Field Inspection and Test Record Transformer Protection Relay Test

This document summarizes the results of a field inspection and test of a transformer protection relay. Key details include: 1) Tests were conducted on a Siemens 7UT61215EB921BA0--0G relay located at a 115kV substation. 2) Measurements of current injection levels matched expected values on both the 115kV and 22kV sides to within tolerance. 3) Differential element pickup values and operating times were confirmed to be within tolerance during testing.
Copyright
© © All Rights Reserved
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
87 views

Field Inspection and Test Record Transformer Protection Relay Test

This document summarizes the results of a field inspection and test of a transformer protection relay. Key details include: 1) Tests were conducted on a Siemens 7UT61215EB921BA0--0G relay located at a 115kV substation. 2) Measurements of current injection levels matched expected values on both the 115kV and 22kV sides to within tolerance. 3) Differential element pickup values and operating times were confirmed to be within tolerance during testing.
Copyright
© © All Rights Reserved
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 30

FIELD INSPECTION AND TEST RECORD

TRANSFORMER PROTECTION RELAY TEST


Project Name : 115/22kV GIS SUBSTATION Contract no. : L1753/2561 Report No. : ISP1803-T-RY-115-001-2019

Costomer : CPRAM CO., LTD. Location : 115kV TCPP1 Date : 28/6/2019

TECHNICAL DATA
Manufacture SIEMENS
Type 7UT61215EB921BA0--0G
Serial No. BF1811509960

1. VISUAL CHECK Checked


1.1 Check relay undamaged 4

1.2 Check relay case earthen 4

2. POWER SYSTEM DATA 1


- Rated Frequency 50 - CT Rated Pri. Current Side 1 200 A
- Phase Sequence L1,L2,L3 - CT Rated Sec. Current Side 1 1 A
- Rated Primary Voltage Side 1 115 kV - CT Rated Pri. Current Side 2 1000 A
- Rated Primary Voltage Side 2 22 kV - CT Rated Sec. Current Side 2 1 A
- Rated App. Power of Transformer 30 MVA
- Vector Group of Transformer Dyn1

3. MEASUREMENT
Injected Side 1, 1 A 3Phase Injected Side 2,1 A 3Phase
Display Unit
Should be As found Should be As found
L1 Side 1 200 201.0 0 0 A
L2 Side 1 200 200.0 0 0 A
L3 Side 1 200 201.0 0 0 A
L1 Side 2 0 0 1000 1000 A
L2 Side 2 0 0 1000 1000 A
L3 Side 2 0 0 1000 1000 A
I diff. L1 1.328 1.33 1.270 1.27 I / InO
I diff. L2 1.328 1.33 1.270 1.27 I / InO
I diff. L3 1.328 1.33 1.270 1.27 I / InO
I rest. L1 1.328 1.34 1.270 1.27 I / InO
I rest. L2 1.328 1.33 1.270 1.28 I / InO
I rest. L3 1.328 1.34 1.270 1.27 I / InO
*Current tolerance is 1% of measured value or 1% Inom
*Differential tolerance is 2% of measured value or 2% Inom

WITNESSED BY
RESPONSIBILITY TESTED BY CHECKED BY WITNESSED BY
APPROVED BY

Company DEMCO PCL. DEMCO PCL. CPRAM CO., LTD. PEA

Page 1 of 30 QCF-021.2
FIELD INSPECTION AND TEST RECORD

TRANSFORMER PROTECTION RELAY TEST


Project Name : 115/22kV GIS SUBSTATION Contract no. : L1753/2561 Report No. : ISP1803-T-RY-115-001-2019

Costomer : CPRAM CO., LTD. Location : 115kV TCPP1 Date : 28/6/2019

Name Mr.Somnuek S.

Signature

Date 28 June 2019

4. DIFFERENTIAL PROTECTION
Setting : 87- Pickup Value of Diff. Curr. = 0.30 I/InO

87- T I-DIFF> Time Delay = 0.00 sec

87- Pickup Value of High Set Trip = 6.0 I/InO

87- T I-DIFF>> Time Delay = 0.00 sec

87- Slope 1 of Tripping Characteristic = 0.30


87- Base Point for Slope 1 of Charac. = 0.00 I/InO

87- Slope 2 of Tripping Characteristic = 0.70


87- Base Point for Slope 2 of Charac. = 2.50 I/InO

4.1 Differential Operating Current and Time Test ( I-DIFF> )


Differential current (A) Operating time at 2.0xI-DIFF> ( ms )
Injection
Should be Pick up Drop-off Should be As found
L1 Side 1 0.226 0.226 0.160 38.0 32.3
L2 side 1 0.226 0.225 0.160 38.0 32.1
L3 Side 1 0.226 0.227 0.160 38.0 32.8
L1-L2 Side 1 0.226 0.227 0.159 38.0 32.3
L2-L3 Side 1 0.226 0.227 0.160 38.0 33.1
L3-L1 Side 1 0.226 0.227 0.160 38.0 32.0
L1,2,3 Side 1 0.226 0.227 0.160 38.0 33.0
L1 Side 2 0.409 0.409 0.290 38.0 32.2
L2 side 2 0.409 0.411 0.289 38.0 30.4
L3 Side 2 0.409 0.412 0.289 38.0 32.1
L1-L2 Side 1 0.204 0.206 0.145 38.0 32.8
L2-L3 Side 1 0.204 0.206 0.144 38.0 35.0
L3-L1 Side 1 0.204 0.205 0.145 38.0 32.3
L1,2,3 Side 2 0.236 0.236 0.167 38.0 33.1
*Current tolerance is 5% of set value
*Drop-off to pickup ratio is approx. 0.7
*Time tolerance is 1% of set value or 10ms

Page 2 of 30 QCF-021.2
FIELD INSPECTION AND TEST RECORD

TRANSFORMER PROTECTION RELAY TEST


Project Name : 115/22kV GIS SUBSTATION Contract no. : L1753/2561 Report No. : ISP1803-T-RY-115-001-2019

Costomer : CPRAM CO., LTD. Location : 115kV TCPP1 Date : 28/6/2019

WITNESSED BY
RESPONSIBILITY TESTED BY CHECKED BY WITNESSED BY
APPROVED BY

Company DEMCO PCL. DEMCO PCL. CPRAM CO., LTD. PEA

Name Mr.Somnuek S.

