1-Unit # 4 Capacity Calculations & Line Balancing
1-Unit # 4 Capacity Calculations & Line Balancing
PER DAY CAPACITY CALCULATION USING WORK MEASUREMENT & ASSEMBLY LINES B
UNIT #4
Item: GLD, EVD, CALLISTO, LUNALITE-D, SU blades
Total time= 8.5 hr = 30600 sec
Calculation time= 7 hr 15 min = 26100 sec
Sr. # Process name Worker name Qty Normal time (sec) per unit time (sec)
1 Deburing Sajida 10 114 11.4
Deburing Yasmeen 10 119 11.9
Deburing Samra bhutta 10 191 19.1
Deburing Samra irfan 10 91 9.1
Deburing Rubina sehar 10 194 19.4
Deburing ABC 10 136 13.6
Deburing ABC 10 115 11.5
Deburing ABC 10 109 10.9
Monitoring results
60000
50000
40000
Column
30000 Column
Column
20000 Column
Column
10000
0
Deburing Sharpness Cleaning of Double ball Acrylic tube Fitting of Hammering Q.C
checking blade plunger fitting mounting
Column
10000
0
Deburing Sharpness Cleaning of Double ball Acrylic tube Fitting of Hammering Q.C
checking blade plunger fitting mounting
Production planning
Each organization is set up for a specific output capacity of goods or services or both. The plant
and equipment capabilities and capacities provide a potential to produce the required output.
The effective utilization of plant and equipment resources along-with manpower, material and
capital resources is necessary for the achievement of economic and performance goal of the
organization.
Three alternate strategies are available to prepare the production plan.
Vary Production Plan
Vary production has a direct relation to monthly requirement. In this plan, inventory carrying
cost is zero. However, the set up cost and labour hiring costs are very high. Moreover, the
administrative problems of hiring and lay-off of labour are complex and usually do not permit
this practice to be adopted.
Level Production Plan
In this plan, the production is planned at a uniform production rate throughout the year. The
production rate or level is determined by drawing a straight line through the start and end
points of the demand curve. In this plan, there is inventory carrying cost but most of the
complexities can be overcome.
Month JAN FEB MAR APR MAY JUN JUL AUG SEP
Demand 34380 47250 113880 181226 84450 167050 82710 187120 190600
Days 27 24 26 26 25 26 24 25 22
Prod. 124659 108288 117312 117312 112800 117312 108288 112800 99264
P-D 90279 61038 3432 -63914 28350 -49738 25578 -74320 -91336
Is 41735 132014 193052 196484 132570 160920 111182 136760 62440
Ie 132014 193052 196484 132570 160920 111182 136760 62440 -28896
I avg 86874.5 162533 194768 164527 146745 136051 123971 99600 16772
Tempo Printing
Total time= 8.5 hr = 30600 sec
Calculation time= 7 hr 15 min = 26100 sec
Total Workers = 9 (including superwiser + 2 Loader + 6 on machine worker)
Sr. # Process name Worker name Qty Efficient time (sec) per unit time (sec)
1 Tempo printing Hafiza 10 37 3.7
Alia
Aliza
2 Tempo printing Laila 10 34 3.4
Razia
Rehana
Sr. # Process name Worker name Qty Efficient time (sec) per unit time (sec)
1 Deburring ABC 10 96 9.6
Deburring ABC 10 106 10.6
Deburring ABC 10 129 12.9
Deburring ABC 10 109 10.9
Sr. # Process name Worker name Qty Efficient time (sec) per unit time (sec)
1 Deburring ABC 10 96 9.6
