0% found this document useful (0 votes)
74 views

Project Cost Estimate Worksheet

The document appears to be a blank project estimate template for a department. It includes sections for labor costs by trade, materials costs, and totals. However, no project details or costs are provided. The project number, title, location, and other information are blank. The estimate and all cost subtotals are $0.

Uploaded by

Panda Jaf
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
74 views

Project Cost Estimate Worksheet

The document appears to be a blank project estimate template for a department. It includes sections for labor costs by trade, materials costs, and totals. However, no project details or costs are provided. The project number, title, location, and other information are blank. The estimate and all cost subtotals are $0.

Uploaded by

Panda Jaf
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 25

ORIGINAL ESTIMATE

Dept. Name: Project Title:


Dept. No. AIM Project No.:
Information
Customer

Contact: Project Location:


Office:
Office / Cell:
Fax: Project Manager:
Email Date:

LABOR MATERIALS
TRADE DESCRIPTION TOTAL COST
PRSN HRS RATE COST COST
Maint 0 0 45.27 $0.00 $ - $ -
0 0 45.27 $0.00 $ - $ -
0 0 45.27 $0.00 $ - $ -
0 0 45.27 $0.00 $ - $ -
0 0 45.27 $0.00 $ - $ -
0 0 45.27 $0.00 $ - $ -
0 0 45.27 $0.00 $ - $ -
0 0 45.27 $0.00 $ - $ -
0 0 45.27 $0.00 $ - $ -
0 0 45.27 $0.00 $ - $ -
0 0 45.27 $0.00 $ - $ -
0 0 45.27 $0.00 $ - $ -
Utility 0 0 42.88 $0.00 $ - $ -
0 0 42.88 $0.00 $ - $ -
0 0 42.88 $0.00 $ - $ -
Landscape 0 0 40.18 $0.00 $ - $ -
0 0 40.18 $0.00 $ - $ -
0 0 40.18 $0.00 $ - $ -
0 0 40.18 $0.00 $ - $ -

University Facilities SUB-TOTALS $0.00 $ - $ -

CONTRACTORS DESCRIPTION ESTIMATE TOTAL COST


$ - $ -
$ - $ -
$ - $ -
$ -
$ -

ASBESTOS
DESCRIPTION ESTIMATE TOTAL COST
ABATEMENT
$ -

TELECOM/CCIT DESCRIPTION ESTIMATE TOTAL COST


$ -
$ -

LOOSE
DESCRIPTION ESTIMATE TOTAL COST
FURNISHINGS
$ -
$ -

SUB-TOTAL $ - $ -

Combined TOTAL $ -
Area Rates Y20/21
Maint $45.27
Utility $42.88
Landscape $40.18
Project Management Services for Projects < $1M 0.950
Project Management Services for Projects > $1M 0.965
Adjusting these rates will automatically update labor rates on Summary pages.
PROJECT COST SUMMARY
Form version: 2020.9.24

AIM PROJECT NUMBER 0

PROJECT TITLE 0

PROJECT MANAGER 0

DATE 30-Dec-99

FACILITIES' DESIGN FEE


$0.00
8% of Construction Estimates

A/E if applicable

ASBESTOS ABATEMENT $0.00

TELECOM/CCIT $0.00

LOOSE FURNISHINGS $0.00

CONSTRUCTION ESTIMATE
$0.00

Contingency $0.00

CONSTRUCTION + CONTINGENCY $0.00

PM FEE $0.00

TOTAL PROJECT ESTIMATE $0.00


REVISION 1
Dept. Name: 0 Project Title: 0
Dept. No. 0 AIM Project No.: 0
Information
Customer