Signature

Date 28 June 2019

4.2 OPERATING CHARACTERISTIC CHECK


Idiff. Operated ( I/Iref )
Irestrain (IR) As found
Should be
( I/Iref ) Phase A Phase B Phase C Phase AB Phase BC Phase CA Phase ABC
0.50 0.300 0.298 0.298 0.297 0.296 0.297 0.297 0.296
1.00 0.300 0.300 0.300 0.300 0.297 0.300 0.297 0.295
2.00 0.600 0.596 0.600 0.593 0.602 0.598 0.600 0.591
3.00 0.900 0.898 0.897 0.893 0.902 0.900 0.890 0.889
4.00 1.200 1.194 1.198 1.203 1.209 1.201 1.207 1.194
1.500 1.501 1.501 1.502
5.00
1.750 1.750 1.754 1.755 1.688
1.800 1.782 1.798 1.792
6.00
2.450 2.446 2.456 2.459 2.366
2.400 2.403 2.417 2.384
8.00
3.850 3.845 3.871 3.851 3.779
3.500 3.508 3.484 3.536
10.00
5.250 5.243 5.278 5.253 5.193
4.900 4.904 4.858 4.915
12.00
6.000 5.955 5.946 5.988 5.923
*Current tolerance is 5% of set value

Page 3 of 30 QCF-021.2
FIELD INSPECTION AND TEST RECORD

TRANSFORMER PROTECTION RELAY TEST


Project Name : 115/22kV GIS SUBSTATION Contract no. : L1753/2561 Report No. : ISP1803-T-RY-115-001-2019

Costomer : CPRAM CO., LTD. Location : 115kV TCPP1 Date : 28/6/2019

WITNESSED BY
RESPONSIBILITY TESTED BY CHECKED BY WITNESSED BY
APPROVED BY

Company DEMCO PCL. DEMCO PCL. CPRAM CO., LTD. PEA

Name Mr.Somnuek S.

Signature

Date 28 June 2019

5. REF EARTH FAULT PROTECTION


Setting : 87REF- Pickup Value IREF> = 0.50 I/InS

87REF- T I-REF> Time Delay = 0.00 sec

5.1 Operating Time Test


Differential current (A) Operating time at 2.0xI-DIFF> ( ms )
Injection
Should be Pickup Drop-off Should be As found
REF 0.437 0.438 0.307 40.0 31.4
*Current tolerance is 5% of set value

6. INRUSH STABILIZATION
Setting : Inrush with 2.Harmonic Restraint = Yes
2nd Harmonic Restraint = 15 %
Time for Cross-blocking 2nd Harm. = 3.0 Cycle
n-th Harmonic Restraint = 5th
n-th Harmonic Content in-Diff = 30 %
Time for Cross-blocking n-th Harm. = 0.0 Cycle
Limit Idiff Fmax of n-th Harm.Restraint = 1.5 I/In0

2nd Harmonic block (%) Check the relay operated by 2nd harmonic . Checked
Side W1
Should be As found The relay will be blocked all trip signal P
IA 15.00 13.96
IB 15.00 14.53
IC 15.00 14.87
IABC 15.00 14.62

5th Harmonic block (%) Check the relay operated by 5th harmonic . Checked
Side W1
Should be As found The relay will be blocked all trip signal P
IA 30.00 28.48
IB 30.00 29.84
IC 30.00 30.01
IABC 30.00 31.98

Page 4 of 30 QCF-021.2
FIELD INSPECTION AND TEST RECORD

TRANSFORMER PROTECTION RELAY TEST


Project Name : 115/22kV GIS SUBSTATION Contract no. : L1753/2561 Report No. : ISP1803-T-RY-115-001-2019

Costomer : CPRAM CO., LTD. Location : 115kV TCPP1 Date : 28/6/2019

WITNESSED BY
RESPONSIBILITY TESTED BY CHECKED BY WITNESSED BY
APPROVED BY

Company DEMCO PCL. DEMCO PCL. CPRAM CO., LTD. PEA

Name Mr.Somnuek S.

Signature

Date 28 June 2019

7. INPUTS / OUTPUTS CONTACT AND LEDs CHECK


7.1 Binary inputs check Checked
BI1 N/A
BI2 N/A
BI3 N/A

7.2 Binary outputs check Checked


BO1 87T Initiate K86T1 P
BO2 87REF Initiate K86T1 P
BO3 87T to ANN. P
BO4 87REF to ANN. P

7.3 LEDs check Checked


LED1 Diff TRIP P
LED2 Diff TRIP L1 P
LED3 Diff TRIP L2 P
LED4 Diff TRIP L3 P
LED5 REF TRIP P
LED6 Diff 2nd Harmonic P
LED7 Diff 5th Harmonic P

Page 5 of 30 QCF-021.2
FIELD INSPECTION AND TEST RECORD

TRANSFORMER PROTECTION RELAY TEST


Project Name : 115/22kV GIS SUBSTATION Contract no. : L1753/2561 Report No. : ISP1803-T-RY-115-001-2019

Costomer : CPRAM CO., LTD. Location : 115kV TCPP1 Date : 28/6/2019

References to used instruments

Type : Universal Relay Testing Omicron CMC 256plus Serial no. : QF482R

WITNESSED BY
RESPONSIBILITY TESTED BY CHECKED BY WITNESSED BY
APPROVED BY

Company DEMCO PCL. DEMCO PCL. CPRAM CO., LTD. PEA

Name Mr.Somnuek S.

Signature

Date 28 June 2019

Page 6 of 30 QCF-021.2
FIELD INSPECTION AND TEST RECORD

OVERCURRENT PROTECTION RELAY TEST


Project Name : 115/22kV GIS SUBSTATION Contract no. : L1753/2561 Report No. : ISP1803-T-RY-115-001-2019

Costomer : CPRAM CO., LTD. Location : 115kV TCPP1 Date : 28/6/2019

TECHNICAL DATA
Manufacture SIEMENS
Type 7SJ80415EB961FB0--0G
Serial No. BF1811510151

1. VISUAL CHECK Checked


1.1 Check relay undamaged 4

1.2 Check relay case earthen 4

2. CONFIGURATION OF THE SCOPE OF FUNCTIONS


Power System Data 1
Rated frequency = 50 Hz VT Rated primary = 115000 V
Phase sequence = L1 L2 L3 VT Rated secondary = 115 V
CT Rated primary current = 200 A
CT Rated secondary current = 1 A
IE-CT Rated primary current = 200 A
IE-CT Rated secondary current = 1 A

