Estimate For Column
Estimate For Column
C
Area of column Let’s consider M20. ratio is (1:1.5:3) =
(5.5)
A= section 1. Quantity of Cement
O
1
Section : 150mm x 250 mm 5.5 = 0.18 x 2.95 m³ = 0.53 m³
To kg: 0.53m³ x 1440 kg/m³= 763.2kg
L
To meters: 0.15m x 0.25m = 0.0375 cm2
To bags: 763.2kg x 1 bag/40kg = 19. 08 or
Let say height is 3m 20 bag @ 40 kg
U
2. Quantity of Sand
NO. of column = 17 1.5
5.5 = 0.273 x 2.95m³ = 0.7965m³
M
A = area x height x no. of column 3. Quantity of Aggregates
3
V = 0.0375m2 x 3m x 17 5.5 = 0.55 x 2.95 m³ = 1.62 m³
N V= 1.9125 m³
4. Quantity of Steel Bar
Dry volume of concrete = 1.54 Area = diameter x pi/4
(1.6 cm)”2” x .7854 = 2.01 cm2
Increases by 54% 150mm x 250 mm = 15cm x 25cm
No. of reinforcement = 4
Dry volume of concrete x Volume of one column = 0.4 x 375 cm2 = 15 cm2
1.54 x 1.9125 m³ 15
2.01 = 7.5 or 8 vertical bars of 16mm
= 2.95m³
E
Number of columns = 17 units
s
Coco lumber = 2”x2”