GPCB STP Guide
GPCB STP Guide
By R.P.A.D
SPECIFIC CONDITIONS
Computer generated Order thru XGN, does NOT require Physical Signature Page No-1 of 7
GUJARAT POLLUTION CONTROL BOARD
Paryavaran Bhavan, Sector-10/A,
Gandhinagar - 382010
GPCB
Phone: (079)23226295
Fax: (079)23232156
Websit: WWW.gpcb.gov.in
3.Unit shall not carryout any activity / production without prior permission that attracts EIA
Notification dated 14/09/2006 amended from time to time.
OTHER CONDITIONS
1. Total production of products mentioned in sr. no. 1 shall not exceed 10 MT/Month in any case.
2. Total production of products mentioned in sr. no. 2 shall not exceed 60 MT/Month in any case.
3.1 The quantity of total water consumption shall not exceed 4.000 KL/Day as per below break up
as mentioned in form D submitted for consent application under the Water Act- 1974.
a) Industrial: 3.000 KL/Day
b) Domestic: 1.000 KL/Day
3.2 The quantity of total waste water generation shall not exceed 0.800 KL / Day as per below
break up as mentioned in form D submitted for consent application under the Water Act- 1974.
a) Industrial: 0.000 KL/Day
b) Domestic: 0.800 KL/Day
3.3 Sewage shall be disposed off through septic tank/soak pit system or shall be treated separately in
Sewage Treatment Plant (STP) to conform the following standards and treated sewage shall be
utilized on land for irrigation / plantation.
3.4 There shall be no discharge of the industrial effluent which will be generated from the
manufacturing process and other ancillary industrial operations, Hence the unit shall strictly adhere
to zero liquid discharge (ZLD).
3.5 Unit shall be required to make adequate storage facilities to store the effluent by providing acid
proof brick lined impervious tanks/HDPE tanks.
3.6 Unit shall make fixed arrangement in Effluent Treatment Plant. Unit shall not keep any by-pass
line or system or loose or flexible pipe line in ETP.
3.7 Magnetic flow meters shall be installed at the inlet & outlet of effluent collection tanks/ ETP
to measure the quantity of effluent.
3.8 Unit shall affix of water meters as per Section 4 (1) of the water (Prevention and Control of
Clean Gujarat Green Gujarat
ISO-9001-2008 & ISO - 14001 - 2004 Cerfified Organisation
Computer generated Order thru XGN, does NOT require Physical Signature Page No-2 of 7
GUJARAT POLLUTION CONTROL BOARD
Paryavaran Bhavan, Sector-10/A,
Gandhinagar - 382010
GPCB
Phone: (079)23226295
Fax: (079)23232156
Websit: WWW.gpcb.gov.in
Pollution) Cess Act – 1977 for the purpose of measuring and recording the quantity of water
consumed at such places as may be required, within 15 days and it shall be presumed that the quantity
indicated by the meter has been consumed by the unit until the contrary is proved.
3.9 The underground drainage connection given by the GIDC for discharge of industrial effluent shall
be disconnected & the outlet shall be sealed, if unit have.
3.10 In no circumstances the effluent either treated or untreated shall be discharged into underground
drainage pipeline of GIDC, storm water drain or anywhere else.
3.11 Unit shall provide adequate / safe effluent sampling facility for the effluent being stored in final
collection / discharge tank of ETP/STP.
3.12 Unit shall put up at the entrance a board displaying the name of unit, particulars of the products/
process, the name of proprietor/partners /directors of the unit, the electricity consumer number as on
the record of DGVCL.
3.13 Unit shall have to display on-line data outside the main factory gate with regard to and nature
of hazardous chemicals being handled in the plant, including waste water and air emission and solid
hazardous waste generated within the factory premises.
3.14 Unit shall have to keep accurate records of quality & quantity of effluent on day- to -day basis.
Separate logbook shall be maintained for recording the data & shall be made available for inspection
as & when asked.
3.15 Unit shall keep accurate records of quantity of production of each product, quantity of water
consumption, quantity of effluent generated and consumption of electricity on day to day
basis and required to submit the complied record of each month to GPCB on or before fifth day
of the succeeding month.
3.16 In case of incinerators or MEE, the flow measuring devices for mother liquor/ toxic effluent/
Non-biodegradable effluent, light diesel oil, Furnace oil, etc. i.e. fuel used for combustion, air
used for combustion shall be separately provided. Incinerator temperature recording devices as
well as gaseous flow measuring devices for scrubber s hall also be provided. These data of
temperature & flow should be recorded every day & submitted to GPCB on monthly basis.
3.17 Disposal system for storm water shall be provided separately. In no circumstances storm water
shall be mixed with the industrial effluent.
3.18 Leachate from the hazardous solid waste, if any shall also be connected into a collection tank
through leachate collection facilities and shall be treated along with industrial effluent and unit
shall maintain ZLD.
3.19 The Environmental Management Unit / Cell shall be setup to ensure implementation on and
monitoring of environment safeguards and other conditions stipulated by statutory authorities .The
Environmental Management Cell / Unit shall directly report to the Chief Executive of the organization
and shall work as a focal point for internalizing environmental issued. These Cells also coordinate the
exercise of environmental audit and preparation of environmental statements.
Computer generated Order thru XGN, does NOT require Physical Signature Page No-3 of 7
GUJARAT POLLUTION CONTROL BOARD
Paryavaran Bhavan, Sector-10/A,
Gandhinagar - 382010
GPCB
Phone: (079)23226295
Fax: (079)23232156
Websit: WWW.gpcb.gov.in
3.20 The Environmental audit shall be carryout yearly, if applicable. The environmental statements
pertaining to the previous year shall be submitting to this State Board latest by 30th September every
year.