Contact: 0 Project Location: 0


Office: 0
Office / Cell: 0
Fax: 0 Project Manager: 0
Email 0 Date

LABOR MATERIALS
TRADE DESCRIPTION TOTAL COST
PRSN HRS RATE COST COST
Maint 0 0 45.27 $0.00 $ - $ -
0 0 45.27 $0.00 $ - $ -
0 0 45.27 $0.00 $ - $ -
0 0 45.27 $0.00 $ - $ -
0 0 45.27 $0.00 $ - $ -
0 0 45.27 $0.00 $ - $ -
0 0 45.27 $0.00 $ - $ -
0 0 45.27 $0.00 $ - $ -
0 0 45.27 $0.00 $ - $ -
0 0 45.27 $0.00 $ - $ -
0 0 45.27 $0.00 $ - $ -
0 0 45.27 $0.00 $ - $ -
Utility 0 0 42.88 $0.00 $ - $ -
0 0 42.88 $0.00 $ - $ -
0 0 42.88 $0.00 $ - $ -
Landscape 0 0 40.18 $0.00 $ - $ -
0 0 40.18 $0.00 $ - $ -
0 0 40.18 $0.00 $ - $ -
0 0 40.18 $0.00 $ - $ -

University Facilities SUB-TOTALS $0.00 $ - $ -

CONTRACTORS DESCRIPTION ESTIMATE TOTAL COST


$ - $ -
$ - $ -
$ -
$ -
$ -

ASBESTOS
DESCRIPTION ESTIMATE TOTAL COST
ABATEMENT
$ - $ -

TELECOM/CCIT DESCRIPTION ESTIMATE TOTAL COST


$ -
$ -

LOOSE
DESCRIPTION ESTIMATE TOTAL COST
FURNISHINGS
$ -
$ -

SUB-TOTAL $ - $ -
PROJECT COST REVISION 1 SUMMARY
Form version: 2020.9.24
AIM PROJECT NUMBER 0

PROJECT TITLE 0

PROJECT MANAGER 0

DATE 30-Dec-99

ADDITIONAL SCOPE

FACILITIES' DESIGN FEE


8% of Construction Estimate

A/E if applicable

ASBESTOS ABATEMENT $0.00

TELECOM/CCIT $0.00

LOOSE FURNISHINGS $0.00

CONSTRUCTION ESTIMATE
$0.00

Contingency $0.00

CONSTRUCTION + CONTINGENCY $0.00

PM FEE $0.00

ADDITIONAL PROJECT ESTIMATE $0.00

ORIGINAL ESTIMATE $0.00

REVISED PROJECT ESTIMATE $0.00


REVISION 2
Dept. Name: 0 Project Title: 0
Dept. No. 0 AIM Project No.: 0
Information
Customer

Contact: 0 Project Location: 0


Office: 0
Office / Cell: 0
Fax: 0 Project Manager: 0
Email 0 Date:

LABOR MATERIALS
TRADE DESCRIPTION TOTAL COST
PRSN HRS RATE COST COST
Maint 0 0 45.27 $0.00 $ - $ -
0 0 45.27 $0.00 $ - $ -
0 0 45.27 $0.00 $ - $ -
0 0 45.27 $0.00 $ - $ -
0 0 45.27 $0.00 $ - $ -
0 0 45.27 $0.00 $ - $ -
0 0 45.27 $0.00 $ - $ -
0 0 45.27 $0.00 $ - $ -
0 0 45.27 $0.00 $ - $ -
0 0 45.27 $0.00 $ - $ -
0 0 45.27 $0.00 $ - $ -
0 0 45.27 $0.00 $ - $ -
Utility 0 0 42.88 $0.00 $ - $ -
0 0 42.88 $0.00 $ - $ -
0 0 42.88 $0.00 $ - $ -
Landscape 0 0 40.18 $0.00 $ - $ -
0 0 40.18 $0.00 $ - $ -
0 0 40.18 $0.00 $ - $ -
0 0 40.18 $0.00 $ - $ -

