rat
Rates.
es.
c. Unskille
Unskilled
d Labo
Laborer
rer 1 2.00
Sub
Sub - To
Tota
tall fo
forr A
,
Name
Name and Capaci
Capacity
ty No of Unitls No. of Houris Hourly Rate Amoun
Amountt (PhP)
(PhP)
B. Equipment
Minor
Minor Tools
Tools (10%
(10% of Labor
Labor Cost)
Cost)
f
Sub
Sub - T
Tot
otal
al fo
forr B
C. Total (A + B)
Total
Output =
D. Output 1 set
E. Direc
Directt Unit
Unit Cos
Costt (C + D )
F. Mater
Materials
ials
a. Kitch
Kitchen
en Sink/S
Sink/Scru
crub
b Up S
Sink
ink/Sl
/Slop
op Sink
Sink with Prices of materia
materials
ls are vari variable
able per Region
Region/ /
set 1.00 Di
Dist
stric
rictt base
based d on thethe preva
prevail
iling
ing un unit
it pric
prices
es in
complete
complete accessor
accessories
ies
the local
locality
ity whi
which
ch inc
includ
ludee pay ment of local
payment local
b. Con
Consum
sumabl
ables
es (5% of Materi
Materials
als Cos
Cost)
t) taxe
taxess anand
d hau
hauli
ling
ng co cost
st to the
the projec
projectt site
site..
Re
Refe
ferr to the
the Cons
Constrtruc
ucti
tion
on Ma Mateteri
rial
al Pric
Price e Da
Data ta
est
establi
ablishe
shed
d quarter
quarterlyly by CentCentral
ral Office
Office Pric
Price e
Monitoring
Monitoring Committee.
Committee.
Sub
Sub - Tot
Total
al fo
forr F
G. Dire
Direct Unit Cost (E + F)
ct Unit
H. Overh
Overhead
ead,, Contin
Contingen
gencie
cies
s & M
Misc
iscell
ellane
aneous
ous (OCM)
(OCM) Expens
Expenses
es 15%/
15%/12
12%/
%/10
10%/
%/8%
8% of G
I. Contra
Contracto
ctor's
r's Profit
Profit (CP) 10%/
10%/8%
8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. Total
Total Unit
Unit Cos
Costt (G + H + I + J)
No
Note
te:: 1. Us
Use
e this
this cost
cost sheet
sheet for
for Item Nos.
Nos. 10
1002
02(5
(5)c
)c,, 10
1002
02(5
(5)d
)d an
and
d 10
1002
02(5
(5)e
)e..
76 Par
Partt C - Fin
Finish
ishing
ing
DETAIL
DETAILED
ED UNI
UNIT
T PRICE ANA
ANALYS
LYSIS
IS (DU
(DUPA)
PA)
A. Labor
Sub
Sub - T
Tot
otal
al fo
forr A
Name
Name and Capaci
Capacity
ty No of Unit/s No. of HourIs Hourly Rate Amoun
Amountt (PhP
(PhP))
B. Equipment
Minor
Minor Tools
Tools (10%
(10% of Labor
Labor Cos
Cost)
t)
.J
Sub
Sub - T
Tot
otal
al fo
forr B
C. Total (A + B)
Output =
D. Output 1 set
E. Direc Unit Cost (C + D)
Directt Unit
F. Materials
a. Lav
Lavato
atory
ry (Wall
(Wall Hung/
Hung/Cou
Counte
nterto
rtop/U
p/Unde
nderr Counte
Counter)
r) set 1.00 Prices
Prices o off materi
materials
als are var variabl
iablee per Reg Region/
ion/
Di
Dist
stri
rict
ct ba base
sed
d on thethe prev
prevail
ailin
ing
g uni unitt price
prices s in
b. Consum
Consumabl
ables
es (5% of Mater
Material
ials
s Cos
Cost)
t)
the
the loca
localility
ty wh
whic
ich
h incl
include
ude papaym
ymenentt of loc local
al
taxes and
and ha hauli
uling
ng co cost
st to the
the proj
projec
ectt site
site..
Re
Refe
ferr to thethe Con
Conststruc
ructi
tion
on Ma
Mateteri
rial
al Pr Pric
icee Data
Data
establ
establish
ished
ed qua quarter
rterly
ly by Cent
Central
ral Office
Office Pric
Price e
Monitoring
Monito ring Commit
Committee.
tee.
Sub
Sub - Tot
Total
al fo
forr F
G. Dir
Direct
ect Unit
Unit Cost (E + F)
H. Overhead
Overhead,, Con
Contin
tingen
gencie
cies
s & Miscel
Miscellan
laneou
eous
s (OC
(OCM)
M) Expens
Expenses
es 15%/12%/10%/8% of G
I. Contra
Contracto
ctor's
r's Profit
Profit (CP) 10%/8% of G
J. Value Added Tax (VAT) 5% of (G + H + I)
K. Total Unit Cost (G + H + I + J)
No
Note
te:: 1. Us
Use
e this
this cost
cost sheet
sheet for
for Item
Item Nos. 100
1002(
2(5)
5)ff an
and
d 1002(5
1002(5)g
)g..
77 Part
Part C - Fin
Finishi
ishing
ng
DETAILE
DETAILED
D UNI
UNIT
T PRICE ANA
ANALYSI
LYSIS
S (DU
(DUPA)
PA)
A. Labor
Sub
Sub - To
Tota
tall fo
forr A
Name
Name and Capaci
Capacity
ty No of Unitls No. of HourIs Hourly Rate Amou
Amount
nt (PhP)
(PhP)
B. Equipment
Minor
Minor Tools
Tools (10%
(10% of Lab
Labor
or Cost)
Cost)
.J
Sub
Sub - T
Tot
otal
al fo
forr B
C. Total (A + B)
Output =
D. Output 1 set
E. Direc Unit Cost (C + D)
Directt Unit
F. Mater
Materials
ials
a. Floor
Floor Drain
Drain Plate
Plate set 1
1..00 Prices of
Prices of materials are variable per Regionl
District based on the prevailing unit prices in
b. Cons
Consuma
umable
bles
s (5% of Mate
Materia
rials
ls Cos
Cost)
t)
the locality which include payment
payment of local
of local
taxes and hauling cost to the project site.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.
Sub
Sub - Tot
Total
al fo
forr F
G. Dire
Direct
ct Unit
Unit Cost (E + F)
H. Overhead
Overhead,, Contin
Contingen
gencie
cies
s & M
Misc
iscell
ellane
aneous
ous (OCM)
(OCM) Expens
Expenses
es 15%/
15%/12
12%/
%/10
10%/
%/8%
8% of G
I. Contra
Contracto
ctor's
r's Profit
Profit (CP) 10%/
10%/8%
8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. To
Total
tal Unit
Unit Cost
Cost (G + H + I + J)
78 Part
Part C - Fini
Finishin
shing
g
DETAIL
DETAILED
ED UNI
UNIT
T PRIC
PRICE
E ANALY
ANALYSIS
SIS (DUPA)
(DUPA)
A Labor
a. Constructi
Construction
on Foreman
Foreman 1 0.75 Labor
d Rates
based
base are variable
on minimu
minimumm wage per approved
wage as
as Region/District
by
b. Skilled Laborer 1 0.75 DOLE. Refer to the Schedule of Labor Rates.
c. Unskilled Laborer 1 0.75
Sub
Sub - To
Tota
tall fo
forr A
Name
Name and Capaci
Capacity
ty No of Unit/s No. of HourIs Hourly Rate Amoun
Amountt (PhP
(PhP))
B. Equipment
Minor
Minor Tools
Tools (10%
(10% of Labor
Labor Cost)
Cost)
.J
Sub
Sub - T
Tot
otal
al fo
forr B
C. Total (A + B)
D. Output = 1 pc
E. Di
Dire
rect
ct Un
Unit
it Cost
Cost (C + D)
F. Mater
Materials
ials
a. Soa
Soap
p Holder
Holder (Toil
(Toilet
et Soapl Liquid Soap) set 1.00 Prices of materials are variable per Region/
District
District based
based on the prev
prevailin
ailing
g unit price
pricess in
b. Consum
Consumabl
ables
es (5% of Mater
Material
ials
s Cost)
Cost)
the locality
locality which include
include paymen
paymentt of local
taxes
taxe s and haul
hauling
ing cost to the project site
site..
Refer to the Constructi
Construction
on Material
Material Price Data
established quarterly by Central Office Price
Monitoring Committee.
Sub
Sub - T
Tot
otal
al fo
forr F
G. Dire
Direct
ct Unit
Unit Cos
Costt (E + F)
H. Overhead,
Overhead, Contingencies & Miscellane
Contingencies Miscellaneous
ous (OCM) Expenses
Expenses 15%/12%/10%/8% of G
I. Contra
Contracto
ctor's
r's Profit
Profit (CP) 10%/8% of G
J. Value Added Tax (VAT) 5% of (G + H + I)
K. Total Unit Cost (G + H + I + J)
No
Note
te:: 1. Us
Use
e thi
this
s cost
cost she
sheet
et for
for Item Nos.
Nos. 10
1002
02(5
(5)i
)i an
and
d 10
1002
02(5
(5)j
)j..
79 Part C - Fin
Finishi
ishing
ng
DETAILE
DETAILED
D UNI
UNIT
T PRICE ANA
ANALYSI
LYSIS
S (DU
(DUPA)
PA)
A. Labor
a. Const
Constructi
ruction
on Foreman
Foreman Labo
Laborr R
Rate
ates
s are var
variabl
iable
e per
per Regi
Region/
on/Dis
Distri
trict
ct
1 0.75
ba
base
sed
d on min
minim
imum
um wawage
ge as app
approv
roved
ed by
b. Skilied
Skilied Laborer
Laborer 1 0.75 DO
DOLE
LE.. Re
Refe
ferr to the
the Sch
Schedu
edule
le of L Labo
aborr Ra
Rate
tes.
s.
c. Unskill
Unskilled
ed Laborer
Laborer 1 0.75
Sub
Sub - To
Tota
tall fo
forr A
Name
Name and Capaci
Capacity
ty No of Unitls No. of HourIs Hourly Rate Amou
Amount
nt (PhP)
(PhP)
B. Equipment
Minor
Minor Tools
Tools (10%
(10% of Labor
Labor Cost)
Cost)
f
Sub
Sub - T
Tot
otal
al fo
forr B
C. Total (A + B)
D. Output = 1 pc
E. Direc Unit Cost (C + D)
Directt Unit
F. Materials
a. Toil
Toilet
et Tissue
Tissue Holder/Dis
Holder/Dispens
penser
er set 1.00 Prices
Prices o
off materia
materials
ls are var
variabl
iable
e per Regi
Region/
on/
Di
Dist
stric
rictt babasesed
d on thethe prev
prevail
ailin
ing
g un unit
it pric
prices
es in
b. Con
Consum
sumabl
ables
es (5% of Materi
Materials
als Cos
Cost)
t)
the
the loca
localit
lity
y whwhic
ich
h includ
include e pa
paymyment
ent of loclocal
al
taxe
taxess an andd hahauli
uling
ng co cost
st to the proje
project
ct site
site..
Re
Refe
ferr to thethe Cons
Constrtruc
ucti
tion
on MaMate teri
rial
al Pric
Pricee Da Data
ta
establ
establish
isheded quarquarter
terly
ly by C Cent
entral
ral Office
Office Pric
Pricee
Monitoring
Monito ring Committee.
Committee.
Sub
Sub - Tot
Total
al fo
forr F
G. D
Dir
irec
ectt Un
Unit
it Co
Cost
st (E + F)
H. Overh
Overhead
ead,, Con
Contin
tingen
gencie
cies
s & M
Misc
iscell
ellane
aneous
ous (OCM)
(OCM) Expens
Expenses
es 15%/12%/10%/8% of G
I. Contra
Contracto
ctor's
r's Profit
Profit (CP) 10%/
10%/8%
8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. To
Total
tal Unit
Unit Cost
Cost (G + H + I + J)
No
Note
te:: 1. Us
Use
e this
this cost
cost sheet
sheet for
for It
Item
em Nos.
Nos. 10
1002
02(5
(5)k
)k an
and
d 10
1002
02(5
(5)1
)1..
80 Part
Part C - Fin
Finish
ishing
ing
DETAIL
DETAILED
ED UNI
UNIT
T PRICE ANA
ANALYS
LYSIS
IS (DU
(DUPA)
PA)
A. Labor
Labo
Laborr Rates
Rates are variabl
variable
e per Regi
Region/
on/Dis
Distri
trict
ct
a. Con!)truction Foreman 1 0.40 bas
based
ed on minim
minimum wage as approv
um wage approved
ed by
b. Skilled Laborer 1 0.40
DO
DOLE
LE.. Re
Refe
ferr to the
the Sch
Schedu
edule
le of Labo
Laborr Ra
Rate
tes.
s.
Sub
Sub - To
Tota
tall fo
forr A
Name
Name and Capaci
Capacity
ty No of Unitls No. of HourIs Hourly Rate Amount (P hP )
B. Equipment
Minor
Minor Tools
Tools (10%
(10% of Labor
Labor Cost)
Cost)
.J
Sub
Sub - Tot
Total
al fo
forr B
C. Total (A + B)
D. Output = 1 pc
E. Direct
Direct Unit
Unit Cost
Cost (C -;
-;.D)
.D)
F. Materials
a. Bi
Bide
det!
t! Fa
Fauc
ucet
et!! Hose
Hose Bi
Bibb
bb set 1.00 Prices
Prices of materia
materials
ls are var variabl
iablee per RegiRegion/
on/
Di
Dist
stri
rict
ct bas
based
ed on thethe preva
prevail
iling
ing un unit
it pric
prices
es in
b. Cons
Consuma
umable
bles
s (5% of Mater
Material
ials
s Cos
Cost)
t)
the
the loca
locali
lity
ty wh
whic
ich
h incl
includ
udee pay
paymementnt of loclocal
al
taxe
taxess anandd hauli
hauling
ng co cost
st to the
the proj
projec
ectt site
site..
Re
Refe
ferr to the
the Con
Conststru
ruct
ctio
ion
n Ma
Mateteri
rial
al Pric
Pricee DaData
ta
est
establi
ablishe
shedd quar
quarter
terly
ly by C Cent
entral
ral Office
Office Price
Monitor
Moni toring
ing Commit
Committee
tee..
Sub
Sub - Tot
Total
al fo
forr F
G. Direc
Directt Unit
Unit Cos
Costt (E + F)
H. O
Over
verhea
head,
d, Contin
Contingen
gencie
cies
s & M
Misc
iscell
ellane
aneous
ous (OC
(OCM)
M) Exp
Expens
enses
es 15
15%/
%/12
12%/
%/10
10%/
%/8%
8% of G
I. Contra
Contracto
ctor's
r's Profit
Profit (CP) 10%/
10%/8%
8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. Total Unit Cost (G + H + I + J)
No
Note
te:: 1. Us
Use
e this
this cost shee
sheett for
for Item
Item No
Nos.
s. 1002(5
1002(5)m
)m,, 10
1002
02(5
(5)q
)q,, an
and
d 10
1002
02(5
(5)r
)r..
81 Par
Partt C - Fin
Finish
ishing
ing
DETAIL
DETAILED
ED UNI
UNIT
T PRICE ANALYSIS
ANALYSIS (DU
(DUPA)
PA)
Item No./Description 10
1002
02(5
(5)n
)n Stain
Stainle
less
ss St
Stee
eell Gr
Grab
ab ba
bar
r
Unit of Measu
Measureme
rement
nt m
Output
Output per hour
hour 0.
0.45
45 m
Designation No
No.. o f P e
errs on
on //s
s No.
No. o f Hou
Hour Is
Is Hourly
Hourly Rate
Rate Amount
Amount (PhP)
(PhP)
A. Labor
Labo
Laborr R
Rate
ates
s a
are
re variabl
variable
e per
per Regi
Region/
on/Dis
Distri
trict
ct
a. Const
Construct
ruction
ion Foreman
Foreman 1 1.00 base
based
d on min
minim
imum
um wa ge as app
wage approv
roved
ed by
b. Skilled
Skilled Laborer
Laborer 1 1.00 DOLE.
DOL E. Ref
Refer
er to the Sch
Schedul
edulee of Labo
Laborr Rat
Rates.
es.
c. Unskill
Unskilled
ed Labo
Laborer
rer 2 1.00
Sub
Sub - To
Tota
tall fo
forr A
Name
Name and Capaci
Capacity
ty No of Unitls
Unitls No. of HourIs Hourly Rate Amou
Amount
nt (PhP
(PhP))
B. Equipment
Minor
Minor Tools
Tools (10%
(10% of Labor
Labor Cost)
Cost)
.J
Su
Sub
b - T
Tot
otal
al fo
forr B
C. Total (A + B)
D. Ou
Outp
tput
ut per Hour =
per Hour 0.45
0.45 m
E. Di
Direc
rectt Unit
Unit Cost (C + D)
F. Mater
Materials
ials
a. 40 mm 1IlS
1IlSta
tain
inle
less
ss St
Stee
eell Gr
Grab
ab Bar 1.00 Prices of materia
materials
ls are var variab
iable
le per Region/
Region/
m
Di
Dist
stri
rict
ct bas
based
ed on thethe preva
prevail
iling
ing uniunitt price
pricess in
b. Cons
Consuma
umable
bles
s (5% of Mate
Materia
rials
ls Cos
Cost)
t)
the localit
locality
y whi
which
ch incinclud
ludee pay ment of local
payment
taxe
taxess anand
d hauli
hauling
ng co cost
st to the
the pro
projec
jectt site
site..
Re
Refe
ferr to the
the Con
Conststru
ructctio
ion
n Ma
Mateteria
riall Pric
Price
e Da Data
ta
establi
establishe
shedd quar
quarter
terlyly by C Cent
entral
ral Office
Office Price
Monitoring
Monitoring Commit
Committee.
tee.
Su
Sub
b - T
Tot
otal
al fo
forr F
G. Dir
Direct
ect Unit Cost (E + F)
Unit Cost
H. Overhead
Overhead,, Con
Contin
tingen
gencie
cies
s & Miscel
Miscellan
laneou
eous
s (OCM)
(OCM) Expens
Expenses
es 15%/12%/10%/8% of G
I. Contra
Contracto
ctor's
r's Profit
Profit (CP) 10%/8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. Total
Total Unit
Unit Cost
Cost (G + H + I + J)
82 Part C - Fin
Finish
ishing
ing
DETAIL
DETAILED
ED UNI
UNIT
T PRICE
PRICE ANA
ANALYSI
LYSIS
S (DU
(DUPA)
PA)
Designation No.
No. of Pers
Perso
on/s
n/s No. of Hour
HourIs
Is Hourl
ourly
y Rat
Rate Amount (PhP)
A. Labor
B. Equipment
Minor Tools
Tools (10% of Labor Cost)
.J
F. Materials
a. Shower headl
headl Shower Valve set 1.00 Prices of materials are variable per Region/
Distr
District
ict based
based on the prev
prevailin
ailing
g unit price
pricess in
b. Consumables
Consumables (5% of Materials
Materials Cost)
the locality which include payment
payment of local
taxes
taxe s and haul
hauling
ing cost to the projec
projectt site
site..
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.
DETAILE
DETAILED
D UNI
UNIT
T PRICE ANA
ANALYSI
LYSIS
S (DU
(DUPA)
PA)
Output
Output per hou
hour
r 0.4 m2
A. Labor
Sub
Sub - To
Tota
tall fo
forr A .
Name
Name and Capaci
Capacity
ty No of Unitls No. of HourIs Hourly Rate Amou
Amount
nt (PhP
(PhP))
B. Equipment
Minor
Minor Tools
Tools (10%
(10% of Labor
Labor Cost)
Cost)
f
Sub
Sub - T
Tot
otal
al fo
forr B
C. Total (A + B)
2
D. Ou
Outp
tput per Hour =
ut per 0.4
0.4 m
E. Direc
Directt Unit
Unit Cos
Costt (C + D)
F. Materials
Sub
Sub - Tot
Total
al fo
forr F
G. Dir
Direct
ect Unit
Unit Cost
Cost (E + F)
H. Overh
Overhead
ead,, Con
Contin
tingen
gencie
cies
s & Misc
Miscell
ellane
aneous
ous (OCM)
(OCM) Exp
Expens
enses
es 15%/12%/10%/8% of G
I. Contra
Contracto
ctor's
r's Profit
Profit (CP) 10%/
10%/8%
8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. Total Unit Cost (G + H + I + J)
84 Part C - Fin
Finishi
ishing
ng
DETAIL
DETAILED
ED UNIT
UNIT PRICE
PRICE ANA
ANALYSI
LYSIS
S (DU
(DUPA)
PA)
A. Labor
See de
deri
riva
vati
tion
on for
for Items
Items 1002
1002(1
(1)) to Items
Items 100
1002(5
2(5))
Sub
Sub - To
Tota
tall fo
forr A
Name
Name and Capaci
Capacity
ty No of Unitls No. of HourIs Hourly Rate Amoun
Amountt (PhP
(PhP))
B. Equipment
See der
deriva
ivatio
tion
n for Item
Items
s 1002(1
1002(1)) to Items 1002(5)
1002(5)
.J
Sub
Sub - T
Tot
otal
al fo
forr B
C. Total (A + B)
D. Output
Output per
per Hour
Hour - 1.00
1.00 I.s.
I.s.
E. Dir
Direct
ect Unit
Unit Cost (C
(C + D)
F. Materials
See de
deri
riva
vati
tion
on for
for It
Item
ems
s 10
1002
02(1
(1)) to Items
Items 100
1002(5
2(5))
Sub
Sub - To
Tota
tall fo
forr F
G. Dir
Direct
ect Unit Cost (E + F)
Unit Cost
H. O
Over
verhea
head,
d, Contin
Contingen
gencie
cies
s & M
Misc
iscell
ellane
aneous
ous (OC
(OCM)
M) Exp
Expens
enses
es 15%/12%/10%/8% of G
I. Contra
Contracto
ctor's
r's Profit
Profit (CP) 10%/8% of G
J. Va
Value
lue Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. To
Total
tal Unit
Unit Cost
Cost (G + H + I + J)
No
Note
te:: 1. Th
The
e "Ium
"Iumps
psum
um"" unit
unit of m
mea
easu
sure
reme
ment
nt as per
per Blue
Blue Book
Book shall
shall be b
bas
ased
ed on the
the de
deri
rive
ved
d outp
output
uts
s of IIte
tem
m No
No.1
.1 00
002(
2(1)
1)a
a to
Item No. 1001(5).
85 Part C - Fin
Finishi
ishing
ng
DETAIL
DETAILED
ED UNI
UNIT
T PRICE ANAL
ANALYSI
YSIS
S (DU
(DUPA)
PA)
A. Labor
See deri
derivat
vation
ion for Item
Item Nos. 100
1002(3
2(3)a
)a to 1002(3)1.
Sub
Sub - To
Tota
tall fo
forr A
Name
Name and Capaci
Capacity
ty No of Unitls No. of HourIs Hourly Rate Amount (P hP)
B. Equipment
J
Sub
Sub - T
Tot
otal
al fo
forr B
C. To
Tota
tall (A + B)
D. Ou
Outp
tput
ut per
per Hour
Hour - 1.00
1.00 I.s.
I.s.
E. Dir
Direct
ect Unit Costt (C + D)
Unit Cos
F. Mater
Materials
ials
See der
deriva
ivatio
tion
n for Item
Item Nos. 100
1002(3
2(3)a
)a to 1002(3)1.
Sub
Sub - Tot
Total
al fo
forr F
G. D
Dir
irec
ectt Unit
Unit Cost (E + F)
H. Ove
Overhe
rhead,
ad, Con
Contin
tingen
gencie
cies
s & Mi
Misce
scella
llaneo
neous
us (OCM)
(OCM) Expens
Expenses
es 15%/12%/10%/8% of G
I. Contra
Contracto
ctor's
r's Profit
Profit (CP) 10%/
10%/8%
8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of ( G + H + I )
K. Total
Total Unit
Unit Cost
Cost (G + H + I + J)
No
Note
te:: 1. Th
The
e "Ium
"Iumps
psum
um"" unit
unit of me
meas
asur
urem
emen
entt as per
per Blue Bo
Book
ok sh
shal
alll be base
based
d on the
the de
deri
rive
ved
d outp
output
uts
s of It
Item
em No.100
No.1002(
2(3)
3)a
a to 10
1002
02(3
(3)1
)1..
86 Par
Partt C - Fin
Finishi
ishing
ng
DETAIL
DETAILED
ED UNI
UNIT
T PRIC
PRICE
E ANALY
ANALYSIS
SIS (DUPA)
(DUPA)
Output
Output per hour
hour 1.243 m2
1.243
A. Labor
Sub
Sub - T
Tot
otal
al fo
forr A
Name
Name and Capaci
Capacity
ty No of Unitls No. of HourIs Hourly Rate Amount (P hP )
B. Equipment
Minor
Minor Tools
Tools (10%
(10% of Labor
Labor Cost)
Cost)
Su
Sub
b - Tota
Totall fo
forr B
C. Total (A + B)
2
D. Ou
Outp
tput per Hour =
ut per 1.243
1.243 m r
E. Di
Direc
rectt Unit
Unit Cos
Costt (C + D)
F. Materials
a. 4.5
4.5mm
mm FiFibe
berr Ceme
Cement
nt Boar
Board/
d/ 4.
4.5
5 mm Ma
Mari
rine
ne pc 0.365
Pl
Plyw
ywoo
ood/
d/6
6 mm MariMarine
ne Plywoo
Plywood/
d/6m
6mmm Or
Ordi
dina
nary
ry
Plywood
b.Meta
b.Metall Fur
Furrin
ring
g (size
(size var
variab
iable
le on plan
plan and pc 1.131
and specif
specifica
icatio
tions
ns ) 3m length
length
c. Carr
Carryin
ying
g Channe
Channels
ls (size
(size varia
variable
ble dep
depend
ends
s on plans
plans pc 0.357 Prices of materials
Prices materials are variable per Regionl
District
District based on the prevprevailin
ailing
g unit price
pricess in
and specifications)
the locality which include payment
payment of local
local
d. Hange
Hangerr Bars/R
Bars/Rod
od (size
(size variable
variable dep
depend
ends
s on plans
plans pc 1 taxes and hauling cost to the project site.
and specifications) Refer to the Construct
Construction
ion Mater
Material
ial Price Data
established quarterly by Central Office Price
e. Channe
Channell cli
clip
p pc 6
Monitoring Committee.
f. Wall
Wall Angle
Angle pc 0.238
g. Rivets
Rivets pc 14
h. 1" Metal Scr
Screw
ew pc 4
Note:
Quantitie
Quan tities
s were derived
derived from pl
plans
ans and
specifications of a sta
standard
ndard school building with carrying
channels
chan spaced by 1.20 m
nels spaced m and metal furring spaced by
0.40 m
m on center.
Sub
Sub - Tot
Total
al fo
forr F
G. Dir
Direct
ect Unit Cost (E + F)
Unit Cost
H. O
Over
verhea
head,
d, Contin
Contingen
gencie
cies
s & Misc
Miscell
ellane
aneous
ous (OCM)
(OCM) Expens
Expenses
es 15
15%/
%/12
12%/
%/10
10%/
%/8%
8% of G
I. Contra
Contracto
ctor's
r's Profit
Profit (CP) 10%/
10%/8%
8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. To
Total
tal Unit
Unit Cos
Costt (G + H + I + J)
No
Note
te:: 1. Use
Use this
this co
cost
st sheet
sheetfo
forr It
Item
em Nos. 10
1003
03(1
(1 )a
)a1,
1, 10
1003
03(1
(1 )b
)b1,
1, 100
1003(
3(1
1 )c1,
)c1, and
and 1003
1003(1
(1 )d1.
)d1.
87 Part
Part C - Fin
Finish
ishing
ing
DETAIL
DETAILED
ED UNI
UNIT
T PRICE
PRICE ANALYS
ANALYSIS
IS (DU
(DUPA)
PA)
Item No./Description 10
1003
03(1
(1)a
)a 4.
4.5m
5mm
m Fibe
Fiberr Cement
Cement Bo
Boar
ard/
d/ 4.
4.5
5 mm Marine
Marine Ply
Plywo
wood
od// 6 mm Mar
Marin
ine
e Pl
Plyw
ywoo
ood/
d/ 6mm
6mm Or
Ordi
dina
nary
ry Pl
Plyw
ywoo
ood
d
in Wood
Wood Framin
Framing
g Ceilin
Ceiling
g
2
Unit of Measu
Measuremen
rementt m
Output
Output per hour 1.489 m2
1.489
A. Labor
-
a. Cons
Construct
truction
ion Foreman
Foreman 1 1.00 Labor Rates are variable per Region/District
b. Skilled
Skilled Labo
Laborer
rer 1 1.00 based
based on minimum
minimum wage as
wage as approved by
c. Unskilled Laborer 2 1.00 DOLE Refer to the Schedule
Schedule of Labo
Laborr Rates
Rates..
Sub
Sub - T
Tot
otal
al fo
forr A
B. Equipment
Minor
Minor Tools (10%
(10% of Labor
Labor Cos
Cost)
t)
.J
Sub
Sub - T
Tot
otal
al fo
forr B
C. To
Tota
tall (A + B)
D. Ou
Outpu
tputt per Hour =
Hour 1.489 m2
1.489
E. Direct
Direct Unit
Unit Cost (C + D)
Sub
Sub - Tot
Total
al fo
forr F
G. D
Dir
irec
ectt Unit
Unit Co
Cost
st (E + F)
H. Ov
Ove
er he
hea d,
d, C
Co
o nt
nt iin
ng en
en ci
cie s & Mis
Mis ce
ce llll a
an
ne ou
ou s (O
OCM
CM)) E x
xp
p en
en se
se s 1 5%/
5%/1
1 2%/
2%/1
1 0%/
0%/8
8% of G
I. Contra
Contracto
ctor's
r's Profit
Profit (CP) 10%/
10%/8%
8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. To
Total
tal Unit
Unit Cost
Cost (G + H + I + J)
Note:
Note: 1. Use th
this
is cost sheet
sheet for Item
Item Nos.
Nos. 100
1003(1
3(1 )a2,
)a2, 100
1003(1
3(1 )b2
)b2,, 100
1003(1
3(1 )c2
)c2,, and 1003(1
1003(1 )d2.
)d2.
88 Part C - Fin
Finishi
ishing
ng
DETAIL
DETAILED
ED UNI
UNIT
T PRIC
PRICE
E ANALYS
ANALYSIS
IS (DU
(DUPA)
PA)
A. Labor
Sub
Sub - To
Tota
tall fo
forr A
Name
Name and Capaci
Capacity
ty No of Unitls No. of HourIs Hourly Rate Amou
Amount
nt (PhP
(PhP))
B. Equi
Equipm
pmen
entt .
Minor
Minor Tools
Tools (10%
(10% of Labor
Labor Cost)
Cost)
.J
Sub
Sub - T
Tot
otal
al fo
forr B
C. Total (A + B)
D. Output
Output per Hour
Hour = 1.340 m2
1.340
E. Direc
Directt Unit
Unit Cos
Costt (C + D)
F. Materials
a. Gypsum Board pc 0.365
b.Meta
b.Metall Fur
Furrin
ring
g (size
(size var
variab
iable
le on plan
plan and pc 1.13
c. Carry
Carrying
ing Cha
Channe
nnels
ls (size
(size varia
variable
ble dep
depend
ends
s on plans
plans Prices of materials are variable per Region!
pc 0.36 District
District based
based on the preva
prevailing
iling unit price
prices
s in
and specifications)
the locality which include payment of local
d. Hange
Hangerr Bars/R
Bars/Rod
od «si
«size
ze var
variab
iable
le dep
depend
ends
s on plan
plans
s taxes
taxes and hauling
hauling cost to the project
project site.
pc 1.00
and specifications) Refer to the Construct
Construction
ion Mater
Material
ial Price Data
e. Chann
Channel
el cli
clip
p pc 6 established quarterly by Central Office Price
Monitoring Committee
f. Wall
Wall Angle
Angle pc 0.238
g. Rivets
Rivets pc 14
h. 1" metal screw pc 4
Note:
Quantitie
Quan tities
s were derived
derived from plans
plans and
specifica
spec ification
tions
s of a a standard school building with carrying
channels
chan nels spaced
spaced by 1.20 m and
m and metal furring spaced by
0.40 m
m on center.
Sub
Sub - T
Tot
otal
al fo
forr F
G. Dir
Direct
ect Unit Cost (E + F)
Unit Cost
H. Overhea
Overhead,
d, Contin
Contingen
gencie
cies
s & Miscel
Miscellan
laneou
eous
s (OCM)
(OCM) Expens
Expenses
es 15%/
15%/12
12%/
%/10
10%/
%/8%
8% of G
I. Contr
Contract
actor'
or's
s Profit
Profit (CP) 10%/
10%/8%
8% of G
J. Value Added Tax (VAT) 5% of (G + H + I)
K. Total Unit Cost (G + H + I + J)
89 Part C - Fini
Finishin
shing
g
DETAIL
DETAILED
ED UNI
UNIT
T PRICE
PRICE ANALYS
ANALYSIS
IS (DU
(DUPA)
PA)
Unit of Measu
Measureme
rement
nt
Output
Output per hou
hour
r
A. Labor
Labor -
a. Const
Construct
ruction
ion Foreman
Foreman 1 1.00 Labor
Labor R
Rates
ates are variabl
variable
e per Reg
Region/
ion/Dis
Distri
trict
ct
bas
based
ed on minim
minimum wage as appro
um wage approve
ved
d by
b. Skilled
Skilled Labo
Laborer
rer 1 1.00
DO
DOLE
LE.. Re
Refe
ferr to the
the Sche
Schedu
dule
le of La Labo
borr Rates
Rates..
c. Unskille
Unskilled
d Labo
Laborer
rer 2 1.00
Sub - Total
Total for A
Name
Name and Capaci
Capacity
ty No of Unitls No. of HourIs Hou
Hourly
rly Rate
Rate Amoun
Amountt (PhP
(PhP))
B. Equipment
Minor
Minor Tools
Tools (10%
(10% of Labor
Labor Cost)
Cost)
.J
Sub
Sub - T
Tot
otal
al fo
forr B
C. Total
Total (A + B)
D. Output Hour
Output per Hour = 0.776 m2
0.776
E. Dire
Direct
ct Unit
Unit Cost (C + D)
F. Materials
a. 4.5mml 6.0 mm 4' X 8' th
thk cement boardl
k fiber cement Prices
Prices of materi
materials
als are vari
variable
able per Regi
Region/
on/
4.
4.5m
5mm
m Mari
Marine
ne Ply
Plywo
wood
od/6
/6.0
.0 mm Mar
Marin
ine
e Pl
Plyw
ywoo
oodl
dl 6.
6.0
0 pc 0.730 Di
Dist
stri
rict
ct bas
based
ed on the
the prev
prevail
ailin
ing
g uniunitt pric
prices
es in
mm Ord
Ordina
inary
ry Plywoo
Plywood
d the
the loca
locali
lity
ty wh
whic
ichh inc
includ
ludee pa
paym
ymenentt of loca
local l
taxe
taxess and haulin
hauling
g co
cost
st to the
the pro
proje
ject
ct site
site..
b. Metal
Metal Studs
Studs (size
(size variable
variable dep
depend
ends
s on plan
plan and Re
Refe
ferr to
to the
the Con
Const
struc
ructi
tion
on Ma
Mate
teri
rial
al Pric
Price
e DDat
ata
a
spe
specs.
cs.)) 3 m length
length pc 1.181
establi
establishe
shedd quarter
quarterly
ly by C Centr
entral
al Office
Office Pric
Price
e
Monitoring
Monitoring Commit
Committee.
tee.
c. Rivets
Rivets pc 117.00
d. 1" Metal
Metal Screw
Screw pc 4.00
Su
Sub
b - T
Tot
otal
al fo
forr F
G. D
Dire
irect
ct Unit
Unit Cost
Cost (E + F)
H. Overhead
Overhead,, Conti
Contingencies & Miscellane
ngencies Miscellaneous
ous (OCM) Expense
Expenses
s 15%/12%/10%/8% of G
I. Contra
Contracto
ctor's
r's Profit
Profit (CP) 10%/8% of G
J. Value
Value Add
Added
ed Tax (VAT)
(VAT) 5% of (G + H + I)
K. T
Tota
otall Unit
Unit Cost
Cost (G + H + I + J)
Note:
Note: 1. Use thi
this
s cost
cost shee
sheetfo
tforr Item
Item Nos.
Nos. 100
1003(2
3(2)a1
)a1,, 100
1003(2
3(2)b1
)b1,, 100
1003(2
3(2)c1
)c1,, 1003(2
1003(2)d1
)d1 and 1003(
1003(2)e
2)e1.
1.
90 Part
Part C - Fin
Finishi
ishing
ng
DETAIL
DETAILED
ED UNI
UNIT
T PRICE ANALYSIS
ANALYSIS (DU
(DUPA)
PA)
A Labor
(La
(Labor
bor_
_ cos
costt for these
these ite
items
ms are to be consi
consider
dered/
ed/inc
includ
luded
ed in the
the inst
install
allati
ation
on of doors
doors,, window
windows,
s, and other
other fabric
fabricate
ated
d materi
materials
als.)
.)
Su
Sub
b - Tota
Totall fo
forr A
Name
Name and Capaci
Capacity
ty No of Unitls No. of HourIs Hourly Rate Amou
Amount
nt (PhP
(PhP))
B. Equipment
.J
Su
Sub
b - T
Tot
otal
al fo
forr B
C. Total (A + B)
Output =
D. Output
E. Direct
Direct Unit
Unit Cos
Costt (C + D)
F. Materials
Sub
Sub - Tot
Total
al fo
forr F
G. Dir
Direct
ect Unit Cost (E + F)
Unit Cost
H. Overhea
Overhead,
d, Contin
Contingen
gencie
cies
s & Miscel
Miscellan
laneou
eous
s (OC
(OCM)
M) Exp
Expens
enses
es 15
15%/
%/12
12%/
%/10
10%/
%/8%
8% of G
I. Contra
Contracto
ctor's
r's Profit
Profit (CP) 10%/
10%/8%
8% of G
J. Va
Value
lue Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. Total Unit Cost (G + H + I + J)
No
Note
te:: 1. Us
Use
e this
this cost sheet
sheet for
for Item Nos.
Nos. 10
1004
04(2
(2)a
)a to 1004
1004(2
(2)i
)i..
91 Part
Part C - Fin
Finishi
ishing
ng
DETAIL
DETAILED
ED UNI
UNIT
T PRICE
PRICE ANALYS
ANALYSIS
IS (DU
(DUPA)
PA)
Output
Output per ho
hour
ur 0.18m2
A. Labor
a. Constr
Construct
uction
ion For
Forema
eman
n 1 1.00 Labor Rates are variable per RegionlDistrict
b. Skilled Laborer 1 1.00 based
based on minimu
minimumm wage as
wage as approved by
c. Unskilled Laborer 1 1.00 DOLE. Refer to the Schedule
Schedule of Labo
Laborr Rates
Rates..
Su
Sub
b - Tota
Totall fo
forr A
Name
Name and Capaci
Capacity
ty No of Unitls No. of Houris Hourly Rate Amount (P hP )
B. Equipment
Note:
It is a
assu
ssumed
med that
that fabricat
fabrication
ion of stee
steell win
window
dows
s are
alr
alread
eadyy comple
completed
ted.. Thus,
Thus, labor
labor and equip
equipmen
mentt output
output
sha
shall
ll be based
based on insta
installa
llatio
tion
n tim
time
e onl
only.
y.
f
Sub
Sub - Tot
Total
al fo
forr B
C. Total (A + B)
Total
D. Output Hour
Output per Hour = 0.18 m2
0.18
E. Dire
Direct
ct Unit Costt (C + D)
Unit Cos
m
2 Prices of materials are variable per Regionl
a. Reside
Residenti
ntial
al Caseme
Casement
nt Steel
Steel Window
Windowsl
sl Heavy
Heavy Duty
Duty 1.00
District based on the prevailing
District prevailing unit pr
prices
ices in
Sid
Side-h
e-hing
inged
ed Ventil
Ventilato
atorl
rl Projec
Projected
ted Ventil
Ventilato
atorl
rl Awning
Awning the locality which include payment of local
Ventilator
Ventilatorll Grille
Grille Window
Window taxes
taxe s and hauling
hauling cost to the project
project site.
b. Cons
Consuma
umable
bles
s (5% of Mate
Materia
rials
ls Cos
Cost)
t) Refer to the Const
Construct
ruction
ion Mater
Material
ial Price Data
established quarterly by Central Office Price
Monitoring Committee.
Sub
Sub - T
Tot
otal
al fo
forr F
G. Direc Unit Cost (E + F)
Directt Unit
H. Overhead
Overhead,, Con
Contin
tingen
gencie
cies
s & Misc
Miscell
ellane
aneous
ous (OCM)
(OCM) Exp
Expens
enses
es 15%/12%/10%/8% of G
I. Contr
Contract
actor'
or's Profit
Profit (CP) 10%/8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. Total Unit Cost (G + H + I + J)
Note:
Note: 1. Use tthis
his cost
cost sheet
sheet for Item
Item Nos.
Nos. 1005(1),
1005(1), 100
1005(2
5(2),
), 100
1005(3
5(3),
), 100
1005(4
5(4),
), and 1005(5
1005(5).
).
92 Part
Part C - Fin
Finish
ishing
ing
DETAIL
DETAILED
ED UNI
UNIT
T PRICE ANAL
ANALYSIS
YSIS (DU
(DUPA)
PA)
Output
Output per hou
hour
r 0.26 m2
0.26
A. Labor
Sub
Sub - To
Tota
tall fo
forr A
Name
Name and Capaci
Capacity
ty No of Unitls
Unitls No. of HourIs Hourly Rate Amou
Amount
nt (PhP
(PhP))
B. Equipment
.J
Sub
Sub - To
Tota
tall fo
forr B
C. Total (A + B)
Hour =
2
D. Output
Output per Hour 0.26
0.26 m
E. Di
Direc
rectt Unit
Unit Cost (C + D)
F. Mater
Materials
ials
Prices of
Prices of materials
materials are variable per Region/
a. Hollow
Hollow Steel
Steel Door/
Door/ Steel
Steel Flu
Flush
sh Doorl Grille
Grille Door/ District based on the prevailing unit prices
m2 1.00
Steel
Steel Lou
Louver
ver Door
Door in the locality which include payment
payment of
b. Con
Consum
sumabl
ables
es (3% of Mater
Material
ials
s Cos
Cost)
t) local taxes and hauling cost to the project
site. Refer to the Construction Material
Price Data established quarterly by Central
Office Price Monitoring Committee.
Sub
Sub - Tot
Total
al fo
forr F
G. Dire
Direct
ct Unit Cost (E + F)
Unit Cost
H. Overhead
Overhead,, Con
Contin
tingen
gencie
cies
s & Miscel
Miscellan
laneou
eous
s (OC
(OCM)
M) Expens
Expenses
es 15%/12%/10%/8% of G
I. Contractor's P rofit (CP) 10%/8% of G
J. Value Added Tax (VAT) 5% of (G + H + I)
K. Total Unit Cost (G + H + I + J)
No
Note
te:: 1. Us
Use
e this
this cost
cost she
sheet
et for Item
Item No
Nos.
s. 1006(
1006(1)
1),, 10
1006
06(2
(2),
), 10
1006
06(3
(3)) an
and
d 10
1006
06(4
(4).
).
93 Par
Partt C - Fin
Finishi
ishing
ng
DETAIL
DETAILED
ED UNI
UNIT
T PRICE ANAL
ANALYSI
YSIS
S (DU
(DUPA)
PA)
A. Labor
a. Constructi
Construction
on Foreman
Foreman 1 1.00 Labor Rates are variable per Region/District
b. Skilled
Skilled Laborer
Laborer 1 1.00 based
based on minimum
minimum wage
wage as
as approved by
c. Unskil
Unskilled
led Labo
Laborer
rer 2 1.00 DOLE. Refer to the Schedule
Schedule of Labo
Laborr Rates
Rates..
Sub
Sub - T
Tot
otal
al fo
forr A
Name
Name and Capaci
Capacity
ty No of Unitls No. of HourIs Hourly Rate Amount (P h P )
B. Equipment
a. Weld
Welding
ing Machi
Machine
ne 1 0.25 See lat
latest
est ACEL rental
rental rates
Minor
Minor Tools
Tools (10%
(10% of Labor
Labor Cos
Cost)
t)
.J
Sub
Sub - T
Tot
otal
al fo
forr B
C. Total (A + B)
Total
2
D. Ou
Outp
tput
ut per Hour =
per Hour 0.26
0.26 m
E. Dir
Direct
ect Unit
Unit Cost (C + D)
F. Mater
Materials
ials
m
2 Prices of materials are variable per Region/
a. Fire
Fire rated Fir
Fire
e Exi
Exitt Steel Door
Door 1.00
District based on the prevailing unit prices
prices in
b. Cons
Consuma
umable
bles
s (3% of Mater
Material
ials
s Cost)
Cost) the locality which include payment of local
taxes
taxe s and hauling
hauling cost to the proje
project
ct site.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.
Sub
Sub - To
Tota
tall fo
forr F
G. Dire
Direct
ct Unit Cost (E + F)
Unit Cost
H. Overh
Overhead
ead,, Contin
Contingen
gencie
cies
s & M
Misc
iscell
ellane
aneous
ous (OCM)
(OCM) Expens
Expenses
es 15%/12%/10%/8% of G
I. Contra
Contracto
ctor's
r's Profit
Profit (CP) 10%/8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. Total
Total Unit
Unit Cost
Cost (G + H + I + J)
94 Part
Part C - Fin
Finish
ishing
ing
DETAILE
DETAILED
D UNI
UNIT
T PRICE ANA
ANALYSI
LYSIS
S (DU
(DUPA)
PA)
A. Labor
Sub
Sub - To
Tota
tall fo
forr A
Name
Name and Capaci
Capacity
ty No of Unit/s No. of Hour/s Hourly Rate A mount (P h P )
B. Equipment
Minor
Minor Tool
Tools
s (10%
(10% of Labor
Labor Cost)
Cost)
.J
Sub
Sub - T
Tot
otal
al fo
forr B
C. Total (A + B)
2
D. Ou
Outp
tput per Hour =
ut per 0.26
0.26 m
E. Dir
Direct
ect Unit
Unit Cost (C + D)
F. Mater
Materials
ials
Sub
Sub - Tot
Total
al fo
forr F
G. Direc
Directt Unit Costt (E + F)
Unit Cos
H. Overhead,
Overhead, Contingencies & Miscellan
Contingencies Miscellaneous
eous (OCM) Expenses
Expenses 15
15%/
%/12
12%/
%/10
10%/
%/8%
8% of G
I. Co
Contr
ntract
actor'
or's Profit
Profit (CP) 10%/
10%/8%
8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. To
Total
tal Unit
Unit Cost
Cost (G + H + I + J)
No
Note
te:: 1. Us
Use
e this
this cost
cost she
sheet
et for It
Item
em Nos.
Nos. 10
1007
07(1
(1)a
)a an
and
d 1007(
1007(1)
1)b.
b.
95 Par
Partt C - Fin
Finish
ishing
ing
DETAILE
DETAILED
D UNI
UNIT
T PRICE ANALYSIS
ANALYSIS (DU
(DUPA)
PA)
Item No./Description 1008 Aluminum Glass Window (Sliding/ Casement! Awning/ Fixed Type)
2
Unit of Measu
Measuremen
rementt m
Output
Output per hou
hour
r 0.36 m2
0.36
A. Labor
a. Constructi
Construction
on Foreman
Foreman 1 1.00 Labor Rates are variable per Region/District
b. Skilled
Skilled Laborer
Laborer 1 1.00 based
based on minimu
minimumm wage
wage as
as approved by
c. Unskilled
Unskilled Labo
Laborer
rer 1 1.00 DOLE. Refer to the Schedule
Schedule of of Labor Rates.
