Dhanjal Brothers Limited 2019: Company Profile

Dhanjal Brothers Limited (DBL) is a construction company based in Mombasa, Kenya that has been in business since 1970. They provide services such as road construction, building construction, coastal defense works, and quarrying. DBL has a large inventory of equipment and machinery and extensive experience constructing major infrastructure projects across Kenya. Their mission is to be the top civil engineering firm in Kenya focused on infrastructure and heavy industries by supplying quality construction materials and services.

Uploaded by

SETUP
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
772 views16 pages

Dhanjal Brothers Limited 2019: Company Profile

Dhanjal Brothers Limited (DBL) is a construction company based in Mombasa, Kenya that has been in business since 1970. They provide services such as road construction, building construction, coastal defense works, and quarrying. DBL has a large inventory of equipment and machinery and extensive experience constructing major infrastructure projects across Kenya. Their mission is to be the top civil engineering firm in Kenya focused on infrastructure and heavy industries by supplying quality construction materials and services.

Uploaded by

SETUP
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 16

Company

Profile

DHANJAL BROTHERS LIMITED 2019

Physical Address: DBL Building, Lumumba Road,


Makupa, Mombasa.

Postal Address: P.O.Box 82909 – 80100

Email: [email protected]

Tel: (+254) 0722411514 - 0700869470 - 0736888585

Website: dhanjalbrothers.com
Contents:
Introduction (Pg. 3)

Mission Statement (Pg. 3)

Particulars (Pg. 4)

Guarantees and Insurance (Pg. 5)

Quality Control (Pg. 5)

What We Do (Pg. 6)

Road and Highway Construction (Pg. 7)

Yard Construction (Pg. 8)

Building Construction (Pg. 9)

Health and Safety Commitment (Pg. 10-11)

Equipment and Machinery (Pg. 12)

Schedule of Major Works Carried Out (Pg. 13-15)

Annex 1: Equipment and Machinery (Pg. 16)

2
Introduction:
– Dhanjal Brothers Limited was incorporated on 23rd April
1970 as a Building and Civil Engineering contractor.
<Insert
– Through the years it has grown to be an integrated
Picture construction company with support operations in:
Logistics, production of crushed stone aggregates,
Here> asphaltic concrete batching, mining natural gravels,
and manufacture of common precast concrete units.

– A wealth of experience, wide integration and


comprehensive inventory of equipment and
construction machinery has made DBL one of the largest
contractors regionally; Certified by the National
Construction Authority for Road Works, Building works
and Water works.

– The company’s headquarters are situated along


Lumumba Road, Mombasa. DBL is well known nationally
and is a member of the Kenya Association of Building
and Civil Engineering Contractors (KABCEC), and The
Roads and Civil Engineering Contractors Association
(RACECA).

Mission:
What? Construction building service.
To Whom? Industrial and commercial concerns.
How? By invitation to tender or referrals.
Based on? Providing a reliable, warrantable
product/service that will stand the test of time.

Vision:
• To be the first choice civil engineering firm
nationally, with a focus on infrastructure and
heavy industries.
• To supply the best quality crushed aggregates,
premix asphalt and concrete to large-scale
projects.
• To continuously enhance and build a strong
management/technical team to strive towards a
sustainable, environmentally friendly engineering
approach with utmost care for the people and
their surrounding environment.

3
Particulars:

Physical Address: DBL Building, Lumumba Road, Makupa,


Mombasa.
Postal Address: P.O.Box 82909 – 80100
Email: [email protected]
Tel: (+254) 0722411514 - 0700869470 - 0736888585
Website: dhanjalbrothers.com

KRA Pin: P051092055U


Co. Reg. No: 9075

NCA Details:
CIVIL ENGINEERING WORKS - NCA 1
BUILDING WORKS - NCA 1
WATER WORKS - NCA 1

Company Directors and Managers:


Daljit Dhanjal – Managing Director
Surjit Dhanjal – Director
Tanraaj Dhanjal – Director
Raajveer Dhanjal – Project Manager

Bankers:
DIAMOND TRUST BANK KENYA LIMITED
Branch: MOI AVENUE, MOMBASA
Tel: (+254) 0720633111

Auditors:
PKF KENYA
Address: P.O. BOX 90553 – 80100 MOMBASA
Tel: (+254) 0724563668

4
Guarantees and Insurance:
The company is insured generally for construction
work at any one time worth up to KES 100,000,000.
Furthermore when a new contract is signed we
immediately insure the job for the requisite amount
and this protects the client against site risks (CAR
policy).