University Facilities SUB-TOTALS $0.00 $ - $ -

CONTRACTORS DESCRIPTION ESTIMATE TOTAL COST


$ - $ -
$ - $ -
$ -
$ -
$ -

ASBESTOS
DESCRIPTION ESTIMATE TOTAL COST
ABATEMENT
$ -

TELECOM/CCIT DESCRIPTION ESTIMATE TOTAL COST


$ -
$ -

LOOSE
DESCRIPTION ESTIMATE TOTAL COST
FURNISHINGS
$ -
$ -

SUB-TOTAL $ - $ -
PROJECT COST REVISION 2 SUMMARY
Form version: 2020.9.24
AIM PROJECT NUMBER 0

PROJECT TITLE 0

PROJECT MANAGER 0

DATE 30-Dec-99

ADDITIONAL SCOPE

FACILITIES' DESIGN FEE


8% of Construction Estimate

A/E if applicable

ASBESTOS ABATEMENT $0.00

TELECOM/CCIT $0.00

LOOSE FURNISHINGS $0.00

CONSTRUCTION ESTIMATE
$0.00

Contingency $0.00

CONSTRUCTION + CONTINGENCY $0.00

PM FEE $0.00

ADDITIONAL PROJECT ESTIMATE $0.00

PREVIOUS ESTIMATE $0.00

REVISED PROJECT ESTIMATE $0.00


REVISION 3
Dept. Name: 0 Project Title: 0
Dept. No. 0 AIM Project No.: 0
Information
Customer

Contact: 0 Project Location: 0


Office: 0
Office / Cell: 0
Fax: 0 Project Manager: 0
Email 0 Date:

LABOR MATERIALS
TRADE DESCRIPTION TOTAL COST
PRSN HRS RATE COST COST
Maint 0 0 45.27 $0.00 $ - $ -
0 0 45.27 $0.00 $ - $ -
0 0 45.27 $0.00 $ - $ -
0 0 45.27 $0.00 $ - $ -
0 0 45.27 $0.00 $ - $ -
0 0 45.27 $0.00 $ - $ -
0 0 45.27 $0.00 $ - $ -
0 0 45.27 $0.00 $ - $ -
0 0 45.27 $0.00 $ - $ -
0 0 45.27 $0.00 $ - $ -
0 0 45.27 $0.00 $ - $ -
0 0 45.27 $0.00 $ - $ -
Utility 0 0 42.88 $0.00 $ - $ -
0 0 42.88 $0.00 $ - $ -
0 0 42.88 $0.00 $ - $ -
Landscape 0 0 40.18 $0.00 $ - $ -
0 0 40.18 $0.00 $ - $ -
0 0 40.18 $0.00 $ - $ -
0 0 40.18 $0.00 $ - $ -

University Facilities SUB-TOTALS $0.00 $ - $ -

CONTRACTORS DESCRIPTION ESTIMATE TOTAL COST


$ - $ -
$ - $ -
$ -
$ -
$ -

ASBESTOS
DESCRIPTION ESTIMATE TOTAL COST
ABATEMENT
$ -

TELECOM/CCIT DESCRIPTION ESTIMATE TOTAL COST


$ -
$ -

LOOSE
DESCRIPTION ESTIMATE TOTAL COST
FURNISHINGS
$ -
$ -

SUB-TOTAL $ - $ -
PROJECT COST REVISION 3 SUMMARY
Form version: 2020.9.24
AIM PROJECT NUMBER 0

PROJECT TITLE 0

PROJECT MANAGER 0

DATE 30-Dec-99

ADDITIONAL SCOPE

FACILITIES' DESIGN FEE


8% of Construction Estimate

A/E if applicable

ASBESTOS ABATEMENT $0.00

TELECOM/CCIT $0.00

LOOSE FURNISHINGS $0.00

CONSTRUCTION ESTIMATE
$0.00

Contingency $0.00

CONSTRUCTION + CONTINGENCY $0.00

PM FEE $0.00

ADDITIONAL PROJECT ESTIMATE $0.00

PREVIOUS ESTIMATE $0.00

REVISED PROJECT ESTIMATE $0.00


REVISION 4
Dept. Name: 0
Dept. No. 0
Information
Customer
Contact: 0
Office: 0
Office / Cell: 0
Fax: 0
Email 0