Sub
Sub - To
Tota
tall fo
forr A
Name
Name and Capaci
Capacity
ty No of Unit/s No. of Hour/s Hourly Rate Amoun
Amountt (PhP
(PhP))
B. Equipment
Minor
Minor Tool
Tools
s (10%
(10% of Labor
Labor Cos
Cost)
t)
f
Sub
Sub - Tot
Total
al fo
forr B
C. Total (A + B)
2
D. Ou
Outp
tput
ut pe
perr Hour =
Hour 0.3
0.36
6 m
E. Dire
Direct
ct Unit
Unit Cost
Cost (C + D)
F. Materials
a. Alumin
Aluminum
um Glass
Glass Win
Window
dow (Sl
(Slidi
iding/
ng/ Caseme
Casement!
nt! Prices of
Prices of materials are variable per Region/
2 District based on the prevailing unit prices in
Awning/ Fixed Type) m 1.00
the locality which include payment
payment of local
local
b. Cons
Consuma
umable
bles
s (3% of Mate
Materia
rials
ls Cos
Cost)
t) taxes and hauling cost to the project site.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.
Su
Sub
b - Tot
Total
al fo
forr F
G. D
Dir
irec
ectt Unit
Unit Cost (E + F)
H. Over
Overhea
head,
d, Contin
Contingen
gencie
cies
s & Misce
Miscella
llaneo
neous
us (OCM)
(OCM) Expens
Expenses
es 15
15%/
%/12
12%/
%/10
10%/
%/8%
8% of G
I. Contra
Contracto
ctor's
r's Profit
Profit (CP) 10%/
10%/8%
8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5 % of ( G + H + I )
K. To
Total
tal Unit
Unit Cost
Cost (G + H + I + J)
Note:
Note: 1. Use th
this
is cost sheet
sheet for Item
Item Nos. 100
1008(1
8(1 la, 1008(1
1008(1 )b, 1008(
1008(1)c
1)c and 1008(1
1008(1)d.
)d.
96 Part
Part C - Fin
Finishi
ishing
ng
DETAIL
DETAILED
ED UNI
UNIT
T PRIC
PRICE
E ANALY
ANALYSIS
SIS (DUPA)
(DUPA)
A. Labor
B. Equipment
Minor Tools
Tools (10% of Labor Cost
Cost))
.J
F. Materials
2 Pric
Prices
es of ma mate
teri
rial
als
s areare vavari
riabl
ablee per Re Regio
gion/
n/
a. Jalousie Window (Glass) m 1.00
Di
Dist
stri
rict
ct bas
based
ed on th thee pre
preva
vail
iling
ing uni unitt price
prices s in
b. Consumables
Consumables (3% of Materials
Materials Cost) the
the loca
locali
lity
ty wh
whic
ichh incl
includ
udee pay
payme
ment nt of loc local
al
taxe
taxess and hauling
hauling co cost
st to the proj
projec
ectt site
site..
Refer
Refer to the the Cons
Constrtruc
ucti
tion
on Ma Mateteri
rial
al Pr Pric
icee DaDatata
establi
establishe
shedd quarter
quarterlyly by Centra
Centrall Office
Office Pric
Price e
Mon
Monito
itoring
ring ComCommitmittee
tee..
DETAIL
DETAILED
ED UNI
UNIT
T PRICE ANA
ANALYSI
LYSIS
S (DUPA)
(DUPA)
A. Labor
Sub
Sub - To
Tota
tall fo
forr A
Name
Name and Capaci
Capacity
ty No of Unitls No. of Houris Hourly Rate Amou
Amount
nt (PhP)
(PhP)
B. Equipment
Minor
Minor Tools
Tools (10%
(10% of Labor
Labor Cost)
Cost)
.J
Sub
Sub - T
Tot
otal
al fo
forr B
C. Tot
Total
al (A + B)
D. Output - 1 set
E. Direct
Direct Unit
Unit Cost (C + D)
F. Materials
a. Jamb
Jambs,
s, Sill,
Sill, Head,
Head, Tran
Transom
soms
s and Mullio
Mullion
n 1.00 Prices
Prices of materi
materials
als are variabvariable
le per RegRegionl
ionl
set
Di
Dist
stri
rict
ct bas
based
ed on the the prev
prevai
ailin
ling
g uni
unitt price
prices s in
b. Con
Consum
sumabl
ables
es (5% of Mater
Material
ials
s Cos
Cost)
t)
the
the local
localit
ity
y wh
whic
ich
h incl
include
ude papaymymen
entt of loclocal
al
taxe
taxess and haulin
hauling
g co cost
st to the
the proj
projec
ectt site
site..
Re
Refe
ferr to the
the Cons
Constr truc
ucti
tion
on Materi
Material
al Pr Pric
icee DaData
ta
establi
establishe
shed d qua
quarte
rterly
rly by Central
Central Office
Office Price
Monitoring
Monito ring Commit
Committee.tee.
Sub
Sub - T
Tot
otal
al fo
forr F
G. Dire
Direct
ct Unit
Unit Cos
Costt (E + F)
H. Overhea
Overhead,
d, Contin
Contingen
gencie
cies
s & Miscel
Miscellan
laneou
eous
s (OCM)
(OCM) Exp
Expens
enses
es 15%/12%/10%/8% of G
I. Contra
Contracto
ctor's
r's Profit
Profit (CP) 10%/
10%/8%
8% of G
J. Value
Value Add
Added
ed Tax (VAT)
(VAT) 5% of (G + H + I)
K. To
Total
tal Unit
Unit Cost
Cost (G + H + I + J)
98 Part
Part C - Fin
Finishi
ishing
ng
DETAILE
DETAILED
D UNI
UNIT
T PRICE ANAL
ANALYSI
YSIS
S (DU
(DUPA)
PA)
Item No.lDescription 10
1010
10(2
(2)a
)a Ho
Holl
llow
ow Co
Core
re Flus
Flush
h Do
Door
or
2
Unit of Measuremen
Measurementt m
2
Output
Output per hour 0.
0.32
32 m
A. Labor
Sub
Sub - T
Tot
otal
al fo
forr A
B. Equipment
Minor
Minor Tools
Tools (10%
(10% of Labo
Laborr Cos
Cost)
t)
.J
Sub
Sub - T
Tot
otal
al fo
forr B
C. Total (A + B)
D. Ou
Outp
tput per Hour
ut per = 0.32 m2
0.32
E. Direc
Directt Unit
Unit Cos
Costt (C + D)
F. Mater
Materials
ials
Sub
Sub - T
Tot
otal
al fo
forr F
G. Dire
Direct Unit Cost (E + F)
ct Unit
H. Overhead
Overhead,, Con
Contin
tingen
gencie
cies
s & M
Misc
iscell
ellane
aneous
ous (OCM)
(OCM) Exp
Expens
enses
es 15%/12%/10%/8% of G
I. Contractor's Profit (CP) 10%/8% of G
J. Value Added Tax (VAT) 5% of (G + H + I)
K. Total Unit Cost (G + H + I + J)
99 Part
Part C - Fin
Finishi
ishing
ng
DETAIL
DETAILED
ED UNI
UNIT
T PRICE
PRICE ANAlY
ANAlYSIS
SIS (DU
(DUPA)
PA)
A. Labor
a. Const
Construct
ruction
ion Foreman
Foreman 1 1.00 Labor
Labor Rate
Rates
s ar
are
e var
variabl
iable
e per RegRegionl
ionlDis
Distri
trict
ct
b. Skilled
Skilled Laborer
Laborer 1 1.00 bas
based
ed on minim
minimum
um wagewage as ap
appro
prove
vedd by
c. Unskilled
Unskilled Labo
Laborer
rer 2 1.00 DO
DOLE
LE.. Refer
Refer to the
the Sc
Sched
hedul
ule
e of LabLabor
or Ra
Ratetes.
s.
Sub
Sub - To
Tota
tall fo
forr A
Name
Name and Capaci
Capacity
ty No of Unitls No. of Houris Hourly
Hourly Rate
Rate Amoun
Amountt (PhP
(PhP))
B. Equipment
Minor
Minor Tools
Tools (10%
(10% of Labor
Labor Cost)
Cost)
f
Sub
Sub - To
Tota
tall fo
forr B
C. Total (A + B)
2
D. Ou
Outp
tput
ut per Hour =
per Hour 0.32
0.32 m
E. Di
Direc
rectt Unit
Unit Cost (C + D)
F. Mater
Materials
ials
2 Prices
Prices of materi
materials
als are varivariabl
ablee per RegiRegionl
onl
a. Wooden Panel Door m 1.00
Di
Dist
stri
rict
ct bas
based
ed on tthehe prev
prevai
ailin
ling
g uniunitt price
pricess in
the
the loca
locali
lity
ty wh
whic
ich
h incl
include
ude paypaymement
nt of loclocal
al
taxes
taxes and hauling
hauling cocost
st to the
the proj
projec
ectt site
site..
Re
Refe
ferr to the
the Cons
Constrtruc
ucti
tion
on Materi
Materialal Pric
Pricee Data
Data
establi
establishe
shed d quarterl
quarterly
y by CentCentral
ral Office
Office Pric
Pricee
Monitoring
Monito ring Commit
Committee.
tee.
Su
Sub
b - T
Tot
otal
al fo
forr F
G. Dire
Direct
ct Unit
Unit Cost (E + F)
H. Over
Overhea
head,
d, Contin
Contingen
gencie
cies
s & Misc
Miscell
ellane
aneous
ous (OCM)
(OCM) Exp
Expens
enses
es 15%/12%/10%/8% of G
I. Contra
Contracto
ctor's
r's Profit
Profit (CP) 10%/8% of G
J. Value
Value Add
Added
ed Ta
Tax
x (VAT)
(VAT) 5% of (G + H + I)
K. T
Tota
otall Unit
Unit Cost
Cost (G + H + I + J)
100 Part C - Fin
Finishi
ishing
ng
DETAIL
DETAILED
ED UNI
UNIT
T PRICE ANALYSI
ANALYSIS
S (DU
(DUPA)
PA)
A Labor
Sub
Sub - T
Tot
otal
al fo
forr A
Name
Name and Capaci
Capacity
ty No of Unit/s No. of HourIs Hourly Rate Am
Amou
ount
nt (PhP
(PhP))
B. Equipment
Minor
Minor Tools (10%
(10% of Labor
Labor Cost)
Cost)
.J
Sub
Sub - T
Tot
otal
al fo
forr B
C. Total (A + B)
D. Output = 1.00 set
E. Di
Direc
rectt Unit
Unit Cos
Costt (C
(C + D)
F. Mater
Materials
ials
a. Ste
Steel
elll Alu
Alumi
minu
num
m Ro
Roll
ll Up Door
Door Set 1.00 Prices
Prices of materials
materials are varia
variable
ble per Regio
Region/
n/
Distr
District
ict based
based on the preva
prevailing
iling unit price
prices
s in
b. Consum
Consumabl
ables
es (3% of Mate
Materia
rials
ls Cos
Cost)
t)
the locality
locality which include
include payment of local
taxes
taxe s and hauling
hauling cost to the project site.
Refer to the Construct
Construction
ion Mater
Materialial Price Data
established quarterly by Central Office Price
Monitoring Committee.
Su
Sub
b - Tot
Total
al fo
forr F
G. Direc
Directt Unit
Unit Cos
Costt (E + F)
H. O
Over
verhea
head,
d, Contin
Contingen
gencie
cies
s & Misc
Miscell
ellane
aneous
ous (OCM)
(OCM) Expens
Expenses
es 15%/12%/10%/8% of G
I. Contra
Contracto
ctor's
r's Profit
Profit (CP) 10%/8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. Total Unit Cost (G + H + I + J)
101 Part
Part C - Fin
Finish
ishing
ing
DETAIL
DETAILED
ED UNI
UNIT
T PRICE
PRICE ANALYS
ANALYSIS
IS (DU
(DUPA)
PA)
A. Labor
a. Co~
Co~tru
tructi
ction
on Forema
Foreman
n 1 1.00 Labor
Labor R
Rates
ates are variabl
variable
e pe
perr Regi
RegionlD
onlDist
istric
rict
t
b. Skilled
Skilled Laborer
Laborer 1 1.00 bas
based
ed on mini
minimum
mum wa ge as ap
wage appro
prove
ved
d by
c. Unskille
Unskilled
d Labo
Laborer
rer 1 1.00 DOLE.
DOLE. Refer
Refer to the Sch
Schedul e of L
edule Labor
abor Rat
Rates.
es.
Su
Sub
b - Tota
Totall fo
forr A .
Name
Name and Capaci
Capacity
ty No of Unit/s No. of HourIs Hourly Rate Amount (P hP )
B. Equipment
Minor
Minor Tools
Tools (10%
(10% of Labor
Labor Cost)
Cost)
.J
Sub
Sub - Tot
Total
al fo
forr B
C. Total (A + B)
Total
D. Output Hour
Output per Hour = 0.26 m2
0.26
E. Direct
Direct Unit
Unit Cost (C + D )
F. Materials
Sub
Sub - T
Tot
otal
al fo
forr F
G. Dir
Direct
ect Unit Cost (E + F)
Unit Cost
H. Overhead,
Overhead, Contingencies & Miscellan
Contingencies Miscellaneous
eous (OCM) Expenses
Expenses 15%/12%/10%/8% of G
I. Contr
Contract
actor'
or's Profit
Profit (CP) 10%/8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. Total
Total Unit
Unit Cost
Cost (G + H + I + J)
No
Note
te:: 1. Us
Use
e this
this cost
cost sheet
sheet for
for It
Item
em No
Nos.
s. 10
1012
12(1
(1 )d
)d1
1 and
and 10
1012
12(1
(1 )d
)d2.
2.
102 Par
Partt C - Fin
Finishi
ishing
ng
DETAIL
DETAILED
ED UNI
UNIT
T PRICE
PRICE ANA
ANALYSI
LYSIS
S (DUPA)
(DUPA)
A. Labor
-
a. Construction Foreman 1 1.00 Labor
Labor Rates
Rates are variabl
variable
e per Regi
Region/
on/Dis
Distri
trict
ct
b. Skilled
Skilled Labo
Laborer
rer 1 1.00 bas
based
ed on mi
minim
nimum wage as ap
um wage appro
prove
ved
d by
c. Unskilled
Unskilled Laborer
Laborer 1 1.00 DO
DOLE
LE.. Refer
Refer to the
the Sc
Sched
hedule
ule of Labor
Labor Ra
Rate
tes.
s.
Su
Sub
b - Tota
Totall fo
forr A
Name
Name and Capaci
Capacity
ty No of Unitls No. of HourIs Hourly
Hourly Rate
Rate Amoun
Amountt (PhP
(PhP))
.
B. Equipment
Minor
Minor Tools
Tools (10%
(10% of Labor
Labor Cost)
Cost)
f
Su
Sub
b - T
Tot
otal
al fo
forr B
C. Total (A + B)
D. Ou
Outp
tput
ut per
per Hour =
Hour 0.36 m2
0.36
E. Direct Unit Cost (C + D)
Direct Unit
F. Mater
Materials
ials
Prices
Prices of materia
materials
ls are var variabl
iable e per Regi Region/
on/
a. Tem
Temper
pered
ed Glass
Glass Wind
Windows
ows (8 mm/10mm) m2 1.00
Di
Dist
stri
rict
ct bas
based
ed on th thee pre
preva
vail
iling
ing uni unitt price
prices s in
b. Cons
Consuma
umable
bles
s (3% of Mater
Material
ials
s Cos
Cost)
t) the
the loca
locali
lity
ty wh
whic
ich
h incl
includ
udee pay
paymen
mentt of loc local
al
taxe
taxess anandd hauli
hauling
ng co cost
st to the pr proj
ojec
ectt site
site..
Re
Refe
ferr to the
the Con
Const stru
ruct
ctio
ion
n Ma
Mate teri
rial
al Pr Pric
icee Da Data
ta
establi
establishe
shed d quar
quarter
terly
ly by Cen Centra
trall Office
Office Pric
Price e
Monitoring
Monitor ing Commit
Committee.
tee.
Sub
Sub - T
Tot
otal
al fo
forr F
G. Dir
Direct
ect Unit Cost (E + F)
Unit Cost
H. Overhead,
Overhead, Contingencies & Miscellane
Contingencies Miscellaneous
ous (OCM) Expenses 15%/12%/10%/8% of G
I. Contra
Contracto
ctor's
r's Profit
Profit (CP) 10%/8% of G
J. Value
Value Add
Added
ed Tax (VAT)
(VAT) 5% of (G + H + I)
K. T
Tota
otall Unit
Unit Cost
Cost (G + H + I + J)
No
Note
te:: 1. Us
Use
e this
this cost
cost sheet
sheet for Ite
Item
m No
Nos.
s. 1012(
1012(1)
1)e1
e1 an
and
d 10
1012
12(1
(1)e
)e2.
2.
103 Part C - Finishing
DETAIL
DETAILED
ED UNIT
UNIT PRICE ANAL
ANALYSIS
YSIS (DUPA)
(DUPA)
A. Labor
a. Const
Construc
ructio
tion
n Forema
Foreman
n 1 1.00 Labor Rates are variable per Region/District
based on minim
based minimum
um wage
wage as
as approved
approved by
b. Skilled
Skilled Laborer
Laborer 1 1.00
DOLE. Refer to the Schedule of Labor Rates.
c. Unskille
Unskilled
d Labo
Laborer
rer 2 1.
1.00
Sub
Sub - Tot
Total
al fo
forr A
Name
Name and Capaci
Capacity
ty No. of Unitls No. of HourIs Hourly Rate Amou
Amount
nt (PhP
(PhP))
B. Equipment
Minor
Minor Too
Tools
ls (10%
(10% of Labor
Labor Cost)
Cost)
f
Sub
Sub - To
Tota
tall fo
forr B
C. Total (A + B)
2
D. Output Hour =
Output per Hour 2.07
2.076
6 m
E. Di
Dire
rect Unit Cost (C + D)
ct Unit
F. Materials
2 Prices of materials
materials are vari
variable
able per Region/
Region/
a. Corrugated Roofing Sheet m 1.05
District
District based on the prevail
prevailing
ing unit p
price
ricess in
b. Tek screw/J-bolt with washers
washers pc 10 the locality which include payment
payment of local
local
c. Consum
Consumabl
ables
es (3% of Materi
Materials
als Cos
Cost)
t) taxes
taxes and haul hauling
ing cost to the project
project site
site..
Refer to the Constructi
Construction
on Material
Material Price Data
establish
esta blished
ed quar
quarterly
terly by Central
Central Office
Office Price
Monitoring Committee.
Sub
Sub - Tot
Total
al fo
forr F
G. Dir
Direc
ectt Un
Unit
it Cost (E + F)
H. Overhead,
Overhead, Contingencies & Miscel
Contingencies Miscellan
laneou
eous
s (OCM)
(OCM) Expens
Expenses
es 15%/12%/10%/8% of G
I. Contra
Contracto
ctor's
r's Pro
Profit
fit (CP) 10 %/
%/ 8%
8% of G
J. Value
Value Added
Added Tax (VAT
(VAT)) 5% o f ( G + H + I )
K. T
Tota
otall Unit
Unit Cos
Costt (G + H + I + J)
104 Par
Partt C - Fin
Finishi
ishing
ng
DETAILE
DETAILED
D UNI
UNIT
T PRIC
PRICE
E ANALY
ANALYSIS
SIS (DU
(DUPA)
PA)
A. Labor
a. Construction
Construction Foreman
Foreman 1 1.00 Labor Rates are variable per Region/District
b. Skilled Laborer 1 1.00 based
based on minimu
minimumm wage
wage as
as approved by
DOLE. Refer to the Schedule
Schedule of Labor
Labor
c. Unskilled Laborer 1 1.00
B. Equipment
.J
F. Materials
Materials
Prices
Prices of materials
materials are vari
variable
able per Regio
Region/
n/
a. Ridge/Hip
Ridge/Hip Rolis/Flashin
Rolis/FlashingsNall
gsNalley
ey Roll! Co
Counter
unter
m 1.05 District
District based
based on the prev
prevailin
ailing
g unit prices
prices in
Flashing
Flashi ng (0.60 m
mm)
m) the locality
locality which include
include payment of local
local
b. Blind Rivets pc 19.00 taxes
taxes and hauling
hauling cost to the project
project si
site.
te.
c. Consumables
Consumables (3% of Materials Cost) Refer to the Const
Constructi
ruction
on Material
Material Price Data
establish
esta blished
ed quar
quarterly
terly by Central
Central Office
Office Price
Monitoring Committee.
DETAIL
DETAILED
ED UNI
UNIT
T PRICE A
ANAL
NALYSIS
YSIS (DUPA)
(DUPA)
A. Labor
Su
Sub
b - Tota
Totall fo
forr A
B. Equipment
Minor
Minor Tools
Tools (10%
(10% of Labor
Labor Cost)
Cost)
f
Sub
Sub - T
Tot
otal
al fo
forr B
C. Total (A + B )
D. Ou
Outp
tput per Hour
ut per = 11.
11.80
80 m
E. Dir
Direct
ect Unit
Unit Cos
Costt (C + D)
F. Materials
Materials
a. Gutte
Gutterr (0.
(0.6
6 mm) m 1.00 Prices
Prices of materials
materials are variable
variable per Regio
Region/
n/
Distr
District
ict based
based on the prev
prevailin
ailing
g unit prices
prices in
b. 12" x 1" Plain
Plain GI Strap
Strap pc 3.00
the locality
locality which include
include payment of local
c. Blind
Blind Riv
Rivets
ets pc 16.00 taxes and haul
hauling
ing cost to the project
project site.
d. Consum
Consumabl
ables
es (3% of Materi
Materials
als Cost)
Cost) Refer to the Construct
Construction
ion Mater
Material
ial Price Data
establishe
estab lished
d quar
quarterly
terly by Central
Central Office
Office Price
Monitoring Committee.
Sub
Sub - T
Tot
otal
al fo
forr F
G. D
Dir
irec
ectt Unit
Unit Co
Cost
st (E + F)
H. Ove
Overhe
rhead,
ad, Con
Contin
tingen
gencie
cies
s & Miscel
Miscellan
laneou
eous
s (OC
(OCM)
M) Expens
Expenses
es 15%/12%/10%/8% of G
I. Contractor's Profit (CP) 10%/8% of G
J. Value Added Tax (VAT) 5% of (G + H + I)
K. Total Unit Cost (G + H + I + J)
106 Part C - Finishing
OETAILE
OETAILEOUN
OUNIT
IT PRIC
PRICE
E ANA
ANALYSI
LYSIS
S (OUPA)
(OUPA)
A. Labor
Sub
Sub - Tota
Totall fo
forr A
Name
Name and Capaci
Capacity
ty No. of Unitls No. of Houris Hourly Rate Amoun
Amountt (PhP
(PhP))
B. Equipment
Minor
Minor Too
Tools
ls (10%
(10% of Labo
Laborr Cos
Cost)
t)
.J
Sub
Sub - To
Tota
tall fo
forr B
C. Total (A + B)
perr Hour =
2
D. Ou
Outp
tput
ut pe 2.07
2.076
6 m
E. Di
Dire
rect
ct Unit
Unit Co
Cost
st (C
(C + D)
F. Materials
Materials
Prices
Prices of materials
materials are vari
variable
able per Regio
Region/
n/
a. Pre
Prepai
painte
nted
d Metal
Metal Sheets
Sheets (Corru
(Corrugat
gated,
ed, Short
Short
District
District based on the prevail
prevailing
ing unit pprice
rices
s in
2
Sp
Span
anll Lo
Long
ng Sp
Span
an,, belo
below
w 0.42
0.427m
7mm
m th
thkl
kl abo
above
ve m 1.05 the locality
locality which include
include paymen
paymentt of loca
local l
0.4
0.427m
27mm
m thk
thk)) taxes
taxe s and hauling
hauling cost to the project
project site.
Refer to the Construct
Construction
ion Mater
Material
ial Price Data
b. Tek
Tek scr
screw/
ew/J-b
J-bolt
olt wit
with
h washer
washers
s pc 10
establish
esta blished
ed quar
quarterly
terly by Central
Central Office
Office Price
c. Con
Consum
sumabl
ables
es (3% of Materi
Materials
als Cos
Cost)
t) Monitoring Committee.
Sub
Sub - Tot
Total
al fo
forr F
G. Di
Dire
rect
ct Unit
Unit Cost
Cost (E + F)
F)
.. Ove
H .. Overhe
rhead,
ad, Contin
Contingen
gencie
cies
s & Miscel
Miscellan
laneou
eous
s (OC
(OCM)
M) Exp
Expens
enses
es 15%/12%/10%/8% ofG
I. Contr
Contract
actor'
or's Profit
Profit (CP) 10%1 8% of G
J. Value Added Tax (VAT) 5% of (G + H + I)
K. T
Tota
otall Unit
Unit Cost
Cost (G + H + I + J)
No
Note
te:: 1. Us
Use
e this
this cost
cost shee
sheett for
for Item
Item Nos
Nos.. 10
1014
14(1
(1)a
)a an
and
d 10
1014
14(2
(2)a
)a..
107 Part
Part C - Fin
Finishi
ishing
ng
DETAIL
DETAILED
ED UNIT
UNIT PRICE ANA
ANALYSI
LYSIS
S (DUPA)
(DUPA)
A. Labor
a. Construction
Construction Foreman
Foreman 1 1.00 Labor Rates are variable per Region/District
based
based on minimu
minimumm wage
wage as
as approved
approved by
b. Skilled Laborer 1 1.00 DOLE. Refer to the Schedule of Labor Rates.
c. Unskilled Laborer 2 1
1..00
B. Equipment
J
F. Materials
Materials
a. Prepainted
Prepainted Metal Sh
Sheets
eets (Rib Type,
Type, Short Spanl Prices
Prices of materials
materials are vari
variable
able per Regio
Region!
n!
2 District
District based
based on the prev
prevailin
ailing
g unit prices
prices iin
n
Long Span, below 0.427mm thkl above 0.427mm m 1.00
the locality
locality which inclu
include
de payme
payment nt of local
thk) taxes
taxe s and hauling
hauling cost to the projec
projectt site.
b. Tek screw/
screw/J-bolt
J-bolt with washers
washers pc 10.00 Refer to the Constructi
Construction
on Material
Material Price Data
c. Consumables (3% of Materials Cost) establis
established
hed quarterly
quarterly by Central
Central Office
Office Price
Monitoring Committee.
DETAILE
DETAILED
D UNI
UNIT
T PRICE
PRICE ANAL
ANALYSIS
YSIS (DUPA)
(DUPA)
A. Labor-
Su
Sub
b - Tota
Totall for
for A
Name and Capacity No. of Unitls No. of Houris Hourly Rate Amoun
Amountt (PhP
(PhP))
B. Equipment
Minor
Minor Tools
Tools (10%
(10% of Labor
Labor Cost)
Cost)
.J
Sub
Sub - T
Tot
otal
al fo
forr B
C. To
Tota
tall (A + B)
2
D. Ou
Outp
tput
ut pe Hour
perr Hour = 1.8
1.875
75 m
E. Di
Dire
rect
ct Unit
Unit Co
Cost
st (C + D)
Unit Quantity Unit Cost Amoun
Amountt (PhP
(PhP))
Name and Specifica
Specification
tion
F. Materials
2 Prices of material
materials
s are variable
variable per Regio
Region/
n/
a. Cemen
Cement-bas
t-based
ed waterproo
waterproofing
fing m 1.05
District
District based on the prevprevailin
ailing
g unit pprice
rices
s in
the locality which include payment
payment of local
local
taxes
taxe s and hauling
hauling cost to the proje
project
ct site.
Refer to the Construction
Construction Material
Material Price Data
establish
esta blished
ed quar
quarterly
terly by Central
Central Office
Office Price
Monitoring Committee.
Sub
Sub - T
Tot
otal
al fo
forr F
G. D
Dir
irec
ectt Un
Unit
it Co
Cost
st (E + F)
H. Overhe
Overhead,
ad, Con
Contin
tingen
gencies & Miscel
cies Miscellan
laneou
eous
s (OCM)
(OCM) Exp
Expens
enses
es 15%/12%/10%/8% of G
I. C
Cont
ontrac
ractor
tor's
's Profit
Profit (CP) 10%/8% of G
J. Value
Value Add
Added
ed Tax (VAT)
(VAT) 5 % o f ( G + H + I)
K. T
Tota
otall Unit
Unit Cost
Cost (G + H + I + J)
109 Par
Partt C - Fini
Finishi
shing
ng
DETAIL
DETAILED
ED UNI
UNIT
T PRI
PRICE
CE ANA
ANALYSI
LYSIS
S (DU
(DUPA)
PA)
A. labor-
a. Const
Construc
ructio
tion
n Forema
Foreman
n 1 1.00 Labor Rates are variable per Region/District
based on minim
based minimum
um wage
wage as
as approved
approved by
b. Skilled
Skilled laborer
laborer 1 1.00
DOLE. Refer to the Schedule
Schedule of Labor Rates.
c. Unskill
Unskilled
ed lab
labore
orer
r 1 1.00
Sub
Sub - To
Tota
tall fo
forr A
Name
Name and Capaci
Capacity
ty No. of Unitls N o.
o. of H ou
ouris Hourly
Hourly Rate
Rate Amoun
Amountt (PhP
(PhP))
B. Equipment
Mino
Minorr To
Tool
ols
s (1
(10%
0% of labo
laborr Co
Cost
st))
J
Sub
Sub - T
Tot
otal
al fo
forr B
C. Total (A + B)
D. Output Hour
Output per Hour = 5.772 m2
5.772
E. Direct
Direct Unit
Unit Cost (C + D)
F. Mater
Materials
ials
a. Primer
Primer Coat
Coat gal 0.04 Prices
Prices of materials
materials are varia
variable
ble per Regio
Region/ n/
District
District based
based on the prev
prevailin
ailing
g unit
unit prices
prices in
b. Liquid Waterproo
Waterproofing
fing gal 0.03
the locality
locality which include
include payment of local
local
c. Consum
Consumabl
ables
es (3% of Materi
Materials
als Cost)
Cost) taxe
taxess and hauling
hauling cost to the project
project site
site..
Refer to the Construct
Construction
ion Mater
Material
ial Price Data
establish
esta blished
ed quarterly
quarterly by Central Office Price
Monitoring Committee.
Sub
Sub - To
Tota
tall fo
forr F
G. D
Dir
irec
ectt Unit
Unit Co
Cost
st (E + F)
H. Overhea
Overhead,
d, Contin
Contingen
gencie
cies
s & Miscel
Miscellan
laneou
eous
s (OC
(OCM)
M) Expens
Expenses
es 15%/12%/10%/8% ofG
I. Co
Contr
ntract
actor'
or's Profit
Profit (CP) 10%/8% of G
J. Va
Value
lue Added Tax (VAT)
(VAT) 5% of (G + H + I )
K. T
Tota
otall Unit
Unit Cos
Costt (G + H + I + J)
110 Part C - Fin
Finishi
ishing
ng
DETAILE
DETAILED
D UNI
UNIT
T PRICE
PRICE ANAL
ANALYSI
YSIS
S (DUPA)
(DUPA)
Item No.lDescription 10
1016
16(2
(2)) Bu
Buil
ilt-
t-up
up and Pr
Pref
efor
orme
med
d Memb
Membra
rane
ne
2
Unit of Measureme
Measurement
nt m
2
Output
Output per hour
hour 4.
4.80
805
5 m
A. Labor -
Sub
Sub - T
Tot
otal
al fo
forr A
Name
Name and Capaci
Capacity
ty No. of Unitls No. of Houris Hourly Rate Amoun
Amountt (PhP)
(PhP)
B. Equipment
Minor
Minor Tools
Tools (10%
(10% of Labo
Laborr Cost)
Cost)
.J
Sub
Sub - T
Tot
otal
al fo
forr B
C. Total (A + B )
D. Outp
Output per Hour =
ut per 4.805 m2
4.805
E.
Di
Dire
rect Unit Cost (C + D)
ct Unit
Name and Specificat
Specification
ion Unit Quantity Unit Cost Amoun
Amountt (PhP
(PhP))
F. Materials
Prices of materials
Prices materials are variable
variable per Regio
Region/ n/
a. Asphalt P rimer gal 0.10 District
District based on the prevailin
prevailing
g unit pprice
ricess in
2
b. Prefor
Preformed
med Mem
Membra
brane
ne m 1.05 the locality which include payment
payment of local
local
c. Consum
Consumabl
ables
es (5% of
of Ma
Mater
terial
ials
s Cost)
Cost) taxe
taxess and haulhauling
ing cost to the project
project site
site..
Refer to the Construct
Construction
ion Mater
Material
ial Price Data
establish
esta blished
ed quar
quarterl
terly
y by Central Office
Office Price
Monitoring Committee.
Sub
Sub - To
Tota
tall fo
forr F
G. Direct
Direct Un
Unit
it Cost (E + F)
H. Overhead,
Overhead, Contingencies & Miscel
Contingencies Miscellan
laneou
eous
s (OCM)
(OCM) Expens
Expenses
es 15%/12%/10%/8% of G
I. C
Cont
ontrac
ractor
tor's
's Pro
Profit
fit (CP) 10%/
10%/8%
8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. T
Tota
otall Unit
Unit Cost
Cost (G + H + I + J)
111 Par
Partt C - Fin
Finish
ishing
ing
DETAILE
DETAILED
D UNI
UNIT
T PRICE
PRICE ANAL
ANALYSI
YSIS
S (DU
(DUPA)
PA)
A. Labor -
a. Skilled
Skilled Laborer
Laborer 1 0.50 Labor Rates are variable per Region/District
based
based on minim
minimum
um wage
wage as
as approved
approved by
b. Unski
Unskilled
lled Laborer
Laborer 1 0.50
DOLE. Refer to the Schedule
Schedule of Labor Rates.
Sub
Sub - T
Tot
otal
al fo
forr A
Name
Name and Capaci
Capacity
ty No. of Unitls
Unitls No. of HourIs Hourly Rate Amoun
Amountt (PhP
(PhP))
B. Equipment
Minor
Minor Tools
Tools (10%
(10% of La
Labor
bor Cost)
Cost)
.J
Sub
Sub - To
Tota
tall fo
forr B
C. Total (A + B)
D. Output
Output = 1 set
E. Dire
Direct
ct Unit Costt (C + D)
Unit Cos
Name and Specification
Specification Unit Quantity Unit Cost Amou
Amount
nt (PhP
(PhP))
F. Mater
Materials
ials
Sub
Sub - T
Tot
otal
al fo
forr F
G. Dir
Direc
ectt Unit
Unit Cost
Cost (E + F)
F)
H. Overhead,
Overhead, Contingencies & Miscel
Contingencies Miscellan
laneou
eous
s (OCM)
(OCM) Expens
Expenses
es 15%/12%/10%/8% of G
I. Co
Contr
ntract
actor'
or's
s Profit
Profit (CP) 10%/
10%/ 8% of G
J.
Valu
Value
e Added
Added Ta
Tax
x (VAT)
(VAT) 5% of (G + H + I )
K. Tota
Totall Unit
Unit Cost
Cost (G + H + I + J)
Note:
Note: 1. Use th
this
is cost sheet
sheet for Item
Item Nos.
Nos. 101
1017(1
7(1 )a1,
)a1, 1017(1
1017(1 )a2,
)a2, 101
1017(1
7(1 )a3
)a3,, 101
1017(1
7(1 )a4,
)a4, 1017(2
1017(2)b1
)b1,, 1017(2
1017(2)b2
)b2,, 1017(2
1017(2)b3
)b3,,
1017(2
1017(2)b4
)b4,, 101
1017(3
7(3)c1
)c1,, 101
1017(3
7(3)c2
)c2 and 1017(3
1017(3)c3
)c3
112 Part
Part C - Fin
Finishi
ishing
ng
DETAIL
DETAILED
ED UNIT
UNIT PRICE ANA
ANALYSI
LYSIS
S (DUPA)
(DUPA)
A. Labor
Sub
Sub - T
Tot
otal
al fo
forr A
Name
Name and Capaci
Capacity
ty No. of Unitls No. of HourIs Hourly Rate Amoun
Amountt (PhP
(PhP))
B. Equipment
Minor
Minor Tools
Tools (10%
(10% of Labor
Labor Cost)
Cost)
.J
Sub
Sub - T
Tot
otal
al fo
forr B
C. Total (A + B)
2
D. Ou
Outp
tput
ut per Hour =
per Hour 1.36
1.365
5 m
E. Di
Dire
rect
ct Un
Unit
it Cost
Cost (C + D)
F. Materials
a. Glazed
Glazed Tiles
Tiles 2 Prices
Prices of materials
materials are varia
variable
ble per Regio
Region/ n/
m 1.050
District based
District based on the prev
prevaili
ailing
ng unit pr
prices
ices in
b. Cemen
Cementt bags 0.325 the locality
locality which include
include payment of localocal l
c.Sand 3
m 0.026 taxes and haul
hauling
ing cost to the project
project site.
site.
Refer to the Construct
Construction
ion Mater
Material
ial Price Data
d. Tile Gro
Grout
ut bags 0.125
establishe
estab lished
d quarterl
quarterlyy by Central Office
Office Price
e. Tile
Tile Adhes
Adhesive
ive (25 kg) bags 0.143 Monitoring Committee.
f. Consum
Consumabl
ables
es (3% of Materi
Materials
als Cos
Cost)
t)
Sub
Sub - Tot
Total
al fo
forr F
G. Di
Dire
rect
ct Un
Unit
it Cost
Cost (E + F)
H. Overhe
Overhead,
ad, Contin
Contingen
gencie
cies
s & Miscel
Miscellan
laneou
eous
s (OC
(OCM)
M) Expens
Expenses
es 15%/12%/10%/8% of G
I. Con
Contra
tracto
ctor's
r's Profit
Profit (CP)
(CP) 10%/
10%/8%
8% of G
J. Va
Value
lue Added
Added TaTaxx (VAT) 5% of (G + H + I)
K. Tota
Totall Unit
Unit Cos
Costt (G + H + I + J)
113 Par
Partt C - Fini
Finishin
shing
g
DETAILE
DETAILED
D UNI
UNIT
T PRIC
PRICE
E ANAL
ANALYSIS
YSIS (DUPA)
(DUPA)
A. labor-
a. Cons
Constru
tructi
ction
on Forema
Foreman
n 1 1.00 Labor Rates are variable per Region/District
b. Skille
Skilled
d laborer
laborer 5 1.00 based
based on minim
minimum
um wage
wage as
as approved
approved by
c. Unski
Unskilled
lled labo
laborer
rer 5 1
1..00 DOLE. Refer to the Schedule
Schedule of Labor
Labor
Sub
Sub - Tot
Total
al fo
forr A
Name
Name and Cap
Capaci
acity
ty No. of Unitls No. of HourIs Hourly Rate Amount (P h P )
B. Equipment
Mino
Minorr To
Tool
ols
s (1
(10%
0% of labo
laborr Co
Cost
st))
J
Sub
Sub - T
Tot
otal
al fo
forr B
C. Total (A + B )
2
D. Output Hour =
Output per Hour 1.95
1.95 m
E. Dir
Direc
ectt Unit
Unit Cos
Costt (C + D )
F. Mater
Materials
ials
Sub
Sub - T
Tot
otal
al fo
forr F
G. Di
Dire
rect
ct Un
Unit
it Cost
Cost (E + F)
F)
H. O
Overhe
verhead,
ad, Contingencies & Miscel
Contingencies Miscellan
laneou
eous
s (OCM)
(OCM) Expens
Expenses
es 15%/12%/10%/8% of G
I. Co
Contr
ntract
actor'
or's Profit
Profit (CP) 10%/8% ofG
J. Value
Value Added
Added Tax (VAT
(VAT)) 5% of (G + H + I)
K. T
Tota
otall Unit
Unit Cost
Cost (G + H + I + J)
No
Note
te:: 1. Us
Use
e this
this costi
costing
ng sh
shee
eett fo
forr Item Nos.
Nos. 10
1018
18(2
(2),
), 10
1018
18(3
(3)) and
and 10
1018
18(4
(4).
).
114 Part
Part C - Fin
Finishi
ishing
ng
DETAILE
DETAILED
D UNI
UNIT
T PRICE ANAL
ANALYSIS
YSIS (DUPA)
(DUPA)
A. labor-
B. Equipment
Minor Tools
Tools (10% of labo
laborr Cost)
.J
F. Materials
DETAILE
DETAILED
D UNI
UNIT
T PRIC
PRICE
E ANAL
ANALYSIS
YSIS (DUPA)
(DUPA)
A. Labor
a. Cons
Constru
tructi
ction
on Forema
Foreman
n 1 1.00 Labor Rates are variable per Region/District
based
based on minimu
minimumm wage
wage as
as approved
approved by
b. Skille
Skilled
d Laborer
Laborer 5 1.00
DOLE. Refer to the Schedu
Schedulele of Labor
c. Unski
Unskilled
lled Laborer
Laborer 5 1
1..00 Rates.
Sub
Sub - To
Tota
tall fo
forr A
Name
Name and Capaci
Capacity
ty No. of Unitls No. of HourIs Hourly Rate . Amoun
Amountt (Ph
(PhP)
P)
B. Equipment
Minor
Minor Too
Tools
ls (10%
(10% of Labor
Labor Cost)
Cost)
.J
Sub
Sub - To
Tota
tall fo
forr B
C. Total (A + B)
D. Outp
Output
ut per
per Hour
Hour = 1.95 m2
1.95
E. Di
Direc
rectt Unit Costt (C + D)
Unit Cos
F. Materials
a. Lami
Laminat
nated
ed Wood
Wood Tiles
Tiles 2 Prices
Prices of materials
materials are vari
variable
able per Regio
Region/ n/
m 1.050
District
District based
based on the preva
prevailing
iling unit pr
prices
ices in
b. Glue Adhesive
Adhesive L 0.500 the locality
locality which include
include payment of local
c. Cement
Cement bag 0.325 taxes and hauling
hauling cost to the project
project site.
site.
d.Sand 3 Refer to the Construct
Construction
ion Mater
Material
ial Price Data
m 0.026
establis
esta blished
hed quar
quarterly
terly by Central
Central Office
Office Price
e. Consum
Consumabl
ables
es (5% of M
Mate
ateria
rials
ls Cost)
Cost) Monitoring Committee.
Sub
Sub - T
Tot
otal
al fo
forr F
G. Dir
Direct
ect Unit Cost (E + F)
Unit Cost
H. Overhe
Overhead,
ad, Contin
Contingen
gencie
cies
s & Miscel
Miscellan
laneou
eous
s (OC
(OCM)
M) Exp
Expens
enses
es 15%/12%/10%/8% ofG
I. Con
Contra
tracto
ctor's
r's Profit
Profit (CP)
(CP) 10%/8% ofG
J. Va
Value
lue Added
Added Tax (VA
(VAT)
T) 5% of (G + H + I)
K. T
Tota
otall Unit
Unit Cost
Cost (G + H + I + J)
116 Part
Part C - Fin
Finishi
ishing
ng
DETAIL
DETAILED
ED UNIT
UNIT PRIC
PRICE
E ANAL
ANALYSIS
YSIS (DUPA)
(DUPA)
A. Labor -
B. Equipment
J
E. Dire
Direct
ct Unit Cos
Costt (C + D)
Name and SpecifSpecification
ication Unit Quantity Unit Cost Amo
Amount
unt (Ph
(PhP)
P)
F. Materials
DETAILE
DETAILED
D UNI
UNIT
T PRICE AN
ANALY
ALYSIS
SIS (DUPA)
(DUPA)
Designation No
No.. of P e
err so
so nl
nl s No.
No. o f Hou
Hou rI
rI s Hourly
Hourly Rate
Rate Amoun
Amountt (P
(PhP
hP))
A. Labor
a. Cons
Constru
tructi
ction
on Forema
Foreman
n 1 1.00 Labor Rates are variable per Region/District
based on minim
based um wage as approved by
minimum
b. Skilled
Skilled Laborer
Laborer 1 1.00 DOLE. Refer to the Schedule of Labor
Labor
c. Unski
Unskilled
lled Laborer
Laborer 3 1.00 Rates.
Sub
Sub - To
Tota
tall fo
forr A
Name
Name and Cap
Capaci
acity
ty No. of UniUs No. of HourIs Hourly
Hourly Rate
Rate Amoun
Amountt (P
(PhP
hP))
B. Equipment
Minor
Minor Tools
Tools (10%
(10% of Labor
Labor Cost)
Cost)
J
Sub
Sub - T
Tot
otal
al fo
forr B
C. To
Tota
tall (A + B)
2
D. Outp
Output
ut per
per Hour =
Hour 5.95
5.95 m
E. Di
Dire
rect
ct Unit
Unit Cost
Cost (C + D)
F. Materials
a. Cement
Cement bag 0.726 Prices of materials
materials are vari
variable
able per Regio
Region/
n/
District
District based
based on the pre prevaili
vailing
ng unit pprice
rices
s in
b.Sand m3 0.055 the locality which include payment
payment of local
local
taxes and hauling cost to the projectproject site.
Refer to the Construct
Constructionion Mater
Material
ial Price Data
establishe
estab lished d quar
quarterly
terly by Central
Central Office
Office Price
Monitoring Committee.
Sub
Sub - To
Tota
tall fo
forr F
G. D
Dir
irec
ectt Un
Unit
it Cost (E + F)
H. Overhead,
Overhead, Contingencies & Miscel
Contingencies Miscellan
laneou
eous
s (OCM)
(OCM) Expens
Expenses
es 15%/12%/10%/8% of G
I. Con
Contra
tracto
ctor's
r's Profit
Profit (CP)
(CP) 10%/8% of G
J. Va
Value
lue Added
Added Tax (VAT)
(VAT) 5 % o f ( G + H + I)
K. To
Total
tal Unit
Unit Cos
Costt (G + H + I + J)
118 Part
Part C - Fin
Finishi
ishing
ng
DETAIL
DETAILED
ED UNIT
UNIT PRICE
PRICE ANALY
ANALYSIS
SIS (DU
(DUPA)
PA)
A. Labor
B. Equipment
.J
F. Materials
DETAILE
DETAILED
D UNI
UNIT
T PRIC
PRICE
E ANALY
ANALYSIS
SIS (DU
(DUPA)
PA)
Item No./Description 10
1023
23(1
(1)) Gr
Gran
anol
olit
ithi
hic
c Marb
Marble
le Wo
Work
rk
2
Unit of Measureme
Measurement
nt m
2
Output
Output per hou
hour
r 5.
5.95
95 m
A. Labor
a. Const
Construc
ructio
tion
n Forema
Foreman
n 1 1.00 Labor Rates are variable per Region/District
b. Skilled
Skilled Laborer
Laborer 1 1.00 based
based on minim
minimum
um wage as
wage as approved
approved by
c. Unskill
Unskilled
ed Labo
Laborer
rer 3 1
1..00 DOLE. Refer to the Schedule
Schedule of Labor Rates.
Sub
Sub - Tot
Total
al fo
forr A
Name
Name and Capaci
Capacity
ty No. of Unitls No. of Houris Hourly Rate Amou
Amount
nt (P
(PhP
hP))
B. Equipment
Minor
Minor Too
Tools
ls (10%
(10% of Labor
Labor Cost)
Cost)
.J
Sub
Sub - T
Tot
otal
al fo
forr B
C. Tota
Totall (A + B)
2
D. Output Hour =
Output per Hour 5.95
5.95 m
E. Di
Dire
rect
ct Unit
Unit Cost
Cost (C + D)
Name and Specificat
Specification
ion Unit Quantity Unit Cost Amoun
Amountt (PhP
(PhP))
F. Materials
a. Marble
Marble chi
chips
ps 3 Prices of materials are variable per Region/
of materials
m 0.726
District
District based on the preprevail
vailing
ing unit pprice
rices
s in
b. Portla
Portland
nd cement
cement bag 0.055 the locality which include payment
payment of local
local
c. Divider
Divider str
strips
ips m 1.00 taxe
taxess and hauling
hauling cost to the project
project site.
site.
Refer to the Construction
Construction Material
Material Price Data
establis
esta blished
hed quarterly
quarterly by Central
Central Office
Office Price
Monitoring Committee.
