Kensington Sector Plan: Worksession 1 May 12, 2011
Kensington Sector Plan: Worksession 1 May 12, 2011
worksession 1
may 12, 2011*
* revised to reflect planning
board decisions
today’s tasks
rationale:
….master plan level of analysis precluded detailed
evaluation of design issues, including added right-of-way
dedication and implications of substantial topography
change on property
….level of analysis also precluded economic evaluation
….while sector plan generally directed taller buildings to
core at connecticut/knowles, added height in this area
meets plan’s primary goal of encouraging revitalization
specific properties: konterra
60 ft
additional height
density and height
opportunities
density and height
density distribution
density and height
existing conditions
density and height
….areas 10 and 11
….area 10 proposed for crn
1.5: c 1.5, r 1.5, h 45
….generally preserves
current far
….allows mixed- or
single-use projects
….area 11 proposed for crn
1.0: c 1.0, r 0.5, h 45
….reflects lower existing
far in transition zones
….far “windfall”
undesirable absent
optional method
ask proposal—area analysis
1 (Connecticut and Knowles CRT 2.5: C 2.0, R 2.0 H Rename area Retain Public Hearing Plan recommendation
Avenues; Connecticut 75 “Downtown Core;” Draft recommendation will create incentive for
Avenue/Plyers Mill Road Reduce density to 2.0 landowners to absorb
FAR; reduce building risks of redevelopment;
height to 65 feet; no recommended height
clear zoning will allow new projects
recommendation on smaller properties to
provide public areas,
open space and other
amenities
2 (3700 Plyers Mill Road LLC CRT 2.0: C 1.0, R 1.5, H Mapping rules indicate Retain Public Hearing Plan recommendation
property) 60 property suitable for CRN Draft recommendation provides incentive for
1.0, H 40 revitalization; it also calls
for maximum height on
Metropolitan Avenue
and attached units on
Plyers Mill and
multifamily units in
interior
3 (Connecticut/University CRT 2.0: C 1.5, R 1.5, H No clear zoning Retain Public Hearing
Area) 60 recommendation Draft recommendation
4 (Antique Row and CRT 2.0: C 2.0, R 0.5, H Reduce density to 1.5 Retain Public Hearing Plan recommendation
Montgomery Avenue) 50 FAR; mapping rules Draft recommendation will create incentive for
indicate area suitable for landowners to absorb
CRN 1.5, H 45 risks of redevelopment;
CRT zone provides
optional method to
achieve public benefits
ask proposal—area analysis
Area Public Hearing Draft ASK Proposal Staff Worksession Rationale
Recommendation Recommendation
5 (Concord and CRT 1.5: C 1.5, R 1.5, H No clear zoning Retain Public Hearing Plan recommendation
Connecticut Avenues) 60 recommendation for Draft recommendation places property devoted
most of area; mapping to non-residential uses
rules indicate that in appropriate zone for
portions of Concord entire use; two
property now in R-60 properties on Plyers Mill
Zone with special front on arterial
exception should remain roadway; plan
in R-60 Zone; properties recommendation
currently in C-T Zone broadens base of uses
suitable for CRN 1.0, H and likely standard
40; mapping rules method development
oppose allowing single- will allow modest
use projects revitalization without
significant financial
burden; while Plan’s
recommended zone
would allow single-use
projects, it does not
preclude mixed use
6 (South side CRT 1.5: C 1.5, H 1.5 H No clear zoning Retain Public Hearing While Plan’s
Metropolitan Avenue) 60 recommendation; Draft recommendation; recommended zone
mapping rules oppose add building height on would allow single-use
allowing single-use Konterra property projects, it does not
projects preclude mixed use
7 (West side Connecticut CRT 1.5: C 1.0, R 0.5, H No clear zoning Retain Public Hearing
Avenue) 60 recommendation Draft recommendation
ask proposal—area analysis
8 (Kensington Parkway CRT 1.5: C 1.0, R 1.0, H Recommends this area as Retain Public Hearing Plan recommendation
and Montgomery Avenue) 45) Town Center; mapping Draft recommendation does not preclude use of
rules indicate area this area as civic
suitable for CRN 1.5, H 45 gathering space; CRT
zone provides optional
method to achieve public
benefits and amenities—
open areas, public use
space, streetscape—
included in ASK concept
