0% found this document useful (0 votes)
420 views6 pages

Electrical Engineer Commissioning

Electrical Engineer Commissioning with 20 years experience looking for a Middle Management position.

Uploaded by

api-76895932
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as TXT, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
420 views6 pages

Electrical Engineer Commissioning

Electrical Engineer Commissioning with 20 years experience looking for a Middle Management position.

Uploaded by

api-76895932
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as TXT, PDF, TXT or read online on Scribd
You are on page 1/ 6

David L Marston

2614 Parkbriar Lane, Pearland Texas 77584


Phone (Home) 281 412 9771
Phone (Cell) 281 352 1116
(E-mail [email protected])
SUMMARY: I & E and Commissioning Engineer with more than (25) years of experien
ce in design, Estimating, Control wiring Cathodic Protection, Supervision, Commi
ssioning, construction and maintenance of various projects in he US and overseas
. With proven abilities and technical experience. Assignment have included posit
ions from Field Engineering to Project Manager.Industreies served include the fo
llowing petrochemical, refineries. Structures served Oil rig on shore and offsho
re jack up, semi submersible and floating (oil and gas), water treatment plants,
oil rigs off shore and on shore, off shore loading platforms Oil and gas, Gas p
lants load and unloading (LNG), sewage treatment plants, Power plants (nuclear,
oil and cold fired) Sub-Stations, shipyard, hospitals, and shopping centers. I w
rite Maintenances and commissioning specification in accordance with the NETA
Computer skills Includes AutoCAD, Word 2000, Excel 2000, Access 2000
International Experience: U.S Virgin Island , Saudi Arabia ,Thailand Singapore
Indonesia Philippines Malaysia frica Mxico Dominican Republica Venezue
la Iraq Kuwait France Abu Dhabi UAE Afganist*n abd Doha Qatar

