Proposed work method
1) Review of Reports, Design and Drawings
We shall validate the available inputs and modify to suit to site conditions. 2) Surveys and Investigation a) Topographical Survey covering all features of the Right of way shall be carried out to have the actual profile b) Soil Investigation /Boring shall be carried at CD structures locations and along in road to ascertain soil properties 3) Submission of Design and drawing We shall prepare GFC drawings and submit for approval 4) Identification and approval of materials We shall identify quarry for Aggregate and Borrow pit for Earthwork 5) Arrangement of required recourses We shall establish base camp lists for all requisite infrastructures such as READY MIX CONCRETE, ASPHALT MIX PLANT and others to complete the project as per schedule. Else, we shall enter into agreement with the owner of available resources. We shall establish Quality control lab at base camp to carry out all the requisite tests on materials and to assist construction activities along with nearby reputed institute assistance shall also be taken 6) All works are Constructed as per MORTH V manual