Turbo Alternators
Turbo Alternators
BEKULAN
Part 2
CONTENTS
Page
1.2.3. Stages
In multi-stage steam turbines where large amounts of energy have to
be transformed efficiently into rotary motion, it is necessary to expend the
pressure energy in a series of steps each with a set of nozzles and a ring of
blades identified as a stage. To reduce turbine length and cost a com-
pounded velocity or Curtis stage often forms the first high pressure stage.
This allows a large press.ure drop to be effected in the first row of nozzles
and can give the same heat drop as four impulse stages, but with some loss
1. ENERGY TRANSFER of efficiency. With this type, a row of stationary guide blades attached to
the casing are interposed between two rows of moving blades on the rotor
wheel and the stationary blades deflect the steam into the second row of
1.1. ENTHALPY DROP
moving blades at the required angle.
Enthalpy drop is the basic energy quantity for steam turbines and the
Successive pressure compounded stages of multi-stage machines are
art and science of design devotes much attention to the efficient absorption
formed by diaphragms held in the turbine casing and carrying stationary
of the kinetic energy obtained from the enthalpy drop when steam is
blading or nozzles arranged for 360 0 arc steam flow, and each followed by
expanded through the turbine. Losses occur because of shock waves and
a row of impulse blades mounted on the rotor. Such compact Rateau stages
friction in nozzle and blade passages, leakage past shaft seals and blades.
effect the whole of the pressure drop in the stationary blading and provide
disc friction, and the unavoidable loss in kinetic energy at exit from the
comparative insensitivity to blading clearances.
final row of blades where the steam must have a higher velocity than the
blades in order to escape.
1.2.4. Steam Flow
In addition to their designed function, the first stage nozzles form an
1.2. CONTROL OF ENERGY TRANSFER efficient flow measuring device. Since the exhaust pressure or condenser
Turbine efficiencies are, of course, a function of type and design which pressure is constant (or nearly so) over the load range, the nozzle box
are beyond the scope of this text. The main features which control the absolute pressure is indicative of steam flow and is almost directly related to
energy transfer are as given below. power output. This almost linear relationship between steam rate and output
is known as a Willans Line (see Fig. 1.2.4.) and only two points need to be
1.2.1. The Nozzles determined, for any particular nozzle group, to plot the entire line. The
When steam is allowed to expand through a nozzle, it assumes kinetic intercept on the ordinate represents the flow required for no load and the
energy at the expense of its enthalpy. Maximum kinetic energy is available
when the steam is initially at full stop valve pressure before the nozzles Steam 185 Ib/in 2 g(12-75 bars) dry sat.
and the expanded steam directly impinges on the turbine blades. However, 500 11000 Exhaust 26 1/2 inHg (8974mb) vacuum
a measure of throttling is necessary for governor control and this entails 1000
converting the kinetic energy into force following the change in momentum
1000-j 2000
of the steam. Typical blades are shown on Fig. 3.2.2. The root fixing has
to be capable of withstanding high steam bending stress and centrifugal
o
stress, the latter being greatly increased when the overspeed test of governing o 6 100 200 360 400 500
gear is carried out on each occasion when the turbine is started. Particular Output, kW
care is necessary when carrying out this test. FlO. 1.2.4.-Willans Line.
2
4 MARINE ENGINEERING PRACTICE
intercept extended to the other axis is a measure of the no-load losses. Such
a diagram may be easily drawn up to give an accurate basis for estimating
part load steam consumption over the range. At steam conditions other than
design it is necessary to apply correction factors to establish mass flow.
a) Self-contained or Package
These sets have their own condenser and are supplied complete
with all attached piping and accessories in place, ready for con-
.J. or
necting to shipboard piping. The condenser may be mounted on the
common turbine/ gearing/ generator base and provide the seating for
the turbine. In other cases the condenser may be separately mounted
below or alongside the turbo-generator and the condenser may also
serve other auxiliary turbines.
c) Pass-out Condensing
These turbines were fitted in some past generations of passenger
ships where the demands for power and for heating steam varied
widely and independently. The turbine provided a combin&.tion· in
one cylinder of a back pressure turbine, discharging at constant
pressure to the low pressure steam main, followed by a condensing (d)
turbine operated on low pressure steam.
feed pumps) so allowing the turbo-generator exhaust heat to be and the materials used for standard turbine internal parts are made
used efficiently, the back pressure turbine is often selected for ships suitable for operation with saturated steam to provide long life
which spend a large part of their working lives under full power where a superheater is not fitted to the boiler. Present day standard
conditions. The number of turbine stages provided varies from 2 machines usually have 5 stages but the number of stages used and
to 5, depending upon the terminal steam conditions. Power is gener- hence the efficiency is linked to the compromise necessary between
ated at nearly ideal efficiency since internal losses are passed on as turbine cost and waste heat recovery plant cost, bearing in mind
increased heat in the exhaust steam so becoming recoverable in the that for any designed load one cost increases as the other decreases.
heat exchangers supplied from this exhaust steam source. Never- Turbo-generators of this type have been used and are very suitable
theless, the steam rate of the machine is important under any for operation in unattended machinery spaces in view of their
operating condition when the main engine power is below design or reliability and as the residual heat in the boiler plus waste heat unit
the electrical load is unduly high. If these conditions-e.g. at low continues to generate steam and allows the power supply to be
power steaming or in or approaching port-lead to the exhaust maintained for several minutes under the extreme emergency of an
steam flow exceeding that which can be absorbed by the main abrupt main engine stop. This time margin allows boiler fires to be
power plant feed heating or related systems, the surplus exhaust lit-off or a stand-by Diesel set to be started, all by automatic control
must be dumped to a condenser at substantial dis-economy. The devices, to maintain the integrity of electrical power supply under
intimate link to the exhaust steam range requires the surplus ex- such conditions. The results of actual shipboard tests are shown
haust valve to be quick acting to relieve increasing range pressure if on Figs 2.3.3.(a) and 2.3.3.(b).
the normal feed floy; to the boilers is suddenly reduced or inter-
rupted in emergency.
b) Single Stage Condensing
b) Single Stage Back Pressure Some package turbines of this type, arranged to exhaust at a vac-
Turbines of this type have been fitted in many ships as stand-by uum to a condenser, were formerly fitted to operate in conjunction
machines and arranged to exhaust at atmospheric or near atmos- with waste heat recovery plant in motorships where the electrical
pheric pressure to an auxiliary condenser normally used for cargo sea load was low due to the provision of main engine driven pumps
pump exhaust or similar duty. Although their steam rate is neces- and the minimum of electrical appliances. They seldom, if ever,
sarily high, their selection is based on the premise that their low were adequate to carry the applied sea loading due to the high
initial cost offsets the high fuel consumption for the short periods steam rate of such turbines and undue optimism of the system
when they are on load. Due to the high availability of the multi designers when assessing electrical loads, main engine service con-
stage turbine (which is shared by the single stage machine), stand-by ditions, and heating steam requirements on board the ships.
turbo-generators of the latter type are normally only on load to
provide a "spinning" power reserve when a ship is in close waters
and near absolute electrical system integrity is essential. c) Bled Steam Condensing
When high steam pressures and temperatures are employed for
2.3.3. Low Pressure Condensing large powered steam turbine propelled ships the initial cost of the
Low pressure horizontal multi-stage condensing turbines are widely main turbo-generator may be reduced by it being arranged for
used where the available steam pressure is in the 6 to 20 bar range. Apart operation on bled steam, and the overall thermal efficiency of the
from the operating pressure distinction the turbines are as discussed in power plant may be improved in some cases. The bled steam is
Section 2.3.1. extracted from a suitable stage of the main high pressure turbine
at reduced pressure and temperature when the main engine is run-
a) Waste Heat Recovery Type ning at power. Provision must be made for automatic changeover
Self-contained or package type sets as described in Section 2.3.1(a) to a source of live reduced pressure steam when the ship is operating
are used in motorships where the steam source at sea is from waste at reduced power and when in port. The driving turbine for the
heat recovery plant. The turbines are usually designed to operate generator is provided with the required number of stages to suit
with low pressure superheated steam at sea and with steam at a the available pressure drop before exhausting to the main con-
higher pressure direct from an oil fired boiler under port conditions~ denser.
10 MARINE ENGINEERING PRACTICE TURBINE TYPES. GENERAL 11
generator and a clutch connected to the low pressure turbine pinion. Under
steady power and, with shaft speeds near design, the clutch is engaged
Ship A. Rundown tflSt with automatic
I I firing provision for botlflr-
to cut In Mlow 140 IblinZg (9·6S bars).
to drive the unit from the main engine and the auxiliary turbine is vented
to the main condenser. Under other operating conditions, when frequency
1'lt'60JI TlA on full Sfla load
Heating steam services in USfi would exceed the acceptable 5 to 10Hz variation, steam is admitted to
the auxiliary turbine and the clutch is released, all by means of automatic
I~ and/ or remote control devices. When reversing the procedure to engage the
~ I~ I 150
clutch, the auxiliary turbine speed is controlled to match the frequencies
and a friction clutch effects a short term coupling to main gearing before
~10..j ~
<l 10 I
the gear type positive drive clutch is engaged and driving steam shut off
",,' I<l I
~
ti<:II 1"'ali~
~ Full firfl
the auxiliary turbine. With this arrangement provision has to be made to
'-
,:::>
I '"~ allow the electrical circuits and components to accept some frequency
Q..
