0% found this document useful (0 votes)
60 views1 page

Ecl Travellers Inn 4

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
60 views1 page

Ecl Travellers Inn 4

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

A B C D E F G A B C D E F G

17.5m 10MM Ø TIES SPACED AT:4 @ 50MM;


17.5m
4 @ 100MM; 4 @ 100MM; REST @200MM
2000
1.25m 3.5m 3.5m 3.5m 3.5m 3.5m 8-16mm Ø VERT. BARS
1.25m 3.5m 3.5m 3.5m 3.5m 3.5m 350

1m 1.5m 1m 11-16MM Ø MATT. BARS BOTHWAYS


1.6m

1.6m
1m 1.5m 1m

1.6m

1.6m
FB2 FB2 FB2 FB2 FB2 FB2

11-16MM Ø MATT. BARS BOTHWAYS


RB1 RB1 RB1 RB1 RB1 RB1
1.2m

1.2m
FB6

FB6

FB6

FB6

FB6
S2 S2 S2 S2 S2 S2

1.2m

1.2m
RB1

RB1

RB1

RB1

RB1

RB1

RB1

2000
1

350
FB1 FB1 FB1 FB1 FB1 FB1
1 RB1 RB1 RB1 RB1 RB1 RB1

STAIR
WELL
FB4

FB3

FB3

FB3

FB3

FB3

FB3

RB1

RB1

RB1

RB1

RB1

RB1

RB1
4.25m

4.25m
S2 S1 S1 S1 S1

4.25m

4.25m
S2
C1F1 PLAN

10.9m
10.9m

2 FB6 FB1 FB1 FB1 FB1 FB6

10.9m
10.9m
2 RB1 RB1 RB1 RB1 RB1
FB4

FB3

FB3

FB3

FB3

FB3
4.25m

4.25m
FB4
S2 S1 S1 S1 S1

4.25m

4.25m
RB1

RB1

RB1

RB1

RB1

RB1

RB1
S2

10MM Ø TIES SPACED AT:4 @ 50MM;


4 @ 100MM; 4 @ 100MM; REST @200MM

3 FB6 FB1 FB1 FB1 FB1 FB1 8-16mm Ø VERT. BARS


3 RB1 RB1 RB1 RB1 RB1
1.2m

1.2m
FB6

FB6

FB6

FB6

FB6
S2 S2 S2 S2 S2 S2

RB1

RB1

RB1

RB1

RB1

RB1
1.2m

1.2m

200
FB4 FB4 FB4 FB4 FB5 NAT. GRND. LINE
3' RB1 RB1 RB1 RB1 RB1
3'

1.35m 3.4m 1.2m 1.3m


1.35m 3.4m 1.2m 1.3m

4.75m 3.5m 3.5m 3.5m 2.5m


4.75m 3.5m 3.5m 3.5m 2.5m

2000
17.5m
17.5m

1 THIRD FLOOR FRAMING PLAN 2 ROOF BEAM PLAN TIE BEAM


S2 SCALE 1:100MM S2 SCALE 1:100MM

350
SCHEDULE OF COLUMN C1F1 SECTION
150 SECTION REBARS
2 - 12MM Ø CONT. TOP BARS MARK
2 - 12MM Ø TOP CUT BARS a(depth) b(depth) Vert. Bars Ties
10mm Ø AT 4 - 50 MM;
300

4 -100MM; 4 -150MM;
2 - 12MM Ø BOTTOM BARS C-1 350 350 8-16mm Ø Rest @ 200MM
2 - 12MM Ø CONT. TOP BARS 9mm Ø TIES AT :
2 - 12MM Ø TOP CUT BARS 150 C-2 6-12mm Ø
2 - 12MM Ø CONT. TOP BARS 150 350 2 -50MM; 3 -100MM;
Rest @ 175MM

200 150
300

2 - 12MM Ø BOT. CUT BARS 2 - 16MM Ø 2 - 16MM Ø


2 - 12MM Ø CONT. BOTTOM BARS TOP BARS TOP BARS

10MM Ø STIRRUPS AT 10MM Ø STIRRUPS


10MM Ø STIRRUPS SPACED AT
300

300
2 - 12MM Ø CONT. BOTTOM BARS 2-3'', 2-4'',2-6'' & SPACED @ 200MM
2 - 12MM Ø BOT. CUT BARS
2 @ 50mm; 2 @ 75mm;
2 @100mm; 2 @150mm
SECTION AT MIDSPAN REST @ 8'' O.C. O.C.
REST @ 200MM O.C. 2-16MM Ø
4-16MM Ø
BOTTOM BARS
L/5 3L/5 L/5 BOTTOM BARS