TRADE DESCRIPTION
PRSN

Maint 0
0
0
0
0
0
0
0
0
0
0
0
Utility 0
0
0
Landscape 0
0
0
0

University Facilities SUB-TOTALS

CONTRACTORS DESCRIPTION
ASBESTOS
DESCRIPTION
ABATEMENT

TELECOM/CCIT DESCRIPTION

LOOSE
DESCRIPTION
FURNISHINGS

SUB-TOTAL
Project Title: 0
AIM Project No.: 0
Project Location: 0

Project Manager: 0
Date:

LABOR MATERIALS
TOTAL COST
HRS RATE COST COST
0 45.27 $0.00 $ - $ -
0 45.27 $0.00 $ - $ -
0 45.27 $0.00 $ - $ -
0 45.27 $0.00 $ - $ -
0 45.27 $0.00 $ - $ -
0 45.27 $0.00 $ - $ -
0 45.27 $0.00 $ - $ -
0 45.27 $0.00 $ - $ -
0 45.27 $0.00 $ - $ -
0 45.27 $0.00 $ - $ -
0 45.27 $0.00 $ - $ -
0 45.27 $0.00 $ - $ -
0 42.88 $0.00 $ - $ -
0 42.88 $0.00 $ - $ -
0 42.88 $0.00 $ - $ -
0 40.18 $0.00 $ - $ -
0 40.18 $0.00 $ - $ -
0 40.18 $0.00 $ - $ -
0 40.18 $0.00 $ - $ -

$0.00 $ - $ -

IPTION ESTIMATE TOTAL COST


$ - $ -
$ - $ -
$ -
$ -
$ -

IPTION ESTIMATE TOTAL COST

$ -

IPTION ESTIMATE TOTAL COST


$ -
$ -

IPTION ESTIMATE TOTAL COST

$ -
$ -

$ - $ -

Combined TOTAL $ -
PROJECT COST REVISION 4 SUMMARY
Form version: 2020.9.24
AIM PROJECT NUMBER 0

PROJECT TITLE 0

PROJECT MANAGER 0

DATE 30-Dec-99

ADDITIONAL SCOPE

FACILITIES' DESIGN FEE


8% of Construction Estimate

A/E if applicable

ASBESTOS ABATEMENT $0.00

TELECOM/CCIT $0.00

LOOSE FURNISHINGS $0.00

CONSTRUCTION ESTIMATE
$0.00

Contingency $0.00

CONSTRUCTION + CONTINGENCY $0.00

PM FEE $0.00

ADDITIONAL PROJECT ESTIMATE $0.00

PREVIOUS ESTIMATE $0.00

REVISED PROJECT ESTIMATE $0.00


REVISION 5
Dept. Name: 0
Dept. No. 0
Information
Customer
Contact: 0
Office: 0
Office / Cell: 0
Fax: 0
Email 0

TRADE DESCRIPTION
PRSN

Maint 0
0
0
0
0
0
0
0
0
0
0
0
Utility 0
0
0
Landscape 0
0
0
0

University Facilities SUB-TOTALS

CONTRACTORS DESCRIPTION
ASBESTOS
DESCRIPTION
ABATEMENT

TELECOM/CCIT DESCRIPTION

LOOSE
DESCRIPTION
FURNISHINGS

SUB-TOTAL
Project Title: 0
AIM Project No.: 0
Project Location: 0

Project Manager: 0
Date:

LABOR MATERIALS
TOTAL COST
HRS RATE COST COST
0 45.27 $0.00 $ - $ -
0 45.27 $0.00 $ - $ -
0 45.27 $0.00 $ - $ -
0 45.27 $0.00 $ - $ -
0 45.27 $0.00 $ - $ -
0 45.27 $0.00 $ - $ -
0 45.27 $0.00 $ - $ -
0 45.27 $0.00 $ - $ -
0 45.27 $0.00 $ - $ -
0 45.27 $0.00 $ - $ -
0 45.27 $0.00 $ - $ -
0 45.27 $0.00 $ - $ -
0 42.88 $0.00 $ - $ -
0 42.88 $0.00 $ - $ -
0 42.88 $0.00 $ - $ -
0 40.18 $0.00 $ - $ -
0 40.18 $0.00 $ - $ -
0 40.18 $0.00 $ - $ -
0 40.18 $0.00 $ - $ -