EDUCATION: University Of Kansas: B.S, Electrical Engineering


PROFESSIONAL EXPERIENCE:
August 2008 To March 2009
CH2MHILL International Contractors Inc.
Electrical Project Engineer/Commissioning Manager /Consultant
Al Udeid Air Base Doha Qatar
As Electrical / Instrumentation Commissioning Specialist I am responsible for th
e day-to-day inspection and commissioning of all electrical and Instrumentation
installation work at Al Udeid Air Base Doha Qatar Responsible to the Project man
ager for the following: To insure all work complied with drawing and specificati
on. Assure that all QA/QC requirements for commissioning documentation are a sys
tem. For the Commissioning off four (4)15Mv Turbomack Gas Turbines Generators Sw
itch yard building/(4) Transformers(all Switch gear 11KV and 4160V All BOP Equip
ment, (415) switch gear DC control power and UPS.
January 2008 To July 2008
St
rategic Contract Resources
Commissioning Manager
Dominion Cove Point LNG Plant
Lusby Maryland Md.
Commissioning Manager
As Electrical / Instrumentation Commissioning Specialist I am responsible for th
e day-to-day inspection and commissioning of all electrical and Instrumentation
installation work at Cove Point LNG, Plant Lusby Maryland. Responsible to the Pr
oject manager for the following: To insure all work complied with drawing and sp
ecification. Assure that all QA/QC requirements for commissioning documentation
are a system. For the Commissioning of a 13.8KV Substation (all Switch gear)) (2
)NP MS 5001P GE gas turbines. All BOP Equipment, (4160V) and (480) switch gear D
C control power and UPS.
May 2007 to November 2007
RMS / Readiness Management Support LLC
Lead Electrical Engineer
Al Dhafrs Air Base Abu Dhabi UAE
Bagram Air force Base Afghanistan
Lead Electrical Engineer Responsible to the PCO) Project Controls Officer) DOD f
ar all Electrical workas Design, Construction, Commissioning and Estimating. All
work is classified, as so, canat deliberate more .
January 2007 to April 2007
GE power Plant System Department
Lead Electrical Commissioning Engineer
Spindle Hill Energy/Kuwait
As Lead Electrical Commissioning Engineer I was responsible to the Commissioning
manager for the Commissioning of a 230kV Substation (all equipment their in) th
ree (3) Siemen GFI Breakers (4) Switches, RTU, CTs and CVTs. All BOP Equipment a
nd (2).Two GT transformers and (1) SST for two Frames 7 Gas Turbines Simple Cycl
e.
(4160V) and (480) switch gear DC control power and UPS.
September 2006 to December 2006
Exxon Mobil Development
Electrical Engineer/Commissioning Engineer
Victoria Island Lagos Nigeria
As Electrical Engineer/Commissioning Engineer I was responsible to the project m
anager for the upgrade of all Electrical and Instrumentation work on three (3) s
olar generators (4160V) on a production platform and the removal and replacement
of a 933Catapillar emergency generator work was completed on time and with in b
udget.
April 2006 to August 2006
United Services a" O&M
Transmission and Distribution Coordinator Iraq Re-construction
Baghdad Iraq
As Transmission and Distribution Coordinator responsible to the (PCO) Project co
ntrol officer Army Corps of Engineers, for the day to day Operations, Maintenanc
e and Repair of a 132Kv substation on the Baghdad Ring. Assist in the developmen
t and implementation of a computerize operation and maintenance program and repo
rts for plant equipment. Power plant outage planning and execution. All so Assis
ted in the development of a training center so that an effective O&M program was
established.
October 2004 to February 2006
Universal Project Management
Commissioning Manager (Substations)
Iraq Re-construction Baghdad Iraq
As Commissioning Manager I was responsible for all aspect of commissioning and s
tart-up for a 132Kv and a 400Kv substation. Attended training for GIS breakers a
nd switchgear at VA TECH Transmission and Distribution Grenoble France. Training
included Leak check linkage adjustment, calibration of instruments. Responsible
for the day-to-day commissioning of all equipment in the Al Almeel Substation (
132Kv) and Al Rashid Substation (400Kv) Republic of Iraq I was reasonable fo
r the following: To insure that all Equipment complied with drawing, specificati
on, standards, provisions and worked as designed.
Assure that all QA/QC requirements for commissioning documentation are achieved
for the following GSI Switches and breakers updated and calibrated all ALSTOM re
lays. For Accepted by the USACE. Commissioning was completed on time and with in
budget
University Project Management Inc Assignment in Al-Khobar Saudi Arabia as Techni
cal advisor To National Contracting Company LTD.I Assisted in preparation of Tec
hnical Proposal requirements for (2) substations (1-400Kv located Mustapha and (
1 60Kv located in Bir-Ghbalou Algiers. Responsible to the project manager for th
e following, specification of electrical equipment for two Substations, Equipmen
t consisted of the following CTs, PTs CCVTs, Breakers and Switches. A SCADA Syst
em. Electrical equipment and commissioning specifications. Proposal was complete
d on time and with in budget
November 2003 to March 2004
Washington Group International
Site Representative (Bayji Power Station)
Iraq Re-construction Alexandria La
As Site Representative I was responsible for the day-to-day erection and inspe
ction of (4) 145 KV Substation Alexandria La. For the Bayji Power Station Iraq W
ashington Group International. I was reasonable for the following: To insure
all work complied with drawing, specification and worked as designed. Substatio
n was completed, all switch and breaker tested. All Substation were color-coded
disassemble pack and shipped to Houston Texas Air France for shipment to Iraq
Representative I was responsible for the day-to-day erection of sub station ste
el and inspection of a 345 Kv Substation at Younker NY, Dunwoody S/S 345 Kv Seri
es Reactors and a SCADA System I was Responsible to the Project Manager for the
following: To insure all work complied with drawing and specification. Power Gen
eration and a SCADA system Substation was completed on time and with in budget.
April 2003 to July 2003
Strategic
Contract Resources
Commissioning Specialist
Cove Point LNG Plant
Lusby Maryland Md.
As Electrical / Instrumentation Commissioning Specialist I am responsible for th
e day-to-day inspection and commissioning of all electrical and Instrumentation
installation work at Cove Point LNG, Plant Lusby Maryland. Responsible to the ma
nager for the following: To insure all work complied with drawing and specificat
ion. Assure that all QA/QC requirements for commissioning documentation are achi
eved for the following equipment. Three Frame three generators (3) Emergency Gen
erators (1500 KV) and a SCADA system.
July 2002 To January 2003
PCI International Inc.
Electrical / Instrumentation Supervisor Puerto Plata Power
Plant
Puerto Plata Dominican Republic
As Electrical / Instrumentation supervisor I was responsible for the day-to-day
construction and commissioning of SD Boiler Plant (84 KW). I was responsible to
the project manager for the following: To insure all work complied with drawing
and specification. Electrical (Power Generation) and instrumentation installatio
n testing and commissioning of all Electrical equipment and a SCADA system Job w
as completed on time and with in Budget. Also, responsible for training a team o
f third country national for operation and maintenance personnel. (182.5 DAYS)
February 2002 To May 2002
Bata Engineer Corp.
Electrical Supervisor Califonia Edison Sub-Station Up Grade
Palmdale CA
As electrical supervisor I was responsible for estimating and the day-to-day con
struction, modification of a 500 Kv substation. I was responsible to project ma
nager for the following: To insure all work complied with drawing and specificat
ion: Civil work: materials: erection of substation steel: installing capacitors
: Power Generation on Bus supports: breakers: CT: PT and switches: SCADA and tec
hnical support for all the above. Job was for (4) Months, Completed on time and
with in budget. (120 DAYS)
January 2000 To March 2002
PIC International Inc.
Electrical Supervisor
Tux pan (2) and Altamira-1 (2) Two Power Plants
Tuxpan and Alta Mira Mexico
As Electrical Supervisor I was responsible for estimating and for the day-to-day
construction of two 400KV Electrical Sub-Stations being built by Mitsubishi Hea
vy Industries. I was Responsible to the Project Managers for the following: To i
nsure all work complied with drawing and specification: Material for the steel s
tructures. Installation of Power Generation, CT, PT, switches, breakers, SCADA s
ystem and technical support for all the above. Both Projects was finish on time
and within budget.
Cadereyata Project:
Responsible to the central zone Manager for the Following: To insure all work co
mplied with drawing and specification: Estimating and the day-to-day installati
on of all Electrical and Instrumentation during construction of a pump station C
adereyata Pipeline. Including Power Generation, (3) Pumps 4160 volts, All MOVas
(4) Transformers, Control wiring for MCC and PLC All Instruments and pig launche
r (2) 24aand a SCADA system.
October 1998 To November 1999
Alliances Engineering
Instrumentation/Electrical Specialist
Exxon platform Up-Grade
Electrical design Engineer: A member of the Alliance design team, work on (2) ga
s plants and an off shore platform. (Jack up) Up-graded the lighting system and
the power Generation distribution systems high and low voltage. Up graded (UPS D
CS) and SCADA system).
March 1996 To August 1998
Ipco Nigeria Ltd
Senior Electrical/Instrumentation Engineer NNPC off Shore L
oading Platform
I was a member of Ipco Nigeria Ltd.Project Management team working at Sambawang
Shipyard along with Sambawang Engineering (Singapore and Africa) I was responsi
ble to the Project Manger for all Electrical (Power Generation) and Instrumentat
ion during construction of a off shore loading Platform. Oil and (L&P) Gas. I wa
s all so part of the commissioning team in Nigeria.
September 1994 To April 1996
Pacific Equipment and Leasing Pte.Ltd.
Pipeline Commissioning Engineer
Shell Oil
Responsible for the day to day operation of commissioning of a 300 Km to the pro
ject manager
Generated and maintained Instrumentation and computer programs pertaining to the
testing, cleaning and drying of pipelines (8a and 24a) 300 Km .Oil and Gas load
ing and unloading (LNG gas) Pumping station and gas compressor Stations. Project
s were completed on time and in budget.
July 1993 To August 1994
R.J. Brown and Associates (Far East) Pte. Ltd.
Senior Electrical/Instrumentation Engineer
The Gleam Gas Gathering Station
Electrical and Instrumentation Design Engineer for the Gleam Gas Gathering Stati
on. This included the following Control Room, Sub-station, MCCas, 2000 KVA power
plant (2) 500 KVA
Emergency generators, lighting system, power distribution and a SCADA system.

