0% found this document useful (0 votes)
795 views

66kV SS TypeTower Foundation Drawing

This document provides information for a project involving the design, supply, installation, and commissioning of a 33kV overhead transmission line between Bo and Kenema in Sierra Leone and the rehabilitation of 11kV and 0.4kV distribution networks. It includes basic information like the project title, numbers, employers, consultants, contractors, and revision details.

Uploaded by

BAWA ALEX
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
795 views

66kV SS TypeTower Foundation Drawing

This document provides information for a project involving the design, supply, installation, and commissioning of a 33kV overhead transmission line between Bo and Kenema in Sierra Leone and the rehabilitation of 11kV and 0.4kV distribution networks. It includes basic information like the project title, numbers, employers, consultants, contractors, and revision details.

Uploaded by

BAWA ALEX
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

A1

B1

Lj (Center Line of Chimney)

REFERENCE DOCUMENTS:
DOCUMENT NO. TITLE

EMPLOYER : CONSULTANT : CONTRACTOR :

MOE & EDSA TRACTEBEL ENGINEERING S.A. SINOTEC-GTSCC JV


PROJECT :

LOT 2 - DESIGN, SUPPLY, INSTALLATION, AND COMMISSIONING OF ONE 33KV


OVERHEAD TRANSMISSION LINE BETWEEN BO AND KENEMA AND REHABILITATION OF
11KV AND 0.4 KV DISTRIBUTION NETWORK

PROJECT NO.: P-SL-F00-007

TITLE:

REVISION
0. ERKENO Y. ERKENO Y. SHIYANG LIAN WEILI WANG 18/01/2022 ISSUED FOR INFORMATION

NO. DRAWN DESIGNED CHECKED APPROVED DATE NOTES/DESCRIPTIONS

SCALE: DRAWING NO.: SIZE PAGE NO. PAGE TOTAL


P-SL-F00-007/CM/A0240/H/004/A
A2 1 1
A1

B1

Lj (Center Line of Chimney)

REFERENCE DOCUMENTS:
DOCUMENT NO. TITLE

EMPLOYER : CONSULTANT : CONTRACTOR :

MOE & EDSA TRACTEBEL ENGINEERING S.A. SINOTEC-GTSCC JV


PROJECT :

LOT 2 - DESIGN, SUPPLY, INSTALLATION, AND COMMISSIONING OF ONE 33KV


OVERHEAD TRANSMISSION LINE BETWEEN BO AND KENEMA AND REHABILITATION OF
11KV AND 0.4 KV DISTRIBUTION NETWORK

PROJECT NO.: P-SL-F00-007

TITLE:

REVISION
0. ERKENO Y. ERKENO Y. SHIYANG LIAN WEILI WANG 18/01/2022 ISSUED FOR INFORMATION

NO. DRAWN DESIGNED CHECKED APPROVED DATE NOTES/DESCRIPTIONS

SCALE: DRAWING NO.: SIZE PAGE NO. PAGE TOTAL


P-SL-F00-007/CM/A0240/H/004/A
A2 1 1

You might also like