9 (West Side Connecticut CRN 1.5: C 1.5, R 1.5, H Mapping rules indicate Retain Public Hearing Plan recommendation
Avenue along town 45 property suitable for CRN Draft recommendation maintains already
boundary) 1.0, H 40 allowable densities
building heights and
provides incentive to
revitalize with added
residential uses
ask proposal—area analysis
Area Public Hearing Draft ASK Proposal Staff Worksession Rationale
Recommendation Recommendation
9 (North Side CRN 1.5: C 1.5, R 1.5, H Mapping rules indicate Retain Public Hearing Plan recommendation
Metropolitan Avenue) 45 portions of this area Draft recommendation maintains already
closest to existing allowable densities
residential neighborhood building heights and
suitable for CRN 1.0, H provides incentive to
40; no clear zoning revitalize with added
recommendation for residential uses
areas on Metropolitan
Avenue
10 CRN 1.0: C 1.0, R 0.5, H Mapping rules indicate Retain Public Hearing Plan recommendation
(Connecticut/University 45 area suitable for CRN 1.0, Draft recommendation places property devoted
Area) H 40; rules also retain R- to non-residential uses in
60 Zone for several appropriate zone for
properties entire use
11 (Knowles and Detrick CRT 2.5: C 2.0, R 2.0, H Mapping rules indicate Retain Public Hearing Reduced height on this
Avenues) 55 property suitable for CRN Draft recommendation property acknowledges
1.0, H 40 transition while including
it in key town center
block; dispersed
ownership of block
reduces assemblage
potential and suggests
likelihood of standard
method development
ask proposal—other issues
ASK Proposal Details Staff Response Recommendation
Properties within 500 feet Properties within 500 feet of This proposal has no zones Retain Public Hearing Draft
of MARC station station can achieve maximum associated with it, so its recommendation
density of 2.0 FAR; if MARC implementation is uncertain.
service achieves parity with Distance regulation appears to
Metro, maximum densities of preclude 2.0 FAR in area ASK
2.5 FAR are achievable, with describes as Downtown Core. It
community review and appears to conflict with other ASK
approval proposals, which reduce density on
Antique Row to 1.5 FAR and
propose CRN Zone, with maximum
allowable FAR of 1.5, for area
nearest train station.
Connectivity Proposes charrette to evaluate Nothing in the Public Hearing Draft No additions to Public Hearing
options for pedestrian precludes organization of a Draft are warranted
crossings of rail tracks, charrette by any interested party;
reversible lanes on Summit draft also recommends
Avenue, additional pedestrian cooperative study of circulation
bridge; proposes interior north of rail tracks, which could
streets on 3700 Plyers Mill include these ideas; sketch plan
Road LLC property; walkways and detailed site plan review of
along rail tracks; additional redevelopment projects are
crosswalks for intersections appropriate venue for detailed
design issues; additional
crosswalks on Connecticut Avenue
are in the purview of SHA
ask proposal—other issues
ASK Proposal Details Staff Response Recommendation
Parking Proposes that parking Issue is more appropriately No additions to Public Hearing
“incentives” be limited to 10 evaluated as part of CRN and CRT Draft are warranted
percent and proposes that zones text amendment. ZTA has
parking be required to be increased parking requirements for
within 500 feet of project retail and restaurant uses
Language “Encourage railroad-oriented Proposal focuses on design, not These ideas can be considered for
development….” uses, and makes streetscape and inclusion in the Urban Design
pedestrian circulation suggestions. Guidelines
Townhouse development in Edge areas largely encompass small No additions to Public Hearing
transitional areas lots that are is dispersed Draft are warranted
ownership; assembly is uncertain,
so standard method development
in existing buildings is likely
outcome
New “Business District” Town Center designation covers No change in designations is
designation both the Connecticut Avenue and necessary
East Howard Avenue business
areas, including the area ASK
proposes for a town center; in any
event designations are informal
Zoning and Compatibility Proposed language focuses on Ideas can be considered for