3. MEASUREMENT
Injected 1 A, 115 VL-L 3Phase 50Hz
Display Unit
Should be As found
IL1 200 201 A
IL2 200 201 A
IL3 200 201 A
UL1 66.40 67 kV
UL2 66.40 67 kV
UL3 66.40 67 kV
UL12 115.00 116 kV
UL23 115.00 116 kV
UL31 115.00 116 kV
F 50.00 50.0 Hz
*Current tolerance is 1.5% of measured value or 1% Inom
*Voltage tolerance is 1.5% of measured value or 0.5% Vnom
*Frequency tolerance is 20 mHz

WITNESSED BY
RESPONSIBILITY TESTED BY CHECKED BY WITNESSED BY
APPROVED BY

Company DEMCO PCL. DEMCO PCL. CPRAM CO., LTD. PEA

Page 7 of 30 QCF-021.2
FIELD INSPECTION AND TEST RECORD

OVERCURRENT PROTECTION RELAY TEST


Project Name : 115/22kV GIS SUBSTATION Contract no. : L1753/2561 Report No. : ISP1803-T-RY-115-001-2019

Costomer : CPRAM CO., LTD. Location : 115kV TCPP1 Date : 28/6/2019

Name Mr.Somnuek S.

Signature

Date 28 June 2019

4. OVERCURRENT PROTECTION ( 50/50N, 51/51N )


Setting : Ip Pick up = 1.25 A IEp Pick up ( 51N ) = 0.38 A
T Ip Time dial = 0.23 T IEp Time dial = 0.44
Time curve = Normal Inverse Time curve = Normal Inverse
I> Pick up = 7.38 A IE> Pick up = 2.25 A
T I> Time delay = 0.00 s T IE> Time delay = 0.05 s

4.1 Operating Current Test


Operating current (A)
Function Should be Phase A-B Phase B-C Phase C-A Earth
Pickup Drop-off Pickup Drop-off Pickup Drop-off Pickup Drop-off Pickup Drop-off

Ip 1.375 1.306 1.366 1.296 1.365 1.294 1.364 1.295

I> 7.380 7.011 7.34 6.95 7.34 6.96 7.34 6.96


IEp 0.418 0.397 0.411 0.391
IE> 2.250 2.138 2.238 2.123
*Current tolerance is 3% of set value or 75mA
*Drop-off to pickup ratio is approx. 0.95

4.2 Operating Time Test


Injected Operating Time ( s )
Function Should be
Current (A) Phase A-B Phase B-C Phase C-A Earth

1.5 x Is 3.955 3.916 3.916 3.916


Ip 2.0 x Is 2.307 2.295 2.305 2.305
3.0 x Is 1.449 1.455 1.454 1.454
1.5 x Is 0.000 0.034 0.034 0.034
I>
2.0 x Is 0.000 0.034 0.034 0.034
2.0 x Is 4.413 4.387
IEp 3.0 x Is 2.773 2.766
4.0 x Is 2.191 2.186
1.5 x Is 0.050 0.079
IE>
2.0 x Is 0.050 0.082
*Time tolerance is 5% of set value or 50ms

Page 8 of 30 QCF-021.2
FIELD INSPECTION AND TEST RECORD

OVERCURRENT PROTECTION RELAY TEST


Project Name : 115/22kV GIS SUBSTATION Contract no. : L1753/2561 Report No. : ISP1803-T-RY-115-001-2019

Costomer : CPRAM CO., LTD. Location : 115kV TCPP1 Date : 28/6/2019

WITNESSED BY
RESPONSIBILITY TESTED BY CHECKED BY WITNESSED BY
APPROVED BY

Company DEMCO PCL. DEMCO PCL. CPRAM CO., LTD. PEA

Name Mr.Somnuek S.

Signature

Date 28 June 2019

5. VOLTAGE PROTECTION ( 27 , 59 )
Setting : 27-1 Flexible Function 01 = ON 59-1 Flexible Function 03 = ON
27-1 Pickup Threshold = 92.0 V 59-1 Pickup Threshold = 126.5 V
27-1 Trip Time Delay = 5.0 s 59-1 Trip Time Delay = 5.0 s
27-1 Dropout ratio = 1.01 59-1 Dropout ratio = 0.99
27-2 Flexible Function 02 = ON 59-2 Flexible Function 04 = ON
27-2 Pickup Threshold = 80.5 V 59-2 Pickup Threshold = 138.0 V
27-2 Trip Time Delay = 1.0 s 59-2 Trip Time Delay = 1.0 s
27-2 Dropout ratio = 1.01 59-2 Dropout ratio = 0.99

5.1 Operating Voltage Test


Operating Voltage Ph-N (V)
Function Should be Phase A Phase B Phase C
Pickup Drop-off Pickup Drop-off Pickup Drop-off Pickup Drop-off

Flx01 53.12 53.65 52.75 53.62 52.79 53.69 52.81 53.66


Flx02 46.48 46.94 46.16 47.06 46.17 47.05 46.17 47.00
Flx03 73.04 72.31 72.51 71.66 72.47 71.68 72.42 71.65
Flx04 79.68 78.88 79.08 78.30 79.06 78.27 79.11 78.25
*Voltage tolerance is 3% of set value or 1V

5.2 Operating Time Test


Injected Operating Time ( s )
Function
Current (A) Should be Phase A Phase B Phase C

Flx01 0.95 x Vs 5.000 5.040 5.033 5.033


Flx02 0.95 x Vs 1.000 1.032 1.042 1.032
Flx03 1.05 x Vs 5.000 5.028 5.033 5.033
Flx04 1.05 x Vs 1.000 1.031 1.033 1.031
*Time tolerance is 1% of set value or 10ms

Page 9 of 30 QCF-021.2
FIELD INSPECTION AND TEST RECORD

OVERCURRENT PROTECTION RELAY TEST


Project Name : 115/22kV GIS SUBSTATION Contract no. : L1753/2561 Report No. : ISP1803-T-RY-115-001-2019

Costomer : CPRAM CO., LTD. Location : 115kV TCPP1 Date : 28/6/2019

WITNESSED BY
RESPONSIBILITY TESTED BY CHECKED BY WITNESSED BY
APPROVED BY

Company DEMCO PCL. DEMCO PCL. CPRAM CO., LTD. PEA

Name Mr.Somnuek S.

