0% found this document useful (0 votes)
251 views

Is 1200 (Part 09) 1973 Method of Measurement of Building and Civil Engineering Works, Part 9 - Roof Covering (Including Cladding)

Uploaded by

Binja Ram
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
251 views

Is 1200 (Part 09) 1973 Method of Measurement of Building and Civil Engineering Works, Part 9 - Roof Covering (Including Cladding)

Uploaded by

Binja Ram
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 13

Download

From

material.vatsalvala.in
IS : 1200 (Part IX) - 1973
(Reaffirmed 2007)

Indian Standard
METHOD OF MEASUREMENT OF
BUILDING AND CIVIL ENGINEERING WORKS
PART IX ROOF COVERING (INCLUDING CLADDING)

( Second Revision)
Tenth Reprint JUNE 2008
(Incorporanng Amendment No.1)

UDC 69.003.12 : 69.024.15

© Copyright 1978
BUREAU OF INDIAN STANDARDS
MANAK BHAVAN, 9 BAHADUR SHAH ZAFAR MARG
NEW DELHI 110002

Gr 3 March 1973
IS I J»O (Part IX) -1973

Indian Standard
METHOD OF MEASUREMENT OF
BUILDING AND CIVIL ENGINEERING WORKS
PART IX ROOF COVERING (INCLUDING CLADDING)

(Second Revision)
Civil Works Measurement Sectional Committee, BDG 44

CluJinnd" RqwUltdi.,
SHal v. R. V AJSR Bureau or Public Enterprises, Ministry ofYmance
M,mbns
SUBI N. P. ACHABYY.&. Calcutta Port Trust
SURI R. G. ANA.ND Indian Institute of Architects, Bombay
ASSISTANT ADVI8BB (PRE) Ministry of Health & Family Planning
SaB] B. G. BALJ'EJtAB Hindustan Steel Works Construction Ltd, Calcutta
8Ha] P. L. BHASIN Institute of Surveyors, New Delhi
CHIEF ENGINEER Heavy Engineering Corporation Ltd, Ranchi
CHID' ENGINEEB (H. & B) Public Works Department, Government of Andhra
Pradesh
S1JJ'EBINTENDI~O ENGINE!:B
( PLANNING .& DB8IGN) (Altn'1lat,)
SaBI R. K. CRoun'RRY Bhakra Management Board, Nanga} Township
SHBI P. S. RAO ( Alknaal, )
SSBI V. B. DESAI Hindustan Construction Co Ltd, Bombay
DIBEOTOR (RATES 4!t CoSTS) Central Water &. Power Commission, New Delhi
DEPUTY DIBZcrOB (RATES
8t COSTS) (AllmatJl,)
DIBBCTOR, IRI Irrigation Department, Government of Uttar
Pradesh
SUBI P. K. DOCTOB Concrete Association of India) Bombay
SaRI D. S. VI~AYBNDBA (AltmuJtt)
ExEOUTIVE ENOINBEB (PLAlOfING Ministry of Railwa fI
&. DESIGNS) NOB T B E B N
RAILWAY
SSBI P. N. GADI Institution of Engineen (India), Calcutta
SSBI W.J. daGAJI.&. Bombay Port Trust
SUBI V. G. HBoDJI: National Buildings Organization, New Delhi
SU:a1 J. P. SRAB• .&. (.AI''''''',)
SHal G. V. HDtOO:a.ANJ Gammon India Ltd, Bombay