I~
I variation, and to maintain the desired efficiency the main turbine speed has
9~ ~ t3- 1 to be kept within the acceptable range despite hull/propeller fouling or
I
~ adverse weather conditions. In operation at sea this may entail restricting
if)
125
I
I ! i i i i rudder angles, avoiding temporary power changes, and ensuring that the
o 5 W ~ ~ ~
Time from stopping main enginfl, minutfls auxiliary turbine steam valve will operate freely if a sudden emergency
(a) arises after a long passage during which the steam valve has been in the
closed position.
18 61
'j
'" 'tl
~h::,-~ ~ :t....~
12l 170
I)"
1!Q",? " I-b-g.~%.
~ C:l'tl tl
--x-,x
\ 5
t$.15t60 -<l.....
" ~] § t
~ C:l'tl.2
\
\ 5
~
:::.
~~~~ ~
f>-r-
1 - -r-c;.
~ 140
.....E"/ Q: ~~~ \ S7 tt
~"'?E" \
III
~ ~
f 9ll~130 \ S6
x
~ IfJ~
~ 8 ~f2 S5
~ C:l
<l: Ship B. RundOwn I,,'wdh
7-J l:l automatic starting
\ ~ 10 arrangement for DIA sfit
~
<:l.. ~ provided but isola. ted for tfist.
6 ~ 9 T/A on full Sfia load Initially.
~ 8 Hfiatlng steam m USfi
SJ 70
o
I iii
1 2 3 4
I iii
5 6 7
8 iii
9 10 11
I
12
Timfl from stoppmg main flngine, minutes
(b)
vided, and a pressurized air seal between steam and oil seals prevents oil or
feed contamination under running conditions. A condensate circulated gland
tJ> t), ejector / condenser is provided. Turbine and gear bearings have white metal
.~
l;:;
-g ...
\'j lined steel shells~ the thrust bearing is a Michell multi-pad type complete
<j <II
~
Q. <l
....
I/)
with surge pads and arrangements made for adjusting the axial position of
(::
;:: ...:;, the rotor. The speed governor is motorized and arranged for both remote
:>-.
-Q
:s and local control for synchronization; it consists of a speed responsive
~
~
"
tl
Q.
t),
centrifugal element driven from a take-off on the rotor shaft extension and
(j
.;:; :§ operating a double beat profiled throttle valve through an oil operated
Vj
~ hydraulic servo mechanism. The speed control is arranged for straight line
regulation (load against speed) with a speed droop of about 4 per cent
between full load and no load; governor adjustment may be made on site
to modify speed droop control within a range of approximately 21- to 51- per
cent to enable kW load sharing between turbine and Diesel generators to
be readily matched. The security devices comprise an overspeed trip of
spring loaded unbalanced valve type (or eccentric ring or bolt type if
required) carried in an extension of the turbine shaft, a low pressure oil
trip and a vacuum trip which operate within limits of 10 to 15 per cent
overpeed, 0'345 to 0'690 bar (5 to 10 Ib/in 2 g) oil pressure and 406 to
457 mm Hg (16 to 18 in Hg) vacuum, respectively; all are as far as possible
arranged to fail safe and on operation release pressure from the hydraulic
~
::. servo mechanism of the throttle or emergency valve so shutting steam off
Q.,
:a... the turbine. Forced lubrication of bearings and gear trains is supplied by
\'j a gear type oil pump driven from the shaft extension and discharging via
~
duplex, expendable, cartridge type micronic filters providing filtration down
to 10 to 15 /lm; a motor driven oil pump is provided for normal starting
and a hand operated pump for emergency use. The gearing forming the
speed reduction unit to the generator drive coupling is single helical reduc-
tion type with teeth hardened by nitriding and precision ground by the
Maag process: end thrust due to the small helix angle is absorbed in the
gearbox and divorced from the turbine thrust. Turbine and high speed
pinion in the latest designs are coupled via a "membrane" coupling, or a
hardened and ground single engagement gear type coupling (as shown) if
preferred, and all rotating parts are accurately dynamically balanced. The
turbine, gears and generator are mounted on a common fabricated baseplate
and the oil tank for the lubrication system is integral with the baseplate
-2 section supporting the turbine and gears.
~
...<lo
~
<:: 3.3. BACK PRESSURE TURBO-GENERATOR
§,
rj
... Machines of this type, as discussed in Section 2.3.2(a), have been fitted
in many oil tankers over the last several decades and, more recently, in high
1 powered steam turbine driven container ships where the same criteria of
long sea time/short port time applies in addition to requirements for large
FrG, 3,2,2.-Turbine components. auxiliary powers and compact units.
16 MARINE ENGINEERING PRACTICE TYPICAL MACHINES 17
3.3.1. Brotherhood 1200 to 1360 kW Set usually much less than for condensing machines and the light load fraction,
A series of recently built container ships have been provided with i.e. the fraction of the full load steam required to carry the no load losses.
1200 /1360 kW back pressure turbo-generator sets as shown on Fig. 3.3.1. is correspondingly higher as is evident from a comparison of the steam rates
The 304'8 mm (12 in) multi-stage steam turbine has one Curtis plus five given in Sections 3.2.1. and 3.3.1. This calls for the greater efficiency possible
Rateau stages. Each set is arranged for turbine/generator speeds of 12000/ with minimum throttling. In addition. a dual sensitivity to loading is im-
1800 rev/min and for steam conditions of 60'33 bar/507°C (875 Ib/in 2g/ posed on back pressure turbines since the steam flow will vary with either
945°F) with an exhaust pressure of 3'86 bar abs (56 lb /in 2 a). Steam con- changes in electrical loading or changes in the steam off take from the back
sumption at designed conditions is: pressure range, e.g. if'the exhaust steam flow from feed pumps or other
units exhausting to the range is varied following changes in their loading. A
Load in kW 1360 1200 960 720 480 schematic arrangement of the control gear and protective devices for such
kg/kW/h 7'93 7'74 8'03 8'50 9'54 turbines is shown on Fig. 3.3.2(b).
(lb/kW/h) (17'48) (17'06) (17'70) (18'75) (21'04)
~
9
IJ,)
~
N / F/. .ibk couplinIJ
~
!
C3
Hardened and ground
reducHon gear/ng
3:
>
:-:l
Z
;;. tTl
~ tTl
::r-
Cl
Cl Blower for air ~
~
sf:aling glands Z
tTl
"'"
~ tTl
:-:l
"'"'
~
Overspel2d trip-
~
(1:l
1::l "tl
;:::
... :-:l
(1:l
i:
... Rotor
q
~
"'"
Cl
DQ
tTl
(1:l
;::
~
0-
:"
Blades
Q/''DIS
,,~
~ !~, 0,....
1 . .~> )~j.,
\'"-.,)i""
...: @
~
!5 ~~ l
~
IN
N
? ...,
'I -<
"tl
~ n
~ >
l"
s:::.
;:::
~ 3:
(")
Pressure >
(J
Cl control :I:
;:: valve
::;
;2., ~
CIJ
Motorized ~ntrifugal To lubricating
~ governor oil system
""~
~
B
\,
Gear oil pump
J
-, r
L
I~
Orifice
Hand trip
Drain
Drain Drain Drain
-
\0
20 MARINE ENGINEERING PRACTICE TYPICAL MACHINES 21
it maintains the vacuum while the motor is running, whereas the steam jet
is sensitive to initial steam pressure and loses vacuum suddenly if the
Ship Type Turbo- Steam Steam Steam Rate
pressure is reduced to any appreciable extent.
Generator Pressure Temperature kg (lb) /h
Size kW bar (lb/in 2 g) °C (OF)
Planet wheels
Rotating ""-"" ~ rotating about
sun wheel ~ "'-.. lVJ own spmdles
3.7. MATERIALS OF CONSTRUCTION values are needed. Since the principal designers are in general agreement on
Special or high grade carbon or alloy steels, including proprietary the properties required, and as the range of suppliers offering these special
brands, are widely used in the manufacture of turbo-generator components. steels or other special materials is limited because of the restricted market,
24 MARINE ENGINEERING PRACTICE
Item Material The scope of this work does not allow all turbine compo'lents to be
Rotor shaft and discs 722M 24T illustrated and discussed and reference should be made to Working Instruc-
Turbine blading Firth Vickers FV520B tion Books on board ship, and to text books, for detailed information. This
Steam casing BS3100: 1976 A2 or section, then, deals only with such vital sub-systems and components as are
BS2789 SN27/12 generally applicable in principle to many turbo-generators, even though
Exhaust casing BS2789 SN27/12 details may vary between different makes of machines.