Signature

Date 28 June 2019

6. POWER OFF PROTECTION ( 27 )


Setting : Undervoltage prot. = ON
U< Pick up (ph-ph) = 23.0 V
U< Time delay = 5.0 s

6.1 Operating Voltage Test


Operating Voltage Ph-Ph (V)
Function Should be Phase A-B Phase B-C Phase C-A
Pickup Drop-off Pickup Drop-off Pickup Drop-off Pickup Drop-off

U< 23.00 23.23 22.81 23.69 22.87 23.79 22.84 23.74


*Voltage tolerance is 3% of set value or 1V

6.2 Operating Time Test


Injected Operating Time ( s )
Function
Current (A) Should be Phase A-B Phase B-C Phase C-A
U< 0.95 x Vs 5.000 5.034 5.050 5.030
*Time tolerance is 1% of set value or 10ms

7. BREAKER FAILURE PROTECTION ( 50BF )


Setting : Breaker Failure Protection = ON
Pick-up threshold I> = 0.38 A
TRIP-Timer = 0.25 s

7.1 Operating Current Test


Operating current (A)
Function Should be Phase A Phase B Phase C
Pickup Drop-off Pickup Drop-off Pickup Drop-off Pickup Drop-off

I> 0.380 0.342 0.373 0.344 0.375 0.344 0.375 0.344

7.2 Operating Time Test


Operating Time ( s )
Function
Should be As found
50BF (Int.) 0.250 0.245

Page 10 of 30 QCF-021.2
FIELD INSPECTION AND TEST RECORD

OVERCURRENT PROTECTION RELAY TEST


Project Name : 115/22kV GIS SUBSTATION Contract no. : L1753/2561 Report No. : ISP1803-T-RY-115-001-2019

Costomer : CPRAM CO., LTD. Location : 115kV TCPP1 Date : 28/6/2019

50BF (Ext.) 0.250 0.275

WITNESSED BY
RESPONSIBILITY TESTED BY CHECKED BY WITNESSED BY
APPROVED BY

Company DEMCO PCL. DEMCO PCL. CPRAM CO., LTD. PEA

Name Mr.Somnuek S.

Signature

Date 28 June 2019

8. INPUTS / OUTPUTS CONTACT AND LEDs CHECK


8.1 Binary inputs check Checked
BI1 Initiate 50BF P
BI2 N/A
BI3 N/A
BI4 N/A
BI5 N/A
BI6 N/A
BI7 N/A

8.2 Binary outputs check Checked


BO1 O/C TRIP to K86T1 P
BO2 N/A
BO3 O/C TRIP to ANN. P
BO4 50BF TRIP to ANN. P
BO5 Power OFF TRIP to trip coil 1 P
BO6 Power OFF TRIP to trip coil 2 P
BO7 Power OFF TRIP to ANN. N/A
BO8 N/A

8.3 LEDs check Checked


LED1 O/C Ph L1 PU P
LED2 O/C Ph L2 PU P
LED3 O/C Ph L3 PU P
LED4 O/C Earth PU P
LED5 O/C Time Trip P
LED6 O/C Inst. Trip P
LED7 50BF Operated P
LED8 27/59 Alarm or Trip P

Page 11 of 30 QCF-021.2
FIELD INSPECTION AND TEST RECORD

OVERCURRENT PROTECTION RELAY TEST


Project Name : 115/22kV GIS SUBSTATION Contract no. : L1753/2561 Report No. : ISP1803-T-RY-115-001-2019

Costomer : CPRAM CO., LTD. Location : 115kV TCPP1 Date : 28/6/2019

References to used instruments

Type : Universal Relay Testing Omicron CMC 256plus Serial no. : QF482R

WITNESSED BY
RESPONSIBILITY TESTED BY CHECKED BY WITNESSED BY
APPROVED BY

Company DEMCO PCL. DEMCO PCL. CPRAM CO., LTD. PEA

Name Mr.Somnuek S.

Signature

Date 28 June 2019

Page 12 of 30 QCF-021.2
FIELD INSPECTION AND TEST RECORD

AUTOMATIC VOLTAGE REGULATOR


Project Name : 115/22kV GIS SUBSTATION Contract no. : L1753/2561 Report No. : ISP1803-T-RY-115-001-2019

Costomer : CPRAM CO., LTD. Location : 115kV TCPP1 Date : 28/6/2019

TECHNICAL DATA
Manufacture MR
Type TAPCON 230 BASIC
Rated voltage Un 0 - 170
Rated frequency fn 50
Serial No. 1953799

1. VISUAL CHECK Checked


1.1 Check relay undamaged 4

1.2 Check relay case earthen 4

2. RELAY SETTING
VT Setting : Parameter Setting :

Primary voltage = 22.0 kV Delay time T1 = 40


Secondary voltage = 110.0 V T1 Mode = Linear
Delay time T2 = 10 s

Parameter Setting : Overvoltage U> = 110 %


DES. Voltage SW1 = 22.0 kV Undervoltage U< = 80 %
Bandwidth = 1.3 % Overcurrent I> = - %

3. METERING CHECK
Va-b 110 V 50 Hz
Display Unit
Shouled be Relay Reading
U actual 22.00 22.03 kV
U REF 22.00 22.00 kV
dU 0.0 0.13 %
F 50.0 50.0 Hz

WITNESSED BY
RESPONSIBILITY TESTED BY CHECKED BY WITNESSED BY
APPROVED BY

Company DEMCO PCL. DEMCO PCL. CPRAM CO., LTD. PEA

Page 13 of 30 QCF-021.2
FIELD INSPECTION AND TEST RECORD

AUTOMATIC VOLTAGE REGULATOR


Project Name : 115/22kV GIS SUBSTATION Contract no. : L1753/2561 Report No. : ISP1803-T-RY-115-001-2019

Costomer : CPRAM CO., LTD. Location : 115kV TCPP1 Date : 28/6/2019

Name Mr.Somnuek S.