Quality Control:
The company contracts recognized quality control
institutions and materials consultants such as
SURTECH who perform tests for; concrete cube
capacity, CBR of gravels, Bore tests etc. This ensures
quality long lasting products.

Asphalt Core Drilling

5
What we do:
– Road & Highway Construction
Site clearance, sub-base/base formation, soil-
stabilization, asphaltic concrete laying and surface
dressing, AC overlays, bridges and box culverts,
storm drainage systems.
– Yard Construction
Natural gravel or Graded crushed stone bases,
Fibre Reinforced Concrete and RCC hardstanding
Coastal Defence: Shaheena
Marina Sea Wall, 2015
areas, Paving block surface (Cabro), Asphaltic
concrete surface.
– Building Construction
Hotel/apartment complex, warehouses, housing
developments and private homes, perimeter walls,
etc.
– Coastal Defence
Reclamation of the Sea, Sea walls, rip rap,
Revetments.
– Slope Protection
Stone pitching, Gabions, Geotextiles, Retaining
walls.
– Pre-Cast Concrete Products
Spun concrete culverts, concrete building blocks
of various sizes, concrete paving blocks, road
kerbs, road channels, slabs and various other pre-
cast units.
– Hard Stone Quarrying
Boulder for rip rap, hard-core for road bases.
Production of various sizes of building aggregates
for use in concrete, asphalt, graded crushed stone,
etc.

Road over rail bridge on the


Kipevu Dual Carriageway
access to Kilindini Port, Gate
18 incl. approach roads.

AC Overlay, 2016, KPA

6
Road & Highway Construction:
– Road building is one of the major sectors the
company operates in. With over 30 years
experience in building and maintaining roads, from
simple gravelling on country roads to class A roads
with high traffic counts. The company has
experience with the numerous complexities of
highway construction, and has successfully
undertaken the design and construction of several
types of pavements and wearing courses.
– A 100 Tons/hr mobile asphaltic concrete batching
plant can be set up on any site allowing quick
production of different graded asphalt mixes.

100 Tons/hr Mobile Asphaltic


– The company has constructed several major
Concrete Batching Plant bridges as a main contractor and sub contractor.
DBL was sub contracted to do the New Nyali
approach roads and main bridge asphalt works by
the then Main Contractor M/S Sumitomo
Construction Co. Ltd. The Company was also sub-
contracted by Sumitomo on the subsequent
construction of Kilifi Bridge and access roads, the
company also supplied the building materials and
aggregates for both jobs.
The road over rail Bridge on the Kipevu Dual
Carriageway access to the Port of Mombasa was
constructed by DBL including the approach roads.
– In 2011– 2012 DBL constructed the Mwatsuma
bridge while undertaking the construction of the
Mariakani- Kaloleni Road C107, a 14m wide by
61m long bridge under KeNHA.

Aggregate Production:
Mobile Crushing and Mwatsuma Bridge, 2012,
Screening Plant Construction of Mariakani-
Kaloleni Rd C107, KeNHA

7
Yard Construction:
– We are experienced in all types of yard
construction and have completed; - 40,000 m3 in
concreting hard-standing areas; - 1000+ acres of
leveling and graveling yards - and Over 200 acres
of Cabro (PCC Paving Block) Yards.
– This includes several public works on large scale
yards and in the Kilindini port of Mombasa (Kenya
Ports Authority), as well as several private logistics
yards and CFS’s; Mitchell Cotts CFS, Boss Freight
Terminal, AO Bayusuf Transporters, Southern
Shipping Services Limited, Anwar Ali and Brothers
Limited and several others.

SECO Stasso: Warehouse


foundation/ walling, Office
Block, Cabro surface yard.

Yard Leveling: Doshi


(2016)

8
Building Construction:
– DBL has a rich heritage in the Building sector with 4
hotel complexes built, several office buildings and
boundary walls for the yards we have constructed.
– We operate pre-casting yards at 2 locations in
support of our building and civil works. We currently
manufacture 100mm/4” solid, 6” solid, 6” hollow,
200mm/8”solid, and 9” hollow blocks for use on our
building and boundary walling jobs. As well as
several precast units such as; kerbs, channels, spun
culverts, bollards as well as paving blocks of various
sizes on order.