Nozzle segements 1st stage 321 S 12
Nozzle segements later stages 420 S 37R 4.1. LUBRICATING OIL SYSTEM
Labyrinth packings 416 S 21P It is an axiom that oil is cheaper than metal and it is obvious that the
Casing fasteners BS1506-621B (T) lubricating and servo-oil systems are essential to turbine operation. The
Main steam valve 321 S 12 oil formulation used has to compromise between the requirements for bear-
Main steam valve seat 420 S 37R "Stellited" ing lubrication and cooling, and gearing and servo system operation: resist
Nozzle chest BS3100: 1976 A2 or BS2789 deterioration from oxidization, emulsification and corrosion products and
SN 27/12 inhibit sludge formation as far as possible. Water contamination is the most
Throttle valve and spindles 722 M24S nitrided common hazard due to leakage from shaft glands or condensation in the oil
Throttle valve seats 420 S 37R "Stellited" sump or in drain lines: this leads to emulsion formation when a mixture
Governor weights 722 M 24R nitrided of oil and water is agitated, but the emulsion will normally separate into
Gearbox C.1. BS1452 G20 the constituents unless oxidization of the oil has occurred. Such oxidization
Pinion and gearwheel 722 M 24S nitrided may o~cur due to a thorough mixing of air and oil, so producing foam: any
Unless otherwise stated materials are to BS970: 1970 and are those most foaming will impair bearing lubrication an1 cause erratic functioning of
frequently encountered in marine applications. servo systems due to the compressive nature of such fO:lm entrained with
the operating oil.
KEY
x::x:x::x::x. 0/1 suction On~oftwo Combined stop and
control valVl<'S eml<'rgency~
Gov.oil
z:z:z:z::z 2S0lblin Zg
~ ---Lub.oil
~
:s ---3S-tSIb/inZg
t:l ~
is 0
b, I ~
g~
~ ElTIflrgency trip
<::l ~ gear
l.. t:: ~ I fl """#i?lll Handrl<'sl<'tting
-2 ~ lever
t:l
f: ~ 'Low lub.oil and
~ § oVflrspfled trip
~ Hand trip lever
'" Actuator 11 I
TP 1 thermometer
pocket
Oi/tank
TP2 thermocouple
pocket
strainers.rr I 1 "I 'II cooler
-2
~.s.
~-b FIG. 4.1.2.-Control and lubricating oil systems, Allen B.P. turbine.
, \ ~'b
~....... ,
QC::
c::
(\I
':3 c- ~ E
(\I
S.
}; ~ ,
::ttl
~ 4.1.2. The Allen back pressure turbo-generators discussed in Section 3.6. are
''....""
(\I
:>.
-::::
(\I
Q. u
"::::
:::, .~~
0 .....
'i::
Q provided with separate tandem driven pumps for control and lubricating
0 UJ
Q. Cl
'b ~~ ::t oil duties, as indicated on Fig. 4.1.2. The control oil pressure of 250 lb/ in 2
0 c:: 0UJ--:::;'
.....
::...
.Q
~ (17 bar) is maintained by means of a relief valve and an accumulator to
(\I
Q: provide a reserve of oil in the event of pressure surges; the control pressure
is released in the event of any of the emergency trip devices operating, so
FIG. 4.1.1.-Diagram of oil system, Brotherhood B.P. turbine.
28 MARINE ENGINEERING PRACTICE VITAL SUB-SYSTEMS 29
stopping the turbine via the emergency trip gear. The lubricating oil
pressure of 2'06 to 2'40 bar (30 to 35 lb / in 2 ) is applied to the epicyclic gear
with downstream pressure reduced to 1'06 to 1'37 bar (15 to 20 lb / in 2 ) via
an orifice plate and a relief valve to supply the turbine bearings. A tapping
from the lubricating system, via an orifice and a three-way cock, provides .~
4.2.1. The mechanical speed governor traditionally used is driven through Power piston
gearing from the rotor shaft and is a force balance system where the ~"
centrifugal force of rotating weights is balanced by the elastic force of a
spring or springs; the radial position of the weights is dependent upon the
speed of rotation and weight movement is usually transmitted via links and
relays to hydraulic servo motors which provide force amplification to Power cylinder
actuate the steam control valve of the turbine. The general features of such
governors can be distinguished from Fig. 3.3.2.(b). The figure shows the
connexion for the speeder motor at the top left hand side, rotation of the
worm wheel by motor or manually alters the load on the governor spring
and so adjusts the turbine speed to facilitate synchronizing and load sharing.
4.2.2. The type of governor described with hydraulic linkage or direct • Pressure all
linkage has been developed and proven over decades of operating experi- o Sump oil
ence but is relatively large and expensive. The "Woodward" spe¢d
governor is a proprietary specialised product which is increasingly being
used in place of the unit manufactured especially for a specific turbine. It
is now offered as an alternative by "Brotherhood" who use the standard FIG. 4.2.2.-Woodward UG8 governor.
UG8 base and by "Allen" who use this "Woodward" UG8 type hydraulic
governor driven by a vertical shaft through a worm gear fitted on the steam 4.3. PROTECTIVE DEVICES
end of the turbine rotor shaft. These are normally provided to guard against overspeeding, oil failure.
This compact variable speed oil pressure governor has a self contained vacuum failure or high exhaust pressure and a schematic arrangement, from
oil pump and accumulators and offers externally adjustable speed droop, which the type of device can be identified, is shown on Fig. 3.3.2.(b). In some
speed adjustment with limit stops and load limit control which may be used cases, other equipment is provided to cover for thrust bearing failure or
for manual shutdown; Fig. 4.2.2. show a simplified impression of the gov- excessive vibration but this is not common for turbo-generators of the size
ernor with limit and indicating mechanism removed, under the speed under consideration and will not be discussed as the devices are similar to
increasing condition. For a full description and maintenance instructions it those used for larger modern main turbines. Electrical system devices to
is necessary to refer to the makers brochure. guard against motoring or to remotely trip the generator set are outside the
30 MARINE ENGINEERING PRACTICE VITAL SUB-SYSTEMS 31
present scope. Details of individual protective devices vary with makers t'l
<.:
l:: ~'"
but all modern tripping devices operate on the fail safe principle in that the 3' ~ :S!
operation of anyone of them causes the complete collapse of relay oil I
pressure.
I
~
of a spring loaded bolt, ring, valve or weighted leaf spring in which the
centre of mass of the weight is offset from the centre of rotation. On over-
speed the out of balance force causes movement of the trip to initiate action
leading to steam valve closure. Depending upon the type used, the weight
7 :N««cs 7
movement either contacts a trip lever linked to a catch normally holding J
the spring loaded steam valve open, or uncovers a port which releases
pressure in the relay oil system, so allowing the spring loaded steam supply ...
~~
valve to close. A manually operated device is often included in the linkage ~t
tit:
to allow local immediate tripping of the steam valve. Typical examples of
overspeed trips are: b"
'-
t:
t--+-+-~ III
:..,
a) Eccentric bolt type
This is shown on Fig. 4.3.1.(a). Under the normal running conditions
.,
~tj"b
..
~
the spring holds the bolt head against the plug. On overspeed the ~t ~
unbalanced centrifugal force causes the bolt to fly out very quickly ~~
.,,, --~
and kick the lever which is connected through linkage to the retain- "'"
:"0
~a
ing latch of the steam valve, which then closes.
c) Unbalanced 'valve type restored while the turbine is running down or when the overspeed trip
An exploded view of this type as fitted in the latest "Brotherhood" valve has operated. Before restarting the turbine the plunger must be
turbo-generators is shown in Fig. 4.3.1.(c). The assembly is carried withdrawn by pulling the reset knob provided on the valve body.
in an extension of the turbine rotor shaft and the unbalanced valve
is held onto the valve seat by means of the helical spring at
normal shaft speed. At overspeed the centrifugal force exerted by
the valve overcomes the spring force causing rapid opening of the
valve. Lubricating oil is fed into the centre of the shaft extension \
via an orifice-see Fig. 3.3.2.(b)-and when the unbalanced valve is
opened on shaft overspeed this causes the pressure downstream of J
the orifice to be reduced to zero, so actuating the low pressure oil
trip, destroying control system pressure and so closing the steam
supply valve to the turbine.
I
and the weight moves to an eccentric position so opening the orifice
to flow and relieving the oil pressure to drain. This destroys the Low pressure oil signal
control system pressure which leads to operation of the low lubrica- from lubricating system
ting oil trip and the emergency trip gear through the circuit shown
in Fig. 4.1.2.
FIG. 4.3.2.-Low pressure oil trip.