$0.00 $ - $ -

IPTION ESTIMATE TOTAL COST


$ - $ -
$ -
$ -
$ -
$ -

IPTION ESTIMATE TOTAL COST

$ -

IPTION ESTIMATE TOTAL COST


$ -
$ -

IPTION ESTIMATE TOTAL COST

$ -
$ -

$ - $ -

Combined TOTAL $ -
PROJECT COST REVISION 5 SUMMARY
Form version: 2020.9.24
AIM PROJECT NUMBER 0

PROJECT TITLE 0

PROJECT MANAGER 0

DATE 30-Dec-99

ADDITIONAL SCOPE

FACILITIES' DESIGN FEE


8% of Construction Estimate

A/E if applicable

ASBESTOS ABATEMENT $0.00

TELECOM/CCIT $0.00

LOOSE FURNISHINGS $0.00

CONSTRUCTION ESTIMATE
$0.00

Contingency $0.00

CONSTRUCTION + CONTINGENCY $0.00

PM FEE $0.00

ADDITIONAL PROJECT ESTIMATE $0.00

PREVIOUS ESTIMATE $0.00

REVISED PROJECT ESTIMATE $0.00


REVISION 6
Dept. Name: 0
Dept. No. 0
Information
Customer
Contact: 0
Office: 0
Office / Cell: 0
Fax: 0
Email 0

TRADE DESCRIPTION
PRSN

Maint 0
0
0
0
0
0
0
0
0
0
0
0
Utility 0
0
0
Landscape 0
0
0
0

University Facilities SUB-TOTALS

CONTRACTORS DESCRIPTION
ASBESTOS
DESCRIPTION
ABATEMENT

TELECOM/CCIT DESCRIPTION

LOOSE
DESCRIPTION
FURNISHINGS

SUB-TOTAL
Project Title: 0
AIM Project No.: 0
Project Location: 0

Project Manager: 0
Date:

LABOR MATERIALS
TOTAL COST
HRS RATE COST COST
0 45.27 $0.00 $ - $ -
0 45.27 $0.00 $ - $ -
0 45.27 $0.00 $ - $ -
0 45.27 $0.00 $ - $ -
0 45.27 $0.00 $ - $ -
0 45.27 $0.00 $ - $ -
0 45.27 $0.00 $ - $ -
0 45.27 $0.00 $ - $ -
0 45.27 $0.00 $ - $ -
0 45.27 $0.00 $ - $ -
0 45.27 $0.00 $ - $ -
0 45.27 $0.00 $ - $ -
0 42.88 $0.00 $ - $ -
0 42.88 $0.00 $ - $ -
0 42.88 $0.00 $ - $ -
0 40.18 $0.00 $ - $ -
0 40.18 $0.00 $ - $ -
0 40.18 $0.00 $ - $ -
0 40.18 $0.00 $ - $ -

$0.00 $ - $ -

IPTION ESTIMATE TOTAL COST


$ - $ -
$ -
$ -
$ -
$ -

IPTION ESTIMATE TOTAL COST

$ -

IPTION ESTIMATE TOTAL COST


$ -
$ -

IPTION ESTIMATE TOTAL COST

$ -
$ -

$ - $ -

Combined TOTAL $ -
PROJECT COST REVISION 6 SUMMARY
Form version: 2020.9.24
AIM PROJECT NUMBER 0

PROJECT TITLE 0

PROJECT MANAGER 0

DATE 30-Dec-99

ADDITIONAL SCOPE

FACILITIES' DESIGN FEE


8% of Construction Estimate

A/E if applicable

ASBESTOS ABATEMENT $0.00

TELECOM/CCIT $0.00

LOOSE FURNISHINGS $0.00

CONSTRUCTION ESTIMATE
$0.00

Contingency $0.00

CONSTRUCTION + CONTINGENCY $0.00

PM FEE $0.00

ADDITIONAL PROJECT ESTIMATE $0.00

PREVIOUS ESTIMATE $0.00

REVISED PROJECT ESTIMATE $0.00

You might also like