Sub
Sub - To
Tota
tall fo
forr F
G. Di
Dire
rect
ct Unit
Unit Cost (E + F)
H. Overhe
Overhead,
ad, Con
Contin
tingen
gencie
cies
s & Miscel
Miscellan
laneou
eous
s (OC
(OCM)
M) Expens
Expenses
es 15%/12%/10%/8% ofG
I. Co
Contr
ntract
actor'
or's
s Profit
Profit (CP) 10%/
10%/8%
8% of G
J. Va
Value
lue Added
Added Tax (VAT)(VAT) 5% of (G + H + I)
K. To
Total
tal Unit
Unit Cost
Cost (G + + I + J)
H
120 Par
Partt C - Fin
Finishi
ishing
ng
DETAIL
DETAILED
ED UNIT
UNIT PRIC
PRICE
E ANALY
ANALYSIS
SIS (DU
(DUPA)
PA)
Item No.lDescription 10
1024
24(( 1) Pe
Pea
a Gra
Grave
vell Fini
Finish
sh
2
Unit of Measuremen
Measurementt m
2
Output
Output per hour
hour 1.7
1.785
85 m
A. labor
Su
Sub
b - Tota
Totall fo
forr A
B. Equipment
Mino
Minorr To
Tool
ols
s (1
(10%
0% of lab
labor
or Co
Cost
st))
.J
Sub
Sub - Tot
Total
al fo
forr B
C. Total (A + B)
2
D. Ou
Outp
tput
ut per
per Hour =
Hour 5.95
5.95 m
E. Di
Dire
rect
ct Un
Unit
it Cost
Cost (C + D)
Name and Specification
Specification Unit Quantity Unit Cost Amou
Amount
nt (PhP
(PhP))
F. Mater
Materials
ials
a. Cemen
Cementt bag 0.795 Prices
Prices of materials
materials are variable
variable per Regio
Region/ n/
3 District
District based
based on the prev
prevailin
ailing
g unit pprices
rices in
b. Pea Gra
Gravel
vel m 0.013 the locality
locality which include
include paymen
paymentt of loclocal
al
c.Sand 3 taxes
taxes and haul
hauling
ing cost to the project
project site.
site.
m 0.039
Refer to the Const
Construct
ruction
ion Mater
Material
ial Price Data
establish
esta blished
ed quart
quarterly
erly by Central
Central Office
Office Price
Monitoring Committee.
Sub
Sub - T
Tot
otal
al fo
forr F
G. Dir
Direc
ectt Unit Cost (E + F)
Unit Cost
H. Ove
Overhe
rhead,
ad, Con
Contin
tingen
gencie
cies
s & Miscel
Miscellan
laneou
eous
s (OC
(OCM)
M) Expens
Expenses
es 15%/12%/10%/8% of G
I. C
Cont
ontrac
ractor
tor's
's Profit
Profit (CP) 10%/8% of G
J. Va
Value
lue Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. To
Total
tal Unit
Unit Cost
Cost (G + H + I + J)
121 Part C - Fin
Finishi
ishing
ng
DETAILE
DETAILED
D UNIT
UNIT PRICE ANALYSIS
ANALYSIS (DUPA)
(DUPA)
Item No.lDescription 10
1026
26(1
(1)) Pe
Pebb
bble
le Wash
Washou
outt Fini
Finish
sh
2
Unit of Measuremen
Measurementt m
2
Output
Output per hour
hour 1.7
1.785
85 m
A. Labor
-
a. Construction Foreman 1 1.00 Labor
Labor Rates are varia
variable
ble per
b. Skilled Laborer 1 1.00 Region/Dis
Region/Distric
trictt based
based on minim
minimum
um wage
wage as
c. Unskilled
Unskilled Laborer
Laborer 2 1
1..00 approved
approved by DOLE. Refer to the Schedule
Schedule
of Labor Rates.
Sub
Sub - To
Tota
tall fo
forr A
Name
Name and Capaci
Capacity
ty No. of Unitls
Unitls No. of HourIs Hourly Rate Amou
Amount
nt (PhP
(PhP))
B. Equipment
Minor
Minor Too
Tools
ls (10%
(10% of Labor
Labor Cos
Cost)
t)
f
Sub
Sub - T
Tot
otal
al fo
forr B
C. Total (A + B)
D. Ou
Outp
tput per Hour =
ut per 5.95 m2
5.95
E. Di
Dire
rect
ct Un
Unit
it Cost
Cost (C + D )
F. Mater
Materials
ials
a. Cement
Cement bag 0.795 Prices
Prices of materials
materials are vari
variable
able per Region/
Region/
3 District based on the pre
District prevail
vailing
ing unit p
price
rices
s in
b. Pea Gra
Gravel
vel m 0.013 the locality
locality which include
include payment of local
c.Sand 3 taxes
taxes and hauling
hauling cost to the project
project site.
m 0.039
Refer to the Constructi
Construction
on Material
Material Price Data
establish
esta blished
ed quar
quarterly
terly by Central
Central Office
Office Price
Monitoring Committee.
Sub
Sub - T
Tot
otal
al fo
forr F
G. D
Dir
irec
ectt Unit
Unit Co
Cost
st (E + F)
H. Ove
Overhe
rhead,
ad, Contin
Contingen
gencie
cies
s & Miscel
Miscellan
laneou
eous
s (OC
(OCM)
M) Expens
Expenses
es 15%/12%/10%/8% of G
I. Co
Contr
ntract
actor'
or's Profit
Profit (CP) 10%/8% ofG
J. Va
Value
lue Added
Added Tax (VA (VAT)
T) 5% of (G + H + I)
K. T
Tota
otall Unit
Unit Cos
Costt (G + H + I + J)
122 Part
Part C - Fin
Finishi
ishing
ng
DETAIL
DETAILED
ED UNIT
UNIT PRICE AN
ANALY
ALYSIS
SIS (DU
(DUPA)
PA)
Designation No
o.. of P e
errson/s No. of HourIs Hourly
Hourly Rate
Rate Amou
Amount
nt (PhP
(PhP))
-
A. Labor
Su
Sub
b - Tota
Totall fo
forr A
B. Equipment
Minor
Minor Tools
Tools (10%
(10% of Labor
Labor Cost)
Cost)
.J
Sub
Sub - To
Tota
tall fo
forr B
C. To
Tota
tall (A + B)
D. Ou
Outp
tput per Hour
ut per = 7.125 m2
7.125
E. D
Dire
irect
ct Unit Cost (C + D)
Unit Cost
F. Mate
Materials
rials
a. Cemen
Cementt bag 0.330 Prices
Prices of materials
materials are vari
variable
able per Regio
Regionl
nl
District
District based
based on the prev
prevailin
ailing
g unit prices
prices in
b. Sand cU.m 0.027
the locality
locality which include
include paymen
paymentt of local
taxes
taxe s and hauling
hauling cost to the pro
project
ject site.
Refer to the Cons
Construct
truction
ion Mater
Material
ial Price Data
establis
esta blished
hed quar
quarterly
terly by Central
Central Office
Office Price
Monitoring Committee.
Sub
Sub - Tot
Total
al fo
forr F
G. Dir
Direc
ectt Unit
Unit Co
Cost
st (E + F)
H. Overhe
Overhead,
ad, Contin
Contingen
gencie
cies
s & Miscel
Miscellan
laneou
eous
s (OCM
(OCM)) Expens
Expenses
es 15%/12%/10%/8% of G
I. Contractor's Profit (CP) 10%/ 8% of G
J. Va
Value
lue Added
Added Tax (VAT)
(VAT) 5 % o f ( G + H + I)
K. Total Unit Cost (G + H + I + J )
123 Par
Partt C - Fini
Finishi
shing
ng
DETAILE
DETAILED
D UNI
UNIT
T PRICE AN
ANALY
ALYSIS
SIS (DU
(DUPA)
PA)
Designation No. of Pe
Perr so
son/s No. of HourIs Hourly Rate Amo
Amount
unt (PhP
(PhP))
A. Labor-
a. Construction
Construction Foreman
Foreman 1 1.00 Labor Rates are variable per Region/District
b. Skilled Labor
Laborer
er 2 1.00 based
based on minim
minimum
um wage
wage as
as approved
approved by
c. Unskilled Laborer 1 1.00 DOLE. Refer to the Schedule
Schedule of Labo
Labor
r
Rates.
B. Equipment
f
F. Materials
Materials
DETAILED
DETAILED UNI
UNIT
T PRICE ANALYSI
ANALYSIS
S (DUPA)
(DUPA)
B. Equipment
.f
F. Materials
DETAIL
DETAILED
ED UNIT
UNIT PRICE ANA
ANALYSI
LYSIS
S (DUPA)
(DUPA)
A. Labor
Labor _
Sub
Sub - To
Tota
tall fo
forr A
Name
Name and Cap
Capaci
acity
ty No. of Unitls No. of HourIs Hourly Rate Amou
Amount
nt (PhP
(PhP))
B. Equipment
Minor
Minor Tools
Tools (10%
(10% of Labor
Labor Cost)
Cost)
.J
Sub
Sub - To
Tota
tall fo
forr B
C. Total (A + B )
per Hour =
2
D. Outp
Output
ut per 2.00
2.00 m
E. Di
Direc
rectt Unit Costt (C + D )
Unit Cos
Name and Specifica
Specification
tion Unit Quantity Unit Cost Amoun
Amountt (PhP
(PhP))
F. Materials
Sub
Sub - Tot
Total
al fo
forr F
G. Di
Dire
rect
ct Un
Unit
it Cost (E + F)
F)
H. Overhe
Overhead,
ad, Contin
Contingen
gencie
cies
s & Miscel
Miscellan
laneou
eous
s (OC
(OCM)
M) Exp
Expens
enses
es 15%/12%/10%/8% ofG
I. C
Cont
ontrac
ractor
tor's
's Pro
Profit
fit (CP) 10%/
10%/ 8% of G
J. Value
Value Added
Added Tax (VA(VAT)
T) 5 % o f ( G + H + I)
K. Total
Total Unit
Unit Cost
Cost (G + H + I + J)
126 Part C - Fini
Finishin
shing
g
DETAIL
DETAILED
ED UNIT
UNIT PRIC
PRICE
E ANALY
ANALYSIS
SIS (DU
(DUPA)
PA)
A. Labor.
B. Equipment
f
F. Materials
Prices
Prices of materials
materials are variable
variable per Regio
Region/ n/
a.Varnish gal 0.04
District
District based
based on the preva
prevailing
iling unit prices
prices in
b. Consumable
Consumables
s (5% of Mater
Materials
ials Cost) the locality
locality which include
include payment of loc local
al
taxes
taxe s and haul
hauling
ing cost to the proje
project
ct site.
site.
Refer to the Construction
Construction Material
Material Price Data
establishe
estab lished
d quar
quarterl
terly
y by Central Office
Office Price
Monitoring Committee.
DETAIL
DETAILED
ED UNI
UNIT
T PRIC
PRICE
E ANALY
ANALYSIS
SIS (DU
(DUPA)
PA)
Item No./Description 10
1032
32(4
(4)) Ducc
Ducco
o Fin
Finis
ish
h
2
Unit of Measureme
Measurement
nt m
2
Output
Output per hour
hour 1.512m
A. Labor-
a. Cons
Constru
tructi
ction
on Forema
Foreman
n 1 1.00 Labor Rates are variable per Region/District
b. Skilled
Skilled Laborer
Laborer 2 1.00 based
based on minimu
minimumm wage as appr
approved
oved by
c. Unskilled
Unskilled Laborer
Laborer 1 1.00 DOLE. Refer to the Schedule
Schedule of Labo
Labor
r
Rates.
Sub
Sub - To
Tota
tall fo
forr A
Name
Name and Capaci
Capacity
ty No. of Unitls No. of Houris Hourly Rate Amou
Amount
nt (PhP
(PhP))
B. Equipment
Minor
Minor Tools
Tools (10%
(10% of Labo
Laborr Cos
Cost)
t)
f
Sub
Sub - T
Tot
otal
al fo
forr B
C. Total (A + B)
2
D. Ou
Outp
tput
ut per
per Hour =
Hour 1.512m
E. D
Dire
irect Unit Cost (C + D)
ct Unit
F. Mater
Materials
ials
a. Glazzi
Glazzing
ng Putty
Putty gal 0.05 Prices
Prices of materials
materials are vari
variable
able per Regio
Region!
n!
District
District based
based on the prev
prevailin
ailing
g unit prices
prices in
b. Flat
Flat Wal
Walll Enamel
Enamel gal 0.04
the locality
locality which include
include payment of local
c. Enam
Enamel
el Qu
Quic
ick
k Dr
Dry
y gal 0.04 taxes
taxes and hauling
hauling cost to the project
project site.
site.
d. Paint Thinner
Thinner gal 0.01 Refer to the Constructi
Construction
on Material
Material Price Data
e. Tinti
Tinting
ng Color (Opti
(Optional
onal)) pint 0.01 establis
established
hed quarterly
quarterly by Central
Central Office
Office Price
Monitoring Committee.
f. Consum
Consumabl
ables
es (5% of
of Ma
Mater
terial
ials
s Cos
Cost)
t)
Sub
Sub - T
Tot
otal
al fo
forr F
G. Di
Dire
rect
ct Unit
Unit Cost
Cost (E + F)
F)
H. Ove
Overhe
rhead,
ad, Contin
Contingen
gencie
cies
s & Miscel
Miscellan
laneou
eous
s (OC
(OCM)
M) Expens
Expenses
es 15
15%/
%/12
12%/
%/10
10%/
%/8%
8% of G
I. Co
Contr
ntract
actor'
or's Profit
Profit (CP) 10%/8% of G
J. Value
Value Added
Added Tax (VAT
(VAT)) 5% of (G + H + I)
K. T
Tota
otall Unit
Unit Cost
Cost (G + H + I + J)
128 Part
Part C - Fin
Finishi
ishing
ng
DETAIL
DETAILED
ED UNIT
UNIT PRICE ANAL
ANALYSIS
YSIS (DUPA)
(DUPA)
Item No./Description 10
1034(1)
34(1) Dam
Dampro
proofi
ofing
ng ( Polyeth
Polyethylen
ylene
e She
Sheets
ets))
2
Unit of Measurement m
2
Output per hour 37.559 m
B. Equipment
.J
F. Materials
Materials
DETAIL
DETAILED
ED UNI
UNIT
T PRICE
PRICE ANALYS
ANALYSIS
IS (DU
(DUPA)
PA)
A. Labor
-
a. Cons
Constru
tructi
ction
on Forema
Foreman
n 1 1.00 Labor Rates are variable per Region/District
b. Skilled
Skilled Laborer
Laborer 1 1.00 base
based
d on minimu
minimumm wage
wage as
as approved by
c. Unskilled
Unskilled Laborer
Laborer 2 1.00 DOLE. Refer to the Schedule
Schedule of Labor
Labor
Rates.
Sub
Sub - To
Tota
tall fo
forr A
Name
Name and Capaci
Capacity
ty No. of Unitls No. of HourIs Hourly Rate Amou
Amount
nt (PhP
(PhP))
B. Equipment
Minor
Minor Too
Tools
ls (10%
(10% of Labor
Labor Cost)
Cost)
.J
Sub
Sub - To
Tota
tall fo
forr B
C. Total (A + B)
2
D. Ou
Outp
tput
ut per
per Hour
Hour = 5.56
5.56 m
E. Di
Dire
rect
ct Un
Unit Cost (C + D)
it Cost
Name and Specificat
Specification
ion Unit Quantity Unit Cost Amoun
Amountt (PhP)
(PhP)
F. Mater
Materials
ials
a. Reflec
Reflective
tive Insulatio
Insulation
n 2 Prices of materials
materials are variable per Regionl
m 1.000
District
District based on the prevailing
prevailing unit prices
prices in
b. Consum
Consumble
bles
s (5% of Materi
Materials
als Cos
Cost)
t) the locality which include payment
payment of local
local
taxes
taxes and hauling
hauling cost to the projec
projectt site
site..
Refer to the Construct
Constructionion Mater
Material
ial Price Data
establish
established
ed quar
quarterly
terly by Central
Central Office
Office Price
Monitoring Committee.
Sub
Sub - T
Tot
otal
al fo
forr F
G. Di
Dire
rect
ct Unit
Unit Cost
Cost (E + F)
F)
H. Ove
Overhe
rhead,
ad, Contin
Contingen
gencie
cies
s & Miscel
Miscellan
laneou
eous
s (OC
(OCM)
M) Expens
Expenses
es 15%/12%/10%/8% ofG
I. C
Cont
ontrac
ractor
tor's
's Profit
Profit (CP) 10%/8% of G
J. Val
Value
ue Added
Add ed Tax (VAT)
(VAT) 5 % o f (G + H + I )
K. To
Total
tal Unit
Unit Cost
Cost ( G + H + I + J)
130 Part
Part C - Fin
Finishi
ishing
ng
DETAILED
DETAILED UNIT
UNIT PRI
PRICE
CE ANALY
ANALYSIS
SIS (DU
(DUPA)
PA)
A. Labor
Sub
Sub - T
Tot
otal
al fo
forr A
Name
Name and Cap
Capaci
acity
ty No. of Unitls No. of HourIs Hourly Rate Amou
Amount
nt (PhP)
(PhP)
B. Equipment
Minor
Minor Tools
Tools (10%
(10% of Labor
Labor Cost)
Cost)
.f
Sub
Sub - Tot
Total
al fo
forr B
C. To
Tota
tall (A + B)
2
D. Ou
Outp
tput
ut per
per Hour
Hour = 0.32
0.32 m
E. Di
Dire
rect
ct Un
Unit Cost (C + D)
it Cost
Name and Specifica
Specification
tion Unit Quantity Unit Cost Amoun
Amountt (PhP
(PhP))
F. Materials
a. Stai
Stainle
nless
ss Steel
Steel Doors
Doors and Frames
Frames 2 Prices
Prices of materials
materials are variable
variable per Regio
Region/
n/
m 1.000
District based
District based on the prev
prevailin
ailing
g unit pprices
rices in
b. Con
Consum
sumabl
ables
es (3% of Materi
Materials
als Cos
Cost)
t) the locality
locality which include
include paymen
paymentt of local
local
taxes and hauling
hauling cost to the proje
project
ct site.
Refer to the Const
Constructi
ruction
on Mater
Material
ial Price Data
establishe
estab lished
d quar
quarterly
terly by Central
Central Office
Office Price
Monitoring Committee.
Sub
Sub - Tot
Total
al fo
forr F
G. D
Dir
irec
ectt Un
Unit
it Co
Cost
st (E + F)
H. Overhead,
Overhead, Conti
Contingencies & Miscel
ngencies Miscellan
laneou
eous
s (OCM)
(OCM) Expens
Expenses
es 15%/
15%/12
12%/
%/10
10%/
%/8%
8% of G
I. C
Cont
ontrac
ractor
tor's
's Profit
Profit (CP) 10 %/
%/ 8%
8% of G
J. Value
Value Added
Added Tax (VAT
(VAT)) 5 % o f ( G + H + I)
DETAIL
DETAILED
ED UNI
UNIT
T PRICE
PRICE ANA
ANALYSI
LYSIS
S (DUPA)
(DUPA)
Item No./Descrip
No./Description
tion 10
1043
43(1
(1)) PVC
PVC Do
Door
ors
s and Fram
Frames
es
2
Unit of Meas
Measureme
urement
nt m
2
Output
Output per hour
hour 0.
0.31
315
5 m
A. Labor
-
a. Construction Foreman 1 1.00 Labor Rates are variable per RegionlDistrict
b. S killed Laborer 1 1.00 based
based on minim
minimum
um wage
wage as
as approved
approved by
c. Unskilled Laborer 1 1.00 DOLE. Refer to the Schedule
Schedule of Labor
Labor Rates
Rates..
Sub
Sub - To
Tota
tall fo
forr A
Name
Name and Capaci
Capacity
ty No. of UniUs No. of HourIs Hourly Rate Amoun
Amountt (PhP
(PhP))
B. Equipment
Minor
Minor Tools
Tools (10%
(10% of La
Labor
bor Cost)
Cost)
.J
Sub
Sub - T
Tot
otal
al fo
forr B
C. Total
Total (A + B)
perr Hour =
2
D. Ou
Outp
tput
ut pe 0.31
0.315
5 m
E. Di
Dire
rect
ct Un
Unit Cost (C + D)
it Cost
Name and Specification
Specification Unit Quantity Unit Cost Amou
Amount
nt (PhP
(PhP))
F. Materials
a. PVC Do
Door
ors
s and
and Fram
Frames
es 2 Prices
Prices of materials
materials are vari
variable
able per Regio
Regionl nl
m 1.000
District
District based
based on the prev
prevailin
ailing
g unit pr
prices
ices in
b. Consum
Consumabl
ables
es (5% of Materi
Materials
als Cost)
Cost) the locality
locality which include
include payment of local
taxes
taxe s and hauling
hauling cost to the projec
projectt site
site..
Refer to the Construct
Construction
ion Mater
Material
ial Price Data
establish
esta blished
ed quarterly
quarterly by Central
Central Office
Office Price
Monitoring Committee.
Sub
Sub - T
Tot
otal
al fo
forr F
G. Dir
Direct
ect Unit
Unit Cos
Costt (E + F)
H. Ove
Overhe
rhead,
ad, Con
Contin
tingen
gencie
cies
s & Miscel
Miscellan
laneou
eous
s (OC
(OCM)
M) Expens
Expenses
es 15%/12%/10%/8% ofG
I. Co
Contr
ntract
actor'
or's
s Profit
Profit (CP) 10%/8% of G
J. Value Added Tax (VAT) 5% of (G + H + I)
K. T
Tota
otall Unit
Unit Cost
Cost (G + H + I + J)
132 Part C - Finishing
DETAIL
DETAILED
ED UNI
UNIT
T PRIC
PRICE
E ANAL
ANALYSIS
YSIS (DUPA)
(DUPA)
Name and Capacity No. of Unitls No. of HourIs Hourly Rate Amo
Amount
unt (Ph
(PhP)
P)
B. Equipment
.J
F. Mater
Materials
ials
DETAILE
DETAILED
D UNI
UNIT
T PRICE AN
ANALY
ALYSIS
SIS (DUPA)
(DUPA)
No. of Person
Person/s
/s No. of HourIs
HourIs Hour
Hourly
ly Rate
Rate Amoun
Amountt (PhP)
(PhP)
Designation
A . Labor .
Labor
Labor Rates are vari
variable
able per
a. Cons
Constru
tructi
ction
on For
Forema
eman
n 1 1.00
Region/Dis
Regio n/District
trict based
based on minimu
minimum
m wage
b. Skilled
Skilled Laborer
Laborer 2 1.00 as
as approved
approved by DOLE. Refer to the
c. Unskil
Unskilled
led Labo
Laborer
rer 3 1.00 Schedule of Labor Rates.
Sub
Sub - Tot
Total
al fo
forr A
No. of Unitls
Unitls No. of HourIs
HourIs Hourly
Hourly Rate
Rate Amoun
Amountt (PhP
(PhP))
Name
Name and Capaci
Capacity
ty
B. Equipment
1 1.00 See la
lates
testt ACEL rental
rental rat
rates.
es.
a. One-
One-bag
bagger
ger mixer
mixer
Minor
Minor Tools
Tools (10%
(10% of Labor
Labor Cost)
Cost)
.J
Su
Sub
b - T
Tot
otal
al fo
forr B
C. To
Tota
tall (A + B)
2
D. Output Hour =
Output per Hour 3.82
3.825
5 m
E. Dir
Direct Unit Cost (C + D )
ect Unit
Unit Quantity Unit
Unit Cost
Cost Amoun
Amountt (PhP
(PhP))
Name and Specifica
Specification
tion
F. Materials
Prices of materials
materials are variable per Regio
Region/
n/
a. 100 mm thk CHB (Non-L
(Non-Load
oad Bearin
BearinglL
glLoad
oad pc 13.00 District
District based
based on the prevprevailin
ailing
g unit pri
prices
ces in
b. Cement bag 0.525 the locality which include payment of local
local
cU.m 0.04 taxe
taxess and haulhauling
ing cost to the project
project site.
c.Sand
Refer to the Construct
Construction
ion Mater
Material
ial Price Data
d. Reinf
Reinforc
orcing
ing Steel
Steel kg 3.24*
establish
esta blished
ed quarterly
quarterly by Central Office
Office Price
e. #16
#16 Tie wire kg 0.05 Monitoring Committee.
'Quantity
'Quan derived from 10mm 12'bars
tity derived spaced at 0.4 m
bars spaced
vertically and every 3 layers of CHB
CHB
Sub
Sub - T
Tot
otal
al fo
forr F
G. D
Dir
irec
ectt Unit
Unit Cost (E + F)
H. Ove
Overhe
rhead,
ad, Contin
Contingen
gencie
cies
s & Mis
Miscel
cellan
laneou
eous
s (OC
(OCM)
M) Expens
Expenses
es 15%/12%/10%/8% of G
I. C
Cont
ontrac
ractor
tor's
's Profit
Profit (CP) 10%/8% of G
5 % of ((G
G + H + I)
J. Value
Value Added
Added Tax (VAT)
(VAT)
(G + H + I + J)
K. T
Tota
otall Unit
Unit Cos
Costt
Note: 1. This
This cos
costt sheet
sheet sha
shall
ll be used
used for Ite
Item
m Nos. 1046(1)a
1046(1)a and 1046(2
1046(2)a.
)a.
134 Part
Part C - Fin
Finishi
ishing
ng
DETAILE
DETAILED
D UNI
UNIT
T PRICE
PRICE ANAL
ANALYSIS
YSIS (DUPA)
(DUPA)
A. Labor
-
a. Construction Foreman 1 1.00 Labor Rates are variable per Region/District
b. Skilled Laborer 2 1.00 based
based on minimu
minimumm wage
wage as
as approved
approved by
c. Unskilled Laborer 3 1.00 DOLE. Refer to the Schedule
Schedule of Labor
Labor Rates
Rates..
B. Equipment
.J
F. Materials
Materials
'Quantity
'Quan tity derived
derived from 10mm 12' bars spaced 0.4 m
spaced at 0.4
vertically and every 3 layer
vertically layers
s of CHB
Sub - Total for F
G. Direct Unit Cost (E + F)
H. Overhe
Overhead,
ad, Contingenc
Contingenciesies & Miscellaneous (OCM) Expenses 15%/12%/10%/8% of G
I. Contractor's
Contractor's Profit (CP)
(CP) 10%1 8% of G
Value Added Tax (VAT) 5% of (G + H + I)
J. Total Unit Cost (G + H + I + J)
K.
Note: 1. This cost sh sheet
eet shall be used
used for
for Item Nos. 1046(1)b
1046(1)b and 1046(2)b.
1046(2)b.
135 Par
Partt C - Fin
Finishi
ishing
ng
DETAIL
DETAILED
ED UNIT
UNIT PRIC
PRICE
E ANALY
ANALYSIS
SIS (DU
(DUPA)
PA)
Designation No. of Pe
Perr so
son/s No. of HourIs Hour ly
ly Rate Amoun
Amountt (PhP)
A. Labor.
See deri
derivat
vation
ions
s for Ite
Item
m Nos. 104
1047(2
7(2)) - 1047(
1047(6)
6)
B. Equipment
See deriv
derivati
ations
ons for Ite
Item
m Nos. 104
1047(2
7(2)) - 1047(
1047(6)
6)
.J
F. Materials
Materials
See der
deriva
ivatio
tions
ns for Item Nos. 1047(2) - 1047(6)
DETAILE
DETAILED
D UNI
UNIT
T PRICE
PRICE ANAL
ANALYSI
YSIS
S (DUPA)
(DUPA)
A. Labor·
Fabrication
a. Construction Foreman 1 1.00 Labor Rates are variable per Region/District
base
based
d on minimu
minimumm wage
wage as
as approved
approved by
b. Skilled Laborer 2 1.00
DOLE. Refer to the Schedul
Schedule e of Labor Rates.
c. Unskilled Laborer 2 1.00
Erection
a. Skilled
Skilled Laborer
Laborer 3 0.49
b. Unski
Unskilled
lled Labo
Laborer
rer 3 0.49
Sub
Sub - To
Tota
tall fo
forr A
Name
Name and Cap
Capaci
acity
ty No. of Unitls No. of HourIs Hourly
Hourly Rate
Rate Am
Amou
ount
nt (PhP
(PhP))
B. Equipment
.J
Sub
Sub - T
Tot
otal
al fo
forr B
C. Tota
Totall (A + B)
D. Outpu
Outputt pe
perr Ho
Hour
ur - 85.
85.00
00 kg
E. Dir
Direct
ect Unit
Unit Cost (C + D)
F. Mat
Materi
erials
als
a. Struct
Structura
urall Steel
Steel Frami
Framing
ng includ
including
ing cro
cross
ss kg 1.00 Prices
Prices of materials
materials are variable
variable per Regio
Region/ n/
District
District based
based on the prev
prevaili
ailing
ng unit pprices
rices in
b. Acetylene kg 0.011
the locality
locality which include
include paymen
paymentt of local
c. Oxyge
Oxygen
n kg 0.022 taxes and haul
hauling
ing cost to the project
project site.
site.
d. Wel
Weldin
ding
g Rod kg 0.020 Refer to the Const
Construct
ruction
ion Mater
Material
ial Price Data
e. Consum
Consumabl
ables
es (5% of Materi
Materials
als Cos
Cost)
t) estab
establishe
lished
d quar
quarterl
terly
y by Central
Central Office
Office Price
Monitoring Committee.
Sub
Sub - T
Tot
otal
al fo
forr F
G. Dir
Direc
ectt Unit
Unit Cost
Cost (E + F)
H. Overhe
Overhead,
ad, Con
Contin
tingen
gencie
cies
s & Miscel
Miscellan
laneou
eous
s (OC
(OCM)
M) Expens
Expenses
es 15%/12%/10%/8% of G
I. Cont
Contrac
ractor
tor's
's Profit
Profit (CP) 10%/8% of G
J. Value Added Tax (VAT) 5% of (G + H + I)
DETAILE
DETAILED
D UNIT
UNIT PRICE
PRICE ANAL
ANALYSIS
YSIS (DUPA)
(DUPA)
A. labor
Fabrication
a. Const
Construc
ructio
tion
n For
Forema
eman
n Labor Rates are variable per Region/District
1 1.00
based
based on minimum
minimum wage as
wage as approved
approved by
b. Skilled
Skilled labor
laborer
er 2 1.00 DOLE. Refer to the Schedule
Schedule of Labor Rates.
c. Unskill
Unskilled
ed labo
laborer
rer 2 1
1..00
Erection
a. Skilled
Skilled laborer
laborer 3 0.49
b. Unskill
Unskilled
ed labo
laborer
rer 3 0.49
Sub
Sub - To
Tota
tall fo
forr A
Name
Name and Capaci
Capacity
ty No. of Unitls
Unitls No. of HourIs Hourly Rate Am
Amou
ount
nt (PhP
(PhP))
B. Equipment
a. Weld
Welding
ing Machin
Machine
e 1 0.75 See lat
latest
est ACEL rental
rental rates.
rates.
b. Cutting Outfit 1 0.25
c. Truc
Truck
k Moun
Mounte
ted
d Cr
Cran
ane
e (2
(20-
0-25
25 mt)
mt) 1 0.49
Mino
Minorr Tool
Tools
s (1
(10
0 % of lab
labor
or Co
Cost
st))
.J
Sub
Sub - T
Tot
otal
al fo
forr B
C. Total (A + B )
D. Output per H o
ou
ur - 85.00 k
kg
g
E. Direct
Direct Unit
Unit Cost (C + D)
Name and Specifica
Specification
tion Unit Quantity Unit Cost Amoun
Amountt (PhP
(PhP))
F. Materials
a. Struc
Structur
tural
al Steel
Steel Tru
Truss
ss kg 1.00 Prices
Prices of materials
materials are vari
variable
able per Regio
Region/
n/
District
District based
based on the prev
prevailin
ailing
g unit prices
prices in
b. Acetylene kg 0.011
the locality
locality which include
include payment of local
c. Oxygen
Oxygen kg 0.022 taxes and hauling
hauling cost to the project
project site.
d. Wel
Weldi
ding
ng Ro
Rod
d kg 0.020 Refer to the Construct
Construction
ion Mater
Material
ial Price Data
e. Consum
Consumabl
ables
es (5% of M
Mate
ateria
rials
ls Cost)
Cost) establis
established
hed quarterly
quarterly by Central
Central Office
Office Price
Monitoring Committee.
Sub
Sub - To
Tota
tall fo
forr F
G. Di
Dire
rect
ct Un
Unit
it Cost
Cost (E + F)
H. Ove
Overhe
rhead,
ad, Con
Contin
tingen
gencie
cies
s & Miscel
Miscellan
laneou
eous
s (OC
(OCM)
M) Exp
Expens
enses
es 15%/12%/10%/8% of G
I. Co
Contr
ntract
actor'
or's
s Pro
Profit
fit (CP) 10%1 8%
8% o f G
J. Value
Value Added
Added Tax (VA (VAT)
T) 5 % o f ( G + H + I)
K. T
Tota
otall Unit
Unit Cost
Cost (G + H + I + J)
138 Part
Part C - Fin
Finishi
ishing
ng
DETAIL
DETAILED
ED UNI
UNIT
T PRICE AN
ANALYS
ALYSIS
IS (DU
(DUPA)
PA)
A. Labor-
a. Construction
Construction Foreman
Foreman 1 1.00 Labor Rates are variable per Region/District
b. Skilled Laborer 2 1.00 based
based on minimu
minimumm wage as approved
approved by
Name and Capacity No. of Unitls No. of Houris Hourly Rate Amou
Amount
nt (Ph
(PhP)
P)
B. Equipment
a. Welding
Welding Machine
Machine 2 1.00 See lat
latest
est AGEL rental
rental rates.
rates.
Minor Tools (10% of Labor Cost)
.J
F. Materials
DETAILE
DETAILED
D UNI
UNIT
T PRIC
PRICE
E ANALYS
ANALYSIS
IS (DU
(DUPA)
PA)
A. Labor
-
a. Construction Foreman 1 0.10 Labor Rates are variable per Region/District
base
based
d on minim
minimum
um wage
wage as
as approved
approved by
b. Skilled Laborer 1 0.10
DOLE. Refer to the Schedule of Labor
Labor
c. Unski
Unskilled
lled Laborer
Laborer 1 0.10 Rates.
Sub
Sub - To
Tota
tall fo
forr A
Name
Name and Cap
Capaci
acity
ty No. of UniUs No. of HourIs Hourly Rate Amoun
Amountt (P
(PhP
hP))
B. Equipment
Minor
Minor Tools
Tools (10%
(10% of Labor
Labor Cost)
Cost)
.J
Sub
Sub - To
Tota
tall fo
forr B
C. Tot
Total
al (A + B)
D. Output = 90.
90.45
45 kg
E. Di
Dire
rect
ct Unit Cost (C + D)
Unit Cost
Name and Specifica
Specification
tion Unit Quantity Unit
Unit Cost
Cost Am
Amou
ount
nt (PhP
(PhP))
F. Materials
a. Anch
Anchor
or Bolt
Bolt pc 1.00 Prices of materials
materials are variable per Region/
District
District based
based on the prev prevailin
ailing
g unit pprices
rices in
the locality which include payment of local
local
taxes
taxes and hauling
hauling cost to the projec
projectt site
site..
Refer to the Construct
Construction
ion Mater
Material
ial Price Data
establish
established
ed quar
quarterl
terly
y by Central
Central Office Price
Monitoring Committee.
Sub
Sub - Tot
Total
al fo
forr F
G. Dir
Direct
ect Unit
Unit Cost
Cost (E + F)
H. Overhead,
Overhead, Contingencies & Miscel
Contingencies Miscellan
laneou
eous
s (OCM)
(OCM) Expens
Expenses
es 15%/12%/10%/8% of G
I. Co
Contr
ntract
actor'
or's Profit
Profit (CP) 10%/8% of G
J. Value
Value Adde
Added
d Ta
Tax
x (V
(VAT)
AT) 5% of (G + H + I)
K. T
Tota
otall Unit
Unit Cos
Costt (G + H + I + J)
140 Part C - Fin
Finishi
ishing
ng
DE
DETA
TAIL
ILED
ED UNIT
UNIT PRIC
PRICE
E ANAL
ANALYS
YSIS
IS (DUP
(DUPA)
A)
Sub
Sub - To
Tota
tall fo
forr A
Name
Name and Capaci
Capacity
ty No. of Unitls No. of HourIs Hourly Rate Amoun
Amountt (PhP
(PhP))
B. Equipment
Minor
Minor Too
Tools
ls (10%
(10% of Labor
Labor Cost)
Cost)
,J
Sub
Sub - Tot
Total
al fo
forr B
C. Total (A + B )
Output =
D. Output 1 pc
E. Di
Dire
rect
ct Un
Unit
it Cost
Cost (C + D )
F. Materials
a. Sagro
Sagrod
d wit
with
h nut
nuts
s and bolts pc 1.00 Price
Pricess of materials
materials are vari
variable
able per Regio
Region/ n/
District
District based on the prev
prevailin
ailing
g unit pprice
ricess in
the locality
locality which include
include payment of loca local l
taxes
taxe s and hauling
hauling cost to the project site
site..
Refer to the Construct
Construction
ion Mater
Material
ial Price Data
establish
esta blished
ed quarterly
quarterly by Central
Central Office
Office Price
Monitoring Committee.
Sub
Sub - T
Tot
otal
al fo
forr F
G. D
Dir
irec
ectt Unit
Unit Co
Cost
st (E + F)
H. Overhead,
Overhead, Conti
Contingencies & Miscel
ngencies Miscellan
laneou
eous
s (OCM)
(OCM) Expens
Expenses
es 15%/12%/10%/8% of G
I. Co
Cont
ntra
ract
ctor
or's
's Pr
Prof
ofit
it (CP) 10%/8% of G
J. Value
Value Adde
Added
d Ta
Tax
x (V
(VAT)
AT)
5% of (G + H + I )
K. Tota
Totall Unit
Unit Cos
Costt (G + H + I + J)
141 Part C - Finishing
DETAIL
DETAILED
ED UNIT
UNIT PRIC
PRICE
E ANALY
ANALYSIS
SIS (DU
(DUPA)
PA)
Item No.lDescri
No.lDescription
ption 1047(3
1047(3)c
)c Met
Metal
al S
Stru
tructu
cture
re Access
Accessori
ories
es (Tu
(Turnb
rnbuck
uckle)
le)
Unit of Meas
Measureme
urement
nt pc
Output
Output per ho
hour
ur 1 pc
A. Labor
Sub
Sub - Tota
Totall fo
forr A
Name
Name and Capaci
Capacity
ty No. of Unitls No. of HourIs Hourly
Hourly Rate
Rate Amoun
Amountt (PhP
(PhP))
B. Equipment
Minor
Minor Tools
Tools (10%
(10% of Labor
Labor Cost)
Cost)
.J
Sub
Sub - T
Tot
otal
al fo
forr B
C. Total (A + B)
D. Output
Output = 1 pc
E. Dir
Direct
ect Unit
Unit Cost
Cost (C + D)
F. Materials
a. Standar
Standard
d Turnbuckle
Turnbuckle pc 1.00 Prices
Prices of materials
materials are varia
variable
ble per Regio
Region/ n/
District based on the prev
District prevailin
ailing
g unit pprice
ricess in
the locality
locality which include
include payment of local
taxes
taxe s and hauling
hauling cost to the projec
projectt site
site..
Refer to the Construct
Construction
ion Mater
Material
ial Price Data
establish
esta blished
ed quarterly
quarterly by Central Office
Office Price
Monitoring Committee.
Sub
Sub - T
Tot
otal
al fo
forr F
G. Direc
Directt Unit
Unit Cost
Cost (E + F)
H. Overhe
Overhead,
ad, Contin
Contingen
gencie
cies
s & Miscel
Miscellan
laneou
eous
s (OC
(OCM)
M) Expens
Expenses
es 15%/12%/10%/8% ofG
I. C
Cont
ontrac
ractor
tor's
's Profit
Profit (CP) 10%/8% of G
J. Value Added Tax (VAT) 5% of (G + H + I)
K. Total
Total Unit
Unit Cos
Costt ( G + H + I + J)
142 Part C - Fin
Finish
ishing
ing
DETAILE
DETAILED
D UNI
UNIT
T PRICE
PRICE ANAL
ANALYSI
YSIS
S (DUPA)
(DUPA)
B. Equipment
.J
F. Materials
Materials
DETAILE
DETAILED
D UNI
UNIT
T PRICE
PRICE ANALY
ANALYSIS
SIS (DUPA)
(DUPA)
A. Labor-
Sub
Sub - To
Tota
tall fo
forr A
Name
Name and Capaci
Capacity
ty No. of UniUs No. of HourIs Hourly Rate Amoun
Amountt (PhP
(PhP))
B. Equipment
Minor
Minor Tools
Tools (10%
(10% of Labor
Labor Cost)
Cost)
J
Sub
Sub - T
Tot
otal
al fo
forr B
C. Tota
Totall (A + B)
D. Ou
Outp
tput
ut per Hour =
per Hour 12.
12.995
995 kg
E. Dire
Direct
ct Unit
Unit Cost (C + D)
F. Materi
Materials
als
a. Cross
Cross Bracin
Bracing
g kg 1.05 Price
Pricess of materials
materials are variable
variable per Regio
Region/ n/
Distr
District
ict based
based on the preva
prevailing
iling unit prices
prices in
b. Con
Consum
sumabl
ables
es (3% of Materi
Material
al Cos
Cost)
t)
the locality
locality which include
include payment of localocal l
taxes
taxe s and hauling
hauling cost to the projec
projectt site
site..
Refer to the Construct
Construction
ion Mater
Material
ial Price Data
establish
esta blished
ed quar
quarterl
terly
y by Central Office Price
Monitoring Committee.
Sub
Sub - Tot
Total
al fo
forr F
G. D
Dir
irec
ectt Unit
Unit Co
Cost
st (E + F)
H. Ove
Overhe
rhead,
ad, Con
Contin
tingen
gencie
cies
s & Miscel
Miscellan
laneou
eous
s (OCM)
(OCM) Expens
Expenses
es 15%/12%/10%/8% of G
I. Contr
Contract
actor'
or's
s Profit
Profit (CP) 10%/
10%/8%
8% of G
J. Value
Value Adde
Added d Ta
Tax
x (V
(VAT)
AT) 5% of (G + H + I )
K. T
Tota
otall Unit
Unit Cost
Cost (G + H + I + J)
144 Part C - Fin
Finishi
ishing
ng
DETAIL
DETAILED
ED UNIT
UNIT PRICE ANALYS
ANALYSIS
IS (DU
(DUPA)
PA)
Sub
Sub - To
Tota
tall fo
forr A
Name
Name and Capaci
Capacity
ty No. of Unitls
Unitls No. of HourIs Hourly Rate Amoun
Amountt (PhP
(PhP))
B. Equipment
Mino
Minorr Tool
Tools
s (1
(10%
0% of La
Labo
borr Co
Cost
st))
.J
Sub
Sub - T
Tot
otal
al fo
forr B
C. Total (A + B )
D. O
Output per Hour = 12.
utput
E. Direct
Direct Unit
Unit Cost (C + D)
12.995
995 kg
F. Mater
Materials
ials
a. Steel
Steel Plates
Plates kg 1.05 Price
Pricess of materials
materials are vari
variable
able per Region/
Region/
Distr
District
ict based
based on the prev
prevailin
ailing
g unit price
prices
s in
b. Con
Consum
sumabl
ables
es (3% of Materi
Materials
als Cost)
Cost)
the locality
locality which include
include paymen
paymentt of loca
local l
taxes
taxe s and hauling
hauling cost to the proj
project
ect site.
Refer to the Construction
Construction Material
Material Price Data
establish
esta blished
ed quar
quarterly
terly by Central
Central Office
Office Price
Monitoring Committee.
Sub
Sub - T
Tot
otal
al fo
forr F
G. D
Dir
irec
ectt Unit
Unit Cost (E + F)
H. O
Overhe
verhead,
ad, Contingencies & Miscel
Contingencies Miscellan
laneou
eous
s (OCM)
(OCM) Expens
Expenses
es 15%/12%/10%/8% of G
I. Contr
Contract
actor'
or's Profit
Profit (CP) 10%/8% of G
J. V alue Added Tax (V AT) 5% of (G + H + I)
K. Total Unit Cost (G + H + I + J )
145 Par
Partt C - Fin
Finish
ishing
ing
DETAIL
DETAILED
ED UNIT
UNIT PRIC
PRICE
E ANALY
ANALYSIS
SIS (DU
(DUPA)
PA)
A. labor
B. Equipment
Surface Prepa
Preparation
ration
a. Portable Grinder 2 0.40 See lates
latestt ACEL rental
rental rates
rates..
b. Jack Hammer 1 0.20
c. Air Compressor 1 0.40
c. Speed Ventilator 1 0.40
d. Electric Drill 1 0.20
e. Chipping Gun 1 0.10
f. Paddle Mixer 1 0.20
g. Generator Set (20KVA) 1 0.10
Application
a.Saturator Machine 1 0.
0.10
b. Generator Set (20 KVA) 1 0.10 .J
146 Par
Partt C - Fin
Finishi
ishing
ng
DETAILE
DETAILED
D UNI
UNIT
T PRICE
PRICE ANAL
ANALYSIS
YSIS (DUPA)
(DUPA)
A. Labor
B. Equipment
Surface
Surface Preparation
Preparation
F. Materials
Materials
147 Part
Part C - Fini
Finishin
shing
g
DETAILE
DETAILED
D UNI
UNIT
T PRIC
PRICE
E ANALYS
ANALYSIS
IS (DU
(DUPA)
PA)
Designation No. of Pe
Perrs o
on
n /s No. of HourIs Hourly Rate Amou
Amount
nt (PhP
(PhP))
A. Labor
a. Construction
Construction Forema
Foreman
n 1 1.00 Labor Rates are variable per Region/District
b. Skilled Laborer 6 1.00 based
based on minim um wage as approved by
minimum
c. Unskill
Unskilled
ed Laborer
Laborer 6 1
1..00 DOLE. Refer to the Schedule
Schedule of Labor
Labor
Rates.
Name and Capacity No. of Unitls No. of HourIs Hourly Rate Amo
Amount
unt (Ph
(PhP)
P)
B. Equipment
a. Jetting Machine
Machine 1 1.00 See latest
latest ACEL renta
rentall rate
rates.
s.
.J
F. Materials
Materials
148 Part
Part C - Fin
Finish
ishing
ing
DETAILE
DETAILED
D UNI
UNIT
T PRICE
PRICE ANALYS
ANALYSIS
IS (DU
(DUPA)
PA)
A. Labor -
Labo
Laborr Rates
Rates are variabl
variable
e per Region/
Region/Dis
Distri
trict
ct
a. Construction Foreman 1 1.00
bas
based
ed on mini
minimu
mumm wa ge as approv
wage approved
ed by
b. Unskilled Laborer 4 1.00 DO
DOLE
LE.. Refer
Refer to
to the
the Sc
Sche
hedul
dule
e of LabLabor
or
Rates.
Sub - Total
Total for A
Name
Name and Capaci
Capacity
ty No. of Unitls No. of HourIs Hourly Rate Amount
Amount (Ph
(PhP)
P)
B. Equipment
.J
Sub
Sub - To
Tota
tall fo
forr B
C. Total (A + B)
D. Output
Output per Ho
Hour
ur = 48.
48.00
00 m
E. Direct
Direct Un
Unit
it Cost (C + D)
F. Materials
a. Untre
Untreate
ated
d Tim
Timber (375 mm (II average)
ber (375 bd-ft 48.30 Prices
Prices o off mat
materia
erials
ls are var variab
iable
le per RegRegion/
ion/
b. Misce
Miscella
llaneo
neous
us (5% of Mat
Materi
erials
als Cost)
Cost) Di
Dist
stri
rict
ct babase
sed
d on the the preva
prevail
iling
ing uni
unitt price
prices s in
the local
locality
ity which
which incinclud
ludee payment
payment of loc local
al
taxe
taxess and hauli
hauling
ng co cost
st to the
the proj
projec
ectt site
site..
Ref
Refer
er to the C Cons
onstru
tructi
ction
on Materia
Materiall Price
Price Data
establ
establish
ished
ed quarter
quarterlyly by C Cent
entral
ral Office
Office Price
Note: Monitoring
Monito ring Commit
Committee.
tee.
Assumed average minimum diameter is 3 375
75 mm
for less than 12 m length.
less than length. For beyond 12 m leng
length
th and
bigg
bigger
er diam
diamete
eter,
r, adjust
adjust the qu
quant
antity
ity in bd-f
bd-ftt acc
accord
ordingl
ingly.
y.