4.3.2. Oil Failure Trip
Loss of oil supply pressure to the bearings would quickly lead to 4.3.3. Back Pressure Trip
journal and thrust bearing failure and to shaft damage. In the absenae Excessive back pressure may be imposed on a turbine if the exhaust
of corrective action and, in the ultimate, it could lead to explosion following steam range pressure increases unduly due to mal-operation of bled steam
overheating with hazard to both machine and man. Causes of pressure loss } control valves connected to the range or cessation of feed flow through
units absorbing the exhaust steam; with condensing turbines the vacuum
may be undetected oil leakages, pump failure or blockage of suction strainer
may fall due to loss of circulating water, air not being removed from the
or discharge oil strainer. Although these defects are rare, it is I condenser or the condenser flooding due to condensate not being extracted.
fortunate that the low lubricating oil pressure trip is a simple reliable device
not subject to wear and requiring only that the oil supplied be clean to The function of the back pressure or low vacuum trip is to protect the
avoid lacquer deposit that might impair operation. Location of the trip in turbine exhaust casing and exhaust main or condenser shell / tubes from
circuit is shown on Figs. 3.3.2.(b) and 4.1.1. and details shown on Fig. 4.3.2. excessive pressure, and the last stages of turbine blading from increased
with the device in the tripped position. It will be seen that the trip consists temperatures which would follow. One type of trip used and its location in
of a spring loaded hydraulic spool valve which moves to the spill position the circuit can be identified on Fig. 3.3.2(b), it is a spring balanced hydraulic
as shown in the governing oil circuit if the lubricating oil supply pressure spool valve connected to a bellows contained in a casing; either the casing
falls to 5 to 7 Ib / in 2 g G to ! bar). In this condition the spring loaded interior or bellows interior (depending on type and the direction of the
plunger prevents the valve rising should the lubricating oil pressure be balancing load required for normal operation) is connected to the turbine
34 MARINE ENGINEERING PRACTICE VITAL SUB-SYSTEMS 35
~
exhaust casing. In normal operation the spring plus bellows loading holds "b~ ~~
~~ ~ ~ ~ ~
the spool valve in a position where high pressure oil can transit the spool .~ ~ .g
~ ~.~
~
b, .... ~
.~ ....~ ;:, l... ~ ·s ~ c:: tl
valve to actuate the governor relay and stop valve, but if the turbine exhaust II) tl
g, .~
.~ .::-gtl ~
'5 ~~
tl .... 'to..
U c:: ~tl
~
t:l
casing pressure changes to a preset level, the difference in loading on the .... ~8 o .... .... II)
'ii~
~
~ t:l ' ~
~ a:::: ~ .Ql...~
bellows unit allows the spool valve to move due to the then unbalanced .Q
lX3
<.J
:::: "'~
0
.~~
g lX3~
Vi
.Q
lX3
.,c::0
~
tl
1lI
-Qtl'"
.~ ~ 0
spring loads, so spoiling control oil pressure to stop the turbine. In another ",
~
"'0
....
type of trip, which is still found in use, a spring loaded bellows is used and
connected so that bellows deformation actuates a spindle connected to
a latch which, on release, actuates the low pressure oil trip of the turbine.
Opinion varies as to the need of these exhaust pressure trips and in many
cases a Sentinel audible warning device is considered to be an adequate
'-- irl
~lIC~:t~. <~~-:--" . .
~~
'.
c::
.Q .::
-g ~~EC="
_
:,--
.I
; t _~~ . o.~
~~
~i
0
~
~
c:::
~~=- ~
Shaft seals are required to avoid leakages of steam and lubricant from .,
.<.J
,,'
~
the turbine and reduction gears and to preclude mixing of these elements ....
in their various phases. Such mixing can have destructive consequences, for ~
~
~;;c-c_. ~,§=l~.
n~il>/t~
example aeration or emulsification of oil, or oil contamination of condensate ~ <>
or steam which ultimately allows oil to reach the steam boiler plant. The ,,"
~ L['. •
sealing arrangements made are similar to those required for a main turbine,
[~5 r~~f/ '1~
......
but the arrangements need to be much more compact and the turbo- ~ "bb,', // ~
u_ - --
- ,.. -3§
.~
generator loss of power output through interstage leakage is not so t:l ~~ ,,~ ~
significant. Figure 4.4. shows the steam, air and oil sealing systems for an
"b
~
g~' ,. ~
~----------------
~ c=::::=====-=='~
-Q .... t:l b,
e: ..... s
·s ~ ~-l(
up to date turbo-generator, and is largely self explanatory. The use of steam b,·S
:~T""T,·-·····~ l-1!1
tl
,===1
labyrinth glands (which operate by successive pressure fall and velocity
increase over each tooth with subsequent loss of velocity by eddying in the
space between each tooth) is now usual for the high steam pressures and
~
.a
~
",
->:
~~
' _ .. , . •
(j.s
~ ~-
Hb,c::
~'t
.Q ~===,::;:;;;;;;;;;;;;;;;;::;:;;;;::::;::oQ t ~
~==--- -----===-~~ ~~__:==-.~=:c~ ~~
-Q
shaft speeds currently used. Carbon glands are fitted in many older .~
C'~,"'"' I,
/'
rL~
.a't:
[
l~~
.Qtl
common with other pipe connexions to the turbine, they should be ~
tl-+ I [, ~
rR-" ~~;:1iil"" ~
~ 1-"':1.... g
......
adequately supported and should not be rigid. Constant load pipe supports ~ I ?~ ",
are provided on some high pressure systems and should be kept at the Vi~
LIM
~ ~)
9:
gt
........
.~
,1r~ ;tff~ J
designed load. Drainage arrangements also vary and a vortex separator
is sometimes incorporated in the steam supply line to assist drainage and
reduce the risk of any water carry-over causing damage to the turbine. A
"b ~ ~ ) \ " ~
steam strainer is often fitted in or close to the turbine stop valve casing ~~ ~ ;:L~ :s 2 ~
to reduce the risk of solids reaching the turbine steam control valves or
nozzles, or choking the small diameter steam jets in air ejector or gland '~~~J,
: ~~ ~.~~E.'--~-~
/~ ~. ~\t~i
~~ ~ <.>
~
condenser nozzles.
I....
<:1..
.I....~
0
----~
d'
~~
--
l,Jb, ~
~
-..J
tl
I....
~
<:
I....
~tl1lI ~. Vi ~~ ~
e
4.6. CONDENSATE SYSTEMS
Figure 4.6. shows a schematic arrangement of a condensing system for
",
a
<.J
:s
FIG. 4.4.-Brotherhood shaft sealing system.
36 MARINE ENGINEERING PRACTICE VITAL SUB-SYSTEMS 37
.~.3 figure does not show a gland steam condenser which, when provided, is
5~
l..
-Qi::;C»
~u ~~g condensate circulated and is either a separate fitting or is incorporated in
~.e ...... <.J
the air ejector casing: in addition to dealing with surplus gland steam this
~.~ unit also deals with steam leakage from throttle and stop valves spindles, etc.
~'f
lij~
+
From &y&tem--.
finHg(34mb)abs
~1.J Iii ~ Entrain air
from system
From
concknsrlr l( I To Nash plJm,> (c) Bibby coupling
t Seal watrzr
to heat
rzxchangrzr
I=I=I
t
Cooling watrzr in +
Cooling watrzr out
T
I t· . to·
t T
~~~.:!~/~~~~_~~~~nz:.~~r ® ~~~~~~~£~~~~~~-~~
5. STARTING TURBINES
® P~~!!...~rL0:B.P..!r.2.C?!!.e.!..a~!-/9E-:!... _ ~~
V~~~C?~u~v.:=.~u!!!.____ I
steam turbine may be deduced from consideration of the fluids, vapours and t.!: £~g~~~!L ?/?c?!!...s!2P_va~ @ !!2c.!..C?E..5!... t.:!!!!!.".!. !P~d.- t.!: I
actions which must be involved, i.e. oil, water, steam, air seal services, and
trip gear (OWSAT) need to be commissioned before the turbine is rotated.
r~ .6'!!'!.!!9P.L~=L~.!! @ !!..~!.!'!£S_af_4Q"h-~<L - - - -.!2 l
OvC?rspC?ro trtp opC?rated. OC?lay rC?SC?ttmg ~
1r·
With experience the finer details of procedures are quickly acquired by of trips. ChC?ck lubricating oil tC?mpC?raturC? ,
repetition but frequent changes of personnel, particularly in motorships ~ ® ~~~~2q~~~~~~~~~~t I ~
where the younger engineers may have had little previous acquaintance with CI) , 1\1
steam systems, make it desirable to provide both general and detailed ~I ~ Qp~.!...to.P. 'P~~~n.3E!!.. @ TU!E~~ !]2~~~J..s£..vtJ!:. E2c!.'"E!...!0 I~
recommendations. These cannot be comprehensive since machines differ in ~I .~ ® A~C?~!!.~?-05..o!:!:§j!!!!,:!:!~ 9 i ~
detail and the Working Instructions for each specific machine should be ~
~I {;"\:) ~ ~
, ----rurblM warming through. .~
I ~
CI)
Once the turbine has been brought from the secured position discussed
in Section 7, and preliminary checks carried out, before attempting to start t
INITIATE STARTING PROCEDURE
an unfamiliar machine the engineer should be certain he is familiar with Preliminary conditions- StC?am availabl'l at turbin'l with supply line drain'ld
all controls and understands their function. With many machines an - All turbin'l strtam drains open
- Oil sump I'lvtll corr'lct
emergency steam valve or the steam control valve will need to be reset by - Trips and stC?am control Va.!V'l r'ls'lt
means of a hand operated lever: on other machines it may be necessary FIG. 5.1.-Starting turbo alternator.
to reset a low pressure oil trip, etc. and typical locations of such parts can
be seen on some of the earlier figures shown.
