Time Sheet For Work On Site: Working Hours Work Description Remarks From To

Surendran M worked on an energy plant project in Haryana, India from November 21st to December 5th. He traveled to the site and performed testing on equipment like transformers, circuit breakers, alternators, and relays. He also conducted cable hipot tests and generator stability tests. Surendran prepared reports on his work and submitted his final report on December 1st before returning home.

Uploaded by

sathish
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
16 views1 page

Time Sheet For Work On Site: Working Hours Work Description Remarks From To

Surendran M worked on an energy plant project in Haryana, India from November 21st to December 5th. He traveled to the site and performed testing on equipment like transformers, circuit breakers, alternators, and relays. He also conducted cable hipot tests and generator stability tests. Surendran prepared reports on his work and submitted his final report on December 1st before returning home.

Uploaded by

sathish
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

TIME SHEET FOR WORK ON SITE

LOCATION Haryana
PROJECT Energy Plant
DATE 21-Nov-21
REPRESENTATIVES SURENDRAN M

WORKING HOURS
Date From To
WORK DESCRIPTION Remarks

21-Nov-21 Reached s Guest house & Reported Train Cancelled due to Rain

22-Nov-21 went to Office for site preparation Train ticket booked for next day

23-Nov-21 Departed form chennai towards Delhi

24-Nov-21 traveling towards delhi

25-Nov-21 reached site & reported at site

LA SC PT& CT Panel ( 2 set PT+ 2 set CT ) , NGR ,NGR


26-Nov-21 8.00am 7.00pm
isolator,NGR CT testing

Alternator, Alternator CT , AVR transformer, HT Panel ( CT ,


27-Nov-21 8.00am 6.00pm
PT ,Breaker) testing

28-Nov-21 Report preparation

Scheme check on AVR, Relay Panel, Meter & syn Panel, HT


29-Nov-21 9.00am 6.00pm
panel

30-Nov-21 9.00am 6.00pm functional checks on AVR , NGR , HT panel, Report preparation

Report preparation, final correction, Report signing &


1-Dec-21 9.00am 6.00pm
submittion

2-Dec-21 9.00am 7.00pm 19nos Cable Hipot Test done

Generator stability test not done because Relay team have


3-Dec-21 9.00am 6.00pm Report prepartion, GPR 1 Relay testing
been working on Generator Protection

Generator stability test not done because Relay team have


4-Dec-21 9.00am 6.00pm GPR 2 Relay testing,
been working on Generator Protection

5-Dec-21 9.00am 9.00pm Stabilty test, Primary Injection test

NAME SURENDRAN

DESIGNATION T&C Engineer Site Engineer Electrical Engineer Electrical Engineer

SIGNATURE

DATE

Page 1 of 1

You might also like