Sub
Sub - T
Tot
otal
al fo
forr F
G. Direc
Directt Unit
Unit Cost
Cost (E + F)
H. Overhe
Overhead,
ad, Contin
Contingen
gencie
cies
s & Miscel
Miscellan
laneou
eous
s (OGM)
(OGM) Exp
Expens
enses
es 15%/12%/10%/8% of G
I. Contrac
Contractor
tor's
's Profit
Profit (CP) 10%/
10%/8%
8% of G
J. Value
Value Added
Added Tax (VAT) 5% of (G + H + I)
K. Total
Total Unit
Unit Cost
Cost (G + H + I + J)
149 Part C - Fin
Finishi
ishing
ng
DETAILE
DETAILED
D UNI
UNIT
T PRICE ANALYSI
ANALYSIS
S (DUPA)
(DUPA)
A. Labor
-
Labo
Laborr Rates
Rates are variab
variable
le pe
perr Regi
Region/
on/Dis
Distri
trict
ct
a. Const
Construct
ruction
ion Foreman
Foreman 1 1.
1.00
bas
based
ed on mini
minimu
mumm wa ge as app
wage approv
roved
ed by
b. Unskill
Unskilled
ed Laborer
Laborer 4 1.00 DOLE.
DOL E. Refer
Refer to the Sc
Sched
hedule
ule of Labo
Laborr Rat
Rates.
es.
Sub - Total
Total for A
Name
Name and Capaci
Capacity
ty No. of Unitls
Unitls No. of HourIs Hourly Rate Amount
Amount (PhP)
(PhP)
B. Equipment
a. Truc
Truck
k Mounte
Mounted
d Crane
Crane (41 - 45 mt) 1 1.00 Se
See
e late
latest
st AC
ACEL
EL rent
rental
al rat
rates
es..
(Unloadin
(Unloading
g and Stockpilin
Stockpiling)
g)
Minor
Minor Too
Tools
ls (10%
(10% of labor
labor cos
cost)
t)
J
Sub
Sub - To
Tota
tall fo
forr B
C. Total (A + B)
D. Output Hour = 48.
Output per Hour 48.00
00 m
E. Dire
Direct
ct Unit
Unit Cost (C + D)
F. Materials
a. Trea
Treated
ted Timber (375 mm ¢ average)
Timber (375 bd-ft 48.30 Prices
Prices o off materi
materials
als are var variabl
iablee per RegiRegion/
on/
Di
Dist
stri
rict
ct bas
baseded on thethe prev
prevail
ailin
ing
g un unit
it price
prices s in
b. Misce
Miscella
llaneo
neous
us (3% of Materi
Materials
als Cos
Cost)
t)
the local
locality
ity whi
which
ch inc
include
lude pay
payment
ment of loc local
al
taxe
taxess anandd hauli
hauling
ng cocost
st to the
the proj
projec
ectt site
site..
Ref
Refer
er to the Co Const
nstruc
ructio
tion
n Materi
Material al Price
Price Data
est
establi
ablishe
shed d quar
quarter
terly
ly by CenCentra
trall Office
Office Price
Price
Note:
Monitoring
Monitoring Committee.
Committee.
Assumed average minimum diameter is 375 mm
than 12 m leng
for less than th. For beyond 12 m len
length. length
gth and
big
bigger
ger diam
diamete
eter,
r, adjust
adjust the quan
quantit
tity
y in bd-
bd-ft
ft acc
accordi
ordingly
ngly..
Sub
Sub - To
Tota
tall fo
forr F
G. Direc
Directt Unit Cost (E + F)
Unit Cost
H. Ove
Overhe
rhead,
ad, Contin
Contingen
gencie
cies
s & Misc
Miscell
ellane
aneous
ous (OCM)
(OCM) Expens
Expenses
es 15
15%/
%/12
12%/
%/10
10%/
%/8%
8% of G
I. Contrac
Contractor
tor's
's Pro
Profit
fit (CP) 10%/
10%/8%
8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. Total
Total Unit
Unit Cost
Cost (G + H + I + J)
150 Part
Part C - Fini
Finishin
shing
g
DETAIL
DETAILED
ED UNIT
UNIT PRICE ANA
ANALYSI
LYSIS
S (DU
(DUPA)
PA)
A. Labor
-
Labo
Laborr Rat
Rates
es are variabl
variable
e pe
perr Reg
Region/
ion/Dis
Distri
trict
ct
a. Construction Foreman 1 1.00
bas
based
ed on min
minim
imum
um wa ge as approve
wage approved d by
b. Skilled
Skilled Laborer
Laborer 2 1.00 DOLE.
DOL E. Refer
Refer to the
the Sch
Schedul e of L
edule Labor
abor Rates.
Rates.
c. Unskille
Unskilled
d Laborer
Laborer 2 1.00
Sub - Total
Total for A
Name
Name and Cap
Capaci
acity
ty No. of Unit/s No. of HourIs Hourly Rate Amount (P hP)
B. Equipment
.J
Sub
Sub - T
Tot
otal
al fo
forr B
C. Total (A + B)
D. O
Ou
utput p e
err H ou
our = 48.00 m
E. Di
Direc
rectt Unit
Unit Cost (C + D)
F. Mater
Materials
ials
a. Stru
Structu
ctural
ral Steel
Steel Pile,
Pile, W=159
W=159 kg/
kg/m
m m 1.00
(del
(delivere
ivered
d at site)
site) Prices of materia
materials
ls are vari
variable
able per Regionl
Regionl
Di
Dist
stric
rictt bas
based
ed on thethe prev
prevai
ailin
ling
g un unitit pric
prices
es in
b. Misce
Miscella
llaneo
neous
us (2% of Mat
Materi
erials
als Cost)
Cost)
the locali
locality
ty whi
which
ch inc
includ
lude payment of local
e payment local
taxe
taxess anand
d hau
hauli
ling
ng co cost
st to the
the pro
proje
ject
ct site
site..
Ref
Refer
er to the Co Const
nstruc
ructio
tion
n Mat
Materia
eriall Price
Price Data
establ
establishe
ishedd quarter
quarterly
ly by Cent
Central
ral Office
Office Pric
Pricee
Monitoring
Monitor ing Commit
Committee.
tee.
Su
Sub
b - Tota
Totall fo
forr F
G. Dire
Direct
ct Un
Unit
it Cost (E + F)
H. Overhead
Overhead,, Contin
Contingen
gencie
cies
s & M
Misc
iscell
ellane
aneous
ous (OCM)
(OCM) Expens
Expenses
es 15
15%/
%/12
12%/
%/10
10%/
%/8%
8% ofG
ofG
I. Contrac
Contractor
tor's
's Profit
Profit (CP) 10%/
10%/8%
8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
To
Total
tal Unit
Unit Cost
Cost
K. (G + H + I + J)
151 Part C - Fin
Finishi
ishing
ng
DETAIL
DETAILED
ED UNIT
UNIT PRICE ANAL
ANALYSIS
YSIS (DUPA)
(DUPA)
A. Labor
a. Const
Construct
ruction
ion Foreman
Foreman 1 1.00 Labor Rates are variable per RegionlDist
RegionlDistrict
rict
b. Skilled
Skilled Laborer
Laborer 4 1.00 bas
based
ed on mi
mini
nimu
mumm wage
wage as a
appr
pprov
oved
ed by
DO
DOLE
LE.. Refer
Refer to
to the
the Sc
Sched
hedul
ule
e of LabLabor
or
c. Unskilled
Unskilled Laborer
Laborer 8 1.00
Rates.
Sub - Total
Total for A
Name
Name and Cap
Capaci
acity
ty No. of Unitls No. of HourIs Hourly Rate A mount (P h P )
B. Equipment
a. Pay
Paylo
load
ader
er (1
(1.5
.50
0 m\ LX80
LX80-2
-2C
C 1 0.05 Se
See
e late
latest
st AC
ACEL
EL rent
rental
al rat
rates
es..
b. Concre
Concrete
te Vibrator
Vibrator 1 0.10
c. Plate
Plate Compacto
Compactorr (for
(for Casting
Casting Bed
Bed)) 1 0.28
d. Bar Bender
Bender 1 0.28
e. Bar Cutter 1 0.28
Minor
Minor Too
Tools
ls (10%
(10% of Labor
Labor Cost)
Cost)
Sub
Sub - To
Tota
tall fo
forr B
C. Total (A + B )
"
D. Output Hour =
Output per Hour 2.50m
E. Direct
Direct Unit
Unit Cost (C + D )
F. Materials
cU.m 0.168
a. Ready
Ready Mix conc
concret
rete,
e, Cla
Class
ss AA-27.6
AA-27.60MP
0MPa
a @ 28Day
28Days*
s* Prices
Prices of mat
materi
erials
als are vari
variable
able per Regionl
Regionl
b. Reinf
Reinforc
orced
ed Steel
Steel Bar,
Bar, Grade 60 kg 40.45 Di
Dist
stri
rict
ct base
based
d on thethe preva
prevail
iling
ing uni
unitt price
prices
s in
c. Tie
Tie Wire #1
#16
6 (2
(2%
% of RSB)
RSB) kg 0.809 the loca
localit
lity
y whic
whichh inc
include
lude pay
payment
ment of loc local
al
taxes and hauling
hauling coscostt to the
the pro
project
ject site.
site.
d. Good
Good Lum
Lumber
ber - 4 u
uses
ses bd-ft 1
15
5.333 Refer
Refer to the C Const
onstruct
ruction
ion Mat
Materia
eriall Price
Price Data
e. Marine Plywood, 1/2"
Marine Plywood, 1/2" x 4' x 8' - 4 uses pc 0.268 establi
establishe
shed d quar
quarter
terly
ly by CenCentra
trall Offi
Office
ce Price
Price
f. A
Asso
ssorte
rted
d CWN (1k
(1kg/1
g/100b
00bd-f
d-ftt of Lu
Lumbe
mber)
r) kg 0.163 Monitor
Monitoring
ing Commit
Committee.
tee.
Castin
Casting
g Bed
a. Ready
Ready Mix Concr
Concrete
ete,, Cla
Class
ss B cU.m 0.03
b. Good
Good Lumber
Lumber bd-ft 1.00
c. Base
Base Course
Course cU.m 0.06
Note:
*If no availabl
available
e Rea
Readydy Mix Concr
Concrete
ete at projec
project
t site,
der
deriv
ive
e the
the co
cost
st of co
conc
ncret
rete
e ususin
ing
g th
thee Batc
Batchin
hing
g Pl
Plant
ant or
One Bagger
Bagger Mixer
Mixer for s small
mall quantit
quantity.
y.
Sub
Sub - To
Tota
tall fo
forr F
G. Direc
Directt Unit
Unit Cost
Cost (E + F)
H. Overhead,
Overhead, Conti
Contingencies & Miscellane
ngencies Miscellaneous
ous (OCM) Expenses 15
15%/
%/12
12%/
%/10
10%/
%/8%
8% ofG
ofG
I. Contra
Contractor
ctor's
's Profit
Profit (CP) 10%/
10%/8%
8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. Total
Total Unit
Unit Cos
Costt ( G + H + I + J)
152 Part
Part C - Fin
Finish
ishing
ing
DETAILE
DETAILED
D UNI
UNIT
T PRICE ANALYSI
ANALYSIS
S (DUPA)
(DUPA)
A. Labor
a. Const
Construct
ruction
ion Forem
Foreman
an 1 1.
1.00 Labo
Labor
bas r Rates
based
ed Ra
ontes are
mini
minimu
mummvar
variabl
iable
wa e per
wage
ge Reg
Region/
as apprion/Dis
approvedDistri
oved trict
ct
by
b. Skill8d
Skill8d Labo
Laborer
rer 4 1.00
DOLE.
DOL E. Refer to the
Refer the Sched
Schedule
ule of Labor
Labor
c. Unskill
Unskilled
ed Laborer
Laborer 8 1.00 Rates.
Sub
Sub - To
Tota
tall fo
forr A
Name and Capacity No. of Unitls No. of HourIs Hourly Rate Amount
Amount (PhP)
(PhP)
B. Equipment
a. Pay
Paylo
load
ader
er (1
(1.5
.50
0 m\ LX80
LX80-2
-2C
C 1 0.05 See late
latest
st AGEL
AGEL rent
rental
al rates
rates..
b. Concre
Concrete
te Vibrator
Vibrator 1 0.10
c. P late Compactor (for Casting Bed) 1 0.28
d. Bar Bender
Bender 1 0.28
e. Bar Cutter 1 0.28
Minor
Minor Too
Tools
ls (10%
(10% of Labor
Labor Cost)
Cost)
.J
Sub
Sub - T
Tot
otal
al fo
forr B
C. Total (A + B)
D. Output Hour =
Output per Hour 2.50m
E. Di
Dire
rect
ct Unit
Unit Co
Cost
st (C + D)
F. Mater
Materials
ials
Prices
Prices of materi
materials
als are var
variabl
iable
e pe
perr Reg
Regionl
ionl
cU.m 0.168
a. Ready
Ready Mix concrete AA-27.60MPa @ 28Days*
concrete,, Glass AA-27.60MPa Di
Dist
stri
rict
ct base
based
d on thethe preva
prevail
iling
ing uni
unitt price
prices
s in
b. Reinf
Reinforc
orced
ed Steel
Steel Bar,
Bar, Grade 60 kg 48.69 the loc
locali
ality
ty whi
which
ch inc
include
lude pay payment
ment of loclocal
al
tax
taxes
es and hauling
hauling cos
cost
t to the
the proj
project
ect site.
site.
c. T
Tie
ie Wire #16
#16 (2
(2%
% of RSB) kg 0.974 Refer to the Constr
Construct
uction
ion MateriaMateriall Price
Price Dat
Data
a
d. Good
Good Lumber
Lumber - 4 uses
uses bd-ft 15
15.333 est
establi
ablishe
shed d quar
quarter
terly
ly by Cen Centratrall Offi
Office
ce Price
Price
e. Marine
Marine Ply
Plywoo
wood,
d, 1/2"
1/2" x 4' x 8' - 4 u
uses
ses pc 0.268 Monitoring
Monitoring CommitCommittee.
tee.
f. Assorte
Assorted
d CWN (1kg/1 OObd-
OObd-ft
ft of Lumber)
Lumber) kg 0.163
Castin
Casting
g Bed
a. Re
Ready
ady Mix Conc
Concret
rete,
e, Class
Class B cU.m 0.03
b. Good
Good Lumber
Lumber bd-ft 1.00
c. Base Course
Course cU.m 0.06
Note:
*If no availab
available
le Ready
Ready Mix Concr
Concrete
ete at Proje
Project
ct Sit
Site,
e,
deriv
derive
e the
the cost
cost of co
conc
ncret
rete
e ususin
ing
g ththe
e Bat
Batch
ching
ing Pl Plant
ant or
One Bagger
Bagger Mix
Mixer
er for smsmall
all quan
quantit
tity
y
Sub
Sub - To
Tota
tall fo
forr F
G. Direc
Directt Unit
Unit Cost (E + F)
H. Overhe
Overhead,
ad, Contin
Contingen
gencie
cies
s & Miscel
Miscellan
laneou
eous
s (OCM)
(OCM) Exp
Expens
enses
es 15
15%/
%/12
12%/
%/10
10%/
%/8%
8% of G
I. Contrac
Contractor's
tor's Profit
Profit (CP) 10%/
10%/8%
8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. Total
Total Unit
Unit Cost
Cost (G + H + I + J)
153 Par
Partt C - Fin
Finish
ishing
ing
DETAIL
DETAILED
ED UNIT
UNIT PRICE ANA
ANALYSI
LYSIS
S (DUPA)
(DUPA)
A Labor
a. Const
Construct
ruction
ion Forem
Foreman
an 1 1
1..00 Labo
Laborr Rate
Rates
s are var
variabl
iable
e per RegRegion/
ion/Dis
Distri
trict
ct
bas
based
ed on mini
minimu
mum wage as appr
m wage approve
oved
d by
b. Skilled
Skilled Laborer
Laborer 4 1.00
DOLE.
DOL E. Ref
Refer
er to the Sche
Schedul e of La
dule Labor
bor Rates.
Rates.
c. Unskille
Unskilled
d Laborer
Laborer 8 1.00
Sub - Total
Total for A
Name
Name and Capaci
Capacity
ty No. of Unitls No. of HourIs Hourly Rate Amount (PhP )
B. Equipment
a. Payloa
Payloader
der (1.
(1.50
50 m\ LX80-2
LX80-2C
C 1 0.05 See llatest
atest AGEL rental
rental rates.
rates.
b. Concrete
Concrete Vibra
Vibrator
tor 1 0.10
c. Plat
Plate
e Compac
Compactor
tor (for
(for Casting
Casting Bed
Bed)) 1 0.27
d. Bar Bender
Bender 1 0.27
e. Bar Cutter
Cutter 1 0.27
Minor
Minor Too
Tools
ls (10%
(10% of Labor
Labor Cost)
Cost)
J
Sub
Sub - To
Tota
tall fo
forr B
C. Total (A + B)
D. Output Hour =
Output per Hour 2.30m
E. Direct
Direct Unit
Unit Cost (C + D)
F. Materials
Materials
Prices of materi
materials
als are varia
variable
ble per Regionl
Regionl
cU.m 0.213
a. Ready
Ready Mix concr
concrete
ete,, Cla
Class
ss AA-
AA-27.
27.60M
60MPa
Pa @ 28
28Day
Days'
s' Di
Dist
stri
rict
ct bas
based ed on thethe prev
prevail
ailin
ing
g un
unit
it price
prices
s in
b. Reinf
Reinforc
orced
ed Steel
Steel Bar,
Bar, Grade 60 the loca
localit
lity
y whi
which
ch inc
include
lude pay
payment
ment of local
local
kg 50.040
taxes
taxes and haulhauling
ing cos
costt to the proj
project
ect site.
site.
c. Tie
Tie Wi
Wire
re #1
#16
6 (2
(2%
% of RSB)
RSB) kg 1.001 Ref
Refer
er to the Constr
Construct
uction
ion Materi
Materialal Price
Price DatDataa
d. Good
Good Lumber
Lumber - 4 uses
uses bd-ft 17.25 est
establi
ablishe
shed d qua
quarte
rterly
rly b by
y Cen
Centra
trall Office
Office Price
Price
e. Marine
Marine Ply
Plywoo
wood,
d, 1/2"
1/2" x 4' x 8' - 4 use
uses
s pc 0.30 Monitor
Monitoring
ing Commit
Committee.
tee.
f. Assorted
Assorted CWN (1kg/1 OObd.
OObd.ft
ft of Lumber
Lumber)) kg 0.183
Castin
Casting
g Bed
a. Ready
Ready Mix Conc
Concret
rete,
e, Cla
Class
ss B cU.m 0.033
b. Good Lumbe
Lumber
r bd-ft 1.00
c. Base Course
Course cU.m 0.07
Note:
'If
'If no avai
availa
lable
ble Re Ready
ady MiMix
x CoConcncre
rete
te at Proj
Projec
ectt Si
Site
te,,
derive the cost of conc
derive concre
rete
te ususing
ing th
thee Batc
Batchi
hing
ng Pl
Plan
antt or
One Bagger
Bagger Mixer
Mixer for s smal
malll quan
quantit
tity
y
Sub - Total
Total for F
G. Direc
Directt Unit
Unit Cost (E + F)
H. Overh
Overhead,
ead, Conti
Contingen
ngencies
cies Miscellan
Miscellaneous
eous (OCM) Expenses
I. Contrac
Contractor's
tor's Profit
Profit (CP) &
15%/
15%/12
12%/
%/10
10%/
%/8%
8%
10%/
10%/8%
8%
of G
of G
J. Value
Value Added
Added Tax (VAT)
(VAT) + +
5% of (G H I)
K. Total
Total Unit
Unit Cost
Cost (G + H + I + J)
154 Par
Partt C - Fin
Finish
ishing
ing
DETAIL
DETAILED
ED UNI
UNIT
T PRICE ANA
ANALYSI
LYSIS
S (DUPA)
(DUPA)
A. Labor
a. Const
Construct
ruction
ion Forema
Foreman
n 1 1.00 Labor
Labor R
Rates
ates are variab
variable
le peperr Regi
Regionl
onlDis
Distri
trict
ct
bas
based
ed on mi
minim
nimum
um wagwagee as approv
approved
ed by
b. Skilled Laborer 4 1.00
DOLE.
DOL E. Refer
Refer to the Sc
Sched
hedule
ule of Labo
Laborr Rat
Rates.
es.
c. Unskilled Laborer 8 1.00
Sub
Sub - To
Tota
tall fo
forr A
Name
Name and Capaci
Capacity
ty No. of Unitls No. of HourIs Hourly Rate Amount
Amount (PhP)
(PhP)
B. Equipment
a. Paylo
Payloade (1.50 m3), LX80-2C
aderr (1.50 1 0.05 Se
See
e lates
latestt AGEL
AGEL rent
rental
al rate
rates.
s.
.J
Sub
Sub - To
Tota
tall fo
forr B
C. Total (A + B)
D. Output Hour =
Output per Hour 2.30m
E. Direct
Direct Unit
Unit Cost (C + D)
F. Materials
Prices
Prices o
off mat
materi
erials
als are variabl
variable
e per Reg
Region!
ion!
cU.m 0.213
a. Read
Readyy Mix concre
concrete,
te, Cla
Class
ss AA-27.6
AA-27.60MP
0MPa
a @ 28Days* Di
Dist
stri
rict
ct bas
based
ed on the
the preva
prevail
iling
ing uni unitt price
prices
s in
the loc
locali
ality
ty whi
which
ch inc
include
lude pay
payment
ment of loca local l
b. Reinforced Steel Bar, Grade 60 kg 62.46
tax
taxes
es and hauling
hauling cos
costt to the proje
project
ct site.
site.
c. Tie
Tie Wire #16
#16 (2
(2%
% of RSB) kg 1.249 Ref
Refer
er to the ConConstr
struct
uction
ion Materi
Material al Pri
Price
ce Dat
Data a
d. Good Lumber - 4 uses bd-ft 17.25 est
establi
ablishe
shed d quar
quarter
terly
ly by CenCentra
trall Offi
Office
ce Price
Price
e. Marine
Marine Plywoo
Plywood,
d, 1/2"
1/2" x 4' x 8' - 4 uses pc 0.30 Monito
Monitoring
ring Commit
Committee.
tee.
f. As
Asso
sort
rted
ed CW
CWN
N (1 kg/1 OObd-ft of Lumber)
(1kg/1 kg 0.183
Castin
Casting
g Bed
a. Ready
Ready Mix Concr
Concrete
ete,, Cla
Class
ss B cU.m 0.033
b. Good
Good Lumb
Lumber
er bd-ft 1.00
c. Base Course
Course cU.m 0.07
Note:
"I
"Iff n
no
o avai
availa
lable
ble Re
Ready
ady MiMixx Conc
Concre
rete
te at Pro
Projec
jectt Si
Site
te,,
de
deriv
rive
e the
the cost of conc
concre
rete
te ususin
ing
g th
the
e Batchin
Batching
g Pl ant or
Plant
One Bagger
Bagger Mixer
Mixer for sm
small
all quantit
quantity
y
Sub
Sub - To
Tota
tall fo
forr F
G. Direc
Directt Unit Cost (E + F)
Unit Cost
H. Overhead
Overhead,, Contin
Contingen
gencie
cies
s & Miscel
Miscellan
laneou
eous
s (OCM)
(OCM) Expens
Expenses
es 15
15%/
%/12
12%/
%/10
10%/
%/8%
8% ofG
ofG
I. Contrac
Contractor
tor's
's Profit
Profit (CP) 10%/
10%/8%
8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. Total
Total Unit
Unit Cost
Cost (G + H + I + J)
155 Part
Part C - Fin
Finishi
ishing
ng
DETAIL
DETAILED
ED UNIT
UNIT PRI
PRICE
CE ANAL
ANALYSIS
YSIS (DUPA)
(DUPA)
a. Cons
Construct
truction
ion Forem
Foreman
an 1 1
1..00 Labo
Laborr Rates
Rates are variabl
variable
e per RegRegion/
ion/Dis
Distri
trict
ct
base
based
d on mi
mininimum
mum wa ge as appr
wage approv
oved
ed by
b. Skilled
Skilled Laborer
Laborer 2 1.00
DO
DOLE
LE.. Re
Refe
ferr to the
the Sch
Schededule
ule of L Lab
abor
or RaRate
tes.
s.
c. Unskilled Laborer 2 1.00
Sub - Total
Total for A
Name
Name and Cap
Capaci
acity
ty No. of Unitls No. of Houris Hourly Rate Amount
Amount (Ph
(PhP)
P)
B. Equipment
.J
Sub
Sub - To
Tota
tall fo
forr B
C. Total (A + B)
D. Output Hour =
Output per Hour 48.
48.00
00 m
E. Direct
Direct Unit
Unit Cost (C + D )
F. Mater
Materials
ials
a. Preca
Precast,
st, Prestr
Prestress
essed
ed Con
Concre
crete
te Pil
Piles
es m 1.00 Prices
Prices of materia
materials
ls are varivariabl
ablee per Reg
Region!
ion!
Di
Dist
stri
rict
ct babasesed
d on the
the prev
prevai
ailin
ling
g ununit
it pric
prices
es in
(delivere
(delivered
d at site)
site)
the loca
localit
lity
y which
which includ
include e payment
payment of loc local
al
Miscel
Miscellan
laneou
eous
s (2% of Materi
Materials
als Cost)
Cost) taxe
taxess and haulihauling
ng cocost
st to the proje
project
ct site
site..
Ref
Refer
er to thethe Con
Constr
struct
uction
ion Materia
Materiall Price
Price DatDataa
est
establ
ablish
ished
ed quarquarter
terly
ly by C Cent
entral
ral Office
Office Price
Monitoring
Monito ring Commit
Committee.
tee.
Sub
Sub - To
Tota
tall fo
forr F
G. Direc
Directt Unit
Unit Cost
Cost (E + F)
H. Ove
Overhe
rhead,
ad, Con
Contin
tingen
gencie
cies
s & Misce
Miscella
llaneo
neous
us (OCM)
(OCM) Expens
Expenses
es 15%/12%/10%/8% of G
I. Contrac
Contractor's
tor's Profit
Profit (CP) 10%/8% of G
J. Value
Value Added
Added Tax (VAT) 5% of (G + H + I)
K. Total
Total Unit
Unit Cost
Cost (G + H + I + J)
156 Part C - Finishing
DETAilED
DETAilED UNI
UNIT
T PRIC
PRICE
E AN
ANALY
ALYSIS
SIS (DU
(DUPA)
PA)
Labo
Laborr R
Rates
ates are var
variab
iable
le per
per Reg
Region/
ion/Dis
Distri
trict
ct
a. Cons
Construct
truction
ion Forem
Foreman
an 1 1.
1.00
ba
base
sed
d on min
minim
imum
um wa ge as appro
wage approveved
d by
b. Skilled
Skilled Labo
Laborer
rer 2 1.00 DOLE.
DOL E. Ref
Refer
er to th
the
e Sch
Schedul e of L
edule Labor
abor Rates.
Rates.
c. Unskilled Laborer 2 1.00
Sub - Total
Total for A
Name and Capacity No. of Unitls No. of HourIs Hourly Rate Amount (P h P )
B. Equipment
.J
Sub
Sub - To
Tota
tall fo
forr B
C. Total (A + B)
D. Output Hour =
Output per Hour 48.
48.00
00 m
E. Di
Dire
rect
ct Unit
Unit Cost
Cost (C + D)
F. Materials
a. Preca
Precast,
st, Prestr
Prestress
essed
ed Con
Concre
crete
te Pil
Piles
es m 1.00 Prices of mat
materia
erials
ls are varivariable
able per Region/
Region/
Di
Dist
stric
rictt bas
based
ed on thethe prev
prevai
ailin
ling
g uniunitt pric
priceses in
(delivered
(delivered at site)
site)
the localit
locality
y whi
which
ch inc
include payment of local
lude payment local
Miscel
Miscellan
laneou
eous
s (2% of Ma
Mater
terial
ials
s Cost)
Cost) taxe
taxess anandd hauli
hauling
ng co cost
st to the
the proj
projec
ectt site
site..
Ref
Refer
er to the Co Const
nstruc
ructio
tion
n Materi
Materialal Price
Price Data
est
establ
ablish
ished
ed quar
quarter
terly
ly by C Cent
entral
ral Office
Office Price
Monitoring
Monitor ing Committee.
Committee.
Sub
Sub - Tot
Total
al fo
forr F
G. Direc
Directt Unit Costt (E + F)
Unit Cos
H. Overh
Overhead
ead,, Contin
Contingen
gencie
cies
s & M
Misc
iscell
ellane
aneous
ous (OCM)
(OCM) Expens
Expenses
es 15%/12%/10%/8% of G
I. Contrac
Contractor
tor's
's Pro
Profit
fit (CP) 10%/8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. Total
Total Unit
Unit Cos
Costt (G + H + I + J)
157 Part C - Finishing
DETAIL
DETAILED
ED UNIT
UNIT PRICE ANA
ANALYSI
LYSIS
S (DUPA)
(DUPA)
A. Labor
a. Const
Construct
ruction
ion Forem
Foreman
an 1 1.00 Lab
Labor
or RRate
ates
s ar
are
e variabl
variable
e per RegRegion/
ion/Dis
Distri
trict
ct
ba
base
sed
d on mini
minimu
mum wage as appr
m wage approv
oved
ed by
b. Skilled
Skilled Laborer
Laborer 2 1.00
DOLE.
DOL E. Ref
Refer
er to th
the
e Sch
Schedul e of L
edule Labor
abor Rat
Rates.
es.
c. Unskille
Unskilled
d Laborer
Laborer 2 1.00
Sub - Total
Total for A
Name
Name and Capaci
Capacity
ty No. of Unitls No. of HourIs Hourly Rate Amount (P h P )
B. Equipment
a. Truc
Truck
k Mounte
Mounted
d Crane
Crane (41 - 45 mt) 1 1.00 See late
latest
st AC
ACEL
EL rent
rental
al rates
rates..
Minor
Minor Tools (10%
(10% of Labor
Labor Cost)
Cost)
J
Sub
Sub - T
Tot
otal
al fo
forr B
C. Total (A + B)
D. Output Hour =
Output per Hour 72.
72.00
00 m
E. Direct
Direct Unit
Unit Cost (C + D)
F. Mater
Materials
ials
a. Steel
Steel Sheet
Sheet Pile
Pile KSP II (deliv
(delivere
ered
d at site)
site) kg 48.00 Prices of materi
materials
als are varivariable
able per Regionl
Regionl
Miscel
Miscellan
laneou
eous
s (2% of Materia
Materials
ls Cost)
Cost) Di
Dist
stri
rict
ct bas
based
ed on thethe preva
prevail
iling
ing uni
unitt price
pricess in
the locali
locality
ty which
which inc
include
lude pay ment of local
payment local
taxes
taxes and haul hauling
ing cos
costt to the
the pr
projec
ojectt site.
site.
Ref
Refer
er to the Constr
Construct
uction
ion Mat
Materia
eriall Price
Price Dat
Dataa
establi
establishe
shed d quaquarte
rterly
rly by C Cent
entral
ral Office
Office Pri
Price
ce
Monitoring
Monitor ing Commit
Committee.
tee.
Sub
Sub - T
Tot
otal
al fo
forr F
G. Dir
Direct
ect Unit
Unit Cost
Cost (E + F)
H. Ov
Overhea
erhead,
d, Conti
Contingencies & Miscellan
ngencies Miscellaneous
eous (OCM) Expenses 15%/12%/10%/8% ofG
I. Contrac
Contractor's
tor's Profit
Profit (CP) 10%/8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. Total
Total Unit
Unit Cost
Cost
(G + H + I + J)
158 Part
Part C - Fin
Finish
ishing
ing
DETAILE
DETAILED
D UNI
UNIT
T PRICE ANALYSI
ANALYSIS
S (DU
(DUPA)
PA)
A. Labor
Sub - Total
Total for A
B. Equipment
g. Plate
Plate Compact
Compactor
or (5 hp),
hp), fo
forr Cast
Casting
ing Bed 1 0.03
Minor
Minor Too
Tools
ls (10%
(10% of Labor
Labor Cost)
Cost)
.J
Sub
Sub - To
Tota
tall fo
forr B
C. Total (A + B)
D. Output Hour =
Output per Hour 1.90
1.90 m
E. Direct
Direct Unit
Unit Cost (C + D)
F. Mater
Materials
ials
a. Reinfo
Reinforci
rcing
ng Steel
Steel Bar kg 41.64 Prices
Prices of materi
materials
als are varvariabl
iablee per Reg Region/
ion/
Di
Dist
stri
rict
ct bas
based
ed on thethe preva
prevail
ilin
ing
g uniunitt price
pricess in
b. Cement bag 1.66
the loca
localit
lity
y whi
which
ch inc
include
lude pay
payment
ment of localocal l
c.Sand m3 0.09 taxes and ha hauli
uling
ng co cost
st to the
the proj
projec
ectt site
site..
m3 Ref
Refer
er to the ConConstr
struct
uction
ion Materi
Materialal Pri
Price
ce DatData a
d. Grave
Gravell 0.18
est
establi
ablishe
shed d quar
quarter
terly
ly by C Cent
entral
ral Office
Office Pric
Price e
e. Plywood
Plywood,, 1/2"
1/2" x 4' x 8' - 4 uses
uses pc 0.24 Monitoring
Monito ring Commit
Committee.
tee.
f. Good
Good Lumber
Lumber - 4 uses
uses bd-ft 12.40
g. #16
#16 GI Tie
Tie Wir
Wire
e (2
(2%
% of RSB)
RSB) kg 0.83
h. Asso
Assorte
rted
d CWN (1 kg
kg/10
/100
0 bd-
bd-ft
ft of Lum
Lumber
ber)) kg 0.12
Castin
Casting
g Bed
a. Cemen
Cementt bag 0.296
b.Sand m3 0.019
c. Gravel
Gravel m3 0.037
d. Good
Good Lum
Lumber
ber - 4 u
uses
ses bd.ft 1.00
3
e. Base Course
Course m 0.08
Sub
Sub - To
Tota
tall fo
forr F
G. Direc Unit Cost (E + F)
Directt Unit
H. Ov
Overh
erhead
ead,, Contin
Continoen
oencie
cies
s & M
Misc
iscell
ellane
aneous
ous (OCM)
(OCM) Exp
Expens
enses
es 15
15%/
%/12
12%/
%/10
10%/
%/8%
8% of G
I. Contra
Contractor
ctor's
's Profit
Profit (CP) 10%/
10%/8%
8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. Total
Total Unit
Unit Cost
Cost (G + H + I + J)
159 Par
Partt C - Fin
Finish
ishing
ing
DETAIL
DETAILED
ED UNI
UNIT
T PRICE ANAL
ANALYSIS
YSIS (DUPA)
(DUPA)
A. Labor
a. Const
Constructi
ruction
on Foreman
Foreman 1 1.
1.00 Labor
Labor Rates
Rates are variabl
variable
e per RegRegion/
ion/Dis
Distri
trict
ct
bas
based
ed on mini
minimu
mum wage as appro
m wage approve
ved
d by
b. Skilled
Skilled Laborer
Laborer 4 1.00
DOLE.
DOL E. Ref
Refer
er to th
the
e Sch
Schedu le of La
edule Labor
bor Rat
Rates.
es.
c. Unskille
Unskilled
d Laborer
Laborer 8 1.00
Sub - Total
Total for A
Name
Name and Capac
Capacity
ity No. of Unitls
Unitls No. of HourIs Hourly Rate Amount (P h P )
B. Equipment
a. Pa
Payl
yloa
oade
derr (1
(1.5
.50
0 m\ LX
LX80
80-2
-2C
C 1 0.03 Se
See
e late
latest
st AC
ACEL
EL renta
rentall rate
rates.
s.
b. Concret
Concrete
e Vibrator
Vibrator 1 0.10
c. Plate
Plate Com
Compac
pactor
tor (5 hp),
hp), for Castin
Casting
g Bed 1 0.03
d. Bar Cutter
Cutter 1 0.22
e. Bar Bender
Bender 1 0.22
Minor
Minor Too
Tools
ls (10%
(10% of Labor
Labor Cost)
Cost)
Sub - Total
Total for B
C. Total (A + B)
Total J
D. Outp
Output
ut pe
perr Hour
Hour = 2.30m
E. Dir
Direct
ect Unit
Unit Cost
Cost (C + D)
F. Materials
a. Reinf
Reinforc
orcing
ing Steel
Steel Bar kg 41.64 Prices of materia
materials
ls are varia
variable
ble per Regio
Region! n!
3 Di
Dist
stri
rict
ct bas
baseded on thethe prev
prevai
ailin
ling
g uniunitt pric
priceses in
b. Rea
Ready
dy Mix Concr
Concrete
ete,, fc'
fc'=27
=27.60
.60 Mpa @28 day
days'
s' m 0.18
the local
locality
ity whi
which
ch inc
includ
lude payment of local
e payment local
Plywood, 1/2"
c. Plywood, 1/2" x 4' x 8' - 4 uses pc 0.24 taxe
taxess anand
d hauli
hauling
ng co cost
st to the
the pro
proje
ject
ct site
site..
f. Good
Good Lumber
Lumber - 4 u uses
ses bd-ft 1
122.40 Ref
Refer
er to the ConConstr
struct
uction
ion Materia
Materiall Price
Price DatData a
g. #16
#16 GI Tie
Tie Wi
Wire
re (2
(2%
% of RSB) kg 0.83 est
establ
ablish
ished
ed quarquarter
terly
ly by Cent
Central
ral Office
Office Price
Price
Monitoring
Monitoring Committee.
Committee.
h. Ass
Assort
orted
ed CWN (1 kg/10
kg/100
0 bd-
bd-ft
ft of Lumber)
Lumber) kg 0.12
Castin
Casting
g Bed
a. Ready
Ready Mix Concret
Concrete,
e, Cla
Class
ss B m3 0.037
d. Good Lumber - 4 uses bd-ft 1.00
e. Base Cours
Course
e m3 0.08
Note:
'If
'If no avai
availalable
ble Ready
Ready Mix
Mix CoConc ncret
rete
e at pro
proje
ject
ct sisite
te,,
deri
derive
ve the cos t of con
cost concre
crete
te using
using the Ba Batch
tching
ing Plant or
Plant
One Bagger
Bagger Mixer
Mixer for sm small
all quan
quantit
tities
ies..
Sub
Sub - To
Tota
tall fo
forr F
G. Direc Unit Cost (E + F)
Directt Unit
H. Ov
Overh
erhead
ead,, Contin
Contingen
gencie
cies
s & M
Misc
iscell
ellane
aneous
ous (OCM)
(OCM) Expens
Expenses
es 15
15%/
%/12
12%/
%/10
10%/
%/8%
8% of G
I. Contrac
Contractor's
tor's Profit
Profit (CP) 10%/
10%/8%
8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. To
Total
tal Unit
Unit Cost
Cost (G + H + I + J)
DETAIL
DETAILED
ED UNIT
UNIT PRICE ANA
ANALYSI
LYSIS
S (DUPA)
(DUPA)
Item No./Description 10
1052
52(8
(8)) Un
Untr
trea
eate
ted
d Ti
Timb
mber
er Piles,
Piles, dri
drive
ven
n
Unit of Measureme
Measurement
nt m
Outputt per hour
Outpu 3.00m
A. Labor
Sub - Total
Total for A
Name
Name and Cap
Capaci
acity
ty No. of Unitls No. of HourIs Hourly Rate Amount
Amount (Ph
(PhP)
P)
B. Equipment
,J
Sub
Sub - Tot
Total
al fo
forr B
C. Total (A + B)
D. Ou
Outp
tput
ut pe
perr Hour =
Hour 3.00m
E. Direct
Direct Unit
Unit Cost (C + D)
F. Mater
Materials
ials
a. Coco
Coco Log - 2 uses
uses m 1.00 Prices
Prices of materia
materials
ls are var
variab
iable
le pe
perr Regi
Regionl
onl
Di
Dist
stric
rictt ba
basesed
d on thethe prev
prevai
ailin
ling
g un unitit pric
prices
es in
b. Good Lumber (Falsework) - 4 uses bd-ft 16.00
the loca
localit
lity
y whi
which
ch inc
includ
ludee payment
payment of loc local
al
c. NaillS
NaillSpik
pike
e (1
(1 kg/100 bd-ft of Lumber) kg 0.16 taxe
taxess anandd hau
hauli
ling
ng cocost
st to the
the pro
proje
ject
ct site
site..
Miscel
Miscellan
laneou
eous
s (2% of Mater
Material
ials
s Cost)
Cost) Ref
Refer
er to the Cons Constru
tructi
ction
on Mat
Materia
eriall Price
Price Data
Data
establ
establishe
ished d quar
quarter
terly
ly by Cent
Central
ral Office
Office Pric
Pricee
Monitoring
Monitor ing Committee,
Committee,
Sub
Sub - To
Tota
tall fo
forr F
G. Direc Unit Cost (E + F)
Directt Unit
H. Overh
Overhead,
ead, Conti
Contingencies & Miscellan
ngencies Miscellaneous
eous (OCM) Expenses 15%/12%/10%/8% ofG
I. Contra
Contracto
ctor's
r's Profit
Profit (CP) 10%/8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. To
Total
tal Unit
Unit Cost
Cost (G + H + I + J)
161 Part C - Finishing
DETAIL
DETAILED
ED UNIT
UNIT PRICE ANAL
ANALYSIS
YSIS (DUPA)
(DUPA)
A. Labor
Sub
Sub - To
Tota
tall fo
forr A
Name
Name and Capaci
Capacity
ty No. of Unitls No. of HourIs Hourly Rate A mount (P h P )
B. Equipment
a. Truc
Truck
k Mounte
Mounted
d Crane
Crane (41 - 45 mt) 1 0.58 Se
See
e late
latest
st AG
AGEL
EL ren
renta
tall rate
rates.
s.
b. Drop Hammer
Hammer 1 0.13
Minor
Minor Too
Tools
ls (10%
(10% of Labor
Labor Cost)
Cost)
Sub
Sub - To
Tota
tall fo
forr B ,
C. Total (A + B)
D. Output
Output per Hou
Hour
r = 3.00m
E. Direct
Direct Unit
Unit Cost
Cost (C + D)
F. Mater
Materials
ials
a. Coco
Coco Log - 2 uses
uses m 1.00 Prices
Prices o off materia
materials
ls are variabl
variable
e per Reg Regionl
ionl
Di
Dist
stri
rict
ct base
basedd on thethe preva
prevail
iling
ing uni
unitt price
prices
s in
b. Good Lumber (Falsework) - 4 uses bd-ft 16.00 the loc
locali
ality
ty whi
which
ch inc
include
lude pay
payment
ment of loc local
al
c. Nail
NaillSp
lSpike
ike (1
(1 kg/100
kg/100 bd-ft of Lumber)
Lumber) kg 0.16
taxe
taxess and hauli
hauling
ng cocost
st to the
the proj
projec
ectt site
site..
Miscel
Miscellan
laneou
eous
s (2% of Mater
Material
ials
s Cost)
Cost) Ref
Refer
er to the Co Const
nstruct
ruction
ion Materia
Materiall Price
Price Data
establi
establishe
shed d quar
quarter
terly
ly by C Cent
entral
ral Office
Office Pri
Price
ce
Monitoring
Monito ring Commit
Committee.
tee.
Sub
Sub - To
Tota
tall fo
forr F
G. Direc Unit Cost (E + F)
Directt Unit
H. Overhe
Overhead,
ad, Contin
Contingen
gencie
cies
s & Misce
Miscella
llaneo
neous
us (OCM)
(OCM) Expens
Expenses
es 15%/12%/10%/8% of G
I. Contract
Contractor's
or's Profi
Profitt (CP) 10%/8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. Total
Total Unit
Unit Cost
Cost (G + H + I + J)
162 Part
Part C - Fin
Finish
ishing
ing
DETAIL
DETAILED
ED UNI
UNIT
T PRICE ANALYSI
ANALYSIS
S (DU
(DUPA)
PA)
A. Labor
-
a. Construction Foreman 1 1.00 Labor
Labor Rates
Rates are variabl
variable
e per Region/
Region/Dis
Distri
trict
ct
bas
based
ed onon mini
minimu
mumm wa wage
ge as apappro
prove
ved
d by
b. Skilled
Skilled Laborer
Laborer 6 1.00
DO
DOLE
LE.. Re
Refe
ferr to the
the Sch
Schedu
edule
le of LLabo
aborr Ra
Ratetes.
s.
c. Unskille
Unskilled
d Laborer
Laborer 6 1.00
Sub - Total
Total for A
Name and Capacity No. of Unitls No. of HourIs Hourly Rate Amount (P h P )
B. Equipment
.J
Sub
Sub - To
Tota
tall fo
forr B
C. Total (A + B)
D. Output Hour =
Output per Hour 4.50m
E. Direct
Direct Unit
Unit Cost (C + D)
F. Mater
Materials
ials
Prices
Prices of materia
materials
ls are variab
variable
le peperr Reg
Regionl
ionl
a. Coco Log - 2 uses m 1.00 Di
Dist
stri
rict
ct bas
based
ed on thethe prev
prevai
ailin
ling
g uniunitt pric
prices
es in
b. Good Lumber (Falsework) - 4 uses bd-ft 16.00
the loc
localit
ality
y whic
whichh inc
include
lude payment
payment of loc local
al
c. Nail/Sp
Nail/Spike
ike (1 kg/
kg/100
100 bd-
bd-ft
ft of Lumber
Lumber)) kg 0.16
taxe
taxess and hauli
hauling
ng co cost
st to the
the pro
proje
ject
ct site
site..
d. Oxygen
Oxygen/Ac
/Acety
etylen
lene
e (1 se
set/5
t/5000
000 kg of S
Stee
teel)
l) set 0.032 Ref
Refer
er to the ConConstr
struct
uction
ion Mat
Materia
eriall Price Dat Dataa
e. Welding Rod (1 kg/2000 kg of S teel) kg 0.08 establ
establish
ished
ed quarter
quarterly
ly by Cent
Central
ral Office
Office Price
Price
Monitoring
Monitor ing Commit
Committee.
tee.
Miscel
Miscellan
laneou
eous
s (2% of Materi
Materials
als Cost)
Cost)
Note:
Assumed weight of Steel H-Pile is 159 kglm
Sub
Sub - T
Tot
otal
al fo
forr F
G. Direc
Directt Unit
Unit Cost
Cost (E + F)
H. Overhead,
Overhead, Continoencies & Miscellaneous
Continoencies (OCM) Expenses 15%/12%/10%/8% of G
I. Contrac
Contractor
tor's
's Profit
Profit (CP) 10%/8% of G
J. Value Added Tax (VAT) 5% of (G + H + I)
K. Total
Total Unit
Unit Cost
Cost (G + H + I + J)
163 Part C - Fin
Finishi
ishing
ng
DETAIL
DETAILED
ED UNIT
UNIT PRICE ANALYSI
ANALYSIS
S (DUPA)
(DUPA)
A. Labor
a. Const
Construct
ruction
ion Forem
Foreman
an 1 1
1..00 Labor
Labor Rates
Rates aare
re variabl
variable
e per Reg
Regionl
ionlDis
Distri
trict
ct
bas
based
ed on mi
mini
nimu
mum wage as approve
m wage approved d by
b. Skilled Laborer 6 1.00
DOLE.