~ CopyriJl'" 1978'
BITREAlJ OF INDIAN STANDARDS
This publication is protected under the Ifldia Copyri,1aI At' (XIV of 1957) and
reproduction in whole or in part by any means except with written permiaaion or the
publisher .hall be deemed to be an in&in~ment of copyright under the aid Act.
ISI~ (Part 1X)-I97S
( c.n"",tlfr"'" /HJ,. 1 )
M.".".,s &/Jr,..,Uw
SHal H. K. KHOSLA Irr~tiOD Department, Governmeat of Haryana
Sa&1 KalSKAN KUKAB Mimstry of Shipping It Tra.port ( Iloada Wing )
SlIBJ L. R. KADIY ALI (A.lImtt*)
S••I K. K. MADBOJt Builders AuociatioD ollodia, Bombay
SSBI MUJt18B Gurr.& (AltWMU)
SaBl R. S. MUBTBY Engineer-in..Qhief'1 Branch, Army Headquarten,
New Delhi
SRBI V. V. SA.m..... (All"""')
Sam T. S. MUBTBY National Project CODItructioD Corporation,
New Delhi
SlUt! K. N. TAX&TA (AlImMII)
8JrBI C. B. PATBL M. N. Daltur & Co Private Ltd, Calcutta
SR.l B. C. PATBL (.dll.rltllll)
5. .1 Y. G. PA.TEL Patel Engineering Co Ltd. Bombay
SKat C. K. CsoJt8m (AlImtIJU)
Sam A. A. RAI'O' HiDdultan Steel Ltd, Rancbi
SJlBI S. Sannv.i. • .uf ( A.lImtIJU )
S"J K. G. SALVI HiDduatan Housing Factory Ltd, New Delhi
8lmI G. B. SINOH ( All.,.,.,.)
SBCllETABY Central Board of Irrigation and Power J New Delhi
DB R. B. SINOH Banaras Hindu University, Varanasi
StTPBJWfTD'DINQ St1JIVKYOB ow Central Public Worka Department (Aviation),
New Delhi
WOBE.8 (AVIATION)
SUBVBYOB
AT'rAOBltD TO
o.
~OBK. (1)
SUPJIBIlf-
~ENDINQ SuaVEYOB OY
WOBK8 (AVIATION) (AlImuzl,)
S11PJ:J&IN"l'.BND11fQ St1BVBYO. 0.. Central Public Worb Department. New Delhi
WOaK8 (I)
StTBVltYOB 0., WOllES (I)
ATTAOHJDD TO Sup.8BUf-
~IJrQ StTBV&Yo. (d'
Wo:ue (I) (Altml4ll)
TJ:CJDflO.A.L ExAKnma Buildinp and CommunicatiOD Department, Govem-
ment of Maharuhtra
S. .1 D. A3ITBA SIKB&, Director OeDeral, lSI (&-qIi&io M6mHr )
Director (Civ EDa )

~
SBJU K.. M. MA~raa
A8iataat Director (CiY Baa), lSI

2
B,l_ (Part 1X)-1t73

Indian Standard
METHOD OF MEASUREMENT OF
BUILDING AND CIVIL ENGINEERING WORKS
PART IX ROOF COVERING (INCLUDING CLADDING)

(Second Revision J
o. FOREWORD
0.1 This Indian Standard (Part IX) (Second Revision) was adopted by
the Indian Standards Institution on 16 February 1973, after the draft
finalized by the Civil Works Measurement Sectional Committee had been
approved by the Civil Engineering Division Council.
0.2 Measurement occupies a very important place in the planning and
execution of any civil engineering work from the time of first estimates to
the final completion and settlement of payments for a project. Methods
followed for measurement are not uniform and considerable differences
exist among practices followed by different construction agencies and
also among various Central and State Government departments. While
it is recognized that each system of measurement has to be specifically
related to administrative and financial organizations within a department
responsible for the work, a unification of various systems at technical level
has been accepted as very desirable specially as it permirs a wider range
of operation for civil engineering contractors and eliminates ambiguities
and misunderstandings of various systems followed.
0.3 Among various civil engineering items, measurement of buildings 'was
the first to be taken up for standardization and this standard having
provisions relating to building work was first published in 1958 and was
revised in 1964.
0.4 In the course of usage of this standard by various construction agen-
cies in the country, several clarifications and suggestions for modifications
were received and as a result of study, the technical committee responsi-
ble for this standard decided that its scope besides being applicable to
buildings should be expanded to cover method of measurement of civil
engineering works like industrial and river valley projects.
oeSSince different trades are not related to one another t the Sectional
Committee decided that each trade as given in IS: 1200-1964· shall be
·Metbod of measurement of building worb ("'Diud).

3
ISI~ (PanIX)-lI7S
issued separately as a dift'ereIlt part. This will also be helpful to u~en
in using the specific standard.
0.5.1 Pfhis part coven method of measurement 4)f roof eovttilt~
( including cladding) applicable to buildings as well as to civil eng,,~r.-~t ...
ing works.
0.6 For the purpose of deciding whether a particular requirement of this
standard is complied with, the final value, observed or calculated,
expressing the result of a measurement, shall be rounded off in accord-
ance with IS: 2-1960*. The number of sign~cant places retained in
the rounded off value should be the same as that of the specified value
in this standard.

1. SCOPE
1.1' This standard (Part IX) covers the method of measuremmt of roof
coVCring (including cladding) for buildings and civil engineering worb.

