0% found this document useful (0 votes)
32 views

Bill of Quantities: Division 2: Site Work

The bill of quantities document provides pricing details for a construction project divided into site work, concrete work, and steel/metal work. It lists the materials, quantities, unit prices, and total prices for items like demolition, excavation, cement, rebar, and tiles. The concrete work makes up the bulk of costs at P302,987 and includes footings, walls, slabs, beams and tiles. Steel/metal reinforcement adds another P399,070 to the bill. In total, the document outlines the material needs and estimated pricing for the key structural elements of the building project.

Uploaded by

Cristine Arpon
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
32 views

Bill of Quantities: Division 2: Site Work

The bill of quantities document provides pricing details for a construction project divided into site work, concrete work, and steel/metal work. It lists the materials, quantities, unit prices, and total prices for items like demolition, excavation, cement, rebar, and tiles. The concrete work makes up the bulk of costs at P302,987 and includes footings, walls, slabs, beams and tiles. Steel/metal reinforcement adds another P399,070 to the bill. In total, the document outlines the material needs and estimated pricing for the key structural elements of the building project.

Uploaded by

Cristine Arpon
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

BILL OF QUANTITIES

MRK DESCRIPTION QUANTITY PRICE/ TOTAL PRICE


UNIT
A DIVISION 2: SITE WORK
Demolition P 15,000

Earthfill P 75,000

Hauling P 15,000

Excavation P 25,000

SUBTOTAL P 130,000
B DIVISION 3: CONCRETE
B.1 COLUMN FOOTINGS, COLUMNS AND GRADE BEAM
Cement 30 bags 237 /per bag P 7,110.00
Sand 15 cu.m. 200 per cu.m. 3,000.00
Gravel 32 cu.m. 400 per cu.m. 12,800.00

B.2 WALL AND WALL FOOTINGS


Cement 293 bags 257 per bag P 75,301.00

Sand 34.7 cu.m. 650 per cu.m. 22,555.00

Gravel 90 cu.m. 450 per cu.m. 40,500.00

6" x 8" x 16" CHB 3,324 pcs. 15 per pc 49,860.00


4" x 8" x 16" CHB 1,393 pcs. 13 per pc. 18,109.00
B.3 FLOOR SLAB ON FILL
Cement 20 bags 257 per bag P 5,140.00
Sand 11 cu.m. 650 per cu.m 7,150.00
Gravel 22 cu.m 450 per cu.m 9,900.00

Gravel bed 20 cu.m. 800 per cu.m. 16,000.00


B.4 FLOOR SLAB
Cement 20 bags 257 per bag P 5,140.00
Sand 10 cu.m. 650 per cu.m. 6,500.00
Gravel 21 cu.m. 450 per cu.m. 9,450.00

B.5 ROOF BEAM


Cement 2 bags 257 per bag P 514.00

Sand 1.5 cu.m. 650 per cu.m. 975.00


Gravel 3 cu.m. 450 per cu.m. 1,350.00
B.6 TILE WORKS
Cement 57 bags 257 per bag P 14,649.00

SUBTOTAL: P 302, 987


C DIVISION 5: STEEL/ METAL
C.1 COLUMN FOOTINGS, COLUMNS AND GRADE BEAM
Def. Bars 16mm dia. x 6.0m 448 pcs. 408 per pc. 182,784.00
10mm dia. X 6.0m 280 pcs. 177 per pc. 49,560.00
# 16 G.I. Tie Wire 62.8 kilos 43 per kilo 2,700.40
C.2 WALL AND WALL FOOTINGS
Ties,Vert./Hozntl. 10mmdiaX 6.0m 281 pcs. 177 per.pc 49,737.00
# 16 G.I. Tie Wire 12 kilos 40 per kilo 480.00
C.3 FLOOR SLAB ON FILL
Def. Bars 16mm dia. x 6.0m 54 pcs. 408 per pc. 22,032.00
10mm dia. X 6.0m 21 pcs. 177 per pc. 3,717.00
# 16 G.I. Tie Wire 5 kilos 43 per kilo 215.00
C.4 FLOOR SLAB
Def. Bars 16mm dia. x 6.0m 216 pcs. 408 per pc. 88,128.00
10mm dia. X 6.0m 16 pcs. 177 per pc. 2,832.00
# 16 G.I. Tie Wire 14 kilos 43 per kilo 602.00

SUBTOTAL: P 399, 070