DOL E. Ref
Refer
er to the Sch
Schedul e of La
edule Labor
bor Rat
Rates.
es.
c. Unskilled Laborer 6 1.00
Sub - Total
Total for A
Name
Name and Cap
Capaci
acity
ty No. of Unitls No. of H ou
ourIs Hourly Rate A mount (P h P )
B. Equipment
.J
Sub - Total
Total for B
C. Tota
Totall (A + B)
D. Output
Output per Hour =
Hour 3.00m
E. Direct
Direct Unit
Unit Cost (G + D)
F. Mater
Materials
ials
a. Tubu
Tubular
lar Pile (0.40 m ¢ x 9.50 mm thk)
Pile (0.40 m 1.00 Prices of materia
materials
ls are varivariable
able per Regionl
Regionl
(delivere
(delivered
d at site)
site) Dis
Distri
trict
ct bas
based
ed on the prevai
prevailing
ling uni
unitt prices
prices in
the loc
localit
ality
y whi
which
ch inc
include payment of local
lude payment local
b. Weld
Welding
ing Rod (1 kg/200
kg/2000
0 kg of St
Steel
eel)) kg 0.048
taxes a and
nd hauling
hauling co cost
st to th
thee proj
projec
ectt site
site..
c. Oxyge
Oxygen/A
n/Acet
cetyle
ylene
ne (1 set/5
set/5000
000 kg of S
Stee
teel)
l) set 0.019 Ref
Refer
er to the ConsConstru
tructi
ction
on Materi
Material
al Pric
Price e Dat
Data
a
d. Coco Log - 2 uses m 1.00 est
establ
ablish
ished
ed quar
quarter
terly
ly by Cent
Central
ral Office
Office Price
Price
Monitor
Monitoringing Commit
Committee.
tee.
e. Good Lumber (Falsework) - 4 uses bd-ft 16.00
f. Nail/S
Nail/Spik
pike
e (1 kg/100
kg/100 bd-
bd-ft
ft of Lumber)
Lumber) kg 0.16
Miscel
Miscellan
laneou
eous
s (2% of Mater
Material
ials
s Cost)
Cost)
Note:
Assumed weight of T
Tubu
ubular
lar Pipe
Pipe Pil
Pile
e is 95.93
95.93
kglm
Sub
Sub - To
Tota
tall fo
forr F
G. Direc
Directt Unit
Unit Cost (E + F)
H. Ov
Overh
erhead
ead,, Con
Contin
tingen
gencie
cies
s & Misc
Miscell
ellane
aneous
ous (OCM)
(OCM) Expens
Expenses
es 15%/
15%/12
12%/
%/10
10%/
%/8%
8% of G
I. Contrac
Contractor's
tor's Profit
Profit (CP) 10%/
10%/8%
8% of G
J. Value Added Tax (VAT) 5% of (G + H + I)
K. Total
Total Unit
Unit Cost
Cost (G + H + I + J)
164 Part C - Fini
Finishin
shing
g
DETAILE
DETAILED
D UNI
UNIT
T PRICE ANALYSI
ANALYSIS
S (DU
(DUPA)
PA)
A. Labor
Sub - Total
Total for A
Name
Name and Cap
Capaci
acity
ty No. of Unitls No. of HourIs Hourly Rate Amount (P h P )
B. Equipment
.f
Sub
Sub - To
Tota
tall fo
forr B
C. Total (A + B)
D. Ou
Outp
tput
ut pe
perr Hour =
Hour 10.
10.00
00 m
E. Direct
Direct Unit
Unit Cost
Cost (C + D)
F. Mater
Materials
ials
a. Wel
Weldi
ding
ng Ro
Rod
d (1
(1 kg/2000
kg/2000 kg of Steel) kg 0.024 Prices
Prices of mat materia
erials
ls are var variabl
iablee per RegRegion!
ion!
Di
Dist
stric
rictt base
basedd on thethe prev
prevai
ailin
ling
g unit
unit pric
prices
es in
b. Oxyg
Oxygenl
enlAce
Acetyl
tylene
ene (1 se
set/5
t/5000
000 kg o
off Stee
Steel)
l) set 0.0096
the local
locality
ity whi
which
ch inc
include
lude payment
payment of loc local
al
c. Coco
Coco Log - 2 uses
uses m 0.18 taxe
taxess anandd hauli
hauling
ng co cost
st to the
the proj
projec
ectt site
site..
d. Good
Good Lum
Lumber
ber - 4 us
uses
es bd-ft 1.55 Ref
Refer
er to the Cons
Constru
tructi
ction
on Materi
Materialal Price DataData
e. Assort
Assorted
ed CWN (1 kg
kg/10
/100
0 bd-
bd-ft
ft of Lum
Lumber
ber)) kg 0.02 est
establ
ablish
ished
ed quar
quarter
terly
ly by Cent
Central
ral Office
Office Price
Price
Monitoring
Monitor ing Committee.
Committee.
Miscel
Miscellan
laneou
eous
s (2% of Materi
Materials
als Cost)
Cost)
Sub
Sub - Tot
Total
al fo
forr F
G. Direc
Directt Unit
Unit Cos
Costt (E + F)
H. Overhe
Overhead,
ad, Contin
Contingen
gencie
cies
s & Miscel
Miscellan
laneou
eous
s (OCM
(OCM)) Expens
Expenses
es 15%/
15%/12
12%/
%/10
10%/
%/8%
8% of G
I. Contrac
Contractor
tor's
's Pro
Profit
fit (CP) 10%/
10%/8%
8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. Total
Total Unit
Unit Cost
Cost (G + H + I + J)
165 Par
Partt C - Fini
Finishin
shing
g
DETAIL
DETAILED
ED UNI
UNIT
T PRI
PRICE
CE ANAL
ANALYSIS
YSIS (DUPA)
(DUPA)
a. Const
Constructi
ruction
on Foreman
Foreman 1 1.00 Labo
Laborr Rates
Rates are variabl
variable
e per Regionl
RegionlDis
Distri
trict
ct
base
based
d on mi
minim
nimum
um wagwagee as approv
approved
ed by
b. Skilled
Skilled Laborer
Laborer 6 1.00
DOLE.
DOL E. Ref
Refer
er to th
the
e Sch
Schedul
edulee of L
Labor
abor Rat
Rates.
es.
c. Unskille
Unskilled
d Laborer
Laborer 6 1.00
Sub - Total
Total for A
Name
Name and Cap
Capaci
acity
ty No. of Unitls No. of HourIs Hourly Rate Amount (P h P )
B. Equipment
a. Truc
Truck
k Mounte
Mounted
d Crane
Crane (41 - 45 mt) 1 0.56 Se
See
e late
latest
st AC
ACEL
EL renta
rentall rate
rates.
s.
b. Diesel
Diesel Hammer
Hammer (K25
(K25 or equi
equival
valent
ent)) 1 0.31
c. Drop Hammer 1 0.31
d. Jack Hammer 2 0.19
e. Air
Air Compress
Compressor
or (356
(356 - 450
450 cfm) 1 0.19
Minor
Minor Too
Tools
ls (10%
(10% of Labor
Labor Cost)
Cost)
.J
Sub
Sub - To
Tota
tall fo
forr B
C. Total (A + B)
D. Output Hour =
Output per Hour 2.80m
E. Dir
Direct
ect Unit
Unit Cost
Cost (C + D)
F. Materials
a. Coco
Coco Log - 2 uses m 0.71 Prices of mat
materi
erials
als are varia
variable
ble per RegiRegionl
onl
Di
Dist
stri
rict
ct bas
based
ed on the the prev
prevail
ailin
ing
g uniunitt price
pricess in
b. Good
Good Lumber
Lumber - 4 u
uses
ses bd-ft 6.19
the localit
locality
y whi
which
ch inc
include
lude pay ment of local
payment local
c. Nail
NaillSp
lSpike (1 kg/100 bd-f
ike (1 bd-ftt of Lumber)
Lumber) kg 0.06 taxes
taxes and hauling
hauling cos costt to the proj
project
ect site.
site.
d. As
Asso
sort
rted
ed CW
CWN (1 kg/100 bd-ft
N (1 bd-ft of Lumb
Lumber)
er) kg 0.06 Ref
Refer
er to the Cons
Construtructi
ction
on Mat
Materia
eriall Price DataData
Miscel
Miscellan
laneou
eous
s (2% of Mater
Material
ials
s Cost)
Cost) est
establi
ablishe
shed d quaquarte
rterly
rly by Centra
Centrall Office
Office Price
Price
Monitoring
Monitor ing Commit
Committee.
tee.
Sub
Sub - To
Tota
tall fo
forr F
G. Di
Dire
rect
ct Un
Unit
it Cost
Cost (E + F)
H. Overhead
Overhead,, Contin
Contingen
gencie
cies
s & M
Misc
iscell
ellane
aneous
ous (OCM)
(OCM) Expens
Expenses
es 15%/12%/10%/8% of G
I. Contrac
Contractor
tor's
's Profit
Profit (CP) 10%/
10%/8%
8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. Total
Total Unit
Unit Cost
Cost (G + H + I + J)
166 Par
Partt C - Fin
Finishi
ishing
ng
DETAilE
DETAilED
D UNI
UNIT
T PRICE
PRICE A
ANAL
NALYSI
YSIS
S (DU
(DUPA)
PA)
a. Const
Construct
ruction
ion Forem
Foreman
an 1 1
1..00 Lab
Labor
or Rat
Rates
es are
are variabl
variable
e per RegRegion/
ion/Dis
Distri
trict
ct
base
based
d on mi
mini
nimum wage as a
mum wage appr
pprovoved
ed by
b. Skilled
Skilled Laborer
Laborer 6 1.00
DOLE.
DOL E. Refer
Refer to th
the
e Schedu
Schedule le of L
Labo
aborr Rates.
Rates.
c. Unskill
Unskilled
ed Laborer
Laborer 6 1.00
Sub - Total
Total for A
Name
Name and Cap
Capaci
acity
ty No. of Unitls No. of HourIs Hourly Rate Amount (P h P )
B. Equipment
.J
Sub
Sub - To
Tota
tall fo
forr B
C. Total (A + B)
D. Outp
Output
ut pe
perr Hour
Hour - 2.40
2.40 m
E. Direct
Direct Unit
Unit Cost (C + D)
F. Mater
Materials
ials
a. Coco
Coco Lo
Log
g - 2 uses
uses m 1.00 Prices of mat
materia
erials
ls are varia
variable
ble per Region
Region/ /
Di
Dist
stri
rict
ct bas
based
ed on thethe preva
prevail
iling
ing uni
unitt pric
priceses in
b. Good Lumber - 4 uses bd-ft 16.00
the locali
locality
ty whi
which
ch inc
includ
ludee pay ment of local
payment local
c. Naill
NaillSpi
Spike
ke (1
(1 kg/100
kg/100 bd-ft of Lumber)
Lumber) kg 0.16 taxe
taxess and hauli
hauling
ng co cost
st to the
the pro
proje
ject
ct site
site..
d. O xygenlAcetylen
xygenlAcetylene
e kg 0.01 Ref
Refer
er to the ConConstr
struct
uction
ion Materia
Materiall Price Dat Data a
Miscel
Miscellan
laneou
eous
s (2% of Mater
Material
ials
s Cost)
Cost) establ
establish
ished
ed quar
quarter
terly
ly by CenCentral
tral Office
Office Price
Price
Monitoring
Monito ring Commit
Committee.
tee.
Sub
Sub - To
Tota
tall fo
forr F
G. Direc
Directt Un
Unit
it Cost (E + F)
H. Overhead,
Overhead, Contingencies & Miscellane
Contingencies Miscellaneous
ous (OGM) Expenses 15%/12%/10%/8% ofG
I. Contra
Contractor'
ctor's Profit
Profit (CP) 10%/8% of G
J. Va
Valu
lue
e Ad
Adde
ded
d Ta
Tax
x (VAT)
(VAT) 5% of (G + H + I)
K. Total
Total Unit
Unit Cost
Cost (G + H + I + J)
167 Part C - Finishing
DETAIL
DETAILED
ED UNIT
UNIT PRI
PRICE
CE ANAL
ANALYSIS
YSIS (DUPA)
(DUPA)
a. Const
Construct
ruction
ion Forem
Foreman
an 1 1.00 Labo
Laborr Rates
Rates are variabl
variable
e per RegRegion/
ion/Dis
Distri
trict
ct
ba
base
sed
d on minim
minimum wage as app
um wage appro
rove
vedd by
b. Skilled
Skilled Laborer
Laborer 6 1.00
DO
DOLE
LE.. Re
Refe
ferr to the
the Sche
Schedudule
le of Lab
Labor
or RaRate
tes.
s.
c. Unskille
Unskilled
d Laborer
Laborer 6 1.00
Sub - Total
Total for A
Name
Name and Cap
Capaci
acity
ty No. of Unitls No. of HourIs Hourly Rate Amount (P h P )
B. Equipment
a. Truc
Truck
k Mounte
Mounted
d Crane
Crane (41 - 45 mt) 1 0.62 Se
See
e late
latest
st AGEL
AGEL rent
rental
al rates
rates..
b. Diesel
Diesel Hammer (K25 or equiv
equivalent
alent)) 1 0.41
c. Drop Hammer 1 0.11
d. Cutting
Cutting Outfit
Outfit 1 0.16
e. Jack
Jack Hammer 2 0.16
f. Air
Air Compr
Compress
essor
or (356
(356 - 450
450 cfm
cfm)) 1 0.16
Minor
Minor Too
Tools
ls (10%
(10% of Labor
Labor Gost)
Gost)
f
Sub
Sub - To
Tota
tall fo
forr B
C. Total (A + B)
D. O ut
utput p
peer Hour - 1.95 m
,
E. Direct
Direct Unit
Unit Cost (C + D )
F. Materials
Sub - Total
Total for F
G. Direc
Directt Unit
Unit Cost
Cost (E + F)
H. Overhead,
Overhead, Contingencies & Miscellan
Contingencies Miscellaneous
eous (OCM) Expenses 15
15%/
%/12
12%/
%/10
10%/
%/8%
8% ofG
ofG
I. Contrac
Contractor
tor's
's Pro
Profit
fit (CP) 10%/
10%/8%
8% of G
J. Value
Value Added
Added Tax (VAT) 5% of (G + H + I)
DETAIL
DETAILED
ED UNIT
UNIT PRICE ANA
ANALYSI
LYSIS
S (DUPA)
(DUPA)
a. Const
Constructi
ruction
on Foreman
Foreman 1 1.
1.00 Labor Rates are variable per Region/District
b. Skilled
Skilled Laborer
Laborer 6 1.00 base
based
d on minimu
minimumm wage as
wage as approved by
DOLE. Refer to the Schedule of Labor Rates.
c. Unskille
Unskilled
d Laborer
Laborer 6 1.00
Sub - Total
Total for A
Name and Capacity No. of Unitls No. of HourIs Hourly Rate A mount (P h P )
B. Equipment
.J
Sub
Sub - To
Tota
tall fo
forr B
C. Total (A + B)
D. Output
Output per Hour =
Hour 2.40
2.40 m
E. Direct
Direct Unit
Unit Cost
Cost (C + D)
F. Mater
Materials
ials
a. Coco
Coco Log - 2 uses
uses m 1.00 Prices of materials are variable per Region/
b. Good Lumber (Falsework) - 4 uses bd-ft 16.00 District based on the prevailing unit prices in
the locality which include payment of local
c. Nail/
Nail/Spi
Spike
ke (1
(1 kg/100 bd-ft of Lumber)
Lumber) kg 0.16 taxes
taxe s and hauling
hauling cost to the project
project site.
d. OxygenlAcetylene set 0.01 Refer to the Construction Material Price Data
Miscel
Miscellan
laneou
eous
s (2% of Mater
Material
ials
s Cost)
Cost) established quarterly by Central Office Price
Monitoring Committee.
Sub
Sub - To
Tota
tall fo
forr F
G. Direc
Directt Unit
Unit Cost (E + F)
H. Overh
Overhead,
ead, Conti
Contingencies & Miscellan
ngencies Miscellaneous
eous (OCM) Expenses
Expenses 15%/12%/10%/8% ofG
I. Contrac
Contractor's
tor's Profit
Profit (CP) 10%/
10%/8%
8% of G
J. Va
Value
lue Added
Added Tax (VAT) 5% of (G + H + I)
DETAIL
DETAILED
ED UNIT
UNIT PRICE ANA
ANALYSI
LYSIS
S (DUPA)
(DUPA)
A. Labor
a. Cons
Construct
truction
ion Forem
Foreman
an 1 1.00 Labo
Laborr Rate
Rates
s arare
e var
variabl
iable
e per Region/
Region/Dis
Distri
trict
ct
bas
based
ed on mini
minimu
mum wage as app
m wage approve
roved
d by
b. Skilled
Skilled Laborer
Laborer 6 1.00
DO
DOLE
LE.. Re
Refe
ferr to th
the
e Sc
Sched
hedul
ule
e of Labo
Laborr Ra
Ratetes.
s.
c. Unskil
Unskilled
led Laborer
Laborer 6 1.00
Sub - Total
Total for A
Name
Name and Cap
Capaci
acity
ty No. of Unitls
Unitls No. of HourIs Hourly Rate Amount (P h P )
B. Equipment
a. Truc
Truck
k Mounte
Mounted
d Crane
Crane (41 - 45 mt) 1 0.62 Se
See
e late
latest
st AC
ACEL
EL rent
rental
al rates
rates..
b. Diesel
Diesel Hammer (K25 or equi
equivale
valent)
nt) 1 0.41
c. Drop Hamme
Hammer
r 1 0.11
d. Cutting
Cutting Outfit
Outfit 1 0.16
e. Jack
Jack Hammer 2 0.16
f. A
Air
ir Compress
Compressor
or (356
(356 - 450
450 cfm) 1 0.16
Minor
Minor Too
Tools
ls (10%
(10% of Labor
Labor Cost)
Cost)
.J
Sub
Sub - To
Tota
tall fo
forr B
C. Total (A + B)
D. Output Hour =
Output per Hour 1.95
1.95 m
E. Direct
Direct Unit
Unit Cost
Cost (C + D)
F. Mater
Materials
ials
a. Coc
Coco
o Log - 2 uses
uses m 1.00 Prices
Prices of materia
materials
ls are var variabl
iable
e per Reg Region/
ion/
b. Good
Good Lumber
Lumber (Fa
(False
lsewor
work)
k) - 4 uses
uses bd-ft 16.00 Dis
Distri
trict
ct bas
based
ed on the prevail
prevailing
ing uniunitt pric
prices
es in
the loc
localit
ality
y which incinclud
ludee payme
payment nt of loclocal
al
c. Naill
NaillSpi
Spike
ke (1
(1 kg/100
kg/100 bd-ft of Lumber) kg 0.16
taxe
taxess an andd hau
hauli
ling
ng cocost
st to the
the proj
projec
ectt site
site..
d. OxygenlAcetylene set 0.01 Ref
Refer
er to the Co Const
nstruc
ructio
tion
n Materi
Material
al Price
Price Data
Data
Miscel
Miscellan
laneou
eous
s (2% of Materi
Materials
als Cost)
Cost) est
establ
ablish
ished
ed quarter
quarterly
ly by Central
Central Office
Office Price
Price
Monitoring
Monitor ing Commit
Committee.
tee.
Sub - Total
Total for F
G. Direc
Directt Unit
Unit Cost (E + F)
H. Overh
Overhead
ead,, Con
Contin
tingen
gencie
cies
s & Misce
Miscella
llaneo
neous
us (OCM)
(OCM) Expens
Expenses
es 15%/12%/10%/8% of G
I. Contrac
Contractor's
tor's Profit
Profit (CP) 10%/8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. Total
Total Unit
Unit Cost
Cost (G + H + I + J)
170 Part
Part C - Fin
Finish
ishing
ing
DETAILE
DETAILED
D UNI
UNIT
T PRICE ANALYSI
ANALYSIS
S (DU
(DUPA)
PA)
A. Labor .
a. Const
Construct
ruction
ion Forem
Foreman
an 1 1.00 Labo
Laborr Rates
Rates are var
variabl
iable
e per RegRegion/
ion/Dis
Distri
trict
ct
bas
based
ed on mimininimu
mum wage as approve
m wage approvedd by
b. Skilled
Skilled Laborer
Laborer 6 1.00
DO
DOLE
LE.. Re
Refe
ferr to the
the Sc
Sched
hedul
ule
e of Lab
Labor
or Rate
Rates.s.
c. Unskille
Unskilled
d Laborer
Laborer 6 1.00
Sub - Total
Total for A
Name and Capacity No. of Unitls No. of HourIs Hourly Rate A mount (P h P )
B. Equipment
a. Truc
Truck
k Mounte
Mounted
d Crane
Crane (41 - 45 mt) 1 0.53 Se
See
e late
latest
st AG
AGEL
EL rent
rental
al rates
rates..
b. Diesel Hammer (K25 or equivalent) 1 0.27
c. Drop Hammer
Hammer 1 0.13
d. Cutting
Cutting Outfit
Outfit 1 0.20
e. Jack
Jack Hammer 2 0.20
f. Air Compres
Compressor
sor (356
(356 - 4
450
50 cfm) 1 0.20
Minor
Minor Tools (10%
(10% of Labor
Labor Cost)
Cost)
.f
Sub
Sub - To
Tota
tall fo
forr B
C. Total (A + B)
Total
Output per Hour =
D. Output 2.40
2.40 m
E. Direct
Direct Unit
Unit Cost (C + D )
F. Mater
Materials
ials
a. Coc
Coco
o Log - 2 uses
uses m 2.00 Prices
Prices o off mat
materi
erials
als are variabl
variablee per Region/
Region/
b. Good Lumber (Falsework) - 4 uses bd-ft 16.00 Di
Dist
stri
rict
ct base
basedd on thethe preva
prevail
ilin
ing
g uni unitt price
prices
s in
the
the loca
locali
lity
ty whi
which
ch inc
includ
ludee payme
payment nt of local
local
c. Naill
NaillSpi
Spike
ke (1
(1 kg/100
kg/100 bd-ft of Lumber)
Lumber) kg 0.16
taxes
taxes and hauli
hauling
ng coscostt to the
the prprojec
ojectt site.
site.
d.Oxygen/Acetylene set 0.01 Refer
Refer to the C Const
onstruct
ruction
ion Materi
Material al Price
Price Data
Data
e. Fabric
Fabricate
ated
d RC Pile (deliv
(delivere
ered
d at site
site)) m 1.00 establi
establishe
shed d qua
quarter
rterly
ly by CenCentratrall Offi
Office
ce Price
Price
Monitoring
Monito ring Commit
Committee.
tee.
Note:
The unit
unit cost
cost of F
Fabri
abricat
cated
ed RC Pile is de
depend
pendent
ent
on its typ
type.
e.
Pleas
Please
e refer
refer to the
the Dir
Direc
ectt Cost
Cost of
Item 1052(7)a
1052(7)a
Sub
Sub - To
Tota
tall fo
forr F
G. Direc
Directt Unit Costt (E + F)
Unit Cos
H. Overhe
Overhead,
ad, Contin
Contingen
gencie
cies
s & M
Misc
iscell
ellane
aneous
ous (OGM)
(OGM) Expens
Expenses
es 15%/
15%/12
12%/
%/10
10%/
%/8%
8% of G
I. Contra
Contracto
ctor's
r's Pro
Profit
fit (CP) 10%/
10%/8%
8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. Total
Total Unit
Unit Cost
Cost (G + H + I + J)
171 Par
Partt C - Fini
Finishin
shing
g
DETAIL
DETAILED
ED UNIT
UNIT PRI
PRICE
CE ANAL
ANALYSIS
YSIS (DUPA)
(DUPA)
A. Labor
a. Cons
Construct
truction
ion Forem
Foreman
an 1 1
1..00 Labo
Laborr Rates
Rates are var
variab
iable
le per RegRegionl
ionlDis
Distri
trict
ct
base
based
d on mi
minim
nimum wage as approv
um wage approved
ed by
b. Skilled
Skilled Labo
Laborer
rer 6 1.00
DO
DOLE
LE.. Re
Refe
ferr to the
the Sch
Sched
edule
ule of Lab
Labor
or Ra
Rate
tes.
s.
c. Unskill
Unskilled
ed Laborer
Laborer 6 1.00
Sub
Sub - To
Tota
tall fo
forr A
Name
Name and Cap
Capaci
acity
ty N o.
o. of U n
niitls N o.
o. of H ou
ourIs Hourly
Hourly Rate
Rate Amount
Amount (PhP)
(PhP)
B. Equipment
a. Truc
Truck
k Mounte
Mounted
d Crane
Crane (41 - 45 mt) 1 0.62 Se
See
e late
latest
st AC
ACEL
EL ren
renta
tall rate
rates.
s.
b. Diesel
Diesel Hammer
Hammer (K25
(K25 or equ
equiva
ivalen
lent)
t) 1 0.41
c. Drop Hammer 1 0.11
d. Cutting
Cutting Outfit
Outfit 1 0.16
e. Jack Hammer 2 0.16
f. Air
Air Compre
Compresso
ssorr (356
(356 - 450
450 cfm
cfm)) 1 0.16
Minor
Minor Too
Tools
ls (10%
(10% of Labor
Labor Cost)
Cost)
Sub
Sub - To
Tota
tall fo
forr B
C. Tota
Totall (A + B)
"
D. Output Hour =
Output per Hour 1.95
1.95 m
E. Dir
Direct
ect Unit
Unit Cost
Cost (C + D)
F. Mater
Materials
ials
a. Coco
Coco Log - 2 uses
uses m 2.00 Prices
Prices of mat materi
erials
als are var variabl
iablee pe perr Region!
Region!
b. Good
Good Lumber
Lumber (Fa
(False
lsewor
work)
k) - 4 uses
uses Di
Dist
stric
rictt base
basedd on thethe prev
prevail
ailin
ing
g un unit
it price
pricess in
bd-ft 16.00 the loc
localit
ality
y whic
whichh inc
include
lude pay
paymen
mentt of loc local
al
c. Nail
NaillSp
lSpike (1 kg/100 bd-f
ike (1 bd-ftt of Lumber)
Lumber) kg 0.16
taxe
taxess anandd hauli
hauling
ng co cost
st to the projec
projectt site
site..
d. Oxygen/Acetylene set 0.01 Refer
Refer to the ConsConstru
tructi
ction
on Materi
Material al Pric
Price e Dat
Data
a
e. Fabric
Fabricate
ated
d RC Pile (del
(delive
ivered
red at s
site
ite)) m 1.00 establ
establishe
ished d quar
quarter
terly
ly by CenCentra
trall Of
Offic
fice
e Price
Price
Monitoring
Monitor ing Committee.
Committee.
Note:
The unit cost of Fabrica
Fabricated
ted RC Pile is dep
depende
endent
nt
on its type.
type.
Plea
Please
se ref
refer
er to th
the
e Dire
Direct
ct Co
Cost
st of
Item 1052(7)a
Su
Sub
b - Tota
Totall fo
forr F
G. Direc
Directt Unit
Unit Cost (E + F)
H. Overhe
Overhead,
ad, Contin
Contingen
gencie
cies
s & Misce
Miscella
llaneo
neous
us (OCM)
(OCM) Expens
Expenses
es 15
15%/
%/12
12%/
%/10
10%/
%/8%
8% of G
I. Contra
Contractor
ctor's
's Profit
Profit (CP) 10%/
10%/8%
8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. Total
Total Unit
Unit Cost
Cost (G + H + I + J)
172 Part
Part C - Fin
Finishi
ishing
ng
DETAIL
DETAILED
ED UNIT
UNIT PRICE ANALYS
ANALYSIS
IS (DU
(DUPA)
PA)
A. Labor
Sub - Total
Total for A
Name
Name and Capaci
Capacity
ty No. of Unitls No. of Houris Hourly Rate Amount (PhP )
B. Equipment
F. Materials
a. Ready
Ready Mix Concrete,, fc' = 28 MPa @ 28 Days
Concrete cu.m 0.55 Prices
Prices o off materi
materials
als are variabl
variable
e per Reg Region/
ion/
b. Reinf
Reinforc
orcing
ing Steel
Steel Bar'
Bar' kg 205.00 Di
Dist
stri
rict
ct based
based on the the prev
prevail
ailin
ing
g unitunit pric
prices
es in
the loc
localit
ality
y whic
which h inc
include
lude pay
paymen
mentt of loc local
al
c. T
Tir
ire
e Wi
Wire
re (2
(2%
% of RSB) kg 4 .10
taxe
taxess anandd hau
hauli
ling
ng co
cost
st to the
the proj
projec
ectt site
site..
d. Oxyg
Oxygenl
enlAce
Acetyl
tylene
ene (1 s
set/
et/500
5000
0 kg. of RSB
RSB)) set 0.041 Ref
Refer
er to the C Const
onstruc
ructio
tion
n Materi
Materialal Price
Price Data
e. Weld
Welding
ing Rod (1 kg/2000
(1 kg/2000 kg of RSB) kg 0.10 establi
establishe
shed d quarterl
quarterly
y by CenCentra
trall Offic
Office
e Price
Price
Miscel
Miscellan
laneou
eous
s (3% of Mat
Materi
erials
als,, Benton
Bentonite
ite and etc.)
etc.) Monitor
Monitoring
ing Commit
Committee.
tee.
* Its qu
quant
antity
ity is va
variab
riable
le depe
dependin
nding
g on the act
actual
ual des
design
ign
G. Direc
Directt Unit
Unit Cos
Costt (E + F)
H. Ove
Overhe
rhead,
ad, Con
Contin
tinQen
Qencie
cies
s & Misc
Miscell
ellane
aneous
ous (OCM)
(OCM) Expens
Expenses
es 15%/12%/10%/8% of G
I. Con
Contra
tracto
ctor's
r's Profit
Profit (CP)
(CP) 10%/8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. Total Unit Cost (G + H + I + J)
173 Part C - Fin
Finishi
ishing
ng
DETAIL
DETAILED
ED UNIT
UNIT PRI
PRICE
CE ANAL
ANALYSIS
YSIS (DUPA)
(DUPA)
A. Labor
a. Const
Construct
ruction
ion Foreman
Foreman 1 1.00 Labo
Laborr Rates
Rates are var
variabl
iable
e per Region/
Region/Dis
Distri
trict
ct
bas
based
ed on minim
minimum
um w age as app
wage approve
roved
d by
b. Skilled
Skilled Laborer
Laborer 5 1.00
DO
DOLE
LE.. Ref
Refer
er to
to the
the Sc
Sche
hedul
dule
e of Labor
Labor
c. Unskill
Unskilled
ed Laborer
Laborer 6 1.00
Rates.
Fab
Fabric
ricati
ation
on of Cage
Cage Bar
d. Skilled
Skilled Labo
Laborer
rer 9 0.56
e. Unskilled
Unskilled Laborer
Laborer 16 0.56
Sub - Total
Total for A
Name
Name and Cap
Capaci
acity
ty No. of Unitls No. of HourIs Hourly Rate Amount
Amount (PhP)
(PhP)
B. Equipment
o. Tremi
Tremie
e Pipe
Pipe Set 1 0.22
p. SPT & Desanding
Desanding Mach
Machine
ine 1 0.24
q. Portabl
Portable
e Breake
Breaker,
r, BHF30S
BHF30S 2 0.04
r. Air Compres
Compressor
sor,, Portab
Portable
le (126
(126 - 16
160
0 cfm
cfm)) 1 0.04
s. Ligh
Lightin
ting
g System
SystemlTo
lTower
wer Lig
Lights
hts 1 0.96
Minor
Minor Too
Tools
ls (10%
(10% of Labor
Labor Cost)
Cost)
Sub
Sub - To
Tota
tall fo
forr B
C. Total (A + B)
D. O ut
utput p
pe
er Hour - 1.33 m
E. Di
Dire
rect
ct Unit
Unit Cost
Cost (C + D )
F. Mater
Materials
ials
a. Ready
Ready Mix Concr
Concrete
ete,, fc' = 28 MPa @ 28 Days cU.m 0.86 Prices
Prices o off mat
materi
erials
als are variabl
variable e pe perr Reg
Region/
ion/
b. Reinf
Reinforc
orcing
ing Steel
Steel Bar * kg 25
253.59 Di
Dist
stri
rict
ct bas
baseded on the the preva
prevaililin
ing
g uniunitt price
pricess in
the
the loc
locali
ality
ty wh
whic
ich
h incinclud
ludee pay
payme mentnt of loclocal
al
c. Tire
Tire Wir
Wire
e (2% of RSB) kg 5.
5 .07 taxes
taxes and haulin g cost to
hauling to the projec
projectt site.
site.
d. Oxyge
OxygenlA
nlAcet
cetyle
ylene
ne (1 set/
set/500
5000
0 kg. of
of RSB) set 0.051 Refer
Refer to the Con Constr
struct
uction
ion Materia
Materiall PricePrice Dat
Dataa
e. Weld
Welding
ing Rod (1 kg/200
kg/2000
0 kg o
off RSB) kg 0.13 establi
establishe
shed d qua
quarter
rterlyly by CenCentratrall Offi
Office
ce Price
Price
Miscel
Miscellan
laneou
eous
s (3% of Materi
Materials
als,, Benton
Bentonite
ite and etc.)
etc.) Monitoring
Monitoring Commit
Committee.
tee.
DETAILE
DETAILED
D UNI
UNIT
T PRICE
PRICE ANALYS
ANALYSIS
IS (DU
(DUPA)
PA)
A. Labor
Sub - Total
Total for A
Name
Name and Capaci
Capacity
ty No. of Unitls No. of Hour/s Hourly Rate Amount (P h P )
B. Equipment
a. Drilli
Drilling
ng Rig (300
(300 hp) 1 0.35 Se
See
e late
latest
st AC
ACEL
EL rent
rental
al rates
rates..
b. Crawl
Crawler
er Crane
Crane (41 - 4
45
5 mt) 1 0.96
c. Crawl
Crawler
er Crane
Crane (21 - 2
25
5 mt) 1 0.96
d. Dump
Dump Tru
Truck
ck (12 yd3) 1 0.96
e. Payloa
Payloader
der (1.
(1.50
50 m\ LX80-2
LX80-2C
C 1 0.96
f. Genera
Generator
tor Set ((300
300 kW) 1 0.96
g. Benton
Bentonite
ite Bin 1 0.56
h. Bento
Bentonite
nite Mixer 1 0.56
i . Water
Water Pump,
Pump, 100 mm suction
suction (Il (7.5 hp) 1 0.82
j. Water
Water Truck/Pu
Truck/Pump
mp (16000
(16000 L) 1 0.82
k. Bar Cutte
Cutter
r 1 0.60
I. Bar Bend
Bender
er 1 0.60
m. Weld
Welding
ing Machin
Machine
e (500
(500 A), Elect
Electric
ric Dri
Driven
ven 1 0.75
n. Cutting
Cutting Outfit
Outfit 1 0.75
.J
o. Trem
Tremie
ie Pipe
Pipe Set 1 0.22
p. SPT
SPT & Desandi
Desanding
ng Machin
Machine
e 1 0.25
q. Portab
Portable
le Breake
Breaker,
r, BHF30S
BHF30S 2 0.04
r. Air Compre
Compresso
ssor,
r, Portab
Portable
le (126-
(126- 160 c
cfm)
fm) 1 0.04
s. Light
Lighting
ing System
SystemfTo
fTower
wer Lig
Lights
hts 1 0.96
Minor
Minor Too
Tools
ls (10%
(10% of Labor
Labor Cost)
Cost)
Sub
Sub - To
Tota
tall fo
forr B
C. Total (A + B)
D. Output
Output per Hour
Hour 1.09
1.09 m
E. Direct
Direct Unit Cost (C
Unit Cost = + D)
Name and Specifica
Specification
tion Unit Quantity Unit
Unit Cos
Costt Amount
Amount (Ph
(PhP)
P)
F. Mater
Materials
ials
a. Ready
Ready Mix Concre
Concrete,
te, fe' = 2288 MPa
MPa @ 28 Days cU.m 1.24 Prices
Prices of mat materia
erials
ls are variabl
variable
e per Reg Region/
ion/
b. Rein
Reinfor
forcin
cing
g Steel
Steel Bar * kg 30
304.30 Di
Dist
stri
rict
ct base
basedd on the the preva
prevail
iling
ing uni
unitt price
prices
s in
the loc
locali
ality
ty whi
which
ch inc
includ
ludee payme
payment nt of loclocal
al
c. Tire
Tire Wir
Wire
e (2% of RSB) kg 6.09
taxe
taxess and haulin
haulingg co cost
st to the
the pro
proje
ject
ct site
site..
d. Oxyg
Oxygen/
en/Ace
Acetyl
tylene
ene (1 set/
set/500
5000
0 kg. o
off RSB) set 0.06 Ref
Refer
er to the ConConstrstruct
uction
ion Materia
Materiall Pric
Pricee Dat
Data
a
e. Weld
Welding
ing Rod (1 kg/20
kg/2000
00 kg of RS
RSB)
B) kg 0.15 establ
establish
ished
ed quarter
quarterlyly by Cent
Central
ral Office
Office Price
Price
Miscel
Miscellan
laneou
eous
s (3% of Mater
Material
ials,
s, Benton
Bentonite
ite and etc.)
etc.) Monitor
Monitoring
ing Committee.
Committee.
* Its
Its quant
quantit
ity
y is var
varia
iabl
ble
e depend
dependin
ing
g on the act
actua
uall design
design
G. Direc
Directt Unit
Unit Cos
Costt (E + F)
H. Overhe
Overhead,
ad, Contin
Contingen
gencie
cies
s & Miscel
Miscellan
laneou
eous
s (OCM)
(OCM) Exp
Expens
enses
es 15
15%/
%/12
12%/
%/10
10%/
%/8%
8% of G
I. Contrac
Contractor
tor's
's Pro
Profit
fit (CP) 10%/
10%/8%
8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. Total
Total Unit
Unit Cost
Cost (G + H + I + J)
175 Par
Partt C - Fin
Finish
ishing
ing
DETAIL
DETAILED
ED UNIT
UNIT PRICE ANAL
ANALYSIS
YSIS (DUPA)
(DUPA)
A. Labor
Sub - Total
Total for A
Name
Name and Cap
Capaci
acity
ty No. of Unitls No. of HourIs Hourly Rate A mount (P h P )
B. Equipment
a. Drilli
Drilling
ng Rig (300
(300 hp) 1 0.39 Se
See
e late
latest
st AG
AGEL
EL rent
rental
al rat
rates
es..
b. Crawl
Crawler
er Crane
Crane (41 - 45 mt) 1 0.97
c. Crawl
Crawler
er Crane
Crane (21 - 2
25
5 mt) 1 0.97
d. Dump
Dump Tru
Truck yd3)
ck (12 yd 1 0.97
e. Payloa
Payloader
der (1.50
(1.50 m\ LX80-2
LX80-2C
C 1 0.97
f. Genera
Generator
tor Set ((300
300 kW) 1 0.97
g. Benton
Bentonite
ite Bin 1 0.61
h. Benton
Bentonite
ite Mixer 1 0.61
i . Water
Water Pump, suction ¢ (7.5 hp)
Pump, 100 mm suction 1 0.86
j. Water Truck/Pump (16000 L) 1 0.86
k. Bar Cutter
Cutter 1 0.65
I. Bar Ben
Bender
der 1 0.65
m. Weldi
Welding
ng Machin
Machine
e (500
(500 A), Ele
Electr
ctric
ic Driven
Driven 1 0.76
n. Cutting
Cutting Outfi
Outfitt 1 0.76 .J
o. Tremi
Tremie
e Pipe
Pipe Set 1 0.22
p. SPT
SPT & Desand
Desanding
ing Mac
Machin
hine
e 1 0.26
q. Portab
Portable
le Breake
Breaker,
r, BHF30S
BHF30S 2 0.03
r. Air Compres
Compressor
sor,, Portab
Portable
le (126-
(126- 160 cfm)
cfm) 1 0.03
s. Light
Lighting
ing System
SystemfTo
fTower
wer Lig
Lights
hts 1 0.97
Minor
Minor Too
Tools
ls (10%
(10% of Labor
Labor Cost)
Cost)
Sub
Sub - To
Tota
tall fo
forr B
C. Total (A + B)
D. Output
Output per Ho ur = 0.8
Hour 0.81
1 m
E. Dir
Direct
ect Unit
Unit Cost
Cost (C .;.D)
F. Materials
a. Ready
Ready Mix Concrete,, fc' = 28 MPa @ 28 Days
Concrete cU.m 1.94 Prices
Prices Df materia
materials
ls are variabl
variable
e per RegRegiDn
iDn/
/
Dis
Distri
trict
ct based D Dn
n the prev
prevail
ailing
ing unit prices
prices in
b. Reinf
Reinforc
orcing
ing Steel
Steel Bar'
Bar' kg 387.77
the IDcali
IDcality
ty which
which inc
includ
lude
e paym
paymentent Df IDcal
IDcal
c. Tire
Tire Wire (2% of RSB) kg 7.76 taxes
taxes and hauling
hauling CDSttD
CDSttD the pr projec
ojectt site.
site.
d. Oxyg
Oxygen/
en/Ace
Acetyl
tylene
ene (1 set/
set/500
5000
0 kg o
off RSB) set 0.08 Ref
Refer
er tDtD the CDn
CDnstr
struct
uctiDn
iDn Material
Material Price
Price D Data
ata
e. Weld
Welding
ing Rod (1 kg/200
kg/2000
0 kg of
of RSB) kg 0.19 establi
establishe
shed d quarter
quarterly
ly by Cen
Central
tral Office
Office Price
Price
MDnit
MDnitDring
Dring CDmmittee.
CDmmittee.
Miscel
Miscellan
laneou
eous
s (3% of Mater
Material
ials,
s, Benton
Bentonite
ite and etc.)
etc.)
• Its quantity
quantity is var
variab
iable
le depe
dependin
nding
g Dn the act
actual
ual desi
design
gn
G. Direc
Directt Unit
Unit Cost
Cost (E + F)
H. Overh
Overhead
ead,, Con
Contin
tingen
gencie
cies
s & Misce
Miscella
llaneo
neous
us (OGM)
(OGM) Expens
Expenses
es 15%/12%/10%/8% of G
I. Contra
Contractor
ctor's
's Profit
Profit (CP) 10%/8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. To
Total
tal Unit
Unit Cost
Cost (G + H + I + J)
176 Par
Partt C - Fin
Finish
ishing
ing
"
DETAILE
DETAILED
D UNI
UNIT
T PRICE ANALYSIS
ANALYSIS (DUPA)
(DUPA)
A. Labor
a. Const
Construct
ruction
ion Forem
Foreman
an 1 1.00 Lab
Labor
or Ra
Rate
tess are va
vari
riabl
able
e per
Region/
Region/Dis
Distri
trict
ct bas
based
ed on minminimum
imum wag e as
wage
b. Skilled
Skilled Laborer
Laborer 5 1.00
approved
approved by DOLEDOLE.. Ref
Refer
er to the
the Sch
Schedul
edule
e
c. Unskill
Unskilled
ed Laborer
Laborer 6 1.00 of Lab
Labor
or Rat
Rates.
es.
Fab
Fabric
ricati
ation
on of Cage
Cage Bar
d. Skilled
Skilled Laborer
Laborer 6 0.68
e. Unskille
Unskilled
d Laborer
Laborer 11 0.68
Sub - Total
Total for A
Name
Name and Cap
Capaci
acity
ty No. of Unitls
Unitls No. of Hour/s Hourly Rate Amount
Amount (PhP)
(PhP)
B. Equipment
a. Drilli
Drilling
ng Rig (300
(300 hp) 1 0.42 Se
See
e late
latest
st AGEL
AGEL rent
rental
al rat
rates
es..
b. Crawl
Crawler
er Crane
Crane (41 - 45 mt) 1 0.98
c. Craw
Crawler
ler Crane
Crane (21 - 25
25 mt) 1 0.98
d. Dump
Dump Tru
Truck
ck (12 yd3) 1 0.98
e. Payloa
Payloader
der (1.50
(1.50 m\ LX80-2
LX80-2C
C 1 0.98
f. Genera
Generator
tor Set ((300
300 kW) 1 0.98
g. Benton
Bentonite
ite Bin 1 0.64
h. Bento
Bentonite
nite Mixer 1 0.64
i . Water
Water Pump,
Pump, 100 mm suctio
suction
n 11l(7.5 hp) 1 0.90
j. Water
Water Truck/Pu
Truck/Pump
mp (16000
(16000 L) 1 0.90
k. Bar Cutter
Cutter 1 0.68
I. Bar Bend
Bender
er 1 0.68
m. Weldi
Welding
ng Machin
Machine
e (500
(500 A), Ele
Electr
ctric
ic Dri
Driven
ven 1 0.76
.J
n. Cutting
Cutting Outfit
Outfit 1 0.76
o. Trem
Tremie
ie Pipe
Pipe Set 1 0.22
p. SPT
SPT & Desand
Desanding
ing Mac
Machin
hine
e 1 0.26
q. Portab
Portable
le Breake
Breaker,
r, BHF30S
BHF30S 2 0.02
r. Air Comp
Compres
ressor
sor,, Portab
Portable
le (126-1
(126-160
60 cfm
cfm)) 1 0.02
s. Ligh
Lightin
ting
g System
System/To
/Tower
wer Lights
Lights 1 0.98
Minor
Minor Too
Tools
ls (10%
(10% of Labor
Labor Cost)
Cost)
Sub
Sub - To
Tota
tall fo
forr B
C. Tot
Total
al (A + B)
D. O
Ou
utput p
pe
er Hour - 0.62m
E. Direct
Direct Unit
Unit Cost (C + D)
F. Materials
Materials
a. Ready
Ready Mix Concrete, fe' = 28 Mpa @ 28 D
Concrete, cU.m 2.80 Prices
Prices of materi
materials
als are var variabl
iablee per Reg Regionl
ionl
Di
Dist
stri
rict
ct base
basedd on thethe preva
prevail
iling
ing uniunitt price
pricess in
b. Reinf
Reinforc
orcing
ing Steel
Steel Bar'
Bar' kg 451.98
the loca
localit
lity
y whi
which
ch inc
include
lude pay
payment
ment of loc local
al
c. Tire
Tire Wire (2
(2%
% of RSB)
RSB) kg 9
9..04 taxe
taxess and haulin
hauling
g co cost
st to the
the proj
projec
ectt site
site..
d. Oxyg
Oxygen/
en/Ace
Acetyl
tylene
ene (1 s
set/
et/500
5000
0 kg o
off RSB) set 0.09 Ref
Refer
er to the ConConstr
struct
uction
ion Materia
Materiall Pric
Pricee Dat
Data
a
e. Weld
Welding
ing Rod (1 kg/20
kg/2000
00 kg of RSB)
RSB) kg 0.23 est
establi
ablishe
shed d quar
quarter
terly
ly by CenCentra
trall Offi
Office
ce Price
Price
Monito
Monitoring
ring Commit
Committee.
tee.
Miscel
Miscellan
laneou
eous
s (3% of Mater
Material
ials,
s, Benton
Bentonite
ite and etc.)
etc.)
• Its quantity
quantity is variabl
variable
e depe
dependin
nding
g on the ac
actua
tuall des
design
ign
G. Direc
Directt Unit
Unit Cos
Costt (E + F)
H. Overhead
Overhead,, Contin
Contingen
gencie
cies
s & Miscel
Miscellan
laneou
eous
s (OCM
(OCM)) Expens
Expenses
es 15%/
15%/12
12%/
%/10
10%/
%/8%
8% of G
I. Contrac
Contractor
tor's
's Pro
Profit
fit (CP) 10%/
10%/8%
8% of G
J. Value
Value Added
Added Tax (VAT) 5% of (G + H + I)
K. Total
Total Unit
Unit Cost
Cost (G + H + I + J)
177 Par
Partt C - Fin
Finish
ishing
ing
DEl AILED
AILED UNI
UNIT
T PRICE ANAL
ANALYSIS
YSIS (DUPA)
(DUPA)
A. Labor
Sub - Total
Total for A
Name
Name and Cap
Capaci
acity
ty No. of Unitls No. of HourIs Hourly Rate Amount
Amount (Ph
(PhP)
P)
B. Equipment
o. Tremi
Tremie
e Pipe
Pipe Set 1 0.21
p. SPT & Desanding
Desanding Mach
Machine
ine 1 0.26
q. Portable Breaker, BHF30S 2 0.02
r. Air Compres
Compressor
sor,, Portab
Portable
le (126-
(126- 160 c
cfm)
fm) 1 0.02
s. Lighting System/Tower Lights 1 0.98
Minor
Minor Too
Tools
ls (10%
(10% of Labor)
Labor)
Sub
Sub - To
Tota
tall fo
forr B
C. Total (A + B )
D. Output Hour =
Output per Hour 0.53m
E. Di
Dire
rect
ct Unit
Unit Cost
Cost (C + D)
F. Mate
Materi
rial
als
s .
a. Ready
Ready Mix Concrete,, fc' = 28 MPa @ 28 Days
Concrete cU.m 3.46 Prices
Prices o off materi
materials
als are var variabl
iable
e per Region/
Region/
b. Reinf
Reinforc
orcing
ing Steel
Steel Bar'
Bar' kg 490.33 Di
Dist
stri
rict
ct base
based
d on the the prev
prevail
ailin
ing
g uni unitt price
prices
s in
the
the loc
local
alit
ity
y whic
which h inc
includ
ludee payme
payment nt of loclocal
al
c. Tire Wire (2% of RSB ) kg 9.81
taxes and hauling cost to the project site.
d. Oxyge
OxygenlA
nlAcet
cetyle
ylene
ne (1 set/
set/500
5000
0 kg o
off RSB) set 0.098 Ref
Refer
er to the Constr
Constructuction
ion Materi
Materialal Price
Price Dat
Data
a
e. Wel
Weldin
ding
g (1 kg/2000 kg of RSB)
Rod (1 RSB) kg 0.25 establi
establishe
shed d qua
quarte
rterly
rly b by
y Cen
Centra
trall Offi
Office
ce Price
Price
Miscel
Miscellan
laneou
eous
s (3% of Materi
Materials
als,, Benton
Bentonite
ite and etc.)
etc.) Monitor
Monitoring
ing Commit
Committee.
tee.
