This document provides a risk assessment for a video surveillance system testing and commissioning project. It identifies 4 main activities - preparing the work area, using hand tools, using ladders/scaffolds, and testing/commissioning using a multimeter. For each activity, potential hazards, risks, initial risk rating, and control measures to reduce the residual risk are described. The control measures include requirements for training, inspections, use of proper equipment, and following safety protocols to minimize risks like cuts, falls, and electric shocks during the project work.

Uploaded by

Anonymous
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
172 views

Assessment For CCTV System Testing & Commissioning

This document provides a risk assessment for a video surveillance system testing and commissioning project. It identifies 4 main activities - preparing the work area, using hand tools, using ladders/scaffolds, and testing/commissioning using a multimeter. For each activity, potential hazards, risks, initial risk rating, and control measures to reduce the residual risk are described. The control measures include requirements for training, inspections, use of proper equipment, and following safety protocols to minimize risks like cuts, falls, and electric shocks during the project work.

Uploaded by

Anonymous
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 5

PROJECT NAME

Ref No:
ACTIVITY– Video surveillance system (CCTV) Testing and commissioning Rev.No:0
Page 1 of 5

Serial Sub-Activities Risk Rating


No. Hazards Identified Risks Involved Residual
Initial Control Measures
(Generic & Task) (People & Property) Severity Probability Risk
Risk
· TBT/DSTI shall be conducted by the foreman/
safety officer prior to work commencement.
· Task specific safety training to be provided. Low
· Unauthorized, untrained · Cuts
1. Prepare work area 2 A L (ALARP)
workers · Abrasions · Authorized personnel to undertake the job.
· Daily safety inspection should be carried out
and eliminate the hazard.
•Hand tools shall be free from oil, grease & etc.
• Slip, trip and fall • Don’t extend the spanner by using a pipe as
Use of Hand tools • Damaged / worn out hand • Fatigue an extension bar
2. ( Screw driver, wire tools • Trigger finger 3 C M • Never use a screw driver as a chisel. Low
cutter ) • Flying objects • Cuts and abrasions • Use right tools for the job (ALARP)
∙ Mushroom Heads • Use eye/ face protection when there is flying
• Using incorrect type materials hazard, wear gloves while required to
protect the hands.
• Visual inspection should be carried out before
use (i.e., hand rails, toe board, on the platform
and any opening are there).
• The ladder should extend minimum one meter
• Person/ material falling from • Sprain and strain from the top for safe movement Low
height • Fracture 3 C M • Do not erect in slippery, uneven surface (ALARP)
3. Use of ladder/ scaffold • Over reaching • Spinal cord damage • Should be set up with a 4 vertical to 1
• Over loading • Musculoskeletal horizontal slope ( 4:1 )
• Obstructing the access way Injury • Step ladder must fully open and lock the
• Slippery or uneven surface • Fatality devices as per manufacturer recommendations.
• Overhead structure and cable • Do not work from the top of two rungs of step
• Untrained, unauthorized ladders.
Workers • Remember the 3 point contact.
• Collapse of scaffold • Ladder shall be used for short duration works
Only limited to 15 min.
• Colour code system shall be implemented.
• Do not stack materials on to the scaffold.
• Keep walkways free of obstacles, tools and
equipment.
PROJECT NAME

Ref No:
ACTIVITY– Video surveillance system (CCTV) Testing and commissioning Rev.No:0
Page 2 of 5
Serial Sub-Activities Hazards Identified Risks Involved Risk Rating Residual
No. Initial Control Measures
(Generic & Task) (People & Property) Severity Probability Risk
Risk
• Work at height is restricted during adverse
weather condition.
• Adequate lighting shall be provided while
working at night.
• Safety harness shall be used above 2mtr height
and anchored in above shoulder height at all
time.
• Competent team shall be involved to execute
Testing & • Unauthorized/ untrained the activities.
4. commissioning using Person • Electric shock and • Calibrated / certified instrument only shall be Low
by multi meter • Faulty Instrument Burns 3 B M used. (ALARP)
• Improper identification • Cut and abrasion • Ensure that the circuit is not live before
• Electrocution using the instrument.
• Safe and obstruction free access for working
personnel’s shall be maintained at all times.
• Emergency procedure shall be briefed to all
personnel prior to start the activity.
• Emergency evacuation plan shall be readily
available according to site condition and briefed
to the workforce prior to start.
• Emergency contact numbers shall be displayed
at work location for easy communication
• Trained first aider, fire warden and emergency
vehicle to be available at the site during the
activity.
• Communicate to all personnel about testing
& commissioning.
• Warning signs and boards should be provided
and area to be well barricaded
• Appropriate PPE shall be worn at all times.
• Electricity • Electrocution or • Lock out tag out (LOTO) procedure to be
5. Working with • Conductors ( water, metal, death followed during testing & commissioning. Low
electricity concrete ) • Burns and shocks 4 B M • Only those persons who have been adequately (ALARP)
• Muscle contraction trained and experienced in the work of
PROJECT NAME