Signature

Date 28 June 2019

4. VOLTAGE REGULATION
4.1 VOLTAGE REGULATION TEST
Should be Relay Operated (V)
Function
(V) Pick up Drop off
Raise 108.57 108.3 108.6
Low 111.43 111.4 111.2

4.2 OPERATING TIME TEST


Delay time T1 Operating time (s)
Inject voltage ( V )
T1 Mode Operation Should be As found
-2x%BW (107.1) 40 41.85
Raise
Linear -4x%BW (104.8) 40 41.11
t = 40 s 2x%BW (112.9) 40 41.58
Low
4x%BW (115.2) 40 41.43
Delay time T2 Operating time (s)
Inject voltage ( V )
T2 Operation Should be As found
-2x%BW (107.1) 10 10.05
Raise
-4x%BW (104.8) 10 10.36
t = 10 s
2x%BW (112.9) 10 10.20
Low
4x%BW (115.2) 10 10.23

4.3 VOLTAGE DETECTION CHECK


Should be Relay Operated (V)
Function
(V) Pick up Drop off
U> 121.0 121.1 120.5
U< 88.0 87.63 88.19

Page 14 of 30 QCF-021.2
FIELD INSPECTION AND TEST RECORD

AUTOMATIC VOLTAGE REGULATOR


Project Name : 115/22kV GIS SUBSTATION Contract no. : L1753/2561 Report No. : ISP1803-T-RY-115-001-2019

Costomer : CPRAM CO., LTD. Location : 115kV TCPP1 Date : 28/6/2019

WITNESSED BY
RESPONSIBILITY TESTED BY CHECKED BY WITNESSED BY
APPROVED BY

Company DEMCO PCL. DEMCO PCL. CPRAM CO., LTD. PEA

Name Mr.Somnuek S.

Signature

Date 28 June 2019

5. INPUTS,OUTPUTS AND LED CHECK


l Inputs check Checked l Outputs check Checked l LED check Checked
- Manual control mode P - Raise P - LED Healthy P
- Auto control mode P - Low P - LED I> N/A
- Raise P - Man/Auto control mode N/A - LED <U P
- Low P - Failure P - LED >U P
- GPI1 N/A - U<,U>,I> P - LED Parallel N/A
- GPI2 N/A - Mornitoring N/A - LED Norm set N/A
- GPI3 N/A - GPO1 N/A - LED 1 N/A
- GPI4 N/A - GPO2 N/A - LED 2 N/A
- GPI5 N/A - LED 3 N/A
- GPI6 N/A - LED 4 N/A

l Keypad checked 4

Page 15 of 30 QCF-021.2
FIELD INSPECTION AND TEST RECORD

AUTOMATIC VOLTAGE REGULATOR


Project Name : 115/22kV GIS SUBSTATION Contract no. : L1753/2561 Report No. : ISP1803-T-RY-115-001-2019

Costomer : CPRAM CO., LTD. Location : 115kV TCPP1 Date : 28/6/2019

References to used instruments

Type : Universal Relay Testing Omicron CMC 256plus Serial no. : QF482R

WITNESSED BY
RESPONSIBILITY TESTED BY CHECKED BY WITNESSED BY
APPROVED BY

Company DEMCO PCL. DEMCO PCL. CPRAM CO., LTD. PEA

Name Mr.Somnuek S.

Signature
Date 28 June 2019

Page 16 of 30 QCF-021.2
FIELD INSPECTION AND TEST RECORD

OVERCURRENT PROTECTION RELAY TEST


Project Name : 115/22kV GIS SUBSTATION Contract no. : L1753/2561 Report No. : ISP1803-T-RY-22-001-2019

Costomer : CPRAM CO., LTD. Location : 22kV SWG. INC1 Date : 27/6/2019

TECHNICAL DATA
Manufacture SIEMENS
Type 7SJ82 (P1J82332)
Serial No. BM1811009392

1. VISUAL CHECK Checked


1.1 Check relay undamaged 4

1.2 Check relay case earthen 4

2. CONFIGURATION OF THE SCOPE OF FUNCTIONS


Power System Data 1
Rated frequency = 50 Hz VT Rated primary = 22000 V
Phase sequence = L1 L2 L3 VT Rated secondary = 110 V
CT Rated primary current = 1000 A
CT Rated secondary current = 1 A
IE-CT Rated primary current = 1000 A
IE-CT Rated secondary current = 1 A

3. MEASUREMENT
Injected 1 A, 110 VL-L 3Phase 50Hz
Display Unit
Should be As found
IL1 1000 1000 A
IL2 1000 1000 A
IL3 1000 1001 A
UL1 12.70 12.697 kV
UL2 12.70 12.693 kV
UL3 12.70 12.705 kV
UL12 22.00 21.998 kV
UL23 22.00 22.009 kV
UL31 22.00 22.000 kV
F 50.00 50.00 Hz
*Current tolerance is 0.1% of measured value
*Voltage tolerance is 0.1% of measured value
*Frequency tolerance is 20 mHz

WITNESSED BY
RESPONSIBILITY TESTED BY CHECKED BY WITNESSED BY
APPROVED BY

Company DEMCO PCL. DEMCO PCL. CPRAM CO., LTD. PEA

Page 17 of 30 QCF-021.2
FIELD INSPECTION AND TEST RECORD

OVERCURRENT PROTECTION RELAY TEST


Project Name : 115/22kV GIS SUBSTATION Contract no. : L1753/2561 Report No. : ISP1803-T-RY-22-001-2019

Costomer : CPRAM CO., LTD. Location : 22kV SWG. INC1 Date : 27/6/2019

Name Mr.Somnuek S.

Signature

Date 27 June 2019

4. OVERCURRENT PROTECTION ( 50/50N, 51/51N )


Setting : Ip Pick up = 0.86 A IEp Pick up ( 51N ) = 0.26 A
T Ip Time dial = 0.18 T IEp Time dial = 0.27
Time curve = Normal Inverse Time curve = Normal Inverse
I> Pick up = 4.30 A IE> Pick up = 1.82 A
T I> Time delay = 0.30 s T IE> Time delay = 0.30 s

4.1 Operating Current Test


Operating current (A)
Function Should be Phase A Phase B Phase C Earth
Pickup Drop-off Pickup Drop-off Pickup Drop-off Pickup Drop-off Pickup Drop-off

Ip 0.946 0.899 0.947 0.899 0.947 0.898 0.946 0.898

I> 4.300 4.085 4.301 4.085 4.300 4.084 4.301 4.085


IEp 0.286 0.272 0.285 0.270
IE> 1.820 1.729 1.821 1.728
*Current tolerance is 3% of set value or 75mA
*Drop-off to pickup ratio is approx. 0.95

4.2 Operating Time Test


Injected Operating Time ( s )
Function Should be
Current (A) Phase A-B Phase B-C Phase C-A Earth

