We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as TXT, PDF, TXT or read online on Scribd
You are on page 1/ 6
David L Marston
2614 Parkbriar Lane, Pearland Texas 77584
Phone (Home) 281 412 9771 Phone (Cell) 281 352 1116 (E-mail [email protected]) SUMMARY: I & E and Commissioning Engineer with more than (25) years of experien ce in design, Estimating, Control wiring Cathodic Protection, Supervision, Commi ssioning, construction and maintenance of various projects in he US and overseas . With proven abilities and technical experience. Assignment have included posit ions from Field Engineering to Project Manager.Industreies served include the fo llowing petrochemical, refineries. Structures served Oil rig on shore and offsho re jack up, semi submersible and floating (oil and gas), water treatment plants, oil rigs off shore and on shore, off shore loading platforms Oil and gas, Gas p lants load and unloading (LNG), sewage treatment plants, Power plants (nuclear, oil and cold fired) Sub-Stations, shipyard, hospitals, and shopping centers. I w rite Maintenances and commissioning specification in accordance with the NETA Computer skills Includes AutoCAD, Word 2000, Excel 2000, Access 2000 International Experience: U.S Virgin Island , Saudi Arabia ,Thailand Singapore Indonesia Philippines Malaysia frica Mxico Dominican Republica Venezue la Iraq Kuwait France Abu Dhabi UAE Afganist*n abd Doha Qatar
EDUCATION: University Of Kansas: B.S, Electrical Engineering
PROFESSIONAL EXPERIENCE: August 2008 To March 2009 CH2MHILL International Contractors Inc. Electrical Project Engineer/Commissioning Manager /Consultant Al Udeid Air Base Doha Qatar As Electrical / Instrumentation Commissioning Specialist I am responsible for th e day-to-day inspection and commissioning of all electrical and Instrumentation installation work at Al Udeid Air Base Doha Qatar Responsible to the Project man ager for the following: To insure all work complied with drawing and specificati on. Assure that all QA/QC requirements for commissioning documentation are a sys tem. For the Commissioning off four (4)15Mv Turbomack Gas Turbines Generators Sw itch yard building/(4) Transformers(all Switch gear 11KV and 4160V All BOP Equip ment, (415) switch gear DC control power and UPS. January 2008 To July 2008 St rategic Contract Resources Commissioning Manager Dominion Cove Point LNG Plant Lusby Maryland Md. Commissioning Manager As Electrical / Instrumentation Commissioning Specialist I am responsible for th e day-to-day inspection and commissioning of all electrical and Instrumentation installation work at Cove Point LNG, Plant Lusby Maryland. Responsible to the Pr oject manager for the following: To insure all work complied with drawing and sp ecification. Assure that all QA/QC requirements for commissioning documentation are a system. For the Commissioning of a 13.8KV Substation (all Switch gear)) (2 )NP MS 5001P GE gas turbines. All BOP Equipment, (4160V) and (480) switch gear D C control power and UPS. May 2007 to November 2007 RMS / Readiness Management Support LLC Lead Electrical Engineer Al Dhafrs Air Base Abu Dhabi UAE Bagram Air force Base Afghanistan Lead Electrical Engineer Responsible to the PCO) Project Controls Officer) DOD f ar all Electrical workas Design, Construction, Commissioning and Estimating. All work is classified, as so, canat deliberate more . January 2007 to April 2007 GE power Plant System Department Lead Electrical Commissioning Engineer Spindle Hill Energy/Kuwait As Lead Electrical Commissioning Engineer I was responsible to the Commissioning manager for the Commissioning of a 230kV Substation (all equipment their in) th ree (3) Siemen GFI Breakers (4) Switches, RTU, CTs and CVTs. All BOP Equipment a nd (2).Two GT transformers and (1) SST for two Frames 7 Gas Turbines Simple Cycl e. (4160V) and (480) switch gear DC control power and UPS. September 2006 to December 2006 Exxon Mobil Development Electrical Engineer/Commissioning Engineer Victoria Island Lagos Nigeria As Electrical Engineer/Commissioning Engineer I was responsible to the project m anager for the upgrade of all Electrical and Instrumentation work on three (3) s olar generators (4160V) on a production platform and the removal and replacement of a 933Catapillar emergency generator work was completed on time and with in b udget. April 2006 to August 2006 United Services a" O&M Transmission and Distribution Coordinator Iraq Re-construction Baghdad Iraq As Transmission and Distribution Coordinator responsible to the (PCO) Project co ntrol officer Army Corps of Engineers, for the day to day Operations, Maintenanc e and Repair of a 132Kv substation on the Baghdad Ring. Assist in the developmen t and implementation of a computerize operation and