Spedag Interfreight Office


Block and Parking

Boss Freight Terminal:


Office Building and
Asphalt surface CFS Yard
Hotel Construction:
Travellers Beach Hotel

9
Health & Safety Commitment:
– The company has a comprehensive Health and
Safety policy to ensure the wellbeing of all
company employees and the public at large. We
provide our clients with responsive, safe and
reliable services while adhering to the ideas of
sustainable environmental requirements. We give
priority to Environment, Health and Safety in all
projects. We believe that EHS contributes to our
competitive strengths and benefits our clients,
shareholders and employees by contributing to the
overall well-being and economic health of the
communities we serve.
– The management believes that effective
management of Environmental, Health and Safety
Management issues is fundamental to success,
and is therefore committed to continually
improving the EHS performance through setting
and monitoring of objectives and targets,
necessary training, encouraging new ideas,
employee participation, coordination with clients,
suppliers and annual management reviews.

We do so by adhering to the following principals:

A. Communication: We continuously engage our


employees, clients and suppliers for input on
local conditions and sustainable practice.
B. Prevention: We employ an EHS Officer on each
site to prevent activities and conditions that
pose a threat to human health, safety or the
environment. We minimize risk and protect our
employees and the communities in which we
operate by employing safe technologies and
operating procedures .
C. Compliance: strict compliance to EHS standards
is a key component of our training,
performance reviews and incentives to all
employees. We comply with all applicable laws
and regulations.

10
Heavy Machinery :
– All operators of heavy machinery are provided
with adequate and visible clothing, including
overalls with reflective strips, helmets, safety
boots, safety goggles, gloves and dust masks
(for open machinery)
– Foremen and labour assisting or around heavy
machinery will always wear a reflective jacket
or hi-vis overall, safety boots, gloves, safety
goggles and dust masks
– Maintenance- machines to be serviced as per
scheduled intervals, inspection and if needed
inspection/replacement of tyres and other
perishables should be done at minimum
monthly basis.
Tarmac work and other labour related
works :
– The company maintains a fleet of 3
asphaltic concrete pavers to undertake
jobs of varying sizes/widths. If only one
paver is required another is kept on standby
to ensure continuity
– The asphalt labour team is professionally
kitted out in heat resistant overalls, gloves
and safety boots (with pan attachments for
those walking on fresh tarmac), along with
the standard PPE’s; Safety Goggles,
Helmets, Reflective strips.
– The equipment for the labour including
rakes, brooms, spades etc. will be
purchased new to a high standard to
ensure the safety and productivity of the
labour.
First aid and emergency care:
– The company ensures that there is always a
first aid kit available on all sites and in each
machine, this alleviates the chance for
infection in the event of small injuries, the
company provides the foreman on site with
an emergency injury budget for
extraordinary cases in remote areas to be
spent at the nearest hospital or clinic.
– Work Injury Benefit (WIBA) protects against 11
serious injury.
Equipment and Machinery (* For a full list of
equipment and machinery see Annex 1.)

* Plant requirements in excess of the above are hired as and when required to suit the 12
specific project requirements.
Starting Ending
No Month/Y Month/Y Mnths Contract Identification/Description Name of Employer Roll Contract Amount (KES)
ear ear
CONSTRUCTION OF 100 BED ROOMS HOTEL IN NORTH

Schedule of
1 Jan-79 Sep-79 9mths SEVERIN SEA LODGE Contractor 18,500,000.00
COAST

CONSTRUCTION OF 100 BED ROOMS HOTEL IN NORTH


2 Mar-80 Dec-80 10mths HOLIDAY CENTRES LTD Contractor 22,417,615.00
COAST - PLAZA BEACH HOTEL

Major 3 Feb-81 Mar-81 1mth CHANGAMWE REPOOLING SCHEME MOMBASA MUNICIPAL COUNCIL Contractor 3,078,419.00

Works
4 Feb-81 Apr-81 3mths NEW GASOLINE TANK PADS & DRAINAGE E A OIL REFINERIES LTD Contractor 6,525,022.00

