0% found this document useful (0 votes)
81 views

Muhammad Javed

The document provides a summary of Muhammad Javaid's professional experience and qualifications. He has over 20 years of experience working as a senior electrical technician and engineer at various power plants and industrial facilities. His experience includes maintenance, operation, and commissioning of power generation equipment, electrical systems, and instrumentation. He is seeking a challenging position utilizing his education and experience in the field of electric engineering.

Uploaded by

Ahmed Hussain
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
81 views

Muhammad Javed

The document provides a summary of Muhammad Javaid's professional experience and qualifications. He has over 20 years of experience working as a senior electrical technician and engineer at various power plants and industrial facilities. His experience includes maintenance, operation, and commissioning of power generation equipment, electrical systems, and instrumentation. He is seeking a challenging position utilizing his education and experience in the field of electric engineering.

Uploaded by

Ahmed Hussain
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 5

MUHAMMAD JAVAID

Gulshan-e-usman colony near Almacca petrol pump (PSO)


2 Km Rahim Yar Khan Road Khan Pur District (RYK).
Cell: 0306-1360071 / 0334-1760071(WhatsApp) ,
[email protected] , [email protected]

Objective:
Seeking a challenging position to utilize my education and experience in the field of electric engineering profession. To attain and
strive for the position of target achievable personally and along with allowable resource. Establishment of ideal working relationship
with professional staff at all levels in a team to meet company’s standards of quality and accuracy. Management of multiple tasks by
setting priorities according to need, demand and urgency.

Personal Profile:
Father Name Muhammad Ramzan
Date of Birth 15-04-1972
N.I.C No 31301-1443067-7

Permanent address Gulshan-e-usman colony near almacca


petrol pump 1 Km Rahim Yar Khan
Road Khan pur District (RYK)
Religion Islam
Marital Status Married
Nationality Pakistani
House mobile No 0092-0302-2071943

Applied for the post of : Senior Electrical Technician

Educational Qualification:

 Two Years Certificate Trade Testing Board Lahore


(Electrical) 1994 2 nd Division

 Matric (Science) Board of intermediate & Secondary Education (Bahawalpur)


1988 - 2nd Division
Professional Experience

1 Popular cement Factory Noriabad Karachi


Position: Senior Electrical & instrument Supervisor (10/1/2019 to till date)
Work Duties:
In Power Generation Plant and WHRP Operation & Maintenance Department
Preventive, Predictive & Annua l Maintenance.
 I also keep check on the store inventory electrical items & raise the purchase requisition when necessary.
Total Plant =22.84 MW.
1Wartsila Diesel 16SW28 capacity 3.96MW each x 4 set.= 15.84MW
2Waste Heat Recovery Kawasaki & GE= 7MW
HMI and PLC system operation power load projection and reactive recovery procedure
During fault condition.
 Having well knowledge about troubleshooting & maintenance of all auxiliary such as viscosity controller,
Exhaust gas boiler (Clayton Belgium), Water treatment plant, maintenance HT panel PEL,ABB,Siemens Air
circuit breaker, Calibration of Temp switch, Pres Switch & Flow Switch , Maintenance of transformer
, generator, Lt, H.t, motors, H.T Cable jointing& Termination work, Earth system ,heat exchanger boiler,
& Battery Bank & capacitor bank, 20MW grid station also maintenance work.
Computer Skill:
M.s office, Excel.
Systematic Applicable Program Company soft ware of popular group
2 Descon Power Solutions
Altern Energy Limited (IPP Combine Cycle Power Plant Fatah Jang).
Position: Senior Electrical & Instrument Supervisor =2/2/2018 to 9/1/2019
Work Duties:
In Power Generation Plant Operation & Maintenance Department
Preventive, Predictive & Annual Maintenance Following Equipment
Total Plant 39 MW.
1 Deutz Gas Engine TCG 2032 V16 Capacity 4MW Each x 8 Sets. 32MW
2 Steam Turbine Heat Recovery 7 MW
 Strong knowledge HMI and PLC system operation power load projection and
reactive recovery procedure
During fault condition.
 H.T Panel Alstom, Siemens, AEG also MV Panel Jonson & Philips control
circuits fault rectification.
 Grid station 11KV/66KV step up transformers and oil circuit breaker
Troubleshooting & maintenance work.
 Maintenance & Overhauling LT, HT Motors (Maximum 200kW) and VFD
drives control L.V ,H.V motors
(Siemens, ABB). VFD also preventive maintenance
 Strong knowledge of safety JSA, Hot work permit, Cold work permit, Confined
Space area.
 I also keep check on the store inventory electrical items & raise the purchase
requisition when necessary.
Computer Skills:
M.S Office, SAP (Systematic Applicable Program), Company Software of DPSL