maintenance program and repo rts for plant equipment. Power plant outage planning and execution. All so Assis ted in the development of a training center so that an effective O&M program was established. October 2004 to February 2006 Universal Project Management Commissioning Manager (Substations) Iraq Re-construction Baghdad Iraq As Commissioning Manager I was responsible for all aspect of commissioning and s tart-up for a 132Kv and a 400Kv substation. Attended training for GIS breakers a nd switchgear at VA TECH Transmission and Distribution Grenoble France. Training included Leak check linkage adjustment, calibration of instruments. Responsible for the day-to-day commissioning of all equipment in the Al Almeel Substation ( 132Kv) and Al Rashid Substation (400Kv) Republic of Iraq I was reasonable fo r the following: To insure that all Equipment complied with drawing, specificati on, standards, provisions and worked as designed. Assure that all QA/QC requirements for commissioning documentation are achieved for the following GSI Switches and breakers updated and calibrated all ALSTOM re lays. For Accepted by the USACE. Commissioning was completed on time and with in budget University Project Management Inc Assignment in Al-Khobar Saudi Arabia as Techni cal advisor To National Contracting Company LTD.I Assisted in preparation of Tec hnical Proposal requirements for (2) substations (1-400Kv located Mustapha and ( 1 60Kv located in Bir-Ghbalou Algiers. Responsible to the project manager for th e following, specification of electrical equipment for two Substations, Equipmen t consisted of the following CTs, PTs CCVTs, Breakers and Switches. A SCADA Syst em. Electrical equipment and commissioning specifications. Proposal was complete d on time and with in budget November 2003 to March 2004 Washington Group International Site Representative (Bayji Power Station) Iraq Re-construction Alexandria La As Site Representative I was responsible for the day-to-day erection and inspe ction of (4) 145 KV Substation Alexandria La. For the Bayji Power Station Iraq W ashington Group International. I was reasonable for the following: To insure all work complied with drawing, specification and worked as designed. Substatio n was completed, all switch and breaker tested. All Substation were color-coded disassemble pack and shipped to Houston Texas Air France for shipment to Iraq Representative I was responsible for the day-to-day erection of sub station ste el and inspection of a 345 Kv Substation at Younker NY, Dunwoody S/S 345 Kv Seri es Reactors and a SCADA System I was Responsible to the Project Manager for the following: To insure all work complied with drawing and specification. Power Gen eration and a SCADA system Substation was completed on time and with in budget. April 2003 to July 2003 Strategic Contract Resources Commissioning Specialist Cove Point LNG Plant Lusby Maryland Md. As Electrical / Instrumentation Commissioning Specialist I am responsible for th e day-to-day inspection and commissioning of all electrical and Instrumentation installation work at Cove Point LNG, Plant Lusby Maryland. Responsible to the ma nager for the following: To insure all work complied with drawing and specificat ion. Assure that all QA/QC requirements for commissioning documentation are achi eved for the following equipment. Three Frame three generators (3) Emergency Gen erators (1500 KV) and a SCADA system. July 2002 To January 2003 PCI International Inc. Electrical / Instrumentation Supervisor Puerto Plata Power Plant Puerto Plata Dominican Republic As Electrical / Instrumentation supervisor I was responsible for the day-to-day construction and commissioning of SD Boiler Plant (84 KW). I was responsible to the project manager for the following: To insure all work complied with drawing and specification. Electrical (Power Generation) and instrumentation installatio n testing and commissioning of all Electrical equipment and a SCADA system Job w as completed on time and with in Budget. Also, responsible for training a team o f third country national for operation and maintenance personnel. (182.5 DAYS) February 2002 To May 2002 Bata Engineer Corp. Electrical Supervisor Califonia Edison Sub-Station Up Grade Palmdale CA As electrical supervisor I was responsible for estimating and the day-to-day con struction, modification of a 500 Kv substation. I was responsible to project ma nager for the following: To insure all work complied with drawing and specificat ion: Civil work: materials: erection of substation steel: installing capacitors : Power Generation on Bus supports: breakers: CT: PT and switches: SCADA and tec hnical support for all the above. Job was for (4) Months, Completed on time and with in budget. (120 DAYS) January 