DETAILE
DETAILED
D UNI
UNIT
T PRICE ANALYS
ANALYSIS
IS (DU
(DUPA)
PA)
A. Labor
Sub - Total
Total for A
B. Equipment
h. One
One Bagger
Bagger Mixer
Mixer 1 0.17
i. Water
Water Tru
Truck/
ck/Pum
Pump
p (16000
(16000L)
L) 1 0.04
j. Concrete Vibrator 1 0.04
k. Tremie
Tremie Pipe
Pipe Set 1 0.17
Minor
Minor Too
Tools
ls (10%
(10% of Labor
Labor Cost)
Cost)
.J
Sub
Sub - Tot
Total
al fo
forr B
C. Total (A + B)
D. Output Hour =
Output per Hour 1.8
1.80
0 m
E. Di
Dire
rect
ct Un
Unit
it Cost
Cost (C + D)
F. Mater
Materials
ials
a. Tubul
Tubular
ar Pile
Pile (0.
(0.40
40 m ~ x 9.50 mm thk
thk)*
)* m 1.00 Prices of mat
materia
erials
ls are vari
variabl
able
e per Reg Regionl
ionl
b. Reinf
Reinforc
orcing
ing Steel
Steel Bar kg 29.547 Di
Dist
stri
rict
ct base
basedd on thethe preva
prevail
iling
ing uni
unitt pric
prices
es in
the loc
locali
ality
ty wwhic
hich
h inc
includ
lude payment of local
e payment
C. Cement bag 1.194
taxe
taxess and haulin
hauling
g cocost
st to the
the pro
proje
ject
ct site
site..
d.Sand m' 0.063 Ref
Refer
er to the ConConstr
struct
uction
ion Materia
Materiall Price Dat Dataa
e. Gravel
Gravel m' 0.126 establ
establish
ished
ed quar
quarter
terly
ly by Cent
Central
ral Office
Office Price
Price
f. #
#16
16 Ti
Tie
e Wire
Wire (2
(2%
% of RSB)
RSB) Monito
Monitoring
ring Commit
Committee.
tee.
kg 0.591
g. Wel
Weldi
ding
ng Rod
Rod (1
(1 kg/2000
kg/2000 kg of Steel) kg 0.063
h. Oxy/
Oxy/Ace
Acetyl
tylene
ene (1
(1 kg/5000 kg of Steel) set 0.025
i. Coco
Coco Log
Log-- 2 uses
uses m 1.00
j. Good Lumber (Falsework)- 4 uses bd-ft 16.00
k. Nail/S
Nail/Spik
pike
e (1 kg/100
kg/100 bd-
bd-ft
ft of Lumber)
Lumber) kg 0.16
Miscel
Miscellan
laneou
eous
s (2% of Materi
Materials
als Cost)
Cost)
Note:
*Assum
*Assumed
ed weight of Tubular
weight Tubular Pipe
Pipe Pil
Pile
e is
95.
95.93
93 kglm
Sub
Sub - T
Tot
otal
al fo
forr F
G. D
Dire
irect
ct Unit Cost (E + F)
Unit Cost
H. Overhead,
Overhead, Conti
Contingencies & Miscellane
ngencies Miscellaneous
ous (OCM) Expe
Expenses
nses 15%/
15%/12
12%/
%/10
10%/
%/8%
8% of G
I. Contra
Contracto
ctor's
r's Profit
Profit (CP) 10%/
10%/8%
8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. Total
Total Unit
Unit Cos
Costt (G + H + I + J)
DETAIL
DETAILED
ED UNIT
UNIT PRI
PRICE
CE ANAL
ANALYSIS
YSIS (DUPA)
(DUPA)
A. Labor
Labor
Labor RRate
ates
s are
are variabl
variable
e peperr Regi
Region/
on/Dis
Distri
trict
ct
a. Const
Construct
ruction
ion Foreman
Foreman 1 1.
1.00
bas
based
ed on mini
minimu
mum
m wa wage
ge appr
approved
oved by
b. Skilled
Skilled Laborer
Laborer .6 1.00 DOLE.
DOL E. Ref
Refer
er to the
the Sche as of Labo
Schedule
dule Laborr Rat
Rates.
es.
c. Unskill
Unskilled
ed Laborer
Laborer 6 1.00
Sub - Total
Total for A
Name
Name and Capaci
Capacity
ty No. of Unitls No. of Hour/s Hourly Rate Amount
Amount (Ph
(PhP)
P)
B. Equipment
Sub
Sub - To
Tota
tall fo
forr B
C. Total (A + B)
D. Ou
Output p e
err Hour = 2.00m .J
E. Di
Dire
rect
ct Unit
Unit Cos
Costt (C + D)
F. Materials
a. Tubu
Tubular
lar Pile (0.40 m ¢ x 9.50
Pile 9.50 mm thk)* m 1.00 Prices
Prices of matmateri
erials
als are variabl
variablee per Region/
Region/
Di
Dist
stri
rict
ct base
basedd on the the prev
prevail
ailin
ing
g unit
unit price
prices
s in
b. Reinforcing S teel Bar kg 29.547
the local
locality
ity whi
which
ch inc
include
lude pay
paymen
mentt of loc
local
al
c. Read
Ready
y Mix Conc
Concret
rete
e fc'
fc'=20
=20.7
.7 MPa m' 0.132
d. #16 Tie Wire (2% of RSB) kg 0.591 taxe
taxes
s an
andd hauli
hauling
ng co cost
st to the
the proj
projec
ectt site
site..
Refer
Refer to the Cons
Constru
tructi
ction
on Materi
Materialal Pric
Pricee Data
Data
e. Weldi
Welding
ng Rod (1 kg/200
kg/2000
0 kg of St
Steel
eel)) kg 0.063 establ
establishe
ishedd quar
quarter
terly
ly by Cen
Centra
trall Offi
Office
ce Price
Price
Monitor
Monitoring
ing Committee.
Committee.
f. Oxy/A
Oxy/Acet
cetyle
ylene
ne (1 kg/500
kg/5000
0 kg of Ste
Steel)
el) set 0.025
g. Coco
Coco Log-
Log- 2 uses m 1.00
h. Good
Good Lum
Lumber
ber (Fa
(False
lsewor
work)-
k)- 4 uses
uses bd-ft 16.00
i. Nail/
Nail/Spi
Spike
ke (1 kg/100
kg/100 bd-
bd-ft
ft of Lumber)
Lumber) kg 0.16
Miscel
Miscellan
laneou
eous
s (2% of Materia
Materials
ls Cost)
Cost)
Note:
'Ass
'Assum
umed
ed we weig
ight
ht of Tu
Tubu
bular
lar Pi
Pipe Pile is
pe Pile
95.93
95.93 kgl
kglm.
m.
If no av
avail
ailable
able Ready
Ready Mix Conc
Concret
rete
e at proproject
ject
sit
site,
e, derive
derive the cos
costt of concr
concrete
ete using
using the BatBatchi
ching
ng
Pl
Plan
antt or One Bagg
Bagger
er Mixe
Mixerr for
for smal
smalll qua
quant
ntit
ity.
y.
Sub
Sub - To
Tota
tall fo
forr F
G. Direct
Direct Unit Costt (E + F)
Unit Cos
H. Overhead,
Overhead, Conti
Contingen
ngencies
cies Miscellan
Miscellaneous
eous (OCM) Expenses 15
15%/
%/12
12%/
%/10
10%/
%/8%
8% of G
&
I. Contra
Contractor
ctor s Profit
Profit (CP) 10%/
10%/8%
8% of G
J. Va
Value
lue Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. Tot
Total
al Unit
Unit Cost
Cost (G + H + I + J)
180 Part
Part C - Fini
Finishin
shing
g
DETAILE
DETAILED
D UNI
UNIT
T PRICE ANALYSI
ANALYSIS
S (DU
(DUPA)
PA)
A. Labor
Sub - Total
Total for A
Name
Name and Capaci
Capacity
ty No. of U n
niitls No. of H ou
ourIs Hourly
Hourly Rate
Rate Amount
Amount (Ph
(PhP)
P)
B. Equipment
Sub
Sub - T
Tot
otal
al fo
forr B
,oJ
C. Tota
Totall (A + B)
D. Output Hour =
Output per Hour 2.40
2.40 m
E. Direct
Direct Unit
Unit Cos
Costt (C + D)
F. Materials
a. Tubul
Tubular
ar Pile (0.40 m (Il x 9.50 mm thk)*
Pile (0.40 m. 1.00 Prices of materials are variable per Regionl
District based on the prevailing unit prices in
b. Reinforcing Steel B ar kg. 29.547 the locality which include payment of local
c. Cement bag 1.194 taxes and hauling cost to the project site.
d. Sand m3 0.063 Refer to the Construction Material Price Data
e. Gravel m3 0.126 established quarterly by Central Office Price
Monitoring Committee.
1. #16 Tie Wire (2% of RS B) kg. 0.591
g. Wel
Weldi
ding
ng Ro
Rod
d (1
(1 kg/2000
kg/2000 kg of Steel) kg. 0.063
h. Oxy/A
Oxy/Acet
cetyle
ylene
ne (1 kg/500
kg/5000
0 kg of Ste
Steel)
el) set 0.025
i. Coco Log- 2 uses m 1.00
j. Good Lumber (Falsework)- 4 uses bd-ft 16.00
k. Nail
NaillSp
lSpike
ike (1
(1 kg/100
kg/100 bd-ft of Lumber) kg. 0.16
Miscel
Miscellan
laneou
eous
s (2% of Ma
Mater
terial
ials
s Cost)
Cost)
Note:
*Assumed
*Assumed weight
weight of Tubular
Tubular Pipe Pile is
95.93 kglm.
Sub
Sub - T
Tot
otal
al fo
forr F
G. Di
Dire
rect
ct Unit
Unit Co
Cost
st (E + F)
H. Overhead,
Overhead, Contingencies & Miscellan
Contingencies Miscellaneous
eous (OCM) Expe
Expenses
nses 15%/12%/10%/8% ofG
I. Contract
Contractor'
or's
s Profit
Profit (CP) 10%/
10%/8%
8% of G
J. Value Added Tax (VAT) 5% of (G + H + I)
K. Total
Total Unit
Unit Cost
Cost (G + H + I + J)
181 Par
Partt C - Fini
Finishin
shing
g
DETAIL
DETAILED
ED UNIT
UNIT PRI
PRICE
CE ANAL
ANALYSIS
YSIS (DUPA)
(DUPA)
A. Labor
a. Const
Constructi
ruction
on Foreman
Foreman 1 1.00 Labor
Labor R Rate
ates
s are
are variabl
variable
e pe
perr Reg
Region/
ion/Dis
Distri
trict
ct
b. Skilled
Skilled Labo
Laborer
rer bas
based
ed on mimini
nimu
mum wage as appr
m wage approve
ovedd by
6 1.00
DO
DOLE
LE.. Refer
Refer to the
the Sc
Sched
hedul
ule
e of Labor
Labor RatRates
es..
c. Unskil
Unskilled
led Laborer
Laborer 6 1.00
Sub - Total
Total for A
Name
Name and Cap
Capaci
acity
ty No. of Unitls No. of Hour/s Hourly Rate A mount (P h P )
B. Equipment
a. Truc
Truck
k Mounte
Mounted
d Crane
Crane (41 - 45 mt) 1 0.45 Se
See
e late
latest
st AG
AGEL
EL ren
renta
tall rate
rates.
s.
b. Diesel
Diesel Hammer
Hammer (K2
(K25
5 or equiva
equivalen
lent)
t) 1 0.17
c. Drop Hammer 1 0.08
d. Bar Cutter
Cutter 1 0.14
e. Bar Bender
Bender 1 0.14
f. Wel
Weldin
ding
g Machin
Machine
e (500A)
(500A),, Gas
Gas/Di
/Diese
esell Dri
Driven
ven 1 0.06
g. Cutting
Cutting Outfit
Outfit 1 0.06
h. Concret
Concrete
e Vibrator
Vibrator 1 0.01
i. Tre
Tremie
mie Pipe
Pipe Set 1 0.05
Minor
Minor Too
Tools
ls (10%
(10% of Labor
Labor Cost)
Cost)
Sub
Sub - To
Tota
tall fo
forr B
C. Total (A + B )
D. O
Ou
utput p
pe
er Hour - 2.00m
·oJ
E. Direct
Direct Unit
Unit Cost (C + D)
F. Mater
Materials
ials
a. Tub
Tubula
ularr Pil
Pile (0.40 m ¢ x 9.50 mm thk)*
e (0.40 m 1.00 Prices
Prices of mat materi
erials
als are variabl
variablee per Regi
Regionl
onl
b. Reinf
Reinforc
orcing
ing Steel
Steel Bar kg 29.547 Di
Dist
stric
rictt bas
based
ed on thethe prev
prevail
ailin
ing
g ununit
it price
pricess in
the loc
localit
ality
y whic
whichh inc
include
lude pay
paymen
mentt of loc
local
al
c. Read
Ready
y Mix Concr
Concrete
ete fc'
fc'=20
=20.7
.7 MPa m' 0.132
taxe
taxess anandd hauli
hauling
ng cocost
st to the projec
projectt site
site..
d. #16
#16 Tie Wire (2
(2%
% of RSB) kg 0.591 Refer
Refer to the
the Con
Constr
struct
uction
ion Materi
Material
al Price
Price Data
e. Weld
Welding
ing Rod (1 kg/200
kg/2000
0 kg of Stee
Steel)
l) kg 0.063 establ
establishe
ishedd quar
quarter
terly
ly by Cen
Centra
trall Offi
Office
ce Price
Price
f. Oxy/A
Oxy/Acet
cetyle
ylene
ne (1 kg/500
kg/5000
0 kg of Ste
Steel)
el) set 0.025 Monitor
Monitoring
ing Commit
Committee.
tee.
g. Coco
Coco Log-
Log- 2 uses
uses m 1.00
h. Good
Good Lumber
Lumber (Fa
(False
lsewor
work)-
k)- 4 u
uses
ses bd-ft 16.00
i. Nail/S
Nail/Spik
pike
e (1 kg/100
kg/100 bd-
bd-ft
ft of Lumber)
Lumber) kg 0.16
Miscel
Miscellan
laneou
eous
s (2% of Mater
Material
ials
s Cost)
Cost)
Note:
'Ass
'Assum
umed
ed we
weig
ight
ht of TuTubul
bular
ar Pi
Pipe
pe Pile is
95.93
95.93 kglm.
kglm.
If no ava
avail
ilabl
able
e ReReady
ady Mi
Mix
x Concr
Concret
ete
e at P Pro
roje
ject
ct
Site,
Site, deri
derive
ve the cos
costt of concr
concrete
ete using
using the B Batc
atching
hing
Plan
Plantt or One Bagger
Bagger Mi Mixe
xerr for
for sma
small
ll quant
quantit
ity
y
Sub
Sub - To
Tota
tall fo
forr F
G. Direc
Directt Unit
Unit Cos
Costt (E + F)
H. Overhead
Overhead,, Contin
Contingen
gencie
cies
s & Misc
Miscell
ellane
aneous
ous (OCM)
(OCM) Expens
Expenses
es 15
15%/
%/12
12%/
%/10
10%/
%/8%
8% of G
I. Contra
Contracto
ctor's
r's Profit
Profit (CP) 10%/
10%/8%
8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. Total
Total Unit
Unit Cost
Cost ( G + H + I + J)
182 Part
Part C - Fin
Finishi
ishing
ng
DETAILE
DETAILED
D UNI
UNIT
T PRICE ANALYSI
ANALYSIS
S (DU
(DUPA)
PA)
Labo
Laborr R
Rate
ates
s are
are var
variabl
iable
e pe
perr Reg
Region/
ion/Dis
Distri
trict
ct
a. Construction Foreman 1 1.00
bas
based
ed on min
minim
imum
um wa ge as ap
wage appro
prove
ved
d by
b. Skilled Laborer 1 1.00 DOLE.
DOL E. Ref
Refer
er to th
the
e Schedu
Schedulele of L
Labor
abor Rat
Rates.
es.
c. Unskilled Laborer 1 1.00
Sub
Sub - To
Tota
tall fo
forr A
Name
Name and Capaci
Capacity
ty No. of U n
niitls No. of H ou
ourIs Hourly Rate Amount (P h P )
B. Equipment
.J
Sub
Sub - To
Tota
tall fo
forr B
C. Total (A + B)
D. Output Hour =
Output per Hour 4.00
4.00 ea
E. Dir
Direct
ect Unit
Unit Cost
Cost (C + D)
F. Materials
a. Reinf
Reinforc
orcing
ing Steel
Steel Bar,
Bar, Grade
Grade 40 kg 23.86 Prices of materi
materials
als are variab
variablele per Region
Regionl l
Di
Dist
stri
rict
ct bas
baseded on thethe prev
prevail
ailin
ing
g un unit
it pric
priceses in
b. Steel Plate (100+100) x 300 mm, 12 mm thk kg 6.00
the localit
locality
y which
which inc
include
lude pay ment of local
payment local
c. Wel
Weldi
ding
ng Rod
Rod (1 kg/2000 kg of Steel)
Steel) kg 0.015 taxe
taxess anand
d hau
hauli
ling
ng co
cost
st to the
the proj
projec
ectt site
site..
Refer
Refer to the Co Const
nstruc
ructio
tion
n Materi
Materialal Price
Price Data
establi
establishe
shed d quarterl
quarterly
y by C Centr
entral
al Office
Office Pric
Pricee
Monitoring
Monito ring Commit
Committee.
tee.
Sub
Sub - To
Tota
tall fo
forr F
G. Direc
Directt Unit
Unit Cost
Cost (E + F)
H. Overhead
Overhead,, Contin
Contingen
gencie
cies
s & Miscel
Miscellan
laneou
eous
s (OCM)
(OCM) Exp
Expens
enses
es 15%/12%/10%/8% of G
I. Contrac
Contractor
tor's
's Profit
Profit (CP) 10%/8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. Total Unit Cost (G + H + I + J)
183 Part C - Fin
Finishi
ishing
ng
DETAIL
DETAILED
ED UNIT
UNIT PRICE ANA
ANALYSI
LYSIS
S (DUPA)
(DUPA)
A. Labor
a. ConStru
ConStructio
ction
n Foreman
Foreman 1 1.00 Labor Rates are variable per RegionlDistrict
based on minimum wage as
wage as approved by
b. Skilled
Skilled Laborer
Laborer 5 1.00 DOLE. Refer to the Schedule of Labor Rates.
c. Unskille
Unskilled
d Labo
Laborer
rer 6 1.00
Fab
Fabric
ricati
ation
on of Cage
Cage Bar
d. Skilled
Skilled Laborer
Laborer 9 0.50
e. Unskille
Unskilled
d Laborer
Laborer 17 0.50
Sub - Total
Total for A
Name
Name and Cap
Capaci
acity
ty No. of Unitls No. of HourIs Hourly
Hourly Rate
Rate Amount
Amount (PhP)
(PhP)
B. Equipment
a. Drilli
Drilling
ng Rig (300
(300 hp) 1 0.26 See latest
latest AGEL rental
rental rates
rates..
b. Crawler Crane (41 - 45 mt) 1 0.95
c. Crawl
Crawler
er Crane
Crane (21 - 25
25 mt) 1 0.95
d. Dump
Dump Truck (12 yd3)
Truck 1 0.95
e. Payl
Payload
oader (1.50 m3), LX80-2C
er (1.50 1 0.95
f. Genera
Generator
tor Set ((300
300 kW) 1 0.95
g. Bento
Bentonit
nite
e Bin 1 0.50
h. Bento
Bentonite
nite Mixer 1 0.50
i . Wat
Water
er Pump, suction !2l (7.5 hp)
Pump, 100 mm suction 1 0.74
j. Water Truck (16000 L) 1 0.
0.74
k. Bar Cutter
Cutter 1 0.50
I. Bar Bend
Bender
er 1 0.50
m. Weld
Welding
ing Mac
Machin
hine
e (500A)
(500A),, Ele
Electr
ctric
ic Dri
Driven
ven 1 0.71
n. Cutting
Cutting Outfit
Outfit 1 0.71 J
o. Tremi
Tremie
e Pipe
Pipe Set 1 0.24
p. SPT & Desanding
Desanding Machine
Machine 1 0.24
q. Portabl
Portable
e Breake
Breaker,
r, BHF30S
BHF30S 2 0.05
r. Air Compres
Compressor
sor,, Portab
Portable
le (126
(126 - 160 cfm)
cfm) 1 0.05 ,
s. Ligh
Lightin
ting
g System
SystemlTo
lTower
wer Lig
Lights
hts 1 0.95
Minor
Minor Too
Tools
ls (10%
(10% of Labor
Labor Cost)
Cost)
Sub
Sub - To
Tota
tall fo
forr B
C. Total (A + B )
D. Output
Output per Hour
Hour
= 1.58
1.58 m
E. Direct
Direct Unit
Unit Cost (C + D)
F. Mater
Materials
ials
a. Ready
Ready Mix Concre
Concrete,
te, fe' = 28 MPa @ 28 Days cU.m 0.55 Prices of materials are variable per Regionl
b. Reinf
Reinforc
orcing
ing Steel
Steel Bar * kg 205.00 District
District based
based on the prev
prevailin
ailing
g unit
unit price
prices
s in
the locality which include payment of local
c. Tire
Tire Wire (2% of RSB) kg 4.
4 .10 taxes
taxe s and hauling cost to the project
project site.
d. OxygenlAcetylene (1 set
set/50
/5000
00 kg. of RS
RSB)
B) set 0.041 Refer to the Construction Material Price Data
e. Wel
Weldin
ding
g Rod (1
(1 kg/2000 kg of RSB) kg 0.10 established quarterly by Central Office Price
Miscel
Miscellan
laneou
eous
s (3% of Materia
Materials,
ls, Benton
Bentonite
ite and etc.)
etc.) Monitoring Committee.
DETAILE
DETAILED
D UNI
UNIT
T PRICE ANALYS
ANALYSIS
IS (DUPA)
(DUPA)
A. Labor
Sub - Total
Total for A
Name
Name and Capaci
Capacity
ty No. of Unitls No. of HourIs Hourly Rate Amount
Amount (PhP)
(PhP)
B. Equipment
F. Materials
3
a. Ready
Ready Mix Concrete,, fe' = 28 MPa
Concrete m 0.86 Prices
Prices o off mat
materia
erials
ls are varvariabl
iablee per RegiRegionl
onl
Di
Dist
stri
rict
ct bas
baseded on the the prev
prevail
ailin
ing
g un unit
it pric
prices
es in
b. Reinf
Reinforc
orcing
ing Steel
Steel Bar * kg 2
25
53.59
the local
locality
ity whi
whichch inc
include
lude pay
paymen
mentt of loclocal
al
c. Tire
Tire Wir
Wire
e (2% of RSB) kg 5
5..07 taxe
taxess anandd hau
hauli
ling
ng cocost
st to the
the proj
projec
ectt site
site..
d. Oxyge
OxygenlA
nlAcet
cetyle
ylene
ne (1 set/
set/500
5000
0 kg o
off RSB) set 0.051 Ref
Refer
er to the Cons
Construtructi
ction
on Materi
Material al Pric
Pricee Dat
Data
a
e. Wel
Weldin
ding
g Rod (1 kg/2000
(1 kg/2000 kg of RSB) kg 0.13 establi
establishe
shed d quarterl
quarterlyy by CenCentra
trall Offi
Office
ce Price
Price
Monitoring
Monitoring Commit
Committee.
tee.
Miscel
Miscellan
laneou
eous
s (3% of Mater
Material
ials,
s, Benton
Bentonite
ite and etc.)
etc.)
* Its
Its quan
quanti
tity
ty is varia
variabl
ble
e depend
dependin
ing
g on the act
actual
ual de
desi
sign
gn
G. Direc
Directt Unit
Unit Cost
Cost (E + F)
H. Overh
Overhead
ead,, Contin
Contingen
gencie
cies
s & M
Misc
iscell
ellane
aneous
ous (OCM)
(OCM) Expens
Expenses
es 15%/
15%/12
12%/
%/10
10%/
%/8%
8% of G
I. Contrac
Contractor
tor's
's Pro
Profit
fit (CP) 10%/
10%/8%
8% of G
J. Value
Value Added
Added Tax (VAT) 5% of (G + H + I)
J.
K. Total
Total Unit
Unit Cost
Cost (G + H + I + J)
185 Part
Part C - Fin
Finish
ishing
ing
DETAIL
DETAILED
ED UNIT
UNIT PRI
PRICE
CE ANAL
ANALYSIS
YSIS (DUPA)
(DUPA)
A. Labor
Sub - Total
Total for A
Name
Name and Cap
Capaci
acity
ty No. of Unitls No. of HourIs Hourly Rate Amount (P h P )
B. Equipment
a. Drilli
Drilling
ng Rig (300
(300 hp) 1 0.35 Se
See
e late
latest
st AG
AGEL
EL rent
rental
al rate
rates.
s.
b. Crawl
Crawler
er Gra
Grane
ne (41-
(41- 45 mt) 1 0.96
c. Crawl
Crawler
er Crane
Crane (21-
(21- 25 mt) 1 0.96
d. Dump
Dump Tru
Truck
ck (12 yd3) 1 0.96
e. Paylo
Payloade
aderr (1.50
(1.50 m3), LX80-2G 1 0.96
f. Genera
Generator
tor Set ((300
300 kW) 1 0.96
g. Bento
Bentonit
nite
e Bin 1 0.56
h. Benton
Bentonite
ite Mixer 1 0.56
i . Wa
Wate
terr Pump
Pump,, 100
100 mm suct
suctio
ion"
n""" (7
(7.5
.5 hp) 1 0.82
j. Water Truck/Pump (16000L) 1 0.82
k. Bar Cutter 1 0.60
I. Bar Bend
Bender
er 1 0.60
m. Weldi
Welding
ng Machin
Machine
e (500
(500 A), Ele
Electr
ctric
ic Driven
Driven 1 0.75
n. Cutting
Cutting Outfit
Outfit 1 0.75
.J
o. Trem
Tremie
ie Pipe
Pipe Set 1 0.22
p. SPT & Desanding
Desanding Machi
Machine
ne 1 0.25
q. Portab
Portable
le Breake
Breaker,
r, BHF30S
BHF30S 2 0.04
r. Air Compre
Compresso
ssor,
r, Portab
Portable
le (126-1
(126-160
60 cfm
cfm)) 1 0.04
s. Lighting
Lighting System
System /To
/Tower
wer Lights
Lights 1 0.96
Minor
Minor Too
Tools
ls (10%
(10% of Labor
Labor Cos
Cost)
t)
Sub
Sub - To
Tota
tall fo
forr B
C. Total (A + B)
D . Output p
peer H ou
our - 1.09 m
E. Direct
Direct Unit
Unit Cost (G + D)
F. Mater
Materials
ials
3
a. Ready
Ready Mix Concrete, fe' = 28 MPa
Concrete, m 1.24 Prices
Prices of materi
materials
als are var
variabl
iablee pe
perr Regionl
Regionl
Di
Dist
stri
rict
ct bas
based
ed on thethe prev
prevail
ailin
ing
g uni
unitt price
prices
s in
b. Reinf
Reinforc
orcing
ing Steel
Steel Bar'
Bar' kg 304.30
the
the loca
locali
lity
ty wh
whic
ich
h includ
include e pa
paym
yment
ent of loc local
al
c. Tire
Tire Wire (2% of RSB) kg 6.09 taxes
taxes and haulhauling
ing coscostt to the
the pr
projec
ojectt site.
site.
d. Oxyg
Oxygenl
enlAce
Acetyl
tylene
ene (1 set/5
set/5000
000 kg o
off RSB) set 0.061 Ref
Refer
er to the Con
Constr
struct
uction
ion MatMateria
eriall Price DatDataa
e. Weld
Welding
ing Rod (1 kg/20
kg/2000
00 kg o
off RSB) kg 0.15 est
establi
ablishe
shed d quar
quarter
terly
ly by CenCentra
trall Offic
Office
e Price
Price
Monitoring
Monitoring Commit
Committee.
tee.
Miscel
Miscellan
laneou
eous
s (3% of Mater
Material
ials,
s, Benton
Bentonite
ite and etc.)
etc.)
quantity
• Its quantity is variabl
variable
e depe
dependi
nding
ng on th
the
e actual
actual des
design
ign
G. Direct
Direct Unit
Unit Cos
Costt (E + F)
H. Overhead,
Overhead, Conti
Contingencies & Miscellane
ngencies Miscellaneous
ous (OCM) Expenses 15%/12%/10%/8% ofG
I. Contrac
Contractor
tor's
's Profit
Profit (CP) 10%/8% of G
+ +
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G H I)
K. To
Total
tal Unit
Unit Cost
Cost (G + H + I + J)
186 Part
Part C - Fin
Finishi
ishing
ng
DETAIL
DETAILED
ED UNIT
UNIT PRI
PRICE
CE ANAL
ANALYSIS
YSIS (DUPA)
(DUPA)
A. Labor
- Laborr Rat
Labo Rates
es are varvariabl
iable
e per RegRegionl
ionlDis
Distri
trict
ct
a. Construction Foreman 1 1.00
bas
based
ed on mini
minimu
mumm wa ge as app
wage approve
rovedd by
b. Skilled Laborer 5 1.00 DO
DOLE
LE.. Re
Refe
ferr to the
the Schedu
Schedulele of Labo
Laborr Ra
Rate
tes.
s.
c. Unskill
Unskilled
ed Laborer
Laborer 6 1.00
Fab
Fabric
ricati
ation
on of Cage
Cage Bar
d. Skilled Laborer 7 0.65
e. Unskilled Laborer 13 0.65
Sub - Total
Total for A
Name
Name and Cap
Capaci
acity
ty No. of Unitls No. of Hour/s Hourly Rate Amount
Amount (PhP)
(PhP)
B. Equipment
a. Drilli
Drilling
ng Rig (300
(300 hp) 1 0.39 S ee late
latest
st AGEL
AGEL ren
renta
tall rate
rates.
s.
b. Crawler Crane (41- 45 mt) 1 0.97
c. Crawler Crane (21- 25 mt) 1 0.97
d. Dump
Dump Tru
Truck
ck (12 yd3) 1 0.97
e. Paylo
Payloade
aderr (1.50
(1.50 m 3
), LX80-2C 1 0.97
f. Genera
Generator
tor Set ((300
300 kW)
kW) 1 0.97
g. Bento
Bentonit
nite
e Bin 1 0.61
h. Bento
Bentonite
nite Mixer 1 0.61
i . Wat
Water
er Pump, suction 0 (7
Pump, 100 mm suction (7.5
.5 hp) 1 0.86
j. Water Truck/Pump (16000L) 1 0.86
k. Bar Cutter
Cutter 1 0.65
I. Bar Bend
Bender
er 1 0.65
m. Weldi
Welding
ng Machin
Machine
e (500
(500 A), Elect
Electric
ric Driven
Driven 1 0.76
n. Cutting
Cutting Outfit
Outfit 1 0.76 .J
o. Tre
Tremie
mie Pipe
Pipe Set 1 0.22
p. SPT
SPT & Desand
Desanding
ing Mac
Machin
hine
e 1 0.26
q. Portab
Portable
le Breake
Breaker,
r, BHF30S
BHF30S 2 0.03
r. Air Compre
Compresso
ssor,
r, Portab
Portable
le (126-1
(126-160
60 cfm
cfm)) 1 0.03
s. Lighting System/Tower Lights 1 0.97
Minor
Minor Tools (10%
(10% of Labor
Labor Cost)
Cost)
Sub
Sub - T
Tot
otal
al fo
forr B
C. Total (A + B)
D. Output Hour =
Output per Hour 0.81
0.81 m
E. Direc
Directt Unit
Unit Cost
Cost (C + D)
F. Materials
3
a. Ready
Ready Mix Concrete, fc' = 28 MPa
Concrete, m 1.94 Prices
Prices o off mat
materi
erials
als are var variabl
iablee per RegiRegionl
onl
Di
Dist
stri
rict
ct base
basedd on the the prev
prevail
ailin
ing
g unitunit price
pricess in
b. Rein
Reinfor
forcin
cing
g Steel
Steel Bar'
Bar' kg 387.77
the
the local
localit
ity
y wh
whic
ich
h inc
includ
ludee pa
paym
yment
ent of loca
local l
c. Tire Wire (2% of RSB) kg 7.76 taxe
taxess and hauli
hauling
ng co cost
st to the
the proj
project
ect site
site..
d. Oxyg
Oxygen/
en/Ace
Acetyl
tylene
ene (1 s
set/
et/500
5000
0 kg o
off RSB) set 0.078 Ref
Refer
er to the ConConstr
struct
uction
ion Materia
Materiall Price
Price DatDataa
e. Wel
Weldin
ding
g Rod (1 kg/20
kg/2000
00 kg of
of RSB) kg 0.19 est
establi
ablishe
shed d quar
quarter
terly
ly by CenCentra
trall Offi
Office
ce Price
Price
Monitor
Monitoring
ing Commit
Committee.
tee.
Miscel
Miscellan
laneou
eous
s (3% of Ma
Mater
terial
ials,
s, Benton
Bentonite
ite and etc.)
etc.)
• IIts
ts quant
quantit
ity
y is va
varia
riabl
ble
e depend
dependin
ing
g on the act
actua
uall design
design
G. Direc
Directt Unit Cost (E + F)
Unit Cost
H. Ove
Overhe
rhead,
ad, Con
Contin
tingen
gencie
cies
s & Misc
Miscell
ellane
aneous
ous (OGM)
(OGM) Expens
Expenses
es 15%/
15%/12
12%/
%/10
10%/
%/8%
8% of G
I. Contrac
Contractor
tor s Profit
Profit (CP) 10%/
10%/8%
8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. Total
Total Unit
Unit Cost
Cost (G + H + I + J)
187 Par
Partt C - Fin
Finish
ishing
ing
DETAIL
DETAILED
ED UNIT
UNIT PRICE ANA
ANALYSI
LYSIS
S (DUPA)
(DUPA)
A. Labor
a. Const
Construct
ruction
ion Foreman
Foreman 1 1
1..00 Labor
Labor Rat
Rates
es are variabl
variable
e pe
perr Reg
Region/
ion/Dis
Distri
trict
ct
ba
base
sed
d on minim
minimum wage as a
um wage app
pprov
roved
ed by
b. Skilled
Skilled Laborer
Laborer 5 1.00
DO
DOLE
LE.. Re
Refe
ferr to the
the Sc
Sche
hedul
dule
e of L Labo
aborr Rates
Rates..
c. Unskilled
Unskilled Laborer
Laborer 6 1.00
Fab
Fabric
ricati
ation
on of Cage
Cage Bar
d. Skilled
Skilled Laborer
Laborer 7 0.68
e. Unskill
Unskilled
ed Laborer
Laborer 12 0.68
Sub - Total
Total for A
Name
Name and Cap
Capaci
acity
ty No. of Unitls No. of Houris Hourly Rate Amount (P h P )
B. Equipment
a. Drilli
Drilling
ng Rig (300
(300 hp) 1 0.42 Se
See
e late
latest
st AGEL
AGEL rent
rental
al rates
rates..
b. Craw
Crawler
ler Crane
Crane (41-
(41- 45 mt) 1 0.98
c. Craw
Crawler
ler Crane
Crane (21-
(21- 25 mt) 1 0.98
d. Dump
Dump Tru
Truck
ck (12 yd3)
yd 1 0.98
e. Payloa
Payloader
der (1.50
(1.50 m\ LX80-2
LX80-2C
C 1 0.98
f. Genera
Generator
tor Set ((300
300 kW) 1 0.98
g. Benton
Bentonite
ite Bin 1 0.64
h. Benton
Bentonite
ite Mixer 1 0.64
i . Water
Water Pump,
Pump, 100 mm suc
suctio
tion
n QJ (7.
(7.5
5 hp) 1 0.90
j. Water
Water Truck/Pump
Truck/Pump (160
(16000L)
00L) 1 0.90
k. Bar Cutter
Cutter 1 0.68
I. Bar Bend
Bender
er 1 0.68
m. Weldi
Welding
ng Machin
Machine
e (500
(500 A), Electric
Electric Dri
Driven
ven 1 0.76
n. Gutting
Gutting Outfit
Outfit 1 0.76
o. Trem
Tremie
ie Pipe
Pipe Set 1 0.22 .J
p. SPT
SPT & Desandi
Desanding
ng Machin
Machine
e 1 0.26
q. Portable
Portable Breaker
Breaker 2 0.02
r. Air Compre
Compresso
ssor,
r, Portab
Portable
le (126-1
(126-160
60 cfm
cfm)) 1 0.02
s. Ligh
Lightin
ting
g System
SystemlTo
lTower
wer Lig
Lights
hts 1 0.98
Minor
Minor Too
Tools
ls (10%
(10% of Labor
Labor Cost)
Cost)
Sub
Sub - To
Tota
tall fo
forr B
C. Total (A + B)
D. Output
Output per Hour =
Hour 0.6
0.62
2 m
E. Dir
Direct
ect Unit
Unit Gost
Gost (C + D)
F. Malerials
a. Ready
Ready Mix Concrete,, fe' = 28
Concrete 28 MPa m3 2.80 Prices
Prices o off materia
materials
ls are variabl
variablee per Reg Regionl
ionl
Di
Dist
stri
rict
ct base
basedd on thethe preva
prevail
iling
ing uniunitt price
prices
s in
b. Reinf
Reinforc
orcing
ing Steel
Steel Bar * kg 45
451.98
the local
locality
ity which
which inc
include
lude payment
payment of loc local
al
c. Tire
Tire Wire (2% of RSB) kg 9
9..04 taxe
taxess and hauli
hauling
ng cocost
st to the
the proje
project
ct sit
site.
e.
d. Oxyge
Oxygen/A
n/Acet
cetyle
ylene
ne (1 set/5
set/5000
000 kg o
off RSB) set 0.090 Ref
Refer
er toto the Con
Constr
struct
uction
ion Materia
Materiall Price Dat Dataa
e. Weld
Welding
ing Rod (1 kg/20
kg/2000
00 kg o
off RSB) establi
establishe
shed d quar
quarter
terly
ly by Cen
Central
tral Office
Office Price
Price
kg 0.23
Monito
Monitoring
ring Commit
Committee.
tee.
Miscel
Miscellan
laneou
eous
s (3% of Mater
Material
ials,
s, Benton
Bentonite
ite and etc.)
etc.)
* Its
Its quantity is variabl
quantity variable
e depe
dependi
nding
ng on tthe
he act
actual
ual desi
design
gn
G. Direc
Directt Unit
Unit Cost
Cost (E + F)
H. Overhead
Overhead,, Contin
Contingen
gencie
cies
s & Misc
Miscell
ellane
aneous
ous (OCM)
(OCM) Expens
Expenses
es 15
15%/
%/12
12%/
%/10
10%/
%/8%
8% of G
I. C
Contra
ontractor
ctor's
's Profit
Profit (CP) 10%/
10%/8%
8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. Total
Total Unit
Unit Cost
Cost ( G + H + I + J)
188 Part
Part C - Fin
Finishi
ishing
ng
DETAIL
DETAILED
ED UNIT
UNIT PRICE ANALYS
ANALYSIS
IS (DU
(DUPA)
PA)
A. Labor
Sub - Total
Total for A
B. Equipment
a. Drilli
Drilling
ng Rig (300
(300 hp) 1 0.44 Se
See
e lates
latestt AG
AGEL
EL rent
rental
al rate
rates.
s.
b. Crawler Crane (41- 45 mt) 1 0.98
c. Crawler Crane (21- 25 mt) 1 0.98
d. Dump
Dump Truc
Truck
k (12 yd3)
(12 1 0.98
e. Paylo
Payloade
aderr (1.50 m3), LX80-2C
(1.50 1 0.98
f. Genera
Generator
tor Set ((300
300 kW) 1 0.98
g. Bento
Bentonit
nite
e Bin 1 0.65
h. Bento
Bentonite
nite Mixer 1 0.65
i . Wat
Water
er Pump, suction 0 (7
Pump, 100 mm suction (7.5
.5 hp) 1 0.91
j. Water Truck/Pump (16000L) 1 0.91
k. Bar Cutte
Cutter
r 1 0.70
I. Bar Bend
Bender
er 1 0.70
m. Weldi
Welding
ng Machin
Machine
e (500
(500 A), Elect
Electric
ric Dri
Driven
ven 1 0.77
n. Cutting
Cutting Outfi
Outfitt 1 0.77
o. Trem
Tremie
ie Pipe
Pipe Set 1 0.21 .J
F. Materials
3
a. Ready
Ready Mix Concrete, fc' = 28 MPa
Concrete, m 3.46 Prices of materi
materials
als are varia
variable
ble per Regio
Region! n!
b. Rein
Reinfor
forcin
cing
g Steel Bar *
Steel kg 490.33 Di
Dist
stri
rict
ct based
based on the the prev
prevail
ailin
ing
g unit
unit pric
priceses in
the loc
localit
ality
y wh
which
ich inc
include
lude pay
paymen t of local
ment local
c. Tire Wire (2% of RS B) kg 9.81
taxe
taxess anandd hau
hauli
ling
ng co cost
st to the
the proj
projec
ectt site
site..
d. Oxyge
Oxygen/A
n/Acet
cetyle
ylene
ne (1 set/5
set/5000
000 kg o
off RSB) set 0.098 Ref
Refer
er to the Cons
Construtructi
ction
on Materi
Materialal Pric
Price e Dat
Data a
e. Weld
Welding
ing Rod (1 kg/20
kg/2000
00 kg of
of RSB) kg 0.25 establi
establishe
shed d quar
quarter
terly
ly by Cent
Central
ral Office
Office Price
Price
Miscel
Miscellan
laneou
eous
s (3% of Mater
Material
ials,
s, Benton
Bentonite
ite and etc.)
etc.) Monitoring
Monitoring Committee.
Committee.
* Its
Its quan
quanti
tity
ty is var
variab
iable
le de
depen
pendin
ding
g on th
the
e ac
actu
tual
al des
desig
ign
n
G. Direc
Directt Un
Unit
it Cost (E + F)
H. Overhead
Overhead,, Contin
Contingen
gencie
cies
s & M
Misc
iscell
ellane
aneous
ous (OCM)
(OCM) Expens
Expenses
es 15%/12%/10%/8% ofG
I. Contra
Contractor'
ctor's Profit
Profit (CP) 10%/
10%/8%
8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. Total Unit Cost (G + H + I + J)
189 Part
Part C - Fin
Finishi
ishing
ng
DETAIL
DETAILED
ED UNIT
UNIT PRICE ANAL
ANALYSIS
YSIS (DUPA)
(DUPA)
A Labor
a. Const
Construct
ruction
ion Foreman
Foreman 1 1.00 Labor Rates are variable per RegionlDistrict
based on minimum wage as approved by
b. Skilled
Skilled Laborer
Laborer 4 1.00
DOLE. Refer to the Schedule of Labor Rates.
c. Unskille
Unskilled
d Labo
Laborer
rer 6 1.00
Sub - Total
Total for A
Name
Name and Cap
Capaci
acity
ty N o.
o. of Unitls No. of H ou
ourIs Hourly Rate A mount (P h P )
B. Equipment
a. Truc
Truck
k Mounte
Mounted
d Crane
Crane (41-
(41- 45 mt) 1 1.00 See latest
latest AGEL rental
rental rate
rates.
s.
Vibro Hammer wI Hydr
b. Vibro Hydraul
aulic
ic Power
Power Pac
Pack
k 1 0.50
c. Wel
Weldin
ding
g Machin
Machine
e (500
(500 A), Gas/
Gas/Die
Diesel
sel Driven
Driven 1 0.50
d. Cutting
Cutting Outfit
Outfit 1 0.50
Minor
Minor Tools
Tools (10%
(10% ofLab
ofLabor
or Cost)
Cost)
Sub
Sub - To
Tota
tall fo
forr B
'.
C. Tota
Totall (A + B)
D. Output Hour =
Output per Hour 3.00m
E. Dir
Direct
ect Unit
Unit Cost
Cost (C + D )
F. Materials
a. Steel
Steel Cas
Casing
ing,, 10 mm thk
thk m 1.025 Prices of materials are variable per Region!
District based on the prevailing unit price
prices
s in
b. Oxy/A
Oxy/Acet
cetyle
ylene
ne (1 set/2
set/2500
500 kg of SteSteel)
el) set 0.082 the locality which include payment of local
c. Wel
Weldin
ding
g Rod (1 kgl500 kg of Steel) kg 0.409 taxes and hauling cost to the project site.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Note:
Monitoring Committee.
Assumed length of Steel Casing without splicing
but with full weld = 12.00 meter,
meter, 2.50% additional quantity
of Steel Casing represents the collar of O.30 m for 12 m.
Sub
Sub - Tot
Total
al fo
forr F
G. Direc
Directt Unit
Unit Cost (E + F)
H. Overhead,
Overhead, Conti
Contingencies & Miscellan
ngencies Miscellaneous
eous (OCM) Expenses 15%/12%/10%/8% of G
I. Contra
Contractor
ctor's
's Profit
Profit (CP) 10%/
10%/8%
8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. Total
Total Unit
Unit Cost
Cost (G + H + I + J)
190 Part
Part C - Fin
Finishi
ishing
ng
DETAILE
DETAILED
D UNI
UNIT
T PRICE ANALYSI
ANALYSIS
S (DUPA)
(DUPA)
A. La
Labo
borr •
Sub - Total
Total for A
Name
Name and Capaci
Capacity
ty No. of Unitls No. of Houris Hourly Rate Amount (P h P )
B. Equipment
c. Wel
Weldin
dingg Machin
Machine
e (500
(500 A), Gas/D
Gas/Dies
iesel
el Driven
Driven 1 0.50
d. Cutting Outfit 1 0.50
Minor
Minor Too
Tools
ls (10%
(10% of Labor
Labor Cost)
Cost)
.J
Sub
Sub - To
Tota
tall fo
forr B
C. Total (A + B)
D. Output
Output per Hour
Hour = 2.40
2.40 m
E. Direct
Direct Unit
Unit Cost (C
(C + D)
F. Mater
Materials
ials
a. Steel
Steel Casin
Casing,
g, 10 mm thk thk m 1.025 Prices of
Prices
District of
District materials
based
base d on theare variable
prev
prevailing per
ailing unit Region/
unit price
pricess in
b. Oxy/Acetylene (1 seU2500
seU2500 kg of Steel) set 0.102
the locality which include payment
payment of local
local
c. Weld
Welding
ing Rod (1 kg/500
kg/500 kg of Steel
Steel)) kg 0.511 taxes and hauling
hauling cost to the project
project site.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Note:
Monitoring Committee.
Assumed length of Steel
of Steel Casing
Casing without
without splicing
splicing
but with full weld =
= 12.00 meter,
meter, 2.50% additional quantity
of Steel Casing represents
represents the collar of
of O.30 m for
for 12m.
Sub
Sub - To
Tota
tall fo
forr F
G. Direc
Directt Unit
Unit Cost
Cost (E + F)
H. Overhead,
Overhead, Contingencies & Miscellane
Contingencies Miscellaneous
ous (OCM) Expe
Expenses
nses 15%/
15%/12
12%/
%/10
10%/
%/8%
8% of G
I. Contrac
Contractor
tor's
's Profit
Profit (CP) 10%/
10%/8%
8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. Total Unit Cost (G + H + I + J)
191 Part C - Fin
Finishi
ishing
ng
DETAIL
DETAILED
ED UNIT
UNIT PRICE ANAL
ANALYSIS
YSIS (DUPA)
(DUPA)
A. Labor
a. Const
Constructi
ruction
on Foreman
Foreman Labo
Laborr Rates
Rates are var
variabl
iable
e per Reg
Region/ion/Dis
Distri
trict
ct
1 1.00
bas
based
ed on mi
mini
nimu
mum wage as approve
m wage approved d by
b. Skilled
Skilled Labo
Laborer
rer 4 1.00
DOLE.
DOL E. Ref
Refer
er to th
the
e Sch
Schedul
edule
e of
of Lab
Labor
or Rates.
