Open navigation menu
Close suggestions
Search
Search
en
Change Language
Upload
Sign in
Sign in
Download free for days
0 ratings
0% found this document useful (0 votes)
283 views
9 pages
APAR Guidelines - SPARROW
hi
Uploaded by
stanley
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download
Save
Save APAR Guidelines - SPARROW For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
0 ratings
0% found this document useful (0 votes)
283 views
9 pages
APAR Guidelines - SPARROW
hi
Uploaded by
stanley
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Carousel Previous
Carousel Next
Download
Save
Save APAR Guidelines - SPARROW For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
Download now
Download
You are on page 1
/ 9
Search
Fullscreen
Page nota F. No. CSIAdv (Finance)/SPARROWI2021, Government of India Ministry of Communications Department of Telecommunications ‘Sancher Bhawan, 20-Ashoka Road, New Delhi-110 001 [CS & Protocol Section, SEA] Dated :- 09.09.2021 OFFICE MEMORANDUM ‘The Annual Performance Appraisal Report (APAR) is an important document as it provides the basic and vital inputs for assessing the performance of an officer and for histher further promotions / career advancements. It's therefore, essential that they are ‘Completed in a time bound manner so that up-to-date APARS are available at any given time. 2, It has been observed that there are instances where confirmation, regular promotion, appointment to sensitive posts, deputation etc., could not be considered in time due to non-availability of APARs for the relevant period. With a view to resolve the issue in emergent situation, No Report Cerificate (NRC) is issued. But, subsequently the manual APAR for the seme period Is also received. In order to streamline the process of recording of manual APAR and online Le. through SPARROW portal, fllowing procedure may be adopted and followed by all concexmed:- | __ In SPARROW portal, e-APAR Work Flow I created by the Custodian based Upon basic employee information received from tho Officer Reported Upon in Prescibed format Le. Annexure to the concemed custodian Le. CS To Advisor (Finance) Section, DoT, in respect of IP&TAFS Officers Group ‘A’ working in DoT, Deputation / NICF / Probationers and Nodal Officer of DoP in respect of IP&TAFS ‘Officers. Group ‘A’ working in Department of Post as per DoT O.M. No. CS/Ad (FinanceySPARROW/2020-21 dated 19.03.2021. i, Any delay / mistake in fuming basic employee information by the Officer Reported Upon will hamper the process of generation of @APAR. The Officer Reported Upon must fumish information in Annaxures, period / part wise, well in time with due care as to the correctness of the information, Wherever necessary, foliowing documents may be appended to the Annexure (in case of fresh registration on SPARROW, Annexure ~ and I, copies enclosed):Page 2014 2, Copy of relieving order from the previous cherge and copy of joining report in the current charge for which the APAR is being written, ». In case where option "NRC is chosen by the Officers to be reported upon, the ground for NRC should be clearly specified by the officer reported upon i.e, muliple reporting offcers, period of service under a Reporting Officer less than three months, availing of Eamed Leave / Maternity Leave / Child Gare Leave / Study Leave for more than 15 days. © Leave Orders. Training Orders. €. Incase. Officer reported upon is on deputation, the name of Department / Organization, designation be clearty mentioned inthe Annexute:t along with copy of Order and joining report tothe post on deputation, i, A Time Schedule for various stages in writing of APAR has boon prescribed In DoPT OM. No. 