Concrete Quantity Take-Off

This document contains a concrete quantity take-off for a construction project consisting of 3 storeys (foundation, 1st floor, 2nd floor). It provides dimensions and volumes of concrete needed for columns, pad footings, beams, and slabs for each storey. The total concrete needed for the foundation is 12.418 cubic meters. The totals for the 1st and 2nd floors are 32.062 cubic meters and 8.370 cubic meters respectively.

Uploaded by

ariesibarani
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
57 views

Concrete Quantity Take-Off

This document contains a concrete quantity take-off for a construction project consisting of 3 storeys (foundation, 1st floor, 2nd floor). It provides dimensions and volumes of concrete needed for columns, pad footings, beams, and slabs for each storey. The total concrete needed for the foundation is 12.418 cubic meters. The totals for the 1st and 2nd floors are 32.062 cubic meters and 8.370 cubic meters respectively.

Uploaded by

ariesibarani
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Puskesmas Kelayang Mitra Ideal Consultant, PT (0001453)

Concrete Quantity Take-off Calc. By: Icank


0123 18/02/2021 Rev: 1 Checked By: Arie

Concrete Quantity Take-off


Storey: 0 - FOUNDATION
----------------------

Columns:
b1 b2 Area Length Volume
(mm) (mm) (m2) (mm) (m3)
-------- ---------- ---------- ---------- ---------- ----------
1C1 350.0 350.0 0.123 700.0 0.086
1C2 350.0 350.0 0.123 700.0 0.086
1C3 350.0 350.0 0.123 700.0 0.086
1C4 350.0 350.0 0.123 700.0 0.086
1C5 350.0 350.0 0.123 700.0 0.086
1C6 350.0 350.0 0.123 700.0 0.086
1C7 350.0 350.0 0.123 700.0 0.086
1C8 350.0 350.0 0.123 700.0 0.086
1C9 350.0 350.0 0.123 700.0 0.086
1C10 350.0 350.0 0.123 700.0 0.086
-------- ---------- ---------- ---------- ---------- ----------
Column Totals 0.858

Pad Footings:
b1 b2 Area Length Volume
(mm) (mm) (m2) (mm) (m3)
-------- ---------- ---------- ---------- ---------- ----------
F1 /FC1 1700.0 1700.0 2.890 400.0 1.156
F1 /FC2 1700.0 1700.0 2.890 400.0 1.156
F1 /FC3 1700.0 1700.0 2.890 400.0 1.156
F1 /FC4 1700.0 1700.0 2.890 400.0 1.156
F1 /FC5 1700.0 1700.0 2.890 400.0 1.156
F1 /FC6 1700.0 1700.0 2.890 400.0 1.156
F1 /FC7 1700.0 1700.0 2.890 400.0 1.156
F1 /FC8 1700.0 1700.0 2.890 400.0 1.156
F1 /FC9 1700.0 1700.0 2.890 400.0 1.156
F1 /FC10 1700.0 1700.0 2.890 400.0 1.156
-------- ---------- ---------- ---------- ---------- ----------
Pad Footing Totals 11.560

-------- ---------- ---------- ---------- ---------- ----------


Total (Storey: 0) 12.418
-------- ---------- ---------- ---------- ---------- ----------

Storey: 1
---------

Columns:
b1 b2 Area Length Volume
(mm) (mm) (m2) (mm) (m3)
-------- ---------- ---------- ---------- ---------- ----------
1C1 350.0 350.0 0.123 4000.0 0.490
1C2 350.0 350.0 0.123 4000.0 0.490
1C3 350.0 350.0 0.123 4000.0 0.490
1C4 350.0 350.0 0.123 4000.0 0.490
1C5 350.0 350.0 0.123 4000.0 0.490
1C6 350.0 350.0 0.123 4000.0 0.490
1C7 350.0 350.0 0.123 4000.0 0.490
1C8 350.0 350.0 0.123 4000.0 0.490
1C9 350.0 350.0 0.123 4000.0 0.490
1C10 350.0 350.0 0.123 4000.0 0.490
-------- ---------- ---------- ---------- ---------- ----------
Column Totals 4.900

Beams:
b1 b2 Area Length Volume
(mm) (mm) (m2) (mm) (m3)

ProtaStructure v3.0.4 Page 1


Puskesmas Kelayang Mitra Ideal Consultant, PT (0001453)
Concrete Quantity Take-off Calc. By: Icank
0123 18/02/2021 Rev: 1 Checked By: Arie