Deburring ABC 10 106 10.6
Deburring ABC 10 129 12.9
Deburring ABC 10 109 10.9
Sr. # Process name Worker name Qty Efficient time (sec) per unit time (sec)
1 Deburring ABC 10 96 9.6
Deburring ABC 10 106 10.6
Deburring ABC 10 129 12.9
Deburring ABC 10 109 10.9
Sr. # Process name Worker name Qty Efficient time (sec) per unit time (sec)
1 Deburring ABC 10 96 9.6
Deburring ABC 10 106 10.6
Deburring ABC 10 129 12.9
Deburring ABC 10 109 10.9
UNIT #4 (I.F)
Item: Europa S Mac. blades
Total time= 8.5 hr = 30600 sec
Calculation time= 7 hr = 25200 sec
Sr. # Process name Worker name Qty Normal time (sec) per unit time (sec)
1 Deburing Zishan 10 129 12.9
Deburing Waqar 10 135 13.5
Sr. # Process name Worker name Qty Normal time (sec) per unit time (sec)
1 Removal of flashes Afzal 10 90 9
Removal of flashes Waqar 10 95 9.5
20000
15000
Column H
Column G
10000 Column F
Column E
Column D
5000
0
Removal of Single Ball spring Cleaning of Acrylic light Fitting of Hammerinr Lot number
flashes plunge plunge blades fitting mounting +QC
Column G
10000 Column F
Column E
Column D
5000
0
Removal of Single Ball spring Cleaning of Acrylic light Fitting of Hammerinr Lot number
flashes plunge plunge blades fitting mounting +QC
Hot Stamping
Total time= 8.5 hr = 30600 sec
Calculation time= 7 hr = 25200 sec
Total Workers = 3
Sr. # Process name Worker name Qty Efficient time (sec) per unit time (sec)
1 Lot no. stamping ABC+ABC 10 29 2.9
Lot no. stamping ABC+ABC 10 27 2.7
White Room
Cleaning
Total time= 8.5 hr = 30600 sec
Calculation time= 7 hr = 25200 sec
Total Workers = 15 ( including superwiser)
Table # 1
Sr. # Process name Worker name Qty Efficient time (sec) per unit time (sec)
1 Checking ABC 10 37 3.7
2 Cleaning ABC 10 115 11.5
Cleaning ABC 10 121 12.1
Cleaning ABC 10 107 10.7
Cleaning ABC 10 114 11.4
Cleaning ABC 10 135 13.5
3 Tray fill ABC 10 36 3.6
Table # 2
Sr. # Process name Worker name Qty Efficient time (sec) per unit time (sec)
1 Checking ABC 10 36 3.6
2 Cleaning ABC 10 125 12.5
Cleaning ABC 10 137 13.7
Cleaning ABC 10 109 10.9
Cleaning ABC 10 126 12.6
Cleaning ABC 10 139 13.9
Label on Pouches
Total time= 8.5 hr = 30600 sec
Calculation time= 7 hr = 25200 sec
Total Workers = 3 ( including superwiser)
Sr. # Process name Worker name Qty Efficient time (sec) per unit time (sec)
1 Stick labels ABC 10 73 7.3
Stick labels ABC 10 41 4.1
Stick labels ABC 10 24 2.4
Pouch Packing
Total time= 8.5 hr = 30600 sec
Calculation time= 7 hr = 25200 sec
Total Workers = 8
Sr. # Process name Worker name Qty Efficient time (sec) per unit time (sec)
1 Checking ABC 10 21 2.1
Checking ABC 10 23 2.3
Sr. # Process name Worker name Qty Efficient time (sec) per unit time (sec)
1 Stick labels ABC+ABC 10 82 8.2
Stick labels ABC+ABC 10 51 5.1
Stick labels ABC+ABC 10 66 6.6
Sr. # Process name Worker name Qty Efficient time (sec) per unit time (sec)
1 Checking ABC 10 21 2.1
Checking ABC 10 23 2.3
Sr. # Process name Worker name Qty Efficient time (sec) per unit time (sec)
1 Checking ABC 10 13 1.3
2 Box formation ABC 10 94 9.4
3 Packing in box ABC 10 51 5.1
Packing in box ABC 10 29 2.9
Sr. # Process name Worker name Qty Efficient time (sec) per unit time (sec)