21011/02/2009-Estt(A) (Pt4) dated 23 July, 2009. A Reporting Officer should not wait til the expiry of ime-imit for self appraisal ofthe Officer to be reported upon. After expiry of the first week of the time-schedule, if satf appraisal is not received, the Reporting Officer should remind the Officer to be reported upon in writing / emai to submit his sell-appralsal within stipulated time- schedule with clear message that I the Officer Reported Upon falls to submit the self appraisal by the stipulated date, the report willbe written without self appraisal If no selt-appraisal is received by the stipulated date, the Reporting Officer should proceed to write the report on the basis of his own experience of the work and ‘conduct of the Officer Reported Upon. While doing so, he can also point out the falure of the Officer Reported upon to submit his self-appraisal within the stipulated time. |v. The SPARROW poral also provides status check se that the officers know where their APARS are pending as well as what are pending with them. In case, 'APAR of an Officer Reported Upon is not received by the Reporting Officer, he will Intimate the same to CR Section so thet the APAR of the officer reported upon may bbe ‘Force Forwarded’ to the Reporting Officer for necessary action as envisaged in para i above. v. __ Reporting Officer and Reviewing Officer are to complete the APAR as. per the Time Schedule prescribed. In case the APAR Is not Intiated by the Reporting (fice for any reason beyond stipulated date of the year in which the financial year fended, he shall forfeit his right to enter any remarks in the APAR of the Officer to be reported upon and he shall submit manually / forward online all APARS held by him for reporting to the Reviewing Officer on the next working day. Similarly, the Reviewing Officer shall also forfeit his right to enter any remarks in the APAR boyond stipulated date of the year in which the financial year ended,Pages ora vi In cage the remarks of the Reporting officer or Reviewing Officer have not been entered in the APAR due to the concerned officer forfeiting his right to make ‘any entry, a certificate to this effect shall be added in his APAR for the relevant Period. In case both the Reporting officer and Reviewing Officer had forfeted their Fights to enter any remarks, the APAR format with the seif sppraisal given by the Officer to be roperted upon will be placed in his APAR dossier. vi, Wherever there is any gap in the APAR during a particular reporting period, It shall be the rosponsiilty of the CR Section to place a No Report Certificate (NRC) indicating the oaconie) og a. Officer Reported Upon has not worked for minimum three months under a Reporting Officer, ‘Officer on leave / training during the period; Officer was on unauthorized absence; Officer under suspension: APAR could not be completed by lapse of the time lit for making remarks by the retired Reporting / Reviewing Officer etc In SPARROW portal, NRC can be generated for such no report periods, Study Leave otc. The same shall be downloaded by the CR Section and placed in APAR dossier of the concerned officer. After issue of the NRC, no APAR (manual of ‘online for the relevant period will be taken on record 3. In view of prevailing COVID situation, OoP&T vide O.M. No, 21011/02/2015-Est! (Alippartit dated 17" June, 2021 (Copy enclosed) has extended the time schedule for recording and completion of APAR for the Year 2020-21 only. However, timalines for recording and completion of APAR as per DoPT O.M. dated 23° July, 2009 ibid shall ‘stand and valid from 2021-22 onwards 4. Timely writing of APAR is a public duty. Any instances of delay /falure to perform this