3 Maple Leaf Cement Factory Limited


Cement Manufacturing Plant Iskanderabad District Mianwali
Position: Associate Engineer Electrical (PG &D) Since 20-04-2011 to 31-1-2018.
Work Duties:
In Power Generation Plant & Coil fire power plant, Grid Station
My duties include: maintenance department
Preventive, Predictive & Annual Maintenance Following Equipment:
 I also keep check on the store inventory electrical items & raise the purchase requisition when necessary.
Total Plant 71.6MW
40MW H.F.O Base, Dual Fuel Power Plant
Niiggata 18v32clx 3.9MW each 15.6MW
WARTISILA 18V50DF capacity 16MW
Coil fire Power Plant 40MW
 I was part of the team which completed the Erection & Commissioning of coal fire plant 40MW.
 Have well knowledge of troubleshooting & Power System Protection, Control Relays, Electrical Power, Control
Circuit faults Rectify, H.T panel Merlin Grin Schneider, Toyo Denki, and Siemens), L.T distribution system,
Sivicon Siemens Technology, Sinoma, Merlin Gerin Schneider china ABB technology, VFD control LV, HT
motors, Soft starter. L.O purifier, H.F.O purifier, EPC control new model (Alfa Laval), all instruments also
maintenance and calibration pressure, temperature switches, like that according to the drawings.
 Maintenance & Overhauling LT, We maintenance electric work of firefighting system & RO plant.
 Power cable also joint & termination kit work.
 Knowledge of safety JSA, Hot work permits, Cold work permit, Confined Space area.
Computer Skills:
 Good Knowledge of M.S Office
 Company Software of MLCF (Oracle)
4- Indus Motor Company
(Formally Toyota, Daihatsu Automobile Manufacturing Company Karachi).
Position: Team Leader Electrical (Utility & co-generation) from
05-11-2007 to 30-04-2011
Work Duties:
 At Plant Engineering and Maintenance Department, I worked on Operating and Breakdown plan, Preventive,
Predictive & Annual Maintenance Following Equipment:
10 MW Co-Generation Power House
1. G3516C Catter Pillar 1600KW X 3 Sets
2. D3516B Catter Pillar 1800KW 1 Set
3. GPB Kawasaki 1.5MW 1 Set
760 kW Power Generation Stand by:
1. Cater Pillar 3412, 400 kW each 2Sets Total = 800 kW
2. F.G Willson 80kw
3. F.G Willson 40kw
 Having well knowledge about troubleshooting & good knowledge of Electrical Protection,
Control Relays, Electrical Power, Control Circuit faults Rectify, Communication System.
 Maintenance & operation work all utility area.
 Maintenance Overhauling Lt, Ht Motors (Maximum 800kw) &Transformers, H.T panel (Siemens) control &
power work, L.T distribution system & Rectify Faults of LT, HT System. Oil free air Compressor (Screw Type), Oil
Injected Air Compressor Screw Reciprocating Types. All types of cooling Towers also inspection and
Maintenance work

Computer Skills:
M.S Office, SAP (Systematic Applicable Program), Company Software of IMC.
5- Anoud Power Generation
Client of National Oil Refinery, Kesc, Enar Petro Tech Service, P.S.O.
Position: Electrical Supervisor From 02-06-2000 to 02-11-2007
Work Duties:
Provide 10MW Kesc Korangi grid station. At Bengali camp near bilal chorangi Karachi.
I worked in maintenance and operation department
24MW Power Generation Korangi Industrial Area Karachi:
NIIGATA Diesel 18v32clx capacity 5.96MW each x 4 sets.
 Good knowledge of Electrical Protection, control relays & rectification faults.
 Having well knowledge about troubleshooting & maintenance of all auxiliary such as viscosity controller, Exhaust
gas boiler (Clayton Belgium), Water treatment plant, maintenance of Vacuum Circuit Breaker, LT Air
circuit breaker, Adjustment of Temperature switch, Pressure Switch & Flow Switch
 Maintenance of transformer, generator, Lt, H.t, motors H.T Cable jointing work, Earth system & Battery bank
acts.
Anoud Power Plant (Site Noori Abad)
Capacity, 900KW X 4SETS =3.6MW Waukesha Lt 5794
 I took part in erection of Anoud power generation Ltd. All electrical installation and commissioning completed
under my supervision. I performed duty for six months (during commissioning).
6- Descon Engineering Ltd.
Client of Pak Arab oil refinery (PARCO) Muzafargarh (During commissioning)
Position: Electrician
From 05-04-1999 to 23-05-2000
 Worked at control & power instruments, cable termination, loop testing & commissioning work, H.T. cable
testing work, L.T testing work, temperature, pressure, flow, level switch adjustment & calibration work.
 Testing of H.T, L.T Motor testing, Transformer and substation panels and Meggering,
7- Swanmet (Malaysia) Sdn Bhd.
Ferious non-Ferious foundry
Position: Senior Electrical Technician
From 27-01-1997 to 20-09-1998
Operation & maintenance work of
 kone crane, Damage crane 20ton, Mould mixer machine, Angle grinder high frequency 200Hz, Furnace (pillar
company) 1100KW, All types of H.T, L.T motors, generators and transformers,H.T, L.T Power Distribution System
8- Gulistan Power Generation Ltd.
12MW Power Generation Shekhepura Faisalabad-
NIIGATA diesel 8v32clx 3 x 3.94each sets.
Position: Electrical Technician (Maintenance & Operation)
From 01-02-1994 to 20-01-1997
Troubleshooting & maintenance of:
 all auxiliary such as H.F.O & L.O purifier, viscosity controller, exhaust gas boiler and water treatment plant
 H.T, L.T maintenance work, H.T circuit breaker, Air circuit breaker, Thermocouple, Pt 100, Temperature,
Pressure, Flow, Level Switch. Maintenance of transformer, generator etc.
Earthling system, Battery bank etc.