1) The document outlines the erection progress and plan for a soda recovery boiler project in December 2006.
2) It provides details on the structural components, pressure parts, non-pressure parts, and balance of construction (BOC) that were planned to be erected in December as well as totals erected to date.
3) The total weight planned for erection in December was 292.36 tonnes while the total actually achieved was 252.23 tonnes, slightly below the target for the month.
1) The document outlines the erection progress and plan for a soda recovery boiler project in December 2006.
2) It provides details on the structural components, pressure parts, non-pressure parts, and balance of construction (BOC) that were planned to be erected in December as well as totals erected to date.
3) The total weight planned for erection in December was 292.36 tonnes while the total actually achieved was 252.23 tonnes, slightly below the target for the month.