pubic duty as per time schedule shall be brought to the notice of the Cadre CControling Authority for necessary action. The officer concered shall be personally responsible forthe outcome, Hence, ime schedule for recording and completion of APAR. aall stages should be strictly adhered to by all concerned, 5. _ In SPARROW portal, the recording and movement of APARS is quick and ‘converient due to inbuilt alert mechanism through different modes at appropriate stages. Ithas been aimed at 100% switching over from manual APAR to online mode of APAR Le. through SPARROW portalPage ofa 6. Its requested to bring to the notice of all concerned for strict complance of the above instructions / guidelines to ensure that APARs are completed In time bound manner. It may be served to all Group ‘A’ Officers under acknowledgement for future reference. 1. “Wane win te proof he compen Aster, aoe SB Ska ewat dy olecer eta Tol. No. 011-23372668 ‘e-mail:
[email protected]
Copy forwarded for kind information and necessary action to:- PPS to the Mombar (Finance), DoT HO, New Dehi. PSO to the Advisor (Finance), DoT HO, New Deh CGCA, DoT, NICF Campus, Ghitori, New Det. DG, NICF, Ghitomi, New Delhi. [AI Sr. DDGs / DDGs of Accounts and Finance Wing in DoT HQ New Delhi ‘Sr, DDG (PAF), Department of Posts, Dak Bhawen New Delhi-110001, ‘Addl, Administrator, USOF, DoT HO All Pr. C3CA/ C8CA | Joint CCA /G.M (Finance)/ DAP. All IP&TAFS Group ‘A’ Officers on deputation by e-mail for their information and ‘compliance please. 10.ADG (SEA). 411.US (SEAAI & Legal) for uploading on thé DoT website & e-Ofice 42.Guard Fie/Spere, SEN omseneNo.21011/02/2015-Est.(A‘y parti ‘Government of nda Mistry of Personne, Pubic Grevances and Pensions ‘Departnent of Personnel & Tealing ‘North Block, New Deiti-t i001 Dated 17° June, 202: OFFICE MEMORANDUM ‘Subject: Extension of imelines for recording of Annual Performance Assessment Report (APA) in respect of Group A, ‘Band °C" officers of Cental Ci Services for fe year 2020-21 ‘Tho undersigned is drected to invite altertion to this Department's OM of even number dated 14.04.2021 on the above subject, extending the timelines for _atibuton / oniine gonoration, roordng and corslaton of APAR fo Ue Year 2020. 21 for Group’, "Band ‘C officers of Cental Civ Services, as a che-tma measure, ‘wing to the situation sising out of the lock down due to spread of corona vis. 2. __In view of te rrevaling situation, i has been decided to further extend the {imotines for cstitutononiine generation, recording and completon of APAR fo the year 2020.21 for Group ‘A, “BY and 'C’offcers of Cental Civil Sentoes, a6 a one. {ime measure, 8s epecfed in Annaxure. ‘3 The extended tmelines for the APAR year 2020-21 shail also apply to the reporting / reviewing / accepting authortes, who have demited office or retired from ‘Service on ar after 28,2.2021 and they shal be allowed to recor thelr remarks 1 the respects extended cut-off datas. 4. Further, the dedsion conveyed vide OM of even number dated 14.06.2021 alinking recording and completion of APAR forthe year 2020-21 fromthe conduct of ‘Annual Medical Examinaton afd thereelor submission of summary of medice report Soiser sa Deputy Secretary tothe Govt of india ‘All Mirstiee/DepartmentsCadre Controting Authorites ofthe Gevernment of india Copy to 4 4 AIS Divison, DOFT, Noth Block. New Deli 2. NIC, for uploacig in DoPT websiteAanenure ‘Tine sched for recording and bampleton of AAR forthe year 2020-2 or Group 'K,'B and ofc of Canal Gl Sarees SAT Act Date by which activity tobe] exrpeted | ta Bak Taal Say wa | Rerent 5 ingRay wer Sa i ji |] Deseeme ot Arar to fe tc | 31 onconber 224 ‘menedapen wwe ber esp u oan Way