0% found this document useful (0 votes)
196 views2 pages

SAN-CKL-04-04-07 Oxidation Ponds Checklist (Sewage Treatment)

The document provides a checklist for oxidation pond design and construction. It lists design considerations such as sizing ponds and channels based on flow rates and organic loading. It also lists items that should be included on construction drawings such as pond details, access roads, and fencing.

Uploaded by

shaunswanby
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
196 views2 pages

SAN-CKL-04-04-07 Oxidation Ponds Checklist (Sewage Treatment)

The document provides a checklist for oxidation pond design and construction. It lists design considerations such as sizing ponds and channels based on flow rates and organic loading. It also lists items that should be included on construction drawings such as pond details, access roads, and fencing.

Uploaded by

shaunswanby
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

SAN-CKL-04-04-07

OXIDATION PONDS CHECKLIST


(SEWAGE TREATMENT)

Project Name: Revision: A O


Project Code: Prepared By:
Project Leader
Drawing Number:
Authorisation:
Date:

YES NO N/A
1. DESIGN
1.1 Design Flow
Establish contributors
Any allowance for future?
Any point sources?
Assign daily demand
Calculate average daily flow
Assign organic loading
Calculate daily organic loading
Calculate effluent concentration
Look up average temperature in coldest month from the statistics
supplied by the weather bureau or other sources.

1.2 Calculations
Calculate pond volumes using method in CSIR technical guide
K69
Size grit channel using the method in “The Civil Engineer –
August 1971”
Size evapotranspiration area.

1.3 Other
Have you sent a soil sample for analysis? (Permeability)
Have you considered pond lining?
Have you considered wave protection?
Have you considered access road?
Have you installed a standpipe at grit channel?
Have you considered site lighting?
Have you considered fencing?
Have you considered chlorination?

2. DRAWINGS
2.1 Plan at 1:200 or 1:500 scale
Grids
North Arrow
Cadastral
Road names
Contours

Date:
Rev No. 05 Page: 1 of 2
October 2016
Ponds
Water levels
Access Road
Fence
Water supply pipe and label
Sewer inlet pipe and label
Typical section
Benching under fill
Setting out
Benchmarks
Notes
Pond data
Average daily flow (m³/day)
Primary pond volume (m³)
Secondary pond volume (m³)
Tertiary pond volume (m³)
Lei pond volume (m³)(if any)

2.2 Pond Details


Grit channel
Inter-pond inlets
Inter-pond outlets
Final outlet
Trash screen
Hand stops
Scum-board
Vee-notch
Standpipe
Sewer manhole

3. Architect/Engineer to sign A3 construction drawing

Date:
Rev No. 05 Page: 2 of 2