PID Check List
PID Check List
Sno Category
1 G
2 G
3 G
4 G
5 G/P
6 G
7 P
8 P
9 PR/P
10 PR/P
11 PR
12 IPR
13 PR
14 IPR
15 IPR
16 IPR
17 IPR
18 PR
19 PR
20 PR
21 PR
22 G
23 G
24 G
25 P
Checklist for P&ID Review
G-General
PR-Process(Mech/Elec/Inst./Piping)
P-Piping
PR/P- Process and Piping
IPR-Instr. and Process
Desription
All P&IDs are available with index and document numbers as per index sheet
Symbols and References– this to be referred against the project symbols. Otherwise, vendor standard symbol to be listed for r
Legend P&ID cover information about all the line services, abbreviations, symbols, Piping/Instrumentation/Equipment (like sam
Tagging – this to be referred against the project tagging philosophy/
Compare with Process flow diagram(PFD)
Check revisions are cleared marked and consistent
Inlet and outlet design parameters – design pressure/ temperature; operating pressure/ temperature
Key equipment design parameters – design/ operating pressure; design/ operating temperature; material of construction, corr
Material selection of key components - this to be referred against the project material selection report/ P&ID are reviewed wi
Line sizing – this to be referred against the piping class for material and ratings
Valve sizes/Check type of valve required in line and valve position and condition etc.
Valves position during operation or failure
Check manual valves with mechanical interlock & specified
Instrumentation– suitability for the selected parameters; ranges; alarm set points, trip set points
Upstream & Downstream straight length requirement for special fluid measurement devices. Such as Venturi Tubes, Flow Noz
Control panel interfaces – signals to/ from main control room and field instruments; hardwired signals; serial linked signals
Control loops between the instruments and equipment
Pressure relief valves sizes/ Check Reducer provision for control valves, PSVs, Equipment Nozzles
Check Strainers details(type, orientation)
Tracing / Heating requirements for Pipes and Equipment
Review process vent and drain requirement/Process vents & drains on the P&IDs as per equipment requirement
Termination points/ Scope breaks identified (like Company/Vendor/Instrumentation/ existing /new project scope others if any
Notes describing project requirements, exceptions or operational points.
Consistency between documents such as instrument index, control philosophy, line list sizing calculations to be reviewed as w
Piping /Ducting Specifications and class