CSC
CSC
A Window(18*6)
294
48 6 87 6 84 6 48
10
10
10
10
18
18
Washing Platform Washing Platform
12 12
45
45
Toilet Toilet
24 24
D1 D1
6
6
138
138
12
24
B 18 13 B
D1 D1
6
6
Toilet D1 D1 Toilet
45
45
12 12
Bathroom Bathroom
18
18
48 48
10
10
10 10
4
4
10
10
A
Entrance Note-All dimension are in inches
Entrance
(King)
Queen
Section A-A
126
6 6
24
6
18
Wash Basin
78
37
134
1
3
7
6
8
8
36
24
24
60
6
4
9
84 84
73
72
37
134
1
9
9
9 18
concrete1:2:4
6
6
42
29,85
Beam
Ø21"
36
Plinth Beam
1
36
Ø2"
9
6
,6
9
17
24
D Ø21" 6"SpacingØ41"
D
18
Ø21
"
@6"Ø41"
12
6 Asbestos sheet
75
Solar Panel
Water Tank(3000 Lit)
Concrete roofing
138
114
57
8
30 30
Section E-E
24 111 24 111 24 81,6
24
Crushed Brick
90
96
R2
4
R3 0
R2
24
0 R3
4
R42 R42
EARTHWORK
Earth work in excavation by
mechanical means (Hydraulic
excavator)/manual means over
areas (exceeding 30 cm in depth,
1.5 m in width as well as 10 sqm
1. m3 13.77 181.85 2504.07
on plan) including getting out and
disposal of excavated earth lead
upto 50 m and lift upto 1.5 m, as
directed by Engineer-in-charge for
all kinds of soil.
TOTAL= 2504.07
BRICKWORK FOR SUPERSTRUCTURE
Brick work with common burnt
clay modular bricks of class
2. designation 7.5 in foundation and m3 9.35 5302.60 49579.31
plinth with Cement mortar 1:6 (1
cement : 6 coarse sand)
TOTAL= 49579.31
FLOORING
Cement concrete flooring 1:2:4 (1
cement : 2 coarse sand : 4 graded
stone aggregate) finished with a
floating coat of neat cement,
3. including cement slurry, but m2 20.9 498.35 10415.52
excluding the cost of nosing of
steps etc. complete. 40 mm thick
with 20 mm nominal size stone
aggregate
TOTAL= 10415.52
DPC
Providing and laying damp-proof
course 40mm thick with cement
concrete 1:2:4 (1 cement : 2
4. m2 5.02 347.90 1746.46
coarse sand (zone-III): 4 graded
stone aggregate 12.5mm nominal
size)
TOTAL= 1746.46
FINISHING
12 mm cement plaster of mix :
5. m2 144.59 266.85 38583.84
1:6 (1cement : 6 fine sand)
Finishing walls with water
proofing cement paint of
144.59
6. required shade : 13.44.1 New m2 91.25 13193.83
work (Two or more coats applied
@ 3.84 kg/10 sqm)
TOTAL= 51777.68
DOORS
24 mm thick Factory made
shutters with frame, rails and
panels of PVC extruded sections
in white, grey or wooden finish
7.
Door 1 - 2ft x 6ft nos 6 1209
7254
TOTAL= 7254
SANITARY INSTALLATIONS
Providing and fixing wash basin
with C.I. brackets, 15 mm C.P.
brass pillar taps, 32 mm C.P.
brass waste of standard pattern,
including painting of fittings and
8. brackets, cutting and making nos. 2 2196.05 4392
good the walls wherever require:
White Vitreous China Flat back
wash basin size 450x 300 mm
with single 15mm C.P. brass
pillar tap
Providing and fixing white
vitreous china water closet
9. squatting pan (Indian type) : nos. 4 2544.50 10176
Orissa pattern W.C. pan of size
580x440 mm
TOTAL= 14568
CEMENT CONCRETE
TOTAL= 2036.58
REINFORCED CEMENT CONCRETE
PLINTH BEAM:
CROSS BEAM:
*Non-schedule cost.
This estimate doesn’t include costs of plumbing such as pipes, junctions and drains and filler material
required for foundation (stones and concrete).
The above estimate is a very rough estimate just to give an indicative idea of cost of constructuion.