For a condensing turbo-generator of the self-contained type the
condenser circulating water pump should be started and the condenser
flooded, venting or priming any high level system as necessary. The con-
40
42 MARINE ENGINEERING PRACTICE STARTING TURBINES 43
densate extraction pump should be started and the mobility of any float takes over, and it is necessary to check that the auxiliary pump has in fact
controlled discharge valve in circuit checked by hand operation. also check stopped before the turbo-generator set is loaded as the pump motor may
that if a condensate recirculating loop is provided the appropriate valve is not be continuously rated. The cooling water supply to the oil cooler should
open: ensure condensate is being circulated through the air ejector coolers preferably not be turned on until the oil has reached normal running
and gland condenser (if fitted) and the headers vented; where a motor temperature.
driven vacuum pump is substituted for an air ejector the unit should be When the governor takes over speed control the steam stop valve may
started and the self contained circulating system checked. Gland steam may be fully opened then partially reclosed until speed just begins to fall, then
thereafter be put on and adjusted to discharge just enough steam to seal the opened a further i-turn as a safeguard while the vital overspeed trip gear
shaft glands without discharging an excessive amount into the engine room: is tested. To overspeed the turbine a firm even pressure has usually to be
if automatic pressure control is not provided the sealing pressure will require manually applied at some convenient point in the governor linkage to give
periodic adjustment until the machine is loaded, since the amount of steam a gradual acceleration to the tripping speed level at which the overspeed
required is related to hp gland leakage which is responsive to throttle box device will operate and isolate the turbine from the steam supply.
pressure. The auxiliary oil pump may then be started and lubricating and A safety device, which requires manual resetting after an overspeed,
control oil pressures checked: where only a hand pump is provided the is always incorporated in the control system to prevent the steam supply
bearings may be flooded with oil at this stage and the pump manipulated to being re-connected to the turbine before the overspeed trip actuator has been
supply oil when the machine is started. When the vacuum has reached returned to the normal running position: the safety device may be linked
508 mm (20 in) Hg, for which the secondary air ejector stage alone may to an emergency valve re-setting lever or to the low pressure oil trip and, to
be adequate, the turbine should be warmed through by cracking open the avoid damage to the mechanism, it must not be reset until the turbine
manually-operated stop valve, but the turbine should not be allowed to revolutions have fallen to about 40 per cent of full speed. Thereafter, the
rotate at this stage of the operation. turbine may again be brought under the control of the speed governor by
After a few minutes, when the turbine is warmed through and all water slowly bringing the stop valve to the full open position and then easing back
has been expelled, the drain valves may be partially closed and the steam i-turn to reduce the risk of jamming when fully heated through.
stop valve opened a further few degrees allowing the turbine to rotate at, The set may then be synchronized and loaded, the turbine drains and
say, 10 per cent of normal speed. At this time, and subsequently during condensate recirculating valves fully closed and full vacuum raised. If
the running up procedure, check around the machine for unusual rubbing possible, the load should be applied gradually, taking two or three minutes
noises (a rumbling noise may indicate water in the cylinder but metallic to reach full load, as the final heating of the turbine is unlikely to be effected
sounds are most dangerous indications of potential trouble requiring until there is a substantial flow of steam at normal conditions through the
immediate action be taken) or vibration which if found calls for the machine machine. Such gradual load application is also advantageous in preventing
to be stopped and the starting procedure repeated. The cause of these water carryover where there has not been an earlier balancing steam load
ominous sounds may be temporary distortion of the rotor due to non- on the boiler, or where a pocket of water may lay in the steam supply line
uniform temperature dstribution following high local heat transfer to the and be dislodged by change in line pressure drop.
metal while steam was condensing thereon. Convenient focal points for During the loading procedure, if an a.c. machine is inadvertantly
detecting vibration are the stop vaJve handwheel, the main oil pump, the connected to the switchboard when out of phase an extremely heavy
gearbox and pedestal bearings: if more sophisticated equipment is not load, which may be as high as ten times normal torque, is imposed on the
available the finger tips or the end of the finger nail is sufficiently sensitive, transmission in which the turbine! gearing coupling may be the weakest link.
and he "screwdriver to ear" traditional listening technique may be If such an incident occurs the set must be stopped and the flexible coupling
employed to partially mask out air-borne noises and identify the noise examined, particular attention being given to flange bolts which will have
source. been overloaded by excessive sheer stress.
The length of time recommended for low speed running is related to Some small changes in procedure will of course be required where back
steam conditions and conservatively may be extended to as long as 15 min pressure turbines are fitted. It should also be noted that for certain machines
until experience with a particular machine indicates a shorter time is where the throttle valve is actuated by a hydraulic servo mechanism, too
adequate. Subsequently the turbine may be accelerated in even stages of rapid manual opening of the steam valve may suddenly reduce the control
about 20 per cent of normal revolutions per minute. If a motor driven oil pressure so allowing the valve to close under the action of unbalanced
auxiliary oil pump is fitted it will be automatically stopped by a pressure steam pressure and unnecessarily stopping the turbine.
switch connexion at an intermediate speed when the turbine attached pump
RUNNING 45
2'TI------,----,---,-----, 2T'------,-------~
....
Numb~r of bearings
~
6. RUNNING
~L~'
~
,I
:Q
Turbine
~,
~lly.
+=~
.l:l
~!
Q:
1 Turbine and gea"r
f------ -------r---+---"-1
:
..g ,
~
Q:r---
: I
I
'I
I I
I
Some small adjustments need to be made when the set is loaded and I i I I . I
~ I
'"I 'I
until normal running temperatures are reached. Where gland steam supply
oJ
!
00 10 20 SO 100
is manually controlled it will require adjustment and, with some older Speed, rev/min x 1000 Cold start time,
systems, it has to be set to maintain a light feather of steam at the gland mlf"IUtes to full speed
(a) TYPE OF EQUIPMENT (b) START UP TIME
exit to demonstrate that air cannot enter the exhaust end gland and impair
the vacuum: automatic control is provided on many modern machines by
interposing a thermostatic valve in a leak off line from an internal pocket
of the hp gland so allowing either live steam to enter the gland sealing ....
system or surplus leakage steam to be diverted to a lower pressure point in ~ ~ : I 7'
<..J
<..J I
the turbine-this point depends upon the specific arrangement of the system ~ ~
but may be to an outer pocket of the lp gland, or to an intermediate ~I I '" I ~11 ok::: .1
turbine stage, or to the exhaust volute. Lubricating oil temperature must be
~
.l:l , , I~ ~ j
~
:.:::: I
=tf=:-:
densing turbines it is not desirable to maintain excessive vacuum (over the : : i I
: I 10, starts per year I
design figure) when cold sea conditions allow such greater vacuum to be
I
maintained. The kinetic energy leaving the last stage of the turbine cannot
be reclaimed and the annular area provided in the last row of blading is
made as large as is economically practicable. The leaving loss plus exhaust
branch losses can represent a significant fraction of the total heat drop
r
et _-__
I I
-..to ,
I
0+-- 1
I
across the turbine. Bearing in mind the enormous specific volumes of steam 10 20 a 10 20
Speed,revjmin xlOOO Speed, rev/min x 1000
at high vacuum it is not necessary to impose the higher velocities and hence (e) TYPE OF CASING SUPPORT (f) STARTING FREQUENCY
losses which follow from excessive vacuum.
Should the turbine speed fall unexpectedly the procedures discussed FIG. 6.-Reliability factors for shore-based turbomachinery.
in Section 8.4. should be considered if time allows this. In the special case
of turbo-generators used with waste heat recovery systems one or more
44
46 MARINE ENGINEERING PRACTICE
hand operated nozzle control valves are provided and for best economy the
minimum number of first stage nozzles should be open to steam: total steam
available from such systems is restricted by design and where excess margins
are small a reduction in heating services supply may be necessary at times
to enable sufficient steam to be diverted to the turbo-generator to carry
unduly heavy loads-the simple alternative is, of course, to flash up the
boiler for a short period to make up any steam deficit. These sets are also
operated for long continuous periods and the emergency trip gear should be
tested at times when the turbo-generator set load can be transferred to 7. STOPPING AND SECURING
another machine.