1 Checking ABC 10 13 1.3
2 Box formation ABC 10 94 9.4
3 Packing in box ABC 10 18 1.8
Packing in box ABC 10 23 2.3
f operation
Normal capacity Efficient time (sec) per unit time (sec) Efficient capacity
2289 110 11 2372 To avoid bottle necking only 6 persons
2193 107 10.7 2439
1366 141 14.1 1851 Lack of skills so Proper training req
2868 85 8.5 3070
1345 164 16.4 1591 Lack of skills so Proper training req
1919 131 13.1 1992
2269 100 10 2610
2394 104 10.4 2509
16643 18434
13736 14 1.4 18642 In case of MAC 3 & 4 only 1 person
10875 21 2.1 12428 Not right man to the right job here
24611 31070 Material handling layout problem
3728 62 6.2 4209
3000 83 8.3 3144 Lack of skills can be performed 10 j
4015 55 5.5 4745 Process not making sense here
10743 12098
3480 48 4.8 5437 One more person is required here to b
4745 45 4.5 5800
8225 11237
4578 42 4.2 6214 Lack of skills so Proper training require
5673 39 3.9 6692 Can be done 10 units job within 35 sec
10251 12906
5220 36 3.6 7250
5931 35 3.5 7457
11151 14707
4500 46 4.6 5673 Applying force through hammer not s
4209 47 4.7 5553 Lack of skills so Proper training req
8709 11226
10875 18 1.8 14500 one person is enough for balanced lin
9000 21 2.1 12428
19875 26928
Column Y
Column X
Column W
Column V
Column U
Q.C
Column U
Q.C
Efficient capacity
7054 Loading layout problem
7676
14730
Efficient capacity
2718 For balanced line 2 persons are enough for removal of flashes
2462
2023
2394
9597
5800
4015
949
938
1887
966
13050
2533 Repition of worker is here
4660 Repition of worker is here
1236
2023 In welding instead of using two fitting blocks (129 sec) use 1 block (75 sec).
8700
9000 Repition is here
4423
3575
4745
5117
4423
9540
17400 Repition of worker is here
7250
Efficient capacity
2718
2462
2023
2394
9597
4745
4015
1191
1170
2361
767
779 Repition of worker is here
1546
2269
4660 Repition is here
1236 Buffer storage is required before welding
2023 In welding instead of using two fitting blocks (129 sec) use 1 block (75 sec)
8700
9000
4423
3575
4745
4578
3262
Efficient capacity
2718
2462
2023
2394
9597
5800
4015
3480 For balanced line 1 persons are enough
4423
7903
3954 For balanced line 1 persons are enough
4015
7969
2663
2533
5196
2104 For balanced line 2 persons are enough
1933
2175
6212
2023 Both welding machines should work in this case for balanced line
8700
9000
4423 Single person on both sleave & pin fitting (12.1 sec) save the time instead of separate (15.7 sec) working
3575
4745
5117
4423
9540
15352
7250
Efficient capacity
2718
2462
2023
2394
9597
5800 1 person is enough for both open & fitt strip
3480
6692
1553 For balanced line 2 persons are enough
1466
1631
1380
781
1078
1338
9227
2023 Welding machine is out of order at this time
8700
2157 This method is effective in time saving instead of separate working on sleave & pin fitting
2211 Material handling problem is there
2088
6456
4745
4578
3262
5326
5117
747
959
1011
2717
Normal capacity
1953
1866
3819
3876
3761
4000
7761
3230
3705
1800
3360
4581
3549
4581
4064
12194
4666
10500
Normal capacity Efficient time (sec) per unit time (sec) Efficient capacity
2800 70 7 3600
2652 80 8 3150
5452 6750
5600 45 4.5 5600
3360 65 6.5 3876
3600 68 6.8 3705
6960 7581
5040 44 4.4 5727
4666 47 4.7 5361
9706 11088
10080 25 2.5 10080
5040 45 4.5 5600
3876 59 5.9 4271
8916 9871
7411 30 3 8400
10500 22 2.2 11454
Column H
Column G
Column F
Column E
Column D
er
Column G
Column F
Column E
Column D
er
Efficient capacity
8689
9333
18022
Efficient capacity
6810 1 person should be for checking with material handling
2191 4 persons are enough here
2082
2355
2210
1866
10704
7000
Worker required
6810
7133
7000
Efficient capacity
7000 1 person should be for checking with material handling
2016 4 persons are enough here
1839
2311
2000
1812
9978
6810
Worker required
7000
7962
6810
Efficient capacity
3452
6146
10500 So much Efficient
20098
Efficient capacity
12000
10956
22956
9333
10956
20289
14000 Handling should be perform these persons
15750 Layout problems
29750
Efficient capacity
3073 10 Person should work to give balance demand in pouch packing
4941
3818
11832
Efficient capacity
12000
10956
22956
6000
4421
10421
3500
4131
7631
5478
4846
4131
14455
5361
8129
13490
10500
10956
21456
Efficient capacity
19384
2680
4941 There should be 1 more person at this process
8689
13630
3405
Efficient capacity
19384
2680
14000
10956
24956
3405
34344
bottle necking only 6 persons are required here instead of 8
n is enough for balanced line other may use for material handling
ne Balancing
Q.C
ammering
mounting
ube fitting Column G
Column F
ll plunger
Column E
g of blade
Column D
s checking
Column C
Deburing
