Sub: Renumeration of Site Visit of Warehouse

The document is a letter requesting payment for 10 site visits to a warehouse project between January and March 2022 at a rate of 3500 per visit totaling 35,000 excluding VAT.

Uploaded by

Salin Shrestha
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
28 views1 page

Sub: Renumeration of Site Visit of Warehouse

The document is a letter requesting payment for 10 site visits to a warehouse project between January and March 2022 at a rate of 3500 per visit totaling 35,000 excluding VAT.

Uploaded by

Salin Shrestha
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Date: 3/29/2022

To,
St. Xaviers' School
Jawalakhel, Lalitpur.

Sub: Renumeration of Site Visit of Warehouse

Respected Father,
I would like to request for the renumeration for the Site Visit of the Ware
House project. The Site Visit and Date is as mentioned below:

S. No. Date Day Rate Remarks


1 24th Jan Monday 3500 Foundation Excavation Problem
2 26th Jan Wednesday 3500 Foundation Excavation Problem
3 27th Jan Thrusday 3500 Foundation Orientation Problem
4 6th Feb Sunday 3500 Site Problem
5 20th Feb Sunday 3500 Site Problem
6 23rd Feb Wednesday 3500 Truss Problem
7 28th Feb Monday 3500 Site Problem
8 1st March Tuesday 3500 Site Problem
9 3rd March Thursday 3500 Site Problem
10 9th March Wednesday 3500 Site Problem

Sum 35000

This charge is exclusively of the vat.