Estimate For Column

This document contains an estimate for materials needed to construct 17 concrete columns. It includes: 1) Calculations to determine the quantities of cement, sand, aggregate, and steel reinforcement needed based on the column dimensions and a concrete ratio of 1:1.5:3. 2) Details on the wood forms needed, estimating a total forms area of 51 square meters requiring 18 pieces of plywood. 3) A calculation of the board feet of lumber and nails required.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
39 views

Estimate For Column

This document contains an estimate for materials needed to construct 17 concrete columns. It includes: 1) Calculations to determine the quantities of cement, sand, aggregate, and steel reinforcement needed based on the column dimensions and a concrete ratio of 1:1.5:3. 2) Details on the wood forms needed, estimating a total forms area of 51 square meters requiring 18 pieces of plywood. 3) A calculation of the board feet of lumber and nails required.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

Estimate for Column

C
Area of column Let’s consider M20. ratio is (1:1.5:3) =
(5.5)
A= section 1. Quantity of Cement

O
1
Section : 150mm x 250 mm 5.5 = 0.18 x 2.95 m³ = 0.53 m³
To kg: 0.53m³ x 1440 kg/m³= 763.2kg

L
To meters: 0.15m x 0.25m = 0.0375 cm2
To bags: 763.2kg x 1 bag/40kg = 19. 08 or
Let say height is 3m 20 bag @ 40 kg

U
2. Quantity of Sand
NO. of column = 17 1.5
5.5 = 0.273 x 2.95m³ = 0.7965m³

M
A = area x height x no. of column 3. Quantity of Aggregates
3
V = 0.0375m2 x 3m x 17 5.5 = 0.55 x 2.95 m³ = 1.62 m³

N V= 1.9125 m³
4. Quantity of Steel Bar
Dry volume of concrete = 1.54 Area = diameter x pi/4
(1.6 cm)”2” x .7854 = 2.01 cm2
Increases by 54% 150mm x 250 mm = 15cm x 25cm
No. of reinforcement = 4
Dry volume of concrete x Volume of one column = 0.4 x 375 cm2 = 15 cm2
1.54 x 1.9125 m³ 15
2.01 = 7.5 or 8 vertical bars of 16mm
= 2.95m³
E
Number of columns = 17 units

Column height = 3 meters


s Column s form area
ti Cross section 150mm x 250 mm

m Perimeter length = .15 + .25 + .15 + .25 = 0.8 m


Lapping length = 0.05m x 4 = 0.2m
a Total length = 0.8 m + 0.2 = 1m

t Forms area = total length x height

e Form Area = 1m x 3m = 3 sq.m.


Plywood area = 1.2 m x 2.4m = 2.88 sq.m.
Forms area = 3 sq.m.
Total area of forms = 3m x 17 = 51 sq.m.
Plywood pcs = 51 sq.m./ 2.88 sq.m. = 17.71 or 18 pcs
E Plywood size = 4’x 8’ x ½”

s
Coco lumber = 2”x2”

Board feet per plywood = 20.33 bd.ft.


ti Bd.ft. of Lumber = 20.33 x 18 = 365.94 or 366 bd.ft.
m *Nails
a Total floor area = 136 sq.m.
t CWNails 2”= 0.065kgs/sq.m. x 136 sq.m. = 8.84 kgs

e CWNails 3”=0.5kgs/sq.m. x 136 sq.m. = 68 kgs

CWNails 4”=0.4kgs/sq.m. x 136 sq.m. = 54.4 kgs