Rates.
c. Unskill
Unskilled
ed Laborer
Laborer 6 1.00
Sub - Total
Total for A
Name
Name and Capaci
Capacity
ty No. of Unitls No. of HourIs Hourly Rate A mount (P h P )
B. Equipment
a. Truc
Truck
k Mounte
Mounted
d Crane
Crane (41-
(41- 45 mt) 1 1.00 Se
See
e late
latest
st AC
ACEL
EL ren
renta
tall rate
rates.
s.
Vibro Hammer wI Hydr
b. Vibro Hydraul
aulic
ic Power
Power Pac
Pack
k 1 0.50
c. Wel
Weldin
ding
g Machin
Machine
e (500
(500 A), Gas/
Gas/Die
Diesel
sel Driven
Driven 1 0.50
d. Cutting
Cutting Outfit
Outfit 1 0.50
Minor
Minor Too
Tools
ls (10%
(10% of Labor
Labor Cost)
Cost)
Sub
Sub - Tot
Total
al fo
forr B .J
C. Total (A + B)
D. Output Hour =
Output per Hour 2.00m
E. Direct
Direct Unit
Unit Cost
Cost (C + D)
F. Materials
a. Steel
Steel Cas
Casing
ing,, 10 mm thk
thk m 1.025 Prices of
of mat
materi
erials
als are variable
variable per Regio
Regionl
nl
b. Oxy/A
Oxy/Acet
cetyle
ylene
ne (1 set/2
set/2500
500 kg of Ste
Steel)
el) set 0.122 Di
Dist
stri
rict
ct ba
base sed
d on thethe prev
prevail
ailin
ing
g uni
unitt price
prices s in
the locali
locality
ty whi
which
ch inc
include
lude pay
payment
ment of
of local
c. Wel
Weldin
ding
g Rod (1
(1 kg/500 kg of Steel) kg 0.612 tax
taxes
es and hauling
hauling coscostt to the
the projec
project t site.
Ref
Refer
er to the Con Constr
struct
uction
ion Materia
Materiall Price
Price Dat Dataa
Note: est
establi
ablishe
shed d quar
quarter
terly
ly by Centra
Centrall Office
Office Price Price
Assumed length of of Ste
Steel
el Casing
Casing wit without
hout spl splici
icing
ng Monitoring
Monitoring Committee.
Committee.
but wi with
th full
full we =
weld
ld 12.00
12.00 meter,
meter, 2.5 2.50%
0% addiadditio
tional
nal quantit
quantity
y
of
of Ste
Steel
el Cas
Casing
ing rep
repres
resents
ents the co collar
llar of O.30
O.30 m for
for 12 m.
Sub
Sub - To
Tota
tall fo
forr F
G. Di
Dire
rect
ct Unit
Unit Cost
Cost (E + F)
H. Overhead
Overhead,, Contin
Contingen
gencie
cies
s & Misc
Miscell
ellane
aneous
ous (OCM)
(OCM) Expens
Expenses
es 15%/12%/10%/8% of G
I. Contrac
Contractor
tor's
's Profit
Profit (CP) 10%/8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. Total
Total Unit
Unit Cost
Cost (G + H + I + J)
192 Part
Part C - Fin
Finishi
ishing
ng
DETAIL
DETAILED
ED UNIT
UNIT PRICE ANAL
ANALYSIS
YSIS (DUPA)
(DUPA)
Sub - Total
Total for A
Name and Capacity No. of Unitls No. of HourIs Hourly Rate Amount
Amount (PhP)
(PhP)
B. Equipment
.J
Sub
Sub - To
Tota
tall fo
forr B
C. Total (A + B)
Total
D. Output Hour =
Output per Hour 1.60
1.60 m
E. Direct
Direct Unit
Unit Cost (C .;-D)
F. Mater
Materials
ials
a. Steel Casing, 10 mm thk m 1.025 Prices of materials are variable per Region/
b. Oxy/Ac
Oxy/Acety
etylen
lene
e (1 s
set/
et/250
2500
0 kg of Steel
Steel)) set 0.153 District based on the prevailing unit prices in
the locality which include payment of local
c. Wel
Weldin
ding
g Rod (1 kg/500 kg of Steel) kg 0.763
taxes and hauling cost to the project site.
Refer to the Construction Material Price Data
Note:
established quarterly by Central Office Price
Assumed length of Steel Casing without splicing Monitoring Committee.
but with full weld =
= 12.00 meter,
meter, 2.50% additional quantity
of Steel Casing represents the collar of O.30 m for 12 m.
Casing represents
Sub
Sub - Tot
Total
al fo
forr F
G. D
Dire
irect
ct Unit Cost (E + F)
Unit Cost
H. Overhe
Overhead,
ad, Contin
Contingen
gencie
cies
s & Miscel
Miscellan
laneou
eous
s (OCM
(OCM)) Expens
Expenses
es 15%/12%/10%/8% of G
I. Contrac
Contractor
tor's
's Pro
Profit
fit (CP) 10%/8% of G
J. Value Added Tax (VAT) 5% of (G + H + I)
K. Total Unit Cost (G + H + I + J)
193 Part C - Finishing
DETAILE
DETAILED
D UNI
UNIT
T PRICE ANA
ANALYSI
LYSIS
S (DUPA)
(DUPA)
a. Const
Construct
ruction
ion Forem
Foreman
an 1 1.
1.00 Labo
Laborr RRate
ates
s a are
re var
variabl
iable
e pe
perr Reg
Regioni
ioniDis
Distri
trict
ct
ba
base
sed
d on mini
minimum
mum wa ge as appro
wage approve
vedd by
b. Skilled Laborer 4 1.00
DO
DOLE
LE.. Re
Refe
ferr to the
the Sche
Schedudule
le of LabLabor
or
c. Unskilled Laborer 6 1.00 Rates.
Sub - Total
Total for A
Name
Name and Cap
Capaci
acity
ty No. of Unitls No. of Hour/s Hourly Rate Amount (P h P )
B. Equipment
a. Tru
Truck
ck Mounte
Mounted
d Crane
Crane (41-
(41- 45 mt) 1 1.00 Se
See
e lates
latestt AGEL
AGEL renta
rentall rate
rates.
s.
b. Vibro
Vibro Hammer
Hammer w/ Hydrau
Hydraulic
lic Powe
Powerr Pack
Pack 1 0.50
c. Welding Machine (500 A), Gas/Diesel Driven 1 0.50
d. Cutting
Cutting Outfit
Outfit 1 0.50
Minor
Minor Too
Tools
ls (10%
(10% of Labor
Labor Cost)
Cost)
.J
Sub
Sub - To
Tota
tall fo
forr B
C. Total (A + B)
D. Output
Output per Hour
Hour = 1.33
1.33 m
E. Direct
Direct Unit
Unit Cost (C + D )
F. Mater
Materials
ials
Prices
Prices o
off materi
materials
als are var
variabl
iable
e per Regionl
Regionl
a. Steel
Steel Casing
Casing,, 10 mm
mm thk
m 1.025 Di
Dist
stri
rict
ct bas
based
ed on the prevprevail
ailin
ing
g uniunitt price
prices
s in
b. Oxy/Ac
Oxy/Acety
etylen
lene
e (1 se
set/2
t/2500
500 kg of Ste
Steel)
el) set 0.163 the local
locality
ity which
which inc
include
lude pay
payment
ment of loc local
al
c. Welding Rod (1 kg/500 kg of Steel) kg 0.814 taxes
taxes and hauling
hauling cost to the project
project sit
site.
e.
Ref
Refer
er to the Const
Construc
ructio
tion
n Materi
Materialal Price
Price Dat
Data
a
establi
establishe
shed d quarterl
quarterly
y by C Cent
entral
ral Office
Office Price
Note: Monitoring
Monitor ing Commit
Committee.
tee.
Assumed length of Steel Casing without splicing
bu
butt wi
with
th full
full we
weld =
ld 12.00
12.00 meter, 2.5
2.50%0% addi
additio
tional
nal quantit
quantity
y
of Steel
Steel Ca
Casi
sing
ng repre
represe
sent
nts
s th
the
e collar of O.30 m for 12 m.
collar
Sub
Sub - To
Tota
tall fo
forr F
G. Direc
Directt Unit
Unit Cos
Costt (E + F)
H. Ove
Overhe
rhead,
ad, Con
Contin
tingen
gencie
cies
s & Misc
Miscell
ellane
aneous
ous (OCM)
(OCM) Exp
Expens
enses
es 15%/
15%/12
12%/
%/10
10%/
%/8%
8% of G
I. Contrac
Contractor
tor's
's Profit
Profit (CP) 10%/
10%/8%
8% of G
J. Value
Value Added
Added Tax (VAT) 5% of (G + H + I)
K. Total
Total Unit
Unit Cost
Cost (G + H + I + J)
194 Part C - Fin
Finishi
ishing
ng
DETAILE
DETAILED
D UNI
UNIT
T PRICE
PRICE ANALY
ANALYSIS
SIS (DU
(DUPA)
PA)
A. Labo
Laborr -
Labor
Labor RaRate
tess are va
vari
riabl
able
e peper
r
a. Const
Construct
ruction
ion Forem
Foreman
an 1 1.
1.00
Reg
Region/
ion/Dis
Distri
trict
ct bas
based
ed on min imum wage as
minimum
b. Skilled
Skilled Labo
Laborer
rer 4 1.00 approve
approvedd by DOLE.DOLE. Refe
Referr to
to the Sch
Schedul
edule
e
c. Unskill
Unskilled
ed Laborer
Laborer 6 1.00 of Labo
Laborr Rat
Rates.
es.
Sub - Total
Total for A
Name
Name and Capaci
Capacity
ty No. of Unitls No. of HourIs Hourly Rate A mount (P h P )
B. Equipment
a. Tru
Truck
ck Mounte
Mounted
d Crane
Crane (41-
(41- 45 mt) 1 1.00 Se
See
e late
latest
st AC
ACEL
EL rent
rental
al rate
rates.
s.
b. Vib
Vibro
ro Hammer
Hammer w/ Hyd
Hydrau
raulic
lic Pow
Power
er Pack
Pack 1 0.50
c. Wel
Weldin
dingg Machin
Machine
e (500
(500 A), Gas/D
Gas/Dies
iesel
el Dri
Driven
ven 1 0.50
d. Cutting
Cutting Outfit
Outfit 1 0.50
Minor
Minor Too
Tools
ls (10%
(10% ofL
ofLabo
aborr Cost)
Cost)
.J
Sub
Sub - To
Tota
tall fo
forr B
C. Total (A + B)
D. Output Hour =
Output per Hour 1.20
1.20 m
E. Di
Dire
rect
ct Unit
Unit Cost
Cost (C + D)
F. Materials
a. St
Steel
eel Casin
Casing,
g, 10 mm thk
thk m 1.03 Prices
Prices of mat materia
erials
ls are var variabl
iablee per RegiRegion!
on!
Di
Dist
stric
rictt base
based d on thethe prev
prevail
ailin
ing
g un unit
it pric
prices
es in
b. Oxy/Ac
Oxy/Acety
etylen
lene
e (1 set/2
set/2500
500 kg of Steel
Steel)) set 0.203
the local
locality
ity whi
which
ch includ
includee pay
paymen
mentt of localocal l
c. Weld
Welding
ing Rod (1 kg/500
kg/500 kg of Steel
Steel)) kg 1.016 taxe
taxess anandd hauli
hauling
ng cocost
st to the
the proj
projec
ectt site
site..
Ref
Refer
er to the Co Const
nstruc
ructio
tion
n Materi
Material al Price
Price Data
Data
establi
establishe
shed d quar
quarter
terly
ly by Cen
Centratrall Office
Office Price
Price
Note:
Monitoring
Monitoring Committee.
Committee.
Assumed length of Steel Casing without splicing
bu
butt wi
with
th full
full we
weld =
ld 12.00
12.00 meter, 2.5
2.50%
0% addiadditio
tional
nal quantit
quantity
y
of Ste
Steel
el Casing
Casing repre
represe
sent
nts
s the
the collarr of O.30 m for 12 m.
colla
Sub
Sub - To
Tota
tall fo
forr F
G. Direc
Directt Unit
Unit Cos
Costt (E + F)
H. Overhe
Overhead,
ad, Contin
Contingen
gencie
cies
s & Miscel
Miscellan
laneou
eous
s (OCM
(OCM)) Exp
Expens
enses
es 15%/12%/10%/8% of G
I. Contra
Contracto
ctor's
r's Pro
Profit
fit (CP) 10%/
10%/8%
8% of G
J. Value
Value Added
Added Tax (VAT) 5% of (G + H + I)
K. Total
Total Unit
Unit Cost
Cost (G + H + I + J)
195 Par
Partt C - Fin
Finish
ishing
ing
DETAIL
DETAILED
ED UNIT
UNIT PRI
PRICE
CE ANAL
ANALYSIS
YSIS (DUPA)
(DUPA)
Output
Output per hou
hour
r 0.50 ea
A. Labor
Labor
Labor R
Rates
ates are variabl
variable
e per RegRegion/
ion/Dis
Distri
trict
ct
a. Cons
Construct
truction
ion Forem
Foreman
an 1 1
1..00
ba
base
sed
d on min
minim
imum
um wa ge as appro
wage approve
ved
d by
b. Skilled
Skilled Laborer
Laborer 1 1.00 DOLE.
DOL E. Ref
Refer
er to the Sch
Schedul e of La
edule Labor
bor Rates.
Rates.
c. Unskille
Unskilled
d Laborer
Laborer 1 1.00
Sub - Total
Total for A
Name
Name and Cap
Capaci
acity
ty No. of Unitls No. of HourIs Hourly Rate Amount (P h P )
B. Equipment
Sub
Sub - To
Tota
tall fo
forr B
C. Tot
Total
al (A + B)
D. Output
Output per Hour
Hour = 0.50
0.50 ea --
E. Direct
Direct Unit
Unit Cost (C + D)
F. Materials
a. Reinf
Reinforc
orcing
ing Steel (36 mm ¢ x 1.50 m)*
Steel Bar (36 kg. 51.83 Prices of mat
materi
erials
als are variable
variable per Region/
Region/
b. Conc
Concret
rete
e Epoxy
Epoxy for RC Piles (Par
(Partt A & B) 0.70 Di
Dist
stric
rictt bas
based
ed on thethe prev
prevail
ailin
ing
g unitunit price
prices s in
set
the loc
localit
ality
y whi
which
ch inc
include
lude pay
paymen
ment t of local
c. Sil
Silica
ica Sand gal 1.40 taxe
taxess anandd hauli
hauling
ng co cost
st to the
the proj
projec
ectt site
site..
d. Pipe Sleeve,, 50 mm 0 GI
Pipe Sleeve m 3.00 Refer
Refer to the ConsConstru
tructi
ction
on Materi
Material al Pric
Price e Data
Data
Miscel
Miscellan
laneou
eous
s (2% of Materi
Materials
als Cost)
Cost) establ
establishe
ished d quar
quarter
terly
ly by CenCentra
trall Office
Office Price
Price
Monitoring
Monitor ing Committee.
Committee.
* Depth
Depth of dowe
dowell wi ll be as reco
will recomm
mmend
ended
ed by the
the
manufacturer of epox
epoxy y resin
resin in ordeorderr to dev
develop
elop
requ
required
ired pil
pile
e joint
joint str
streng
ength.
th.
Sub
Sub - To
Tota
tall fo
forr F
G. Direc
Directt Unit
Unit Cost
Cost (E + F)
H. Overhead
Overhead,, Contin
Contingen
gencie
cies
s & M
Misc
iscell
ellane
aneous
ous (OCM)
(OCM) Exp
Expens
enses
es 15%/12%/10%/8% of G
I. Contrac
Contractor
tor's
's Pro
Profit
fit (CP) 10%/8% of G
J. Value
Value Added
Added Tax (VAT) 5% of (G + H + I)
K. Total Unit Cost (G + H + I + J)
196 Par
Partt C - Fin
Finishi
ishing
ng
DETAILE
DETAILED
D UNI
UNIT
T PRICE ANALYS
ANALYSIS
IS (DU
(DUPA)
PA)
A. Labor
a. Const
Constructi
ruction
on Foreman
Foreman 1 1.
1.00 Labor
Labor R Rates
ates are vari
variabl
able
e per Reg Regionl
ionlDis
Distri
trict
ct
ba
base
sed
d on miminim
nimum
um wagwagee as a
appr
pprov
oved
ed by
b. Skilled
Skilled Labo
Laborer
rer 1 1.00
DO
DOLE
LE.. Re
Refe
ferr to th
the
e Sc
Sched
hedule
ule of LabLabor
or RaRate
tes.
s.
c. Unskill
Unskilled
ed Laborer
Laborer 1 1.00
Sub - Total
Total for A
Name
Name and Capaci
Capacity
ty No. of U ni
nitls No. of H ou
ourIs Hourly Rate Amount (P h P )
B. Equipment
a. Tru
Truck
ck Mounte
Mounted
d Crane
Crane (41-45
(41-45 mt) 1 1.00 See late
latest
st AC
ACEL
EL rent
rental
al rates
rates..
Minor
Minor Too
Tools
ls (10%
(10% of Labor
Labor Cost)
Cost)
Sub
Sub - Tot
Total
al fo
forr B
C. Tot
Total
al (A + B) .f
D. Output Hour =
Output per Hour 0.50 ea
E. Direct
Direct Unit
Unit Cost (C + D)
F. Mater
Materials
ials
a. Reinf
Reinforc
orcing
ing Steel
Steel Bar (36
(36 mm 11l x 1.50 m)* kg 51.83 Prices
Prices o off materia
materials
ls are var
variab
iable
le per Reg
Region/
ion/
Di
Dist
stri
rict
ct bas
baseded on thethe preva
prevail
iling
ing uni
unitt pric
prices
es in
b. Concr
Concrete
ete Epoxy
Epoxy for RC Piles (Part A & B)
Piles set 0.80
c. Silica
Silica Sand the loca
localit
lity
y whi
which
ch inc
includ
lude
e paym
payment
ent of loc
local
al
gal 1.60 taxe
taxes
s and haulihauling
ng co cost
st to the
the proj
projec
ectt site
site..
d. Pipe
Pipe Sl
Sleeve,, 50 mm 0 GI
eeve m 3.00 Ref
Refer
er to the Con Constr
struct
uction
ion Materia
Materiall Price Dat Data
a
Miscel
Miscellan
laneou
eous
s (2% of Mater
Material
ials
s Cost)
Cost) establ
establish
ished
ed quarter
quarterly
ly by Cen
Central
tral Office
Office Price
Price
Mon
Monito
itoring
ring ComCommit
mittee
tee .
• Depth
Depth of dowe
dowell wi ll be as reco
will recomm
mmend
ended
ed by tthe
he
manuf
manufac
actu
turer
rer of ep
epox
oxy y resin
resin in or orde
derr to d
dev
evelo
elop
p
requ
required
ired pil
pile
e joint
joint str
strengt
ength.
h.
Sub
Sub - To
Tota
tall fo
forr F
G. Direc
Directt Unit
Unit Cos
Costt (E + F)
H. Overhead,
Overhead, Contingencies & Miscellane
Contingencies Miscellaneous
ous (OCM) Expe
Expenses
nses 15%/
15%/12
12%/
%/10
10%/
%/8%
8% of G
I. Contrac
Contractor
tor's
's Profit
Profit (CP) 10%/
10%/8%
8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. Total
Total Unit
Unit Cost
Cost (G + H + I + J)
197 Part C - Fin
Finishi
ishing
ng
DETAIL
DETAILED
ED UNIT
UNIT PRICE ANAL
ANALYSIS
YSIS (DUPA)
(DUPA)
A. Labor
a. Const
Constructi
ruction
on Foreman
Foreman 1 4.00 Labo
Laborr Rates
Rates are variabl
variable
e per RegRegionl
ionlDis
Distri
trict
ct
bas
based
ed on mini
minimu
mumm wage
wage as appr
approv
oved
ed by
b. Skilled
Skilled Laborer
Laborer 1 4.00
DO
DOLE
LE.. Re
Refe
ferr to the
the Sch
Schedu
edule
le of Labo
Laborr Ra
Rate
tes.
s.
c. Unskill
Unskilled
ed Laborer
Laborer 1 4.00
Pipe Installation
a. Skilled
Skilled Laborer
Laborer 2 4.00
b. Unskil
Unskilled
led Laborer
Laborer 2 4.00
Sub
Sub - Tot
Total
al fo
forr A
Name
Name and Cap
Capaci
acity
ty No. of Unit/s No. of HourIs Hourly Rate Amount
Amount (PhP)
(PhP)
B. Equipment
a. Pile
Pile Integrity
Integrity Testing
Testing (Sonic)
(Sonic) and acce
accessor
ssories
ies 1 lot Se
See
e late
latest
st AG
AGEL
EL ren
renta
tall rate
rates.
s.
(inc
(include
ludess prof
professio
essional
nal fee of
of St
Structu
ructural
ral Engineer
Engineer
and reports)
reports)
b. Wel
Weldin
ding
g Machin
Machine
e (500A)
(500A),, Electr
Electric
ic Driven
Driven 1 4.00
Minor
Minor Too
Tools
ls (10%
(10% of Labor
Labor Cost)
Cost)
Sub
Sub - To
Tota
tall fo
forr B
C. Total (A + B)
D. Output Hour =
Output per Hour 1.00 ea
E. Direct
Direct Unit
Unit Cost (C + D)
F. Materials
a. Black/G
Black/GII Pipe
Pipe & acces
accessor
sories
ies 2"1
2"1Il
Il x 6 m, Sche
Schedul
dule
e 20 m 120.00 Prices
Prices of materi
materials
als are var variabl
iable
e per Region!
Region!
Di
Dist
stri
rict
ct bas
based
ed on thethe prev
prevail
ailin
ing
g uniunitt price
prices
s in
b. Wel
Weldin
ding
g Rod kg 0.10
the local
locality
ity whi
which
ch inc
include
lude pay
payment
ment of localocal l
Miscel
Miscellan
laneou
eous
s (2% of Materi
Materials
als Cost)
Cost) taxes
taxes and hauling
hauling cos
costt to the projec
projectt site.
site.
Refer
Refer to the Co Const
nstruc
ructio
tion
n MatMateria
eriall Price
Price Dat
Data a
est
establi
ablishe
shed d qua
quarte
rterly
rly by C Cent
entral
ral Office
Office Pric
Price e
Note: Monitoring
Monitor ing Commit
Committee.
tee.
Mate
Materi
rial
als
s qu
quant
antit
ity
y compo
componenent
nt,, equipm
equipmen
entt an
and
d
la
labor
bor out
output
put may
may vary
vary prop
proport
ortion
ionat
atel
ely
y dep
depend
ending
ing on
the pile len
length.
gth.
Sub
Sub - To
Tota
tall fo
forr F
G. Direc
Directt Unit Costt (E + F)
Unit Cos
H. Overhead
Overhead,, Contin
Contingen
gencie
cies
s & Misc
Miscell
ellane
aneous
ous (OCM)
(OCM) Expens
Expenses
es 15%/12%/10%/8% ofG
I. Contrac
Contractor
tor's
's Pro
Profit
fit (CP) 10%/8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. To
Total
tal Unit
Unit Cost
Cost (G + H + I + J)
198 Part C - Finishing
DETAILE
DETAILED
D UNI
UNIT
T PRICE ANALYS
ANALYSIS
IS (DUPA)
(DUPA)
A. Labor
Labor
Labor RRate
ates
s are
are var
variabl
iable
e pe
perr Reg
Region/
ion/Dis
Distri
trict
ct
a. Construction Foreman 1 2.00
bas
based
ed on mini
minimu
mum
m wa ge as app
wage approve
roved d by
b. Skilled
Skilled Laborer
Laborer 1 2.00 DOLE.
DOL E. Ref
Refer
er to the
the Sched ule of Labor
Schedule Labor
c. Unskille
Unskilled
d Laborer
Laborer 1 2.00 Rates.
Sub - Total
Total for A
Name
Name and Capaci
Capacity
ty No. of Unitls No. of Houris Hourly Rate Amount (P h P )
B. Equipment
a.Pile
a.Pile Inte
Integrity
grity Testing and accessor
accessories
ies 1 lot Se
See
e late
latest
st AC
ACEL
EL rent
rental
al rat
rates
es..
(inc
(include
ludes
s professio
professional
nal fee of
of Struct
Structural
ural Engineer
Engineer
and reports)
reports)
b. Grindi
Grinding
ng Machine
Machine and acce
accessori
ssories
es 1 2.00
.J
Sub
Sub - Tot
Total
al fo
forr B
C. Tot
Total
al (A + B)
D. Output Hour =
Output per Hour 1.00 ea
E. Di
Direc
rectt Unit
Unit Cost
Cost (C + D)
F. Mater
Materials
ials
a. Grindi
Grinding
ng Dis
Disc
c pc 1.00 Prices of mat
materia
erials
ls are varivariable
able per Region/
Region/
Di
Dist
stri
rict
ct bas
based
ed on th the
e pre
preva
vaili
iling
ng un unit
it pric
priceses in
the localit
locality
y whi
which
ch inc
include
lude pay
paymen
ment t of local
local
taxe
taxess anandd hauli
hauling
ng cocost
st to the
the proj
projec
ectt site
site..
Ref
Refer
er to the Co Const
nstruc
ructio
tion
n Materi
Material al Price
Price Dat Data
a
establi
establishe
shedd quar
quarter
terly
ly by Ce Centr
ntral
al Office
Office Price
Monitor
Moni toring
ing ComCommit
mittee
tee
Note:
Materi
Material
als
s quant
quantit
ity
y comp
compone
onent
nt,, equip
equipme
ment
nt and
lab
labor
or outp
output
ut may
may va
vary
ry pro
propor
porti
tion
onat
atel
ely
y dep
depend
ending
ing on
the pile length.
length.
Sub
Sub - To
Tota
tall fo
forr F
G. Direc
Directt Unit
Unit Cost
Cost (E + F)
H. Overhead
Overhead,, Contin
Contingen
gencie
cies
s & Miscel
Miscellan
laneou
eous
s (OCM)
(OCM) Exp
Expens
enses
es 15%/12%/10%/8% of G
I. Contrac
Contractor
tor's
's Profit
Profit (CP) 10%/8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. Total
Total Unit
Unit Cost
Cost (G + H + I + J)
199 Part C - Fin
Finishi
ishing
ng
DETAIL
DETAILED
ED UNIT
UNIT PRICE ANAL
ANALYSIS
YSIS (DUPA)
(DUPA)
A. Labor
Labo
Laborr R
Rate
ates
s are variabl
variable
e per Reg Region/
ion/Dis
Distri
trict
ct
a. Const
Constructi
ruction
on Foreman
Foreman 1 4.00
bas
based
ed on min
minim
imum
um wag
wage e as app
appro
rove
ved
d by
b. Skilled
Skilled Laborer
Laborer 2 4.00 DOLE.
DOL E. Ref
Refer
er to th
the
e Sch
Schedul
edulee of Labor
c. Unskill
Unskilled
ed Laborer
Laborer 4 8.00 Rates.
Sub
Sub - Tot
Total
al fo
forr A
Name
Name and Capaci
Capacity
ty No. of Unitls No. of HourIs Hourly Rate A mount (P h P )
B. Equipment
aDynam
aDynamic
ic Pile
Pile Testi
Testing
ng 1 lot Se
See
e late
latest
st AC
ACEL
EL ren
renta
tall rate
rates.
s.
(includes
(includes prof
professio
essional
nal fee of
of St
Structu
ructural
ral Engineer)
Engineer)
b. Truck Mounted Crane (45 mt) 1 4.00
c. Drop Hammer w/ acce
accessor
ssories
ies 1 4.00
d. 1 A ir Compressor w/ 2 Jack Hammer 1 8.00
e. Concre
Concrete
te Vibrator
Vibrator 1 0.60
f. Cutting
Cutting Outfit
Outfit 1 2.00
g. Welding Machine (SODA), Electric Driven 1 2.00
Minor
Minor Too
Tools
ls (10%
(10% of Labor
Labor Cost)
Cost)
J
Sub
Sub - T
Tot
otal
al fo
forr B
C. Tota
Totall (A + B)
D. O
Ou
utput p
pe
er Hour - 1.00 ea
E. Direct
Direct Unit
Unit Cost (C + D)
F. Mater
Materials
ials
a. Stee
Steell Cas
Casing
ing,, L = 2 x Pile 0, thickness = 100 mm m
3
3.00 Prices of mat
Di
Dist
stri
rict
ct bas
materi
based
erials
als are variable
ed on the prev
variable per Region!
prevai
aili
ling
ng uni
unitt price
pricess in
b. Ready
Ready Mix Concr
Concrete
ete,, 3000
3000 psi m 5.57 the loca
localit
lity
y wh
which
ich inc
include
lude pay ment of local
payment
c. Weld
Welding
ing Rod (1 kg/SOD
kg/SOD kg of Steel)
Steel) kg 2.234 taxes
taxes a and
nd haul
hauling
ing cost to the project
project site
site..
Ref
Refer
er to the ConConstr
struct
uction
ion Mat
Materia
eriall Price Dat Data
a
d.Oxy/
d.Oxy/Ace
Acetyl
tylene
ene (1 kg/
kg/250
2500
0 kg of Ste
Steel)
el) set 0.447
est
establi
ablishe
shed d quar
quarter
terly
ly by Cent
Central
ral Office
Office Pric
Pricee
Miscel
Miscellan
laneou
eous
s (5% of Mater
Material
ials
s Cost)
Cost) Monitoring
Monitor ing Commit
Committee.
tee.
Note:
Ma
Mateteri
rial
als
s quant
quantit
ity
y compo
compone nent
nt,, eq
equip
uipme
ment
nt an
and
d
labor
labor ou
outp
tput
ut ma mayy vary
vary pro
propor
porti
tion
onat
ately
ely depen
dependin
ding
g on
the pile length.
length.
Sub
Sub - T
Tot
otal
al fo
forr F
G. Direc
Directt Unit Costt (E + F)
Unit Cos
H. Overhe
Overhead,
ad, Contin
Contingen
gencie
cies
s & Misc
Miscell
ellane
aneous
ous (OCM)
(OCM) Expens
Expenses
es 15%/12%/10%/8% of G
I. Contrac
Contractor's
tor's Profit (CP) 10%/8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. Total
Total Unit
Unit Cost
Cost (G + H + I + J)
200 Par
Partt C - Fini
Finishin
shing
g
DETAIL
DETAILED
ED UNIT
UNIT PRICE ANA
ANALYSI
LYSIS
S (DUPA)
(DUPA)
A. Labor
a. Const
Construct
ruction
ion Forem
Foreman
an Labor Rates are variable per Region/District
1 1.
1.00
based on minimum
minimum wage
wage as
as approved by
b. Skilled
Skilled Labo
Laborer
rer 5 1.00 DOLE. Refer to the Schedule of
Schedule of Labor
Labor Rates.
c. Unskille
Unskilled
d Laborer
Laborer 6 1.00
Fab
Fabric
ricati
ation
on of Cage
Cage Bar
d. Skilled
Skilled Laborer
Laborer 4 0.25
e. Unskille
Unskilled
d Laborer
Laborer 8 0.25
Sub - Total
Total for A
Name
Name and Cap
Capaci
acity
ty No. of Unitls No. of HourIs Hourly Rate Amount (P h P )
B. Equipment
a. Drill
Drill Rig
Rig,, Mechan
Mechanica
icall Rotary
Rotary 1 0.74 See la
latest
test ACEL rental
rental rates
rates..
b. Tru
Truck
ck Mounte
Mounted
d Crane
Crane (25T)
(25T) 1 0.95
c. Bar Bende
Bender
r 1 0.04
d. Bar Cutter 1 0.04
e. Benton
Bentonite
ite Mixer
Mixer 1 0.50
f. Benton
Bentonite
ite Bin 1 0.50
g. Wate
Waterr Pump
Pump 1 0.50
h.Water
h.Water Truck 1 0.50
i. Welding
Welding Machi
Machine
ne 1 0.50
j. Tremie Pipe Set 1 0.24
k. SPT
SPT & Desa
Desandi
nding
ng Machin
Machine
e 1 0.24
I. Tower Ligh
Lightt 1 0.50
m. Minor
Minor Too
Tools
ls (10%
(10% of Labor
Labor Cost)
Cost)
.J
Sub
Sub - To
Tota
tall fo
forr B
C. Total (A + B)
D. O ut
utput p
pe
er Hour - 3.00m
E. Dir
Direct
ect Unit Cost (C + D)
Unit Cost
Name and Speci
Specifica
fication
tion Unit Quantity Unit Cost Amount (P hP )
F. Materials
a. Ready
Ready Mix 0.033 cU.m Prices of
Prices of materials
materials are variable per Region/
b. Reinf
Reinforc
orced
ed Steel
Steel Bar'
Bar' 12.626 kg District based on the prevailing unit prices in
the locality which include payment of local
of local
c. Wel
Weldin
ding
g Rod (1kg/
(1kg/200
2000kg
0kg of RS
RSB)
B) 0.006 kg taxes and hauling cost to the project site.
d. Misce
Miscella
llaneo
neous
us (3% of Ma
Mater
terial
ials,
s, Benton
Bentonite
ite & etc.)
etc.) Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.
, Its quan
quantit
tity
y is variab
variable
le depend
depending
ing on the act
actual
ual design
design
G. Direc
Directt Unit
Unit Cos
Costt (E + F)
H. Overhe
Overhead,
ad, Contin
Contingen
gencie
cies
s & Misc
Miscell
ellane
aneous
ous (OCM)
(OCM) Expens
Expenses
es 15%/12%/10%/8% of G
I. Contrac
Contractor's
tor's Profit (CP) 10%/
10%/8%
8% of G
J. Value
Value Added
Added Tax (VAT) 5% of (G + H + I)
K. Total
Total Unit
Unit Cost
Cost (G + H + I + J)
201 Par
Partt C - Fin
Finish
ishing
ing
DETAIL
DETAILED
ED UNI
UNIT
T PRI
PRICE
CE ANAL
ANALYSIS
YSIS (DUPA)
(DUPA)
Item No.lDescription 1 10
10 0(
0( 1
1)) 1 5 mm 0 - 2 5 mm 0 Rigid St
mm Steel
eel Cond
Conduit
uit (RSC)/lnter
(RSC)/lntermedia
mediate
te metal Conduit
Conduit (IMC)
(IMC)II
Electrical
Electrical Metal Tubing
Tubing (EMT)
A. Labor
Labo
Laborr Rate
Rates
s ar aree var
variab
iable
le per
per Reg
Regionl
ionlDis
Distri
trict
ct
a. Constr
Constructio
uction
n Foreman
Foreman 1 1.00
bas
based
ed on mi
mini
nimum
mum wa wage
ge as appr
approv
oved
ed by
b. Skilled Laborer
Laborer 1 1.00 DOLE.
DOL E. Ref
Refer
er to the
the Sche
Schedule
dule of La Labor
bor Rat
Rates.
es.
c. Unskilled
Unskilled Laborer
Laborer 1 1.00
Sub - Total
Total for A
B. Equipment
Minor
Minor Too
Tools
ls (10%
(10% of Labor
Labor Cost)
Cost)
Sub - Total
Total for B '.
C. Total (A + B)
D. Output
Output per Hou
Hour
r = 1.33
1.333
3 lenqth
lenqth
E. Dir
Direct
ect Unit
Unit Cost (C + D)
F. Mate
Materials
rials
a. 15 mm 0 - 25 mm 0 x 3.00
3.00 m Rigid Ste
Steel
el Condui
Conduitt
Prices
Prices of mat
Dis
Distri
trict
ct base
materi
based
erials
als are variabl
d on the prevai
variable
e per Reg
prevailing
Regionl
ling unit pric
prices
ionl
es in the
(RSC)I Intermedia
(RSC)I Intermediate
te metal Conduit
Conduit (IMC)I Electrical
Electrical length 1.00
Metall Tubing (EMT)
Meta loc
localit
alityy whic
which
h inc
includ
lude e pay
paymen
mentt of loclocal
al taxes
and hauling
hauling cos
cost
t to the
theproj
project
ect site.
site. Refe
Refer r to the
b. Consu
Consumab
mables
les (5% of Material
Materials
s Cost)
Cost) Con
Constr
struct
uction
ion Materi
Material al Price
Price Dat
Data
a est
establi
ablishe
shed d
quar
quarter
terly
ly by Cent
Central ral Office
Office Price
Price Mon
Monito
itoring
ring
Committee.
Sub - Total
Total for F
G. Direc
Directt Unit
Unit Cost
Cost (E + F)
H. Overhead.
Overhead. Contingen
Contingencies
cies & Miscellan
Miscellaneous
eous (OCM) Expenses
Expenses 15%/12%/10%/8% of G
I. Contracto
Contractor's
r's Profit
Profit (CP) 10%/8% of G
J. Value Added Tax (VAT
(VAT)) 5% of (G + H + I)
K. Tot
Total
al Unit
Unit Cost
Cost (G + H + I + J)
Note:
Note: 1. Use thi
this
s cost shee
sheett for Item
Item Nos. 1100(1
1100(1)a1
)a1,, 110
1100(1
0(1)a2
)a2,, 110
1100(1
0(1)a3
)a3,, 1100(2
1100(2)a1
)a1,, 1100(2
1100(2)a2
)a2,, 1100(2
1100(2)a3
)a3,, 1100(4
1100(4)a1
)a1,,
1100(4)a
1100(4)a2,2, and 1100
1100(4)a
(4)a3.
3.
202 Part
Part D - Ele
Electri
ctrical
cal
DETAIL
DETAILED
ED UNI
UNIT
T PRICE ANALYSIS
ANALYSIS (DUPA)
(DUPA)
Item No.lDescription 11 00
00 (1
(1 ) 32 mm 13- 40 mm 0 Rigid Steel
40 Steel Conduit
Conduit (RSC)I
(RSC)I Interm
Intermedi
ediate
ate metal
metal Con
Condui
duitt (IM
(IMC)I
C)I
Electrical
Electrical Metal Tubing
Tubing (EMT)
A. Labor
Labo
Laborr Rates
Rates are variabl
variable
e pe
perr Reg
Region/
ion/Dis
Distri
trict
ct
a. Const
Construct
ruction
ion Foreman
Foreman 1 1.00
bas
based
ed on mini
minimu
mumm w wage
age as appr
approved
oved by
b. Skilnld
Skilnld Laborer
Laborer 1 1.00 DOLE.
DOL E. Ref
Refer
er to the
the Sch
Schedu
edule
le of Labor
Labor Rat
Rates.
es.
c. Unskille
Unskilled
d Labo
Laborer
rer 1 1.00
Sub - Total
Total for A
Name
Name and Capaci
Capacity
ty No. of Unitls No. of HourIs Hourly Rate Amount
Amount (PhP)
(PhP)
B. Equipment
Minor
Minor Too
Tools
ls (10%
(10% of Labor
Labor Cos
Cost)
t)
Sub - Total
Total for B
C. Total (A + B )
D. Output
Output per Hour
Hour = 1.250 length
length
E. Direct
Direct Unit
Unit Cos
Costt (C + D)
F. Mater
Materials
ials
a. 32 mm 0 - 4 0 mm 0 x 3.00 m Rig
Rigid
id Ste
Steel
el Condui
Conduitt Prices
Prices of materia
materialsls are variabl
variablee per Reg Region/
ion/
(RSC)I Intermedi
Intermediate
ate metal Conduit
Conduit (IMC)I Electrica
Electricall length 1.00 Dis
Distri
trict
ct bas
baseded on the prev prevail
ailing
ing unit prices
prices in the
Metal Tubing
Tubing (EMT) loc
locali
ality
ty whi
which
ch inc
include
lude pay
payment
ment of loc local
al taxes
taxes
an
andd hau
haulin
ling
g cocost
st to the proje
project
ct site
site.. Re
Refeferr to the
the
b. Consu
Consumab
mables
les (5% of Materia
Materials
ls Cos
Cost)
t) Con
Constr
struct
uction
ion MatMateria
eriall Price
Price Data
Data establi
establishe
shed
d
quarter
quarterly ly by Cent
Central
ral Office
Office Price
Price Mon
Monito
itoring
ring
Committee.
Sub - Total
Total for F
G. Direct
Direct Unit
Unit Cost (E + F)
H. Overh
Overhead,
ead, Contingencies & Miscellan
Contingencies Miscellaneous
eous (OCM) Expenses
Expenses 15%1 12%1 10%1 8% of G
I. Contrac
Contractor's
tor's Profi
Profitt (CP) 10%/8% of G
J. Value
Value Add
Added
ed Tax (VAT)
(VAT) 5% of (G + H + I)
K. Total
Total Unit Cost (G + H + I + J)
Note:
Note: 1. Use th
this
is cos
costt sheet
sheet for Item
Item Nos. 1100(1
1100(1 )a4
)a4,, 1100(1
1100(1 )a5
)a5,, 1100(2)a4
1100(2)a4,, 1100(2)a5, 11OO( 4)a4, 1100(4)a
1100(2)a5, 1100(4)a5.
5.
203 Part D - Elec
Electri
trical
cal
DETAIL
DETAILED
ED UNI
UNIT
T PRICE ANALYSIS
ANALYSIS (DUPA)
(DUPA)
Item No./Description 1 10
10 0(
0( 1)
1) 5 0 mm 0 - 65 mm 0 Rigid Ste
mm Steel
el ConduiU Intermedi
Intermediate
ate metal Cond
Conduit
uit (IMC)/
Electrical
Electrical Metal Tubing
Tubing (EMT)
Unit of Measuremen
Measurementt length
Outputt per hour
Outpu 0.516 leng
length
th
A. Labor
Labo
Laborr Rat
Rates
es are var
variab
iable
le per
per Reg
Region/
ion/Dis
Distri
trict
ct
a. Construction Foreman 1 1.00
bas
based
ed on mini
minimum
mum wa ge as appr
wage approve
oved
d by
b. Skilled Laborer 1 1.00 DOLE.
DOL E. Refer
Refer to the Sch
Schedul
edulee of Lab
Labor
or Rat
Rates.
es.
c. Unskilled Laborer 1 1.00
Sub - Total
Total for A ,-
B. Equipment
Minor
Minor Too
Tools
ls (10%
(10% of Labor
Labor Cos
Cost)
t)
"
Sub - Total
Total for B
C. Total (A + B)
D . Output per Hour - 0.516 length
E. Direct
Direct Unit
Unit Cost (C + D)
F. Materials
Materials
a. 50 mm 0 - 65 mm 0 x 3.00 m Rig
Rigid
id Ste
Steel
el Condui
ConduiU
U Prices of materia
materials
ls are varia
variable
ble per Region
Region/ /
Intermedia
Intermediate
te metal Con
Conduit
duit (IMC)/ Electric
Electrical
al Metal Dis
Distri
trict
ct bas
based
ed on the prevai
prevailing
ling unit pricesprices in the
length 1.00
Tubing
Tubin g (EMT) loc
localit
alityy whic
whichh inc
includ
lude
e pay
paymen
ment t of local
local taxes
and hauling
hauling coscostt to the
the pro
project
ject site.
site. Refer to the the
b. Consu
Consumab
mables
les (5% of Mater
Material
ials
s Cost)
Cost) Constru
Cons tructi
ction
on Mat
Materia
eriall Price
Price Dat
Data a est
establi
ablishe
shed
d
quar
quarter
terly
ly by Centr
Centralal Office
Office Price
Price Mon Monitoitoring
ring
Committee.
Sub - Total
Total for F
G. Direct
Direct Unit
Unit Cos
Costt (E + F)
H. Ove
Overhe
rhead,
ad, Contin
Contingen
gencie
cies
s & Miscel
Miscellan
laneou
eous
s (OCM)
(OCM) Expens
Expenses
es 15
15%/
%/12
12%/
%/10
10%/
%/8%
8% of G
I. Contract
Contractor's
or's Profit (CP) 10%/
10%/8%
8% of G
J. Value
Value Added
Added Tax (VAT
(VAT)) 5% of (G + H + I)
K. Total
Total Unit Cost (G + H + I + J)
Note:
Note: 1. Use thi
this
s co
cost
st sh
sheet
eet for
for Item
Item Nos.
Nos. 1100(1)
1100(1)a6,
a6, 110
1100(1
0(1)a7
)a7,11
,1100(
00(2)a
2)a6,
6, 1100(2
1100(2)a7
)a7,, 1100(4
1100(4)a6
)a6and
and 1100(4
1100(4)a7
)a7..
204 Part
Part D - Ele
Electri
ctrical
cal
DETAILE
DETAILED
D UNI
UNIT
T PRICE ANA
ANALYSI
LYSIS
S (DUPA)
(DUPA)
Item No./Description 1 10
10 0(
0( 1)
1) 8 0 mm 12)- 100 mm 0 Rigid Steel Conduit (RSC)I Intermedi
Intermediate
ate metal Conduit
Conduit (IMC)I
Electrical
Electrical Metal Tubing
Tubing (EMT)
A. Labor
Lab
Labor
or RRate
ates
s aare
re var
variab
iable
le pe
perr Regi
Region/
on/Dis
Distri
trict
ct
a. Construction Foreman 1 1.00
ba
base
sed
d on minim
minimum
um wa ge as app
wage approve
rovedd by
b. Skilled Laborer 1 1.00 DOLE.
DOL E. Ref
Refer
er to the
the Sch
Schedul
edulee of Labor
Labor Rat
Rates.
es.
c. Unskilled
Unskilled Laborer
Laborer 1 1.00
Sub - Total
Total for A
B. Equipment
Minor
Minor Too
Tools
ls (10%
(10% of Labor
Labor Cos
Cost)
t)
,J
Sub - Total
Total for B
C. Total (A + B)
D. Output Hour =
Output per Hour 0.50
0.500
0 leng
length
th
E. Direct
Direct Unit
Unit Cost (C
(C + D)
F. Materials
a. 80 mm 0 x 3 m Rigid Steel
Steel Condui
Conduitt (RSC)
(RSC) length 1.00 Prices
Prices of materia
materialsls are var
variab
iable
le per Regi
Region/
on/
b. Consu
Consumab
mables
les (5% of Materia
Materials
ls Cos
Cost)
t) Dis
Distri
trict
ct bas
based
ed on the prevprevail
ailing
ing uni
unitt pric
prices
es in the
loc
localit
alityy whic
whichh inc
includ
lude
e payment
payment of loc local
al taxes
taxes
and haulin
hauling g co
cost
st to the
the proj
projec
ectt site
site.. Re
Refe
ferr to the
the
Con
Constr
struct
uction
ion Materi
Materialal Price
Price Dat
Data
a establ
establish
ished
ed
quar
quarter
terly
ly by Centr
Centralal Office
Office Price
Price Moni
Monitor
toring
ing
Committee.
Sub - Total
Total for F
G. Direc
Directt Unit
Unit Cost (E + F)
H. Overh
Overhead,
ead, Conti
Contingencies & Miscellane
ngencies Miscellaneous
ous (OCM) Expenses
Expenses 15%/12%/10%/8% of G
I. Contract
Contractor's
or's Profit (CP) 10%/8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. Tot
Total
al Unit
Unit Cos
Costt (G + H + I + J)
Note:
Note: 1. U
Use
se this
this cos
costt she
sheetf
etfor
or Item
Item Nos.
Nos. 110
1100(1
0(1 )a8
)a8,, 110
1100(1
0(1 )a9,
)a9, 1100(1
1100(1 ))a10,
a10, 1100(2)a
1100(2)a8,
8, 1100(2
1100(2)a9
)a9,, 1100
1100(2)
(2)a1
a1 0
0,, 1100(
1100(4)a
4)a8,
8,
1100(4)a
1100(4)a9
9 and 1100(4)a
1100(4)a10.
10.
205 Par
Partt D - Elec
Electric
trical
al
DETAIL
DETAILED
ED UNI
UNIT
T PRICE ANAL
ANALYSIS
YSIS (DU
(DUPA)
PA)
A. Labor
Labo
Laborr Rate
Rates
s ar
are
e var
variabl
iable
e per
per Regi
Region/
on/Dis
Distri
trict
ct
a. Construc
Construction
tion Forem
Foreman
an 1 1.00
b. Skilled Labo
Laborer
rer 1 1.00 bas
based
ed on min
minimuimum m wag
wage
e as app
approve
roved
d by
DOLE. Refer
DOLE. Refer to the
the Sched
Schedule
ule of Labor
Labor Rat
Rates.
es.
c. Unskilled
Unskilled Laborer
Laborer 1 1.00
-
Sub - Total
Total for A
B. Equipment
Minor
Minor Tools
Tools (10%
(10% of Labor
Labor Cos
Cost)
t)
'.
