Man Power Calculation Sheet - MEP: Fire Fighting System

This document provides a manpower calculation sheet for various mechanical, electrical, and plumbing (MEP) systems. It lists the key components of fire fighting, plumbing, HVAC, and electrical systems and estimates the manhours required to install each component based on productivity rates. The total estimated manhours for fire fighting is 0, plumbing is 1000, HVAC is 0, and electrical work including containment is 12000 manhours.

Uploaded by

Mohand Ahamed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
999 views

Man Power Calculation Sheet - MEP: Fire Fighting System

This document provides a manpower calculation sheet for various mechanical, electrical, and plumbing (MEP) systems. It lists the key components of fire fighting, plumbing, HVAC, and electrical systems and estimates the manhours required to install each component based on productivity rates. The total estimated manhours for fire fighting is 0, plumbing is 1000, HVAC is 0, and electrical work including containment is 12000 manhours.

Uploaded by

Mohand Ahamed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Man Power Calculation Sheet -MEP

Productivity
Group Included materials UOM Qty (A) Manhrs - A/B Remarks
(Qty/hr) - B

FIRE FIGHTING SYSTEM


FF Pipes Mtrs
Riser pipes Mtrs
1.10 0
Sprinkler pipes Mtrs
Pipes
Fire supression pipes Mtrs
Fittings Nos 1.00 0
Valves Nos 0.50 0
Dropper Nos
Sprinkler 2.00 0
Sprinkler head Nos
Fire extinguisher Fire extinguisher Nos 0.50 0
FHC/Breach inlet FHC + Breach inlet + Landing valves Nos 0.10 0
Pre action system Pre action system Sys. 0.004 0
ZCV Zone Control Valves Nos 0.20 0
Pumps Fire pump (set Incl. valves + fittings) Nos 0.05 0
Fire suppression Sys.
Fire Suppression Foam System Sys.
0.10 0
systems Cylinders Nos
Nozzles Nos
Pressure test Sprink pipes
Testing and
Sys.
Commissioning
Complete Fire Fighting networks testing
TOTAL MANHOURS 0

PLUMBING SYSTEMS
Hot and cold water Insulation Mtrs 1.40 0
Water supply pipes Mtrs 1.10 0
Drainage, waste/soil Pipes Mtrs 1.25 0
Pipes CDP pipes Mtrs 1.40 0
Fittings Nos 1.00 0
Valve package Nos 0.70 0
GAS, Riser Pipes Mtrs 0.50 0
booster pumps Nos
Circulation pumps Nos
Pumps Sump pumps Nos 0.05 0
Pump connection Nos
Valve package and fittings Nos
Hot water tank & water heaters Nos
Over head tanks Nos
Tanks 0.05 0
LPG tank, boilers Nos
Pressure vessels, DG Fuel tank Nos
Water hamm arresstors
Water hamm arrestors + Auto.air vent Nos 0.80 0
heat exchanger Nos 0.05 0
heat exchanger
Mech heat exchanger Nos 0.05 0
Water meters Nos 0.20 0
Meters
Gas meter & switch Nos 0.40 0
Plumbing manhole Nos
Gratings Mtrs
Accessories 0.40 0
Hose bips Nos
Clean out & floor drains Nos
Excavation Plumbing excavation works Ls 500
Manhole construct Construc of exter. MH Ls 500
Man Power Calculation Sheet -MEP
Productivity
Group Included materials UOM Qty (A) Manhrs - A/B Remarks
(Qty/hr) - B

Testing & Plumbing Network testing & Clorination Sys.


Commissioning LPG System commissioning Sys.
TOTAL MANHOURS 1000

HVAC SYSTEMS
CHW Pipes Mtrs
1.10 0
CHW Pipe Riser pipes Mtrs
Fittings Nos 1.00 0
Ducting works M2 0.40 0
Duct insulation M2 0.50 0
Ducting
Duct fittings Nos 0.50 0
Plenum box , flexible duct Mtrs 0.60 0
FD, VCD, MSFD Nos
Dampers NRD Nos 0.60 0
Sound attenuators Nos
FCU & CCU Installation Nos
FCU/DX Units, CCU DX unit Installation Nos 0.25 0
Valve package Nos
Extract fans Nos
Press. fans Nos
Fans 0.20 0
Smoke extraction fans Nos
All connec works Nos
CHW pipe insult Mtrs
Insulation 1.60 0
Includin fittings Mtrs
Valve package All valve package Nos 0.50 0
Grills/diffusers Nos
Grills/diffusers 1.00 0
Louvers Nos
CAV CAV Install only Nos 0.25 0
AHU/FAHU AHU/FAHU with complete Nos 0.03 0
Pressurization unit Press unit installation Nos 0.02 0
CHW Pump CHW Pump Nos 0.02 0

Chemical dosing system


Chemical dosing system Sys 0.02 0
BTU Meters BTU Meters Installation Nos 0.30 0
Flushing of CHW network
Testin & Commi Sys. 0
Pressure test for CHW pipes
TOTAL MANHOURS 0

ELECTRICAL SYSTEMS
1st fix & Fire Alarm Pts
BMS & CO Sensor Pts 1.00 0
Containment
Conduit Installation Pts 1.00 0
Builders work Containment Ls. 12000
Cable tray/trunking Mtrs
Cable tray 0.60 0
Vertical / horizontal tray/trunking Mtrs
BMS, Struc cabling Pts 0.50 0
Wiring FA, Lighting Pts 0.75 0
Small power Mtrs 0.75 0
DB, SMDB, ESMDB, Mtrs 1.00 0
Cable pulling
Control panels, (LCP) Nos 1.00 0
LV Cable pulling Mtrs
LV Cable 0.25 0
Transformer Room, risser Mtrs
Man Power Calculation Sheet -MEP
Productivity
Group Included materials UOM Qty (A) Manhrs - A/B Remarks
(Qty/hr) - B

MDB, ATS, MCC Nos 0.02 0


LV Panels DG, Capacitor bank Nos 0.02 0
Earthing & Lightning Pts 0.02 0
BMS, UPS Panels, LPG control panels Nos 0.04 0
DB/SMDB
FACP, LCP, DB, SMDB, EDB, ESMDB, Isolators Nos 0.04 0
Termination & Glading
Termination
Interface with other services Ls
All Light fittings
Light fittings Emergency lights Nos 1.00 0
Exit Lights
All socekts Nos
1.50 0
Power outlets Nos
FA devices Nos 1.00 0
Devices BMS Devices Nos 1.00 0
LPG devices Nos 1.50 0
Switch sockets Nos
1.50 0
Tel/data sockets Nos
Light points Nos
Power outlets Pts
Ceiling rose/wire CCTV, Acces control systems Pts
2.00 0
droppers AV, GSM Points, Pts
FA control interface Modules Pts
FA detectors Nos
Busbar Bus bar riser Mtrs 0.15 0
Completion
Testing (Continuity, Meggering, Loop test &
T&C Sys
Fluke test)
Testing and Commissioning
TOTAL MANHOURS 0.00 0