SAAD

The document discusses the deployment of a new restaurant management system. Key points: 1. Various deployment options are considered, including uploading the app to a web server or store, and installing on a local customer server for privacy. 2. The software is packaged for easy setup and installation. 3. A deployment schedule is created to inform stakeholders of events and plan backups and updates. 4. Post-deployment testing checks for bugs, errors, and security holes before launching the new system.

Uploaded by

Anish bhusal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
35 views

SAAD

The document discusses the deployment of a new restaurant management system. Key points: 1. Various deployment options are considered, including uploading the app to a web server or store, and installing on a local customer server for privacy. 2. The software is packaged for easy setup and installation. 3. A deployment schedule is created to inform stakeholders of events and plan backups and updates. 4. Post-deployment testing checks for bugs, errors, and security holes before launching the new system.

Uploaded by

Anish bhusal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 12

1.

Systems analyst

2.
Planning

3.
Third party enquiry

4.
Registration option of system

5.
Observation

6.
Open/ Close

7.
Integration testing

8.
Exception report
9.
Corrective

10.
Enterprise computing system

Question B1

ans
Context Diagram

Context Diagram is a designing tool which is use to show the relationship that the system has with
other external entities. It is also know as context-Level Data-Flow Diagram or Level-0 Data Flow
Diagram. It does not require technical knowledge to understand.

Context Level Data-Flow Diagram


External Entity

Name Customer

Description

Input Data flow Food Service, conformation, invoice generate

Output Data flow Reservation, Food order, payment, Feedback

Data Flow

Name Food list

Description List of the food or menu provided by restaurant


for the customer

Source Restaurant management system

Destination Manager External Entity

Data structure Drinks, snacks, breakfast, continental...

QUESTION B2

~Feasibility study

Feasibility study is the process of analyzing whether the whole process of system analysis
leading to computerization would be profitable ,meaningful , constructive and feasible for
organization to develop or not. It is conducted once the system goal is set. and it is basically the
test of the develop system in terms of cost efficiency, work ability and effective use of
resources. .There are different levels of feasibility studies some of them are as follow;
 Technical Feasibility
 Economic feasibility
 operational feasibility
 social feasibility
 Time (schedule) feasibility
Operational feasibility
Operational feasibility studies whether the user can operate the new system or not. It depends
upon human resources for the implementation and development of the new system. It is
considered whether the experienced manpower and qualified manpower is available for
development and implementation of the system or not. It determine the general skills ,
capabilities and training of the existing personnel. It determines how well the develop system
solve the problems and how it satisfies the requirements identified in the analysis phase of
system development. It includes PIECES framework which is a problem solving framework in
the phase of system development. The survey conducted to determine the flaws of the existing
Restaurant Management System at bistro with respect to the PIECES

PIECES
PIECES is one of the perspective of frameworks for identifying and understanding requirements. It can
serve as tool to classify the opportunities, problem and directives identified in system. The letters of
the PIECES acronym as;
P(Performance):

Through put rate of bistro is sluggish. It is not presentable because records have to search to maintain
in a files whereas in the newly proposed system through put is swift , The records are totally
computerized so that the records can be easily modify. At the manual system it consumes time to search
data of the customers but in new system it takes short time to find customer records. The proposed
framework for Bistro Restaurant must be able to deliver invoice , sales report, bill and order .

Information
I. Input:
It is used to enter the data in a system to be processed. For instance customer records, raw
materials, orders and so on. In the legacy system information are recorded in the register which
creates errors due to replication of same name and it is more time consumption system but in
newly proposed system time consume is very low and can be store more numbers of data in a
minutes. Data redundancy is very low in new develop system.
II. Output
It is difficulties to search the data especially when some change have to be done . It takes more
time while searching the data of the customer. In new system it will be easy to update, delete
names ,orders of the customer and it takes less times to search data .
III. Store data

Records are store in a register which is not save which can be operate by anyone . Once the file
is destroyed it is not available so to prevent from such damages and problems New system is
proposed were files are only operate by real personal and it helps to keep data confidential.

Economic
Economic play vital role in every organization. legacy system is require materials such as register, Pen
and other stuff to keep records of the customer but in new develop system every things done with
computer so it is less expensive and more reliable then old system.

Control and security


Security is essential to prevent data of the customer. It is very difficult to protect data in legacy system
from unauthorized access. In new system it is very easy to keep data confidential. Data can be store in
drives to protected from hackers and unauthorized access.

Efficiency
It is complicated to sort out particular information from whole information. It is difficulties to avoid
redundancy when information is repeated. legacy system is less effective and slow. New system is more
effective and fast to immediate processing .New system is develop to avoid redundancy.

