Offset Air From Corridor: Exhaust Duct General Exhaust Hood Exhaust Branch To Lab
Offset Air From Corridor: Exhaust Duct General Exhaust Hood Exhaust Branch To Lab
UP
300X400
VD VD
1000X550 1000X500
VAV
VD
350X350
300X350
VAV
VAV
1000X300
VD
500X450
500X450
VD
VD
500X450
VD
VD
600X350
VAV
500X400
650X300
VD
VD
VD
VD
VAV
VD
VAV
600X450
VAV 300X400
VD VD
VD
600X500
VD
VD
VD 300X400 VAV
VD
300X200 300X350 VD VAV 300X400
VD VD
VD
600X550
UP
300X200
VD
VD
200X300
VD
600X550
VD
VD
VAV
EXHAUST DUCT
950X550
500X400 HOOD EXHAUST GENERAL EXHAUST
VD
VD
150X150
BRANCH TO LAB
F.A 60 CFM
950X550
VAV
VAV
200X300
60000 BTU/H
DX-CON-02
VD VD 150X100
UP 550X350 350X350
F.A 440 CFM DX-CON-01
VD 36000 BTU/H
400X350
950X550
300X250 VD
950X550
VD
F.A 60 CFM
FUME HOOD
VD
VD AIR FLOW CONTROL PANEL
FD
400X350
350X350
PAC-02
VAV
VD
VAV
VD
950X550
FD
AIR FLOW CONTROL PANEL
350X350 EX-04
600X350 FD
VD
VD offset air from corridor SUPPLY BRANCH TO LAB
950X550 PAC-01
EF-01
VD
VAV
250X350 200X350
FD VD VD SD
VD LAB ROOM SPACE
VAV
550X350
VD
300X250
200X350
75 CFM
150X100 150X100 75 CFM
200X300
200X300
FD
DX-CON-01 SUPPLY DUCT
75 CFM 36000 BTU/H
EX-03
350X350 400X250
600X350
EX-05 EX-02
100 CFM
UP
NOTES
FD FD
200X100 150X100
1-FUME HOOD SHALL BE LOCATED ACCORDING TO DEMAND AND RECOMMENDATION
400X250
OF EACH LAB SPACE AND ALSO IF EXHAUST CAN CONNECTED TO GENERAL EXHAUST
DUCT OR SHALL BE SEPARATE EXHAUSTED
VAV
UP UP
DRAWING TITLE
DRAWING NO.