Ref No:
ACTIVITY– Video surveillance system (CCTV) Testing and commissioning Rev.No:0
Page 3 of 5
Serial Sub-Activities Hazards Identified Risks Involved Risk Rating Residual
No. Initial Control Measures
(Generic & Task) (People & Property) Severity Probability Risk
Risk
• Broken wires • Heart , lung electricity to allow for the same.
• Improper plug, case Paralysis • Electrical work shall not carry out in wet
• Overloading • Property damage Conditions.
• Fire • Do not overload to the circuits.
• Don’t use homemade electrical accessories and
use industrial type only.
• Disconnect main supply before commencing
of work.
• Defective tools and equipment should not be
used, report it and replaced it immediately.
• Temporary power supply shall be taken
through standard rated MCBs & RCBs.
• Temporary power supply cables shall not
have joints.
• Barricade the location and signage to be
placed where circuits and equipment’s are
energized.
• Appropriate PPE shall be worn while working
in energized circuits. ( Insulated gloves, electric
resistivity shoe )
· Work notification to be applied and obtained
prior to start the night work from contractor. Low
3 B M · Adequate illumination shall be provided (ALARP)
∙ Poor illumination ∙ Fatality
6. While working at night
· Slip/trip/fall • Cuts · light post to be secured from fall
shift
· Proper cable management system to be
followed.
· Drink plenty of water
∙ Dehydration ∙ Employees shall be trained about heat
7. Working in hot 2 B M Low
∙ Heat Stress · Sunburn stress symptoms & first aid measures.
weather
· Skin Cancer · Avoid highly physical tasks during the hottest
part of the day
· Isotonic drinks to be provided
PROJECT NAME

Ref No:
ACTIVITY– Video surveillance system (CCTV) Testing and commissioning Rev.No:0
Page 4 of 5
Serial Sub-Activities Hazards Identified Risks Involved Risk Rating Residual
No. Initial Control Measures
(Generic & Task) (People & Property) Severity Probability Risk
Risk
• Provide sufficient rest breaks based on the
humidity & temperature conditions.
• Heat stress management plan shall
developed and implement during the
activity.
· General housekeeping, Remove all surface,
· Poor housekeeping unwanted waste materials from the building Low
8. Work Completion 2 A L · All necessary precautions will be adopted to (ALARP)
· Slip/trip/fall · Fire
prevent fire

RISK MATRIX
Probability
PROJECT NAME

Ref No:
ACTIVITY– Video surveillance system (CCTV) Testing and commissioning Rev.No:0
Page 5 of 5
A B C D E
Improbable Remote Occasional
Probable Frequent
Severity People Assets Environment Reputation 1 in 100,000 1 in 10,000 1 in 1000
1 in 100 years 1 in 10 years
Years Years years
Multiple
fatalities or
Extensive International
5-Catatrophic permanent Massive effect
damage impact
total
disabilities
Single
fatalities or
4-Severe permanent
Major
Major effect National impact
High Risk
damage
total
disabilities
Major injury
Local Considerable
Medium Risk
3-critical or health Localised effect
effects
damage impact (ALARP)
Minor
Minor
2-Marginal injury or Minor effect Minor impact
damage
health effects
Slight injury
Slight
1-Negligble or health
Damage
Slight effect Slight impact Low Risk
effects

3-E
HIGH 4-C,D,E
5-B,C,D,E
1-D,E
2-B,C,D,E
MEDIUM 3-A,B,C,D
4-A,B
5-A
LOW 1-A,B,C
2A