Service
This is the last stage of PIECES framework .The service of the bistro Restaurant is very slow it is not
the satisfactory level but in the new system services is fast and it takes less time to generate bills and
reports.

QUESTION B3

System deployment is the process to make software system available to use and makes ready to
delivered to owners or clients. In this phase of system deployment owners and customer are informed
about the lunching date and time of the product and system.

Restaurant management system use fully computerized system to keep records, generate bills , invoice
number about customer payments. Customer details, order list ,food items are recorded in a database of
the restaurant so it is easy to search particular information about customer.

There are different stage of system deployment. Some of them are as follow

 Determining Deployment options

 Packaging software

 Deployment Scheduling

 System Change-over Strategies

 Integrating system components


 post-Deployment testing

 provide training to user

Determining Deployment options

upload to web server


It is the process where to upload develop application or software . In this phase of the determining
deployment option, application are lunch in the website or web application.

Upload to web store


In this stage application are upload in a play store so that it will to easy to download for end user .
Restaurant has lunch its application to the web store so that any end user can make order or make
reservation by downloading the restaurant app.

Install in customer local server


Restaurant is concerned about customer privacy such as phone number, Address so that restaurant update
the old system to computerized system where all record are store in a database of the restaurant so that
only real person get information about customer and the records are kept in a customer local server
because it will be easy to search information about particular customer .

Packaging software
In this phase, operation are prepared for system to transfer customer information into customer site. In
this process source codes are converted to execution for easy setup and installation of the system in a
computer. At packing software two different manuals are prepared one for user and another for technical.

Deployment scheduling

In this phase of deployment , All the information should be inform to stakeholders about deployments
events. There are plan backup for old system and update for new system in a cloud. In the deployment
scheduling for local system installation at user place, it is necessary to recognize stakeholder involved
in the system and informed about data and time for installation.

System change over strategies


System change over strategies are essential to every organization to update their system. It is the process
of moving from one system to another because of cost, time ,bugs errors e.t.c . The mention restaurant
moved from old system to computerized system so that they can give fast service to their customer and
keep records of their customer in restaurant database.

Integrating system components


At this phase of deployment system all the system are connected to the main server of the organization
so that anyone can get information about their customer records but in case of mention restaurant
integrating system is impossible because there is no any branches of the restaurant but in coming days it
can be update when there will be added more branches so that the information of the customers and
orders can be seen from any branches. In this stage all branches database are connected with each to
each information from one branches to another.

Post Deployment testing


Testing is essential step of any application or software to finds bugs and errors of the system before
lunching in the markets or upload in a web server. In this stage all security is done to check hole of the
system so that unauthorized person cannot access the system . It also check connections between servers
and main branches. In the case of mention restaurant all test are done and now system is ready to lunch
in different platform.

provide training to user


After lunching any software and application training is very importance because it gives idea about how
to run new system. Training is complicated to large organization. It helps end user to understand
common function of the system. It also helps technical supporters to fix common bugs and errors while
running the system.
ii)
ANS

System Changeover is the process of changing old Information system with new system. It is also the
smooth sifting of old system with new system. If the old system is outdated or hard on processing than
system should be update or change according to the new technologies.

Here are 4 methods of System Change-over Strategies

Parallel change over.


In this parallel changeover both old and new system are working at a same time until the users are not
satisfied with new system. In this type of change over there is no high risk of losing data and information of
companies. But it needed large storage capacity on the device for both systems. Manage compare old
system with new in terms of effective and reliable.
-

Direct Changeover
Direct changeover is the change occur in the system immediately after old to new. It is the riskiest way of
change over where no data can be restored if it was damaged because old system was destroyed. Users
should be with enough confident to make this change over on their system .In this change over once the
system is broken it effect whole system of the organization. This is the cheapest method to store
information. There is high chance to loss data from database.
Pilot Changeover
Like pilot research this change over is also done in certain branches or devices of the company. And later on
gradually change occur on all over the company. This change over helps users to know about the system on
pilot phase. Damage of system can’t affect the whole system of the industry. -

Phase Changeover

Phase change over is the combination of direct and parallel changeover. In this type of change only one part
or phase of the system will be implemented. After user get the perfect knowledge about the particular phase
then next implementation will be done. In this way all implementation will be done gradually. It may takes
time but it is the safest way of changeover strategies.
Over all, By looking to the different System Changeover strategies Restaurant Management System is
Phase Changeover because it is the safest way of change over and no extra spacing needed. Information are
more secure because all the records are store in a restaurant database therefore only authentic user have
access to the database .There is no any disturbance when there is any problems arise in a single system .
This system is more reliable and effective to store information so that phase change over strategies is
suitable for restaurant management system.. This system does not affect the work flow of the system.