APPROACH ROADS & DRAINAGE TO NEW NYALI BRIDGE


5 1981 1982 1yr INCLUDING SEWAGERAGE SYSTEM FOR SHIMO LA TEWA SUMITOMO CONSTRUCTION CO. LTD Sub Contractor 60,000,000.00
PRISON

Carried Out 6

7
Mar-83

Mar-83
May-83

Apr-83
3mths

1mth
CHAANI UPGARDING SCHEME

CHAANI TRUNK SEWER


MOMBASA MUNICIPAL COUNCIL

MOMBASA MUNICIPAL COUNCIL


Contractor

Contractor
23,600,000.00

4,601,000.00

8 May-84 Jul-84 2mths CONSTRUCTION OF COMMUNITY FACILITIES AT CHAANI MOMBASA MUNICIPAL COUNCIL Contractor 6,994,330.00

9 Jun-85 Aug-85 3mths GULANZE DAM CONSTRUCTION DIR. OF WATER DEVELOPMENT DEPT Contractor 3,437,839.00

10 Jun-85 Sep-85 4mths MIKINDANI SITE & SERVICE SCHEME MOMBASA MUNICIPAL COUNCIL Contractor 14,240,106.00

ACCESS ROAD TO KENYA NAVAL BASE MTONGWE -


11 Apr-86 Jul-86 3mths U. S NAVY Contractor 22,110,000.00
MOMBASA

12 Apr-86 Jul-86 3mths CONSTRUCTION OF MALLI HOUSE - DIGO ROAD FIMBO FOOTWEAR LTD Contractor 3,000,000.00

13 Aug-87 Nov-88 5mths CONSTRUCTION OF WHOLESALE MARKET MOMBASA MUNICIPAL COUNCIL Contractor 36,005,504.00

14 Aug-88 Sep-88 2mths PREMIX CARPETING REFINERY ROAD MOMBASA MUNICIPAL COUNCIL Contractor 1,116,823.00

15 Aug-88 Oct-88 3mths CONSTRUCTION OF WHOLESALE MARKET - TAITA TAVETA MIN. OF AGRICULTURAL & LIVESTOCK KENYA Contractor 6,222,949.00

16 Jul-89 Feb-91 7mths KIPEVU ROAD PROJECT KENYA PORTS AUTHORITY Contractor 49,987,459.50

PREMIX RECARPETING OF REFINERY ROAD & MOZAMBIQUE


17 Apr-90 May-90 1mths MOMBASA MUNICIPAL COUNCIL Contractor 13,778,904.00
RD

18 Jul-93 Aug-93 1mth KIPEVU ROAD PROJECT & NEW SERVICES AREA AT KPA KENYA PORTS AUTHORITY Contractor 17,000,000.00

19 Jul-93 Jan-94 7mths KILIFI BRIDGE APPROACH ROADS (B 8) MINISTRY OF ROADS & PUBLIC WORKS Contractor 80,000,000.00

20 Aug-93 Mar-94 8mths PREMIX CARPETING OF TOWN PLANNING ROADS MOMBASA MUNICIPAL COUNCIL Contractor 60,000,000.00

21 Jan-94 Jun-94 6mths MOMBASA SEWERAGE PROJECT PHSE 1 MOMBASA MUNICIPAL COUNCIL Contractor 160,610,914.10

22 Jan-94 Mar-95 3mths CONTAINER STACKING YARD 11 / 12 & FORKLIFT WORKSHOP KENYA PORTS AUTHORITY Contractor 120,818,964.00

23 May-95 Feb-96 10mths REPAVING OF STACKING YARD 5 KENYA PORTS AUTHORITY Contractor 178,300,321.45

24 Aug-95 Dec-97 29mths CONSTRUCTION of TRAVELLERS TIWI BEACH HOTEL DHANJAL INVESTMENTS LTD Contractor 300,000,000.00

25 Dec-97 Jan-98 2mths UPGRADING OF PART OF MOI AVENUE PREMIX SURFACING MISTRY JADVA PARBAT & Co. LTD Sub/Contractor 10,372,453.00