FB 1 DETAILS FB 2 & FB4 TYPICAL DETAILS 10mm Ø VERTICAL BARS


3 ROOF BEAM DETAILS (RB1) SPACED @ 0.60M
S2 SCALE 1:30MM
SCHEDULE OF BEAMS
6-12mm Ø VERT. BARS WITH
300 300
9mm Ø TIES SPACED AT:
REBARS REBARS
MARK SECTION @ @ SIZE AND SPACING OF STIRRUPS 2 @ 50mm; 3 @ 100mm; REST
SUPPORT MIDSPAN @175mm

400
L = VARIES TOP 7-16mm 7-16mm 10mm Ø @ STIRRUPS SPACED AT 2 @ 50 mm; 2 @
FTB 300 X 500
75mm; 2 @ 100mm; 2 @ 150mm; REST @ 200mm O.C.
BOTTOM 4-16mm 4-16mm

350 TOP 3-16mm 3-16mm 10mm Ø @ STIRRUPS SPACED AT 2 @ 50 mm; 2 @ 600 600
7 - 16mm Ø TOP BARS 3 - 16mm Ø TOP BARS
250 GFB 250 x 350 75mm; 2 @ 100mm; 2 @ 150mm; REST @ 200mm O.C.
10MM Ø STIRRUPS SPACED AT 250 4 - 16MM Ø MID 2-16mm 2-16mm 3-12MMØ TEMP

7-12mm Ø BARS
2 - 16MM Ø
2 @ 50mm; 2 @ 75mm;
2 @100mm; 2 @150mm
REST @ 200MM O.C.
TOP BARS
TOP BARS

10MM Ø STIRRUPS
BOTTOM
TOP
3-16mm 3-16mm BARS W1F1 PLAN
5-16mm 3-16mm
400

350

10MM Ø STIRRUPS SPACED @ 200MM


3-16mm Ø CONT. BOTTOM BARS FB1
350

W/ 2-16mm Ø EXTRA BARS @


SPACED @ 200MM O.C. 200 X 300 MID 10mm Ø @ STIRRUPS SPACED AT 2 @ 50 mm; 2 @
O.C. 2-16mm 2-16mm 75mm; 2 @ 100mm; 2 @ 150mm; REST @ 200mm O.C.
MIDSPAN (2.0.)
5-16MM Ø 2-16MM Ø BOTTOM 3-16mm 5-16mm 6'' CHB WALL 10MMØ HOR
BOTTOM BARS BOTTOM BARS 7-12mm Ø BARS
4-16mm Ø BOTTOM BARS 10MM Ø STIRRUPS SPACED AT
COLUMN FOOTING TOP 2-16mm 2-16mm BARS EVERY 3 LAYERS
2 @ 50mm; 2 @ 75mm; AT SUPPORT
2 @100mm; 2 @150mm SECTION AT MIDSPAN FB2 & FB4 150 X 300 10mm Ø @ STIRRUPS SPACED @ 200mm O.C.
REST @ 200MM O.C. MID 2-16mm 2-16mm 6-12mm Ø VERT. BARS WITH 10mm Ø VERTICAL BARS
BOTTOM 2-16mm 2-16mm 9mm Ø TIES SPACED AT: SPACED @ 0.60M
FB 3 DETAILS TOP 3-16mm 2-16mm 2 @ 50mm; 3 @ 100mm; REST @175mm
4 GROUND FLOOR BEAM DETAILS (GFB) FB3 250 X 350 MID 10mm Ø @ STIRRUPS SPACED @ 200mm O.C.

