Acurev 2110 Installation Guide 06-04-22
Acurev 2110 Installation Guide 06-04-22
Installation Manual
www.enerionusa.com
Installation Preparation:
2. The use of personal safety measures such as gloves, goggles, dielectric boots
and electrically insulated tools is essential for a safe installation.
3. Do not try to connect voltage that exceeds the specifications of the equipment
as it may cause a health hazard to the installer.
www.enerionusa.com
Dimensions
www.enerionusa.com
Din rail Mounting
type
www.enerionusa.com
Installation
3. The meter must be as close as possible to the circuits to be measured, since the
current transformers have approximately 8 feet of wiring.
www.enerionusa.com
Connection Terminals
www.enerionusa.com
Power Supply and Voltage
Signals Connection
The AcuRev 2110 power supply has a range of 100-414 VAC, 50/60 Hz or 100-300
VDC.
The power supply is connected to terminal blocks 5, 6 and 7 and the voltage signals to
terminal blocks 1, 2, 3 and 4.
The pre-wired cabinet already comes with a fuse holder where the signals will be
connected.
www.enerionusa.com
Current Signal
Connection
The current signals are connected to the bottom of the meter, which have an easy to
connect Snap On connector. The sequences for the connection of the currents are:
Current 1 (47), current 2 (48), current 3 (49), and so on until the 18 circuits are
connected if it is the case to use them.
www.enerionusa.com
Snap On
Connector
www.enerionusa.com
Three-Phase
4-Wire Connection
Diagram
www.enerionusa.com
Finished cabinet
Example
AcuRev 2110 with 18 circuit, 208 VAC three-phase connection. Connected to the
network via Ethernet.
www.enerionusa.com
Connection
Current Transformers
The transformation ratio with which the AcuRev 2110 works is 333mV and CT Coil
Rogowski, so that it can read the measurements correctly. The measurement range is
5-2000A.
For the installation of the Current Transformers we must take into account several
recommendations both for safety and for their correct installation:
b. All current transformers have an arrow indication which indicates the direction
that the current goes, so it is necessary to install them in this way. Always
check the power (kW) on the meter to verify that the transformer is properly
installed. The kW must always be positive (+).
Make sure that the transformers are well adjusted, well closed. This ensures a good
measurement.
www.enerionusa.com
Configuration of
current transformers
and Channel Mapping
The AcuRev 2110 comes with an executable software for desktop or laptop PC which
is on page:
www.accuenergy.com/support/product-support-documents
In order to configure the meter you need a professional quality plug-and-play USB
to RS485 serial converter.
www.enerionusa.com
USB to serial
Converter Connection
Download the executable file and open it, configure the USB port as follows:
Name of the meter, the type of reading select “serial port”, communication port,
the data transmission baud “9600”, no parity “None 1” , data transmission
frequency “300ms” and press "OK"
www.enerionusa.com
USB to serial Converter Connection
www.enerionusa.com
USB to serial
Converter Connection
Go to the configuration and select “Users and CT’s”:
2. For Three-and Two phase wiring : Choose 3LN or 2LN on “Wiring of three Phase
User”, and Select Channel 301/201 for the first group of three, 302/ 202 for the
second group of three, etc
3. For Single-phase wiring: Choose 1LN on “Wiring of three Phase User”, and Select
Channel 101 for the first, 102 for the second, etc
4. For CT model: (3 Phase): Place the Amperage capacity of the transformer (50, 100,
200, 400) and assign the same amperage for each of the three phases until
completing the 18 circuits (Notice the Figure1 below shows six (6) “user names” and
18 circuits, this means that the 6 user names or circuits are grouped in 3s).
5. For CT model (Single Phase): Place the Amperage capacity of the transformer (50,
100, 200, 400) until completing the 18 circuits.
I47
I48
I49
I50
I51
I52
I53
I54
I55
I56
I57
I58
I59
I60
I61
I62
I63
I64
www.enerionusa.com
USB to serial
Converter Connection
Select Reading and wait a few seconds to see the parameters in variables that
appear on the screen.
www.enerionusa.com
Finished Project
Images
www.enerionusa.com