2. GENERAL RULES
2.1 Clabbial olltem- - Items may be clubbed together provided that
the break-up of the clubbed items is agreed to be on the basis of the
detailed description of the items stated in this standard.
2.2 Booldac of Dlme. .1.... - In booking dimensions, the order shall
be consistent and generally in the sequence of length, breadth or width
and height or depth or thickness.
2.3 DeIIcdpdoa 01 Ite1D8 - The description of each item shall, unless
otherwise stated, be held to include, where necessary, canveyance and -,
delivery, handling, unloading, storing, fabrication, hoisting, all labour
for finishing to reCfuired shape and size.
2.4 M~u - Unless otherwise stated hereinafter all works
lball be measured net in decimal system, as fixed in its place, as given in
1.4.1 and"2.4.2 4

2.4.1 Dimension shall be measured to the nearest 0·01 m.


2.U Areas shall be worked out to the nearest 0·01 mi.
2.5 Work executed in the snow shall be measured separately.

-Rules for roundiDl oWDwn~l val... ( rm.u).

4
IS 11200 (Part IX) ·1973
2.8 Bib. of QJaaadtln - The bills of quantities shall fully describe the
materials and workmanship, and accurately represent the work to be
executed.
2. '1 The superficial area of roof coverings and cladding as laid shall be
measured on the flat in square metres without allowance for laps and
corrugations, if any.
2.7.1 Portions of roof covering overlapped by ridge or hip, etc, shall be
included in the measurements of the roof except where otherwise
stated. fII •

2.8 Any opening not exceeding 0·4 rn l shall not be deducted and form-
ing such openings requiring cutting shall be enumerated.
2.' Any opening exceeding 0-4 m l shall be deducted and cutting requi-
red shall be measured in running metres,
2.10 Cutting across corrugations shall be measured on the flat and not
girthed.
2.11 No additions shall be made for laps cut through.
2.12 Sheeting curved or bent to curvature shall be measured separately.
2.13 'The woodwork and steelwork shall be measured separately under
the relevant part of this standard.

3. METAL SHEET ROOFINGS


3.1 The type of sheeting shall be described stating the thickness. The
side and end laps shall be stated.
3.2 If the side and end laps are bolted or riveted, it shall be so stated
specifying the spacing ofthe bolts or rivets.
3.3 Nainital pattern sheet-roofing shall be fully described and measured
separately and shall include all rolls, clips, etc. Measutements shall be
taken on the flat and not girthed.
3.4 Ridges, hips and valleys shall be measured along the central line in
running metres stating the girth and flashings in square metres. The
laps, passings and method of fixing shall be described.
3.4.1 The laps along the length of the ridges, hips, valleys or flashing
pieces shall not be measured separately. ~

t. ASBESTOS CEMENT ROOFING


-1.1 The type of sheeting shall be described stating the thickness.
IS : 1200 ( Part IX) ·1973
4.1.1 The side and end laps shall be stated and the method of fixing
described. If required to be fixed in accordance with maker's instruc-
tions, it shall be so stated.
4.2 Ridges and hips shall be described stating the laps and measured in
running metres along the ce ntral line; where in two pieces, these shall be
measured as one length.
4.3 Ridge finials, cowl type ventilators, curved barge boards for north-
light curves, roof lights, expansion joints for ridges and expansion joints
for northlight curves shall be described and enumerated. Ridge finials
where in two interlocking pieces, shall be measured as one number.
4.4 Eaves filler pieces, aprons, barge boards, corner pieces, flashings,
louvers, northlight and ventilator curves, expansion joints for sheets and
other similar specials shall be described and measured for the finished
work in running metres stating the laps and the method affixing.
4.5 Ventilator sheets and other sheeting of dissimilar material shall be
described and enumerated as C extra over' on ordinary sheeting.
4.6 Eaves and valley gutters shall be described and measured in running
metres along the central line.
4.7 Accessories, such as drop ends, stop ends, nozzles and angles shall
be described and enumerated as 'extra over' gutters.
-i.8 Union clips (loose sockets) shall not be measured separately.

5. ROOF SHEETING OTHER THAN METAL .AND ASBESTOS


CEMENT
5.1 The method of measurement given in 4 shall also be applicable to
roof sheeting of plastic, fibre glass, etc.
6. CLADDING (PLAIN, CORRUGATED OR SEMI-CORRUGATED)
6.1 The type of sheeting shall be described stating the thickness. The
side and end laps shall be stated and method of fixing described. If the
side and end laps are bolted or riveted it shall be so stated specifying the
spacing of bolts OT rivets.
7. ROOF TILING
7.1 The description shall state the kind, pattern, quality and size of the
tiles, the gauge to which they are to be laid and the method of laying.
7.2 Single and double tiling shall each be measured separately.
7.3 Ridges, hips and valleys, shall be measured in running metres. If
let in mortar, it shall be so stated specifying the mortar.
6
IS 11200 (Part IX) -1973