26 Dec-97 Oct-98 11mths SLOPE PROTECTION WORKS (FLOOD REPAIRS) KENYA PORTS AUTHORITY Contractor 83,000,000.00

27 May-98 Dec-98 8mths RESURFACING OF YARD 5 KENYA PORTS AUTHORITY Contractor 85,327,452.00

PREMIX CARPETING & RECONSTRUCTION OF TOWN


28 Jun-98 Feb-99 9mths MOMBASA MUNICIPAL COUNCIL Contractor 63,728,094.10
PLANNING ROADS

29 Jun-98 Feb-99 9mths TAFFIC IMPROVEMENT PROJECT BAMBURI CEMENT LTD Contractor 55,000,000.00

30 Jan-99 Apr-99 4mths KIEMBENI ROAD IMPROVEMENT PROJECT BAMBURI CEMENT LTD Contractor 21,000,000.00

EMERGENCY FLOOD DAMAGE REPAIRS SLOPE PROTECTION


31 May-99 Oct-99 6mths KENYA PORTS AUTHORITY Contractor 54,007,220.00
WORKS
RESTORATION OF INFRASTRUCTURES FOLLWING EL-NINO
32 Jun-99 May-00 12mths KENYA PORTS AUTHORITY Contractor 83,729,463.00
RAINS

33 Apr-00 Jun-00 3mths REHABILITATION OF STORM WATER DRAINAGE KENYA PIPELINE CO. LTD Contractor 5,379,179.00

34 May-00 Mar-02 24mths EL-NINO EMERGENCY PROJECT MOMBASA URBAN ROADS MOMBASA MUNICIPAL COUNCIL Contractor 332,630,210.00

35 Sep-00 Nov-04 REPAIR & RESEALING OF MIRITINI - SABA SABA RD (A 109) MINISTRY OF ROADS & PUBLIC WORKS Contractor 330,000,000.00

36 Apr-02 Jul-02 4mths HARDSTANDING AREA & ASSOCIATED DRAINAGE WORKS INTERFREIGHT E A LTD Contractor 26,009,085.00

37 Dec-02 Feb-03 3mths CONSTRUCTION OF KIPEVU II WATER PIPELINE PROJECT TSAVO POWER PLANT LTD Contractor 7,978,059.00

13
Starting Ending
No Month/Y Month/Y Mnths Contract Identification/Description Name of Employer Roll Contract Amount (KES)
ear ear
REHABILITATION OF SECTION OF UTANGE ROAD FROM

Schedule of
38 May-03 Jul-03 3mths MOMBASA MUNICIPAL COUNCIL Contractor 11,301,962.60
SHANZU

IMPROVEMENT TO HEAD OFFICE YARD & NEW YARD ON


39 Nov-03 May-04 7mths ANWARALI & BROTHERS Contractor 20,880,000.00
PLOT 839 SEC 1MN

Major 40 Mar-04 Apr-04 1mth UPGRADING OF ROAD TO MWAKIRUNGE REFUSE DUMP SITE MOMBASA MUNICIPAL COUNCIL Contractor 9,462,758.00

Works
REHABILITATION OF MARIAKANI WEIGHBRIDGE ACCESS
41 Jul-04 Aug-04 1mth MINISTRY OF ROADS & PUBLIC WORKS Contractor 4,267,400.00
ROAD

