700G - IS-IEC 60870-5-103 InteropGuide - 20180629
700G - IS-IEC 60870-5-103 InteropGuide - 20180629
June 29, 2018 Configuration and Interoperability Guide for IEC 60870-5-103 2
for the SEL-700G Generator and Intertie Protection Relays
1 INTRODUCTION
The purpose of this document is to describe the specific implementation of the IEC 60870-5-103 within
SEL-700G.
SEL-700G uses the Triangle MicroWorks, Inc. IEC 60870-5-103 Slave Source Code Library Version 3.
This document and the documents listed below provide complete information on how to
communicate with SEL-700G via the IEC 60870-5-103 protocol.
Document Description
IEC 60870-5-1 Transmission Frame Formats
IEC 60870-5-2 Link Transmission Procedures
IEC 60870-5-3 General Structure of Application Data
IEC 60870-5-4 Definition and Coding of Application
Information Elements
IEC 60870-5-5 Basic Application Functions
IEC 60870-5-103 Companion Standard for the Informative
Interface of Protection Equipment
1.1 Interoperability
1.1.1 Physical Layer
☒ EIA RS-485
☒ EIA RS-232
Note: EIA RS-485 standard defines unit loads so that 32 of them can be operated on one line.
For detailed information refer to clause 3 of EIA RS-485 standard.
June 29, 2018 Configuration and Interoperability Guide for IEC 60870-5-103 3
for the SEL-700G Generator and Intertie Protection Relays
1.1.1.3 Transmission Speed
☒ <3> Reset CU
☒ <4> Start/restart
☒ <5> Power on
☐ <16> Auto-recloser
June 29, 2018 Configuration and Interoperability Guide for IEC 60870-5-103 4
for the SEL-700G Generator and Intertie Protection Relays
☐ <20> Monitor direction blocked
☐ <23> Characteristic 1
☐ <24> Characteristic 2
☐ <25> Characteristic 3
☐ <26> Characteristic 4
June 29, 2018 Configuration and Interoperability Guide for IEC 60870-5-103 5
for the SEL-700G Generator and Intertie Protection Relays
☐ <51> Earth fault forward, i.e. line
☐ <64> Start/pick-up L1
☐ <65> Start/pick-up L2
☐ <66> Start/pick-up L3
☐ <67> Start/pick-up N
☐ <69> Trip L1
☐ <70> Trip L2
☐ <71> Trip L3
☐ <80> Zone 3
☐ <81> Zone 4
☐ <82> Zone 5
☐ <83> Zone 6
June 29, 2018 Configuration and Interoperability Guide for IEC 60870-5-103 6
for the SEL-700G Generator and Intertie Protection Relays
☐ <87> Trip measuring system L2
☐ <128> CB ‘on’ by AR
☐ <130> AR blocked
☐ <144> Measurand I
☐ <145> Measurands I, V
☐ <146> Measurands I, V, P, Q
☐ <147> Measurands IN, VEN
June 29, 2018 Configuration and Interoperability Guide for IEC 60870-5-103 7
for the SEL-700G Generator and Intertie Protection Relays
☐ <250> Write entry with execution
June 29, 2018 Configuration and Interoperability Guide for IEC 60870-5-103 8
for the SEL-700G Generator and Intertie Protection Relays
☐ <250> Write entry with execution
☐ Test mode
☐ Disturbance data
☐ Generic services
☒ Private data
1.1.3.6 Miscellaneous
Measurands are transmitted with ASDU 3 as well as with ASDU 9. As defined in 7.2.6.8, the
maximum MVAL can either be 1,2 or 2,4 times the rated value. No different rating shall be used
in ASDU 3 and ASDU 9, i.e., for each measurand there is only one choice.
Current L1 ☐ ☒
Current L2 ☐ ☒
Current L3 ☐ ☒
Voltage L1-E ☐ ☒
Voltage L2-E ☐ ☒
Voltage L3-E ☐ ☒
Active power P ☐ ☒
Reactive power Q ☐ ☒
Frequency f ☐ ☒
Voltage L1 - L2 ☐ ☒
June 29, 2018 Configuration and Interoperability Guide for IEC 60870-5-103 9
for the SEL-700G Generator and Intertie Protection Relays
© 2018 by Schweitzer Engineering Laboratories, Inc. All rights reserved.
June 29, 2018 Configuration and Interoperability Guide for IEC 60870-5-103 10
for the SEL-700G Generator and Intertie Protection Relays