-------- ---------- ---------- ---------- ---------- ----------


1B3 250.0 550.0 0.138 6650.0 0.914
1B5 250.0 550.0 0.138 6650.0 0.914
1B6 250.0 550.0 0.138 3650.0 0.502
1B7 250.0 550.0 0.138 3650.0 0.502
1B8 250.0 550.0 0.138 6650.0 0.914
1B9 250.0 550.0 0.138 3650.0 0.502
1B10 250.0 550.0 0.138 3650.0 0.502
1B11 250.0 550.0 0.138 6650.0 0.914
1B12 250.0 550.0 0.138 6650.0 0.914
1B13 250.0 550.0 0.138 6650.0 0.914
1B14 250.0 400.0 0.100 4650.0 0.465
1B15 250.0 400.0 0.100 6650.0 0.665
1B16 250.0 400.0 0.100 4650.0 0.465
1B17 250.0 400.0 0.100 6750.0 0.675
1B18 250.0 400.0 0.100 3250.0 0.325
1B19 250.0 400.0 0.100 3250.0 0.325
1B20 250.0 400.0 0.100 3750.0 0.375
1B21 250.0 400.0 0.100 3750.0 0.375
-------- ---------- ---------- ---------- ---------- ----------
Beam Totals 11.164

Slabs:
b1 b2 Area Length Volume
(mm) (mm) (m2) (mm) (m3)
-------- ---------- ---------- ---------- ---------- ----------
1S1 32.063 130.0 4.168
1S2 10.563 130.0 1.373
1S3 10.563 130.0 1.373
1S4 12.188 130.0 1.584
1S5 12.188 130.0 1.584
1S6 10.563 130.0 1.373
1S7 10.563 130.0 1.373
1S8 12.188 130.0 1.584
1S9 12.188 130.0 1.584
-------- ---------- ---------- ---------- ---------- ----------
Slab Totals 15.998

-------- ---------- ---------- ---------- ---------- ----------


Total (Storey: 1) 32.062
-------- ---------- ---------- ---------- ---------- ----------

Storey: 2
---------

Columns:
b1 b2 Area Length Volume
(mm) (mm) (m2) (mm) (m3)
-------- ---------- ---------- ---------- ---------- ----------
2C1 350.0 350.0 0.123 4000.0 0.490
2C2 350.0 350.0 0.123 4000.0 0.490
2C3 350.0 350.0 0.123 4000.0 0.490
2C4 350.0 350.0 0.123 4000.0 0.490
2C5 350.0 350.0 0.123 4000.0 0.490
2C6 350.0 350.0 0.123 4000.0 0.490
2C7 350.0 350.0 0.123 4000.0 0.490
2C8 350.0 350.0 0.123 4000.0 0.490
-------- ---------- ---------- ---------- ---------- ----------
Column Totals 3.920

Beams:
b1 b2 Area Length Volume
(mm) (mm) (m2) (mm) (m3)
-------- ---------- ---------- ---------- ---------- ----------
2B1 250.0 400.0 0.100 6650.0 0.665
2B2 250.0 400.0 0.100 3650.0 0.365
2B3 250.0 400.0 0.100 3650.0 0.365

ProtaStructure v3.0.4 Page 2


Puskesmas Kelayang Mitra Ideal Consultant, PT (0001453)
Concrete Quantity Take-off Calc. By: Icank
0123 18/02/2021 Rev: 1 Checked By: Arie

2B4 250.0 400.0 0.100 6650.0 0.665


2B5 250.0 400.0 0.100 3650.0 0.365
2B6 250.0 400.0 0.100 3650.0 0.365
2B7 250.0 400.0 0.100 6650.0 0.665
2B8 250.0 400.0 0.100 6650.0 0.665
2B9 250.0 400.0 0.100 6650.0 0.665
2B10 250.0 400.0 0.100 6650.0 0.665
-------- ---------- ---------- ---------- ---------- ----------
Beam Totals 5.450

-------- ---------- ---------- ---------- ---------- ----------


Total (Storey: 2) 9.370
-------- ---------- ---------- ---------- ---------- ----------

CONCRETE QUANTITY EXTRACTION SUMMARY


------------------------------------

Storey COLUMN BEAM SLAB RIB SLAB FIL'R BLOCK FOUNDATION TOTAL
(m3) (m3) (m3) (m3) (m3) (m3) (m3)
-------- ---------- ---------- ---------- ---------- ---------- ---------- ----------
Footings 0.858 0.000 0.000 0.000 0.000 11.560 12.418
1 4.900 11.164 15.998 0.000 0.000 0.000 32.062
2 3.920 5.450 0.000 0.000 0.000 0.000 9.370
-------- ---------- ---------- ---------- ---------- ---------- ---------- ----------
TOTAL 9.678 16.614 15.998 0.000 0.000 11.560 53.849