0% found this document useful (0 votes)
107 views

Manual: Floor To Ceiling Tube Support Unit DM-FCT-1

The document provides operation and maintenance instructions for a floor-to-ceiling tube support unit. It details specifications, construction, operation procedures, and recommends regular inspection and lubrication to ensure proper functioning. Diagrams and part names are referenced throughout.

Uploaded by

Ho Phu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
107 views

Manual: Floor To Ceiling Tube Support Unit DM-FCT-1

The document provides operation and maintenance instructions for a floor-to-ceiling tube support unit. It details specifications, construction, operation procedures, and recommends regular inspection and lubrication to ensure proper functioning. Diagrams and part names are referenced throughout.

Uploaded by

Ho Phu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 9

OPERATION MANUAL Ver.

MANUAL

FLOOR TO CEILING TUBE SUPPORT UNIT


DM-FCT-1

1
OPERATION MANUAL Ver. 0

CONTENTS

1. INTRODUCTION
2. FEATURES
3. SPECIFICATIONS
4. CONSTRUCTIONS
5. OPERATION
6 . MAINTENANCE & INSPECTION
7 . BLOCK DIAGRAM

1. INTRODUCTION

Congratulations on your purchasing our floor – to – ceiling tube


support.
This manual will guide you how to use our tube support effectively
Please read the contents thoroughly.

VR25 VR1
OPERATION MANUAL Ver. 0

2. FEATURES
Dongmun Tube support Units series are designed for heavy duty usage with all
tables and erect bucky stands, assuring a wide and precise tube positions with
stability, rigidity of tube arm and, support capacity. Its fully counter balance
providing all positions and angulations.

3. SPECIFICATIONS

Model DM-FCT-1

Floor To Ceiling

Rails Floor 2,440mmL

3
OPERATION MANUAL Ver. 0

Ceiling 2,440mmL

Stand vertical 650-1,900mm

Transversal 880-1,230mm

Longitudinal Min. 1,400mm

Rotating ±180º manual detents

of Vertical Column at each 90º positions

Rotating ±180º, manual lock

of Horizontal X-ray Beam

Lock Release System Electromagnetic Lock

Lock Release System Vertical, Transverse,

Longitudinal, Rotating

Components Tube Stand,

Tube Arm & Ring

Base Assembly

Floor/Ceiling Rails

Angle Indicator

Power requirements DC. 24V

Dimensions 2100x1,020x2,150Hmm

4. CONSTRUCTIONS

Figure 1 :

4
OPERATION MANUAL Ver. 0

5
OPERATION MANUAL Ver. 0

Figure 2 :

Make a position with Handle

To fix with X-ray tube


And fix with bolts firmly

6
OPERATION MANUAL Ver. 0

5. OPERATION
This tube support unit is operated by operation to move longitudinally,
Transversally, and vertically, and locked electromagnetically.

5.1 Special care must be taken not to let the X-Ray tube unit come in
contact with the table or other objects during the traveling.
5.2 Avoid rough handling and giving a jerk.

5.3 The functions of Operation switches :

ANGLE INDICATOR

lock S/W Horizontal lock S/W Vertical lock S/W

Rotating lock S/W Longitudinal lock S/W

7
OPERATION MANUAL Ver. 0

6. MAINTENANCE AND INSPECTION

6.1 The rails should be kept clean from dust


6.2 Check the parts regularly.
6.3 External inspection
1) Any defect in the unit
2) Lack of lubrication
3) Any deformation or corrosion
4) Connecting parts (Pins and screws)
Wear, deformation, breakage, loosening or missing of those
parts.
5) Bearings
Wear, rusting or lack of lubrication
6) Other check Points
Any failure or defects in the section related with the X-Ray
Tube support.

7. BLOCK DIAGRAM
8
OPERATION MANUAL Ver. 0

You might also like