42 Jul-04 Aug-04 1mth DEMOLITION OF TEN DAYS SHED KENYA PORTS AUTHORITY Contractor 4,232,271.60

Carried Out 43

44
Jul-04

Nov-04
Sep-04

Aug-05
2mths

10mths
IMPROVEMENT TO HARDCORE STANDING AREA MIRITIN
YARD

REHABILITATION OF CFS YARD AT K P A


SOUTHERN SHIPPING SERVICES LTD

KENYA PORTS AUTHORITY


Contractor

Contractor
13,628,320.00

65,641,414.20

REINSTATEMENT OF DAMAGED STONE PITCHING SOUTH


45 Dec-04 Jan-05 2mths KENYA PORTS AUTHORITY Contractor 5,104,000.00
LIGHTER WHARF

46 Jan-05 Mar-05 3mths RECARPETING OF PORT ROADS KENYA PORTS AUTHORITY Contractor 19,047,200.00

47 Jan-05 May-05 5mths CONSTRUCTION OF GODOWN PLOT MN/VI/3800 - JOMVU MANGROOVE INVESTMENTS LTD Contractor 25,000,000.00

48 Feb-05 Jul-05 6mths HARD STANDING AREA & WEIGHBRIDGE AT MIRITINI A O BAYUSUF & SONS LTD Contractor 37,520,000.00

49 Feb-05 Jul-05 6mths REPAIRS & UPGRADING OF OLD MALINDI RD MOMBASA MUNICIPAL COUNCIL Contractor 34,785,785.00

50 Mar-05 Mar-05 1mth CONCRETING OF FORMER PAUL VAULE YARD 5 / 6 KENYA PORTS AUTHORITY Contractor 3,559,100.00

REHABILITATION OF CFS YARD AT K P A BEHIND ONE STOP


51 Mar-05 Jan-06 11mths KENYA PORTS AUTHORITY Contractor 211,879,710.00
CENTRE

52 Apr-05 Jun-05 3mths MOMBASA CITY BEAUTIFICATION PROJECT MOMBASA MUNICIPAL COUNCIL Contractor 22,843,180.00

REPAIRS TO TRANSIY YARD 4 / 5 & BERTH 7 APPROACH


53 Apr-05 Jun-05 3mths KENYA PORTS AUTHORITY Contractor 5,382,400.00
ROADS KILINDINI

VEHICLE HANDLING FACILITY AT PORT OF MOMBASA


54 Apr-05 Jan-06 10mths MATT INTERNATIONAL/ BOSS FREIGHT LTD Contractor 79,946,902.00
MBARAKI
55 May-05 Jul-05 3mths IMPORVEMENT TO HARDSTANDING AREA AT MIRITINI SOUTHERN SHIPPING SERVICES LTD Contractor 12,180,000.00

56 May-05 Aug-05 4mths EMERGENCY REPAIRS TO AIRPORT ROAD (C110) MOMBASA MUNICIPAL COUNCIL Contractor 19,893,884.00

IMPROVEMENT OF STORM WATER DRAINAGE ACROSS


57 May-05 Aug-05 4mths MOMBASA MUNICIPAL COUNCIL Contractor 9,695,494.00
AKAMBA

UP-GRADING & DRAINAGE WORKS AT KONGOWEA ESTATES


58 May-05 Aug-05 4mths MOMBASA MUNICIPAL COUNCIL Contractor 9,898,419.20
RD

59 May-05 Sep-06 17mths VEHICLE HANDLING FACILITY AT PORT OF MOMBASA MATT INTERNATIONAL LTD Contractor 199,865,285.00

ROUTINE, PERIODIC MAINTENANCE & REHABILITATION OF


60 Oct-05 Feb-06 5mths MOMBASA MUNICIPAL COUNCIL Contractor 17,508,518.00
SHIMANZI RD

CONSTRUCTION OF SECURITY PERIMETER WALL AT TUDOR


62 Jun-06 Aug-06 3mths MATT INTERNATIONAL LTD Contractor 8,309,950.00
STAFF HOUSING ESTATE

PROPOSED EXTENTION TO HARD STANDING AREA AT


63 Jun-06 Nov-06 5mths A O BAYUSUF & SONS LTD Contractor 19,720,000.00
MIRITINI

ROUTINE, PERIODIC MAINTENNCE OF HAILE SELASSIE RD,


64 Jun-06 Jul-06 1mth MOMBASA MUNICIPAL COUNCIL Contractor 5,412,299.00
DEDAN KIMANTH, MERU & BALUCH STREET

ROUTINE, PERIODIC MAINTENNCE & SPOT IMPROVEMENT


65 Aug-06 Sep-06 1mth MOMBASA MUNICIPAL COUNCIL Contractor 8,626,021.58
WORKS - CLUSTER RDS 3 & 6

66 Sep-06 Jan-07 5mth HARDSTANDING AT MIRITINI YARD TRANSPARES LTD Contractor 17,830,320.00

HARDSTANDING AT JOMVU YARD EAST OF MAGONGO AND


67 Jan-07 Feb-07 2mths M A BAYUSUF & SONS LTD Contractor 6,104,040.00
PERIMETRE WALL

68 Apr-07 Jul-07 3mths REFERBISHMENT OF CONTAINER TERMINAL YARD KENYA PORTS AUTHORITY Contractor 108,139,120.00

68 Jul-07 Aug-07 2mths EMERGENCY REPAIRS TO KILINDINI ROAD KENYA PORTS AUTHORITY Contractor 8,979,850.00

69 Jul-07 Oct-07 4mths RECONSTRUCTION OF BANDARI / MAGADI ROAD KENYA PORTS AUTHORITY Contractor 37,169,590.00

70 Aug-07 Aug-07 1mth REPLACEMENT OF FIREDECK SLABS & BEAMS COMPLEX 2 KENYA PETROLEUM REFINERIES LTD Contractor 5,000,000.00

