Annexure B - Techno-Commercial Quote Format
Annexure B - Techno-Commercial Quote Format
S.No.
A General Information
Agency/Rating/
1
MNRE Validity
a Site -1
b Site -2
c Site -3
5 Documents furnished for above
6 Total Approx.Roof top Grid Exp
7 Actual PR data for at least 3 site
8 Team PV Experience (Cumulative)
Quoted Solar PV Plant Details
B Plant Performance PR Guarantee provided
1 PR Guarantee (%)
Input by Vendor
Parameter Input by Vendor
4 Communication Instruments (Data logger, sensors Siemens / Schneider / Rockwell or Equivalent Nos 0
etc.)
10 Protection Device like SPD etc ABB/Schneider Electric/Siemens Electric or equivalent Nos
Along with soft copy, please take printout of this sheet and
send the scanned copy with signature and stamp
Vendors Confirmation
Sr. No Checkpoints
(Yes / No)
Vendors Confirmation
Sr. No Checkpoints
(Yes / No)
Vendor should ensure that all the standards (IEC, UL, IS etc)
25 for all litems like solar PV modules, cables, junction boxes,
inverters etc are followed.
Vendors Confirmation
Sr. No Checkpoints
(Yes / No)
A small PLC with SCADA and HMI or data logger with HMI
has to be provided. This PCL / Data logger should have two
Ethernet / MODBUS port. One of the port will be
connected to plant TV for solar generation display and
other will be connected to plant central data concentrator
PLC from where all the data will be sent to cloud. Please
27
develop pages in HMI and transfer same pages to TV and
data concentrator PLC. The pages should cover all the
generation details , alrams and trip data, all these data
should be transfered to HCCB TV and data concerator PLC.
Pyranometer as mentioned below should also be
connected to this SCADA / Data logger HMI.
Guard rail / Hand rail is provided all along the edges of the
33
roof.