F.F.L
S2 SCALE 1:30MM BOTTOM 2-16mm 5-16mm
100mm CONCERETE SLAB 100MM SLAB
TOP 2-16mm 3-16mm
FB5 150 X 300 10mm Ø @ STIRRUPS SPACED @ 200mm O.C.
200

500
150 MID
2 - 16MM Ø 4 - 16MM Ø N.G.L
L = VARIES
TOP BARS TOP BARS BOTTOM 2-16mm 2-16mm
10MM Ø STIRRUPS 10MM Ø STIRRUPS TOP 4-16mm 4-16mm N.G.L
300

300

SPACED @ 200MM SPACED @ 200MM FB6 200 X 300 10mm Ø @ STIRRUPS SPACED @ 200mm O.C.
O.C. O.C. MID
350

300
7 - 16mm Ø TOP BARS 2-16MM Ø 2-16MM Ø BOTTOM
7 - 16mm Ø TOP BARS
BOTTOM BARS
2-16mm 2-16mm
BOTTOM BARS
10MM Ø STIRRUPS SPACED AT TOP 3-12mm 3-12mm 10mm Ø @ STIRRUPS 4 @ 50 mm; 4 @ 100mm; 4 @
2 @ 50mm; 2 @ 75mm; RB 150 x 300

200
MID 150mm; Rest @ 200mm O.C.
2 @100mm; 2 @150mm 2-12mm 2-12mm
REST @ 200MM O.C.
3-12mm Ø TEMP BARS
500

BOTTOM 3-12mm 3-12mm


4-16mm Ø BOTTOM BARS
FB 5 DETAILS FB 6 DETAILS
4-16mm Ø BOTTOM BARS
10MM Ø STIRRUPS SPACED AT COLUMN FOOTING 400
2 @ 50mm; 2 @ 75mm;
2 @100mm; 2 @150mm
REST @ 200MM O.C. SECTION
SCHEDULE OF FOOTINGS
THICKNESS LENGHTH WIDTH DEPTH EXCAVATION
A-BARS B-BARS
W1F1 SECTION
MARK (pcs.) (pcs.) REMARKS
D(mm) A(mm) B(mm) H(mm)

C1F1 350 2000 2000 2000 11-16mm Ø 11-16mm Ø ISOLATED

5 FOOTING TIE BEAM DETAILS (FTB) 6 2ND & 3RD FLOOR BEAM DETAILS COLUMN DETAILS WALL FOOTING DETAILS
C1F2 200 800 800 900 8-12mm Ø 7-12mm Ø ISOLATED 7 8
S2 SCALE 1:30MM S2 SCALE 1:30MM
S2 SCALE 1:30MM S2 SCALE 1:30MM
W1F1 200 VARIABLE 400 500 3 -12 mm Ø temp bars

NOTE: PROJECT TITLE & LOCATION APPROVED BY: SHEET CONTENT CAD BY: DRAWING STATUS REVISIONS: SHEET NO:
THESE DRAWINGS AND SPECIFICATION AND OTHER CONTRACT DOCUMENTS DULY
E Solutions Electronic SIGNED, STAMPED AND SEALED AS INSTRUMENTS OF SERVICE, ARE THE INTELLECTUAL 1
PROPERTY AND DOCUMENT OF THE ARCHITECT, WHETHER THE OBJECT FOR WHICH SVA FOR PERMIT 2
and Electrical Services THEY ARE MADE EXECUTED OR NOT IT SHALL BE UNLAWFUL FOR ANY PERSON TO AS-BUILT OF A THREE(3) STORY AS SHOWN
3 5
DUPLICATE OR MAKE COPIES OF SAID DOCUMENTS FOR USE IN THE REPETITION OF AND
COMMERCIAL BUILDING DATE: PRELIMINAARY
PRC NO. PRC NO. MR. & MRS LUCIANO P. UY 4
T.I.N DATE ISSUED
FOR OTHER PROJECT OR BUIILDING, WHETHER EXECUTED PARTLY OR IN WHOLE,
WITHOUT THE WRITTEN CONSENT OF ARCHITECT OR AUTHOR OF SAID DOCUMENTS. (ECL TRAVELLERS INN) 01-21-2019 FOR APPROVAL
S2
Brgy. Poblacion Ilaya Dumarao
Capiz, Roxas, Philippines OWNER
PLACED ISSUED SECTION 33 REPUBLIC ACT 9266 - ARCHITECTURE LAW OF 2004 NATIONAL HIGHWAY, BRGY UNION, NABAS AKLAN AS BUILT

You might also like