Muhammad Javed
Muhammad Javed
Objective:
Seeking a challenging position to utilize my education and experience in the field of electric engineering profession. To attain and
strive for the position of target achievable personally and along with allowable resource. Establishment of ideal working relationship
with professional staff at all levels in a team to meet company’s standards of quality and accuracy. Management of multiple tasks by
setting priorities according to need, demand and urgency.
Personal Profile:
Father Name Muhammad Ramzan
Date of Birth 15-04-1972
N.I.C No 31301-1443067-7
Educational Qualification:
Computer Skills:
M.S Office, SAP (Systematic Applicable Program), Company Software of IMC.
5- Anoud Power Generation
Client of National Oil Refinery, Kesc, Enar Petro Tech Service, P.S.O.
Position: Electrical Supervisor From 02-06-2000 to 02-11-2007
Work Duties:
Provide 10MW Kesc Korangi grid station. At Bengali camp near bilal chorangi Karachi.
I worked in maintenance and operation department
24MW Power Generation Korangi Industrial Area Karachi:
NIIGATA Diesel 18v32clx capacity 5.96MW each x 4 sets.
Good knowledge of Electrical Protection, control relays & rectification faults.
Having well knowledge about troubleshooting & maintenance of all auxiliary such as viscosity controller, Exhaust
gas boiler (Clayton Belgium), Water treatment plant, maintenance of Vacuum Circuit Breaker, LT Air
circuit breaker, Adjustment of Temperature switch, Pressure Switch & Flow Switch
Maintenance of transformer, generator, Lt, H.t, motors H.T Cable jointing work, Earth system & Battery bank
acts.
Anoud Power Plant (Site Noori Abad)
Capacity, 900KW X 4SETS =3.6MW Waukesha Lt 5794
I took part in erection of Anoud power generation Ltd. All electrical installation and commissioning completed
under my supervision. I performed duty for six months (during commissioning).
6- Descon Engineering Ltd.
Client of Pak Arab oil refinery (PARCO) Muzafargarh (During commissioning)
Position: Electrician
From 05-04-1999 to 23-05-2000
Worked at control & power instruments, cable termination, loop testing & commissioning work, H.T. cable
testing work, L.T testing work, temperature, pressure, flow, level switch adjustment & calibration work.
Testing of H.T, L.T Motor testing, Transformer and substation panels and Meggering,
7- Swanmet (Malaysia) Sdn Bhd.
Ferious non-Ferious foundry
Position: Senior Electrical Technician
From 27-01-1997 to 20-09-1998
Operation & maintenance work of
kone crane, Damage crane 20ton, Mould mixer machine, Angle grinder high frequency 200Hz, Furnace (pillar
company) 1100KW, All types of H.T, L.T motors, generators and transformers,H.T, L.T Power Distribution System
8- Gulistan Power Generation Ltd.
12MW Power Generation Shekhepura Faisalabad-
NIIGATA diesel 8v32clx 3 x 3.94each sets.
Position: Electrical Technician (Maintenance & Operation)
From 01-02-1994 to 20-01-1997
Troubleshooting & maintenance of:
all auxiliary such as H.F.O & L.O purifier, viscosity controller, exhaust gas boiler and water treatment plant
H.T, L.T maintenance work, H.T circuit breaker, Air circuit breaker, Thermocouple, Pt 100, Temperature,
Pressure, Flow, Level Switch. Maintenance of transformer, generator etc.
Earthling system, Battery bank etc.