'7.4: Special ridge and hip tiles shall be described stating the kind, pattern,
quality and size as also the mortar in which bedded and pointed.
Coloured mortar (to match the coloured tiling, if required to be used
for pointing) shall be described.
7.5 Hip hooks shall be enumerated stating the size and whether black or
galvanized.
7.6 Eaves tiles bedded in mortar on walls shall be measured in running
metres as extra for eaves describing the mortar and width of bedding.
7.7 Filling ends and spaces between tiles at eaves with mortar shall be
measured in running metres and described stating the depth of filling.
7.8 Filling to single and double tiling shall be measured separately.
7.9 Screwing eaves tiles to battens shall be measured in running metres
stating type, size, spacing of screws and washers. Drilling holes in the
tiles shall be included in the description.
7.10 Half tiles or one and a half tiles at verges shall not be measured
separately, but straight cutting and waste at verges shall be allowed for
the full length of the verge and measured in running metres.
7.11 Tiles at verges bedded in mortar on walls shall be measured in
running metres as 'extra over' for verges describing the mortar and width
of tile bedding.
7.12 Country tiling shall be described as including all cutting and
waste.
7.13 Special ventilating tiles and glass tiles shall be enumerated as
'extra over' only over roof tiling.
8. ROOF SlDNGLES
1.1 Wood shingles to roof shall be measured in the same way as in the
case of roof tiling (s" 7 ).
9. 1\oop SLA'rING
'.1 Slate roofs shall be measured in the same way as in the case of roof
tiling <. see 7 ).
10. TERRACED ROOFING
10.0 The size and quality of burnt bricks, brick tiles, stone slabs and
similar materials for terraced roofing, method of laying, jointing, point-
ing and mix and type of mortar shall be described, stating the number of
layers of bricks tiles, etc.

7
IS: 1200 (Part IX ) -1973

10.1 Madras Terrace RoofiDg - I t shall be fully described and plaster


finish on the top and underside included in the item.
Itl.2 Flat brick tile roofing shall be fully described stating the thIckness
and number of layers.
10.3 Hollow roof with brick on edge bridging courses in between two
layers of tiles shall be fully described and measured separately.
10.4 Flush pointing to tiles on top and underside of roof shall be described
and included in the item of roofing.
10.5 Tiles laid in CHAJJAS and sun shades shall be measured separately.
10.6 The type of stone) quality and its dressing for stone slab roofing
shall be described stating the thickness of slabs and spacing of battens or
joists. If the size of slabs is required to be uniform, it shall be so stated.
10.7 Jack arch roofing including provision of centering shall be measured
flat overall in square metres. The clear span, rise and thickness of arch,
method of laying, jointing and pointing shall be described. The finish to
top and underside shall also be stated and included in the description.

11. ROOF TREATMENT


11.1 Lime concrete in terracing shall be described and measured in
square metres stating consolidated average thickness.
11.2 Mud terraced roof shall be described stating average consolidated
thickness.
11.3 Each type of waterproofing treatment shall be fully described ( includ-
ing type, quality and quantity of materials, side and end laps, where
necessary) and shall be measured in square metres. All cutting, waste,
forming of openings and wedging and pointing edges in masonry
work shall be included in the description. Tum-ups and trun-downs at
eaves, verges, abutment, etc, shall be measured along with waterproofing
treatment.
11.4 The primer where provided shall also be measured separately as
in 11.3..
11.5 The waterproofing treatment in flashings, aprons, gutters, hips, ridges)
valleys, etc, shall be fully described (see 11.3), and measured net separately
in square metres.
11.6 The waterproofing treatment between laps of corrugated sheeting
shall be fully described including the method of securing and measured in
running metres stating the width.
8
12. THATCHING, MATTING AND BAMBOO WORK
12.1 The materials shall be described stating the kind or fibre or straw
and the finished thickness. The description vha ll Hie Iude bamboo or
wood securing fillers, tying string and trimming to r-aves and verges.
12.2 Thatched capping to ridges and hips shall be described and measured
along central line in running rnerres stating the girth. Matting, rnaterial,
number of layers, laps and the method of fixing shall be described and all
cutting and waste shall be included.
12.:1 Cover strips and cross bracings of split bamboos or wooden laths shall
be measured in square metres as 'extra over' matting and the method of
fixing shall he described.
12.,1 Bamboos laid one-way or two-way JAFFRI work shall each be
measured separately in square metres stating the size of bamboos and their
spacing. Framing shall be included with the item-
12.5 Split bamboo work and whole bamboo work shall be measured
separately.
12 ..6 Whole bamboos fixed independently as support to matting shall be
measured in running metres stating the mean girth. The description
shall state the method of fixing and application of preservatives, if
required.