Other and sudden emergencies may arise with a turbo-generator, as
with any other type of rotating machine. These cannot be described in total The procedures are simple but best carried out to a routine with an
and it still remains the bounden duty of every Marine Engineer to consider EngiI)eer standing by the set and an Attendant at the switchboard.
in advance the emergency action he would take in various events, decide
on the optimum corrective measures he would take, and thereafter be in a
position to take decisive action in emergency without needing time to 7.1. STOPPING
consider whether such action is the best possible under the prevailing This affords an opportunity to fully traverse the governor mechanisms
circumstances. and the linked throttle valves which may have remained in one position for
There still remains much disagreement between engineers on whether a long constant load period during which boiler compound deposits may
it is better to run turbo-generators for long sustained periods, or whether have formed on the throttle valve spindle. Desirable general procedure is:
they should be changed over weekly where two or more identical machines a) Close the steam stop valve slowly until the speed just begins to fall
are available and thus equate routine maintenance requirements with similar then re-open a quarter turn, thus preparing the valve for rapid
periods of time. The basic question is one of reliability and it is obvious that manual closing if mishap arises;
a machine is at higher risk during the starting period than when running, also b) Shed the load at the switchboard, slowly at first to check that the
that the extent of risk is related to starting cycle time. For example, in the governor is following the load changes;
extreme case of a.c. electric motor driven units the short starting time makes c) Switch the full load on and off several times, if allowable, to prove
supervision impossible during acceleration and if trouble then occurs it is governor operation and wipe off any deposits which have formed
unlikely that damage could be prevented. Frequency of starting must then on the throttle valve spindle;
be linked to reliability but there is no known reliable documentation of this d) Trip the emergency steam stop valve by using the hand trip and
for marine turbo-generators. Some related information has been published completely close the steam stop valve (a);
(Reference 6) for shore based turbo machinery and is shown on Fig. 6. The e) Ensure that the auxiliary oil pump is running, if automatic pressure
"Reliability Factor" shown is comparative only, 2·0 giving excellegt control is provided, or start manually if necessary. If no power-
probability of trouble-free operation with a breakdown rate estimated about driven pump is provided maintain the oil supply by the hand pump
half of normal, 1·0 being an average installation with normal probability until the turbine stops. The auxiliary oil pump should be kept
of failures and breakdown, and O·S indicating probability of problems about running for a few minutes after the set has stopped rotating and
twice that of normal. until the hottest bearing temperature is reduced to 43°C (110°F)
say, to avoid heat seepage along the rotor shaft burning stationary
oil into hard deposits;
f) Shut off the steam supply to the gland sealing system, the gland
condenser ejector (if fitted) and the air ejectors, alternatively stop
the motor driven vacuum pump. With a back pressure turbine close
the turbine exhaust valve, and exhaust isolating valve if fitted, and
open the intermediate exhaust line drain;
g) Shut off cooling water to the condenser, and to the oil cooler when
the oil temperature has fallen to, say, 43°C (110°F); ,
"iii
47
:.I"i '
Ii
J.,
48 MARINE ENGINEERING PRACTICE
7.2. SECURING
If the turbin~ is to be left standing for an appreciable p~riod. when
pcrmissibl~, the isolating valve on the engine room steam distributing 8. MAINTENANCE AND OVERHAULING
manifold should be closed and the supply line to the turbine stop valve
drained. The emergency steam stop valve on the turbine should be left in the
tripped position to increase the number of nominally closed valves between The great advantage offered by turbo-generator sets is that there is
th~ steam source and the machine to ensure that, as far as possible, no very little to be done while a machine is actually running. Data from
steam leakage \'/ill condense in the turbine and cause corrosion (see Section instrumentation displays should desirably be recorded under typical service
8.11). The main stop valve, nozzle chest and turbine casing drains must also conditions for comparison with test bed data, to provide a reference level
be kept open until the machine is restarted. When the turbine is first stopped and aid diagnosis of the cause of any deviations from normal. Small adjust-
the r~sid ual heat in the metal will dry out the casing interior: to restore this ments may be carried out in interim service but major overhaul can
condition when a condensing turbine is standing for long periods the air generally be deferred until survey periods. When overhaul or adjustments
ejector or vacuum pump should be operated for about three minutes every are carried out it is, of course, essential to maintain adequate records of
two or three days. Also, such machines should hav~ the condenser inlet replacements, conditions of parts, and all clearances. Reference must be
and outlet valves closed to reduce warm E.R. air reaching the tube surfaces made to Working Instruction Books when such work is contemplated, as
via the turbine drains, and depositing moisture when cooled: if it is details and recommendation vary between manufacturers and must prevail,
considered that aggressive estuarial water was being circulated at shut down and as the scope of this text only enables any guidance or suggestions
it should be replaced by clean salt water when opportunity offers. Subject offered to be of a very general nature.
to their being safely isolated from the steam source, the turbine main stop
valve and any hand operated nozzle group control valves should be fully 8.1. MAINTENANCE SCHEDULES
opened and closed weekly with lubrication applied in accordance with any Large shipping companies operating planned maintenance schemes
specific instructions. Throttle valve or emergency valve spindles should not and issue schedules for work between survey periods. Where such instruc-
normally be lubricated as these must be kept free from all deposits to tions are not available, the frequency of inspection depends mainly on
maintain smooth operation. These normally power actuated valves should operating conditions and, apart from rare breakdowns, is soon indicated by
also be transversed through their full stroke weekly and any associated trip departures from the normal running state. Performance degradation is not
gear operated~ they may require control oil pressure to be applied to check likely to occur unless deposits, carried over from the boiler, foul nozzles or
their mobility. lodge under the shrouding of blades. Adjustments to the schedule must ce
Where an auxiliary oil pump is fitted this should be operated for a made if such fouling or water carry-over with steam, or water starvation
short period at weekly intervals. This will provide power to demonstrate of cooling systems, etc. is suspected. If in doubt, do not compromise as
the smooth movement required for control actuated valves and relay reliability is of the utmost importance since the safety and security of a
gear operation and to test the action of any trip gea r incorporated in the modern ship depends upon the integrity of the electric supply system.
control circuit, e.g. vacuum/back pressure and low oil pressure trips. The Decades of operating experience of turbo-generators running suggests the
lubricating oil sump should also be restored to normal level at these times, following tentative maintenance schedule may be found suitable.
any water present being preferably drained off through a purifier, and oil
filters cleaned when necessary. Full Survey
At classification periods. (An exception may be made for new ships
where a set may be opened up just within the guarantee period to ensure
that no damage has been caused by solids or aggressive material entering the
machine during the fitting out period, also to provide records of any wear
49
50 MARINE ENGINEERING PRACTICE MAINTENANCE AND OVERHAULING 51
rate found to aid future scheduling of inspection work.) Requirements for a 8.3. DYNAMIC BALANCING
typical condensing turbo-generator, excluding electrics, for such full survey Some machines that have been well balanced initially may tend to get
might be: out of balance after extended service; the unbalance resulting from unsym-
a) Remove turbine cover and examine blading; metrical thermal or pressure distortion, erosion, corrosion, wear, material
b) Check clearances between the bottom half of labyrinth packings deposits or creep. Also if work has been carried out on the turbine rotor
and rotor; or blading unbalance may exist and, after correction, it may be necessary
c) Examine and adjust rotor bearings; to approve the final static and dynamic balance obtained. The static balance
d) Check gear spray nozzles; is demonstrated by rolling the rotor on horizontal knife edged supports.
e) Examine gearing and flexible couplings; Dynamic balance is demonstrated by spinning at say 400 rev Imin on a low
f) Check thrust clearances; speed two plane balancing machine with resilient bearings. If part of the
g) Chemically clean oil side of lubricating oil cooler; flexible coupling is bolted to the rotor this should be in place during the
h) Renew lubricating oil, oil filters and main oil pump, and hand operation. When completed the amplitude of vibration at the turbine
clean oil sump; bearing pedestals should be about 0'025 mm (0'001 in) or less.
i) Dismantle and clean speed governor and low lubricating oil pressure
trip; 8.4. SPEED GOVERNING SYSTEMS
j) Dismantle and clean emergency stop valve; Unscheduled maintenance may be required in service if the turbine
k) Renew governor valve spindle and bush; speed should fall or it be impossible to maintain load, or if the governor
l) Overhaul auxiliary oil pump; should "hunt" and amplify load fluctuations. This will require a prog-
m) Clean air seal blower strainer; ranImed check of likely causes extending until the defect is found, com-
n) Clean water side of condensers and oil cooler and renew protective mencing with checks that:
rods; a) The load does not exceed that at which the governor was set, and
Annually that speed adjustment only is required to increase the lift of the
Repeat procedure c)-d)-e)-f)-g)-h) (excluding pump renewal) -i)-j)-k)- throttle valves;
m)-n). b) All steam supply valves are fully open as shown by normal
Six Month Periods pressure at the turbine stop valve when the machine is on load, and
Hand clean lubricating oil cooler and oil sump, change or purify steam temperature is correct;
lubricating oil and renew lubricating oil filters, clean air seal blower strainer. c) The correct back pressure or vacuum is being maintained at the
Three Mouth Periods turbine exhaust, and that adjustment of exhaust range pressure or
Analyse lubricating oil. attention to condenser I air evacuation is the required corrective
action.