cess name
Column G
Column F
Column E
Column D
e & pin fitting
After Line Balancing
Lot number
Hammerinr +QC
Fitting of mounting
Acrylic light fitting
Column F
Cleaning of blades
Column E
Ball spring plunge Column D
Single plunge
Removal of flashes
0 00 00 00 00 00 00
20 40 60 80 10
0
12
0
25000
Deburring 9597
Open strip part A 4745
Fitt strip of part A 4015
Fitt spring of part B 2361
Nake wire 1546
Alfi 2269
Fitting pin 4660
Tapeing A & B 1236
Welding+Untaped 2023
Lot number 8700
Sleave checking 9000
Sleave fitting 4423
Huck pin fitting 3575
Huck pin press 4745
Outer ring fitt 4578
Outer ring press fitt 3262
Fit strip in cap 5326
Heating press 5220
Nake wire
Fitt strip of part A
Deburring
0 2000 4000 6000 8000 10000
Q.C
Process name Worker required Per Day Capacity Hammering
Deburing 6 13932
Fitting of mounting
Sharpness checking 1 13736
Cleaning of blade 3 13554 Acrylic tube fitting
Double ball plunger 3 14237 Double ball plunger
Acrylic tube fitting 2 14108
Cleaning of blade
Fitting of mounting 2 14537
Hammering 3 14920 Sharpness checking
Q.C 1 13736 Deburing
Processofname
Cleaning blades
Double ball plung0 00 00 00 00
20 40 60 80 10
Deburing 4880 Cut extra wire
Bending of tube 5478 Fitt E.W & Pin
Earth wire fitt 9723
Bulb assumbly
Earth wire 2nd fitt
Fitting of tube
Double ball plung
Cut extra wire
Fitt E.W & Pin
Bulb assumbly
Fitting of tube 3111
Earth wire 2nd fitt 4200 Earth wire 2nd fitt
Bulb assumbly 1800 Fitting of tube
Fitt E.W & Pin 3360 Earth wire fitt
Cut extra wire 4581
Bending of tube
Double ball plung 12194
Cleaning of blades 4666 Deburing
Cleaning of blades
Deburing 5051
Double ball plung
Bending of tube 6810
Earth wire fitt 13631 Cut extra wire
Fitting of tube 3189 Fitt E.W & Pin
Earth wire 2nd fitt 5142 Bulb assumbly
Bulb assumbly 1938
Earth wire 2nd fitt
Fitt E.W & Pin 3405
Cut extra wire 5142 Fitting of tube
Double ball plung 12852 Earth wire fitt
Cleaning of blades 5361 Bending of tube
Deburing
Cleaning of blades
Deburing 5015
Bending of tube 5478 Double ball plung
Earth wire fitt 5142 Cut extra wire
Fitting of tube 5911 Fitt E.W & Pin
Earth wire 2nd fitt 5142
Bulb assumbly
Bulb assumbly 5400
Earth wire 2nd fitt
Fitt E.W & Pin 5950
Cut extra wire 5142 Fitting of tube
Double ball plung 7098 Earth wire fitt
Cleaning of blades 5361 Bending of tube
Deburing
0 1000 2000 30
Single plunge
Removal of flashes
Lot number
Lot number
Hammerinr +QC
Lot number 11454
Removal of flashes 10410 Fitting of mounting
Single plunge 11200
Ball spring plunge 11371 Acrylic light fitting
Cleaning of blades 11088 Cleaning of blades
Acrylic light fitting 10080
Fitting of mounting 10535 Ball spring plunge
Hammerinr +QC 8400 Single plunge
Removal of flashes
Lot number
Hammering
Fitting of mounting
Acrylic tube fitting Column G Deburing
Column F Sharpness checking
Double ball plunger
Column E Cleaning of blade
Cleaning of blade Column D60000
Double ball plunger
Column C
Sharpness checking 50000 Acrylic tube fitting
Fitting of mounting
Deburing 40000 Hammering
Process name Q.C
30000
0 5000 10000 15000 20000 25000 20000
10000
Q.C
0
ing
ting
tting
Column G
ger Column F
ade Column E
Column D
ing Column C
ing
me
lades
plung0 00 00 00 00 0 0 0 0
20 40 60 80 00 00 00 00
a wire 10 12 14 16
& Pin
umbly Column H
nd fitt Column G
Column F
tube
plung
a wire
& Pin
umbly Column H
nd fitt Column G
Column F
tube
re fitt
tube
uring
f blades
ll plung
tra wire
W & Pin
sumbly Column H
2nd fitt Column G
Column F
of tube
wire fitt
of tube
eburing
+ Check sleave
nwound tape
Column G
tt A & B + tape Column F
Column E
ndles + Fitt cap
nwound tape
Column G
tt A & B + tape Column F
Column E
Fitt housing
Column D
Filling cells
LED in housing
strip of part A
g cape
on cap
andles
press
fitting
fitting
ecking
umber Column F
taped Column E
+ tape
Column D
ousing
g cells
ousing
part A
part A
0 00 00 00 00 00 00 00 00
20 40 60 80 10
0
12
0
14
0
16
0
Column F
Column E
Column D
Column D
Column C
Column B
Single plunge
Removal of flashes
Hammerinr +QC
Fitting of mounting
Lot number
Ball spring plunge 11371
Cleaning of blades 11088 Hammerinr +QC
Acrylic light fitting 10080 Fitting of mounting
Fitting of mounting 10535
Hammerinr +QC 8400 Acrylic light fitting
Lot number 11454
Cleaning of blades
Single plunge
25000
Removal of flashes
15000
10000
Removal of flashes 5452 6750 Column H
Single plunge 5600 5600 Column G
5000plunge Column F
Ball spring 6960 7581
Column E
Cleaning of blades 9706 11088 Column D
0
Acrylic light fitting 10080 10080
Fitting of mounting 8916 9871
Hammerinr +QC 7411 8400
Lot number 10500 11454
Column F
Column E
Column D
Column F
Column E
Column D
8000
Column F
Column E
Column D