GAAPAR | 8p a | seser | Fawr a repeserttons tse competent aubersy i (0 ‘Wrere tere 16 no scoping aumorty | 31 Dacomber, 2021 (© Where tere is acceptng autorty fer | 1S*Jansary, 2022 APA 1 [Disposal of veprosenatn by ts Sompatart | WAR aie mond af Bae scatterer y | [70] Conenuneaton of wa dese Ww tea baat competent aurty on te represen | of doen 8 compart [7] End of er APARC pceas, afer fiche [33 abn 28-——| ‘PAS be nal taken on rearaged og2 ‘alc tan ‘eas sub the dt ech prt in separate arm ( > ‘Report forthe Yer Pe of Repo (rem & To in DOIMMYYYY} .2APAR Pat No ("Pid of Reporte tn ye T[awoti ate + Sasa pon 5 [sraton tanmeae + [baton a meee |e me Seng) eg + basa amos — [oa clanpeAPAR Bai ne Fay SPARROW yen EEE Deiat SPARROW Eagles ase Teviiag Onicar [ls Reviewing cee 7 | dsang oe peiatar | tot ny SPARROW Report (dened ins | Stem GO! ereaPAR (reNO) SPARROW sjiemst [Nase hehe spetotany [Rack (Anam Pn cararsoatrow RR °. Syren po Desi a SPARROW Engines ote | Ped obsess ty on wag lee, i) ng i ar RS a ‘rn, ples spc eomplt dete NI, whe case aye ‘Abascs | Folod From —[Penadio | TypeNatie | Ramis caeayGage 2g 2 Leaves (ELICCLICOMIL Study Leave raining) taken during the yar 202021. incase there are mitpe periods of rpetng and review during the year, desis of ach reporting reviewing fice with period thereof may be provided Sett-Certinteation: Coifed that the infomation provided above is wue and comect to the bet of my Knowledge. Date Nonatre Nene: Salt No ‘Ofice Const No/Mbi: mail i Note: Kindly forward the Anexure-Iin PF format (ess than 3MB) duly sled in al espct hough il ‘nly inanaerew dover Js,ANNEXURE i! (Details as per Service Book reauired for registration in SPARROW Portal)
You might also like
APAR Timelines for officers other than Group A 2024-25
PDF
No ratings yet
APAR Timelines for officers other than Group A 2024-25
12 pages
Circular SPARROW APAR Generation 2024-25
PDF
No ratings yet
Circular SPARROW APAR Generation 2024-25
2 pages
13. APAR
PDF
No ratings yet
13. APAR
36 pages
.trashed-1747714465-Timeline-APAR-2024-25-11_04_25001
PDF
No ratings yet
.trashed-1747714465-Timeline-APAR-2024-25-11_04_25001
2 pages
Apar Writing by S Mookerjee Dg-Nair
PDF
50% (2)
Apar Writing by S Mookerjee Dg-Nair
38 pages
APAR - Annual Performance Appraisal Report
PDF
100% (1)
APAR - Annual Performance Appraisal Report
2 pages
APAR For Central Government Employees - Frequently Asked Questions
PDF
No ratings yet
APAR For Central Government Employees - Frequently Asked Questions
5 pages
Issue of NRC NO Report Certificate For Missing Periods of APARs
PDF
75% (4)
Issue of NRC NO Report Certificate For Missing Periods of APARs
7 pages
1385465617HandBook For POs (2013) - 281-290
PDF
No ratings yet
1385465617HandBook For POs (2013) - 281-290
10 pages
SPARROW- Compiled Guidelines 20.04.2025
PDF
No ratings yet
SPARROW- Compiled Guidelines 20.04.2025
92 pages
1744801499_dopt001
PDF
No ratings yet
1744801499_dopt001
2 pages
Non Initiation of ACR
PDF
No ratings yet
Non Initiation of ACR
19 pages
APAR REP New
PDF
No ratings yet
APAR REP New
3 pages
No Reporting Certificate Formatted
PDF
No ratings yet
No Reporting Certificate Formatted
2 pages
Directorate General, CRPF Block No.1, Cgo Complex, Lodhi Road, New Delhi - 110 003
PDF
No ratings yet
Directorate General, CRPF Block No.1, Cgo Complex, Lodhi Road, New Delhi - 110 003
47 pages
Notes On Initiations of Apars For New Manual Online Apar Formats
PDF
No ratings yet
Notes On Initiations of Apars For New Manual Online Apar Formats
21 pages
FAQs On APAR PDF
PDF
No ratings yet
FAQs On APAR PDF
7 pages
Online completion of APAR/MTPAR for the period 2024-25 on SPARROW Portal in r/o SAO/AAO/SA/Auditor
PDF
No ratings yet
