0% found this document useful (0 votes)
261 views

IDOT

The Union Pacific Railroad plans to issue a Request for Proposal for a 2011 Illinois High Speed Rail construction package involving jack and bore work. The work will include inspecting and upgrading existing culverts within the railroad right-of-way, installing new culverts through jack and boring, and modifying or repairing existing structures. Contractors must prequalify between June 10 and July 11, 2011 by registering online to be eligible to bid on the project. More information is available at www.idothsr.org.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
261 views

IDOT

The Union Pacific Railroad plans to issue a Request for Proposal for a 2011 Illinois High Speed Rail construction package involving jack and bore work. The work will include inspecting and upgrading existing culverts within the railroad right-of-way, installing new culverts through jack and boring, and modifying or repairing existing structures. Contractors must prequalify between June 10 and July 11, 2011 by registering online to be eligible to bid on the project. More information is available at www.idothsr.org.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

w w w .ido th sr .

o rg P requal if icati on Not ic e

JUNE 2 0 1 1

2011 Illinois HSR Construction Package


Prequalification Start Date: 6/10/11 Prequalification End Date: 7/11/11
The Union Pacific Railroad (UPRR) plans to issue a Request for Proposal (RFP) for the 2011 Illinois HSR Jack & Bore package on the Chicago to St. Louis HighSpeed Rail project. The entire package will consist of locations where the proposed scope of work will fall entirely within existing UPRR right-of-way. The following work types will be included in the Illinois HSR Jack & Bore RFP: 1. Structural Inspection of Culverts The contractor will be required to conduct a field investigation at numerous sites in coordination with the UPRR field representatives. Cleaning of the culverts may be required prior to the actual inspections. Together the team will develop a detailed list of work items to be completed. The contractor will be required to provide an estimated scope and fee on the field inspection as well as any additional work required to be completed at each location. 2. Jack and Bore Culverts The contractor will be required to construct new jack and bore culverts adjacent to existing culvert or bridge locations. The proposed culverts, ranging in size from 24 dia. to 60 dia., will be constructed under railroad live load with the existing track remaining in service during the duration of construction. End treatments will consist of riprap blankets or cast-inplace concrete headwalls. The proposed details will be provided in the bid package set of construction drawings. Minor incidental grading may be required to re-route existing water flow to the new culvert locations. The contractor will provide estimated scope and fee based on the UPRR Round Steel Pipe Culvert standards unless otherwise noted within the construction documents. 3. Various Modifications and Upgrades The contractor will be required to modify or repair existing structure locations. Proposed scope of work may include raising headwalls, adding handrail, placing riprap or repairing existing concrete.
To prequalify click: https://suppliers.www.uprr.com/srmt/eng_prequal/createb2_app.cfm Note: The list of prequalified prime contractors information will become public after the prequalification period (30 days) is closed. At this time the subconsultants/DBE will be able to market their services to the prequalified prime contractors for the inclusion of a particular bidding opportunity.

>> For more information on how you may become qualified or bid on High-Speed Rail construction packages please visit www.idothsr.org/business. If there are questions regarding these construction opportunities or the process please contact: Miriam Gutierrez Rail Program Planning Section Chief Illinois Department of Transportation Division of Public & Intermodal Transportation 312-793-4803 (Direct Line)

PAG E 1 O F 1

You might also like