0% found this document useful (0 votes)
52 views

Spare Capacity - 1

This document discusses engineering calculations and safety factors for HVAC equipment. It specifies that fans, AHUs and pumps should have a 20% safety factor in load calculations, while heat load calculations should have a 10% safety factor. Equipment like chillers, pumps, cooling towers and ventilation fans should be provided in an N+1 configuration. Water-cooled chillers should operate during revenue hours while air-cooled chillers operate at night and in winter. Chilled water connections to property developments need to be metered and controllable via SCADA.

Uploaded by

mohit kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
52 views

Spare Capacity - 1

This document discusses engineering calculations and safety factors for HVAC equipment. It specifies that fans, AHUs and pumps should have a 20% safety factor in load calculations, while heat load calculations should have a 10% safety factor. Equipment like chillers, pumps, cooling towers and ventilation fans should be provided in an N+1 configuration. Water-cooled chillers should operate during revenue hours while air-cooled chillers operate at night and in winter. Chilled water connections to property developments need to be metered and controllable via SCADA.

Uploaded by

mohit kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

DM/EL/COR-OF/118

pattern / profile with best efficiency in that particular zones of


operation.

Part 2/ Section All fans, AHU, Pumps engineering calculations shall have safety
6 Bi / Clause have a safety factor of 20 % in load calculations and same shall be factor of 15% for calculating operating point and heat load
14. 4.1.12 validated during the Testing & Commissioning calculations shall have a safety factor of 10% and same shall be
Page no. 20 of validated during the Testing & Commissioning.
67

ECS Equipment shall be provided with N+1 (N working)


Part 2/ Section
configuration for Chillers, Pumps, cooling towers, ventilation fans,
6 Bi / Clause
15. 4.1.13 SPF, FCU. AHU shall be provided in such a way that minimum 50
Page no. 20 of % working capacity is available at any point even during break
67 down.

Part 2/ Section Water-cooled chillers shall operate during revenue hours and Air Water-cooled chillers shall operate during revenue hours and Air
6 Bi / Clause cooled Chillers shall operate during non-revenue night hours. cooled Chillers shall operate during non-revenue night hours. Also
16. 5.6.1 air cooled chillers shall operate 24 X 7 during winter period.
Page no. 25 of
67
(1) Property Development at Bhaisali and Anand Vihar
shall include chilled water supply and return pipe connections with Station:-
PD area is shown in tender drawings at Anand Vihar & Bhaisali
energy meter and motorized valves; and, fresh air supply duct
station above the station box other than the transit area.
terminated at the boundary of each retail zone under 200 m2. For retail Construction of ECS TVS and Electrical Services are not in the
Part 2/ Section scope of work of this contract. Since construction of PD area
for every 200 m2. SCADA system shall log the usage of the cooling will be done subsequently at a later stage, only the space
6 Bi / Clause
17. planning coordination for Chiller plant will be required to be
5.6.5 energy and report to NCRTC for billing purpose. Chilled water shall be
carried out by this Contractor with the interfacing contractors.
Page no. 26 of 67 provided during revenue service hours.
(2) Property Development at Begumpul Station:-
PD space on Mezzanine floor at Begumpul (not on
platform /concourse): space provision for power supply,
Airconditioning, Smoke extraction , Chiller plant, utility
Gallery, shafts etc. to be done such that the concessionaire

Addendum and Corrigendum 01B Page 5 of 23