If these adjustments are unsuccessful and the governor mechanics are
8.2. ALIGNMENT suspect the load must be transferred to another unit and the defective
This should only require checking if the turbine, gearing or generator machine shut down. The governor I throttle valve linkage should firstly be
alignment has been disturbed during survey I repair periods. On replacement checked to ensure that any bearings, pivot pins, or rockers are free and have
the turbine and gearshaft coupling flanges should be checked for concen- been adequately lubricated. When the throttle valve movement is controlled
tricity and absence of swash after the fitted holding down bolts have been by a pilot or control valve in the hydraulic system, this should next be
tightened down. Checking methods advised by makers may be by straight checked, particularly if the machine has been "hunting". Such pilot valves
edge and feelers or distance gauge, or by bridge gauge across the shafts for are particularly susceptible to dirty oil because in addition to its fine
some older machines, or by attaching a dial gauge to some convenient fixed clearance in a liner, the pilot valve acts as a filter when metering small
point and taking peripheral and face readings on a coupling while it is being quantities of high pressure oil to actuate the power piston of the throttle
rotated; at this time thrust and journal bearings should be in contact with valve: the pilot valve should be examined for score marks, polished if
the shafts. Similar methods may be followed for gearbox I alternator necessary with fine or worn emery cloth, and checked for freedom of
alignment but, depending on makers recommendations, the alternator operation after cleaning and polishing. If any pilot valve or linkage stiffness
coupling may need to be set slightly high to allow for differential expansion has been found it is worth re-assembling Rnd testing the turbine again
when the set is operating. without further dismantling: if not or if the control oil has been found
52 MARiNE ENGINEERING PRACTICE
MAINTENANCE AND OVERHAULING 53
to be dirty it may be necessary to strip and examine the oil relay cylinder /
piston which provides the power to actuate the steam throttle valve; see b) The trip device has moved out but the low pressure oil trip, where
Fig. 3.3.2.(b). Sluggish operation of governor gear may also' be due to carry- connected in circuit, has failed to operate. Where the trip device is
over of chemicals or corrosion products with steam, so impairing clearances linked to a catch holding the throttle valve open, the cause may be
of throttle valve spindles or guide bushes which may require cleaning and in the catch or linkage;
dressing of scores on mating surfaces in the steam control valve. Before c) The trip device has moved out but the emergency steam stop valve
opening up it is essential to ensure that the steam supply and exhaust lines has not fully closed due to partial packing seizure. In modern
are isolated and de-pressurised with all drains open. At the annual overhaul, turbines the gland is of non-packed type but deposits from small
or if the diagnostic procedures suggested have not proved effective, the steam leaks may form on spindle or bush: where packed glands are
speed governor will require overhaul in accordance with makers detailed used the packing should never be followed up or interfered with
instructions. Generally the features requiring attention will be: when the machine is running;
d) Throttle valve(s), actuating gear, linkages and linkage bearings; d) The tachometer reading being incorrect and the turbine not
e) Examinations of governor driving gearwheel and pinion, and their reaching the speed indicated on the instrument dial.
bearings; Routine maintenance may be restricted to cleaning. If the trip
f) Condition of ball and needle bearings in governor; is operating below the rated setting, the spring may be fatigued and
g) Examination of the toes of the governor weights for wear; require replacement. In an emergency, the trip speed may be altered
h) Checking the free length of the governor spring against the original by adjustment of spring loading but it is preferable to replace the
dimensions and the compression rate (weight applied / deformation device by a complete unit which has been tested by the manufac-
under load) which should be -+- 10 per cent of the original rate; turer.
i) On re-assembly movement of all valves and linkages should be
smooth and travel in accordance with original settings; 8.5.2. Low Pressure Oil Trip
j) When first re-started the turbine should be run-up under manual No adjustment of this trip is normally required but if operation is
control of stop valve opening, governor speed control reset, and sluggish due to dirt in the lubricating oil, then the unit should be cleaned
governor control tested by progressively adding and shedding and the valve polished and checked for freedom of movement before
t, 1, -t, and full load which should be switched rapidly on and off. re-assembly. The hand trip assembly, where fitted, may require similar
treatment.
more than 4 to 9 I (1 to 2 gallons) added per week; if substantial amounts 8.7. SHAFT SEALING
are needed it is inadvisable to add more than about 10 per cent of sump Provided that the turbine is warmed through and run up to speed
capacity as rapid sludge formation may occur if excess amounts of new oil slowly, and adequate lubrication is maintained at all times when the machine
are mixed with old oil. An oil sample should be taken weekly for visual is rotating, the shaft seals will require little or no maintenance. The gland
inspection and if water or solid impurities are present the cause should be steam condenser where fitted is almost invariably condensate circulated and,
identified and filter cleaning periods should be modified. Periodic settling or if not inadvertently overheated, the only probable maintenance requirement
purification of the oil charge is desirable, as indicated by the oil condition, will be to clean the small bore steam nozzle of the ejector which is liable to
also regular chemical analysis by the lubricant suppliers. Sponges should be become choked with scale or salts deposited from the steam.
used for mopping out the sump after draining and the use of fibrous
materials not allowed. 8.7.1. Labyrinth Glands
These are similar to those used in main turbines and details of typical
8.6.2. Oil Cooler spring supported glands can be distinguished on Figs. 4.4. and 3.2.2. If
The water side of the tubes needs cleaning annually or more frequently rubbing should occur due to shaft eccentricity-following unsymmetric
if the need is indicated by high oil temperature which may follow occasions heating, vibration or dangerous water carry-over with the steam-the
the ship has been trading in sandy waters; the tube inlet ends should be contact will initially occur at one point on the shaft surface but at all points
examined at this time to check that water velocity has not been too high. around the sealing fins. The gland segments in way are pushed outwards
The oil side of the cooler should be cleaned after 2000 hours cperation against the springs to a larger diameter until the disturbance is over, so
with an initially clean and well kept system. Thereafter frequency of restricting possible shaft damage. Where such a mishap has caused heavy
cleaning will depend on the oil condition and treatment of the charge. fin wear, the replacement of segments may be required. Otherwise, main-
Proprietary brands of chemical cleaners are often supplied for removing tenance at survey will be restricted to checking the freedom of segments
oil sludge and deposits which are trapped in the cooler. Where these are not to move in their housings; if tight the guide surfaces will require cleaning
available steam or high pressure feed water may be used, or the tube stack and polishing with replacement of any weak springs.
may be boiled for 8 hours in a steam heated bath of an alkaline solution,
e.g. commercial soda ash and 50 per cent trisodium phosphate mixed at the 8.7.2. Carbon-ring Glands
rate of 50 gil (8 ozjgallon) of fresh water. Thereafter, the tube stack should These cylinder j shaft seals are found on older design of turbines where
be flushed with high pressure water to remove all traces of alkalinity, as moderate steam temperature and shaft speeds made them suitable. Good
proved by testing the used water with litmus paper, and the stack dried out drainage of the glands is essential, particularly when the turbine is standing,
with an air hose. to avoid shaft corrosion and roughening which will cause heavy wear of the
graphitic carbon rings. Figure 8.7.2. shows a typical gland and all such
8.6.3. Oil Pumps and Bearings glands should be examined and tested for wear whenever a turbine is opened
Oil pumps are generally of the positive displacement gear type of
proprietary design and unsuitable for "on board" maintenance except in
emergency. If the main oil pump overheats, produces heavy vibrations;
leaks at the cover joints or shows any other indications of failure the turbine
should be stopped and the complete pump replaced. To avoid overheating
of bearings with possible consequent vibration and damage to shaft seals
the auxiliary oil pump must be in use throughout the turbine run down
period: if this pump should fail, the hand oil pump must be used.
The quantity of oil delivered to the individual bearings, sprayers, etc.
is fixed by pipe and orifice sizes and should not be altered. Journal and
thrust bearing adjustment methods follow standard engineering practices
for small sensitive bearings and will not be described in detail: typical
clearances are given in a later section. When considering lubrication, the
need to periodically grease bearings in external governor linkages, speeder
gear, etc. must not be overlooked. FIG. 8.7.2.-Carbon ring gland.
56 MARINE ENGINEERING PRACTICE
MAINTENANCE AND OVERHAULING 57
up for inspection. The rings must be free to move in their housings one end of the helices due to load concentration, are often attributable to
and their diametrical clearance adequate to allow for shaft expansion when the flexible coupling becoming fouled and "freezing" when under heavy
heated. If the ring segments have to be rebedded a mandrel should preferably torque. Where gears are not hardened during manufacture, wear on the
be used. The side face of each ring which seats in the housing must be teeth may be caused by water in the lubricating oil and indicated by a
perpendicular to the shaft axis. The ring radial face curvature may require matt surface on the driving flanks of the teeth. Any mal-alignment, which
correction by careful filing or scraping if wear has taken place and the must be investigated, may be due to flexible coupling wear or blockage.
mating segment ends must be closely butted. Garter springs should not be worn bearings, or bearing shells being distorted by dirt trapped between
overstretched, their length when in place should not exceed 5 to 10 per cent the shell and housing. A permanent record on transparent adhesive tape
of their free length. The stop pins fitted to prevent ring rotation should allow should be made of any pitting or other surface deterioration of teeth by
slight radial movement and not prevent the segments bedding on the shaft. adding a thin layer of marking to the tooth surface and applying the
Insufficient radial clearance of the rings may cause vibration when the adhesive side of the strip to the tooth. After lifting the transparent tape,
£u.rbine is restarted. markings will show the location and extent of pitting, etc. If gearing is
on the shaft. This will require the fins to be renewed and the replacement
new bottom half fins will have to be re-examined after the adjacent bearing
has been tightened down while the shaft has been rotated by hand. If the
new fins are then found to have lost their knife edge, this should be restored
by careful dressing before final assembly.
