0% found this document useful (0 votes)
41 views1 page

Comprehensive School Safety (CSS) Pillar

The document outlines a school disaster risk reduction and management plan with three pillars: safe learning facilities, school disaster management, and disaster risk reduction in education. It details key activities, phases of disaster risk reduction, time frames, responsible persons, and needed resources for each pillar.

Uploaded by

Gabs Gary
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
41 views1 page

Comprehensive School Safety (CSS) Pillar

The document outlines a school disaster risk reduction and management plan with three pillars: safe learning facilities, school disaster management, and disaster risk reduction in education. It details key activities, phases of disaster risk reduction, time frames, responsible persons, and needed resources for each pillar.

Uploaded by

Gabs Gary
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

SCHOOL DISASTER RISK REDUCTION & MANAGEMENT PLAN

(Sample)
COMPREHENSIVE
SCHOOL SAFETY (CSS) INTERVENTION/KEY ACTIVITIES PHASES OF DRR TIME FRAME PERSONS INVOLVED RESOURCES NEEDED
PILLAR
 Drainage cleaning
1. Safe Learning  Conduct classroom/building Preparedness Whole year round Administrator School MOOE
Facilities assessment for any hazardous situation Teachers
present (Student-led School Watching Prevention & mitigation Parents Donations from LGUs
& Hazard Mapping) Pupils
 Checking of electrical connections in Property custodian Other sources
the classroom
 Repair/replacement of defective
appliances
 Cleaning of mosquito breeding places
 Contingency planning 1st week of June Administrator
2. School Disaster  School drills Preparedness Teachers School MOOE
Management - Earthquake (quarterly Every quarter Parents Donations from LGUs
- Flood orientation & drill Prevention & mitigation Pupils Other sources
- Fire drill Barangay Officials
 Building maintenance check Whole year round PTA Officials
Administrator
3. Disaster Risk  Teacher and pupils training on first aid Preparedness 1st week of July Teachers School MOOE
Reduction in and flood survival Parents
Education  Tree planting Prevention & mitigation May 28, 2015 Pupils Donations from LGUs
 Environmental campaign on solid waste Barangay Officials
management Whole year round PTA Officials Other sources
 Integration of DRRM concepts in all Residents
subject areas through poster/slogan CENRO TWG
making contests

Prepared by: ______________________________ Noted by: __________________________________


SDRRM Coordinator School Head

You might also like