August 1992 To May1993


Malaysia Shipyard and Engineering Sdn.Bhd.
Maintenance Manger /Senior Project Manager
Developed and computerized a maintenance program for all equipment in the shipya
rd. Setup a technical library for all equipment and documents.maintened a centra
lized director of the shipyard. Updated all shipyard drawing using AutoCAD. As P
roject Manager, Verified all work complied with drawing and specificationas perf
ormed start-up for an offshore platform (Jack up)(ESSO) project. This project in
cluded all electrical switchgear, instrumentation, controls (DCS)systems. Fire a
nd gas
Detection
May 1990 To 1992 July
R.J. Brown and Associates (Far East Pte.Ltd.
Electrical Design Engineer
East Java Pipe Line
Electrical and Instrumentation design Engineer for the East Java Pipeline. The d
esign following all
Electrical, instrumentation and controls for (4) metering and pump stations. Spe
cified and Installed all switchgear High and Low voltage, lighting and power dis
tribution. Emergency generators. (SCADA system) and a telecommunication network
360 Kms.
October 1989 To March April 1990
Senior Electrical Engineer
P.T Tekniskil Pte Ltd.
Supervised (35) technicians involved in the change out of (2) (72) MVA transform
ers, switchgear, control wiring and associated power cable (P.T. Inco Nickel pro
cess plant).
Expansion Phase one.
Supervised (50) technicians for the installation of new transformers switchgear
control wiring and associated power cable. Calibration of new instruments per te
sting of all motors high and low voltage. Commissioning and start-up of the plan
t phase (2)

My references are as followed:


Judee Flynn
Strategic Contract Resources
Vice President of Operation
Phone 678 784 6118
[email protected]
Don Bengtson
Strategic Contract Resources
Phone 404 307 7368
[email protected]
Rod Patch
Construction Manager
Mustang Engineegers
Phone 281 610 7560
[email protected]

You might also like