2.0 x Is 1.805 1.834 1.826 1.830


Ip 3.0 x Is 1.134 1.162 1.163 1.162
4.0 x Is 0.896 0.924 0.928 0.926
1.5 x Is 0.300 0.333 0.328 0.328
I>
3.0 x Is 0.300 0.332 0.330 0.329
2.0 x Is 2.708 2.715
IEp 3.0 x Is 1.702 1.710
4.0 x Is 1.345 1.358
1.5 x Is 0.300 0.330
IE>
2.0 x Is 0.300 0.337
*Time tolerance is 5% of set value or 50ms

Page 18 of 30 QCF-021.2
FIELD INSPECTION AND TEST RECORD

OVERCURRENT PROTECTION RELAY TEST


Project Name : 115/22kV GIS SUBSTATION Contract no. : L1753/2561 Report No. : ISP1803-T-RY-22-001-2019

Costomer : CPRAM CO., LTD. Location : 22kV SWG. INC1 Date : 27/6/2019

WITNESSED BY
RESPONSIBILITY TESTED BY CHECKED BY WITNESSED BY
APPROVED BY

Company DEMCO PCL. DEMCO PCL. CPRAM CO., LTD. PEA

Name Mr.Somnuek S.

Signature

Date 27 June 2019

5. VOLTAGE PROTECTION ( 27 , 59 )
Setting : 27-1 Measured value = phase-to-ground 59-1 Measured value = phase-to-ground
27-1 Threshold = 50.800 V 59-1 Threshold = 69.850 V
27-1 Dropout ratio = 1.01 59-1 Dropout ratio = 0.99
27-1 Operate delay = 5.00 s 59-1 Operate delay = 5.00 s
27-2 Measured value = phase-to-ground 59-2 Measured value = phase-to-ground
27-2 Threshold = 44.450 V 59-2 Threshold = 76.200 V
27-2 Dropout ratio = 1.01 59-2 Dropout ratio = 0.99
27-2 Operate delay = 1.00 s 59-2 Operate delay = 1.00 s

5.1 Operating Voltage Test


Operating Voltage Ph-N (V)
Function Should be Phase A Phase B Phase C
Pickup Drop-off Pickup Drop-off Pickup Drop-off Pickup Drop-off

27-1 50.80 51.31 50.81 51.34 50.81 51.34 50.80 51.34


27-2 44.45 44.89 44.46 44.92 44.46 44.92 44.45 44.91
59-1 69.85 69.15 69.88 69.17 69.88 69.17 69.87 69.16
59-2 76.20 75.44 76.24 75.46 76.24 75.46 76.23 75.45
*Voltage tolerance is 3% of set value or 1V

5.2 Operating Time Test


Injected Operating Time ( s )
Function
Current (A) Should be Phase A Phase B Phase C

27-1 0.95 x Vs 5.000 5.026 5.020 5.020


27-2 0.95 x Vs 1.000 1.030 1.031 1.030
59-1 1.05 x Vs 5.000 5.019 5.020 5.020
59-2 1.05 x Vs 1.000 1.030 1.030 1.030
*Time tolerance is 1% of set value or 10ms

Page 19 of 30 QCF-021.2
FIELD INSPECTION AND TEST RECORD

OVERCURRENT PROTECTION RELAY TEST


Project Name : 115/22kV GIS SUBSTATION Contract no. : L1753/2561 Report No. : ISP1803-T-RY-22-001-2019

Costomer : CPRAM CO., LTD. Location : 22kV SWG. INC1 Date : 27/6/2019

WITNESSED BY
RESPONSIBILITY TESTED BY CHECKED BY WITNESSED BY
APPROVED BY

Company DEMCO PCL. DEMCO PCL. CPRAM CO., LTD. PEA

Name Mr.Somnuek S.

Signature

Date 27 June 2019

6. ARC PROTECTION
Setting : Threshold I> = 2.000 A
Threshold 3I0> = 1.000 A
Channel = Arc module 1.channel 1
Operating mode = current and light

6.1 Operating Current Test


Operating Current (A)
Function Should be As found
Pickup Drop-off Pickup Drop-off

I> 2.000 1.800 2.002 1.800


3I0> 1.000 0.900 1.003 0.902

6.2 Inject current and light to trip check P

7. INPUTS / OUTPUTS CONTACT AND LEDs CHECK


7.1 Opto inputs check Checked
Binary input 1.1 74TC Trip relay P
Binary input 1.2 CB open P
Binary input 1.3 CB close P
Binary input 1.4 N/A
Binary input 1.5 N/A
Binary input 1.6 N/A
Binary input 1.7 N/A
Binary input 1.8 N/A
Binary input 2.1 74TC CB aux. P
Binary input 2.2 N/A
Binary input 2.3 N/A

7.2 Output relay check Checked


Binary Output 1.1 O/C Trip P
Binary Output 1.2 N/A
Binary Output 1.3 Arc Prot. Trip P

Page 20 of 30 QCF-021.2
FIELD INSPECTION AND TEST RECORD

OVERCURRENT PROTECTION RELAY TEST


Project Name : 115/22kV GIS SUBSTATION Contract no. : L1753/2561 Report No. : ISP1803-T-RY-22-001-2019

Costomer : CPRAM CO., LTD. Location : 22kV SWG. INC1 Date : 27/6/2019

Binary Output 1.4 N/A


Binary Output 1.5 N/A
Binary Output 1.6 N/A
Binary Output 2.1 Any Trip P
Binary Output 2.2 Any Trip or 74TC P

WITNESSED BY
RESPONSIBILITY TESTED BY CHECKED BY WITNESSED BY
APPROVED BY

Company DEMCO PCL. DEMCO PCL. CPRAM CO., LTD. PEA

Name Mr.Somnuek S.

Signature

Date 27 June 2019

7.3 LEDs indicator check Checked


LEDs 1.1 O/C Ph L1 PU P
LEDs 1.2 O/C Ph L2 PU P
LEDs 1.3 O/C Ph L3 PU P
LEDs 1.4 O/C Earth PU P
LEDs 1.5 O/C Trip P
LEDs 1.6 O/C Time Trip P
LEDs 1.7 O/C Inst. Trip P
LEDs 1.8 Undervoltage Alarm P
LEDs 1.9 Overvoltage Alarm P
LEDs 1.10 Arc Prot. Trip P
LEDs 1.11 Arc current detected P
LEDs 1.12 Arc light detected P
LEDs 1.13 Arc sensor failure P
LEDs 1.14 N/A
LEDs 1.15 N/A
LEDs 1.16 Trip Circuit Failure P

Page 21 of 30 QCF-021.2
FIELD INSPECTION AND TEST RECORD

OVERCURRENT PROTECTION RELAY TEST


Project Name : 115/22kV GIS SUBSTATION Contract no. : L1753/2561 Report No. : ISP1803-T-RY-22-001-2019

Costomer : CPRAM CO., LTD. Location : 22kV SWG. INC1 Date : 27/6/2019

References to used instruments

Type : Universal Relay Testing Omicron CMC 256plus Serial no. : QF482R

WITNESSED BY
RESPONSIBILITY TESTED BY CHECKED BY WITNESSED BY
APPROVED BY

Company DEMCO PCL. DEMCO PCL. CPRAM CO., LTD. PEA

Name Mr.Somnuek S.