13. RAIN WATER GOODS


13.1 Gutters and pipes shall be described and measured in running metrr-s
including all short lengths, cutting and waste. The material, protective
coating, if any, the pattern, the method of jointing and fixing shall be
described. The length shall be measured along the central line. The
length of all fittings, such as bends, junctions angles and the like shall be
included.
13.2 Brackets for gutters shall be measured separately under the relevant
part of this standard.
13.3 Angles (internal or external ), drop ends and stopped ends shall bp.
eriurnera ted as ( extra over' the length of gutters and shall include extra
joints, cutting and waste.
13.4 Pipe rails, distance pieces and holder bats shall be described and
included with the fixing of the pipes.
13..5 Bends, elbows, offsets, shoes, branches, swan necks ~nd heads shall
be enumerated as C extra over' the length of pipe and shall include for
extra joints, cutting and waste.

9
t\1GIPr - 162 Deptt of HIS/2008 200 Books
BUREAU OF INDIAN STANDARDS
Headquarters:
Manak Bhavan, 9 Bahadur Shah Zatar Marg, NEW DELHI 110002
Telephones 23230131,23233375,23239402 Fax 91+01123239399,23239382
E-Mail Info@ brs org In website http //www brs org In

Central Laboratory: Telephone


Plot No 20/9, Site IV, Satubabad Industnal Area, SAHIBABAD 201010 277 0002

Regional Offices:
Central Manak Bhavan, 9 Bahadur Shah Zatar Marg, NEW DELHI11 0002 23237617
•Eastern 1/14CIT SchemeVl1 M, V I P Road, Kankurgachl, KOLKATA 700054 23378662
Northern SCQ 335-336, Sector 34-A, CHANOIGARH 160022 2609285
Southern CIT Campus, IV Cross Road, CHENNAI 600113 22541984
tWestern Manakalaya, E9, MIDC, Behind Marol Telephone Exchange, 28329295
Andhen (East), MUMBAI400093

Branch Offices:
'Pushpak', Nurmohamed Shaikh Marg, Khanpur, AHMEDABAD 380001 5601348
Peenya Industnal Area, 1st Stage, Bangalore-Tumkur Road, BANGALOAE 8394955
Commercral-cum-Otnce Complex, Opp Dushera Maldan, Arera Colony, 2423452
Bittan Market, BHOPAL 462016
62-63, Ganga Nagar, UnltVI, BHUBANESHWAR 751001 2403139
5 th Floor, Koval Towers, 44 Bala Sundaram Road, COIMBATORE 641018 221 0141
SCQ 21 , Sector 12, Fandabad 121007 2292175
savitn Complex, 116 G T Road, GHAZIABAD 201001 2861498
53/5 Ward No 29, R G Barua Road, 5th By-lane, Apurba Sinha Path, 2456508
GUWAHATI781003
5-8-56C, L N Gupta Marg, Nampally Station Road, HYDERABAD 500001 23201084
Pnthavi Raj Road, Opposite Bharat Overseas Bank, C-Scheme, JAlPUR 302001 2223282
11/418 S, Sarvodaya Nagar, KANPUR 208005 2233012
Sethi Shawan, 2 nd Floor, Behind Leela Cinema, Naval Kishore Road, 261 8923
LUCKNOW 226001
H No 15, Sector-3, PAAWANOO, Distt Solan (H P) 173220 235436
Plot No A-20·21 , Institutional Area, Sector 62, Goutam Budh Nagar, NOIDA 201307 2402206
Patllputra Industrial Estate, PATNA 800013 2262808
Plot Nos 657-660, MarketYard, Gultkdl, PUNE 411037 24274804
"Sahajanand House' 3 rd Floor, Bhaktmaqar Circle, 80 Feet Road, 2378251
RAJKOT 360002
T C No 2/275 (1 & 2), Near Food Corporation of India, Kesavadasapuram-Ulloor Road,
Kesavadasapuram, THIRUVANANTHAPURAM 695004 2557914
11t Floor, Udyog Shavan, VUDA, Sinpuram Junction, VISHAKHAPATNAM-03 2712833

*Sales Office IS at 5 Chownnghee Approach, PO Prmcep Street, KOLKAIA 700072 23553243


tSales Office (WAO) Plot No E-9, MIDC, Ad No 8, Behind Telephone Exchange,
Andhen (East), Mumbal-400 0093 28329295

Printed by the Manager, Govt of India Press, Fandabad

You might also like