3.21 Adequate plantation shall be carried out all along the periphery of the industrial premises in such
a way that the density of plantation is at least 1000 trees per acre of land and a green belt of 5 meters
width is developed.
3.22 In case of change of ownership / management the name and address of the new ownership /
partners / directors / proprietor should immediately be intimate to the Board. Also any change in
equipment or working conditions as mentioned in the consents form / order should immediately be
intimated to this Board.
3.23 The Board reserves the right to review and/or revoke the consent and / or make modifications in
the conditions which it seems fit in accordance with provisions of Water Act-1974.
SPECIFIC CONDITION
4.1 Unit shall use fuel as specified in this consent and the flue gas emission through stack
shall conform to the following standards:
4.2 There shall be no process gas emission from the manufacturing process and any other ancillary
industrial operation through various stacks/ vent of reactors, process, vessel from plant premises.
4.3 The concentration of the following parameters in the ambient air within the premises of the
unit shall not exceed the limits specified hereunder.
Computer generated Order thru XGN, does NOT require Physical Signature Page No-4 of 7
GUJARAT POLLUTION CONTROL BOARD
Paryavaran Bhavan, Sector-10/A,
Gandhinagar - 382010
GPCB
Phone: (079)23226295
Fax: (079)23232156
Websit: WWW.gpcb.gov.in
4.4 Unit shall operate industrial plant / air pollution control equipment very efficiently
and continuously so that the gaseous emission always conforms to the standards specified as
above.
4.5 The consent to operate the industrial plant shall lapse if at any time the parameters of
the gaseous emission are not within the tolerance limits specified as above.
4.6 Unit shall provide portholes, ladder, platform etc at chimney(s) for monitoring the air
emissions and the same shall be open for inspection to / and for use of Board’s staff. The
chimney(s) vents attached to various sources of emission shall be designed by numbers such
as S-1, S-2 , etc. and these shall be painted / displayed to facilitate identification.
4.7 Unit shall take adequate measures for control of noise levels from its own sources within
the premises so as to maintain ambient air quality standards in respect of noise to less than 75
dB(a) during day time and 70 dB (A) during night time. Daytime is reckoned in between 6 a.m.
and 10 p.m. and nighttime is reckoned between 10 p.m. and 6 a.m.
4.8 All efforts shall be made to control VOC emissions and odor problem, if any.
Computer generated Order thru XGN, does NOT require Physical Signature Page No-5 of 7
GUJARAT POLLUTION CONTROL BOARD
Paryavaran Bhavan, Sector-10/A,
Gandhinagar - 382010
GPCB
Phone: (079)23226295
Fax: (079)23232156
Websit: WWW.gpcb.gov.in
5.5 The authorization is subject to the conditions stated below and such other conditions as
may be specified in the rules from time to time under the Environment (Protection) Act -
1986.
.1 The authorised person shall comply with the provisions of the Environment (Protection) Act,1986,
and the rules made there under.
6.2 The authorisation or its renewal shall be produced for inspection at the request of an officer
authorised by the Gujarat Pollution Control Board.
6.3 The person authorised shall not rent, lend, sell, transfer or otherwise transport the hazardous
and other wastes except what is permitted through this authorisation.
Computer generated Order thru XGN, does NOT require Physical Signature Page No-6 of 7
GUJARAT POLLUTION CONTROL BOARD
Paryavaran Bhavan, Sector-10/A,
Gandhinagar - 382010
GPCB
Phone: (079)23226295
Fax: (079)23232156
Websit: WWW.gpcb.gov.in
6.5 The person authorised shall implement Emergency Response Procedure (ERP) for
which this authorisation is being granted considering all site specific possible scenarios
such as spillages, leakages, fire etc. and their possible impacts and also carry out mock drill
in this regard at regular interval of time.
.6 The person authorised shall comply with the provisions outlined in the Central
Pollution Control Board guidelines on “Implementing Liabilities for Environmental Damages
due to Handling and Disposal of Hazardous Waste and Penalty”
.7 It is the duty of the authorised person to take prior permission of the Gujarat Pollution
Control Board to close down the facility.
6.8 The imported hazardous and other wastes shall be fully insured for transit as well as
for any accidental occurrence and its clean - up operation.
6.9 The record of consumption and fate of the imported hazardous and other wastes shall be
maintained.
6.10 The hazardous and other waste which gets generated during recycling or reuse or
recovery or pre - processing or utilisation of imported hazardous or other wastes shall be
treated and disposed of as per specific conditions of authorisation.
6.11 The importer or exporter shall bear the cost of import or export and mitigation of damages if, any.
6.12 An application for the renewal of an authorisation shall be made as laid down
under Hazardous & Other Wastes (Management and Transboundary Movement) Rules - 2016.
6.13 Any other conditions for compliance as per the Guidelines issued by the Ministry of
Environment, Forest and Climate Change or Central Pollution Control Board from time to time.
6.14 Annual return shall be filed by June 30th for the period ensuring 31st March of the year.
6.15 Unit shall have to display the relevant information with regard to hazardous waste as indicated
in the Court’s order in W.P. No. 657 of 1995 dated 14th October 2003.
For and on behalf of
GUJARAT POLLUTION CONTROL BOARD
Computer generated Order thru XGN, does NOT require Physical Signature Page No-7 of 7