Signature

Date 27 June 2019

Page 22 of 30 QCF-021.2
FIELD INSPECTION AND TEST RECORD

OVERCURRENT PROTECTION RELAY TEST


Project Name : 115/22kV GIS SUBSTATION Contract no. : L1753/2561 Report No. : ISP1803-T-RY-22-001-2019

Costomer : CPRAM CO., LTD. Location : 22kV SWG. OUT1 Date : 27/6/2019

TECHNICAL DATA
Manufacture SIEMENS
Type 7SJ80215EB901FA0--0S
Serial No. BF1809510023

1. VISUAL CHECK Checked


1.1 Check relay undamaged 4
1.2 Check relay case earthen 4

2. CONFIGURATION OF THE SCOPE OF FUNCTIONS


Power System Data 1
Rated frequency = 50 Hz
Phase sequence = L1 L2 L3
CT Rated primary current = 600 A
CT Rated secondary current = 1 A
IE-CT Rated primary current = 600 A
IE-CT Rated secondary current = 1 A

3. MEASUREMENT
Injected 1 A 3Phase 50Hz
Display Unit
Should be As found
IL1 600 600 A
IL2 600 600 A
IL3 600 602 A
F 50.00 50.0 Hz

*Current tolerance is 1.5% of measured value or 1% Inom


*Frequency tolerance is 20 mHz

RESPONSIBILITY TESTED BY CHECKED BY WITNESSED BY WITNESSED BY

Company DEMCO PCL. DEMCO PCL. CPRAM CO., LTD. EMUNICS CO., LTD.

Page 23 of 30 QCF-021.2
FIELD INSPECTION AND TEST RECORD

OVERCURRENT PROTECTION RELAY TEST


Project Name : 115/22kV GIS SUBSTATION Contract no. : L1753/2561 Report No. : ISP1803-T-RY-22-001-2019

Costomer : CPRAM CO., LTD. Location : 22kV SWG. OUT1 Date : 27/6/2019

Name Mr.Somnuek S.

Signature

Date 27 June 2019

4. OVERCURRENT PROTECTION ( 50/50N, 51/51N )


Setting : Ip Pick up = 0.75 A IEp Pick up ( 51N ) = 0.30 A
T Ip Time dial = 0.10 T IEp Time dial = 0.10
Time curve = Normal Inverse Time curve = Normal Inverse
I> Pick up = 3.75 A IE> Pick up = 2.10 A
T I> Time delay = 0.05 s T IE> Time delay = 0.05 s

4.1 Operating Current Test


Operating current (A)
Function Should be Phase A Phase B Phase C Earth
Pickup Drop-off Pickup Drop-off Pickup Drop-off Pickup Drop-off Pickup Drop-off
Ip 0.825 0.784 0.819 0.777 0.821 0.779 0.818 0.776
I> 3.750 3.563 3.740 3.546 3.744 3.553 3.731 3.538
IEp 0.330 0.314 0.324 0.303
IE> 2.100 1.995 2.088 1.982
*Current tolerance is 3% of set value or 75mA
*Drop-off to pickup ratio is approx. 0.95

4.2 Operating Time Test


Injected Operating Time ( s )
Function Should be
Current (A) Phase A-B Phase B-C Phase C-A Earth
2.0 x Is 1.003 1.015 1.005 1.005
Ip 3.0 x Is 0.630 0.624 0.624 0.624
4.0 x Is 0.498 0.494 0.493 0.494
1.5 x Is 0.050 0.075 0.082 0.079
I>
2.0 x Is 0.050 0.082 0.080 0.077
2.0 x Is 1.003 1.003
IEp 3.0 x Is 0.630 0.630
4.0 x Is 0.498 0.498
1.5 x Is 0.050 0.082
IE>
2.0 x Is 0.050 0.081
*Time tolerance is 5% of set value or 50ms

Page 24 of 30 QCF-021.2
FIELD INSPECTION AND TEST RECORD

OVERCURRENT PROTECTION RELAY TEST


Project Name : 115/22kV GIS SUBSTATION Contract no. : L1753/2561 Report No. : ISP1803-T-RY-22-001-2019

Costomer : CPRAM CO., LTD. Location : 22kV SWG. OUT1 Date : 27/6/2019

RESPONSIBILITY TESTED BY CHECKED BY WITNESSED BY WITNESSED BY

Company DEMCO PCL. DEMCO PCL. CPRAM CO., LTD. EMUNICS CO., LTD.

Name Mr.Somnuek S.

Signature

Date 27 June 2019

5. INPUTS / OUTPUTS CONTACT AND LEDs CHECK


5.1 Binary inputs check Checked
BI1 N/A
BI2 N/A
BI3 N/A
BI4 N/A
BI5 N/A
BI6 N/A
BI7 N/A

5.2 Binary outputs check Checked


BO1 O/C TRIP P
BO2 N/A
BO3 O/C TRIP P
BO4 O/C TRIP P
BO5 N/A
BO6 N/A
BO7 N/A
BO8 N/A

5.3 LEDs check Checked


LED1 O/C Ph L1 PU P
LED2 O/C Ph L2 PU P
LED3 O/C Ph L3 PU P
LED4 O/C Earth PU P
LED5 O/C Time TRIP P
LED6 O/C Inst. TRIP P
LED7 N/A
LED8 TCS P

Page 25 of 30 QCF-021.2
FIELD INSPECTION AND TEST RECORD

OVERCURRENT PROTECTION RELAY TEST


Project Name : 115/22kV GIS SUBSTATION Contract no. : L1753/2561 Report No. : ISP1803-T-RY-22-001-2019

Costomer : CPRAM CO., LTD. Location : 22kV SWG. OUT1 Date : 27/6/2019

References to used instruments


Type : Universal Relay Testing Omicron CMC 256plus Serial no. : QF482R

RESPONSIBILITY TESTED BY CHECKED BY WITNESSED BY WITNESSED BY

Company DEMCO PCL. DEMCO PCL. CPRAM CO., LTD. EMUNICS CO., LTD.

