What Does Horizontal Directional Drilling (HDD) Mean?

Horizontal directional drilling (HDD) is a trenchless construction method used to install underground pipes without disturbing the surface. HDD involves drilling a steerable pilot hole along the planned pipe path, then enlarging the hole with a reamer before pulling the pipe through. Electronic monitoring tracks the drill path for accuracy. A slurry system circulates drilling fluid and removes cuttings during the process, which takes place entirely underground out of sight except for the entry and exit points.

Uploaded by

Abhishek Kalia
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
76 views

What Does Horizontal Directional Drilling (HDD) Mean?

Horizontal directional drilling (HDD) is a trenchless construction method used to install underground pipes without disturbing the surface. HDD involves drilling a steerable pilot hole along the planned pipe path, then enlarging the hole with a reamer before pulling the pipe through. Electronic monitoring tracks the drill path for accuracy. A slurry system circulates drilling fluid and removes cuttings during the process, which takes place entirely underground out of sight except for the entry and exit points.

Uploaded by

Abhishek Kalia
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

www.trenchlesspedia.

com /definition/2297/horizontal-directional-drilling-hdd

Horizontal Directional Drilling (HDD)


Trenchlesspedia ⋮ ⋮ 23/3/2017

What Does Horizontal Directional Drilling (HDD) Mean?


Horizontal directional drilling (HDD) is a trenchless construction method used to install pipes underground without
disturbing the ground surface. The drill is launched from one end of the designed bore path and retrieved at the other
end, and except for the launch and retrieving spaces above ground, the entire process takes place underground, out
of sight.

HDD has become a choice alternative to conventional pipe-laying methods that require opening up the earth’s
surface up to the depth of installation for the entire pipeline route.

The HDD Process

The HDD method consists of two main stages, i.e. drilling a pilot hole and back reaming. After reaming is completed,
the pipe is pulled in through the hole.

The first stage involves drilling a pilot hole using a steerable guided drill along a planned path. The pilot hole is
approximately 1 to 5 inches in diameter along the proposed centerline of pipe alignment. When the drill string
reaches the exit point, the second stage is initiated.

The second stage involves attaching a reamer of approximately the same size as the product pipe to the end of the
drill string after removing the drill bit and pulling it back to the entry point. Sometimes several passes may be required
before the desired bore diameter is achieved.

The bore diameter is approx. 50% larger than pipe diameter to enable easy pull-through of the pipe string.

Once the reamer has done its job, it’s time for the pipe pullback, where the product pipe is attached to the reamer and
pulled through the borehole.

All along the process, electronic monitoring of the drill path is carried out to obtain a maximum degree of accuracy. A
slurry system helps circulate the drilling fluid and helps transport the drill cuttings back to the surface.