Building Estimation Quantity Sheet

1. The document is an estimation sheet that lists quantities of materials needed to construct a building, including earthwork, concrete, reinforced concrete, brick masonry, and slab. 2. It includes 11 items with descriptions of the components, their numbers, dimensions, and calculated quantities in cubic meters or numbers. 3. The quantities will be used to estimate the costs and materials required for the construction project.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
151 views7 pages

Building Estimation Quantity Sheet

1. The document is an estimation sheet that lists quantities of materials needed to construct a building, including earthwork, concrete, reinforced concrete, brick masonry, and slab. 2. It includes 11 items with descriptions of the components, their numbers, dimensions, and calculated quantities in cubic meters or numbers. 3. The quantities will be used to estimate the costs and materials required for the construction project.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 7

Building Estimation Quantity Sheet

Depth or
S.No. Item Description No. Length Width Quantity Unit
Height

1 Earthwork in Excavtion in Foundation

18 1.6 1.6 1.45 66.816 cum

2 PCC In Foundation
18 1.3 1.3 0.15 4.563 cum

3 Footing RCC
18 1 1 0.3 5.4 cum

4 Column Up To Plinth Beam Bottom

12 0.3 0.3 1 1.08 cum


6 0.2 0.2 1 0.24 cum
Total 1.32 cum
5 Back Filling in Foundation

Excavated Area 18 1.6 1.6 1.45 66.816 cum


Deduction
Footing PCC 18 1.3 1.3 0.15 -4.563 cum
Footing RCC 18 1 1 0.3 -5.4 cum
Column up to plinth 12 0.3 0.3 1 -1.08 cum
6 0.2 0.2 1 -0.24 cum
Total 55.533 cum
6 Plinth Beam RCC
Drawing + Kitchen
Long Walls 2 10.9 0.3 0.3 1.962 cum
Short Wall 3 5 0.3 0.3 1.35 cum
Both Bedroom
Long Walls 2 9.6 0.3 0.3 1.728 cum
Short Wall 2 4.6 3.9 0.3 10.764 cum
Front Varandha
Long Walls 1 9.6 0.2 0.3 0.576 cum
Short Wall 1 2 0.2 0.3 0.12 cum
Back Varandha
Long Walls 1 7.2 0.2 0.3 0.432 cum
Short Wall
Toilet
Long Walls 2 2.7 0.2 0.3 0.324 cum
Short Wall 2 2 0.2 0.3 0.24 cum
Total 17.496 cum
7 Filling in Plinth
Room1 1 6 5 0.3 9 cum
Room2 1 4.5 3.9 0.3 5.265 cum
Room3 1 4.5 3.9 0.3 5.265 cum
Kitchen 1 5 4 0.3 6 cum
Front Varandha 1 9.4 2 0.3 5.64 cum
Back Varandha 1 7.2 2.5 0.3 5.4 cum
Toilet 1 2.5 2 0.3 1.5 cum
Total 38.07 cum
8 Grade Slab
1 10.9 5.6 0.1 6.104 cum
1 9.6 9.4 0.1 9.024 cum
Deduction for Column
12 0.3 0.3 0.1 -0.108 cum
6 0.2 0.2 0.1 -0.024 cum
Total 14.996 cum
9 Column up to Slab Beam
12 0.3 0.3 2.7 2.916 cum
6 0.2 0.2 2.7 0.648 cum
Total 3.564 cum
10 Brick Msonary
Drawing + Kitchen
Long Walls 2 10.9 0.3 2.7 17.658 cum
Short Wall 3 5 0.3 2.7 12.15 cum
Both Bedroom
Long Walls 2 9.6 0.3 2.7 15.552 cum
Short Wall 2 4.6 0.3 2.7 7.452 cum
Toilet
Long Walls 2 2.7 0.2 2.7 2.916 cum
Short Wall 2 2 0.2 2.7 2.16 cum
Deduction
D1 (1.2 × 2.1) 5 1.2 0.3 2.1 -3.78 cum
D2 (1 × 2.1) 3 1 0.3 2.1 -1.89 cum
D3 (0.75 × 2.1) 1 0.75 0.2 2.1 0.315 cum
W1 ( 1 × 1.5) 5 1 0.3 1.5 -2.25 cum
W2 (2 × 1.5) 2 2 0.3 1.5 -1.8 cum
V3 (0.6 × 0.45) 1 0.6 0.2 0.45 0.054 cum
Lintel
D1 (1.2 × 2.1)L=1.2+0.15+0.15 5 1.5 0.3 2.1 -4.725 cum
D2 (1 × 2.1) 3 1.3 0.3 2.1 -2.457 cum
D3 (0.75 × 2.1) 1 1.05 0.2 2.1 -0.441 cum
W1 ( 1 × 1.5) 5 1.3 0.3 1.5 -2.925 cum
W2 (2 × 1.5) 2 2.3 0.3 1.5 -2.07 cum
V3 (0.6 × 0.45) 1 0.9 0.2 0.45 -0.081 cum

Total 35.838 cum

11 Slab
Slab Beam
Drawing + Kitchen
Long Walls 2 10.9 0.3 0.2 1.308 cum
Short Wall 3 5 0.3 0.2 0.9 cum
Both Bedroom
Long Walls 2 9.6 0.3 0.2 1.152 cum
Short Wall 2 4.6 3.9 0.2 7.176 cum
Front Varandha
Long Walls 1 9.6 0.2 0.2 0.384 cum
Short Wall 1 2 0.2 0.2 0.08 cum
Back Varandha 0 cum
Long Walls 1 7.2 0.2 0.2 0.288 cum
Short Wall
Toilet
Long Walls 2 2.7 0.2 0.2 0.216 cum
Short Wall 2 2 0.2 0.2 0.16 cum
Slab RCC
1 10.9 5.6 0.1 6.104 cum
1 9.6 9.4 0.1 9.024 cum
Total 26.792 cum