Name Mr.Somnuek S.

Signature

Date 27 June 2019

Page 26 of 30 QCF-021.2
FIELD INSPECTION AND TEST RECORD

OVERCURRENT PROTECTION RELAY TEST


Project Name : 115/22kV GIS SUBSTATION Contract no. : L1753/2561 Report No. : ISP1803-T-RY-22-001-2019

Costomer : CPRAM CO., LTD. Location : 22kV SWG. OUT2 Date : 27/6/2019

TECHNICAL DATA
Manufacture SIEMENS
Type 7SJ80215EB901FA0--0S
Serial No. BF1809510022

1. VISUAL CHECK Checked


1.1 Check relay undamaged 4
1.2 Check relay case earthen 4

2. CONFIGURATION OF THE SCOPE OF FUNCTIONS


Power System Data 1
Rated frequency = 50 Hz
Phase sequence = L1 L2 L3
CT Rated primary current = 600 A
CT Rated secondary current = 1 A
IE-CT Rated primary current = 600 A
IE-CT Rated secondary current = 1 A

3. MEASUREMENT
Injected 1 A 3Phase 50Hz
Display Unit
Should be As found
IL1 600 603 A
IL2 600 602 A
IL3 600 603 A
F 50.00 50.0 Hz

*Current tolerance is 1.5% of measured value or 1% Inom


*Frequency tolerance is 20 mHz

RESPONSIBILITY TESTED BY CHECKED BY WITNESSED BY WITNESSED BY

Company DEMCO PCL. DEMCO PCL. CPRAM CO., LTD. EMUNICS CO., LTD.

Page 27 of 30 QCF-021.2
FIELD INSPECTION AND TEST RECORD

OVERCURRENT PROTECTION RELAY TEST


Project Name : 115/22kV GIS SUBSTATION Contract no. : L1753/2561 Report No. : ISP1803-T-RY-22-001-2019

Costomer : CPRAM CO., LTD. Location : 22kV SWG. OUT2 Date : 27/6/2019

Name Mr.Somnuek S.

Signature

Date 27 June 2019

4. OVERCURRENT PROTECTION ( 50/50N, 51/51N )


Setting : Ip Pick up = 0.75 A IEp Pick up ( 51N ) = 0.30 A
T Ip Time dial = 0.10 T IEp Time dial = 0.10
Time curve = Normal Inverse Time curve = Normal Inverse
I> Pick up = 3.75 A IE> Pick up = 2.10 A
T I> Time delay = 0.05 s T IE> Time delay = 0.05 s

4.1 Operating Current Test


Operating current (A)
Function Should be Phase A Phase B Phase C Earth
Pickup Drop-off Pickup Drop-off Pickup Drop-off Pickup Drop-off Pickup Drop-off
Ip 0.825 0.784 0.817 0.777 0.818 0.778 0.816 0.777
I> 3.750 3.563 3.729 3.538 3.730 3.539 3.727 3.537
IEp 0.330 0.314 0.324 0.304
IE> 2.100 1.995 2.087 1.980
*Current tolerance is 3% of set value or 75mA
*Drop-off to pickup ratio is approx. 0.95

4.2 Operating Time Test


Injected Operating Time ( s )
Function Should be
Current (A) Phase A-B Phase B-C Phase C-A Earth
2.0 x Is 1.003 1.005 1.005 1.005
Ip 3.0 x Is 0.630 0.634 0.624 0.624
4.0 x Is 0.498 0.494 0.494 0.494
1.5 x Is 0.050 0.079 0.078 0.075
I>
2.0 x Is 0.050 0.074 0.082 0.081
2.0 x Is 1.003 1.006
IEp 3.0 x Is 0.630 0.625
4.0 x Is 0.498 0.495
1.5 x Is 0.050 0.081
IE>
2.0 x Is 0.050 0.085
*Time tolerance is 5% of set value or 50ms

Page 28 of 30 QCF-021.2
FIELD INSPECTION AND TEST RECORD

OVERCURRENT PROTECTION RELAY TEST


Project Name : 115/22kV GIS SUBSTATION Contract no. : L1753/2561 Report No. : ISP1803-T-RY-22-001-2019

Costomer : CPRAM CO., LTD. Location : 22kV SWG. OUT2 Date : 27/6/2019

RESPONSIBILITY TESTED BY CHECKED BY WITNESSED BY WITNESSED BY

Company DEMCO PCL. DEMCO PCL. CPRAM CO., LTD. EMUNICS CO., LTD.

Name Mr.Somnuek S.

Signature

Date 27 June 2019

5. INPUTS / OUTPUTS CONTACT AND LEDs CHECK


5.1 Binary inputs check Checked
BI1 N/A
BI2 N/A
BI3 N/A
BI4 N/A
BI5 N/A
BI6 N/A
BI7 N/A

5.2 Binary outputs check Checked


BO1 O/C TRIP P
BO2 N/A
BO3 O/C TRIP P
BO4 O/C TRIP P
BO5 N/A
BO6 N/A
BO7 N/A
BO8 N/A

5.3 LEDs check Checked


LED1 O/C Ph L1 PU P
LED2 O/C Ph L2 PU P
LED3 O/C Ph L3 PU P
LED4 O/C Earth PU P
LED5 O/C Time TRIP P
LED6 O/C Inst. TRIP P
LED7 N/A
LED8 TCS P

Page 29 of 30 QCF-021.2
FIELD INSPECTION AND TEST RECORD

OVERCURRENT PROTECTION RELAY TEST


Project Name : 115/22kV GIS SUBSTATION Contract no. : L1753/2561 Report No. : ISP1803-T-RY-22-001-2019

Costomer : CPRAM CO., LTD. Location : 22kV SWG. OUT2 Date : 27/6/2019

References to used instruments


Type : Universal Relay Testing Omicron CMC 256plus Serial no. : QF482R

RESPONSIBILITY TESTED BY CHECKED BY WITNESSED BY WITNESSED BY

Company DEMCO PCL. DEMCO PCL. CPRAM CO., LTD. EMUNICS CO., LTD.

Name Mr.Somnuek S.

Signature

Date 27 June 2019

Page 30 of 30 QCF-021.2