to isolate the cooling water lines and remove water box doors: fill the steam pressurized water seal cage is correctly located. When operating, a slight
side of the condenser with distilled water: apply a low air pressure to the leakage of water from the gland should be accepted to prevent air entering
top of the condenser through the vacuum gauge connexion, observing the the pump suction and causing an air lock. When the pump is of the cavita-
pressure on the gland steam gauges and not exceeding 1 bar (14'5 Ib/in 2g); ting type, i.e. returning all condensate directly to the system without a
dry the tubes and tube plates thoroughly by hot air flow and locate the condensate level controller being interposed, an annual examination of the
leaking tubes or ferrules. Air leakage through the turbine glands may be pump internals may be desirable to check on impeller deterioration.
tolerate:! at this time or. if the turbine is still hot, the steam sealing to the
glands m3.Y be kept in use. Leaking ferrules may be hardened up, repacked 8.11. INTERNAL CORROSION
or replaced by a blan:<: ferrule; expanded tube ends may be re-expanded The corrosive effect of moisture and some boiler treatment chemicals
after releasing pressure from the condenser or the tube replaced if this fails. which may be deposited in the turbine is far worse in a standing turbine
Leaking tubes may be plugged at each end as a temporary measure but it open to atmosphere, via glands and drains, than under running conditions.
is preferable to renew the tube if it is an isolated failure. The condenser Condensation of leakage steam in the casing when the turbine is standing
should be re-tested after remedial work is completed. If several tubes are idle must, therefore, be avoided to minimise such corrosion. Some leakage
found defective it is not always economic to completely re-tube a condenser from steam stop valves may have to be tolerated but may be offset by open-
at the repair period. In some cases it may be preferable to have all tubes ing drains interposed between master valves and valves on the turbine, e.g.
electrically probed by a specialist firm to indicate those which are unsound back pressure turbines commonly have such provision made on the con-
or defective: if small in number, these may be securely plugged and the nexions to the exhaust range. All steam drains on the turbine should be left
condenser restored to service with a resulting small fuel penalty at near full open and if condensing turbines are standing for long periods the air ejector
loads due to the reduced condensing surface. or vacuum pump should be operated for about three minutes every two or
three days to keep the cylinder dry.
8.10.2. Air Ejectors
Normal routine maintenance is restricted to c1eanin~ steam nozzles of 8.12. OVERHAUL AND INSPECTION
chemical deposits carried over with boiler steam or of scale which has If considered necessary, after the first year of operation and thereafter
passed through the steam strainer in the turbo-generator supply line. Non- according to Classification Societies regulations, the turbine casing should
scheduled maintenance may arise from overheating and tube leakage if be lifted and the rotor examined. At these times other moving parts should
insufficient cooling water is supplied, because of a failure of the condensate be inspected for wear, particular attention given to thrust and other bearings
to recirculate through the unit at light loads or when starting up, as indi- and to the freedom of movement of control valve gear. On the first occasion
cated by excess condensate temperature rise across the ejector. Apparent this work is done it is desirable to contact the manufacturers to obtain
poor ejector performance may reflect connected system troubles, commonly guidance, and if expert assistance is not available the Working Instruction
excess air leakage on the suction side from inadequate turbine gland sealing Book and drawings should be consulted to establish stripping sequences
as indicated by cool leak-off piping or condenser shell/pipe leakages: and procedures. It is, of course, essential that all steam and exhaust lines
location of leakages is a tedious procedure which entails applying a low air. should be isolated and vented; that warning be given on the danger of
pressure to the condenser and a soap sud check at potential leakage points. exposing escaping oil vapour to a naked light; that precautions are taken
or putting the system under vacuum and testing for air ingress by candle against allowing dirt or foreign bodies to enter the parts exposed during
flame or equivalent to show local air movement. Where rotary vacuum the inspection; and that rotors should not land on blading nor gearing on
pumps are installed the makers instructions shou ld be followed and the gear teeth. Figure 8.12. shows the lifting arrangements for the 120011360
pump shaft gland kept air tight. kW back pressure turbine discussed in Section 3.3. and attention is drawn
to the low weights of the principal components as shown on the figure.
8.10.3. Extraction Pumps
Condensate extraction pumps in common with other pump types re- 8.12.1. Lifting Casing
quire periodical examination to see that the gland, coupling bolts and nuts The extent of preliminary stripping necessary will vary with turbines
are in good condition; no other adjustment should normally be necessary. but typically may comprise removing steam stop valves, disconnecting trip
Mechanical seals are preferable but many packed glands are in use. The and drain pipes, also governor linkages. Casing lifting sling lengths may need
gland packing is sensitive, it should not be topped up or the top rings only adjustment to provide a level lift. After removing the horizontal casing joint
renewed but completely repacked when required to ensure the condensate bolts and fitting the graduated guide pillars jacking screws are manipulated
62 MARINE ENGINEERING PRACTICE MAINTENANCE AND OVERHAULING 63
to break the joint, tension being maintained on the lifting slings meantime. solids passing through the turbine are best left alone, but bruised edges may
When the joint is open about 3 mm (0'12 in), the top half of any labyrinth be lightly dressed, with a brass dolly supporting the edge while dressing.
glands should be proven clear of the casing and left on the rotor shaft, Chipped blade edges may also be lightly dressed with a smooth file to a fine
thereafter the casing should be lifted evenly on the guide pillars and finish to "round off" notches which could lead to stress concentrations and
traversed clear of the machine for landing. Before replacing the casing the ultimate fatigue failures. Erosion damage, caused by suspended moisture in
joint bolt threads may need easing and the cylinder jointing faces cleaned. the steam and which may be found on the outer half and back of the exhaust
end blades should be noted for reference but a considerable amount may
be tolerated because of adequate stress margins usually allowed for blading.
Item Description Estd weight If any cracks or looseness of blading is found the rotor should be removed
~J
A Turbine top cas;[)g 712 kg
B Gearbox cover 369 kg for expert remedial attention.
C Pinion shaft 37 kg
di
D Turbmerotor 153 kg
E Gearwheel shaft 305 kg 8.12.3. Lifting Rotor
F stop valve 204 kg
G Governor and
Before attempting to lift the rotor the drawings should be checked to
ma;[) 01/ pump ! 02 kg ascertain which, if any, internal attachments need to be uncoupled to avoid
B. .
,
Lifts A,C and D occur over turbme damage. The turbine rotor / pinion shaft flexible coupling must be discon·
'==d''==='' ~c sh"ftc,ntr, nected after removing the gear case cover also bearing, packing and oil seal
top halves removed together with any other external restraints. Clearances
between the bottom half labyrinth packings and the rotor should be checked
using long feeler gauges. Lifting slings should be lightly tensioned and the
rotor pushed hard against the thrust surge face to check the thrust clearance.
Thereafter, the thrust-retaining ring with thrust pads should be removed
and the rotor lifted slowly and evenly to avoid bumping the blading and
nozzles.
8.12.4. Adjustments
After the rotor has been landed all cylinder interstage diaphragms may
be examined, the top half casing being reversed for access to the respective
'b
~
half diaphragms. The labyrinth packing segments should be checked for
!;: 1::1 ><
00 tl freedom of movement (see Section 8.7.1.) and diaphragm nozzles examined,
~c\J I::
also interstage drains at the bottom of the diaphragms and cylinder drains
E checked to ensure they have not been blocked by deposits. Rotor shaft
journals, thrust collar and surge faces should be examined; any scoring or
hard marks should be lightly stoned off, but if heavily scored regrinding
ashore will be required. Bearing clearances should be checked by com-
parison of bearing bore and shaft diameter readings taken by micrometer;
lead wire clearances must not, of course, be taken on these small important
bearings.
reported, and may call for an internal examination of the turbine and flex-
ible coupling. If the turbine should begin to vibrate when it is being run up
to speed, the cause may be temporary distortion of the rotor due to non-
uniform temperature distribution which, in excess, may lead to a rub
between the rotor spindle and the gland fins. The machine should be stopped
immediately, thereafter slowly started and allowed to run for about ten
minutes at about 20 per cent normal speed before being gradually brought
up to full speed.
9.2. VIBRATION
Any increase in vibration observed when the turbo-generator is on load
may be due to earlier maltreatment, which may not have been observed or
66
10. THE FUTURE
REFERENCES
1. CEGB. 1971. "Modern Power Station Practice". Vol. 3. "Turbines and
Auxiliary Equipment", 2nd edn. Pergammon Press, Oxford.
2. Harrington, R. 1972. "Marine Engineering". SNAME, New York.
3. MOD (N). 1971. Vol 1, 1962 Vol. II. "Naval Marine Engineering'
Practice". BR 3003. HMSO, London.
4. Kearton, W.J. 1964. "Steam Turbine Operation", 7th edn. Pitman
Press, London.
5. BSRA Report. N.S.214. "Shipboard Evaluation of a Condenser Unit".
6. Sohre, J.S. 1970. "You Can Predict Reliability of Turbo-machinery."
Hydrocarbon Processing. Vol. 49, p.100.
7. Mann, J.W. 1969. "MST 14, a Prototype for a Marine Steam Propulsion
System". Proc. IMAS 1969. 4d, p.24.
8. Yamate, S. 1969. "A 36,000 shp Marine Steam Turbine with Main
Turbine-driven Machines". Proc. [MAS 1969. 4d, p.15.
68