Online completion of APAR/MTPAR for the period 2024-25 on SPARROW Portal in r/o SAO/AAO/SA/Auditor
3 pages
Re-Revised_instructions-APAR
PDF
No ratings yet
Re-Revised_instructions-APAR
6 pages
Apar_User_Manual
PDF
No ratings yet
Apar_User_Manual
32 pages
APAR ExtnTimeline 1032
PDF
No ratings yet
APAR ExtnTimeline 1032
17 pages
Sparrow Circular
PDF
No ratings yet
Sparrow Circular
2 pages
Timely Filing and Completion of APARs on SPARROW as Per the Prescribed Timelines 19.06.2025
PDF
No ratings yet
Timely Filing and Completion of APARs on SPARROW as Per the Prescribed Timelines 19.06.2025
1 page
Circular No.- 697
PDF
No ratings yet
Circular No.- 697
3 pages
Instructions English
PDF
No ratings yet
Instructions English
9 pages
ICAR Circular APAR_merged
PDF
No ratings yet
ICAR Circular APAR_merged
6 pages
APAR timelines 2024-25
PDF
No ratings yet
APAR timelines 2024-25
11 pages
EC_11724
PDF
No ratings yet
EC_11724
4 pages
Eaparguidelines
PDF
No ratings yet
Eaparguidelines
8 pages
APAR for Group B & C officers
PDF
No ratings yet
APAR for Group B & C officers
3 pages
APAR Grading Cat I N II Circular
PDF
No ratings yet
APAR Grading Cat I N II Circular
3 pages
Officer Reported Upon Help Manual
PDF
No ratings yet
Officer Reported Upon Help Manual
7 pages
Timely Preparation of APAR
PDF
No ratings yet
Timely Preparation of APAR
2 pages
1-APAR-ReadingMaterialApril29KSN
PDF
No ratings yet
1-APAR-ReadingMaterialApril29KSN
7 pages
Timelines APAR
PDF
No ratings yet
Timelines APAR
2 pages
APAR Circular
PDF
No ratings yet
APAR Circular
2 pages
Faqs On Apar
PDF
No ratings yet
Faqs On Apar
7 pages
APAR Form For Group C Staff
PDF
No ratings yet
APAR Form For Group C Staff
11 pages
Annual Performance Appraisal: Assessing Performance of The Government Servant
PDF
No ratings yet
Annual Performance Appraisal: Assessing Performance of The Government Servant
20 pages
Sparrow Timeline 2021-22yAmv3
PDF
No ratings yet
Sparrow Timeline 2021-22yAmv3
8 pages
1743165836758Observing APAR Fortnight
PDF
No ratings yet
1743165836758Observing APAR Fortnight
2 pages
11-APAR_Instuctions-2022_unlocked
PDF
No ratings yet
11-APAR_Instuctions-2022_unlocked
7 pages
DoPT OM 21011 - 1 - 2005-Estt (A) - (Pt-II) 140509
PDF
No ratings yet
DoPT OM 21011 - 1 - 2005-Estt (A) - (Pt-II) 140509
2 pages
APARInstructions 11042019
PDF
No ratings yet
APARInstructions 11042019
6 pages
Name: - Designation
PDF
No ratings yet
Name: - Designation
11 pages
3.1 Reading Material Service Law
PDF
No ratings yet
3.1 Reading Material Service Law
8 pages
APAR Form III
PDF
No ratings yet
APAR Form III
20 pages
Apar Circular-2014
PDF
No ratings yet
Apar Circular-2014
2 pages
Time Schedule-APAR on Sparrow- for 2024-2025
PDF
No ratings yet
Time Schedule-APAR on Sparrow- for 2024-2025
2 pages
E APAR 230217
PDF
No ratings yet
E APAR 230217
5 pages
Sparrow Custodian Manual
PDF
No ratings yet
Sparrow Custodian Manual
26 pages
Auto Forwarding of APAR 2022-23
PDF
No ratings yet
Auto Forwarding of APAR 2022-23
1 page
APAR GuidelinesFillingAPAR
PDF
No ratings yet
APAR GuidelinesFillingAPAR
3 pages
apar_0
PDF
No ratings yet
apar_0
12 pages
Guideline
PDF
No ratings yet
Guideline
11 pages
Annual Confidential Reports New Guidelines Issued by DPAT&R
PDF
67% (3)
Annual Confidential Reports New Guidelines Issued by DPAT&R
6 pages
Instructions For Eapar in Sparrow
PDF
No ratings yet
Instructions For Eapar in Sparrow
4 pages
1430209312workshop On Pay Fixation (WPF) - Reading Material
PDF
No ratings yet
1430209312workshop On Pay Fixation (WPF) - Reading Material
1 page
Guidelines and Timeline For Submission of APARs For The Year 2021-22
PDF
No ratings yet
Guidelines and Timeline For Submission of APARs For The Year 2021-22
7 pages