2000 To March 2002 PIC International Inc. Electrical Supervisor Tux pan (2) and Altamira-1 (2) Two Power Plants Tuxpan and Alta Mira Mexico As Electrical Supervisor I was responsible for estimating and for the day-to-day construction of two 400KV Electrical Sub-Stations being built by Mitsubishi Hea vy Industries. I was Responsible to the Project Managers for the following: To i nsure all work complied with drawing and specification: Material for the steel s tructures. Installation of Power Generation, CT, PT, switches, breakers, SCADA s ystem and technical support for all the above. Both Projects was finish on time and within budget. Cadereyata Project: Responsible to the central zone Manager for the Following: To insure all work co mplied with drawing and specification: Estimating and the day-to-day installati on of all Electrical and Instrumentation during construction of a pump station C adereyata Pipeline. Including Power Generation, (3) Pumps 4160 volts, All MOVas (4) Transformers, Control wiring for MCC and PLC All Instruments and pig launche r (2) 24aand a SCADA system. October 1998 To November 1999 Alliances Engineering Instrumentation/Electrical Specialist Exxon platform Up-Grade Electrical design Engineer: A member of the Alliance design team, work on (2) ga s plants and an off shore platform. (Jack up) Up-graded the lighting system and the power Generation distribution systems high and low voltage. Up graded (UPS D CS) and SCADA system). March 1996 To August 1998 Ipco Nigeria Ltd Senior Electrical/Instrumentation Engineer NNPC off Shore L oading Platform I was a member of Ipco Nigeria Ltd.Project Management team working at Sambawang Shipyard along with Sambawang Engineering (Singapore and Africa) I was responsi ble to the Project Manger for all Electrical (Power Generation) and Instrumentat ion during construction of a off shore loading Platform. Oil and (L&P) Gas. I wa s all so part of the commissioning team in Nigeria. September 1994 To April 1996 Pacific Equipment and Leasing Pte.Ltd. Pipeline Commissioning Engineer Shell Oil Responsible for the day to day operation of commissioning of a 300 Km to the pro ject manager Generated and maintained Instrumentation and computer programs pertaining to the testing, cleaning and drying of pipelines (8a and 24a) 300 Km .Oil and Gas load ing and unloading (LNG gas) Pumping station and gas compressor Stations. Project s were completed on time and in budget. July 1993 To August 1994 R.J. Brown and Associates (Far East) Pte. Ltd. Senior Electrical/Instrumentation Engineer The Gleam Gas Gathering Station Electrical and Instrumentation Design Engineer for the Gleam Gas Gathering Stati on. This included the following Control Room, Sub-station, MCCas, 2000 KVA power plant (2) 500 KVA Emergency generators, lighting system, power distribution and a SCADA system.
August 1992 To May1993
Malaysia Shipyard and Engineering Sdn.Bhd. Maintenance Manger /Senior Project Manager Developed and computerized a maintenance program for all equipment in the shipya rd. Setup a technical library for all equipment and documents.maintened a centra lized director of the shipyard. Updated all shipyard drawing using AutoCAD. As P roject Manager, Verified all work complied with drawing and specificationas perf ormed start-up for an offshore platform (Jack up)(ESSO) project. This project in cluded all electrical switchgear, instrumentation, controls (DCS)systems. Fire a nd gas Detection May 1990 To 1992 July R.J. Brown and Associates (Far East Pte.Ltd. Electrical Design Engineer East Java Pipe Line Electrical and Instrumentation design Engineer for the East Java Pipeline. The d esign following all Electrical, instrumentation and controls for (4) metering and pump stations. Spe cified and Installed all switchgear High and Low voltage, lighting and power dis tribution. Emergency generators. (SCADA system) and a telecommunication network 360 Kms. October 1989 To March April 1990 Senior Electrical Engineer P.T Tekniskil Pte Ltd. Supervised (35) technicians involved in the change out of (2) (72) MVA transform ers, switchgear, control wiring and associated power cable (P.T. Inco Nickel pro cess plant). Expansion Phase one. Supervised (50) technicians for the installation of new transformers switchgear control wiring and associated power cable. Calibration of new instruments per te sting of all motors high and low voltage. Commissioning and start-up of the plan t phase (2)
My references are as followed:
Judee Flynn Strategic Contract Resources Vice President of Operation Phone 678 784 6118 [email protected] Don Bengtson Strategic Contract Resources Phone 404 307 7368 [email protected] Rod Patch Construction Manager Mustang Engineegers Phone 281 610 7560 [email protected]