The document lists the recommended tools, equipment, materials, and training facility needs for a course on Electrical Installation & Maintenance NC II for 25 trainees. It includes a detailed list of tools, equipment, and materials such as spirit levels, hacksaws, power drills, electrical wires, boxes, and more. It also specifies the space requirements for the student working areas, laboratory, learning resource center, and circulation with total required area being 256.25 square meters.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
94 views3 pages
Eim Basic and Equipment
The document lists the recommended tools, equipment, materials, and training facility needs for a course on Electrical Installation & Maintenance NC II for 25 trainees. It includes a detailed list of tools, equipment, and materials such as spirit levels, hacksaws, power drills, electrical wires, boxes, and more. It also specifies the space requirements for the student working areas, laboratory, learning resource center, and circulation with total required area being 256.25 square meters.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3
3.
4 LIST OF TOOLS, EQUIPMENT AND MATERIALS
ELECTRICAL INSTALLATION & MAINTENANCE NC II
Recommended list of tools, equipment and materials for the training
of 25 trainees for Electrical Installation & Maintenance NC II.
TOOLS EQUIPMENT MATERIALS
QTY ITEM QTY ITEM QTY ITEM 5 pcs. Spirit level 5 units Power drill 50 pcs. RSC 5 pcs. Hack saw 5 units Portable grinder 50 pcs. IMC 5 pcs. Pipe cutter 1 unit Power saw 50 pcs. EMT 5 pcs. Plumb bob 5 units Fire alarm system 5 pcs. Entrance cap 5 pcs. Pipe reamer 5 units Pipe-in Music/ Paging 125 pcs. Locknut 5 pcs. Pipe threader 5 units Security equipment 125 pcs. Bushing 5 pcs. Pipe bender 5 units CCTV 250 pcs. Metal strap 5 pcs. Bolt cutter 5 units MATV Master 10 pcs. Floor outlet Car park ramp 5 pcs. Jack hammer set 5 units 5 pcs. Ground fault detector 10 Current interrupting 25 pcs. Electrician Pliers Multi-tester 5 pcs. units outlet 25 pcs. Screwdrivers set 5 units Mega-ohmmeter 25 pcs. Working gloves 25 pcs. Wrench box 5 units Clamp ammeter 25 pcs. Safety shoes Proper working 25 pcs. Wire splicer 5 units Megger 25 pcs. clothes 25 pcs. Wire stripper 5 units High potential tester 25 pcs. Hard hat 25 pcs. Electrician knife 5 units Earth resistance tester 25 pcs. Safety goggles 25 pcs. Tools holster 5 units Labeling machine 5 boxes Wire AWG #12 Fire extinguisher KGS 5 pcs. Push-pull 0-5 mtrs 1 unit 5 boxes Wire AWG #14 ABC 5 pcs. Claw hammer 1 unit OHP 5 rolls Electrical tape 5 pcs. Ballpeen hammer 5 units Industrial Fan 1 box Wood screw ½” x 8 Circular loom (mica 5 pcs. Prick punch 50 m tubing 3/8”) 25 Receptacle surface 5 pcs. Heat gun 1200 watts pcs. type Heavy-duty soldering 25 5 pcs. Receptacle flush type iron 1000 watts pcs. 25 Incandescent bulb 50 5 pcs. Flat file smooth 8” pcs. w/ 250V AC Convenient outlet c.o. 25 (flush type) 2 gang w/ sets plate and cover TOOLS EQUIPMENT MATERIALS QTY ITEM QTY ITEM QTY ITEM 10 PVC square box pcs. 4x4 100 PVC clamp ½ pcs. 100 PVC clamp ¾ pcs. 50 Assorted condulet 50 Corrugated PVC ½”, ¾ mtrs. 50 PVC conduit ½, ¾ 50 pcs. Junction box PVC 50 pcs. Junction box metal 50 Connectors PVC, ½ 50 Connectors PVC, ¾ 50 Connectors RSC, ¾ 20 pcs. Elbow PVC ½ 20 pcs. Elbow PVC ¾ 20 pcs. Elbow RSC ½ 20 pcs. Elbow RSC ¾ Panel board with 70 amp main and subcircuits 5 sets 20 amps, 2 pcs. 30 amps, 2 pcs. 15 amps, 2 pcs. Switch (3 way with plate 40 pcs. and cover) Switch (single pole with 20 pcs. plate and cover0 Switch (4 way with plate 20 pcs. and cover) 10 rms. Bond paper 1 pc. Whiteboard 4 x 8 x ¾ Whiteboard 4 x 4 x ¾ 1 pc. with movable stand Whiteboard marker, 1 box assorted color Whiteboard eraser 2 pcs. magnetic 1 box Push pin 1 pc. Pencil sharpener 3 boxes Pencil with eraser 2 kgs. Rag 5 ltrs. Cleaning agent liquid 1 unit First aid kit 10 mtrs. Emery cloth #120 25 pcs. Utility box, 2’ x 4” 3.5 TRAINING FACILITIES ELECTRICAL INSTALLATION & MAINTENANCE NC II
Based on a class intake of 25 students/trainees, below are the space
requirement & their sizes:
SPACE SIZE IN METERS AREA IN TOTAL AREA IN
REQUIREMENTS SQ. METERS SQ. METERS
Student/Trainee 2.50 x 2.50 6.25
Working Space per student/trainee per student 156.25 Contextual Learning Laboratory 4x5 20 20 Learning Resource Center 4x5 20 20 Facilities/Equipment/ Circulation area 10 x 6 60 60