Sub - Total
Total for B
C. Total (A + B)
D. Output
Output per Hour =
Hour 2.00
2.00 m
E. Dir
Direct
ect Unit
Unit Cost (C + D)
F. Materials
Materials
a. 15 mm 0 - 25 mm 0 Fl
Flex
exib
ible
le Meta
Metall Co
Cond
ndui
uitt m 1.00 Prices
Prices of materia
materials
ls are variabl
variable
e per Regi
Region/
on/
b. Consum
Consumabl
ables
es (5% of Material
Materialss Cost)
Cost) Dis
Distri
trict
ct bas
based
ed on the prevprevail
ailing
ing uni
unitt prices
prices in the
loc
locali
ality
ty whi
which
ch inc
include
lude pay
payment
ment of loclocal
al taxes
taxes
and hauling cost to the project site. Refer to the
Con
Constr
struct
uction
ion Mat
Materia
eriall Price
Price Dat
Data
a establ
establishe
ished
d
quarter
quarterly ly by Cent
Central
ral Office
Office Price
Price Moni
Monitor
toring
ing
Committee.
Sub - Total
Total for F
G. Direct
Direct Unit
Unit Cost
Cost (E + F)
H. Overh
Overhead,
ead, Contingencies & Miscellane
Contingencies Miscellaneous
ous (OCM) Expenses
Expenses 15%/12%/10%/8% ofG
I. Contract
Contractor's
or's Profit
Profit (CP) 10%/8% of G
J. Value
Value Add
Added
ed Tax (VAT)
(VAT) 5% of (G + H + I)
K. Total
Total Unit Cost (G + H + I + J)
Note:
Note: 1. Use this
this cost
cost sheet
sheet for Item
Item Nos.
Nos. 1100(3)a1
1100(3)a1,, 1100(3)a
1100(3)a2
2 and 1100(3
1100(3)a3
)a3..
206 Part D - Elec
Electric
trical
al
DETAILE
DETAILED
D UNI
UNIT
T PRICE ANAL
ANALYSI
YSIS
S (DUPA)
(DUPA)
A. Labor
Sub - Total
Total for A
B. Equipment
Minor
Minor Too
Tools
ls (10%
(10% of Labor
Labor Cost)
Cost)
"
Sub - Total
Total for B
C. Total (A + B)
D. Output
Output per Hour
Hour = 3.53
3.534
4 leng
length
th
E. Direct
Direct Unit
Unit Cost (C + D )
F. Mate
Materials
rials
Sub - Total
Total for F
G. Direct
Direct Unit
Unit Cos
Costt (E + F)
H. Overh
Overhead,
ead, ContinQenc
ContinQencies
ies & Misce
Miscellane
llaneous
ous (OCM) Expenses
Expenses 15%/12%/10%/8% ofG
I. Contract
Contractor's
or's Profit
Profit (CP) 10%/8%
10%/8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of(G
of(G + H + I)
K. Total Unit Cost (G + H + I + J)
Note:
Note: 1. Use this
this cos
costt sheet
sheet for Item
Item Nos.
Nos. 1100(6)a
1100(6)a1,
1, 1100(6)
1100(6)a2,
a2, 1100(6)a
1100(6)a3,
3, and 1100(6
1100(6)a4
)a4..
207 Part
Part D - Elec
Electric
trical
al
DETAILE
DETAILED
D UNI
UNIT
T PRICE ANAL
ANALYSIS
YSIS (DUPA)
(DUPA)
A. Labor
(Labor
(Labor cost for the
these
se items shall be considere
considered/inc
d/include
luded
d in the installat
installation
ion of conduit
conduits.)
s.)
B. Equipment
Equipment
"-
Sub - Total
Total for B
C. Total (A + B)
D. Output =
Output 1.00 pc
E. Dir
Direct
ect Unit
Unit Cost (C + D)
F. Mater
Materials
ials
a. Coupl
Coupling/
ing/Elbow/
Elbow/End
End Bell/Clamp
Bell/Clamp or others
others pc 1.00 Prices
Prices of materi
materials
als are variab
variable
le pe
perr Reg
Region!
ion!
Dis
Distri
trict
ct base
basedd on the prevai
prevailing
ling unit pric
priceses in the
the
loc
localit
ality
y which
which inc
include
lude paym
paymentent of loca
locall taxes
taxes
and hauling
hauling coscostt to the
the pro
projec
jectt site.
site. Refer to th the
e
Con
Constr
struct
uction
ion Mat
Materi
erial
al Price
Price Dat
Data
a est
establi
ablishe
shed
d
quar
quarter
terly
ly by Cent
Central
ral Office
Office Price
Price Mon
Monito
itoring
ring
Committee.
Sub - Total
Total for F
G. Dir
Direct
ect Unit
Unit Cost
Cost (E + F)
H. Overhead,
Overhead, Contingen
Contingencies
cies & Misce
Miscellane
llaneous
ous (OCM) Expenses
Expenses 15%/12%/10%/8% of G
I. Contract
Contractor's
or's Profit
Profit (CP) 10%/8% of G
J. Value
Value Added
Added Tax (VAT) 5% of (G + H + I)
K. Total
Total Unit Cost (G + H + I + J)
Note
Note 1. Use this
this cost
cost sheet
sheet fo
forr Item Nos.
Nos. 1100(7
1100(7),
), 110
1100(8
0(8),
), 110
1100(9
0(9),
), 110
1100(1
0(10),
0), 1100(1
1100(11),
1), 1100(1
1100(12),
2), 1100(1
1100(13),
3), 1100(1
1100(14)
4) and
1100(15).
208 Part 0 - Elec
Electrica
tricall
DETAILE
DETAILED
D UNI
UNIT
T PRI
PRICE
CE ANALY
ANALYSIS
SIS (DUPA)
(DUPA)
A. Labor
Labo
Laborr R
Rates
ates are variabl
variable
e per Reg
Region/
ion/Dis
Distri
trict
ct
a. Skilled Laborer 1 0.40
b. Unskilled Laborer 1 0.40 ba
base
sed
d on min
minim
imum
um wawage
ge as appr
approve
oved
d by
DOLE. Ref
DOLE. Refer
er to the Sch
Schedul
edulee of Lab
Labor
or Rates.
Rates.
Sub - Total
Total for A
B. Equipment
".
Sub - Total
Total for B
C. Total (A + B)
D. Output - 1.00 pc
E. Direct
Direct Unit
Unit Cost (C + D )
F. Mate
Materials
rials
a. Ju
Junct
nction
ionll Utilit
Utilityl
yl Pulll
Pulll Squar
Square
e Box pc 1.00 P rices of materia
mat
erialsls are varia
variable
ble per Regio
Region/
n/
b. Consu
Consumab
mables
les (3% of Mater
Material
ials
s Cos
Cost)
t) Dis
Distri
trict
ct bas
based
ed on the prevai
prevailing
ling unit prices
prices in the
loc
localit
alityy whic
whichh inc
includ
lude payment of local taxes
e payment
and haulin
hauling g co
cost
st to the
the pro
projec
jectt site
site.. Re
Refe
ferr to th
the
e
Con
Constr
struct
uction
ion Materi
Materialal Price
Price Dat
Data
a est
establ
ablishe
ished
d
quar
quarter
terly
ly by Centr
Centralal Office
Office Price
Price Moni
Monitor
toring
ing
Committee.
Sub - Total
Total for F
G. Direct
Direct Unit
Unit Cost
Cost (E + F)
H. Overhead,
Overhead, Contingen
Contingencies
cies & Misce
Miscellane
llaneous
ous (OCM) Expenses 15%/12%/10%/8% of G
I. Contract
Contractor's
or's Profit
Profit (CP) 10%/8% of G
J. Value Added Tax (VAT) 5% of (G + H + I)
K. Total
Total Unit Cost (G + H + I + J)
Note
Note 1. Use this
this cos
costt sheet
sheet for Item
Item No
Nos.
s. 1100(1
1100(19),
9), 110
1100(2
0(20).
0). 110
1100(2
0(21),
1), and 1100(2
1100(22).
2).
209 Par
Partt D - Elec
Electric
trical
al
DETAIL
DETAILED
ED UNI
UNIT
T PRICE ANALYSIS
ANALYSIS (DUPA)
(DUPA)
A. Labor
See Deri
Derivat
vation
ion for Item No.110
No.1100(1
0(1)) to Item
Item No. 1100(11)
1100(11)
Sub - Total
Total for A
B. Equipment
See Deriv
Derivati
ation
on for Item No. 110
1100(1
0(1)) to It
Item
em No. 1100(11)
1100(11)
"-
Sub - Total
Total for B
C. Tot
Total
al (A + B)
D. Output - 1.00I.s.
E. Direct
Direct Unit
Unit Cost (C + D )
F. Materials
See Deri
Derivat
vation
ion for Item
Item No.110
No.1100(1
0(1)) to Item
Item No. 110
1100(1
0(11)
1)
Sub - Total
Total for F
G. Direc
Directt Unit
Unit Cost (E + F)
H. Overhead,
Overhead, Conti
Contingencies & Miscellane
ngencies Miscellaneous
ous (OCM) Expenses
Expenses 15
15%/
%/12
12%/
%/10
10%/
%/8%
8% of G
I. Contract
Contractor's
or's Profit
Profit (CP) 10%/8%
10%/8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. Total
Total Unit Cost (G + H + I + J)
Note:
Note: 1. The "Iumps
"Iumpsum"
um" uni
unitt of meas
measure
uremen
mentt as per
per Blue Book,
Book, sh
shall
all be bas
based
ed on the
the derive
derived
d out
output
puts Item No. 11OO( 1) to
s of Item
Item No. 1100(11)
1100(11)..
210 Part D - Elec
Electric
trical
al
DETAIL
DETAILED
ED UNI
UNIT
T PRI
PRICE
CE ANAL
ANALYSIS
YSIS (DUPA)
(DUPA)
A. Labor
Labo
Laborr Rates
Rates are var
variabl
iable
e per
per Reg
Region/
ion/Dis
Distri
trict
ct
a. Construction Foreman 1 1.00 ba
base
sed
d on minim
minimum
um wa ge as appr
wage approved
oved by
b. Skilled
Skilled Labo
Laborer
rer 1 1.00 DOLE.
DOL E. Refer
Refer to the
the Sch
Schedul
edule
e of Labo
Laborr Rat
Rates.
es.
c. Unskilled
Unskilled Laborer
Laborer 1 1.00
Sub - Total
Total for A
B. Equipment
Minor
Minor Tools
Tools (10 % of Labor
Labor Cost)
Cost)
"
Sub - Total
Total for B
C. Total (A + B)
D. Output
Output per Hour = 25m
E. Direct
Direct Unit
Unit Cos
Costt (C + D)
F. Materials
Sub - Total
Total for F
G. Direct
Direct Unit
Unit Cos
Costt (E + F )
H. Ove
Overhe
rhead.
ad. Contin
Contingen
gencie
cies
s & Mis
Miscel
cellan
laneou
eous
s (OCM)
(OCM) Expens
Expenses
es 15%/12%/10%/8% ofG
I. Contracto
Contractor's
r's Profit (CP) 10%/
10%/8%
8% of G
J. Va
Value
lue AddedT
AddedTaxax (VAT)
(VAT) 5% of (G + H + I)
K. Total Unit Cost (G + H + I + J)
Note
Note 1. Use this
this cost
cost sh
sheet
eet for
for Item Nos.
Nos. 1101(2)a 1, 110
1101
1 (2)a2,
(2)a2, 1101(2)a3,
1101(2)a3, 1101
1101 (2)a4,
(2)a4, 1101(2)a
1101(2)a5,
5, 1101(2)a6
1101(2)a6,, and 1101(2)
1101(2)a7.
a7.
211 Par
Partt D - Ele
Electri
ctrical
cal
DETAIL
DETAILED
ED UNI
UNIT
T PRI
PRICE
CE ANAL
ANALYSIS
YSIS (DUPA)
(DUPA)
Item No./Description 11
1101
01(2
(2)) 8.00 mm2 - 22 mm2 Elect
8.00 Electric
ric Wire (TW/THHN/TWHN2)
(TW/THHN/TWHN
Unit of Measurement m
Outputt per hour
Outpu hour 14.286
14.286 m
A. Labor
a. Construc
Construction
tion Forem
Foreman
an 1 1.00 Labo
Laborr Rate
Rates
s aare
re var
variabl
iable
e pe
perr Reg
Region/
ion/Dis
Distri
trict
ct
ba
base
sed
d on minim
minimum
um wa ge as appr
wage approved
oved by
b. Skilled Labo
Laborer
rer 1 1.00 DOLE.
DOL E. Refer
Refer to th
the
e Sched
Schedule
ule of L Labor
abor Rates.
Rates.
c. Unskilled
Unskilled Laborer
Laborer 1 1.00
B. Equipment
Minor
Minor Too
Tools
ls (10 % of Labor Cost)
Cost)
"
Sub - Total
Total for B
C. Total (A + B)
D. Output per Hour - 14.286 m
E. Dir
Direct
ect Unit
Unit Cost (C + D)
F. Materials
Materials
Prices
Prices of m mate
ateria
rials
ls are varia
variable
ble per Regio
Region/
n/
8.00 mm2 Elect
a. 8.00 Electric (TW/THHN/TWHN2)
ric Wire (TW/THHN/TWHN m 1.00 Dis
Distri
trict
ct bas
based
ed on the prevprevail
ailing
ing uni
unitt pric
prices
es in the
b. Consum
Consumabl
ables
es (3% of Materia
Materials
ls Cost)
Cost) loc
locali
ality
ty whi
which
ch inc
include
lude paym
payment
ent of loc local
al taxes
taxes
and hauling
hauling coscostt to the
the projec
projectt site.
site. Refer to th the
e
Con
Constr
struct
uction
ion Materi
Materialal Price
Price Dat
Data
a establ
establishe
ished
d
quarter
quarterly ly by Centr
Centralal Office
Office Price
Price Moni
Monitor
toring
ing
Committee.
Sub - Total
Total for F
G. Di
Direc
rectt Unit
Unit Cost (E + F)
H. Ove
Overhe
rhead,
ad, Contin
Contingen
gencie
cies
s & Mis
Miscel
cellan
laneou
eous
s (OCM)
(OCM) Expens
Expenses
es 15%/12%/10%/8% ofG
I. Contract
Contractor's
or's Profit
Profit (CP) 10%/8%
10%/8% of G
J. Value
Value Added
Added Tax (VAT
(VAT)) 5% of (G + H + I)
K. Total
Total Unit Cost (G + H + I + J)
No
Note
te 1. Us
Use
e this
this c
cos
ostt shee
sheetf
tfor
or It
Item
em Nos.
Nos. 1101(2)
1101(2)a8
a8,, 110
1101(
1(2)
2)a9
a9,, an
and
d 1101(2)a1 O.
1101(2)a1
212 Part 0 - Elec
Electrica
tricall
DETAIL
DETAILED
ED UNI
UNIT
T PRICE ANALYSIS
ANALYSIS (DUPA)
(DUPA)
A. Labor
B. Equipment
Minor
Minor Too
Tools
ls (10 % of Labor
Labor Cost)
Cost)
"-
Sub - Total
Total for B
C. Total (A + B )
D. Output
Output per Hour
Hour = 5.714
5.714 m
E. Direct
Direct Unit
Unit Cost (C + D)
F. Mater
Materials
ials
Sub - Total
Total for F
G. D
Dire
irect
ct Unit
Unit Cost
Cost (E + F)
H. Overhead.
Overhead. Contingencies & Miscellan
Contingencies Miscellaneous
eous (OCM) Expenses
Expenses 15
15%/
%/12
12%/
%/10
10%/
%/8%
8% of G
I. Contrac
Contractor's
tor's Profit
Profit (CP) 10%/8%
10%/8% of G
J. Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. Total Unit Cost (G + H + I + J)
No
Note
te 1. Us
Use
e this
this co
cost
st shee
sheett for
for Item Nos.
Nos. 1101
1101 (2
(2)a
)a 11 an
and
d 1101
1101 (2
(2)a
)a12
12..
213 Part 0 - Elec
Electri
trical
cal
DETAILE
DETAILED
D UNI
UNIT
T PRI
PRICE
CE ANAL
ANALYSI
YSIS
S (DUPA)
(DUPA)
Designation No.
No. of Pers
Person
on/s
/s No.
No. of Hour
Houris
is Hourly
Hourly Rate
Rate Amount
Amount (PhP)
(PhP)
A. Labor
Labo
Laborr R
Rate
ates
s are
are var
variabl
iable
e per
per Regi
Region/
on/Dis
Distri
trict
ct
a. Construc
Construction
tion Foreman
Foreman 1 1.00 bas
based
ed on mini
minimu
mumm wage
wage as appr
approve
oved
d by
b. Skilled Labo
Laborer
rer 2 1.00 DOLE.
DOL E. Ref
Refer
er to the
the Sche
Schedule
dule of L Labor
abor Rates.
Rates.
c. Unskilled
Unskilled Laborer
Laborer 2 1.00
B. Equipment
Minor
Minor Too
Tools
ls (10 % of Labor
Labor Cos
Cost)
t)
"
Sub - Total
Total for B
C. Total (A + B)
D. Outpu
Outputt per
per Hour
Hour - 4.615
4.615 m
E. Dir
Direct
ect Unit
Unit Cost
Cost (C + D)
F. Materials
Materials
Sub - Total
Total for F
G. Direc
Directt Unit
Unit Cost
Cost (E + F)
H. Overhead,
Overhead, Contingen
Contingencies
cies & Misce
Miscellane
llaneous
ous (OCM) Expenses
Expenses 15%/12%/10%/8% ofG
I. Contract
Contractor's
or's Profit
Profit (CP) 10%/8% of G
J. Value Added
Added Tax (VAT
(VAT)) 5% of (G + H + I)
K. Total
Total Unit Cost (G + H + I + J)
No
Note
te 1. Us
Use
e thi
this
s cost
cost she
sheet
etfo
forr It
Item
em Nos
Nos.. 1101(
1101(2)
2)a1
a13
3 an
and
d 1101(2)
1101(2)a1
a14.
4.
214 Part 0 - Elec
Electrica
tricall
DETAILE
DETAILED
D UNI
UNIT
T PRICE ANA
ANALYSI
LYSIS
S (DUPA)
(DUPA)
Item No./Description 11
1101
01(2
(2)) 80
80.00 mm2
.00 - 125 mm 2 Elect
Electric
ric Wire (TW/THHN/TWHN2)
(TW/THHN/TWHN
Unit of Measurement m
Outputt per hour
Outpu hour 2.8
2.857
57 m
A. Labor
Lab
Labor
or Rat
Rates
es are variabl
variable
e per Reg
Region/
ion/Dis
Distri
trict
ct
a. Construction Foreman 1 1.00
ba
base
sed
d on minim
minimum
um wawage
ge as appr
approve
oved
d by
b. Skilled Laborer 2 1.00 DOLE. Ref
DOLE. Refer
er to the Sch
Schedul
edulee of La
Labor
bor Rat
Rates.
es.
c. UnsJ<iIIed Laborer 2 1.00
Sub - Total
Total for A
Minor
Minor Too
Tools
ls (10 % of Labor
Labor Cos
Cost)
t)
"
Sub - Total
Total for B
C. Tot
Total
al (A + B)
D. Output Hour
Output per Hour = 2.8
2.857
57 m
E. Direct
Direct Unit
Unit Cost (C + D )
F. Materials
80.00 mm2
a. 80.00 - 125 mm2 Elect
Electric
ric Wire Prices of materia
materials
ls are varia
variable
ble per Regio
Region/
n/
m 1.00 Dis
Distri
trict
ct bas
based
ed on th the
e prev
prevail
ailing
ing unit pric
prices
es in the
the
(TW/THHN/TWHN 2)
loca
localit
lity
y whi
which
ch inc
includ
lude payment of local taxes
e payment
b. Consu
Consumab
mables
les (3% of Materia
Materials
ls Cost)
Cost) and hauli
hauling
ng cocost
st to ththe
e proj
projec
ectt site
site.. Re
Refe
ferr to th
the
e
Constru
Cons tructi
ction
on Materi
Materialal Price
Price Dat
Data
a est
establ
ablishe
ished
d
quarterl
quarterlyy by Cent
Central
ral Office
Office Price
Price Moni
Monitor
toring
ing
Committee.
Sub - Total
Total for F
G. D
Dire
irect
ct Unit
Unit Cost
Cost (E + F)
H. Ove
Overhe
rhead,
ad, Contin
Contingen
gencie
cies
s & Mis
Miscel
cellan
laneou
eous
s (OCM)
(OCM) Exp
Expens
enses
es 15%/12%/10%/8% of G
I. Contract
Contractor's
or's Profit (CP)
(CP) 10%/8% of G
J. Value Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. Total Unit Cost (G + H + I + J)
No
Note
te 1. Us
Use
e this
this co
cost
st shee
sheett for Item
Item No
Nos.
s. 1101
1101 (2
(2)a
)a15
15,, 110
1101(
1(2)
2)a1
a16a
6and
nd 11
1101(2)
01(2)a1
a17.
7.
215 Part
Part D - Elec
Electric
trical
al
DETAIL
DETAILED
ED UNI
UNIT
T PRICE ANALYSIS
ANALYSIS (DUPA)
(DUPA)
Item No.lDescription 11
1101
01(2
(2)) 150.00 mm2 - 250
150.00 250 mm2 Elect
Electric (TW/THHN/TWHN2)
ric Wire (TW/THHN/TWHN
Unit of Measu
Measuremen
rementt m
Output
Output per hour 1.875
1.875 m
A. Labor
Lab
Labor
or Rat
Rates
es are var
variabl
iable
e per
per Reg
Regionl
ionlDis
Distri
trict
ct
a. Const
Constructi
ruction
on Foreman
Foreman 1 1.00 ba
base
sed
d on mini
minimu
mum
m wa ge as appr
wage approved
oved by
b. Skilled
Skilled Laborer
Laborer 4 1.00 DOLE.
DOL E. Refer
Refer to the
the Sc
Schedu
hedulele of L Labor
abor Rat
Rates.
es.
c. Unstdlled
Unstdlled Labo
Laborer
rer 4 1.00
Sub - Total
Total for A
B. Equipment
Minor
Minor Tools
Tools (10 % of Labor
Labor Cost)
Cost)
"-
Sub - Total
Total for B
C. Total (A + B)
D. Output
Output per Hour
Hour = 1.875
1.875 m
F. Materials
Sub - Total
Total for F
G. Direc
Directt Unit
Unit Cost (E + F)
H. Overhead.
Overhead. Continqen
Continqencies
cies & Miscellane
Miscellaneous
ous (OCM) Expenses 15%/12%/10%/8% of G
I. Contrac
Contractor's
tor's Profi
Profitt (CP) 10%/8% of G
J. Value Added Tax (VAT
(VAT)) 5% of (G + H + I)
"
K. Total
Total Unit
Unit Cost
Cost (G + H + I + J)
No
Note
te 1. Us
Use
e this
this co
cost
st shee
sheett for
for Item
Item Nos. 1101(2)
1101(2)a1
a18,
8, 11
1101(2
01(2)a
)a19
19 and 1101(2)
1101(2)a2
a20.
0.
DETAILE
DETAILED
D UNI
UNIT
T PRICE ANAL
ANALYSI
YSIS
S (DUPA)
(DUPA)
A. Labor
Sub - Total
Total for A
B. Equipment
Minor
Minor Too
Tools
ls (10 % of Labor
Labor Cos
Cost)
t)
-,
Sub - Total
Total for B
C. Total (A + B)
D. Output
Output per Hour =
Hour 1.60
1.60 m
E. Dir
Direct
ect Unit
Unit Cost (C + D )
F. Mater
Materials
ials
Sub - Total
Total for F
G. Direct
Direct Unit
Unit Cost (E + F)
H. Overhead,
Overhead, Contingencies & Miscellane
Contingencies Miscellaneous
ous (OCM) Expenses
Expenses 15%/12%/10%/8% ofG
I. Contract
Contractor's
or's Profit
Profit (CP) 10%/8%
10%/8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. Total Unit Cost (G + H + I + J)
No
Note
te 1. Us
Use
e this
this co
cost
st shee
sheett for Item
Item Nos.
Nos. 1101(2
1101(2)a
)a21
21,, an
and
d 1101(
1101(2)
2)a2
a23.
3.
217 Par
Partt 0 - Elec
Electric
trical
al
DETAIL
DETAILED
ED UNI
UNIT
T PRICE ANAL
ANALYSI
YSIS
S (DUPA)
(DUPA)
A. Labor
Labo
Laborr R
Rate
ates
s a
are
re var
variabl
iable
e per
per Regi
Region/
on/Dis
Distri
trict
ct
a. Const
Constructi
ruction
on Foreman
Foreman 1 1.00
b. Skilled
Skilled Laborer
Laborer 4 1.00 bas
based
ed on mini
minimu
mumm wawage
ge as app
approve
roved
d by
DOLE. Ref
DOLE. Refer
er to th
the
e Sched
Schedule
ule of L Labor
abor Rat
Rates.
es.
c. Unskilled
Unskilled Laborer
Laborer 4 1.00
-
B. Equipment
Minor
Minor Too
Tools
ls (10 % of Labor Cost)
Cost)
..
Sub - Total
Total for B
C. Total (A + B)
D. Output Hour
Output per Hour = 1.333
1.333 m
E. Dir
Direct
ect Unit
Unit Cost (C + D)
F. Materials
Materials
Sub - Total
Total for F
G. Di
Direc
rectt Unit
Unit Cost (E + F)
H. Ove
Overhe
rhead,
ad, Contin
Contingen
gencie
cies
s & Mis
Miscel
cellan
laneou
eous
s (OCM)
(OCM) Expens
Expenses
es 15%/12%/10%/8% of G
I. Contract
Contractor's
or's Profit
Profit (CP) 10%/8% of G
J. Value
Value Add
Addeded Tax (VAT)
(VAT) 5% of (G + H + I)
K. Total
Total Unit Cost (G + H + I + J)
218 Part D - Elec
Electric
trical
al
DETAILE
DETAILED
D UNI
UNIT
T PRI
PRICE
CE ANAL
ANALYSI
YSIS
S (DUPA)
(DUPA)
A. Labor
(Labor
(Labor cos
costt sha
shall
ll be includ
included
ed in the
the Pow
Power
er Contra
Contract
ct wit
with
h MERALCO
MERALCO or Local
Local Power
Power Coo
Cooper
perati
ative.
ve.))
Name and Capacity No. of Unitls No. of HourIs Hourly Rate Amount
Amount (PhP)
(PhP)
B. Equipment
.J
Sub - Total
Total for B
C. Total (A + B)
D. Output
Output per Hour
Hour = 0
E. Direct
Direct Unit
Unit Cost (C + D )
F. Materials
a. XLP
XLPE,
E, Creoso
Creosoted
ted pol
pole,
e, anch
anchor
or Rod
Rod,, anchor
anchor log
log,, (Mate
(Materials
rials cost included
included in the Power Contr
Contract
act with MERALCO
power load studs,
power studs, pad mounted
mounted tran
transfor
sformer,
mer, pole-type
pole-type or Local
Local Power Coope
Cooperati
rative.)
ve.)
tran
transform
sformer,
er, tran
transform
sformer
er brac
bracket,
ket, Aluminum
Aluminum
Conductor
Cond uctor Steel
Steel-Rein
-Reinforce
forcedd (ACSR) powerfuse,
powerfuse,
concrete pole
concrete pole,, power
power trans
transmissi
mission
on pole
pole,, pin insulato
insulator,
r,
pole top pin, machine
machine bolts
bolts and washers
washers
Sub - Total
Total for F
G. Dir
Direct
ect Unit
Unit Cost
Cost (E + F)
H. Overhead,
Overhead, Contingen
Contingencies
cies & Misce
Miscellane
llaneous
ous (OCM) Expenses 15
15%/
%/12
12%/
%/10
10%/
%/8%
8% ofG
ofG
I. Contractor's Profit (CP) 10%/8% of G
J. Value Added Tax (VAT) 5% of (G + H + I)
K. Total Unit Cost (G + H + I + J)
219 Part D - Elec
Electric
trical
al
DETAIL
DETAILED
ED UNI
UNIT
T PRI
PRICE
CE ANAL
ANALYSI
YSIS
S (DUPA)
(DUPA)
A. Labor
a. Constr
Constructio
uction
n Foreman
Foreman Labo
Laborr R
Rate
ates
s a
are
re var
variabl
iable
e per
per Regi
Region/
on/Dis
Distri
trict
ct
1 1.00
bas
based
ed on mi
mini
nimu
mum
m wage
wage as app
approve
roved
d by
b. Skilled
Skilled Laborer
Laborer 1 1.00 DOLE.
DOL E. Ref
Refer
er to the
the Sch
Schedul
edulee of L Labor
abor Rat
Rates.
es.
c. Uns]<illed Laborer 1 1.00
Sub - Total
Total for A
B. Equipment
Minor
Minor Too
Tools
ls (10 % of Labor
Labor Cost)
Cost)
"
Sub - Total
Total for B
C. Tot
Total
al (A + B)
D. Output per Hour - 20.00 m
E. Dir
Direct
ect Unit
Unit Cost (C + D)
F. Mater
Materials
ials
Sub - Total
Total for F
G. Dir
Direct
ect Unit
Unit Cost
Cost (E + F)
H. Overh
Overhead,
ead, Contingencies & Miscellane
Contingencies Miscellaneous
ous (OCM) Expenses
Expenses 15%/12%/10%/8% of G
I. Contract
Contractor's
or's Profit
Profit (CP) 10%/8% of G
J. Value
Value Added
Added Tax (VAT
(VAT)) 5% of (G + H + I)
K. Total
Total Unit Cost (G + H + I + J)
No
Note
te 1. Us
Use
e this
this co
cost
st shee
sheett for
for Item
Item Nos.
Nos. 11
1101(7
01(7)a
)a1,
1, 11
1101(7
01(7)a
)a2,
2, and 1101(7)
1101(7)a3
a3..
220 Part D - Electri
Electrical
cal
DETAIL
DETAILED
ED UNI
UNIT
T PRI
PRICE
CE ANAL
ANALYSIS
YSIS (DUPA)
(DUPA)
Item No.lDescription 11 01
01 ( 7)
7) 00 mm2 - 22
8 ..0 .00 mm2 Bare Copper
22.00 Copper Wire
Unit of Measurement m
Outputt per hour
Outpu 10.
10.00
00 m
A. Labor
a. Construc
Construction
tion Foreman
Foreman 1 1.00 Labo
Laborr R
Rate
ates
s aare
re variabl
variable
e per
per Reg
Region/ion/Dis
Distri
trict
ct
ba
base
sed
d on mini
minimu
mum m wag
wage e as appr
approved
oved by
b. Skilled
Skilled Laborer
Laborer 1 1.00 DOLE.
DOL E. Ref
Refer
er to the Sch
Schedu
edulele of
of Lab
Labor
or Rat
Rates.
es.
c. UnsKilled Laborer
Laborer 1 1.00
Sub - Total
Total for A
Minor
Minor Too
Tools
ls (10 % of Labor
Labor Cost)
Cost)
"
Sub - Total
Total for B
C. Total (A + B )
D. Output
Output per Hour
Hour = 10.
10.00
00 m
E. Direct
Direct Unit
Unit Cost (C + D)
F. Mater
Materials
ials
8.00 mm2 - 22
a. 8.00 .00 mm2 Bare Copper
22.00 Copper Wire m 1.00 Prices of
of materi
materials
als are varia
variable
ble per Regio
Region/ n/
b. Consu
Consumab
mables
les (3% of Materia
Materials
ls Cos
Cost)
t) Dis
Distri
trict
ct base
based d on the prev
prevail
ailing
ing unit prices
prices in the
loc
localit
ality
y whiwhich ch inc
include
lude pay ment of
payment of local taxes
and hauling cost to the project site. ReferRefer to th the
e
Con
Constr
struct
uction
ion Materi
Material
al Price
Price Dat
Data
a establi
establisheshed
d
quar
quarter
terly
ly by Centr
Central
al Office
Office Price
Price Moni
Monitor toring
ing
Committee.
Sub - Total
Total for F
G. Direct
Direct Unit
Unit Cost (E + F)
H. Overhe
Overhead.
ad. ContinQenc
ContinQencies
ies & Miscel
Miscellane
laneous
ous (OCM) Expenses 15
15%/
%/12
12%/
%/10
10%/
%/8%
8% ofG
ofG
I. Contrac
Contractor's
tor's Profi
Profitt (CP) 10%/8%
10%/8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. Total
Total Unit Cost (G + H + I + J)
No
Note
te 1. Us
Use
e tthi
his
s cost
cost sheet
sheet for
for Ite
Item
m Nos.
Nos. 110
1101
1 (7
(7)a
)a4,
4, 11
1101(7)
01(7)a5
a5,, and 1101(7
1101(7)a
)a6.
6.
221 Part 0 - Elec
Electric
trical
al
DETAIL
DETAILED
ED UNI
UNIT
T PRI
PRICE
CE ANALY
ANALYSIS
SIS (DU
(DUPA)
PA)
Item No./Description 11
1101
01(7
(7)) 30
30.00 mm2 - 38.
.00 00 mm2 Bare Copper
38.00 Copper Wire
Unit of Measurement m
Output per hour
Output 12.00
12.00 m
A. Labor
Labo
Laborr Rates
Rates are var
variabl
iable
e per
per Regi
Region/
on/Dis
Distri
trict
ct
a. Construc
Construction
tion Forem
Foreman
an 1 1.00 bas
based
ed on mini
minimu
mum wage as app
m wage approve
roved
d by
b. Skilled Laborer
Laborer 2 1.00 DOLE.
DOL E. Ref
Refer
er to the
the Sch
Schedul
edule
e of L Labor
abor Rates.
Rates.
c. Unskilled
Unskilled Laborer
Laborer 2 1.00
B. Equipment
Minor
Minor Tools (10 % of Labor
Labor Cos
Cost)
t)
"
Sub - Total
Total for B
C. Tota
Totall (A + B)
D. Output per Hour - 12.00 m
E. Dir
Direct
ect Unit Cost
Cost (C + D )
F. Materials
Sub - Total
Total for F
G. Di
Direc
rectt Unit
Unit Cost (E + F)
H. Overh
Overhead,
ead, Contingencies & Miscellane
Contingencies Miscellaneous
ous (OCM) Expenses
Expenses 15
15%/
%/12
12%/
%/10
10%/
%/8%
8% of G
I. Contract
Contractor's
or's Profit
Profit (CP) 10%/8%
10%/8% of G
J. Value
Value Added
Added Tax (VAT) 5% of (G + H + I)
K. Total
Total Unit Cost (G + H + I + J)
No
Note
te 1. Us
Use
e this
this c
cos
ostt sheet
sheet for Ite
Item
m Nos.
Nos. 110
1101
1 (7
(7)a
)a7
7 and 1101(7)
1101(7)a8
a8..
222 Part D - Electri
Electrical
cal
DETAILE
DETAILED
D UNI
UNIT
T PRICE ANAL
ANALYSI
YSIS
S (DUPA)
(DUPA)
Item No./Description 11
1101(7
01(7)) 50
50.00 mm2 - 60
.00 .00 mm2 Bare Copper
60.00 Copper Wire
Unit of Measuremen
Measurementt m
Output per hour
Output hour 10.00
10.00 m
A. Labor
Sub - Total
Total for A
Name and Capacity No. of Unitls No. of HourIs Hourly Rate Amount
Amount (Ph
(PhP)
P)
B. Equipment
Minor
Minor Tools
Tools (10 % of Labo
Laborr Cost)
Cost)
".
Sub - Total
Total for B
C. Tot
Total
al (A + B)
D. Output per Hour - 10.00 m
E. Direct
Direct Unit
Unit Cost (C + D)
F. Mate
Materials
rials
Sub - Total
Total for F
G. Direct
Direct Unit
Unit Cost (E + F)
H. Ov
Ove
er he
he ad
ad , Con
Con titi ng
nge nc
nc iie
es & Mis
Misc el
el la
lan eo
eo us
us ( OCM
OCM)) E x
xp
p en
en se
se s 1 5%/
5%/1
1 2%/
2%/1
10 %/
%/ 8%
8% of G
I. Contractor's Profit (CP) 10%/8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. Total
Total Unit Cost ( G + H + I + J)
No
Note
te 1. Us
Use
e tthi
his
s cost
cost she
sheet
et for It
Item
em Nos.
Nos. 1101(7)
1101(7)a9
a9 and
and 1101(7)a1 O.
1101(7)a1
223 Part D - Elec
Electric
trical
al
"
DETAIL
DETAILED
ED UNI
UNIT
T PRICE ANAL
ANALYSI
YSIS
S (DUPA)
(DUPA)
Item No.lDescription 11
1101(
01(7)
7) 80
80.00 mm2 - 125.00
.00 125.00 mm2 Bare Copper
Copper Wire
Unit of Measurement m
Outputt per hour
Outpu 6.0
6.00
0 m
Designation No.
No. of Pers
Person
on/s
/s No.
No. of Hour
HourIs
Is Hourly
Hourly Rate
Rate Amount
Amount (PhP)
(PhP)
A. Labor
a. Construc
Construction
tion Foreman
Foreman 1 1.00 Labo
Laborr Rate
Rates
s aare
re var
variabl
iable
e per Regi
Region/
on/Dis
Distri
trict
ct
bas
based
ed on min
minimu
imum wage as app
m wage approve
rovedd by
b. Skilled
Skilled Labo
Laborer
rer 2 1.00 DOLE.
DOL E. Ref
Refer
er to the Sch
Schedul e of L
edule Labor
abor Rates.
Rates.
c. Unskilled
Unskilled Laborer
Laborer 2 1.00
B. Equipment
Minor
Minor Too
Tools
ls (10 % of Labor
Labor Cos
Cost)
t)
'.
Sub - Total
Total for B
C. Total (A + B)
D. Output
Output per
per Hour
Hour - 6.00
6.00 m
E. Dir
Direct
ect Unit
Unit Cost (C + D)
F. Materials
Sub - Total
Total for F
G. Dir
Direct
ect Unit
Unit Cost
Cost (E + F)
H. Overhead,
Overhead, Contingen
Contingencies
cies & Misce
Miscellane
llaneous
ous (OCM) Expenses 15%/12%/10%/8% of G
I. Contract
Contractor's
or's Profit
Profit (CP) 10%/8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. Total
Total Unit Cost (G + H + I + J)
No
Note
te 1. Us
Use
e this
this co
cost
st shee
sheett for Item
Item Nos.
Nos. 1101(7)
1101(7)a1
a11,
1, 11
1101(7)
01(7)a1
a12
2 an
and
d 1101(7
1101(7)a
)a13
13..
224 Par
Partt D - Ele
Electri
ctrical
cal
DETAIL
DETAILED
ED UNI
UNIT
T PRI
PRICE
CE ANAL
ANALYSI
YSIS
S (DUPA)
(DUPA)
Item No./Description 11
1101
01(7
(7)) 200.00 mm2 - 250.0
200.00 0 mm2 Bare Copper
250.00 Copper Wire
Unit of Measurement m
Outputt per hour
Outpu hour 6.6
6.667
67 m
A. Labor
Labo
Laborr Rates
Rates are variabl
variable
e per RegRegion/
ion/Dis
Distri
trict
ct
a. Construction Foreman 1 1.00
ba
base
sed
d on min
minim
imum
um wa ge as appr
wage approve
ovedd by
b. Skilled Laborer 4 1.00 DOLE.
DOL E. Ref
Refer
er to the
the Sch
Schedul e of La
edule Labor
bor Rat
Rates.
es.
c. Unskilled Laborer 4 1.00
Sub - Total
Total for A
B. Equipment
Minor
Minor Tools
Tools (10 % of Labor
Labor Cos
Cost)
t)
"
Sub - Total
Total for B
C. Total (A + B)
Output per Hour
D. Output = 6.6
6.667
67 m
E. Direct
Direct Unit
Unit Cost (C + D)
F. Mate
Materials
rials
a. 20
200.00 mm2 - 250.0
0.00 0 mm2 Bare Copper
250.00 Copper Wire m 1.00 Prices of materia
materials
ls are varia
variable
ble per RegRegion!
ion!
b. Consu
Consumab
mables
les (5% of Materia
Materials
ls Cos
Cost)
t) Dis
Distri
trict
ct bas
baseded on the prevai
prevailing
ling unit pric
priceses in the
loca
localit
lity
y whic
which h inc
includ
lude payment of local taxes
e payment
and haulin
hauling g co
cost
st to the
the proj
projec
ectt site
site.. Re
Refeferr to th
the
e
Constru
Cons tructi
ction
on Materi
Materialal Price
Price Dat
Data
a establi
establishe
shed
d
quarterl
quarterlyy by Cent
Central
ral Office
Office Price
Price Mon
Monito
itoring
ring
Committee.
Sub - Total
Total for F
G. Direc
Directt Unit
Unit Cost (E + F)
H. Overh
Overhead,
ead, Contingencies & Miscellane
Contingencies Miscellaneous
ous (OCM) Expenses
Expenses 15%/12%/10%/8% of G
I. Contract
Contractor's
or's Profit (CP)
(CP) 10%/
10%/8%
8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. Tot
Total
al Unit
Unit Cos
Costt (G + H + I + J)
No
Note
te 1. Us
Use
e thi
this
s cost
cost shee
sheetf
tfor
or It
Item
em Nos
Nos.. 1101(
1101(7)
7)a1
a14
4 an
and
d 1101
1101(7
(7)a
)a15
15..
225 Part 0 - Elec
Electrica
tricall
DETAIL
DETAILED
ED UNI
UNIT
T PRICE ANALYSIS
ANALYSIS (DUPA)
(DUPA)
A. Labor
Labo
Laborr Rate
Rates
s aare
re var
variabl
iable
e pe
perr Reg
Region/ion/Dis
Distri
trict
ct
a. Skilled Laborer
Laborer 1 1.00 ba
base
sed
d on mi
minim
nimum
um wa wage
ge as approve
approved d by
b. Unskilled
Unskilled Labo
Laborer
rer 1 1.00 DOLE. Refer to the Schedule
Schedule of of Labor Rates
Rates..
B. Equipment
Minor
Minor Too
Tools
ls (10 % of Labor
Labor Cost)
Cost)
..
Sub - Total
Total for 8
C. Total (A + B)
D. Output - 1 set
E. Dir
Direct
ect Unit
Unit Cost (C + D )
F. Mater
Materials
ials
Sub - Total
Total for F
G. Dir
Direct
ect Unit
Unit Cost (E + F)
H. Overhead,
Overhead, Contingen
Contingencies
cies & Miscellane
Miscellaneous
ous (OCM) Expenses
Expenses 15%/12%/10%/8% ofG
I. Contract
Contractor's
or's Profit
Profit (CP) 10%/8%
10%/8% of G
J. Value Added
Added Tax (VAT
(VAT)) 5% of (G + H + I)
K. Total
Total Unit Cost (G + H + I + J)
No
Note
te 1. Us
Use
e tthi
his
s cost
cost sheet
sheet for
for Ite
Item
m Nos.
Nos. 1101(8
1101(8)) to
to 1101(19
1101(19).
).
226 Part D - Elec
Electric
trical
al
DETAILE
DETAILED
D UNI
UNIT
T PRI
PRICE
CE ANAL
ANALYSI
YSIS
S (DUPA)
(DUPA)
Unit of Measuremen
Measurementt set
Output 1 set
A. Labor-
Labo
Laborr Rates
Rates are var
variabl
iable
e pe
perr Reg
Region/
ion/Dis
Distri
trict
ct
a. Skilled Laborer 1 0.25
ba
base
sed
d on mi
minim
nimum
um wa ge as approve
wage approved
d by
b. Unskilled
Unskilled Labo
Laborer
rer 1 0.25 DOLE.
DOL E. Refer
Refer to the Sc
Schedu
hedulele of Labor
Labor Rates.
Rates.
Sub - Total
Total for A
B. Equipment
Sub - Total
Total for B
C. Total (A + B)
D. Outpu
Outputt = 1 set
E. Dir
Direct
ect Unit
Unit Cost (C + D)
,-
F. Mater
Materials
ials
Prices
Prices of mmate
aterial
rials
s are varia
variable
ble per Region
Region/ /
a. Singl
Singlee Conven
Convenienc
ience
e Outlet/Rec
Outlet/Recepta
eptacle,
cle, Grounding
Grounding Dis
Distri
trict
ct bas
based
ed on the prevai
prevailing
ling unit pric
prices
es in the
Type (GT)I
(GT)I Heavy Duty Convenience
Convenience loca
localit
lity
y whic
which
h inc
includ
lude
e pay
paymen
mentt of loc
local
al taxes
taxes
Outlet/Receptac
Outlet/Receptacle,
le, Groun
Groundingding Type (GT)I
(GT)I Weather and hauli
hau ling
ng co
cost
st toalthe
theP pr
proj
ojec
e ect
t asite
site,
, Re
Refeferr to
d the
the
set 1.00 Con
Constr
struct
uction
ion Materi
Material Pric
rice Dat
Data establi
establishe
shed
Proof Single Convenienc
Convenience e Outle
Outlet/Rec
t/Receptac
eptacle,
le, quar
quarter
terly
ly by Cent
Central
ral Office
Office Price
Price Mon
Monito
itoring
ring
Grounding
Groun ding Type (GT)I
(GT)I Pop-up
Pop-up Type/Floor
Type/Floor Tripl
Triplex
ex Committee.
Convenien
Convenience
ce Outle
Outlet/Rec
t/Recepta
eptacle,
cle, Grounding
Grounding Type (GT)
Sub - Total
Total for F
G. Direc
Directt Unit
Unit Cost
Cost (E + F)
H. Overh
Overhead,
ead, Contingencies & Miscellane
Contingencies Miscellaneous
ous (OCM) Expenses
Expenses 15%/12%/10%/8% of G
I. Contract
Contractor's
or's Profit
Profit (CP) 10%/8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. To
Total
tal Unit Cost (G + H + I + J)
Note
Note 1. Use this
this cos
costt sheet
sheet for Item
Item Nos
Nos.. 1101(20)
1101(20),, 1101(22)
1101(22),, 110
1101
1 (23)
(23) and 1101(3
1101(31).
1).
DETAIL
DETAILED
ED UNI
UNIT
T PRI
PRICE
CE ANALY
ANALYSIS
SIS (DU
(DUPA)
PA)
Unit of Measu
Measureme
rement
nt set
Output 1 set
a. Skilled Laborer
Laborer Labo
Laborr Rates
Rates are variab
variable
le pper
er Reg
Region/
ion/Dis
Distri
trict
ct
1 0.30
bas
based
ed on mini
minimum
mum wa ge as appr
wage approve
ovedd by
b. Unskilled
Unskilled Laborer
Laborer 1 0.30 DOLE.
DOL E. Ref
Refer
er to the
the Sch
Schedul
edulee of Labor
Labor Rates.
Rates.
Sub - Total
Total for A
B. Equipment
Sub - Total
Total for B
C. Total (A + B)
D. Outpu
Outputt = 1 set
E. Direct
Direct Unit
Unit Cost (C + D )
F. Mater
Materials
ials
a. Duple
Duplex x Convenience
Convenience Outlet/Rec
Outlet/Recepta
eptacle,
cle, Grounding
Grounding Prices
Prices of materi
materials
als are var
variab
iable
le per Reg
Region!
ion!
Type (GT) I I Weather
Weather Proof Duplex Conve Convenienc
nience
e Dis
Distri
trict
ct bas
based
ed on the prevai
prevailing
ling unit pric
prices
es in the
Outlet/Rec
Outlet/Receptac
eptacle, le, Grou
Grounding
nding Type (GT)I
(GT)I Special loc
localit
ality
y which
which inc
include
lude paym
payment
ent of loc
local
al taxes
taxes
and hauling
hauling cos
costt to the proj
project
ect site.
site. Ref
Refer
er to the
Purpose
Purpo se Conven
Convenienc ience
e Outle
Outlet/Rec
t/Recepta
eptacle,
cle, Grounding
Grounding
Type
Type for A ACU,
CU, WH, ete! ete! Exp
Explos
losion
ion Pro
ProofT
ofType
ype Dup
Duplex
lex Con
Constr
struct
uction
ion Mat
Materi
erial
al Price
Price Dat
Data
a est
establi
ablishe
shed
d
quarter
quarterly
ly by Centr
Central
al Office
Office Price
Price Mon
Monito
itoring
ring
Convenien
Conv eniencece Outlet/Rec
Outlet/Receptac
eptacle,
le, Grou
Grounding