The document appears to be a log of shift activities for various assets between September 2021 and October 2021. It includes details of the date, shift, operator, asset/unit codes and foreign names for each entry. Activities include things like breakdown repairs for issues like leaking tires, low power, and hydraulic oil leaks. Maintenance activities like greasing and 500 hour PM services are also mentioned.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
39 views
Logset He
The document appears to be a log of shift activities for various assets between September 2021 and October 2021. It includes details of the date, shift, operator, asset/unit codes and foreign names for each entry. Activities include things like breakdown repairs for issues like leaking tires, low power, and hydraulic oil leaks. Maintenance activities like greasing and 500 hour PM services are also mentioned.