0% found this document useful (0 votes)
34 views1 page

Attachment 2. Document List For Pre-Commissioning and Commissioning

Uploaded by

jorgekarlospr
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
34 views1 page

Attachment 2. Document List For Pre-Commissioning and Commissioning

Uploaded by

jorgekarlospr
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Truck Loading Station Document List

PROJECT NO. :
COMPANY NO. : POSCO ENGINEERING & CONSTRUCTION CO., LTD.
CLIENT : ENERGIA NATURAL DOMINICANA ENADOM, S. R. L.,
PROJECT NAME : DR Andres LNG Terminal Expansion Project
DISCIPLINE : Commissioning (Truck Loading Station) Date 2022.03.25
1st Issue 2nd Issue Reviewer
S/N Document No. Title Discipline Class
Rev. Submit Rev. Submit Contractor Owner

Truck Loading Station

1 ELT-01-ER-RPT-0030 Operation Manual for Truck Loading Station (Spanish) Process 1 A 2022.03.07

Operation Manual for Truck Loading Station (English) Process 1 A 2022.02.24

2 ELT-01-KR-PC-0006 Pre-Commissioning and Commissioning Procedure for Truck Loading Station Process 2 A 2021.12.09 B 2022.02.10

3 ELT-01-KR-PC-0007 Pre-Startup Safety Review (PSSR) Procedure for Truck Loading Station Process 2 A 2022.02.02

4 ELT-01-KR-PC-0008 Capability Test Procedure for Truck Loading Station Process 2 A 2022.03.08

5 ELT-01-KR-PC-0009 Performance Test Procedure for Truck Loading Station Process 2 A 2022.03.08

6 ELT-01-KR-RPT-0001 Pre-commissioning (PDO and Leak Test) Report for Truck Loading Station Process 2 A 2022.03.04

7 ELT-01-KR-RPT-0002 Pre-Startup Safety Review (PSSR) Report for Truck Loading Station Process 2 A 2022.03.04

8 ELT-01-KR-RPT-0003 Commossioning Test Report (Cool-down) for Truck Loading Station Process 2 A 2022.03.17

9 ELT-01-KR-RPT-0004 Capability Test Report for Truck Loading Station Process 2 A 2022.03.17

10 ELT-01-KR-RPT-0005 Performance Test Report for Truck Loading Station Process 2 A 2022.03.17

11 ELT-01-KR-RPT-0006 Operation and Maintenance Training Material for Truck Loading Station (Spanish) Process 2 A 2022.03.04

Operation and Maintenance Training Material for Truck Loading Station (English) Process 2 A 2022.03.08

12 ELT-01-KI-RPT-0001 Pre-commissioning (Loop, Fire&Gas and Function test) Report for Truck Loading Station I&E 2 A 2022.03.21