REHABILITATION OF ACCESS ROAD & INTERNAL ROADS AT 77


71 Aug-07 Nov-07 4mths BIRDI CIVIL ENGINEERS LTD Contractor 42,415,400.00
ARTILLARY BATTALION BASE

72 Sep-07 Dec-07 4mths IMPROVEMENT & HARDSTANDING AREA AFRICAN LINES TERMINAL & LOGISTICS Contractor 27,362,080.00

73 Feb-08 Apr-08 3mths DEVELOPMENT AT CFS - SHIMANZI MICHELL COTTS FREIGHT KENYA LTD Contractor 34,431,607.00

14
Starting Ending
No Month/Y Month/Y Mnths Contract Identification/Description Name of Employer Roll Contract Amount (KES)
ear ear

Schedule of
74 Feb-08 Apr-08 3mths LAYING OF PAVING BLOCKS ON 2 ACRE PLOT AT MIRITINI A O BAYUSUF & SONS LTD Contractor 11,600,000.00

75 Apr-08 Nov-08 8mths CONSTRUCTION OF PART YARD AT FORMER SHED 13/14. KENYA PORTS AUTHORITY Contractor 99,140,893.50

Major 76 May-08 Jul-08 3mths REHABILITATION OF CFS YARD & DRAINAGE WORKS KENYA PORTS AUTHORITY Contractor 30,186,095.00

Works
77 Aug-08 Oct-08 3mths KILINDINI ROAD REPAIRS KENYA PORTS AUTHORITY Contractor 45,267,718.20

78 Sep-08 Dec-08 4mths CHANGAMWE ROUNDABOUT DUEL CARRIAGEWAY REPAIRS KENYA PORTS AUTHORITY Contractor 24,016,930.00

Carried Out 79 Feb-08 Dec-08 11mths


REPAIR & RESURFACING OF KENGELENI - KENOL AND BEACH
ROADS
MINISTRY OF ROADS & PUBLIC WORKS Contractor 122,985,378.00

80 May-08 Aug-08 4mths REPAIR & REHABILITATION OF PORT REITZ ROAD MINISTRY OF ROADS & PUBLIC WORKS Contractor 112,841,356.66

81 Jun-08 Aug-08 3mths REPAIR & REHABILITATION OF BANDARI COLLEGE ROAD MINISTRY OF ROADS & PUBLIC WORKS Contractor 17,048,194.97

REPAIR & RESURFACING OF NYALI BRIDGE - KILIF BRIDGE


82 Mar-07 Jun-09 28mths MINISTRY OF ROADS & PUBLIC WORKS Contractor 574,706,279.45
(B89 RD)

83 May-09 Jul-09 3mths REPAIRS TO SELECTED ROADS IN PORT KENYA PORTS AUTHORITY Contractor 35,947,965.00

84 Jun-09 Nov-09 6mths DEVELOPMENT AT CFS - SHIMANZI MICHELL COTTS FREIGHT KENYA LTD Contractor 34,431,607.00

CONCRETING PART OF YARD 13 NEXT TO BERTH &


85 Oct-09 Feb-10 5mths KENYA PORTS AUTHORITY Contractor 47,559,927.50
CONCRETING TO FORMER FORKLIFT W/SHOP.

86 Dec-09 Mar-10 4mths CONCRETING PART OF YARD 13 KENYA PORTS AUTHORITY Contractor 42,044,780.00

88 Jan-10 Mar-10 3mths CONCRETING PART OF YARD 13 NEXT C / T KENYA PORTS AUTHORITY Contractor 39,102,875.00

90 Sep-10 Dec-10 4mths CONCRETING PART OF SHED 12. KENYA PORTS AUTHORITY Contractor 53,844,648.00

91 Apr-11 Dec-11 9mths CONCRETING PART OF YARD 11 ( AREA 4 ) KENYA PORTS AUTHORITY Contractor 72,251,252.50

92 Aug-12 Jan-13 6mths CONCRETING OF KIPEVU MARSHALLING YARD KENYA PORTS AUTHORITY Contractor 62,732,392.00

CONSTRUCTION TO BITUMEN STANDARD OF MARIAKANI -


93 Aug-08 Aug-12 4yrs KENYA NATIONAL HIGHWAYS AUTHORITY Contractor 1,606,612,965.00
KALOLENI ROAD (107) RD

94 Nov-12 Dec-12 1mth ROAD REPAIRS TO BACK OF PORT ROAD CONTAINER KENYA PORTS AUTHORITY Contractor 3,568,325.00

PART OF BANDARI ROAD OVERLAY & POTH-HOLES OLD


95 Mar-13 Apr-13 2mths KENYA PORTS AUTHORITY Contractor 31,447,184.00
KILINDINI ROAD
96 Aug-13 May-14 10mths CONCRETING PART OF BERTH 16 AND 17 KENYA PORTS AUTHORITY Contractor 103,670,334.94

97 Jul-13 Oct-13 4mths AGOL SERVICE ROAD SURFACING AND DRAINAGE WORKS AFRICAN GAS TERMINAL LTD Contractor 34,000,000.00

OVERLAY AND POT-HOLES ON RD TO K-BOAT AND G-


98 Oct-13 Nov-13 2mths KENYA PORTS AUTHORITY Contractor 21,855,763.71
SECTION

99 Oct-13 Dec-13 3mths AMANZEE YARD INTERFRIEGHT (EA) LTD Contractor 42,000,000.00

100 Feb-14 Apr-14 3mnts MANUCHIER YARD (AMANZEE B) AMANZEE INVESTMENTS Contractor 20,000,000.00

101 Nov-14 May-15 7mths SHEHEENA SEA WALL AND RECLAMATION SHEHEENA ENTERPRISES LTD Contractor 38,000,000.00

102 Jul-14 Nov-14 4mths CONCRETING PART OF BERTH 16 KENYA PORTS AUTHORITY Contractor 117,463,903.64

103 Mar-15 Dec-15 9mths SECO YARD PLOT 150 SOUTHERN ENGINERING CO. LTD Contractor 116,133,533.51

104 Sep-15 Nov-15 3mth PAVING OF KILINDINI ROAD PHASE I KENYA PORTS AUTHORITY Contractor 97,888,129.33

105 May-16 Aug-16 4mths CONCRETING AREA ADJACENT TO CONTROL TOWER KENYA PORTS AUTHORITY Contractor 42,554,276.00

106 Jun-16 Jul-16 1mths DOSHI PLOT LEVELING AND PAVEMENT WORKS DOSHI Contractor 2,433,681.00

107 2016 2017 1yr SPEDAG HEAD OFFICE AND PARKING AREA SPEDAG INTERFRIEGHT (EA) LTD Contractor 34,532,848.00

108 Jan-17 Jul-17 6mths TARMAL MAZERAS BUISNESS PARK TARMAL WIRE PRODUCTS LTD Contractor 27,414,971.00

109 Feb-17 Apr-17 2mths TARMAL BAMBURI ACCEL/DECEL LANE TARMAL WIRE PRODUCTS LTD Contractor 8,500,000.00

110 Jun-17 Aug-17 2mths KAA EMERGENCY WORKS MANDA BAY LAMU KENYA PORTS AUTHORITY Contractor 14,222,100.00

111 May-17 On Going ANWAR ALI BROTHERS BAMBURI YARD ANWAR ALI & BROTHERS LTD Contractor 86,354,000.00

On Going
112 KPA YARD 19 KENYA PORTS AUTHORITY Contractor 31,888,983.48

On Going TARMAL MAZERAS PHASE 2 GODOWNS, DRAINAGE AND


113 TARMAL WIRE PRODUCTS LTD Contractor 22,500,000.00
ACCESS ROAD

On Going
114 Oct-18 ALPHA LOGISTICS PARK BONJE SECO GROUP Contractor 30,000,000.00

On Going
115 ANWAR ALI BROTHERS BAMBURI YARD ANWAR ALI & BROTHERS LTD Contractor 92,280,000.00

On Going RECONSTRUCTION OF TAXIWAY AND APRON MANDA


116 KENYA AIRPORTS AUTHORITY Contractor 121,726,189.00
AIRPORT LAMU

15
Annex 1: Equipment & Machinery

16